No hidden charges. No keyword restrictions.FREE SUBSCRIPTION FOR A YEAR

Engineering Department

  • Tender Amount

    ₹ 499,000

  • EMD

    ₹ 9,980

  • Opening Date

    06 Nov 2018

  • Closing Date

    14 Nov 2018

Summary

Rehabilitation Of Existing Of 24 X36 Egg Shape Sewer Lines/drain By Desilting/cleaning With Jetting Cum Suction, Sewer Cleaning Machine With Water Recycling Technology From Point A To B (as Per Plan) At Village Raipur Khurd, Chandigarh Near Ambala-

Name of Work: DNIT FO|tq|||9v|vYv|^.UlY||rvn|nEvvUKKUFREHAB|L|TATloNoFEX|sT|NGoF24m H|"Tl?H*:?:,:iHs,::.jlr'Ig.yTJ:Trry^qc_ullslrcloN, sEWER cienNrii6 MAcHTNE wrrH wArERRECYCLTNG TEcHNoLoGY FRoM PorNr A 19 P qs PER P;N) Ar vTLLAGE RArpuR {;iiil;:#iilJiffiilNEAR AMBALA.CHANDIGARH ROAD U.T. CHANDIGARH APPROX AMOUNT : Rs. 4;99 Lacs EARNEST MONEY : Rs.9,980/- TIMELIMIT : 2MONTHS fl-his BOQ template must not be modified/replaced by th;bidG me should be uploaded after filling the releventcolumns' else the bidder is liable to be rejected for tiris tender. Bidders are ailowed to entei the Bidder Name and Values Rehabilitation of -exGtingGE lines/drain by desilting/cleaning with cum suction, sewer machine with water ly, super sucker cum jet or any improved mechani system including supply of CD CCTV of the job alongwith disposal siUmalba upto 5 km lead complete in Size of drain 24"x36" Egg Shape Total amount in Words Rupees Four Lakh Ninety Thousand t',t ine H unOreO aTortt--O;t Subject: DNIT FOR THE WORK OF REHABILITATION OF EXISTING OF'24]IX36II EGG SHAPE SBWER LINES/DRAIN BYDESILTING/CLEANING WITH JETTING CUM SUCTION, SEWERCLEANING MACHINE WITH WATER RECYCLING TECHNOLOGY FROM POINT A TO B (AS PER PLAN) ATVILLAGE RAIPUR KHURD, CHANDIGARH NEAR .q.Mbal,a. CHANDIGARH ROAD U.T. CHANDIGARH CONDITIONS: 1' Being a specialized job, the tender shall be quoted by the firms having executed similar nature of work. 2' Before desilting, joint inspection by SDE-in-Charge along with other SDE deputed by work awarding authority in presence of contracior shall be done and photography proof will bp maintained as record. However CCTV survey and keeping iis rooiage is , mandatory after the completion of desilting in each and.u"ry ,.g-*t Jf work done.3' Before starting the work, the respective work awarding -autiority will ,nuk" th.' manholes identified on the line to be cleaned identified. 4' These rates includes plugging, cleaning of manhole, consumable, manpower, flow bye pass arrangement etc. Nothing extrJshall be payable above these rates.5' water Suppll required for jetting purpose will bi provided by oepartment from the nearest available point. 6' Temporary plugging of sewer line for working is not compulsory but the contractor has to desilt 1.h: s:w.er ljne completely and witiess it with ictv and also provide irs footage with his cl{m for payment for record of the office. In any .ur., tt.r. should not be more than 65" deep sewage water in the lowest invert level of barrel cleaned thus. 7 The dumping sltg will be provided by concerned work awarding authority.8' Due to levy of GST, if the contractor has to bear extra cost on this work, then the same will be reimbursed to him on production of original receipt of fuy*.n u, uproof. 9' All the defects, including defects at present shall be rectified by the contractor/agency to. rne quantity can be increased or decreased at any time. I l ' The items of work can be decreased by the Engineer-in-charge at any time keeping inview the scope of work at site. No objection-o, claim will be entertained from thecontractor on this account. 12' The under signed reserye the right to reject any or all the tenders without assigning any reason. 13' The Executive Engineer, reserve the right to add or delete any of the items of theDNIT and no claim from the contractor will be entertained on this u..ouni. 14' The EIC reserves the right to assign the work in smaller qualities at different places through sub'orders, throughout the contractual period. 15' The agency will have to execute the assigned work within the circulated period time, based on capacity indicated by him. If thJ work is not executed as per schedule items, this will be taken as a failure on the part of the agency and agency shall be liable forpenalty upto l0% of the assigned work. 16' In case the quality of work is found below specification in edition to panel reduction or rate he may not be considered for further assignment of works. i7. Nothing shall be p

Disclaimer: Bidassist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. Bidassist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.