Andhra Pradesh Township And Infrastructure Development Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender

Civil And Construction
Civil Works Others
Construction Works
Opening Date3 Feb 2022
Closing Date9 Mar 2022
Tender Amount₹ 53,81,27,132 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

2801.81

-

3019678.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

199.97

-

115623.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

199.97

-

734059.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

3415.25

-

6475792.14

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

34.01

-

182266.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

3094.75

-

17603250.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

4.94

-

386594.57

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

3804.34

-

440618.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

855.74

-

494794.57

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

570.49

-

2094183.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

570.49

-

2721126.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

990.35

-

7298799.31

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

374.99

-

2160223.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

15

-

1234064.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

145.66

-

16870.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

17.55

-

10147.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

26.32

-

96635.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

26.32

-

125565.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

46.8

-

344912.21

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

46.8

-

269603.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

2.81

-

231023.06

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 600 KL capacity E.L.S.R : ELSR 600KLConstuction of OHSR / ELSR of 600 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

600000

-

16354662.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

4357.37

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

27663.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

75634.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

214902.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

18876.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

83849.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

62935.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

1000

-

2614280

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

600

-

675552

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

1600

-

1157968

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2070

-

717317.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

910

-

103394.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

72961.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

57214.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

44091.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

6

-

85034.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

28344.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

1

-

12860.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

91

-

341806.01

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

10

-

1346.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

1

-

2831.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

1

-

1456.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

3013.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

91

-

15611.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

13083.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

10511.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

2938.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

91

-

17678.57

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

6

-

2644.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

3413

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

4717.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

4126.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2785.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

1527

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

12

-

2345.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

2

-

36218.18

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

5837.15

-

676058.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

678.75

-

392457.77

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1000

-

117580

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

600

-

60816

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1600

-

109808

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

2070

-

95033.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

910

-

30348.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1526.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1074.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

651.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

6

-

1152.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

384.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

346.97

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

4

-

2991.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

4

-

2108.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

4

-

1945.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

12

-

3795.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

4

-

1265.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

1

-

218.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

14

-

94959.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

5045.66

-

1044956.03

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

22.5

-

2837.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

13.5

-

1426.14

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2558.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

720.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

8

-

1163.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

4307.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4221.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4166.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7001.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10709.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6796.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16283.69

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6156.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45707.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

783.94

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5574.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2572.95

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21680.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

2000

-

2720000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

2000

-

2310000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

2000

-

684000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

8

-

2520

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

8

-

10400

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

8

-

526501

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

4320

-

908193.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

8

-

98416.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

8

-

146408.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

200

-

15224

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

180

-

492944.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

210

-

318042.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

380

-

432341.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

1800

-

1312524

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

910

-

401564.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

32

-

217050.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

48

-

512358.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

2758.2

-

319454.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

420.82

-

243323.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

192.3

-

22271.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

1923

-

846553.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

6410

-

1775697.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

641

-

348114.09

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1474.3

-

457432.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

427.09

-

49465.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

67.44

-

38994.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

44.96

-

165041.42

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

44.96

-

214450.46

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

110.35

-

813270.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

36.78

-

211880.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.68

-

302600.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Physical Infrastructure: Srikalahasthi Phase-II Internal Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

1756.17

-

203399.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Formation of embankment with 50% of Gravel and 50% Of Sand and Spreading in uniform layers sectioning and consolidation with Static Road Roller to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

1757.81

-

1016049.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Forming embankment with 50% of Gravel and 50% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

2629.42

-

1295226

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

1748.81

-

1884797.47

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

140.64

-

81318.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

140.64

-

516268.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

2145.75

-

4068642.41

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

157.2

-

842468.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

1959.75

-

11147255.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

3.34

-

255405.06

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

2590.95

-

300083.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

523.35

-

302604.46

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

348.9

-

1280759.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

348.9

-

1664185.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

672.75

-

4958113.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

244.35

-

1407639.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

9.77

-

804137.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

116.53

-

13496.74

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

14.04

-

8118.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

21.06

-

77308.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

21.06

-

100452.11

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

37.44

-

275929.77

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

37.44

-

215682.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

2.25

-

184818.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 600 KL capacity E.L.S.R : ELSR 600KLConstuction of OHSR / ELSR of 600 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

