Andhra Pradesh Disaster Recovery Project Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Disaster Recovery Project Tender
Eprocure
Opening Date17 Dec 2018
Closing Date17 Jan 2019
Tender Amount₹ 6,08,12,170
Costs
EMD
₹ 6,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of High Level Bridge In Place Of Damaged Causeway On Road .
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_APDRP_419703_1Bid Award Id
ViewTender No
172/AP/PR/APDRP/RRCS/PREDTender Authority
Andhra Pradesh Disaster Recovery Project ViewPurchaser Address
-Website
http://http://apsdma.ap.gov.in/view-apdrp
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specifications Clause 1204.12 MORD, including over heads, and seinorage charges for RCC Grade M40 (Design Mix) but excluding GST
657.72
-
-
Providing and laying reinforced cement concrete M35 grade (Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD ,including overhead charges & Contractors profit, and seignorage charges upto 5m height.but excluding GST. For piers, abutments & return walls
34.34
-
-
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD ,including overhead charges & Contractors profit, and seignorage charges upto 5m height.but excluding GST. For wing walls
124.8
-
-
Providing and laying reinforced cement concrete M35 grade (Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD ,including overhead charges & Contractors profit, and seignorage charges up to 5m height.but excluding GST. For piers
53.63
-
-
Providing and laying reinforced cement concrete M40 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD including overhead charges & Contractors profit from 5m to 10 m height excluding GST. For Cross Beams, Deck Slab and Kerbs
257.24
-
-
Providing and laying reinforced cement concrete PSC M45 grade with 20mm graded granite metal of approved quality as coarse aggregate and river sand as fine aggregate (using a minimum of 400Kgs of O.P.C (Ordinary Portland Cement 53 grade) confirming to IS 12269, latest edition per cum of finished concrete) in pre-cast prestressed I-girders including end anchor blocks, including handling, transportation and erecting in position as per approved drawings including necessary tools plants, machinery, lifts and other inputs like approved super etc., complete. As with all lifts and depths including shuttering, form work lifting, handling and placing on bearings but excluding the cost of reinforcement all complete, true to level and position as per I.R.C 112/cl/12.2.1/2014 including overhead charges & Contractors profit, For T- Beams. from 5 to 10 mts. height.but excluding GST.
260.5
-
-
Providing and laying cement concrete wearing course M30 (Design Mix) grade using 20 & 10mm metal mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD ,including overhead charges & contractors profit, and seignorage charges, but excluding cost of steel and but excluding GST.
38.03
-
-
Supplying, fitting, and placing HYSD Fe 500 bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 MORD , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit etc.,complete.but excluding GST.
197.24
-
-
Supplying, fitting, and placing HYSD bar Fe 500 reinforcement in sub structure complete as per drawing and technical specifications Clauses 1000 and 1202 MORD , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Piers, Pier caps & Pedastals, Abutments, Bed blocks, Guard walls. Contractors profit etc.,complete.but excluding GST.
15.54
-
-
Supplying, fitting, and placing HYSD bar Fe 500 reinforcement in super structure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD , for Bars below 36 mm dia including over laps and wastage, where they are not welded, including overhead charges & Contractors profit etc.,complete.but excluding GST.
59.51
-
-
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 including overhead charges & Contractors profit etc.,complete.but excluding GST.
81.14
-
-
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe4 kgs/cm2 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD including overhead charges & Contractors profit etc.,complete.but excluding GST.
44
-
-
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including Seigniories overhead charges & Contractor profit etc.,complete but excluding GST.
1545.6
-
-
Construction of R.C.C. railing of M 30 grade including reinforcement in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD including overhead charges & Contractors profit, and seignorage charges but excluding GST.
156
-
-
Supplying, fitting and fixing in position true to line and level Elostomeric Neoprene Bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1 MORD including overhead charges & Contractors profit etc.,complete.but excluding GST.
172800
-
-
Providing and constructing one span service road to reach island location from one pier location to another pier location as per Tech. including overhead charges & Contractors profit & Seigniorages, but excluding GST.
90
-
-
Conducting load test on a single pile up to folowing capacity in accordanc with IS 2911(part IV) including installation of loading platfrom and preparation of -pile head of construction of test cap and dismantiling of test cap after test etc with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification Clause 1204.11 MORD , as directed by the Engineer including overhead charges & Contractors profit but excluding GST. etc.,complete.
2
-
-
Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and formed into the joint gap with special adhesive binder to cater for a horizental movement upto 40mm and vertical movement of 3 mm as per drawing and Technical Specification Clause 1403.8 &1403.9 MORD including overhead charges & Contractors profit and but excluding GST...
34
-
-
Providing MS steel liner of 6mm thick for piles including fabricating and setting out as per detailed drawing including all over heads & contractors profit and but excluding GST. 1 @ 187kg/m
840
-
-
Drilling empty of bore 1200mm dia for pile inculing conveyance of all materilas, mechinary , Drawing and Technical Specifications Clause 1204.2 MORD and removal of excavated earth with all lifts and lead upto 1000 m. including overhead charges & Contractors profit and but excluding GST. etc.,complete.
112
-
-
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including De watering setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD.including overhead charges & Contractors profit and Seigniorages. but excluding GST .
1786.78
-
-
DISMANTLING of PCC Concrete more than 150mm thick, clearing away and carefulyly stacking materials useful for reuse for dummy pile Concrete including all Labour & Tool charges etc.complete. including overhead charges & Contractors profit, but excluding GST. etc., Complete.
960
-
-
Construction of Embankment by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 407 MoRD including all over heads & Contractors profit, and seignorage charges but excluding GST.
11193
-
-
Supplying, fitting and fixing in position true to line and level Elostomeric Neoprene Bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1 MORD including overhead charges & Contractors profit and GST etc.,complete.
338580
-
-
Providing and laying reinforced cement concrete 1000 mm dia NP3 pipe for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit, and Seigniorage charges etc. complete.but excluding GST.
75
-
-
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 , including overhead charges & Contractors profit and Seigniorage charges etc. complete.but excluding GST.
1575
-
-
Providing and fixing of typical Informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be we welded with MS angle irone frame of 25 mm x 25 mm x 5 mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level. The top most diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG sheet tube. All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORDincluding overhead charges & Contractors profit, etc.,complete.but excluding GST.
10
-
-
A) Two coasts of elastomeric membrane coasting Bentoflair WG or approved equivalent with breathing property over one coat of its primer Bentoflair WG or approved equivalent. The system should be made of water based acrylic polymer with selected mineral fillers and should be ultra violet resistant, carack bridging type, carbonation resistant water proofing coating. The consumption should be approximately 250 gms per sq.m. (two coats) for the polymer coating and 100 gms per sq.m. for the primer. Contractor shall apply only approved shade/shades of polymer coating. Total thickness of the coating shall not be less than 165 micron (DFT). including overhead charges & Contractors profit and etc.,complete.but excluding GST. B) Surface preparation shall be properly made by cleaning., chipping and removing the dirt particles of the concrete with wire brush and washing with water. Acrylic modified putty shall be applied over the surface to fill the cavities and pin holes of concrete surface prior to application of primer coat and the top coats.but excluding GST.
2189.03
-
-
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm as per Tech .including overhead charges & Contractors profit, but excluding GST. etc.,complete.
2189.03
-
-
Reinforced cement concrete M30 grade (Design Mix) using 20 & 10mm metal mechanically mixed for approach slab including reinforcement as per drawing and technical specifications Clauses 800 and 1211 MORD including overhead charges & Contractors profit and but excluding GST. etc.,complete.
2189.03
-
-
Road work
-
-
-
Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively. and, spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 407 MORD including overhead charges & Contractor profit & Seigonarage charges but excluding GST Complete etc.
336
-
-
Construction of granular sub-base by providing well graded Material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotvator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD .including contractors profit & Over head charges & Seigonarage charges but excluding GST. etc. complete.
180
-
-
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD,including overhead charges & Contractor profit & seigneorage charges but excluding GST.etc., complete
180
-
-
Providing and laying bituminous macadam with 40-60 TPH hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieved the desired compaction as per Technical Specification Clause 504 MORD (using vibratory Roller 80-100 KN for intermediate rolling and 3 wheel roller 80-100 KN for initial and final rolling) including overhead charges & Contractors profit, but excluding GST and seigniorage charges etc., complete
180
-
-
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit and seigniorage charges etc., complete but excluding GST. for Prime Coat
2175
-
-
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit and seigniorage charges etc., complete but excluding GST. for Tack Coat
2400
-
-
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table 500.15 of MORD using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade as per Tech.including overhead charges & Contractors profit and seignioragecharges etc., complete but excluding GST.
2400
-
-
Bridge Protection work
-
-
-
Earthwork in excavation for De watering and structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD.including overhead charges & Contractors profit and seigniorage charge.but excluding GST.
390
-
-
Construction of improved subgrade by providing and spreading in uniform layers on prepared surface ,and compacted as per Technical Specification Clause 303 MORD by using machinery including overhead charges & Contractor profit & Seigonarage charges etc. complete.but excluding GST.
354
-
-
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including overhead charges & Contractors profit and seigniorage charges but excluding GST. for bed concrete
84.3
-
-
Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including overhead charges & Contractors profit and seigniorage charge.but excluding GST.
77.7
-
-
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 MORD including overhead charges & Contractors profit and seigniorage charge.but excluding GST.
96
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements