Solar Power Plant Tenders

Solar Power Plant Tenders

Maharashtra Energy Development Agency - MEDA Tender

Works
Energy, Oil and Gas...+4Solar Installation and Products, Consultancy Services, Electrical and Electronics, Civil And Architectural Services
Eprocure
Corrigendum : Corrigendum Added
Pune, Maharashtra
Closing Date6 Jan 2025
Tender Amount₹ 6.7 Cr 
Details: Survey, Design, Fabrication, Supply, Installation, Testing, Commissioning and Operation & Maintenance for a period of 5 years of total 1192 KW distributed capacity of ground/roof-top Grid Connected Solar PV Power Plant with Net Metering at 32 Police Station in Gadchiroli, 7 Police Station in Bhandara & 12 Police Station in Nandurbar District in the state of Maharashtra.

Central Public Works Department - CPWD Tender

Works
Civil And Construction...+7Civil Works Others, Building Construction, Drainage Work, Security and Emergency Services, Water Storage And Supply, Electrical Works, Electrical and Electronics
Ranchi, Jharkhand
Closing Soon26 Dec 2024
Tender AmountRefer Documents 
Details: Construction Of New Office Building ( G Plus 3) For Pdca & Mab Including Internal Water Supply, Sanitary Installation, Drainage, Stp (50 Kld), Internal E.i & Fans, Street/compound & Garden Light, Substation & Lt Distribution, 250 Kva Dg Set, Lifts, Fire Alarm & Pa System, Fire Fighting System, Cctv & Networking Solar Photovoltaic Power Plant And Vrv/vrf Ac System At Doranda, Ranchi Jharkhand Sh: Providing And Fixing Box Letter, Lago Border Line Of Titaniam Gold Complete.

Coal India Limited - CIL Tender

Works
Energy, Oil and Gas...+2Solar Installation and Products, Civil And Architectural Services
Eprocure
Bikaner, Rajasthan
Closing Soon2 Jan 2025
Tender AmountRefer Documents 
Details: Design, Engineering, Supply And Procurement, Construction, Erection, Testing, Commissioning, Operation And Maintenance Of Solar Photovoltaic Grid-connected Power Plant Of Capacity 1000 Mwac In Rvuns Solar Park , Pugal ,bikaner District, Rajasthan

Paradip Port Trust Tender

Works
Energy, Oil and Gas...+2Solar Installation and Products, Electrical and Electronics
Eprocure
Corrigendum : Closing Date Modified
Kendrapara, Odisha
Closing Soon29 Dec 2024
Tender Amount₹ 87.6 Cr 
Details: Design, Engineering, Procurement And Supply, Construction, Erection, Testing, Commissioning, And Comprehensive Operation And Maintenance For 10 Years Of 10 Mw (ac)/12 Mwp Solar Photovoltaic Grid-connected Power Plant At Paradip Port Authority.

Power Grid Corporation Of India Limited - PGCIL Tender

Works
Energy, Oil and Gas...+2Solar Installation and Products, Electrical and Electronics
Gurugram, Haryana
Closing Soon28 Dec 2024
Tender AmountRefer Documents 
Details: T And D-pilot Package Gh2-01 For Establishment Of Solar Pv Powered Green Hydrogen Plant And Fuel Cell Based Microgrid Pilot Project At 400/220/33kv Neemrana Sub-station, Rajasthan Along With O And M For 10 Years.

Power Grid Corporation Of India Limited - PGCIL Tender

Works
Energy, Oil and Gas...+1Solar Installation and Products
Alwar, Rajasthan
Closing Soon28 Dec 2024
Tender AmountRefer Documents 
Details: T And D-pilot Package Gh2-01 For Establishment Of Solar Pv Powered Green Hydrogen Plant And Fuel Cell Based Microgrid Pilot Project At 400/220/33kv Neemrana Sub-station, Rajasthan Along With O And M For 10 Years.

South Western Railway - SWR Tender

Works
Solar Installation and Products...+1Electrical and Electronics
Ireps
NA
Closing Date16 Jan 2025
Tender Amount₹ 9.5 Cr 
Details: Description:- Supply,testingandcommissioningofongridsolarphotovoltaicpowerplant conforming To Latest Mnre Specifications As Amended And As Per Tender Conditions, Consisting Of mono/polycrystallinesiliconsolarcells,netmeteringfacility,necessaryprotections,earthing, mounted On Gi Structure Of Suitable Strength With Following Components Complete As Required:- A) solarphotovoltaicmoduleofcapacity330wporabove,manufacturedinindia,conformingto is14286/iec61215,is/iec61730-part-1,is/iec61730-part-2.solarphotovoltaicmoduleconversion efficiency Shall Not Be Less Than 16.5%. Pv Modules Used In Solar Power Plants/systems Must Be warranted For Their Output Peak Watt Capacity, Which Should Not Be Less Than 90%at The End Of 10 years And 80% At The End Of 25 Years. B) Power Conditioning Unit (pcu) Of 350-800vdc Input Voltage range And 400vac, Three Phase, 4 Wire, 50hz +/- 2.5hz, Output Voltage Suitable To Generate Ac power With Efficiency Not Less Than 97% Total Harmonic Distortion Less Than And 3% And Suitable For ambient Temperature From 0 To 50-degree C. The Pcu Shall Adjust The Voltage And Frequency Level To suit The Grid Voltage Frequency. C) Data Monitoring System Complete With Accessories. D) Fixing Of arrayjunctionbox&mainjunctionboxwithip65protectionandterminationarrangementfor incoming And Outgoing Cable Along With Glands, Lugs And Other Accessories Etc. As Required. E) lightning And Surge Voltage Protection. F) Connections & Interconnections By Supplying & Fixing required Size Xlpe Insulated Copper Conductor 1.1kv Grade Armoured Power And Control Cables between Solar Modules, Main Power Cable To Grid Supply Pcu Unit Along With Supplying & Fixing Of necessary Channel/conduit Lugs And Other Accessories Etc.
161-170 of 167 active Tenders