Panchayat Raj Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Opening Date28 Dec 2019
Closing Date13 Jan 2020
Tender Amount₹ 34,24,438 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
305709Bid Award Id
ViewTender No
Tender Notice No.AEE2/05/2019-20 Dt : 19.12.2019Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Column Fottings (Pump House)
3.3
-
6768.34
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Columns (Pump House)
1.1
-
7191.2
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Beams (Pump House)
1.3
-
5738.37
Construction of Random rubble stone masonry in CM (1:6) 2nd sort including cost and conveyance of all materials and labour charges selgniorage charges etc complete. (Pump House)
12.2
-
3330.23
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Bedblocks (Pump House)
0.03
-
6768.34
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Lintel Beams (Pump House)
0.48
-
7191.2
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Sun Shades of Size 75mm thick, 50mm edge and 600mm width (Pump House)
0.26
-
5738.37
Vibrated Reinforced Cement Concrete (1:1.5:3) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete finishing top surface, curing concrete, etc., complete for finished item of work excluding cost of Steel and its febrication Charges including and labour chargers etc., complete for Roof slab with 150 mm thich (Pump House)
5.358
-
5738.37
Brick Masonry with CM (1:6) prop: using Second class bricks including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (Pump House)
14.2
-
2215.6
Accoproof Plastering in CM (1:3) 12mm thick in Single coat dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work (Pump House)
35.72
-
1350.6
Flooring with CC (1:2:4) using 40mm size Hard Blasted Granite metal for 100 mm thick and top plastering with CM (1:3) 20 mm thick including cost and conveyance of all the materials etc., complete (Pump House)
24
-
2400.54
Synthetic Enamel Painting over a primery coat of water proof cement paint of approved brand over a basecoat of approved cement primer grade-I including cost and conveyence of all materials and labour charges etc., completed (Pump House)
16.61
-
1716.5
Painting with white cement two coats including cost and conveyance of all the materials etc complete
99.45
-
291.1
Snowcem painting including cost and coveyance of all the materials etc complete
99.45
-
1127.6
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work. (Pump House)
1.5
-
60920.4
Design, Manufacture,Supply,delivery,installation,testing and commissioning of pumping machinary(ISI) with all accessories, appurtenances surge protection devices, ultra sonic flow meter on common delivery main , piping as per requirement and as directed by the department as per technical specifications as specified in technical specifications of pump sets and details as given below on turn key basis including trail run. The tenderer shall engage men to operate and maintain the facilities during the trail run period. The scope of the work includes electrical swich gear panels, electrical equipment connections including required cable from panel board to transformers, vaccum pumpsets with necessary piping etc., crane wherever necessary fire safty equipment, ventilation system, electrical safty system etc for finished item of work including all charges etc., completed with dischage of 5500 LPM and 110m head ( 1 No. Vertical Turbine Pump sets) with 70% over all efficiency and the rate excluding of all taxes
200
-
10633
Cost for extra column pipe length for every 1.5m length for Vertical Turbine Pump Set including necessary piping arrangements and all labour charges for finished item of work. But excluding cost of required size and length of cable wire.
16.33
-
63798
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements