Supaul Tender Results
Supaul Tender Results
Select Contract Period
2024 onwards
2022 onwards
All Time
Public Health Engineering Department - PHED Tender Result
Civil And Architectural Services...+3Civil And Construction, Consultancy Services, Water Storage And Supply
Supaul, Bihar
Contract Date30 Aug 2024
Contract Amount₹ 26.3 Lac
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Bop Saileshpur, 45th Bn Ssb Birpur With Electric Driven Pumps And Iron Removal Treatment Plant Having Technology (adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc.) Certified By Csir Or Any Other Institute Of National Repute, In The District Of Supaul, Bihar On Turn-key Basis With 3 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months After Completion Of Trial Run Period Under P.h. Division, Supaul.
Planning And Development Department Tender Result
Building Construction...+1Civil And Construction
Supaul, Bihar
Contract Date30 Aug 2024
Contract Amount₹ 3.1 Cr
Construction Of Panchayat Sarkar Bhawan At Murli Panchayat Under Saraigarh Bhaptiyahi Block In Supaul District.
Department Of Education Tender Result
Building Construction...+1Civil And Construction
Supaul, Bihar
Contract Date29 Aug 2024
Contract Amount₹ 22.6 Lac
Construction Of New Primary Building At Ps North West Tola Ratauli, Block-pipra , District- Supaul, U-dise Code- 10060601610
Cooperative Department Tender Result
Agriculture or Forestry Works
GEM
Supaul, Bihar
Contract Date29 Aug 2024 This is an estimated contract date, exact date may vary.
Contract Amount₹ 54.7 K
Agriculture Harrow (disc Type)
Water Resources Department - WRD Tender Result
Civil And Construction...+1Road Construction
Supaul, Bihar
Contract Date29 Aug 2024
Contract Amount₹ 3.2 Cr
Repair Of Road From Kosi I.b. To Burma Shell And Physical Modelling Centre (pmc) To Airport Birpur
Urban Development And Housing Department - UDHD Tender Result
GEM
Supaul, Bihar
Contract Date28 Aug 2024 This is an estimated contract date, exact date may vary.
Contract Amount₹ 7.6 Lac This is an estimated amount, exact amount may vary.
Bed Mattresses With Sandwiched Rubberized Coir Sheet As Inner Cushioning Material As Per Is 13489,
Public Health Engineering Department - PHED Tender Result
Civil And Construction...+1Water Storage And Supply
Supaul, Bihar
Contract Date28 Aug 2024
Contract Amount₹ 25 Lac
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Bop Dhada, 45th Bn Ssb Birpur With Electric Driven Pumps And Iron Removal Treatment Plant Having Technology (adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc.) Certified By Csir Or Any Other Institute Of National Repute, In The District Of Supaul, Bihar On Turn-key Basis With 3 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months After Completion Of Trial Run Period Under P.h. Division, Supaul.
Public Health Engineering Department - PHED Tender Result
Civil And Architectural Services...+3Civil And Construction, Consultancy Services, Water Storage And Supply
Supaul, Bihar
Contract Date28 Aug 2024
Contract Amount₹ 25 Lac
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Bop Piprahi, 45th Bn Ssb Birpur With Electric Driven Pumps And Iron Removal Treatment Plant Having Technology (adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc.) Certified By Csir Or Any Other Institute Of National Repute, In The District Of Supaul, Bihar On Turn-key Basis With 3 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months After Completion Of Trial Run Period Under P.h. Division, Supaul.
Public Health Engineering Department - PHED Tender Result
Civil And Construction...+1Water Storage And Supply
Supaul, Bihar
Contract Date28 Aug 2024
Contract Amount₹ 26.3 Lac
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemes For Bop Benalipatti, 45th Bn Ssb Birpur With Electric Driven Pumps And Iron Removal Treatment Plant Having Technology (adsorption/ Ion Exchange/ Membrane/ Nano Technology/ Etc.) Certified By Csir Or Any Other Institute Of National Repute, In The District Of Supaul, Bihar On Turn-key Basis With 3 Months Trial Run Period And Comprehensive Operation And Maintenance Of 60 Months After Completion Of Trial Run Period Under P.h. Division, Supaul..
Urban Development And Housing Department - UDHD Tender Result
Furnitures and Fixtures
GEM
Supaul, Bihar
Contract Date26 Aug 2024 This is an estimated contract date, exact date may vary.
Contract Amount₹ 18.9 Lac This is an estimated amount, exact amount may vary.
Metal Beds (v2),almirah Steel (v2),plastic Moulded Chair As Per Is 13713 (v2),dining Tables - Handc
461-470 of 2416 active Tender Results