Airports Authority Of India Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Airports Authority Of India - AAI Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 May 2025
Closing Date13 Jun 2025
Tender Amount₹ 41,30,251 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and installing of following size of perforated Hot Dipped Galvansied iron cable tray with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc as required. 600mm width X 50mm depth X 2mm thickness

50

-

-

... More
Supply and fixing of class A electrical insulation mats confirming to IS 15652 of thickness minimum 2.0mm with shock proof under leakage current 10 mA of size 1mtr X 2mtrs (or as per site requirement) complete as required.

50

-

-

... More
SITC of 2.0 TR BEE-5 star rated Hi Wall Split inverter AC, complete with inverter compressor suitable for operation at 230V +/- 10% AC power supply, including requiste size suction and discharge Copper pipe and copper pipe insulation, PVC inuslated PVC sheathed multicore copper conductor power cable between from indoor to outdoor unit, drain pipe of length atleast 5 mtrs, installation of outdoor on suitable size MS stand as per site requirement etc., complete as required. Job also includes any minor civil works involved as a part of installation.

2

-

-

... More
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (a) 1st Year after DLP- (Prefixed percentage of 5% on item 1)

4

-

-

... More
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (b) 2nd Year after DLP-(Prefixed percentage,5% escalation on item 7)

4

-

-

... More
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (c) 3rd Year after DLP-(Prefixed percentage,5% escalation on item 8)

4

-

-

... More
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, including carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (d) 4th Year after DLP-(Prefixed percentage,5% escalation on item 9)

4

-

-

... More
All inclusive comprehensive maintenance contract-replacement of all spares excluidng batteries for 4 x40 KVA UPS system as per OEM recommendations, inclduing carrying out mandatory quarterly servicing and attending the breakdown calls within 24hrs as and when required (1job = 1 quarterly visit for 4 nos of 40KVA UPS ). (e) 5th Year after DLP-(Prefixed percentage,5% escalation on item 10)

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.