Panchayat Raj Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Civil And Construction
Building Construction
Opening Date14 Jun 2022
Closing Date28 Jun 2022
Tender Amount₹ 25,55,376 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Pedestrals

1.09

-

10810

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Columns

3.33

-

40139

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Plinth Beams

4.66

-

55009

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Roof Beams

5.05

-

60907

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Roof Slab 125mm thick

96.49

-

141330

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Roof Slab 10mm thick Slab

5.78

-

7571

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Lintels

1.61

-

19712

... More
COMMON FACILITY CENTRE;RCC M-20 Design mix (cement: fine aggregate:coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and coveyance of all materials like cement ,fine aggregate (sand) coarse aggregate ,water etc., to site and including seigiorage charges,sales& oter taxex on all materials including all operational incidental and labour charges such as machine mixing,laying concrete,curing etc., complete but excluding cost of steel and fabrication charges for finished item of work,but excluding centring shuttering for Sunshades 0.60mt width and average thickness 0.0625 mm

9.9

-

10164

... More
COMMON FACILITY CENTRE;Filling with Stone Dust Cushion under footing with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to the work site and all operational & icidental charges, labour charges, seignorage charges, hire and operatnional charges of T&P etc., complete for finished item of work (APSS No.309 & 310)

19.88

-

41006

... More
COMMON FACILITY CENTRE;Brick Masonry with CM (1:6) using common burnt clay bricks of Non modular of traditional size 23 x 11 x7 cm from approved source having minimum crushing strength of 40 kg/sqcm. including cost an conveyance of all materials like cement, sand, bricks water etc., to site, all operational, incidental and labour chrarges such as mixing cement mortar, constructing masonary, scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No.501 & 504)

4.91

-

31487

... More
COMMON FACILITY CENTRE;Brick Masonry with CM (1:8) using common burnt clay bricks of Non modular of traditional size 23 x 11 x7 cm from approved source having minimum crushing strength of 40 kg/sqcm. including cost an conveyance of all materials like cement, sand, bricks water etc., to site, all operational, incidental and labour chrarges such as mixing cement mortar, constructing masonary, scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No.501 & 504) for Super Structure

30.31

-

206069

... More
COMMON FACILITY CENTRE;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22 x 2.13 mtrs with Medium Teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with Commercial ply on both faces of 35mm thick including cost of fixtures such as 6 Nos. Ms-Z Hold fasts of 300Mm long , 2 Nos. MSPC Tower Bolts 200 mm long, 1 No. 300 mm long MSPC Aldrop, 2Nos,MSPC Door Handles 150 mm long, 6 Nos, 125 mm long M.S.Powder Coated butt hinges 1 No.300mm long MSPC Flat latch, Door Stoperts 2 Nos. , Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

1

-

11319

... More
COMMON FACILITY CENTRE;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22 x 2.13 mtrs with Medium Teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with Commercial ply on both faces of 35mm thick including cost of fixtures such as 6 Nos. Ms-Z Hold fasts of 300Mm long , 2 Nos. MSPC Tower Bolts 200 mm long, 1 No. 300 mm long MSPC Aldrop, 2Nos,MSPC Door Handles 150 mm long, 6 Nos, 125 mm long M.S.Powder Coated butt hinges 1 No.300mm long MSPC Flat latch, Door Stoperts 2 Nos. , Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work for Door D2, 0.90 x 2.13 mt

2

-

18256

... More
COMMON FACILITY CENTRE;Providing and fixing factory made uPVC white colour fixed glazed Windows/Ventilators comprising of uPVC multichambered frame andmullion (where ever required) extruded profiles duly reinforced with 1.60± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile),uPVC extruded glazing beads of appropriate dimension, EPDM gasket,G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plasticpackers, plastic caps and necessary stainless steel screws etc. Profileof frame shall be mitred cut and fusion welded at all corners, mullion (ifrequired) shall be also fusion welded including drilling of holes for fixinghardware's and drainage of water etc. After fixing frame the gap betweenframe and adjacent finished wall shall be filled with weather proof siliconsealant over backer rod of required size and of approved quality, allcomplete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes and silicon sealant : Fixed windows / Ventilators made of (small series) frame 47 x 50mm & mullion 47 x 68 mm both having wall thickness of 1.9 ±0.2 mm and single glazing bead of appropriate dimension.

14.18

-

93925

... More
COMMON FACILITY CENTRE;Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)

78.55

-

25547

... More
COMMON FACILITY CENTRE;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

443.27

-

186156

... More
COMMON FACILITY CENTRE;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

97.74

-

45508

... More
COMMON FACILITY CENTRE;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

4520

-

387274

... More
COMMON FACILITY CENTRE;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

26.24

-

5317

... More
COMMON FACILITY CENTRE;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

3.28

-

18953

... More
COMMON FACILITY CENTRE;Vibrated Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings

3.97

-

37392

... More
COMMON FACILITY CENTRE;Vibrated Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Columns

0.78

-

7736

... More
COMMON FACILITY CENTRE;Vibrated Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Pedestrals

3.23

-

38933

... More
COMMON FACILITY CENTRE;Vibrated Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Plinth Beams

4.45

-

52530

... More
COMMON FACILITY CENTRE;Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels

1.9

-

23263

... More
COMMON FACILITY CENTRE;Reinforced Cement Concrete M 30 Nominal Mix (with Concrete Mixer ) using Graded Metal 20mm to 6mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For for sunshades 0.60 mt width and average thickness 0.0625mm

9.9

-

10163

... More
COMMON FACILITY CENTRE;Filling with Stone Dust Cushion under footings with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational & incidental charges, labour charges, seignorage charges, hire and opertaional charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

18.23

-

37603

... More
COMMON FACILITY CENTRE;Brick Masonry in Superstructure with CM (1:6) prop: using Common burnt clay bricks of Non Modular of traditional size 23 x 11 x 7cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

3.84

-

24625

... More
COMMON FACILITY CENTRE;Brick Masonry in Superstructure with CM (1:8) prop: using Common burnt clay bricks of Non Modular of traditional size 23 x 11 x 7cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

45.12

-

306758

... More
COMMON FACILITY CENTRE;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22 x 2.13 mtrs with Medium Teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with Commercial ply on both faces of 35mm thick including cost of fixtures such as 6 Nos. Ms-Z Hold fasts of 300Mm long , 2 Nos. MSPC Tower Bolts 200 mm long, 1 No. 300 mm long MSPC Aldrop, 2Nos,MSPC Door Handles 150 mm long, 6 Nos, 125 mm long M.S.Powder Coated butt hinges 1 No.300mm long MSPC Flat latch, Door Stoperts 2 Nos. , Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2

-

22637

... More
COMMON FACILITY CENTRE;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22 x 2.13 mtrs with Medium Teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with Commercial ply on both faces of 35mm thick including cost of fixtures such as 6 Nos. Ms-Z Hold fasts of 300Mm long , 2 Nos. MSPC Tower Bolts 200 mm long, 1 No. 300 mm long MSPC Aldrop, 2Nos,MSPC Door Handles 150 mm long, 6 Nos, 125 mm long M.S.Powder Coated butt hinges 1 No.300mm long MSPC Flat latch, Door Stoperts 2 Nos. , Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

1

-

9128

... More
COMMON FACILITY CENTRE;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

385.88

-

162054

... More
COMMON FACILITY CENTRE;Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8 to 10mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

93.52

-

88372

... More
COMMON FACILITY CENTRE;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

2000

-

171360



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.