Andaman Lakshadweep Harbour Works Tender
... More
The ALHW has issued a formal invitation for competitive bids for the Andaman Lakshadweep Harbour Works project, for Operation And Maintenance Of Multiple Slipway And Old Slipway For The Period Of One Year (2024-25). in South Andaman, Andaman & Nicobar Islands, with an estimated contract value of Rs. 67,01,934. The bid opening date for this tender is 27-01-2024 and the last date for bid submission is 08-02-2024. Interested bidders for Andaman Lakshadweep Harbour Works tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Andaman Lakshadweep Harbour Works - ALHW Tender
Opening Date27 Jan 2024
Closing Date8 Feb 2024
Tender Amount₹ 67,01,934
Costs
EMD
₹ 1,34,039Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_792448_1Bid Award Id
ViewTender No
EE/CSWD/DB/T-14/2023-24 Dated. 27.01.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Applying cardium compound to the entire steel structure of the side hauling trolley, including the cost of all labour charges, minor tools, GST, labour welfare cess etc. but excluding cost of cardium compound which will be supplied by the department on free of cost etc., complete.
2436.12
-
-
... More
Operation for slipping of vessel on the center slip/Old slipway/shifting of empty cradle as per DSS requirement. Shifting the trolley to required slip lowering the empty cradle to the required position for slipping the vessel. Thereafter hauling the cradle with vessel up to the top of the center slip. The operation includes hauling the main winch and side hauling winch, wire rope fastening to the cradle hook tying the slip sling ropes to the trolley shifting the pulley blocks etc., including all labour charges, GST, labour welfare cess but excluding the hire charges of winches and electric supply which will be supplied by the department on free of cost.
15
-
-
... More
Making wire rope sling of 32mm or 40mm dia by splicing on either ends of each slings as required, for slipway operation including all labour charges, cost of all minor tools, GST, labour welfare cess etc., but excluding the cost of wire rope which will be supplied by the department on free of cost.
3
-
-
... More
Changing of side hauling winch to pit trolley sling (90m or 40m length) 32 mm or 40 mm dia wire rope for shifting of trolley to the required slip including cost of all labour charges, minor tools, GST, labour welfare cess, etc., but excluding the cost of wire ropes which will be supplied by the department on free of cost. The rate includes cutting the wire rope from the rolls received from the store/site
1
-
-
... More
Cleaning the garbage of the multiple slipway and old slipway including the mud removal from the pit, cleaning by sweeping and clearing the swept materials out of the Multiple Slipway and old slipway complete manually as directed by EIC, including cost of all minor tools like broom sticks, spade, mortar pan, all labour charges, GST, labour welfare cess etc complete.
312
-
-
... More
Changing wire rope (Old/New- about 250m) of 60 T capacity winch of slipway, including all labour charges, cost of minor tools, GST, labour welfare cess, etc., but excluding cost of wire rope which will be supplied by the department on free of cost, the rate includes the cutting of wire ropes from the rolls received from the stores/site
1
-
-
... More
Removing the double wheel bracket with wheel from the cradle by gas cutting without damaging to the adjacent members, removing the wheel pawl rack, scrapping, chipping the wheel brackets replacing the worn out wheel providing holes in required position on base plate replacing the double wheel brackets with wheel bolts and nuts etc. including cost of all labour charges, GST, labour welfare cess, minor tools, transportation charges, machine shop charges etc. But excluding the cost of double wheel bracket with wheel, bolts and nuts which will be supplied by the department on free of cost.
35
-
-
... More
Transportation and disposing the stacked garbage of swept materials and all other waste materials from Multiple Slipway/ Old Slipway area by loading manually in the truck and unloading the same to municipal garbage yard within a lead of 14 Km as per instruction of EIC including all labour charges for loading and unloading, hire charges of truck, dumping charges, municiple charges, all lead and lift, GST, labour welfare cess etc complete.
64
-
-
... More
Removing the single wheel bracket with wheel from the cradle / side hauling trolley by gas cutting without damaging to the adjacent members, scrapping, chipping the wheel brackets, replacing the wornout wheel, providing holes in required position on base plate replacing the single wheel brackets with wheel bolts and nuts etc. including cost of all labour charges, minor tools & plants, transportation charges, GST, labour welfare cess, machine shop charges etc. But excluding the cost of single wheel bracket with wheel, bolts and nuts which will be supplied by the department on free of cost.
55
-
-
... More
Changing of wire rope (Old/New) from the side hauling winch to cradle bottom through the pit pulley block (about 190m) 32 mm or 40 mm dia wire rope in slipway including the cost of all labour charges, minor tools, GST, labour welfare cess etc., but excluding cost of wire ropes, which will be supplied by the department on free of cost. The rate includes, cutting the wire rope from the rolls received from the store/site
1
-
-
... More
Fabrication, erection and assembling of steel structures of the cradle /side hauling trolley /making of steel buckets for dry docks as per the original size, shape & design according to the standard welding procedure, (3 run welding wherever required) cleaning the surface free to rust and applying one coat of primer paint including cost of all labour charges, minor tools, oxygen cylinder, gas carbide, welding electrodes, cost of primer paint, painting, transportation cost of materials from ALHW central stores to worksite,GST, labour welfare cess but excluding the cost of steel items such as angles, joists, plates, wheel brackets, bolts and nuts, etc which will be supplied by the department on free of cost at ALHW Central Stores.
10
-
-
... More
Changing of wire rope (Old/New) from the side hauling winch drum, cradle end through bottom pulley block (about 260 m) 32 mm or 40 mm dia wire rope in slipway including cost of all labour charges, minor tools, GST, labour welfare cess, etc., but excluding the cost of wire ropes, which will be supplied by the department on free of cost. The rate includes the cutting of wire ropes from the rolls received from the stores/site
2
-
-
... More
Cutting and removing the damaged /rusted/deteriorated RS Joist /channels, angles telescopic attachment, wheel bracket, base plates etc complete from the steel cradle at slipway by /Side hauling trolley using gas cutting and accumulate the removed steel in a place within a lead of 100 mtr as per direction of EIC including cost of all labour charges, gas carbide, oxygen gas cylinder, gas plant, minor tools , GST, labour welfare cess etc complete.
5
-
-
... More
Engaging of diving team (consisting of 2 Nos. Divers, 1 No. Diving Supervisor) for inspection of underwater site or cleaning/removing debris/unwanted materials or attending repair work on underwater Pulley/Rails and other connected works, if any including cost of labour charges, divers, diving equipments, GST, labour welfare cess etc., complete.
4
-
-
... More
Engaging of winch operator for main/side hauling winches/fire fighting pump and water jet for the work of slipping / unslipping of vessels and other works as and when required. The rate includes the wages of the operator, GST, labour welfare cess etc. complete.
176
-
-
... More
Fixing of new superior hardwood timber pads of size 100cm x 30cm x 15cm, making hole in timber pad and fitting the new timber pad on the base plate by using bolts & nuts including cost of all labour charges, minor tools and plants, GST, Labour welfare cess but excluding cost of timber pad, bolts & nuts which will be supplied by the department on free of cost.
16
-
-
... More
Applying cardium compound to the wire rope for both side hauling and main hauling winch (side hauling 580m & main hauling 250 m) including all labour charges for removing center rope after applying manually the cardium compound, GST, labour welfare cess, etc., but excluding the cost of cardium compound which will be supplied by the department on free of cost.
6
-
-
... More
Operation for slipping of vessel on the slip 1, 2, 4 & 5 excluding center slip. Shifting the trolley to the required slip lowering the cradle on the trolley and side hauling the trolley with cradle to central slip and then lowering the empty cradle to required position for slipping the vessel. Thereafter hauling the cradle with vessel into the trolley pit and side hauling the trolley to required slip and hauling up the cradle on the top of the slip. The operation is including hauling the main winch on side ropes, shifting the pulley block etc., including all labour cost, GST, labour welfare cess but excluding the hire charges of winches with operator and the electric supply which will be supplied by the department on free of cost.
25
-
-
... More
Collection of debris and other unwanted materials shifted/deposited during the high tides and during the course of ship repairs in the approach from the side hauling trolley pit during the year. The rate including the cost of labour charges, pumping of water from the cross trolley pit as and when required, including cost of providing hallow block walling & dismantling etc. and disposal of mud & waste materials, GST, labour welfare cess but excluding the cost of water pump which will be supplied by the department on free of cost.
1
-
-
... More
Fixing of new superior hardwood timber pad of size 50cm x 30cm x 15cm, making hole in timber pad and fitting the new timber pad on the base plate by using bolts & nuts including cost of all labour charges, minor tools and plants, GST, Labour welfare cess but excluding cost of timber pad, bolts & nuts which will be supplied by the department on free of cost.
96
-
-
... More
Scrapping, chipping, cleaning with washing soda and Painting of the rolling shutters, main and side hauling winches base plate etc. complete with one coat primer paint and two coat of synthetic enamel colour paint as per instruction of EIC including the cost of labour charges, brushes, tools and plants, scaffolding charges, GST, labour welfare cess, including cost of primer, synthetic enamel paint, thinner etc., complete
852.78
-
-