Endowments Department Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Civil And Construction
Civil Works Others
Opening Date12 Oct 2022
Closing Date26 Oct 2022
Tender Amount₹ 24,83,617 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Improvements to Temple;Vibrated Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in position vibrating, curing, centering using steel scaffolding pipes, jac props, wallers, foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges, overheads & contractors profit etc., for finished item of work . (APSS No. 402)

17.15

-

114227

... More
Improvements to Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges and including over heads and contractor profit etc., complete for finished item of work.

-

-

-

... More
Improvements to Temple;Roof Slab 120mm thick

12.66

-

18943

... More
Improvements to Temple;Lintel

0.08

-

1108

... More
Improvements to Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)

150.96

-

14299

... More
Improvements to Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam Level

15.22

-

159440

... More
Improvements to Temple;Above Sthambhavargam (1st Floor)

11.32

-

122858

... More
Improvements to Temple;Ornamental Plastering 25 mm to 40 mm thick with base plastering 12 mm to 20mm in CM (1:3) and top finishing 12 MM thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyance of all materials, labour charges, all incidental and operational charges curing and excluding Seignorage charges, sales and other taxes complete etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, Kudam, Palakai, Vedika. Lathalu in Uttar Eludhakam, Pothikas, Nasigudu, Pupha Puskala Adihishtanam, Wherever necessary including over head charges and contractor profit etc., complete.(as per Silpi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam level / 2nd class Varity

40.46

-

53305

... More
Improvements to Temple;Above Sthambhavargam (1st Floor)

47.18

-

127493

... More
Improvements to Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).

0.38

-

3031

... More
Improvements to Temple;Supplying and fixing of black granite cut stone door frame of required size and shape as per plan or as directed during execution of work including cost and conveyance of stone, dressing charges and fixing in position and excluding seigniorage charges, sales and other taxes and including operational, incidental and accidental charges and labour charges etc., complete as per Silpi SSR 2018 and including other head and contractor profit etc., complete.

-

-

-

... More
Improvements to Temple;Cost of cut Stone

37.49

-

12778

... More
Improvements to Temple;Dressing of stone with fine line palamana dressing instead of fine dressing and polishing and padams at top and bottom, naga bandam on verticle stones etc.

41.25

-

18981

... More
Improvements to Temple;Fixing charges for door frame in position

1

-

1818

... More
Improvements to Temple;Supplying and fixing of black granite cut stone Somasutram Nalam type including fine dressing and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials to work site excluding seigninorage charges, sales and other taxes on all materials and including all labour charges operational, incidental and accidental charges etc., complete for finished item of work, as per Silpi SSR 2018 with over head and contractor profit etc., complete.

1

-

7726

... More
Improvements to Temple;Ceiling Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)

3.67

-

1685

... More
Improvements to Temple;Plastering 20mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

14.88

-

6636

... More
Improvements to Temple;Supplying and fixing of best teak wood ornamental Door shutters with two leaves using 25mm thick planks and 40mm thick frame as per standard temple design including cost of frame and flanks and preparation charges, fixing of shutters in position, locking arrangements excluding sales and others taxes etc., complete. (Single padmam with padmarekulu and plain fram

18

-

56035

... More
Improvements to Temple;Supply and fixing of brass metal stoopi with stoopi dendam, Bramha randhram Stone (Gandhapu-Raj including cost and conveyeance of all materials to work site and labour charges excluding Seignorage charges, sales and other taxes etc complete.

1.5

-

4380

... More
Improvements to Temple;Providing Cement Vigrahams using cement, sand, steel reinforcement, iron mesh, Brick bats, flat tile etc., including cost and conveyance of all materials and all labour charges, excludig seigniorage and scaffolding charges but including curing and operational charges and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work as per Silpi SSR 2012.

-

-

-

... More
Improvements to Temple;Standing 2 Hands

22

-

32744

... More
Improvements to Temple;Anjaneya Swamy / Garuda

16

-

21632

... More
Improvements to Temple;Flooring with granite stone tiles 8 to 10mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-in-charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread at the rate of 3.30 Kgs per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of CC bed) excluding cost of seignorage charges, sales and other taxes on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge etc., and over heads & contractors profit complete for finished item of work. (APSS No.701 & 707).

19.51

-

38290

... More
Improvements to Temple;Supplying and fixing of scaffolding to structure including cost & conveyance of all materials to work site such as casino poles, Bamboos mats and coir ropes etc., including labour charges i.e. erection, tying, fixing and including overhead and contractors profit and excluding sales and other taxes etc., complete

-

-

-

... More
Improvements to Temple;Up to 20-0" Height

1239.96

-

16901

... More
Improvements to Temple;Above 20-0" Height

186.6

-

2333

... More
Improvements to Temple;Supply & Application of cost of deco orient base & two coats & two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work in all floors. SS 911.

