Panchayat Raj Engineering Department Tender

... More
The Panchayat Raj Engineering Department has issued a formal invitation for competitive bids for Providing Bt Surface To The Road From Peddandluru To Sunnapurallapalli At Peddandluru Gp Of Jammalamadugu Mandal Of Ysr District, Kadapa, Est. Cost Of Rs.100.00 Lakhs in Y.s.r., Andhra Pradesh, with an estimated contract value of Rs. 74,50,152. The bid opening date for this tender is 20-02-2025 and the last date for bid submission is 06-03-2025. Interested bidders for Panchayat Raj Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Panchayat Raj Engineering Department Tender

Opening Date20 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 74,50,152 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc., complete for finished item of work.

4058.4

248

1008309.48

... More
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including overhead charges & Contractor profit, but excluding GST and Seignorage charges

831.67

1778

1478954.32

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractor profit, but excluding GST and Seignorage charges

172

6650

1143817.2

... More
Construction of sawn joint grove(using diamond studded blades) 3 to 5 mm wide and 1/4 to 1/3 depth of the slab +/- 5 mm or as stipulated in the drawings and dowel bars complying with clause 602.6.5 of specifications for road and bridge works (3rd revision) published new delhi in 1995 by IRC on behalf of Govt of India, Ministry of surface transport as directed in the drawings. The contraction joint shall be cut as soon as the concrete as undergone initial hardening and as hard enough to take the load of joint sawing machine with out causing damaging to the slab.The joint ceiling compound shall not be poured bitumen type having flexibility ,resistance to age hardening and durability of the sealant shall be in accordance with BS 5212(Part-2) with all lead and lift including cost and conveyance of all ,materials etc., completed for 50mm depth.

266.67

135

36000.45

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractor profit, but excluding GST and Seignorage charges for Tack Coat

3746.25

15

59602.84

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges

683.86

2558

1749907.96

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead charges & Contractor profit, but excluding GST and Seignorage charges

2272

2

5748.16

... More
Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively. and, spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 407 MORD and clause 305 & 305.4.4 MORTH including overhead charges & Contractor profit, but excluding GST and Seignorage charges

1730.63

379

657499.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.