Municipality Tender
... More
The Municipality has issued a formal invitation for competitive bids for Construction Of A) 300 Vent Cc Drain From Bankaru Ravi Kumar House To Sairam House At Vasavi Nagar B) 450 Vent Cc Drain From Raja Rajeswari Temple To Towards Existing Gedda At Vasavi Nagar C) 450 Vent Cc Drain On Both Sides From Palavalasa Shyam House To Pyla Surapu Naidu House At Vasavi Nagar D) 450 Vent Cc Drain On Both Sides From Potnuru Sujatha House To Pentapalli Satyanarayana House At Vasavi Nagar In Ward No.05 In The Premises Of Satyanarayanapuram Secretariat Of Rajam Municipality. in Vizianagaram, Andhra Pradesh, with an estimated contract value of Rs. 21,76,062. The bid opening date for this tender is 11-11-2026 and the last date for bid submission is 25-11-2026. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender - AP Tender
Opening Date11 Nov 2026
Closing Date25 Nov 2026
Tender Amount₹ 21,76,062
Costs
EMD
₹ 21,761Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Construction Of A) 300 Vent Cc Drain From Bankaru Ravi Kumar House To Sairam House At Vasavi Nagar B) 450 Vent Cc Drain From Raja Rajeswari Temple To Towards Existing Gedda At Vasavi Nagar C) 450 Vent Cc Drain On Both Sides From Palavalasa Shyam House To Pyla Surapu Naidu House At Vasavi Nagar D) 450 Vent Cc Drain On Both Sides From Potnuru Sujatha House To Pentapalli Satyanarayana House At Vasavi Nagar In Ward No.05 In The Premises Of Satyanarayanapuram Secretariat Of Rajam Municipality.
Contact
Tender Id
1006190Tender No
56/2026-27/E1-RMPTender Authority
Municipality ViewPurchaser Address
-Website
https://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
TOTAL WORK;Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH BRICK MASONRY WITH CEMENT MORTOR
0.13
706
91.82
... More
TOTAL WORK;Vibrated Plain Cement Concrete grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK) SIDE WALLS-WITH FORM WORK
236.98
5625
1333040.94
... More
TOTAL WORK;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 19.
362.4
87
31586.78
... More
TOTAL WORK;Collection, supply, spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. BLD - CSTN-2-8
78.09
890
69504
... More
TOTAL WORK;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MOR3TH Plain Cement Concrete
5.51
1084
5974.6
... More
TOTAL WORK;Providing Gravel Filling in foundations from approved source as per drawing and technical specification this rate including cost and convenyance of materials, damping, watering and all incidental charges etc., complete as per ss and as directed by the departmetnal officer incharge of the work. But excluding seigniorage charges.
27
343
9273.96
... More
TOTAL WORK;Cutting open CC road surface including all labour chrages and othere incidental charges as per SS and as directed by the departmental engineer in charge of the work.
4.5
4137
18620.37
... More
TOTAL WORK;Vibrated P.C.C. grade M 30 (Design Mix) MORTH 12.8 B using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-F-i-Road Approaches
1.98
6178
12233.63
... More
TOTAL WORK;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Reinforced Cement Concrete and prestressed Concrete
0.44
3021
1329.33
... More
TOTAL WORK;Removal of Wet Silt and sludge by manual means from sullage drains with aid of baskets and vessels.
20.25
490
9935.26
... More
TOTAL WORK;Vibrated Plain Cement Concrete grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK) QUENET-WITH OUT FORM WORK
10.71
5416
58012.64