The Municipality has issued a formal invitation for competitive bids for Construction Of Cc Road From Rtc Depot Out Gate Corner To Durga Curry Point At Kodavalli Road 5th Ward In The Bhimavaram Municipality Under Municipal General Funds in West Godavari, Andhra Pradesh, with an estimated contract value of Rs. 1,59,25,089. The bid opening date for this tender is 01-01-2025 and the last date for bid submission is 18-01-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender
Civil And Construction
Road Construction
Opening Date1 Jan 2025
Closing Date18 Jan 2025
Tender Amount₹ 1,59,25,089
Costs
EMD
₹ 1,59,251Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
777513Tender No
131/BHI/General/2024-25/E1Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Granular sub-base/base/surface course with GRADE -3 materials (Table 400.2) Construction of granular sub-base by providing material spreading in uniform layers with on prepared surface, mixing by mix in place method at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per SS and as directed by the Departmental officer in charge of the work. But excluding seigniorage charge.
751
2430
1825553.33
... More
Providing High Yield Strength Deformed (HYSD) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc. ,and overheads & contractors profit complete for finished item of work as per SS and as directed by the departmental officer incharge of the work .
865
88
76535.2
... More
Disposal of surplus earth with a lead of km over initial lead including, transport, unloading etc complete as per SS and as directed by the departmental officer incharge of the work
1105
43
47702.85
... More
Supply and delivery of 25mm dia MS dowel bars S-240 garde including cost and conveyance placing dowel bars in posiation as per design including cost of labour charges conveyance and other incidental charges etc., Complete as per ss and as directed by the Dept officer incharge
1335
84
113034.45
... More
Granular sub-base/base/surface course with GRADE -2 materials (Table 400.2) Construction of granular sub-base by providing material spreading in uniform layers with on prepared surface, mixing by mix in place method at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per SS and as directed by the Departmental officer in charge of the work. But excluding seigniorage charge.
137
2532
346997.71
... More
Percentage in Figures
-
-
-
... More
Granular sub-base/base/surface course with Stone crushed dust materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing material spreading in uniform layers and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD. as per SS and as directed by the Departmental officer in charge of the work. But excluding seigniorage charge.
220.5
1584
349285.23
... More
Granular sub-base/base/surface course with GRADE -1 materials (Table 400.2) Construction of granular sub-base by providing material spreading in uniform layers with on prepared surface, mixing by mix in place method at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per SS and as directed by the Departmental officer in charge of the work. But excluding seigniorage charge.
751
2611
1961379.19
... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Mecadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper of site, laying in uniform layers with paver in base courses on well prepared surface and compacting with vibratory roller to achieve the desired density etc, as directed by Engineer-in-Charge as per MORT&H specification and other incidental charges etc., complete as per ss and as directed by the Departmental officer-in -charges of work. . 406 (4th version) for finished item of work (Pavement based on levels for finished item of work) as per SS and as directed by the Departmental officer in charge of the work. But excluding seigniorage charge
1001
3394
3397804.41
... More
Providing power trowelling to finish the surface including all materials, labour & all hire charges etc. complete for finished item of work including overhead charges &contractor profit etc complete. as per SS and as directed by the departmental officer incharge of the work
4650
76
353400
... More
Total:
-
-
15925089.4