600000

-

16354662.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

4357.37

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

27663.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

75634.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

214902.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

18876.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

83849.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

62935.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4305.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

600

-

1568568

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

650

-

731848

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

650

-

470424.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

1750

-

606427.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

640

-

72716.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

72961.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

57214.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

44091.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

6

-

85034.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

28344.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

1

-

12860.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

64

-

240391.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

10

-

1346.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

4

-

11325.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

1

-

1456.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

3013.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

64

-

10979.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

13083.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

10511.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

2938.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

64

-

12433.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

1763.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

3413

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

4717.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

4126.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2785.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

1527

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

12

-

2345.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

2

-

36218.18

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

4022.6

-

465897.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

468.98

-

271164.47

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

600

-

70548

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

650

-

65884

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

650

-

44609.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1750

-

80342.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

640

-

21344

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1526.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1074.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

651.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

6

-

1152.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

384.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

346.97

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

4

-

2991.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

4

-

2108.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

4

-

1945.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

12

-

3795.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

4

-

1265.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

1

-

218.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

14

-

94959.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

3477.99

-

720290.94

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

22.5

-

2837.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

13.5

-

1426.14

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

1279.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

720.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

8

-

1163.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

4307.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4221.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4166.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7001.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10709.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6796.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16283.69

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6156.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45707.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

783.94

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5574.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2572.95

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21680.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

1750

-

2380000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

1750

-

2021250

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

1750

-

598500

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

7

-

2205

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

7

-

9100

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

7

-

460688.37

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

3780

-

794669.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

7

-

86114.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

7

-

128107.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

175

-

13321

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

450

-

681520.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

1000

-

1137740

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

1800

-

1312524

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

640

-

282419.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

43

-

291661.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

65

-

693818.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

3315

-

383943.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

476.25

-

275370.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

111.6

-

12925.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

1116

-

491291.55

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

3720

-

1030514.19

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

372

-

202025.65

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

855.6

-

265468.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

490.42

-

56800.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

77.43

-

44770.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

51.62

-

189489.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

51.62

-

246217.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

126.71

-

933842.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

42.24

-

243334.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

4.22

-

347521.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Physical Infrastructure: Chittoor Phase-II Internal Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

1883.1

-

218100.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Formation of embankment with 50% of Gravel and 50% Of Sand and Spreading in uniform layers sectioning and consolidation with Static Road Roller to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

1883.7

-

1206735.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Forming embankment with 50% of Gravel and 50% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

2762.93

-

1533978.74

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

1874.7

-

2091359.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

160.42

-

113041.91

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

160.42

-

602179.78

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

2290.8

-

4432995.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

179.3

-

976222.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

2082

-

12020460.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

3.57

-

279604.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

2478.46

-

287055.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

557.5

-

392849.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

371.66

-

1395126.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

371.66

-

1804799.65

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

645.19

-

4808504.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

244.3

-

1426079.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

9.77

-

803973.42

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

123.82

-

14340.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

14.92

-

10511.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

22.38

-

83995.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

22.38

-

108660.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

39.78

-

296474.37

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

39.78

-

232212.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

2.39

-

196369.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 700 KL capacity E.L.S.R : ELSR 700KLConstuction of OHSR / ELSR of 700 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

700000

-

18443721.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

5310.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

28288.41

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

76508.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

215922.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

19002.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

84249.78

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

63290.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

1500

-

3921420

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

760

-

855699.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

3600

-

2605428

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

728

-

252273.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

730

-

82942.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

72961.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

57214.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

10

-

220458.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

10

-

141723.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

28344.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

2

-

25720.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

73

-

274196.03

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

25

-

249114.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

4

-

11325.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

8739.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

7

-

3515.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

73

-

12523.88

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

13083.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

10

-

17519.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

10

-

4896.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

73

-

14181.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

4408.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

8532.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

11793.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

4126.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2785.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

20

-

7635

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

20

-

3908.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

4

-

72436.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

7256.5

-

840447.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

829.59

-

584580.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1500

-

176370

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

760

-

77033.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

3600

-

247068

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

728

-

33422.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

730

-

24345.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1526.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1074.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