106.19

-

27819

... More
Improvements to Temple;Earth work excavation for foundations ( Mannual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage and dewatering charges etc., complete as per SS 20 B (APSS No. 308)

14.92

-

6965

... More
Improvements to Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and including overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

5.32

-

5361

... More
Improvements to Temple;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)

2.93

-

12954

... More
Improvements to Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges and including over heads and contractor profit etc., complete for finished item of work.

-

-

-

... More
Improvements to Temple;Footings

1.81

-

18617

... More
Improvements to Temple;Pedastals

0.38

-

4155

... More
Improvements to Temple;Columns

1.04

-

14529

... More
Improvements to Temple;Plinth Beam

0.88

-

11504

... More
Improvements to Temple;Roof Beam

0.88

-

11119

... More
Improvements to Temple;Roof Slab 120mm thick

7.18

-

10758

... More
Improvements to Temple;Ornamental Sunshade 2'-6" wide

8.02

-

11877

... More
Improvements to Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)

649.37

-

61509

... More
Improvements to Temple;Providing impervious coat to exposed RCC roof slab surfaces 20mm (av thick to required slopes with CM (1:3) prop. Using screened sand mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm wherever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seignorage charges, sales & other taxes on all materials and operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of all and slab etc. and overheads & contractors profit complete for finished item of work (APSS No.901 & 903)

7.18

-

4495

... More
Improvements to Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam Level

2.14

-

22418

... More
Improvements to Temple;Ornamental Plastering 25 mm to 40 mm thick with base plastering 12 mm to 20mm in CM (1:3) and top finishing 12 MM thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyance of all materials, labour charges, all incidental and operational charges curing and excluding Seignorage charges, sales and other taxes complete etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, Kudam, Palakai, Vedika. Lathalu in Uttar Eludhakam, Pothikas, Nasigudu, Pupha Puskala Adihishtanam, Wherever necessary including over head charges and contractor profit etc., complete.(as per Silpi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam level / 2nd class Varity

21.61

-

28471

... More
Improvements to Temple;Ornamental plastering with precast cement moulds to pillars using with cement, fine sand, brick bats etc., including cost and conveyance of all materials and all labour charges, curing and operational charges etc., complete but excluding scaffolding charges for finished item of work.

-

-

-

... More
Improvements to Temple;chitrakanta stambham

132

-

34493

... More
Improvements to Temple;Providing puspha pothikas including cost and coveyance of all materials and all labour charges etc., complete.

12

-

22768

... More
Improvements to Temple;Ceiling Padmam 3-6" dia

7.07

-

2972

... More
Improvements to Temple;Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

26.34

-

12094

... More
Improvements to Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).

0.96

-

7658

... More
Improvements to Temple;Plastering 20mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

3.78

-

1686

... More
Improvements to Temple;Providing polished shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.703 & 701)

10.38

-

8060

... More
Improvements to Temple;Supply & Application of cost of deco orient base & two coats & two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work in all floors. SS 911.

63.99

-

16763

... More
Improvements to Temple;Earth work excavation for foundations ( Mannual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage and dewatering charges etc., complete as per SS 20 B (APSS No. 308)

16.99

-

7931

... More
Improvements to Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and including overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

4.83

-

4867

... More
Improvements to Temple;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)

2.89

-

12777

... More
Improvements to Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges and including over heads and contractor profit etc., complete for finished item of work.

-

-

-

... More
Improvements to Temple;Footings

1.81

-

18563

... More
Improvements to Temple;Pedastals

0.5

-

5467

... More
Improvements to Temple;Columns

0.71

-

9919

... More
Improvements to Temple;Plinth Beam

0.63

-

8236

... More
Improvements to Temple;Lintel

0.18

-

2492

... More
Improvements to Temple;Roof Beam

0.84

-

10614

... More
Improvements to Temple;Roof Slab 100mm thick

10.45

-

12978

... More
Improvements to Temple;Ornamental Sunshade 2'-0" wide

9.47

-

14025

... More
Improvements to Temple;Plain Sunshade 2'-0" wide

3.15

-

3685

... More
Improvements to Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)

631.66

-

59831

... More
Improvements to Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).

6.47

-

51611

... More
Improvements to Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)

0.63

-

6600

... More
Improvements to Temple;Ceiling Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)

22.97

-

10547

... More
Improvements to Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

40.33

-

17349

... More
Improvements to Temple;Plastering 20mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

31.52

-

14057

... More
Improvements to Temple;Providing polished shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.703 & 701)

8.64

-

6709

... More
Improvements to Temple;Supply and fixing doors as per drawings with medium country wood frame of section 100mm x 65mm and ISI marked flush door shutters of 30mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-1) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200mm x 10mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes, including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., excluding sales and other taxes and including overheads & contractors profit etc, complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) BLD-CSTN-13-16.

