Acharya NG Ranga Agricultural University Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Building Construction
Opening Date4 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 10,73,892 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
348164Bid Award Id
ViewTender No
3/AU/EO/TPA/2020-21Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Filling with stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering ramming including cost and conveyance of water to work site and all operational, incidental, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work.
17.1
-
14261
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Plain cement concrete (1:4:8) prop. (cement, fine aggregate, coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size Hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand coarse aggregate, water etc., to site, excluding sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete as directed by the department.
13.46
-
52413
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Footings: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
7.82
-
66634
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Pedestals: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
2.43
-
22103
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Plinth beams: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
5.26
-
58055
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Columns: GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
5.85
-
67491
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Lintels: GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
3.12
-
36027
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Sun shades:GF: (62.5mm average thick): RCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
3.65
-
3584
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Roof beam:GF: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
4.92
-
54051
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;125mm thick GF slab: VRCC M- 20 Nominal mix (using 400kgs of cement)( 1:1.5:3) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including Adjustable Jack screw Props and Acro span hire charges for centering & scaffoldingcost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work.
62.28
-
81774
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Refilling with useful available excavated earth (excluding rock) in trenches sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P, including over heads and contractor profit etc.,complete for finished item of work.
39.86
-
12955
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;50mm thick platforms:Reinforced cement concrete M-20 Nominal mix using 12mm size hard granite machine crushed graded metal (Coarse aggregate - as per IS 383 -1970 and IS 2386 part1 to part8) from approved quarry, using a minimum quantity of 350kgs. Of cement per 1cum of concrete using concrete Mixer 10/7 cft (0.2/0.8cum) capacity including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site including centering, shuttering, labour charges such as weigh batching, machine mixing, hire charges of concrete mixer, laying concrete, lift charges, curing etc., and overheads & contractor profit complete for finished item of work.
4.69
-
4010
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing High Yield Strength Deformed (FE-500 / TMT grade as per IS 1786-2008) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawing, including cost and conveyance of steel bars including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending placing in position, tying excluding sales and other taxes on all materials etc., and overheads & contractors profit complete for finished item of work.
3548.98
-
214536
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;PCC (1:2:4) proportion nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water, etc. to site, excluding sales and other taxes on all materials and including all charges for machine mixing, laying concrete in foundations, ramming in 15cm layers, finishing top surface to the required level, curing, overheads & contractor profits etc. complete for the finished item of work
6.6
-
31937
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM(1:3) prop. Using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 100ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads and contractors profit complete for finished item of work
62.28
-
28088
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Masonary work in CM(1:6) prop. (cement: screened sand) in super structure with fly ash cement / lime solid block of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/sq.cm. including cost and conveyance of all materials like cement, sand, bricks, water, etc. to site and excluding sales & other taxes on all materials including all labour charges, mixing cement mortar, construction, scaffolding charges, lift charges, curing overheads & contractor profits etc., complete for finished item of work and as directed by the department
21.25
-
136744
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Plain cement concrete (1:4:8) prop. nominal mix (cement, fine aggregate, coarse aggregate) for foundations and under flooring beds using coarse aggregate 40mm size hard machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, excluding sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. for Dummy columns
0.97
-
7637
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Ornamental ceiling plastering 12mm thick single coat in CM(1:3) prop. Using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc,, and overheads & contractor profit complete for finished item of work.
66.17
-
23093
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Plastering 20 mm thick in two coats using screened sand with base coat of 16 mm thick in CM (1:6) prop. and top coat of 4mm thick in CM (1:4) prop. with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work
126.62
-
56093
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Plastering 12 mm thick in two coats using screened sand with base coat of 8 mm thick in CM (1:6)prop. and top coat of 4mm thick in CM (1:4) prop. with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding sales & other taxes on all materials, and including all operational, incidental charges on materials like cement, sand, water etc., to site, including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, overheads & contractor profits including cutting Grooves as directed by Engineer - in - charge etc., complete
66.8
-
28524
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing painting to new walls with acrylic emulsion paint 2 coats of approved brand & shade over a coat of primer grade II making total 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, with neat finishing including cost and conveyance of all materials to site and all operational, incidental, labour charges etc., overheads & contractor profitscomplete for finished item of work. For External colouring
126.62
-
28616
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing painting to new walls with acrylic emulsion paint 2 coats of approved brand & shade over a coat of primer grade I making total 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, with neat finishing including cost and conveyance of all materials to site and all operational, incidental, labour charges etc.,overheads & contractor profits complete for finished item of work. For internal colouring
132.97
-
16887
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing synthetic enamel painting two coats of Grade I VOC(Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site,incidental, operational and all labour charges etc., and overheads & contractor profit complete in all floors as directed by the department.