10

-

3256.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

10

-

1921.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

384.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

693.94

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

4

-

2991.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

4

-

2108.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

20

-

9728.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

20

-

6326.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

4

-

1265.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

2

-

437.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

26

-

176353.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

6262.64

-

1296991.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

42

-

5296.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

25.2

-

2662.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

5

-

3198.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

2160.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

10

-

1454.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

5249.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4316.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4202.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7048.31

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10778.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6843.01

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16386.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6191.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45804.65

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

788.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5610.09

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.85

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2587.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21807.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

3500

-

4760000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

3500

-

4042500

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

3500

-

1197000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

14

-

4410

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

14

-

18200

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

14

-

921376.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

7560

-

1589338.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

14

-

172228.98

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

14

-

256215.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

350

-

26642

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

450

-

681520.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

220

-

250302.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

860

-

627094.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

730

-

322134.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

20

-

135656.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

31

-

330898.03

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

1807.9

-

209390.98

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

274.12

-

193165.52

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

125.28

-

14509.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

1252.8

-

552368.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

4176

-

1180132.67

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

417.6

-

226790.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

960.48

-

298009.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

522.5

-

60515.95

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

82.5

-

58134.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

55

-

206457.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

55

-

267082.77

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

135

-

1006134.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

45

-

262683.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

4.5

-

370229.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Approach Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

894.46

-

103594.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Gravel: Collection, spreading and filling with Gravel from approved source with a lead upto 8 KM with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance all materials and water to work site and all operational charges, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work for irrespective of thickness.

2371.05

-

835940.23

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting stone aggregates of 63mm to 45mm IRC graded metal water bound macadam specification including spreading i uniform thickness, hand packing ro;;omg wotj smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming, stone screening/binding materials to fillup the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification Clause-405 MORD/404 MORTH.For compactee thickness of 75mm.

419.28

-

958733.57

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Modified Penetration Macadam (MPM) Roads using 40mm Hard Broken Granite Metal of 0.90 Cum./10 Sqmt. with required quantity of 11.2mm machine crushed chips 0.018 Cum./10 Sqmt. as the key chips and 80/100 grade Bitumen 2 Kg./Sqmt. including removal of the loose meterials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat filling the pot holes duly ramping to fill voids and compacting with three wheel statick roller of 8 to 10 Tonnes including hire charges of Hydraulic self propelled chip spreader both for aggregates and key aggregates anad also bitumen pressure distributer and power roller etc., complete for compacted thickness of 75mm.

5217.66

-

1059126.11

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing and applying Tack Coat with Bitumen emulsion using Emulsion pressure distributor at the rate of 0.20 Kg./Sqm. On the prepared Bituminous/Granular Surface cleaned with mechanical broom as per technical specification No.503 MORTH as directed by the department including cost and conveyance of all material to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work.

5217.66

-

51658.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying of Close Graded Premix Surface materials mixed seal surfaceing of 20mm thickness by Hot Mix Plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type-B) as per table 500-26 of specification 512 of MORT&H (4th revision) Pre-mixed with Bituminous binder 80/100 grade at 19 Kgs./10 Sqmt. are including transportation the hot mix to work site, laying with mechanical paver finisher to the require grade, level and alignmnet, rolling with smooth wheeled roller 8 to 10 tonnes as per MORT&H specifications 512 (4th revision) etc., complete for finished item of work in all respects as directed by the Engineer-in-charge.

5217.66

-

1003940.41

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Physical Infrastructure: Puttur Phase-II Internal Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

1042.86

-

120784.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Formation of embankment with 50% of Gravel and 50% Of Sand and Spreading in uniform layers sectioning and consolidation with Static Road Roller to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

1046.44

-

718527.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Forming embankment with 50% of Gravel and 50% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

