VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date14 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Sources Sought Notice Only. this Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources To Perform The Potential Requirement. This Sources Sought Notice Is Part Of Market Research Effort And Invites Contractors Capable Of Fulfilling The Requirement In Accordance With The Statement Of Work And Salient Characteristics.â  The Responses Received From Interested Contractors Will Assist The Government In Determining The Appropriate Acquisition Method. the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, Is Conducting Market Research To Identify Potential Sources Which Can Provide The Following:â  statement Of Work mold Remediation Services introduction/background air Quality Testing In A Va Building, Revealed Levels Of Airborne Microbial Particles That Exceed An Acceptable Level For A Healthcare Facility. Due To This Hazard, The Building Has Been Vacated Of All Patients And Staff And Will Remain So Until It Is Safe To Occupy. project Objective remediation Services To Remove Or Clean All Surfaces And Materials Located Inside Building. Building To Be Placed Under Negative Pressure, With Additional Units To Be Used As Air Filtrations. Hvac System To Be Isolated, All Diffusers Removed, Cleaned, Then Set Aside, All Flex Ducting To Be Removed (to Later Be Replaced), And All Duct Openings To Be Sealed. All Carpet In The Building To Be Removed. All Ceiling Tiles In The Building To Be Removed. All Drywall (including Above The Drop Ceiling) That Has Microbial Growth Or Moisture Damage To Be Removed. All Pipe And Ductwork Insulation Showing Evidence Of Growth Or Moisture Damage To Be Removed. All Building Semi And Non-porous Surfaces - Such As But Not Limited To Cabinetry, Countertops, Metal, Glass, Rubber Baseboards, Lighting And Plumbing Fixtures - Needs To Be Thoroughly Disinfected Via Appropriate Cleaning Methods. specifications mold Remediation Technical Specifications part 1 General scope this Specification Covers The Remediation Of Mold Including Removal, Cleanup And Disposal Of Mold Contaminated Materials From A Va Building. The Methods And Procedures In This Specification Are Based On The Observations And Previously Collected Background Air Samples. an Estimate Of The Amount Of Material To Be Removed Or Cleaned Is Not Given. The Determination Of The Actual Amounts, For Bidding Purposes, Is The Responsibility Of The Contractor. By Submitting A Bid, The Contractor Acknowledges That He Has Investigated And Satisfied Himself As To: the Conditions Affecting The Work, Including, But Not Limited To, Physical Conditions Of The Site Which May Affect Site Access, Handling And Storage Of Tools And Materials, Access To Water, Electricity Or Other Utilities, Or Otherwise Affect Performance Of Required Activities. the Character And Quantity Of All Surface And Subsurface Materials Or Obstacles To Be Encountered As Far As This Information Is Reasonably Ascertainable From An Inspection Of The Site, Including Exploratory Work Done By The Building Owner Or A Designated Consultant, As Well As Information Presented In Drawings And Specifications Included With This Contract. Any Failure By The Contractor To Acquaint Himself With Available Information Will Not Relieve Him From The Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Building Owner Is Not Responsible For Any Conclusions Or Interpretations Made By The Contractor On The Basis Of The Information Made Available By The Building Owner. description the Work Specified Herein Shall Be The Remediation Of Mold By Competent Persons trained, Knowledgeable And Qualified In The Techniques Of Remediation, Handling And Disposal Of Mold Contaminated Materials And The Subsequent Cleaning Of Contaminated Areas, Who Comply With All Applicable Federal, State And Local Regulations And Are Capable Of, And Willing To Perform, The Work Of This Contract. the Contractor Shall Supply All Labor, Materials, Services, Insurance, Permits, licenses, Patents, And Equipment Necessary To Carry Out The Work In Accordance With All Applicable Federal, State And Local Regulations And These Specifications. the Contractor Is Responsible For Restoring The Work Area And Auxiliary Areas Utilized During The Remediation To Conditions At Least Equal To Original Conditions. (this Excludes Any Material Removed As Part Of Scope.) Any Damages Caused During The Performance Of Remediation Activities Shall Be Repaired By The Contractor (e.g., Paint Peeled Off By Barrier Tape, Nail Holes, Water Damage, Broken Glass) At No Additional Expense To The