2.27

-

17675

... More
Improvements to Temple;Supplying and Fixing of glazed windows of different sizes, using the Sal wood for frame section size of 90mm x 65mm (3 ½? x 2 ½?) and the shutter frame section size of 75mm x 32mm as finished size (after dressing) as per drawing and as directed, including cost and conveyance of all materials, labour charges and cost and fixing of MS ornamental grills with approved design as directed, with the weight of 20 to 25 Kgs per Sqm (safety grills) and the shutter frame should be fixed with 4mm pin head glass pannels and also cost and fixing of window fixture of iron hold fasts Z type, iron powder coated hings, aluminium tower bolts, aluminium handles and hooks and also belts & nuts excluding sales and other taxes and including overheads & contractors profit etc., complete for finished item of work.

3.34

-

21157

... More
Improvements to Temple;Supply & Application of cost of deco orient base & two coats & two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work in all floors. SS 911.

94.82

-

24840

... More
Improvements to Temple;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint grade-II VOC (Volatile Organic Compound) content less than 50 grams / litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc., complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.

5.61

-

1178

... More
Improvements to Temple;Earth work excavation for foundations ( Mannual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage and dewatering charges etc., complete as per SS 20 B (APSS No. 308)

26.11

-

12188

... More
Improvements to Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and including overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

11.93

-

12022

... More
Improvements to Temple;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)

4.75

-

21000

... More
Improvements to Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Improvements to Temple;Footings

3.54

-

36305

... More
Improvements to Temple;Pedastals

0.9

-

9841

... More
Improvements to Temple;Columns

1.21

-

16904

... More
Improvements to Temple;Plinth Beam

1.01

-

13203

... More
Improvements to Temple;Roof Beam

0.6

-

7581

... More
Improvements to Temple;Roof slab 120mm thick

11.61

-

17372

... More
Improvements to Temple;Ornamental Sunshade 2'-0" wide

11.61

-

17194

... More
Improvements to Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)

916.15

-

86778

... More
Improvements to Temple;Providing impervious coat to exposed RCC roof slab surfaces 20mm (av thick to required slopes with CM (1:3) prop. Using screened sand mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm wherever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seignorage charges, sales & other taxes on all materials and operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of all and slab etc. and overheads & contractors profit complete for finished item of work (APSS No.901 & 903)

11.19

-

7005

... More
Improvements to Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).

2.9

-

23139

... More
Improvements to Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam Level

3.57

-

37398

... More
Improvements to Temple;Above Sthambhavargam (1st Floor)

1.47

-

15954

... More
Improvements to Temple;Ornamental Plastering 25 mm to 40 mm thick with base plastering 12 mm to 20mm in CM (1:3) and top finishing 12 MM thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyance of all materials, labour charges, all incidental and operational charges curing and excluding Seignorage charges, sales and other taxes complete etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, Kudam, Palakai, Vedika. Lathalu in Uttar Eludhakam, Pothikas, Nasigudu, Pupha Puskala Adihishtanam, Wherever necessary including over head charges and contractor profit etc., complete.(as per Silpi SSR 2012)

-

-

-

... More
Improvements to Temple;Up to Sthambhavargam level / 2nd class Varity

29.95

-

39459

... More
Improvements to Temple;Above Sthambhavargam (1st Floor)

5.01

-

13538

... More
Improvements to Temple;Ornamental plastering with precast cement moulds to pillars using with cement, fine sand, brick bats etc., including cost and conveyance of all materials and all labour charges, curing and operational charges etc., complete but excluding scaffolding charges for finished item of work.

-

-

-

... More
Improvements to Temple;chitrakanta stambham

167.88

-

43869

... More
Improvements to Temple;Providing puspha pothikas including cost and coveyance of all materials and all labour charges etc., complete.

8

-

15179

... More
Improvements to Temple;Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

33.5

-

15382

... More
Improvements to Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

9.58

-

4121

... More
Improvements to Temple;Providing polished shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.703 & 701)

15.98

-

12408

... More
Improvements to Temple;Supplying and fixing of scaffolding to structure including cost & conveyance of all materials to work site such as casino poles, Bamboos mats and coir ropes etc., including labour charges i.e. erection, tying, fixing and including overhead and contractors profit and excluding sales and other taxes etc., complete

-

-

-

... More
Improvements to Temple;Up to 20-0" Height

1140

-

15538

... More
Improvements to Temple;Supply & Application of cost of deco orient base & two coats & two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work in all floors. SS 911.

93.64

-

24531

... More
Improvements to Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and including overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

130.03

-

131033

... More
Improvements to Temple;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)

25.84

-

114241

... More
Improvements to Temple;Plastering 20mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit and excluding Seignorage charges, sales and other taxes etc., complete for finished item of work (SS 901, 903 & 904)

257.05

-

119657



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.