To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Civil And Construction
Excavation
Opening Date6 Dec 2019
Closing Date13 Dec 2019
Tender Amount₹ 11,59,742 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For Plumbago auriculata (8x10)

290

-

-

... More
For Bougain villea (8x10)

440

-

-

... More
For Murraya paniculata (8x10)

570

-

-

... More
Transportation of bag plants form Gannavaram to idupulapaya

5.2

-

1223

... More
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

20.880000000000003

-

208.43

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

1.9300000000000002

-

3699.69

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for footings

1.5

-

7808.78

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for pedestals

2.37

-

8362.77

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with integral cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 0.5 Kg per one bag of cement , and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for base slab 150mm thick

6.6

-

1214.86

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with integral cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 0.5 Kg per one bag of cement , and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for side walls 150 mm thick

15.2

-

2172.89

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 0.5 Kg per one bag of cement and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for slab 125mm thick

2.3

-

1115.34

... More
Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

-

-

57.52

... More
Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @ 3.3 kgs per Sqm. and jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

9.6

-

1666.08

... More
Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall, sump bottom slab, in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

14.5

-

311.15

... More
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work

478.8

-

88.68

... More
Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work.

19.6

-

91.01

... More
Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

9.8

-

163.96

... More
Providing cladding to MS columns and beam with (HPL) high pressure laminate Board 8mm thick with required size and shape as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

12.6

-

2687.5

... More
MEP works for Rain curtain founta work :- Providing, fixing, testing & commissioning of Nozzles , Lights ,Filter Pumps, Pool fittings , Pool fittings , Wires/cables of various sizes including necessary accessories , uPVC pipes , Valves, fittings etc of required size , Boarding and Ladging and Installation, Chlorine Dosing Unit as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

1

-

553090

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for plinth beam

0.61

-

10274.22

... More
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work

861.9200000000001

-

88.6765075

... More
Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work.

63.5

-

91.00561499999999

... More
Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

21.06

-

163.96

... More
Providing cladding to MS columns and beam with (HPL) high pressure laminate Board 8mm thick with required size and shape as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

22.4

-

2687.5

... More
Providing cladding to MS columns and beam with (GFRC) Glass-Fibre Reinforced Concrete Jaali 25mm thick with required size and shape as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

13.2

-

3762.5

... More
Provision for Lighting of statue back ground portal :-Payment will be made as per the actual work done subject to approval of estimate and rates by the competent authority

1

-

50000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.