Tender Results of Hyderabad Road Development Corporation Limited

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Bridge Construction...+3Civil And Construction, Pipe Line Project, Road Construction
Result Stage: Awarded  (AOC Available)
Vikarabad, Telangana
Construction Of Missing Links/ Slip Roads In Hyderabad For Pkg-a1 On A) Corridor No.1: Nizampet X Roads To Hitex Jn.(via Vasanth Nagar And Nac) And Link Road(2.20 Km), B) Corridor No. 2: Link Road From Ht Line To Miyapur Road(1.00 Km), C) Corridor No. 6: Bharat Nagar Rob To Hitex Road(via Mothinagar, Borabanda Aurobindo Lulu Mall, Ghousia Masjid) (0.70 Km), D) Corridor No. 13: Madhavi Hills To Narnie Road Via Came-lot (0.16 Km), E) Corridor No. 16: Ghmc Serlingampally Zonal Office To Nh 65 @ Gsm Mall (via Manjeera Pipe Line Road) (2.70 Km), F) Corridor No. 18: Botanical Garden Road (kondapur) To Hafeez Railway Track Via Jv Hills(0.73 Km),g) Corridor No. 24: Link Road Near Bio Diversity(0.13 Km), H) Corridor No.26: Old Bombay Highway To Delhi Public School Via Engineering Staff College(2.30 Km), I) Corridor No. (part Of 29&32): Old Bombay Highway To Khajaguda Road Via Malkam Cheruvu & Chitrapuri Colony(0.78 Km), J) Corridor No. 42:link Road From Nac To Kphb Road(0.90 Km)(2nd Call)
Contract DateNA
Contract Amount₹ 59.8 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Bridge Construction...+3Civil And Construction, Food Products, Road Construction
Result Stage: Awarded  (AOC Available)
Hyderabad, Telangana
Construction Of Missing Links/ Slip Roads In Hyderabad City For Package B2 On A)corridor No. 39:isb Road To Lanco Hills Jn(length 3.10km),b)corridor No. 41:bapu Ghat Bridge To Attapur Bridge(0.75km),c)corridor No.75:gunrock-sh-1(1.45km)/kukatpally Metro Supermall To Jagdgirgutta Via Ht Lane ,d)corridor No.76:ambedkar Statue To Golnaka Via Kamela (0.17km),e)corridor No.79:nacharam Mallapur Road To Mouli Ali Flyover (0.66 Km), F)corridor No.82: Radhika X Roads - Balajinagar Dumping Yard (3.10 Km), G)corridor No. 85: Boduppal Colony Road To Mallapur Road (padmavathi Colony Bus Stop) Via Rama Cheruvu (0.94km), H) Corridor No. 86: Bhatukamma Ghat Uppal (ghatkeshar Road) To Boduppal Colony Road (1.20km), I)corridor No. 134: Akshaya Food Court, Gokul Nagar To Hmws Nh-9 Via Idpl Colony (length 0.20km),j)corridor No. 102: Saroor Nagar To Hyatnagar Road(via Indore Stadium) (0.60km),k)corridor No. 137:road No 70 Jubilee Hills(prashasan Nagar) To Narnie Road No 78, Jubilee Hills(0.47km)(2nd Call)
Contract DateNA
Contract Amount₹ 49.4 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+1Road Construction
Result Stage: Potential AOC Released
K.v.rangareddy, Telangana
Construction Of Missing Links/ Slip Roads In Hyderabad City For Package A2 On A) Corridor No. 50: Hitech Citi Phase 2 To Gachibowli- Inorbit Road (length 0.56 Km) B) Corridor No. 66: New Allahpur To 100 Ft Road Adjacent To Sunnam Cheruvu (length 0.84 Km) C) Corridor No. 99: Central Ground Water Board To Pirzadiguda Road (length 4.74 Km) D) Corridor No. 132: Gopanpally To Wipro Circle (length 0.50 Km) E) Corridor No. 136: Slip Road Connects To Q City To Niab Via My Home Vihanga (length 2.04 Km) F) Corridor No. 12: Jv Hills Park To Masjeed Banda Road Via Prabhupadha Layout Under Ht Line (length 1.0 Km) G) Corridor No. 101: Alkapuri Bus Stop To Bandlaguda Road Via Sai Nagar Cheruvu (length 0.70 Km) H) Corridor No. 138: Neknampur Road To Usman Sgar Road Via Alkapur Township (approx. Length 0.46 Km)(2nd Call)
Contract DateNA
Contract Amount₹ 53.8 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+1Road Construction
Result Stage: Awarded  (AOC Available)
Telangana
Construction Of Footpath On I) Nizampet X Roads To Hitecx Jn. (via Vasanth Nagar,and Nac) And Link Road From Km. 0/00 To 4/400 , Ii) Nizampet To Kazipally Orr Link Road Connectivity From Km 0/0 To 8/330, Iii) Connecting Moosapet To Chandanagar Via Rainbow Vistas, Indu And Hafeezpet Parallel To Nh( From Km 0/0 To 8/490 And Iv) Nizampet Ht Line Road From Km 0/0 To 5/200
Contract DateNA
Contract Amount₹ 5.7 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+1Road Construction
Result Stage: Awarded  (AOC Available)
Telangana
Special Repairs To Old Airport Road From Km 0/0 To 3/6 : Subwork : Providing And Laying Of Footpath On Old Airport Road
Contract DateNA
Contract Amount₹ 76.2 Lac 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+1Road Construction
Result Stage: Awarded  (AOC Available)
Telangana
Restoration Of Road Cutting After Laying Of Ug Cable By Ts Transco On I) Intermediate Ring Road From Km. 5/2 To 7/2 (rhs), Km 7/2 To 9/050(rhs), Km 6/140 To 8/5 (lhs), Km 9/650 To 10/580(bhs) & Khajaguda Road From Km 0/0 To 2/7 (rhs) (2nd Call)
Contract DateNA
Contract Amount₹ 6.8 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+2Pipe Line Project, Road Construction
Result Stage: Potential AOC Released
Telangana
Restoration Of Road Cutting After Laying Gas Pipe Line By M/s Bhagyanagar Gas Ltd. (i) Nizampet X Roads To Madinaguda (sony Showroom )for A Length Of 3.2 Km Lhs From Km 14/00 To 18/200 (ii) Allwyn X Roads To Hafizpet For A Length Of 1.7 Km From Km 14/150 To 15/850
Contract DateNA
Contract Amount₹ 2 Cr 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Result Stage: Awarded  (AOC Available)
Telangana
Restoration of road cutting by the HMWSSB at Km 9/7 on Rethibowli - Allwyn X road
Contract DateNA
Contract Amount₹ 2.3 Lac 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+4Civil Works Others, Pipe Line Project, Road Construction, Water Storage And Supply
Result Stage: Awarded  (AOC Available)
Telangana
Restoration Of Trench After Laying 600mm Dia And Ms And 400mm Dia Di Water Supply Pipeline In Tarnaka Area On Hyderabad - Moulali Road From Km 0/900 To 1/1050 (l/s) And Km 2/060 To 2/960 (r/s) And At Km 14/00 To 14/060 On Irr At Tarnaka Junction.
Contract DateNA
Contract Amount₹ 63.1 Lac 

Hyderabad Road Development Corporation Limited - HRDCL Tender Result

Civil And Construction...+1Road Construction
Result Stage: Awarded  (AOC Available)
Telangana
Improvements To Junction At Km 3/4 Near Cod On Jubilee Hills Check Post To Kothaguda Road.
Contract DateNA
Contract Amount₹ 22.2 Lac 
41-50 of 82 active Tender Results