Andhra Pradesh Industrial Infrastructure Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender

Civil And Construction
Drainage Work
Opening Date1 Aug 2023
Closing Date21 Aug 2023
Tender Amount₹ 7,08,87,409 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Forming embankment with Side earth by mechanical means upto SDR including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

19500

2420925

124.15

... More
Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T & P, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

1000

631630

631.63

... More
Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

6000

12196320

2032.72

... More
Providing Dry lean cement concrete subbase over a prepared subgrade with coarse and ifne aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1, aggregate gradaiation after blending to be as per table 600-1, cement content no to be less than 150 kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor/manual means without paver, compcating with 8-10 tonnes vibratory roller, finishing and curing complete for finished item of work as per MoRth (5th revision) specifications 601 and as directed by the Engineer-In-Charge for base coarse below CC pavement

2680

9136468

3409.13

... More
Construction of Un reinforced, dowel jointed plain cement concrete pavement over a preparted sub base with 43 grade cement @ 400 kg per cum coarse and fine aggregate conforming to IS 383, Maximum size of coarse aggregate not exceeding 25mm and confirming to clause 602.2.6.4 mixed in concrete mixer 0.28/0.4 cum capacity (6 mixers) with weigh batcher as per approved mix design laid with manual means without paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion constructions and longitudinal joints joint filler seperation membrane sealent primer joint sealent debonding strip dowel bar tie rod admixture as approved curing finsihing to lines and grades etc., as per MoRT&H specification No. 602 (5th Revision) and as directed by the Engineer In charge for 7.00 Mts CW (Dowel bars - 25 mm dia @ 4.5 M intervel along the road and at a spacing of 300 mm c/c & Tie Bars - 10 mm dia bars of 60 cm length @ spacing 60 cm c/c )

2200

11258874

5117.67

... More
Construction of Un reinforced, dowel jointed plain cement concrete pavement over a preparted sub base with 43 grade cement @ 400 kg per cum coarse and fine aggregate conforming to IS 383, Maximum size of coarse aggregate not exceeding 25mm and confirming to clause 602.2.6.4 mixed in concrete mixer 0.28/0.4 cum capacity (6 mixers) with weigh batcher as per approved mix design laid with manual means without paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion constructions and longitudinal joints joint filler seperation membrane sealent primer joint sealent debonding strip dowel bar tie rod admixture as approved curing finsihing to lines and grades etc., as per MoRT&H specification No. 602 (5th Revision) and as directed by the Engineer In charge for 3.6 Mts CW ( (Dowel bars - 25 mm dia @ 4.5 M intervel along the road and at a spacing of 300 mm c/c)

2930

14903122

5086.39

... More
Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside road boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P, complete for finished item of work as per MORT&H specification 305 (5th revision) (Payment will be made based on levels for finished item of work)

8000

4708000

588.5

... More
Pipe Culverts - 0.60M Dia Pipe Culverts - 34 Nos

-

-

-

... More
Earthwork excavation in soils upto SDR by mechanical means for Drains / foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge

750

95385

127.18

... More
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.

95

450277

4739.76

... More
Providing, laying Reinforced cement concrete Hume pipes of 600 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 600 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

347.5

1216211

3499.89

... More
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure .

359

2096308

5839.3

... More
Painting two coats after filling the surface with Synthethic Enamel paint in all shades on new plastered concrete surfaces

180

19935

110.75

... More
Storm Water Drains-3.10 KM

-

-

-

... More
Earthwork excavation in soils upto SDR by mechanical means for Drains / foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge

10100

1284518

127.18

... More
Sand filling in foundation including cost and conveyence of all materials to site and watering, tamping etc., complete for finshed item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer - in - Charge.

320

307875

962.11

... More
Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below Foundation

250

1103432

4413.73

... More
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500, 1600, 1700 & 2200 (4th revision ) and as directed by the Engineer-in-Charge for Drains.

480

3088382

6434.13

... More
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision ) and as directed by the Engineer-in-Charge for foundations Raft

380

2315104

6092.38

... More
Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

34400

2754409

80.07

... More
Supply and fixing of seperation membrane of MAESTIC PAD 12.7mm thick uniformly in single layer including cost and conveyance of all material and all labour charges as directed by the Engineer-in- Charge.

43

22747

529

... More
No. of BOQ items: 22(Twenty Two) only

-

70887408

-

... More
(Rupees Seven Crores Eight lakhs Eighty Seven thousand Four hundred and Nine Only)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.