8.1
-
1353
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supplying and fixing of flush door double shutter of size 1.50 x 2.10mt with block board type with teak veneer on one face and commercial ply on another face-30mm thick (conforming to IS:2202 of shubdwara) with frame made of well seasibed SAL wood scantling of size 100 x 65mm including fixtures of 6 Nos of 9" 'Z' hold fasts, 300mm long aluminium aldrops-2nos, 125mm long aluminium butt hinges 6 Nos, 200mm aluminium tower bolts - 3 Nos, 150mm long aluminium handles - 2Nos door stop bushes, MS door stopper with necessary screws complete including cost and conveyance of all materials and labour charges etc. including overheads and contractor profit complete
3.15
-
13495
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent .Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels)made of (small series) frame 92 x 44 mm & sash 32 x 60mm both having wall thickness of 1.9 ± 0.2 mm and singleglazingbead of appropriate dimension (Area of window upto1.75 sqm).including overheads and contractor profit complete
5.4
-
49437
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Ventilators: Top Hung 2 '-0" x 2'-0" (609.6x609.6mm) outer frame section size of 46mm x 52 mm shutter frame section size of 46mm x 46 mm:Supplying and fixing of Top Hung Ventilators made of pre -painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120 GSM)primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm section and for shutter of 46 x 46mm section for mullion 46 x 70 mm, The Ventilator to be panelled 4 mm pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM) and the sections cut to length mitre joined with corner brocket mullions fixed using mullion cap and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch including overheads and contractor profit complete for finished item of work.
1.08
-
7724
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of stainless steel sink of size 508.00mm x 457.2mm x 203.20mm, 1mm thick of Indian make fixed on cantilever brackets including supply and fixing 31.75mm C.P. Waste coupling, 31.75mm dia PVC flexible waste pipe of 914.4mm length of 1st quality including chiseling brick masonary wall and making good & restoring to original surfaces, overheads & contractor profit complete for finished item of work in all floors.
1
-
5396
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Flooring with 16 to 18 mm thick polished Granite stone slab (black colour) of approved quality and shade by Engineer-in-charge of length not less than 2.43mts set over a base coat of CM (1:8) prop. 20mm thick using screened sand over CC bed / R.C.C. already laid including neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs per sqm and filling the joints with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, white cement, spacers etc., to site (excluding cost C.C. / R.C.C. bed) including cost of seigniorage charges on all materials, lift charges, cost of base coat and all labour charges for mixing of cement mortar, laying stone to required slope as directed by the Engineer-in-charge curing,overheads and contractor profit etc., complete for finished item of work. for platforms
4.91
-
15899
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Half rounding the edges of marble / granite stone slabs of all thickness including polishing the same ,overheads and contractor profit complete for the finished item of work.
6.54
-
2956
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Dadooing to walls with glazed ceramic wall tiles 1st quality of size 200mm x 300mm/245mm x 325mm set over base coat of CM(1:5) prop. 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including overheads and contractor profit etc., complete for finished item of work.
42.32
-
23657
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supplying and fixing tested chromium plated long body bib cock of fancy type deluxe 400 grams, 112.7mm dia Indian make Seiko / Senior/ Nice or equivalent approved make chromium plated 400 gms with CP wall flanges complete for all floors, including cost and conveyance of all materials, labour charges overheads and contractor profit,etc., complete for finished item of work as directed by the department.
2
-
1242
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Providing and placing on terrace (at all floor levels) Polyethylene water tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including overheads and contractor profit complete for the finished item of work.
1000
-
5960
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;22.20mm O.D.pipe:Supplying and fixing of Ashirvad / Ajay / Astral Flow Guard or equivalent CPVC pipes and fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes ½" to 2") for hot and cold water (IS 15778: 2007) including cost and conveyance of all materials to site, labour charges for fixing ,overheads and contractor profit etc., complete for finished item of work at all floor levels.
30
-
2910
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;28.60mm O.D.pipe:Supplying and fixing of Ashirvad / Ajay / Astral Flow Guard or equivalent CPVC pipes and fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes ½" to 2") for hot and cold water (IS 15778: 2007) including cost and conveyance of all materials to site, labour charges for fixing including overheads and contractor profit etc., complete for finished item of work at all floor levels.
30
-
4200
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Constructing 904.0mm (3'0") dia brick masonary inspection chamber as per IS ? 4111: Part-1: 1986 with cement mortar (1:6) prop. using 2nd class clay bricks of 225mm thick from approved source having a minimum crushing strength of 5N/sq.mm including plastering with cement mortar (1:3) prop. ½ " thick both inside and outside fitted with 20" dia RCC manhole covers and frames including excavating pits up to a depth of 904mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) prop.150mm thick using 40mm HBG Metal and P.C.C. (1:2:4) benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonary, lift charges, curing etc., complete for finished item of work as per standard specification.
4
-
25076
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;160mm dia pipe: Supplying and fixing of SWR PVC pipes (as per ISI standards) 6 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges ,overheads and contractor profitetc., complete for finished item of work at all floor levels.
60
-
43260
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Electrical items
-
-
-
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and Fixing of ISI 25mm dia 2.20mm thick heavy grade with IS:9537 part 3 FRLS regid PVC pipe concealed in Roof slabs with all required accessories including masonary work and labour charges etc., complete. of makes: Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/ Orbit/AKG
75
-
5475
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and Fixing of ISI 25mm dia 1.80 mm thick Concealed medium grade with IS:9537 part 3 FRLS regid P.V.C. pipe with required all accessories including Masnory work all labour charges etc., complete .of Make: Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Anchor/ Polyline/ Polycab/ Orbit/AKG
65
-
5265
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification copper cable in existing pipe including supply and fixing of Ceiling rose and 6A ISI mark Modular type switch on suitable size Hot Dip galvanized 20/18 SWG Module box with earthing terminal with cover frame including cost and conveyance of all material and all labour charges etc., complete for light ,bell ,fan and Exhaust fan points in Non Residential Buildings Makes: Finolex / RR kabel / Havells /KEI/ Polycab/ Gloster Accessories Makes: Legrand Myrius / Crabtree verona / L&T/ HPL/ Schneider Livia/ GMZicono/ C&S/ Goldmedal (Curve/Air) / Million Mway / Logus Platina/ PanasonicVision / Salzer S90series/ Precision/ Koncept(Samrat/Qura) / Ploycab (Levana) / Anchor -Roma/ IndoAsian/ Pointer/ CPL/ Kolors/ Vihan /Hosper
15
-
9135
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of modular type Electronic step type Fan Regulator including cost and conveyance of all material and all labour charges etc., complete. Makes: Legrand Myrius / Crabtree verona / L&T/ HPL/ Schneider Livia/ GMZicono/C&S/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series /Precision /Koncept (Samrat/Qura) / Ploycab (Levana)/Anchor-Roma/ IndoAsian/ Pointer / CPL/Kolors/ Vihan/Hosper
2
-
730
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 6A 3pin wall plug socket with 6A MODULAR switch control on a common switch board with earth continuity including wire leads, connections along with all labour charges etc., complete of makes Makes: Legrand Myrius / Crabtree verona / L&T/ HPL/ Schneider Livia/ GMZicono/C&S/Goldmedal(Curve/Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series /Precision /Koncept (Samrat/Qura) /Ploycab(Levana)/Anchor-Roma/ IndoAsian/Pointer/ CPL/Kolors/ Vihan/Hosper
3
-
669
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 16A/6A 3pin wall plug socket with 16A MODULAR switch control with suitable metalic gang box with earth continuity including wire leads, connections along with all labour charges etc., complete of Makes: Legrand Myrius / Crabtree verona / L&T/ HPL/ Schneider Livia/ GMZicono/ C&S/ Goldmedal (Curve/ Air) / Million Mway / Logus Platina/ Panasonic Vision / Salzer S90series / Precision /Koncept (Samrat /Qura) /Ploycab (Levana) /Anchor -Roma/ IndoAsian/Pointer/ CPL/Kolors/ Vihan/Hosper
3
-
1557
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 1 No 6A and 1 No 16A/6A 3pin wall plug socket with 1 No 6A and 1No 16A MODULAR switch controls with suitable metalic gang box with earth continuity including wire leads, connections along with all labour charges etc.,complete of makes Makes: Legrand Myrius /Crabtree verona/ L&T/ HPL/Schneider Livia/GM- Zicono/ C&S /Goldmedal(Curve/Air) /Million Mway / Logus Platina /PanasonicVision /Salzer S90series/Precision /Koncept(Samrat/Qura) /Ploycab (Levana) /Anchor-Roma/ Amron/ IndoAsian/ Pointer
3
-
2247
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;supply and run of 3 of 36/0.3mm (2.5 sq mm) PVC FRLS/HFFR/ZHFR/ P.V.C. 1100V Grade as per IS 694/1990 insulated unsheathed) flexible copper cable in the existing pipe for run of mains including for earth continuty all labour charges connections etc., complete as directed by the department of Makes: Finolex / RR kabel / Havells /KEI/Polycab/Gloster
80
-
7440
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;supply and run of 3 of 56/0.3mm (4.0 sq mm) PVCFRLS/HFFR/ZHFR/ P.V.C. 1100V Grade as per IS 694/1990 insulated unsheathed) flexible copper cable in the existing pipe for run of mains including for earth continuty all labour charges connections etc., complete as directed by the department of Makes: Finolex / RR kabel / Havells /KEI/Polycab/Gloster
140
-
19740
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;supply and run of 3 of 84/0.3mm (6.0 sq mm) PVCFRLS/HFFR/ZHFR/ P.V.C. 1100V Grade as per IS 694/1990 insulated unsheathed) flexible copper cable in the existing pipe for run of mains including for earth continuty all labour charges connections etc., complete as directed by the department of Makes: Finolex / RR kabel / Havells /KEI/Polycab/Gloster
30
-
6000
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 12 Way SPN DB with IP 43,Protection suitable for accommodating 63 A DP Isolator as incomer and 12 No 6-32A S.P MCB's as out goings etc complete as per IS 8623; IS 13032; IEC 61439-3.including internal connections cable connections and all labour charges for Flush Mounting etc., complete.of concealed Makes: Legrand(Ekinox 3) / Schneider-Acti9/Hager -Novello+/ Seimens/Crabtree Xpro classique-II/L&T-AU
1
-
5879
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 48" (1200mm) Sweep decorative Ceiling Fan, with double ball bearings with all accessories without Regulator including wire leads, connections along with all labour charges etc.,complete of Makes: Crompton HS Decora / Bajaj Regal Star /Havells Spark deco / Orient summer crown/Halonix(Zephyr) /Polycab(India Glory)
2
-
4976
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with set, clamp set in existing hole of the wall and wiring connection etc. complete with nuts & bolts etc., complete of Makes: Crompton / Almounard / Havells TurboForce/Halonix Krypton
3
-
13383
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply, transportation and fixing of 18W / 20W, 1700 lumens, T5, 1200mm length LED with extruded polycorbonate / white powder coated slim box made of CRCA sheet tube light fixture, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete as per IS 10322 (Part 5/ Sec 1).2012 including wire connection and labour charges etc. a) LUMINAIRE MAKE : Phillips / GE-Venture /Crompton / Wipro / Bajaj / Havells / Halonix/Jaquar/HPL/GM / GreenLites / Gold Medal/Eveready b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA/ OSRAM / SAMSUNG/Everlight.
10
-
8000
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply, transportation and fixing of 36W Recessed / Surface mounting 2' x 2' (600x600 mm) LED luminaire made of CRCA sheet housing with powder coated with acrylic diffuser, Constant current Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , With System lumen output = 3200lm operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10%, with high power LED's having efficacy of > 100 lumens / watt, CCT: 3000K - 5700K, minimum CRI>70, .etc.,,including wire leads, connections along with all labour charges etc.,complete of a) LUMINAIRE MAKE : Phillips / GE-Venture / Crompton / Wipro / Bajaj / Havells / Halonix/ Jaquar/HPL/GM / GreenLites / Gold Medal/Eveready b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /SAMSUNG/Everlight.
3
-
10500
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of battern /slanting holder with 7W LED lamp with input voltage 90-300V, colour temparature 3000-6500K, beam angle 170-220 degrees, B22 base in lieu of ceiling rose in light point complete with all connections and all labour charges with etc., complete as directed by the department. Makes: Syska / Green Lites / Fortune Art / GoldMedal / VIN
2
-
440
... More
Construction of kitchen with RCC roof for Girls Hostel at College of Home Science, Lam, Guntur;Supply and fixing of ISI mark (IS:15683) Mono ammonium phosphate powder 90 (MAP) 4 Kg Fire extinguisher, stored pressure type, pressure gauge, gross wt. 6.9 kg, empty wt.2.9 kg, Discharge time minimum 13 sec, controllable discharge mechanism, range min. 4 mts applicable on classes A,B, C & electrically started fire, A rating -3 A, B rating -34 B, can construction: Deep drawn and Co2 mig welding, Valve construction: Forging & Machining, internal coating of can: Epoxy powder coating, External coating of Can:Epoxy polyster powder coating, sheet metal thickness:1.60mm, Helium leak detection tested with 5 years warranty Including transportation, all taxes and all labour charges etc complete. Makes : Cease Fire / Minimax
2
-
11400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements