Panchayat Raj Engineering Department Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Civil Works Roads
Opening Date22 Nov 2019
Closing Date6 Dec 2019
Tender Amount₹ 8,73,493 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and placing of the VRCC M- 30 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for Columns

3.73

41496

11125.04

... More
Brick Masonry in basement with CM (1:6) prop(cement:Sand) using 2nd class bricks including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site and sales & other taxes on all materials, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504) for Basement. for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete.

5.42

34656

6394.18

... More
Filling with Sand in Basement in trenches, sides of foundation and basement with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer by watering and ramming including cost and cost and conveyance of water to site and all operational, incidental labour charges seignorage charges sales and other taxes etc, hire charges of T&P etc complete for finished item of work (APSS NO 309 & 310) including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges as per specifications

51.89

92912

1790.57

... More
Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for All work upto plinth level (APSS No. 402). including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges as per specifications

9.43

42201

4475.24

... More
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST as per specifications (APSS No.126) in all floors.

2

111581

55790.65

... More
Plastering 12 mm thick in CM (1:5) with including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall complete for finished item of work.For External walls (APSS 901,903 & 904) for finished item of work including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges

35.94

9468

263.46

... More
Flooring with Vitrified tiles of 8.0mm thick 1st quality, set over base coat of cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm @ jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement,sand water and tiles etc, complete, for finished item of work but excluding the cost of conveyance of all materials etc complete including cost of all , labour charges for dressing of flooring stones etc., complete for finished item of work. including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges

110.46

97582

883.42

... More
Cost supply and fixing in position of heavy iron grills, trusses, stanchions, heavy beams and girders errecting in position and fixing by using chain pulley blocks, derek ple arrangements and cranes etc., complete For Finished of itm of work including Overheads & Contractors Profit @13.615% excluding GST & NAC charges for trusses

810

79420

98.05

... More
Profiding roofing with 0.5mm thick galvanized / pre painted G.I.profiled sheets fixed to the purlings with 14 size self drilling screws with neoprene washer, side laps are stiched with self tapping / drilling screws , end laps are to be sealed with 25x3mm butyl tape, and the sheets are provided with anti capilary grove etc., complete for finished of itm of work including Overheads & Contractors Profit @13.615% excluding GST & NAC charges for roofing

283.5

244793

863.47



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.