To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Forest Department - APFDC Tender
Civil Works Water Works
Opening Date23 Jun 2020
Closing Date9 Jul 2020
Tender Amount₹ 1,87,43,688 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339413Bid Award Id
ViewTender No
1-CF,KURNOOL/2020-21Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://www.apfdcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using sheep foot roller / vibratory roller / 8 to 10 tonne power roller etc. complete with initial lead upto 1 km and all lifts as directed by the DFO (IRR-DAW-5-5)
-
5973990
-
... More
Providing cut-off trench filling using selected impervious soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using sheep foot roller / Pad foot roller as stipulated etc. complete with initial lead upto 1 km and all lifts as directed by the DFO (IRR-DAW-5-2)
-
5324117
-
... More
Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc. completed (Rubble stones : 0.2475 cum / sqmt) (For Maintenance works) and as directed by the DFO. (IRR–CAW-8-2-A)
-
1367497
-
... More
Providing and constructing dry rubble rock – toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to requires slopes etc., complete with initial lead upto 1 km and all lifts and as directed by the DFO. (IRR-DAW-5-8)
-
526659
-
... More
Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying filter criteria including cost of all materials, machinery, labour, compacting etc., complete with initial lead upto 50 m and all lifts and as directed by the DFO (IRR-DAW-6-6)
-
950638
-
... More
Excavation in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shorting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material and as directed by the DFO (IRR-CCDW-1-2).
-
360239
-
... More
Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than 10 N / Sq.mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation, fitting including cost of all materials, machinery, labour, form work, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc. complete with initial lead upto 50 m and all lifts. (Cement content : 220 Kg /cum with use of super plasticizer (0.4% by wt. of cement), CA: 0.90 cum, blending ratio of CA – 50: 30 :20, FA:0.40 cum) and as directed by the DFO. (IRR-CCDW-2-5)
-
869122
-
... More
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N / Sq.mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc. complete for plain concrete works with initial lead upto 1 Km and all lifts. (Cement content : 260 Kg /cum with use of super plasticizer, CA: 0.90 cum, blending ratio of CA – 50:30:20, FA:0.40 cum) and as directed by the DFO. (IRR-DAW-2-5)
-
677290
-
... More
Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N / Sq.mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, leveling, compacting, finishing, curing, packing joints with asphalt mortar etc. complete with initial lead upto 50 m and all lifts. (Cement content : 330 Kg /cum with use of super plasticizer (0.4% by wt. of cement), CA: 0.80 cum, blending ratio of CA – 65:35, FA:0.45 cum) and as directed by the DFO(IRR-CCDW-2-26)
-
123766
-
... More
Total of Estimated Cost Value (ECV):
-
18794433
-