Acharya NG Ranga Agricultural University Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Water Storage And Supply
Opening Date4 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 4,73,710 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
348951Bid Award Id
ViewTender No
37/AU/EO/TPA/2020-21Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.angrau.ac.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;50mm thick Granolithic concrete flooring with PCC M-20 including 12mm thick plastering in CM(1:3) prop. on top coat and thread lining regular intervals of 0.45cm x 0.45cm including cost and conveyance of all materials and labour charges etc., complete for finished item of work.
15
-
5610
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Filling with stone dust sides of foundation and basement from approved quarry consolidating deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges etc., complete for finished item of work and as directed by the department.
5.03
-
6720
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Masonary work in CM(1:6) prop. (cement: screened sand) in super structure with fly ash cement / lime solid block of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/sq.cm. including cost and conveyance of all materials like cement, sand, bricks, water, etc. to site and excluding sales & other taxes on all materials including all labour charges, mixing cement mortar, construction, scaffolding charges, lift charges, curing etc., complete for finished item of work and as directed by the department
23
-
102787
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Top slab 100mm thick: RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using etal (coarse aggregate) from approved quarry including hire charges for centering & scaffolding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work
22
-
21934
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Baffle walls 75mm thick precast: RCC M- 20 Nominal mix (Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including hire charges for centering & scaffolding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete including hire charges for centering & scaffolding but excluding cost of steel and its fabrication charges for finished item of work
14
-
12012
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;S&F HYSD Tor steel bars (Fe 500 grade as per IS 1786-2008) for RCC works including cost and conveyance of steel to site including labour charges for cutting rods of different diameter and sizes, bending rods, placing grills in position with cover blocks tying grills with binding wire, including cost of all operational and incidental charges, including cost of MS binding wire, labour charges, lift charges etc., complete for finished item of work and as directed by the department.
3240
-
144504
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM(1:3) prop. Using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site excluding sales and other taxes on all materials and including operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads and contractors profit complete for finished item of work
85
-
10370
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Plastering 20 mm thick in two coats using screened sand with base coat of 16 mm thick in CM (1:6) prop. and top coat of 4mm thick in CM (1:4) prop. with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding sales & other taxes on all materials, and including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work
22.2
-
6904
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Constructing 904.0mm (3'0") dia brick masonary inspection chamber as per IS ? 4111: Part-1: 1986 with cement mortar (1:6) prop. using 2nd class clay bricks of 225mm thick from approved source having a minimum crushing strength of 5N/sq.mm including plastering with cement mortar (1:3) prop. ½ " thick both inside and outside fitted with 20" dia RCC manhole covers and frames including excavating pits up to a depth of 904mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) prop.150mm thick using 40mm HBG Metal and P.C.C. (1:2:4) benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonary, lift charges, curing etc., complete for finished item of work as per standard specification.
3
-
18807
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Constructing 457.2mm x 457.2mm (1'6" x 1'6")brick in CM (1:6) prop. masonary Inspection chamber upto 914.4 (3'0") and fitted with light weight 457.2mm 457.2mm (1'6" x1'6") C.I. frame and cover of 20 Kg including cost of all materials etc., and overheads & contractors profit complete.
10
-
36790
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;S/F of UPVC cowl 1st quality etc., complete for finished item of work and as directed by the department 110mm dia - Vent cowl UPVC/SWR pipe fittings
1
-
18
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;110mm dia: Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work at all floor levels.
100
-
24300
... More
Sub estimate Construction of septic tank and providing leak proof treatment at Girls Hostel, Mahana;Leak proof coarse with RCC (1:1.5:3) prop. Using 6mm 12mm size hard granite machine crushed metal and screened sand of 38mm thick using nominal reinforcement including over plastering with impervious coat required slopes with CM (1:3) prop. Using screened sand 20mm thick (Average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 200ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floting coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excludig sales & other taxes on all materials and operational, incidental and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overhead & contractor profit complete for finished item of work.
150
-
89100
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements