Tender Results of Jammu And Kashmir Energy Development Agency

Tender Results of Jammu And Kashmir Energy Development Agency

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Electrical Goods and Equipments...+1Electrical and Electronics
Eprocure
Result Stage: Technical Evaluation
2 years ago
Jammu, Jammu & Kashmir
Contract DateNA
Contract AmountRefer Documents 
Supply Installation Testing And Commissioning Including Five Years Free Of Cost Replacement Warranty And Comprehensive Maintenance Contract Of Solar Street Lights Conforming To The Latest Mnre Goi Specific

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Civil Works Others...+1Energy, Oil and Gas
Eprocure
Result Stage: Technical Evaluation
3 years ago
Ganderbal, Jammu & Kashmir
Contract DateNA
Contract AmountRefer Documents 
Development Of Micro/mini Hydro Power Projects (under Swiss Challenge Method) In The Ut Of Jammu And Kashmir, India Through Independent Power Producer (ipp) Mode For 1.95 Mw Mhp Basmai Nallah At Gund, Ganderbal

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Civil Works Others...+1Energy, Oil and Gas
Eprocure
Result Stage: Technical Evaluation
3 years ago
Ganderbal, Jammu & Kashmir
Contract DateNA
Contract AmountRefer Documents 
Development Of Micro/mini Hydro Power Projects Under Swiss Challenge Method In The Ut Of Jammu And Kashmir, India Through Independent Power Producer (ipp) Mode For 2.00mw Mhp Hung Nallah At Gund, Ganderbal

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Eprocure
Result Stage: Financial Bid Opening
10 years ago
Jammu, Jammu & Kashmir
Contract DateNA
Contract AmountRefer Documents 
SUPPLY,INSTALLATION,COMMISSIONING AND FREE MAINTENANCE OF SOLAR HOME LIGHTING SYSTEMS TO BE INSTALLED IN JAMMU AND KASHMIR

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Energy, Oil and Gas
Eprocure
Result Stage: Technical Evaluation
2 years ago
Jammu, Jammu & Kashmir
Contract DateNA
Contract AmountRefer Documents 
Rfq For Development Of Small Hydro Power Projects Under Ipp Mode

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Services
Consultancy Services...+2Energy, Oil and Gas, Other Consultancy Services
Eprocure
Result Stage: Technical Evaluation
10 months ago
Budgam, Jammu & Kashmir
Contract DateNA
Contract AmountNA 
Engagement Of Consultancy Firms

Jammu And Kashmir Energy Development Agency - JAKEDA Tender Result

Goods
Telecommunication Services
GEM
Result Stage: Under Evaluation
Jammu, Jammu & Kashmir
Contract DateNA
Contract AmountNA 
CATEGORY: Three phase servo stablizer , LED Smart Television. , glass Shelves for Settop Boxes. , Networking Cable latest in features , I-O Boxes , Networking Switch , Giga Switch , Mounting Network Switch , Mapping Charges per Node , Connector Box , Laying charges of LAN Networking , Patch Cable 3-Meters Long , Wireless Access Point , PVC Channel Pipes with latest feature , Clips Flexible Pipe with latest edition , Junction Pipe with latest edition , AC Hot and Cold Including Stazbilizer and Installation , DOME Camera 5MP with Night Vision for CCTV with latest edition , NVR Channel , Cables CCTV , HDD with latest edition , PVC Channel Pipes for CCTV with latest edition , Labour Charges for installation of CCTV , Mic system with latest edition , Interactive Display , Installation and Fixing Charges of Mic. System , Epbax system in full , hot water heater with latest , Automatic Sensor switch based with Low flow basin mixer counter mounting. , Door lock , Automatic Sensor Switch for flushing cistern , Unblocking of existing PVC pipes of bathrooms , BOM required to fulfil the signoff criteria
61-70 of 67 active Tender Results