To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipality Tender
Civil And Construction
Building Construction
Opening Date2 May 2022
Closing Date16 May 2022
Tender Amount₹ 8,98,464
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
500378Tender No
NO.1Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers on prepared surface, mixing by mix in place method at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD. with STONE DUST
47.09
-
49503.83
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixer. All work upto plinth level including cost of all materials and labour charges etc., (Page No.661) BLD-CSTN-2-5
47.74
-
183922.65
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and labour charges etc., (page No.680)
17.28
-
5866.21
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;R.C.C M-20 Design mix (Cement fine aggregate coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)from approved quarry including cost and conveyance of all materialss like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work but excluding centering, shuttering FOR FOOTING
1.02
-
9025.15
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;R.C.C M-20 Nominal mix (Cement fine aggregate coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)from approved quarry including cost and conveyance of all materialss like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work but excluding centering, shuttering FOR PEDASTAL
0.32
-
3016.44
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;R.C.C M-20 Nominal mix (Cement fine aggregate coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)from approved quarry including cost and conveyance of all materialss like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work but excluding centering, shuttering FOR COLUMNS
1.3
-
14302.98
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Unit = cum Taking output = 75 cum (172.50 t)(100 x 3.75 x 0.200)
94.18
-
574728.74
... More
PROVIDING BASKET BALL COURT AND PLAY AREA DEVELOPMENT AT OBS HIGH SCHOOL COMPOUND;Supplying, fitting and placing HYSD bar reinformcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
184.8
-
15144.36