To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil And Construction
Excavation
Opening Date26 Sep 2022
Closing Date14 Oct 2022
Tender Amount₹ 22,85,04,724
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
545615Bid Award Id
ViewTender No
14/2022-23, Dated: 20.09.2022Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for (a) canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts. As directed by the Engineer-in-Charge.
14936
-
9742753
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water As directed by the Engineer-in-Charge.
8831
-
709129
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and filling gravely soil for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts. As directed by the Engineer-in-Charge.
43545
-
27424641
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As directed by the Engineer-in-Charge.
42817
-
5133758
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm) grade cement concrete with 20 mm down size approved, clean, hard,graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.(43 Gr Cement content: 300 kg /cum (22.5 kg/ sqm) with use of super plastciser,CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,) As directed by the Engineer-in-Charge.
40260
-
18483366
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and fixing 20mm thick, 150mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts. As directed by the Engineer-in-Charge.
4560
-
554952
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and forming 35mm wide, 10mm thick construction/contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts. As directed by the Engineer-in-Charge.
5370
-
151971
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying and fixing of 100mm dia, 300mm long precast porous CC plugs in bed and sides using 0.787Kgs of cement per each using 20mm HG metal and placing in local filters of size 600x600x750mm in size including excavation of drains and cost of procuring of all materials including 50m lead and lifts.(Lining thickness 100mm) As directed by the Engineer-in-Charge.
954
-
599112
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25cm before compaction, breaking clods, sectioning, without watering and compacting each layerto density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete. As directed by the Engineer-in-Charge.
6237
-
411642
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) As directed by the Engineer-in-Charge.
1371
-
7718045
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) As directed by the Engineer-in-Charge.
1866
-
11036830
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type retaining walls / piers / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr/cum.(Cement content: 260kg/cum with use of super plasticiser CA:0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum,plums of size 150 to 80 mm : 0.25cum ) As directed by the Engineer-in-Charge.
2643
-
18330527
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu M- 25 ( 28 days cube compressive strength notless than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,curing, complete for RCC works of gallery, sluice, spillway crest, spillway d/s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts.( Cement content : 380 kg / cum with use of super plastciser, CA : 0.90 cum, Blending Ratio of CA--65:35, FA : 0.40 cum) For Bed Block, dirt wall. As directed by the Engineer-in-Charge.
55
-
313522
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 330 kg / cum with use of super plastciser,CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) As directed by the Engineer-in-Charge.
3218
-
34698085
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying insitu M- 25 ( 28 days cube compressive strength notless than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts.( Cement content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.40 cum) As directed by the Engineer-in-Charge.
488
-
3095774
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and75mm thick laying in-situ vibrated M-15( 28 days cube compressive strength not less than 10 N/sq mm) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal including finishing the junction of bed and sides to required curvature including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45Cum) for Lining works. As directed by the Engineer-in-Charge.
1380
-
8669022
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing, fabricating and placing in position reinforcement steel bars for RCC works includingcleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts. As directed by the Engineer-in-Charge.
294758
-
25702898
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and constructing 225 mm thick dry rubble stone pitching including coat of all materials, labour , hand packing , finishing etc., complete (for Maintenance works) As directed by the Engineer-in-Charge.
1421
-
466514
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for WEEP HOLES including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts As directed by the Engineer-in-Charge.
24
-
5638
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to thickness etc., complete with initial lead upto 50M and all lifts. As directed by the Engineer-in-Charge.
6
-
5978
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Rubber water stopper(SSR2020-21, Item No MAT-00061, p/14) As directed by the Engineer-in-Charge.
1000
-
562400
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture ,Supply and Delivery Of R.C.C 200mm dia NP2 class Plain ended Pipes Conforming to B.I.S 458/2003 at Ex-Factory(Rate per Meter of Effective Length).Excluding Transporation,Taxes & Duties per 200mm dia pipe/ for meter length As directed by the Engineer-in-Charge.
290
-
84013
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying and jointing 200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint) As directed by the Engineer-in-Charge.
30
-
13476
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture ,Supply and Delivery Of NP3 300mm R.C.C Plain ended Pipes Conforming to B.I.S 458/2003 at Ex-Factory(Rate per Meter of Effective Length).Excluding Transporation,Taxes & Duties per 300mm dia pipe/ for meter length As directed by the Engineer-in-Charge.
88
-
99986
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying and jointing 300 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint) As directed by the Engineer-in-Charge.
24
-
11858
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture ,Supply and Delivery Of R.C.C 450 mm dia. NP- 3 class Plain ended Pipes Conforming to B.I.S 458/2003 at Ex-Factory(Rate per Meter of Effective Length).Excluding Transporation,Taxes & Duties per 450mm dia pipe/ for meter length As directed by the Engineer-in-Charge.
147
-
252355
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying and jointing 450 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. As directed by the Engineer-in-Charge.
30
-
16437
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture ,Supply and Delivery Of R.C.C 900 mm dia. NP- 3 class plain ended Pipes Conforming to B.I.S 458/2003 at Ex-Factory(Rate per Meter of Effective Length).Excluding Transporation,Taxes & Duties per 900mm dia pipe/ for meter length As directed by the Engineer-in-Charge.
65
-
382174
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying and jointing 900 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. As directed by the Engineer-in-Charge.
19
-
17773
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including excavation of drains and Cost of procuring of all materials As directed by the Engineer-in-Charge.
7409
-
5110728
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.B.Using 750 micron thick LDPE sheet. As directed by the Engineer-in-Charge.
16760
-
3367084
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture, Supply and Delivery of 200 mm dia. NP- 2 class R.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding all taxes. As directed by the Engineer-in-Charge.
30
-
2214
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture, Supply and Delivery of 300 mm dia. NP- 3 classR.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding all taxes. As directed by the Engineer-in-Charge.
24
-
3845
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture, Supply and Delivery of 450 mm dia. NP- 3 class R.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding all taxes. As directed by the Engineer-in-Charge.
30
-
9168
... More
Balance Works of Sri Gorle Sreeramulu Naidu Madduvalasa Reservoir Project Stage II Investigation, De;Manufacture, Supply and Delivery of 900 mm dia. NP- 3 classR.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation but excluding all taxes. As directed by the Engineer-in-Charge.
19
-
18111
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements