To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil Works Buildings
Opening Date22 Nov 2019
Closing Date6 Dec 2019
Tender Amount₹ 8,73,588 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 310
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
299696Bid Award Id
ViewTender No
NIT NO 58/ATO/2019-20 Dated:19.10.2019 of the Executive Engineer PRI Division EluruTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply and placing of the VRCC M- 25 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for Lintels
0.52
5012
9639.72
... More
Supply and placing of the VRCC M- 25 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for Columns
2.18
22456
10300.96
... More
Supply and placing of the VRCC M- 25 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for T Beams & Roof Level beams
3.41
30751
9017.96
... More
Supply and placing of the VRCC M- 25 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for Sunshades f 0.60mts wide and 75mm thick at support and 50mm thick at free end
17.4
7885
453.21
... More
Supply and placing of the VRCC M- 25 Nominal Mix concrete corresponding to IS 380 using mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete. for 110mm thick Roof slab
72.42
73280
1011.88
... More
Providing impervious coat plastering to Accor-Proof compound with CM (1:3), 20mm thick with 1kg of Accor-Proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, including cost and conveyance of all materials to site, all incidental, operational and labour charges for mixing mortar, laying rendering smooth and thread lining curing, rounding off junctions of all and slab etc., complete for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete.
72.42
27885
3850.49
... More
Brick Masonry in basement with CM (1:6) prop(cement:Sand) using 2nd class including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site and sales & other taxes on all materials, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504) for Basement. for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete.
6
34406
5734.47
... More
Brick Masonry in Superstructure with CM (1:8) prop (cement:Sand) using 2nd class including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site and sales & other taxes on all materials, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504) for Superstructure. for finished item of work including Overheads & Contractors Profit @13.615% charges but excluding GST, Seigniorage charges etc. complete.
14.25
80987
5683.34
... More
Earth work in excavation for structures as per drawing and technical Specifications Clause 305.1 including setting out, construction o shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST as per specifications
2.7
468
173.69
... More
Filling with Sand in Basement in trenches, sides of foundation and basement with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer by watering and ramming including cost and cost and conveyance of water to site and all operational, incidental labour charges seignorage charges sales and other taxes etc, hire charges of T&P etc complete for finished item of work (APSS NO 309 & 310) including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges as per specifications
44.55
61266
1375.24
... More
Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for All work upto plinth level (APSS No. 402). including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges as per specifications
6.75
27980
4145.28
... More
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges as per specifications (APSS No.126) in all floors.
3.05
170161
55790.65
... More
Flush type Doors with (1.20x2.10)mts with RCC frames of section 100x75mm with 30mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood (Schedule Item No. 301.) For door shutters including necessary fixtures and fittings etc comp. including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST as per specifications
2
17077
8538.54
... More
Flush type windows with (1.80x1.35)mts with RCC frames of section 100x75mm with 30mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood (Schedule Item No. 301.) For door shutters including necessary fixtures and fittings etc comp. including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST as per specifications
4
43163
10790.91
... More
Plastering 8 mm thick in CM (1:3) with including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall complete for finished item of work.For External walls (APSS 901,903 & 904) for finished item of work including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges
83.73
20924
2499.03
... More
Plastering 12 mm thick in CM (1:5) with including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., for Even Surfaces of brick wall complete for finished item of work.For External walls (APSS 901,903 & 904) for finished item of work including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges
230
58785
2555.88
... More
Flooring with Ceramic tiles of 1st quality,of 7.30mm thick set over base coat of cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm @ jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement,sand water and tiles etc, complete, for finished item of work but excluding the cost of conveyance of all materials etc complete including cost of all , labour charges for dressing of flooring stones etc., complete for finished item of work. including Overheads & Contractors Profit @13.615% for finished item of work but excluding GST and Seignorage charges
58.59
55812
9525.9
... More
Painting to new walls with Single coat of white cement & 2 coats of Water Proof cement paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and alllabour charges etc. complete for finished item of work as per SS 911 over masonry walls. (APSS No.901 & 908) For Finished of itm of works including Overheads & Contractors Profit @13.615% for finished item of work excluding GST & NAC charges for internal walls
83.73
8943
1068.14
... More
Painting to new walls with Single coat of white cement & 2 coats of Water Proof cement paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and alllabour charges etc. complete for finished item of work as per SS 911 over masonry walls. (APSS No.901 & 908) For Finished of itm of works including Overheads & Contractors Profit @13.615% for finished item of work excluding GST & NAC charges for external walls
230
34005
1478.52
... More
Painting with best Synthetic enamil paint two coats over a primary coat of red oxide paint over new wood / Iron work including cost and conveyance of all materials and all labour charges etc., complete including Overheads & Contractors Profit @13.615% for finished item of work excluding GST, & NAC charges
38.07
6447
1693.55
... More
Rupees ( Eight lakhs seventy five thousand six hundred and ninety only)
-