Kanker Tender Results

Kanker Tender Results

Chhattisgarh State Cooperative Dairy Federation Limited Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
KANKER-HAMALI WORK OF MARKFED FOR STORAGE CENTRE KMS 2016-17 KANKER-HAMALI WORK OF MARKFED FOR STORAGE CENTRE KMS 2016-17

Department Of Rural Development And Panchayats Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountNA 
Construction & Maintenance of Road Under CG 08-133 District K... Construction & Maintenance of Road Under CG 08-133 District Kanker 1. L089-Sardanagar To Udumgaon

Department Of Rural Development And Panchayats Tender Result

Civil And Construction
Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountNA 
Nit 165 Dt 14.09.2019 Construction Of Package No.cg 08 - 234 Part A C (pmgsy Batch-ii) Block Antagarh Distt. Kanker. 1. L074-end Point Of L-031 To Garda (4.50 To 7.20)

Public Works Department - PWD Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
B.T.Patch Repair on kanker-Dudhwa road in km. 01 to 09, Puswada ... B.T.Patch Repair on kanker-Dudhwa road in km. 01 to 09, Puswada Approach Road in km.01 to 05, Daspur Approach road in km. 1 to 1/8 & kanker Town road (Part-02)

Public Works Department - PWD Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
1) Approach road & i/c 1 No. HP Culvert for girls I.T.I. Buil... 1) Approach road & i/c 1 No. HP Culvert for girls I.T.I. Building at Kanker. Length=0.147 km. 2) Approach road & i/c 1 No. HP Culvert for High School Building Potgaon. Length= 0.25 Km. 3) Approach road & i/c 1 No. HP Culvert for High School Building

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+4Electrical Goods and Equipments, Electrical and Electronics, Pipe Line Project, Water Storage And Supply
Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountNA 
Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of … Mm Dia To … Mm Hdpe Pe-100 , Pn-6 Pipe & 90 Mm Dia To 110mm Dia.upvc Class 6/10 Kg/sqcm With Suitable Joints & 100 Mm Dia Gi Pipe, Valve Specials And All Fittings Including All Allied Civil Works ,supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Three Phase, 50 Hz, 415v, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss /nylonwireropeandconnection Cable,including Verification Of Tubewell Yield & Electric Connection From Csebconstruction Of Brick Masonry Switch Room Of Size 1.2*1.2*2.4 Mtr ,construction Of Boundary Wall Around The Over Head Tank, Installation Of 01 No. Electro Chlorinator , Construction Of Chlorinator Room Of Size 2.4*2.4*3.0 Mtr , Providing Functional Household Tap Connection(f.h.t.c) In Individual Households And Government Instiution Etc. Complete With Trial Run Operation & Maintanance For 03 Months Under Retrofitting Of Piped Water Supply Scheme Under Jal Jeavan Mission For Village Halba, Block Charama District – Kanker

Public Works Department - PWD Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Construction of Patwari Residence cum Office Building at Charbha... Construction of Patwari Residence cum Office Building at Charbhatti. (Block-Narharpur) (Dist-Kanker)

Public Works Department - PWD Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
B.T. Renewal on Kanker Bhanupratappur Sambalpur Road in km 38/4 ... B.T. Renewal on Kanker Bhanupratappur Sambalpur Road in km 38/4 to 41/2, 41/4 to 42/2, 47/2 to 49/10 & 50/2 to 51/4 = 9.00 km.

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+3Pipe Line Project, Solar Installation and Products, Water Storage And Supply
Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountNA 
Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 75 Mm Dia To 63 Mm Hdpe Pe-100 , Pn-6 Pipe 5200m With Suitable Joints, Valve Specials And All Fittings Including All Allied Civil Works, Providing Functional Household Tap Connection(f.h.t.c) In Individual Households And Government Instiution Etc. Complete With Trial Run Operation & Maintanance For 06 Months Under Solar Based Piped Water Supply Scheme Under Jal Jeevan Mission For 1) Village- Markatolahabitation- Patelpara/markatola & Pratapeepara 2) Village- Markatola , Habitation-ravanpara/fokatpara & Junglepara 3)village- Dallidih, Habitation- Dallidih Block- Charama, District- Kanker.

Public Works Department - PWD Tender Result

Result Stage: Under Evaluation
Kanker, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Construction of Higher Secondary School Building at Dumali Construction of Higher Secondary School Building at Dumali
5281-5290 of 5405 active Tender Results