To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Rajiv Swagruha Corporation Limited - APRSCL Tender

Civil And Construction
Opening Date7 Mar 2022
Closing Date16 Mar 2022
Tender Amount₹ 6,07,73,490 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Construction of Brick masonry Valve Pit of size 3'-0" x 3'-0" required for sluice valveS, scour valves & Air Valves including all civil works such as earth work excavation up to 1.32 mts. 4" thick PCC(1:5:10)Prop., brick masonry in CM(1:8) Prop.,12mm thick plastering in CM(1:4) including 4"thick RCC M30 Grade design mix with necessary reinforcemnt including cost of steel and its fabrication chares for cover slab, and smooth rendering etc., complete and finished item of work, as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

10

-

153851

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 110mm x 90mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

2

-

579.5

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

30.33

-

33646.59

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Construction of Granular Sub-Base by providing coarse graded material(naturally occuring gravel), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401.(GSB) for finished item of work as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

3376

-

3250919.2

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4th revision) and finished item of work, as directed by the Engineer-in-Charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

24611.53

-

310105.28

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing Sand Filling in and arround the Swerage pipes including cost seignorage and conveyance of sand to site and all abour charges for spreading sand in uniform layers and watering and tamping etc complete for finished item of work as directed by the engineer -in-charge of the work, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

6.12

-

6789.22

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 110mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

1958.8

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering and keeping in position of 100 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

381

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of CI.D/F SCOUR VALVES OF 80mmmm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with CI grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

4

-

47346.2

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work for drain foundation, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

474.96

-

526896.88

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Item Detailed Specification Description

-

-

-

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

36

-

3803.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of DI .D/F SLUICE VALVES OF 100mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with CI grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

4

-

56689.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 90mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

25

-

10340

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Construction of subgrade and Gravel/Earthen (using naturally occuring Gravel) Shoulders with approved/selected material obtained from borrowpits with a;ll lifts and leads, transporting to site, spreading, grading to required slopes and compacted to meet reqiurement of Table 300-2(Shoulders with Gravel), including Contractor profit & over Head charges for finished item of work, as directed by the Engineer-in-charge @ 13.615% but excluding seigniorage charges.

3256.72

-

1963150.82

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Clearing of jungle and uprooting prickling jungle including cost and conveyance of all materials and labour charges etc, complete and finished item of work, as directed by the Engineer-in-charge, including CP&OH.

23708.12

-

75865.98

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering and keeping in position of 100 mm Dia. Air valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

190.5

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

11

-

2137.3

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Filling with carted earth in trenches, sides of roads from approved source with a lead of 20 KMs, in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming, including earth work by machinery and all operational, incidental, labour charges, hire charges of T & P etc. complete including cost and conveyance of earth for finished item of work. (APSS No 309 & 310).and finished item of work, as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

8776.93

-

2558036.25

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of D.I.D/F AIR VALVES OF 100mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with CI grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work.

1

-

14172.35

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Construction of embankment with approved/selected material obtained from borrowpits with all lifts and leads, transportaion to site, spreading, grading to requires slope and compacting to meet requirement of Table 300-2 for finished item of work as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

27373.26

-

15219532.56

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete for finished item of work.

1792.11

-

56093.04

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, seigniorage etc., complete for drain foundation, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

474.96

-

2284296.37

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 90mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc.,including Excise duty, Sale Tax and speicals etc., complete for finished item of work.

755.16

-

171610.11

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

6

-

3013.2

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of C.I. D/F 80mm Dia. Duck Foot Bends for scour valve as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading and all other connected taxes etc., complete for finished item of work (each of 26 kgs weight).

4

-

8382.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC (1:3:6) using 12.mm &25mm HBG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like, Cement, fine aggregate (sand) and including sales and other taxes on all materials including all operational, incidental and labour charges such as batching plant at site, mixing, transportation, pumping of concrete, laying , levelling, curing etc., complete but excluding cost of steel and its fabrication charges etc., complete for finished item of work (APSS No.402). for head walls, as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

18

-

121505.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC (1:3:6) using 12&20mm HBG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like, Cement, fine aggregate (sand) and including sales and other taxes on all materials including all operational, incidental and labour charges such as batching plant at site, mixing, transportation, pumping of concrete, laying , levelling, curing etc., complete but excluding cost of steel and its fabrication charges etc., complete for finished item of work (APSS No.402). for drain Side walls, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

529.63

-

3575161.39

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Cost and supply of 300 mm dia NP3 Class RCC collars including cost and conveyance of labour including all charges for finished item of work, as directed by the Engineer-in-charge including CP&OH.

247

-

37334.05

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;S & F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239ISI mark with GI fittings including the cost of pipe & its fittings & labour charges, including CP&OH.

70

-

19964

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Plastering 12mm thick in Single Coat in CM(1:3) Prop. with sponge finishing including cost and conveyance of all materials to work site charges and all operational, incidental charges, scaffolding charges, labour charges, curing etc.,complete for finished item of work for drain side walls, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

6953.92

-

1216588.3

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Earth work excavation for foundations and deposting on bank with an initial lead of 10 Mts. and lift of 2 Mts. in sand or loose soils, wet sand not under water, silt in canals, channels and drains etc., and including all operational incidental labour charges such as shoring sheeting, planking, strutting etc., complete for finished item of work, excluding dewatering charges etc., as per SS-20.B (APSS 308), as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

458.51

-

53553.97

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve.

4

-

1270.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering, Laying and Jointing of 90mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete for finished item of work.

755.16

-

19520.89

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Filling Sand for Culvert foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

71.06

-

78830.41

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC (1:5:10) using 40mm HBG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like, Cement, fine aggregate (sand) and including sales and other taxes on all materials including all operational, incidental and labour charges such as batching plant at site, mixing, transportation, pumping of concrete, laying , levelling, curing etc., complete but excluding cost of steel and its fabrication charges etc., complete for finished item of work (APSS No.402). for RCC hume pipes protection at road crossings, as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

18.45

-

86235.3

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Laying and jointing of 1800mm dia NP4 class pipes finished item of work, including CP&OH.

30

-

23314.5

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping, curing machine mixing, etc., complete for Bed of Culverts, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

60.65

-

291693.14

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing demarcation stones for marking of plots and semifinished houses of the saleable area with 0.60X0.10X0.10m RCC poles including fixing and all labour charges etc complete for finished item of work, as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

295

-

37273.25

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Culverts , including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

299.79

-

35015.47

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering and keeping in position of 80 mm Dia. sluice Air including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

143.5

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering and keeping in position of 80 mm Dia. sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

287

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3- wheeled steel/vibratory Roller 8 -10N in stages to proper grade and camber, applying and brooming, requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density (Grading II) complete for compacted thickness of 75 mm, and finished item of work, as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

1845.87

-

4441993.86

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Filling with Sand for Basements and sides of Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work (APSS No.309 & 310),and finished item of work, as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

263.84

-

292690.9

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Cost and supply of 300 mm dia NP3 Class RCC pipes including cost and conveyance of labour including all charges for finished item of work, as directed by the Engineer-in-charge including CP&OH.

639

-

913322.7

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Construction of Bituminous Penetration Macadam(BPM) roads using 40mm HBG metal of 0.90cum/10 Sq.mtr. and with required quantity of 9.5mm to 11.20mm machine crushed chips 0.18 Cum/10 Sq.mtr as the key chips and 60/70 grade Bitumen 20kg/10Sq.mtr including removal of the loose material in the pot holes, trimming the edges to provide firm verticl faces, cleaning, applying tack coat filling the pot holes duly ramping to fill voids and compacting with three wheel static roller of 8 to 10 T including hire charges of Hydraulic self propelled chip spreader both for aggregates and key agreegates and also Bitumen pressure distributor and power roller etc. complete for compacted thickness of 75mm, and finished item of work, as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

24611.53

-

13701238.75

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 63 mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc.,including Excise duty, Sale Tax and speicals etc., complete for finished item of work.

1792.11

-

203673.3

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supplying and delivery of 63 mm Dia. HDPE END CAPS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

304.6

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 90mmX75mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

840.8

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for Bridge, as directed by the Engineer-in-charge including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

109.46

-

12784.93

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.415 Grade as per IS1786- 1985 and Fe.250 grade as per IS.432 and as amended upto date) of different of diameters including labour charges for cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforce- ment work as per approved designs and drawings including cost and conveyance of mild steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all incidental, Operational labour charges, including sales and other taxes on all materials etc., complete for finished item of work in all floors (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm) including CP&OH.

2.1

-

145967.89

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade for finished item of work, and finished item of work, as directed by the Engineer-in-charge, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

24611.53

-

4388235.8

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of C.I. D/F 80mm Dia. Semi Circular Bends for scour valve as per specifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading and all other connected taxes etc., complete for finished item of work (each of 32.11 kgs weight).

4

-

10352.2

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 110mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc.,including Excise duty, Sale Tax and speicals etc., complete for finished item of work.

384.32

-

133186.1

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for for finished item of work for drain foundations, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

1635.4

-

191014.72

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Cost & supply of 1800mm dia NP4 class pipes including Transportation charges etc complete finished item of work, including CP&OH.

30

-

1137834

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Plastering 12mm thick in Single Coat in CM(1:3) Prop. with sponge finishing including cost and conveyance of all materials to work site charges and all operational, incidental charges, scaffolding charges, labour charges,curing etc.,complete for Culvert Walls for finished item of work, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

986.85

-

172649.41

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete for finished item of work.

384.32

-

8531.9

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Scour Valve.

4

-

1270.4

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;VRCC M20 grade design mix concrete corresponding to IS-456 using Weigh Batcher of 0.50 Cum. (6 Cum./Hr.) with stone aggregate of 20mm & 12.5mm gauage graded hard granite machine crushed metal mechanically mixed ,with necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidental, labour charges, steel shuttering, mixing concrete, laying, vibrating, curing etc., as per standard specifications but excluding cost of reinforcement steel and its fabrication charges etc., complete for finished item work to the required strength as directed by the dept., for Pre Cast Slab for Culverts, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

53.16

-

434093.93

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Manufacture, Supplying and delivery of 110mm Dia. M.S. FLANGES for jointing conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.

4

-

781.8

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including boring the main threading the bore and fixing nipple etc., excluding the cost of rubber insertions, bolts & nuts, Air Valves & Flanged tail pieces etc., and including cost and conveyance of all materials to site of work and all other chrges etc.,complete for 100mm Dia. Air Valve.

2

-

635.2

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

120

-

15132

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC work of mix (1:3:6)Prop. using with 20mm & 12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, charges, laying, levelling and all labour charges, curing etc., complete for Culvert Side Walls, including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

118.67

-

801058.1

... More
Providing Infrastructure works to the Abja Township, at Chollagi(V), Tallarevu(M), Near Kakin;PCC work of mix (1:3:6)Prop. using with 20mm & 12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete for Head Walls , including Contractor profit & over Head charges @ 13.615% but excluding seigniorage charges.

66.04

-

445789.81



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.