The ANGRAU has issued a formal invitation for competitive bids for the Acharya NG Ranga Agricultural University project, for Sub-estimate: Construction Of Septic Tank And Providing Leak Proof Treatment At Girls Hostel, Mahanandi, Kurnool Dist. in Kurnool, Andhra Pradesh, with an estimated contract value of Rs. 4,73,710. The bid opening date for this tender is 04-09-2020 and the last date for bid submission is 21-09-2020. Interested bidders for Acharya NG Ranga Agricultural University tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Acharya NG Ranga Agricultural University - ANGRAU Tender

Opening Date4 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 4,73,710 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Masonary work in CM(1:6) prop. (cement: screened sand) in super structure with fly ash cement / lime solid block of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/sq.cm. including cost and conveyance of all materials like cement, sand, bricks, water, etc. to site and excluding sales & other taxes on all materials including all labour charges, mixing cement mortar, construction, scaffolding charges, lift charges, curing etc., complete for finished item of work and as directed by the department

23

-

102787

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Plain cement concrete (1:5:10) prop. (cement, fine aggregate, coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size Hard machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand coarse aggregate, water etc., to site, excluding sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete as directed by the department.

5.03

-

15940

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;110mm dia: Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work at all floor levels.

100

-

24300

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;S&F HYSD Tor steel bars (Fe 500 grade as per IS 1786-2008) for RCC works including cost and conveyance of steel to site including labour charges for cutting rods of different diameter and sizes, bending rods, placing grills in position with cover blocks tying grills with binding wire, including cost of all operational and incidental charges, including cost of MS binding wire, labour charges, lift charges etc., complete for finished item of work and as directed by the department.

3240

-

144504

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Construction of Septic tank and providing leak proof treatment at Girls Hostel, Mahanandi, Kurnool Dist.

-

-

-

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Top slab 100mm thick: RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using etal (coarse aggregate) from approved quarry including hire charges for centering & scaffolding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work

22

-

21934

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Plastering 20 mm thick in two coats using screened sand with base coat of 16 mm thick in CM (1:6) prop. and top coat of 4mm thick in CM (1:4) prop. with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work

22.2

-

6904

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Constructing 904.0mm (3'0") dia brick masonary inspection chamber as per IS ? 4111: Part-1: 1986 with cement mortar (1:6) prop. using 2nd class clay bricks of 225mm thick from approved source having a minimum crushing strength of 5N/sq.mm including plastering with cement mortar (1:3) prop. ½ " thick both inside and outside fitted with 20" dia RCC manhole covers and frames including excavating pits up to a depth of 904mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) prop.150mm thick using 40mm HBG Metal and P.C.C. (1:2:4) benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonary, lift charges, curing etc., complete for finished item of work as per standard specification.

3

-

18807

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Leak proof coarse with RCC (1:1.5:3) prop. Using 6mm 12mm size hard granite machine crushed metal and screened sand of 38mm thick using nominal reinforcement including over plastering with impervious coat required slopes with CM (1:3) prop. Using screened sand 20mm thick (Average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 200ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floting coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excludig sales & other taxes on all materials and operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overhead & contractor profit complete for finished item of work.

150

-

89100

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;50mm thick Granolithic concrete flooring with PCC M-20 including 12mm thick plastering in CM(1:3) prop. on top coat and thread lining regular intervals of 0.45cm x 0.45cm including cost and conveyance of all materials and labour charges etc., complete for finished item of work.

15

-

5610

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Constructing 457.2mm x 457.2mm (1'6" x 1'6")brick in CM (1:6) prop. masonary Inspection chamber upto 914.4 (3'0") and fitted with light weight 457.2mm 457.2mm (1'6" x1'6") C.I. frame and cover of 20 Kg including cost of all materials etc., and overheads & contractors profit complete.

10

-

36790

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Filling with stone dust sides of foundation and basement from approved quarry consolidating deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges etc., complete for finished item of work and as directed by the department.

5.03

-

6720

... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM(1:3) prop. Using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site excluding sales and other taxes on all materials and including operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads and contractors profit complete for finished item of work

85

-

10370



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.