1485.79

-

893271.81

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

1040.44

-

1121344.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

46.15

-

36809.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

46.15

-

173920.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

1263.75

-

2396246.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

51.58

-

281621.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

1140.25

-

6600665.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

1.88

-

147125.06

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

1465.95

-

169786.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

329.75

-

263011.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

219.83

-

828451.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

219.83

-

1070895.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

381.62

-

2849813.51

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

144.5

-

845486.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

5.78

-

475538.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

72.83

-

8435.46

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

8.78

-

6999.03

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

13.16

-

49604.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

13.16

-

64120.73

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

23.4

-

174743.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

23.4

-

136916.21

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

1.4

-

115511.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 200 KL capacity E.L.S.R : ELSR 200KLConstuction of OHSR / ELSR of 200 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

200000

-

6054832.81

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

6010.79

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

28400.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

76665.07

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

216104.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

19024.69

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

84321.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

63549.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2800

-

2026444

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

785

-

272026.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

210

-

23860.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

44091.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

4

-

56689.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

1

-

14172.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

1

-

12860.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

21

-

78878.31

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

6

-

807.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

2

-

2913.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

3013.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

21

-

3602.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

2

-

3503.88

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

2938.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

21

-

4079.67

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

1763.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

6

-

5119.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

1527

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

8

-

1563.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

2

-

36218.18

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

3561.78

-

412524.78

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

416.32

-

332064.98

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

2800

-

192164

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

785

-

36039.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

210

-

7003.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

651.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

4

-

768.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

192.11

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

346.97

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

4

-

1945.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

8

-

2530.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

2

-

632.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

1

-

218.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

7

-

47479.74

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

3081.07

-

638089.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

12

-

1513.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

7.2

-

760.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

720.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

581.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

5942.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4333.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4208.88

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7056.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10790.28

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6851.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16405.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6216.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45876.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

789.81

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5616.42

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2598.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21901.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

2000

-

2720000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

2000

-

2310000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

2000

-

684000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

8

-

2520

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

8

-

10400

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

8

-

526501

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

4320

-

908193.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

8

-

98416.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

8

-

146408.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

200

-

15224

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

100

-

151449

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

110

-

125151.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

360

-

262504.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

210

-

92668.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

8

-

54262.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

11

-

117415.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

620.7

-

71889.47

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

94.35

-

75254.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

74.1

-

8582.11

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

741

-

326207.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

2470

-

700485.19

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

247

-

134140.69

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

568.1

-

176265.07

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

505.26

-

58519.21

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

79.78

-

63633.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

53.19

-

200451.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

53.19

-

259113.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

130.55

-

974904.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

43.52

-

254640.74

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

4.35

-

358052.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Physical Infrastructure: Punganur Phase-II Internal Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

2300.6

-

266455.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Formation of embankment with 50% of Gravel and 50% Of Sand and Spreading in uniform layers sectioning and consolidation with Static Road Roller to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

2305.69

-

1883771.79

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Forming embankment with 50% of Gravel and 50% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

2227.34

-

1629477.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

2295.19

-

2994373.73

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

154.93

-

130774.09

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

103.28

-

407834.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

2837.75

-

6044662.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

115.45

-

651776.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

2615.25

-

15628534.18

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

4.31

-

337292.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

2641.08

-

305889.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

594.08

-

501454.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

396.05

-

1563930.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

396.05

-

2003577.65

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

687.53

-

5258157.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

260.33

-

1566593.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

10.41

-

856726.97

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

72.83

-

8435.46

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

8.78

-

7406.85

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

13.16

-

51976.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

13.16

-

66587.78

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

23.4

-

178960.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

23.4

-

283401.85

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

1.4

-

115511.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 500 KL capacity E.L.S.R : ELSR 500KLConstuction of OHSR / ELSR of 500 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

500000

-

14082938.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

6361.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

29758.31

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

78565.03

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

218319.79

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

19298.47

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

85191.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

63680.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

485

-

546071.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

3000

-

2171190

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

1740

-

602962.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

470

-

53401.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

57214.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

4

-

88183.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

6

-

85034.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

28344.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

3

-

38580.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

47

-

176537.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

10

-

1346.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

2

-

5662.58

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

10

-

14565.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

2008.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

47

-

8063.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

6541.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

6

-

10511.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

2938.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

47

-

9130.69

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

4408.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

8532.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

11793.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2785.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

8

-

3054

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

12

-

2345.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

6

-

108654.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

5295.6

-

613336.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

620.7

-

523923.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

485

-

49159.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

3000

-

205890

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1740

-

79883.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

470

-

15674.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1074.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

4

-

1302.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

6

-

1152.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

384.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

3

-

1084.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

4

-

2108.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

8

-

3891.52

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

12

-

3795.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

4

-

1265.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

3

-

655.9

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

14

-

94959.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

4581.39

-

948806.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

25.5

-

3215.55

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

15.3

-

1616.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2558.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

1440.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

10

-

1454.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

6288.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4541.14

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4287.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7157.63

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10938.42

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6952.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16629.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6229.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45911.95

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

800.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5693.31

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2604.07

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21948.15

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

5000

-

6800000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

5000

-

5775000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

5000

-

1710000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

20

-

6300

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

20

-

26000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

20

-

1316831.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

10800

-

2270484

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

20

-

246041.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

20

-

366022

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

500

-

38060

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

545

-

825397.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

820

-

932946.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

785

-

572406.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

470

-

207401.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

29

-

196701.78

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

43

-

458987.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

2362.6

-

273636.33

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

325.2

-

274496.44

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

133.5

-

15461.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

1335

-

874368.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

4450

-

1315946.67

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

445

-

241670.47

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1023.5

-

317563.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

828.69

-

95978.88

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

130.85

-

110448.52

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

87.23

-

344455.57

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

87.23

-

441287.91

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

214.11

-

1637490.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

71.37

-

429484.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

7.14

-

587183.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Approach Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

1090.8

-

126334.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Gravel: Collection, spreading and filling with Gravel from approved source with a lead upto 8 KM with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance all materials and water to work site and all operational charges, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work for irrespective of thickness.

2891.53

-

1640344.13

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting stone aggregates of 63mm to 45mm IRC graded metal water bound macadam specification including spreading i uniform thickness, hand packing ro;;omg wotj smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming, stone screening/binding materials to fillup the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification Clause-405 MORD/404 MORTH.For compactee thickness of 75mm.

511.31

-

1284733.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Modified Penetration Macadam (MPM) Roads using 40mm Hard Broken Granite Metal of 0.90 Cum./10 Sqmt. with required quantity of 11.2mm machine crushed chips 0.018 Cum./10 Sqmt. as the key chips and 80/100 grade Bitumen 2 Kg./Sqmt. including removal of the loose meterials in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat filling the pot holes duly ramping to fill voids and compacting with three wheel statick roller of 8 to 10 Tonnes including hire charges of Hydraulic self propelled chip spreader both for aggregates and key aggregates anad also bitumen pressure distributer and power roller etc., complete for compacted thickness of 75mm.

6363

-

1393116.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing and applying Tack Coat with Bitumen emulsion using Emulsion pressure distributor at the rate of 0.20 Kg./Sqm. On the prepared Bituminous/Granular Surface cleaned with mechanical broom as per technical specification No.503 MORTH as directed by the department including cost and conveyance of all material to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work.

6363

-

62998.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying of Close Graded Premix Surface materials mixed seal surfaceing of 20mm thickness by Hot Mix Plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type-B) as per table 500-26 of specification 512 of MORT&H (4th revision) Pre-mixed with Bituminous binder 80/100 grade at 19 Kgs./10 Sqmt. are including transportation the hot mix to work site, laying with mechanical paver finisher to the require grade, level and alignmnet, rolling with smooth wheeled roller 8 to 10 tonnes as per MORT&H specifications 512 (4th revision) etc., complete for finished item of work in all respects as directed by the Engineer-in-charge.

6363

-

1249692.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Physical Infrastructure: Madanapalli Phase-II Internal Roads: Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Road works.

3301.85

-

382420.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Formation of embankment with 50% of Gravel and 50% Of Sand and Spreading in uniform layers sectioning and consolidation with Static Road Roller to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

3301.88

-

2393796.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Forming embankment with 50% of Gravel and 50% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

3325.42

-

2126805.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of granular sub-base by providing Well graded material for grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.

3292.88

-

3922478.66

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

171.41

-

128757.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

171.41

-

656097.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work.

4067.5

-

8188324.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

191.59

-

1057715.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

3744.5

-

21903867.72

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

6.22

-

486764.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Storm water Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

3834.01

-

444055.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Drain foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

862.41

-

647813.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

574.94

-

2200669.09

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain Bed.

574.94

-

2836112.07

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 Prop. 20 mm to 10mm graed graded hard granite machine crushed metal incluidng cost and conveyance of all materials and water to work site and all labour charges, , laying, curing etc., complete for Drain side walls.

998.07

-

7512193.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

377.91

-

2231826.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars (Fe.415 grade & Fe.500 grade as per IS1786 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed complete for 8mm to 40mm).

15.12

-

1243674.15

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;CC Culverts:Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts.

131.1

-

15183.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

15.8

-

11864.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for Bed of Culverts.

23.69

-

90686.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

23.69

-

116860.01

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

42.12

-

317025.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

42.12

-

476380.15

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

2.53

-

207920.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;1 No. of 600 KL capacity E.L.S.R : ELSR 600KLConstuction of OHSR / ELSR of 600 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

600000

-

16354662.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;GLSR /SUMP - 100 KL Capacity :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

135.64

-

15709.59

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

7.54

-

5660.79

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

7.54

-

28845.17

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and placing of VRCC. M30 grade design mix concrete corresponding to IS-456 using BATCHING PLANT with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.(APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR BOTTOM SLABS

11.86

-

77287.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of workt.,for GLSR SIDE WALLS.

13.83

-

216830.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP RING BEAM.

1.71

-

19114.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC. M30 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER / MIXER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of worktt.,for GLSR TOP DOME SLAB.

5.43

-

84606.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

3.94

-

324150.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

128.19

-

63419.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement primer making 3 coats of all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

56.44

-

13001.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Re-Filling with excavated earth for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and labour charges, hire charges of T&P etc., complete for finished item of work.

60.47

-

12523.04

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of RCC Cover of 22" Dia. with nominal reinforcement 3" thick and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply, Transportation of 10.00HP Three Phase open well ISI Submersible Motor Pumpset (100x75) with makes adopted in sor. Including errection in GLSR.(WITH 35M HEAD)

2

-

94831.02

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.)PVC insulated 1100 V grade of ISI approved make as per IS 694/1990 specifications of copper cable of approved make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connections.

50

-

10508

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Erecting of Panel Mounting 125A, 4 Pole, MCCB 25KA, adjustable conforms to IEC 60947-2 and IS 13947 Part-I and II having required breaking capacity with thermal magnetic release Panel Mounted with all connections etc., complete on existing panel.

2

-

24599.56

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing of Automatic Star Delta Starter of approved make fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 15.00 HP Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site,

2

-

36595.38

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 100mm Dia. B Class G.I. Pipe, properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows,tees,couplings, nipples,plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of approved make etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;External water Supply: Manufacture, Supplying and delivery of OD 250mm Dia. DI Pipe of K7 conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (above 90mm dia. straight length in 6mts.)

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

1000

-

1125920

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

5375

-

3890048.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

1855

-

642813.15

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

780

-

88623.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I.D/F SLUICE VALVES OF 250mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with D.I grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

57214.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

2

-

44091.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. , including cost and conveyance of all materials to work site, loading, unloading traansportation charges and all other connected taxes etc., complete for finished item of work.(pn-1.0 (MPa)

10

-

141723.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Scover Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with D.I grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

2

-

28344.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All inteernal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges and all other connected taxes etc., complete for finished item of work.

2

-

25720.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavey type

78

-

292976.58

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. D/F Specials as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading etc., complete as directed by the Departmental Authorities.

10

-

1346.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

4

-

11325.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

2

-

2913.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

7

-

3515.26

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

78

-

13381.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

13083.92

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

7007.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

10

-

4896.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

78

-

15153.06

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 110mm x 125mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

4408.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 140mm x 160mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

8532.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

10

-

11793.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 250mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 200mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2785.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 160mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work

4

-

1527

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

20

-

3908.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

4

-

72436.36

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, inD.Idental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines.

8481.95

-

982379.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, inD.Idental, labour charges, hire charges & T& P etc., complete for finished item of work (APSS No.309 & 310).

989.66

-

743401.48

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 250mm Dia. DI Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 200mm Dia.HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1000

-

101360

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

5375

-

368886.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

1855

-

85163.05

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, inD.Idential and all labour charges etc., complete for finished item of work.

780

-

26013

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 250 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1074.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

651.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

10

-

1921.1

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

384.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for Lowering and keeping in position of 50 mm Dia. AIR VALVE including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

693.94

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 250 mm dia D.I. Sluice Valve.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 200mm dia D.I. Sluice Valve.

4

-

2108.24

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water with a lead upto 500 Mts. and testing to required pressure and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 150mm Dia.Sluice Valve.

4

-

1945.76

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Sluice Valve.

20

-

6326.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing D.I pipes and valves with flanged ends excluding cost and joints materials such as bolts, nuts rubber packing, whilte lead including filling with water conveyance and all other chrges etc.,complete for 100mm Dia. Scour Valve.

4

-

1265.32

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Labour charges for jointing DI pipes and valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail piece etc., and including cost and conveyance of all materials to site of wo and all other chrges etc.,complete for 50mm Dia. Air Valve.

2

-

437.27

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits)

16

-

108525.12

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Refilling the pipe line trenches with excavated earth complying with standard speD.Ification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

7332.82

-

1518627.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

27

-

3404.7

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

16.2

-

1711.37

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 200mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

2558.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 160mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

1440.64

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and delivery of 110mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding ExD.Ise duty, Sale Tax and speicals etc., complete for finished item of work.

10

-

1454.3

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PUMP ROOM :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

6.4

-

741.25

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling with Sand in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements. (APSS No.309 & 310).

7.45

-

5596.34

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for finished item of work.

1.15

-

4401.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for FOOTINGS.

0.49

-

4234.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for VRCC PEDESTALS.

-

-

-

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for PLINTH BEAMS.

0.63

-

7089.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for COLUMNS

0.92

-

10838.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF BEAMS

0.63

-

6884.42

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for ROOF SLAB

1.4

-

16478.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing Impervious coat to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved 1kg of water proof compound per bag of cement laid over roof when it is green, and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

12.54

-

6203.79

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 75 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

45840.39

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete for finished item of work as directed by the Department for LINTELS

0.07

-

793.35

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with 20mm & 12.5mm nominal size machine crushed hard granite metal from approved source including cost and conveyance of all materials like cement, sand, metal, water etc., to site and including seignionarage charges, taxes on all materials including operational, incidental and labour charges weight batching, machine mixing, laying concrete, curing etc complete, but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content as per IS code as approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc complete as directed by the Department finished item of work for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:4) Prop. and finished to average thickness of 50mm.

0.48

-

5641.61

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

0.3

-

24288.87

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Steel powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-150mm long M.S.Powder Coated Tower Bolts, (iii) 1 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.85

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;2'-0"x 3'-0" Window:- Providing and Fixing of Steel windows and top hung and fixed louvered ventilators made of Pre-painted steel (Base steel as per IS 513 of 0.58mm thick D quality galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 46x52mm section and for shutter of 46x46 mm section and for mullion 46 x 70 mm and section for beading should be of 18x 25 mm and section for louverd ventilation of 33x 56 mm box section the windows panelled with 5 mm thick plain float glass and 4 mm pin head glass for ventilator with Ethyl Propeylened diamine monomer gasket (EPDM) and the sections cut to length mitre joined with corner bracket, centre mullion fixed using mullion cap and with handle made of high grade alluminium powder coated and nylon receiver , corner bracket made of CRCA with Zinc phasphate mullion caps made of glass filled nylon, frames fixed to the concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc.,complete for finished item of work.

1

-

3522.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges,complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2593.2

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.62

-

21854.45

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to New Wood Work / Iron Work in two coats with Synthetic Enamel Paint in all shades of Grade-I having V&C (Volatile Organic Compound) content less than 50 grams/Liter of aprpoved brand and colour over one coat of Primary coat including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.83

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work.

64.62

-

14887.99

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Drilling of Borewells: Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

6250

-

8500000

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

6250

-

7218750

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;180mm dia. Pvc Casing pipe perforation charge

6250

-

2137500

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply & Fixing of 180mm dia. PVC Bore Cap

25

-

7875

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Geological Survey charges excluding taxes for Plain Area

25

-

32500

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Transportation of 12.5 HP, 8-12 Stage, 5 starrated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

25

-

1645315.62

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

13500

-

2838105

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

25

-

307551.75

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

25

-

457527.5

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (from Bore hole pipe)

625

-

47575

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;SEWAGE LINES :Manufacture, Supply and delivery and jointing of OD of 460 mm dia (400 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

50

-

136929

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 347 mm dia (300 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

640

-

969273.6

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 295 mm dia (250 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

1820

-

2070686.8

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 235 mm dia (200 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

1400

-

1020852

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture, Supply and delivery and jointing of OD of 180 mm dia (150 Inner dia) SN-8 Double Wall Corrugated (DWC) piping system with non smooth external annular corriguted and smooth internal surface (double wall) for non presssure seweage and drainage application pipe of standard lenght 6.00 Mts grade conforming to IS :16098 (Part-II -2013) including cost and conveyance of pipes to work site, laying, lowering in to trenches true to alignment and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations cutting of pipes wherever necessary including jointing etc complete for finished item of work

780

-

344198.4

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

51

-

345923.82

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Constructing of 904.0 mm (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6) Prop. using Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sqmm including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Perforated Manhole Covers with Frames including excavating pits upto a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC( 1:2:4) prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of seignorage charges on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

77

-

821908.01

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

4205.05

-

487028.89

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand in foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

581.33

-

436671.96

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;KERB WALL :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

193.8

-

22445.53

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Collection and filling of Gravel from approved source including cost & conveyance of all labour charges to site of work, seignorage charges,filling and watering charges etc;

1938

-

1092278.68

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

6460

-

1857689.22

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes 4 KG/SQCM conforming to IS: 4985/2000 including transportation to the site including taxes complete

646

-

350829.49

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Painting to kerb stone with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1485.8

-

461000.95

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Retaining wall: Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). (Ordinary soils-Mechcanical Means-Upto 3 m depth)

548.51

-

63528.43

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping,curing machine mixing etc.,complete for Bed of Flooring and Foundations.

28.41

-

108743.54

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with stone aggregate of 20mm & 12.5mm nominal size machine crushed hard granite metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, Wall Plates, Steel centering plates etc., mixing concrete, pumping of concrete, laying, levelling, vibrating with vibrator, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the department for VRCC FOOTINGS.

75.75

-

654635.29

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;VRCC M20 grade design mix concrete corresponding to IS-456 using BATCHING PLANT at site with stone aggregate of 20mm & 12.5mm nominal size machine crushed hard granite metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, Wall Plates, Steel centering plates etc., mixing concrete, pumping of concrete,laying , levelling, vibrating with vibrator, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the department for VRCC PEDESTALS.

468.43

-

4324096.07

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) Steel Bars (Fe 415/Fe.500 Grade as per IS1786-1979) of different of diameters for RCC Works including labour charges for straightening, cutting, bending to required size and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastage, such as overlaps, couplings, chairs, spacer bars and binding wire, cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work for all Floors. (APSS.No.126). Payment will be made on the basis of wieght of fabrication deformed bars only. No re-rolled steel shall be allowed for 8mm to 40mm).

78.91

-

6492175.84

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing and Fixing of 100mm dia PVC pipe line 30cm long for weep holes including cost of material,drilling and labour charges etc. completed with all leads and lifts.

76.5

-

13471.65

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Outfall Drains :Earth work excavation and depositing on bank for all lifts and with an initial lead of 10mts incluidng all operational, incidental, labour charges, such as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work by mechanical means up to 3.00 Mts depth.

1043.43

-

120850.06

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.

164.75

-

123754.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing and all other taxes etc., complete for Bed of Foundations.

109.84

-

420429.08

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

109.84

-

541827.93

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain Side walls.

269.6

-

2029203.71

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (for Cover Slabs)

89.87

-

530746.16

... More
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Se;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

8.99

-

739388.98



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.