Roads And Buildings Department Tender
... More
The Roads And Buildings Department has issued a formal invitation for competitive bids for Urgent Repairs To Re-construction Of Pipe Culvert At Km. 26/4 Of Butchi-utukur Road(sh-347) In Spsr Nellore District. in Nellore, Andhra Pradesh, with an estimated contract value of Rs. 4,28,920. The bid opening date for this tender is 31-10-2020 and the last date for bid submission is 10-11-2020. Interested bidders for Roads And Buildings Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Roads And Buildings Department Tender
Opening Date31 Oct 2020
Closing Date10 Nov 2020
Tender Amount₹ 4,28,920 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
356877Bid Award Id
ViewTender No
NIT No 37 ATO TO EE RB KVL 2020 21 Dt 22 10 2020Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operation charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600, 1700 & 2702 (5th Revision) and as directed by the Engineer-in-charge for wearing coat over Deck Slab.
4
24292
-
... More
Providing and applying prime coat with bitumen Emulsion (SS1) (Bulk) using Emulsion pressure distributor on prepared surface of granular base including cleari ng of road surface and spraying emulsion at the rate of 0.70Kg/sqm using emulsion pressure distrihbutor for finished item of work etc., complete as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-Charge.
205
5289
-
... More
Forming Diversion Road with borrow useful selected earth having MDD of not less than 1.75 gms/cc from outside road boundary by mechanical means will all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils of borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th Revision).
158
75840
-
... More
Scarifying the existing B.T. surface to a depth of 50mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th revision) Specification No. 305.4.3
110
924
-
... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seigniorage charges for finished item of work, as per MoRT&H Specification 304 (5th Revision) and as directed by the Engineer-in-Charge.
77
7931
-
... More
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, cantering, machine mixing laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts.
10
45540
-
... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam specification (5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical Mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th Revision) for finished item of work.
21
52899
-
... More
(RUPEES FIVE LAKH FOUR THOUSAND FIVE HUNDRED AND FIFTY THREE ONLY)
-
504553
-
... More
Rate of progress
-
-
-
... More
Sand filling in foundation including cost, seignoirage and conveyance of all materials to site and watering, tamping etc., complete for finished item of work as per MoRT&H Specification 304 (5th Revision) and as directed by the engineer-inb-Charge.
8
6088
-
... More
Providing and applying tack coat with Bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared Bitumenous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th Revision) and as directed by the Engineer-in-Charge.
205
1681
-
... More
Progress Upto 2 Months - 100% of work should be completed in all respects.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements