Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Road Construction
Opening Date9 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 9,51,357
Costs
EMD
₹ 9,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
779260Tender No
Rc.E6-120760/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://vijayawada.cdma.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plastering with CM (1:4) 12mm thick including cost and conveyance of all materials, seigniorage charges and labour charges for mixing of mortor watering curing etc. complete.With extra leads and lifts.
161
1422
22906.6
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Unit = cum. including cost and conveyance of all materials and labour charges etc,Complete
94.88
6812
646388.03
... More
Separation Membrane of impermeable plastic sheeting 125 micron thick (M-164 common SSR)
632.5
13
8620.98
... More
Supply of 25mm thick high performance expansion joint filler board (SILFLEXCAPCELLHD-100 or equivalent make),placing the same 25mm below top of pavement slab sealing with bituminous hot sealing compound (Grade-A-ISI) polysulphudiet 50mm interval in CC.Pavement incl.cost and conveyance of all materials but excl.labour charges for placing in position,for expansion joints confirmig to MORTH Specification 602-1Rmt of joint length
147
167
24638.67
... More
Supply of bituminous hot sealing compound (grade-A ISI ) poly sulphide and sealing the joints incl.cost and conveyance of all materials etc.but excl.labour charges for placing in position for contraction joints at 1.50 interval / for expansion joints/for longitudinal joints as per MORTH specification number 602-1 Rm
165
38
6298.05
... More
Collection and supply of Red Earth including excavation cost and conveyance spreading sectioning consolidation with PR complete
36.8
1150
42352.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements