Get Latest Tenders. NO Keyword Restriction.BUY 1 GET 1 YEAR FREE
Guaranteed Value-For-Money PlansAnytime, Anywhere. No hidden charges.BUY 1 GET 1 YEAR FREEJoin Now

Sl.No. Description of Items Qty Unit Quoted rates are negative or positive Rate in Figures in Rupees Amount 1 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 metres lead : a) With cement mortar 1:4 (1 cement : 4 fine sand). 2.00 Sqm Normal Item 0.00 2 Grading roof for water proofing treatment with a) Cement mortar 1:4 (1cement : 4 coarse sand) 2.34 Cum Normal Item 0.00 3 Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 ltr/sqm. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : a) 3 mm thick Name of the Contractor ALL INDIA RADIO(CCW) Nit No. 09/AE(C)/MAINT/SRFTI/KOL/2018-19 SCHEDULE OF QUANTITY Name of work : Repairing and water proofing work at Editing department, SRFTI, Kolkata. 73.00 Sqm Normal Item 0.00 0.00 1. If quoted rates is "Normal Item" this amount will be paid to contractor/Firm by CPWD. IF quoted rates is "Minus Item" this amount will be paid to CPWD by contractor/Firm. 2. If any cells (Rates) left Blank, then the same will be treated as "Zero". Grand Total

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.