Owner. applicable Standards And Guidelines all Work Under This Contract Shall Be Done In Strict Accordance With All Applicable Federal, State, And Local Regulations, Standards, And Codes Governing Mold Remediation And Any Other Trade Work Done In Conjunction With The Remediation. the Most Recent Edition Of Any Relevant Regulation, Standard, Document Or Code Shall Be In Effect. Where Conflict Among The Requirements Or With These Specifications Exists, The Most Stringent Requirements Shall Be Utilized. specific Requirements: title 29, Code Of Federal Regulations, 1926. Occupational Safety And Health Administration (osha), U.s. Department Of Labor. quality Assurance bidders Must Be Licensed As Required By The Iowa Bureau Of Labor. bidders Shall Demonstrate Prior Experience On Mold Remediation Projects Of Similar Nature And Scope Through The Submission Of Letters Of Reference From The Owners Including The Name, Address, And Telephone Numbers Of Contact Person (someone Specifically Familiar With The Contractor's Work) For At Least Three (3) Previous Users Of Service If Requested By The Owners. the Owner Reserves The Right To Reject Bids For Any Reason That Serves The Best Interests Of The Owner Or Building Occupants. The Owner Also Reserves The Right To Waive Any Technicality Or Irregularity In A Bid. Failure To Submit Requested information/documentation Can Result In Automatic Disqualification Of Bid Package. submittals And Notices pre-remediation: submit The Location Of The Landfill To Be Used For Disposal Of The Mold Contaminated Material. submit A List Of All Personnel Who Will Be Involved In The Remediation Activity Including, Supervisors, Workers, And Any Other Personnel Or Agent Who May Be Responsible For Any Aspect Of The Remediation Activities. submit Documentation From A Physician That All Employees Or Agents Have Been Medically Monitored To Determine Whether They Are Physically Capable Of Working While Wearing The Respirator Required Without Suffering Adverse Health Effects. submit Documentation Of Respirator Fit Testing For All Employees And Agents Who Must Enter The Work Area. Document Niosh Approval Of All Respiratory Protective Devices Utilized On-site. submit A List Of Equipment For This Project. with The Owner Or Owner's Representative, Inspect The Premises Wherein All Remediation And Remediation Related Activities Will Occur And Submit A Statement Signed By Both, Agreeing On Building And Fixture Condition Prior To The Commencement Of The Work. submit Manufacturer's Certification That Hepa Vacuums, Negative Pressure Ventilation Units, And Other Local Exhaust Ventilation Equipment Conform To Ansi 29.2-79. when Rental Equipment Is To Be Used In Remediation Areas Or To Transport Mold Contaminated Waste, A Written Notification Concerning Intended Use Of The Rental Equipment Must Be Provided To The Rental Agency With A Copy Submitted To The Owner. during Remediation Activities: submit Weekly Job Progress Reports Detailing Remediation Activities And Progress. submit Copies Of All Transport Manifests, Trip Tickets And Disposal Receipts For All Mold Waste Materials Removed From The Work Area During The Remediation Process. post In The Clean Room Area Of The Worker Decontamination Enclosure: a List Containing The Names, Addresses, And Telephone Numbers Of The Contractor, The Owner, The Assessment Professional, The Testing Laboratory And Any Other Personnel Who May Be Required To Assist During Remediation Activities. a Logbook To Record Names Of All Personnel Who Enter The Work Area. a Copy Of Emergency Procedures. telephone Numbers Of All Emergency Personnel And Principals For This Remediation Project. the Project Will Not Be Considered Completed Until All Submittals Are Received By The Owner. This Will Affect Payment For The Project. site Security the Work Area Is To Be Restricted Only To Authorized, Trained, And Protected Personnel. These May Include The Contractor's Employees, Employees Of subcontractors, Owner Employees And Representatives, State And Local Inspectors And Any Other Designated Individuals. entry Into The Work Area By Unauthorized Individuals Shall Be Reported Immediately To The Owner By The Contractor. access To The Work Area Shall Be Through A Single Worker Decontamination System. All Other Means Of Access (doors, Windows, Hallways, Etc.) Shall Be Blocked Or Locked So As To Prevent Entry To Or Exit From The Work Area. The Only Exceptions For This Rule Are The Waste Pass Out Airlock Which Shall Be Sealed Except During The Removal Of Containerized Mold Waste From The Work Area, And Emergency Exits In Case Of Fire Or Accident. Emergency Exits Shall Not Be Locked From The Inside; However, They Shall Be Sealed With Polyethylene Sheeting And Tape Until Needed. the Contractor Shall Have Control Of Site Security During Remediation Operations Whenever Possible, In Order To Protect Work Efforts And Equipment. contractor Will Have Owner's Assistance In Notifying Building Occupants Of Impending Activity And Enforcement Of Restricted Access By Owner's Employees. emergency Planning emergency Planning Shall Be Developed Prior To Remediation Initiation And Agreed To By Contractor And Owner. emergency Planning Shall Include Considerations Of Fire, Explosion, Toxic Atmospheres, Electrical Hazards, Slips, Trips And Falls, Confined Spaces, And Heat Related Injury. Written Procedures Shall Be Developed And Employee Training In Procedures Shall Be Provided. employees Shall Be Trained In Evacuation Procedures In The Event Of Work Place Emergencies. part 2 Materials And Equipment materials general: deliver All Materials In The Original Packages, Containers, Or Bundles Bearing The Name Of The Manufacturer And The Brand Name. store All Materials Subject To Damage Off The Ground, Away From Wet Or Damp surfaces, And Under Cover Sufficient Enough To Prevent Damage Or Contamination. polyethylene Sheeting For Walls And Stationary Objects Shall Be A Minimum Of 4 Mil Thick. For Floors And All Other Sheeting Of At Least 6 Mil Thickness Shall Be Used In Widths Selected To Minimize The Frequency Of Joints. tape - Duct, Glass Fiber, Or Other Type Capable Of Sealing Adjacent Sheets Of Polyethylene And Capable Of Sealing Polyethylene To Dissimilar Finished Or Unfinished Surfaces Under Both Wet And Dry Conditions Including The Use Of Amended Water. polyethylene Sheeting Utilized For Worker Decontamination Enclosure Shall Be Opaque White Or Black In Color. disposal Bags Shall Be Of 6 Mil Polyethylene. disposal Drums Shall Be Metal Or Fiberboard With Locking Ring Tops. equipment general: a Sufficient Quantity Of Negative Pressure Ventilation Units Equipped With Hepa Filtration Shall Be Utilized To Provide One Workplace Air Change Every 15 Minutes Or A Static Pressure Within The Work Area Of At Least -0.02 Inches Of Water Column. These Ventilation Units Must Be Commercially Produced Units And Not Self-manufactured. Ventilation Units To Be Exhausted Outside.the Contractor Shall Furnish A Copy Of Their Calculations To Obtain This Air Flow Or Static Pressure If Requested By The Owner. air Purifying Respirators Equipped With Hepa Filters Will Be Required. A Sufficient Supply Of Filters Shall Be Available In The Clean Change Area. This Requirement May be Modified By The Assessment Professional If Air Sampling Results Indicate The Need For More Protection. air Purifying Respirators With Dual High Efficiency (hepa) Filters May Be Utilized During Work Area Preparation Activities. Spectacle Kits And Eyeglasses Must Be Provided For Employees Who Wear Glasses And Who Must Wear Full Face Piece Respirators. Respirators Shall Be Provided That Have Been Tested And Approved By The National institute Of Occupational Safety And Health For Use In Mold Contaminated Atmospheres. full Body Disposable Protective Clothing, Including Head, Body And Foot Coverings (unless Using Footwear As Described In Section 2.02 (a)(6) Consisting Of Material Impenetrable By Mold (tyvek Or Equivalent) Shall Be Provided To All Workers In Sizes Adequate To Accommodate Movement Without Tearing. additional Safety Equipment (e.g., Hard Hats, Eye Protection, Safety Shoes Meeting The Applicable Ansi Standard, Disposable Pvc Gloves) As Necessary, Shall Be Provided To All Workers And Authorized Visitors. nonskid Footwear Shall Be Provided To All Remediation Workers. Disposable Clothing Shall Be Adequately Sealed To The Footwear To Prevent Body Contamination. a Sufficient Supply Of Disposable Mops, Rags And Sponges For Work Area Decontamination Shall Be Available. mobile Radios, Telephones, Etc. As Required By The Project Will Be Provided By The Contractor. removal/cleaning Equipment: sufficient Supply Of Scaffolds, Ladders, Lifts And Hand Tools Shall Be Provided As Needed. sprayers With Pumps Capable Of Providing A Water Stream Or Mist For Dust Control. rubber Dustpans And Rubber Squeegees Shall Be Provided For Cleanup. brushes Utilized For Removing Loose Mold Containing Material Shall Have Nylon Or Fiber Bristles, Not Metal. a Sufficient Supply Of Hepa Filtered Vacuum Systems Shall Be Available During Cleanup. part 3 Execution preparation post Caution Signs At Any Location And Approaches To A Location Where Airborne Concentrations Of Mold May Exceed Ambient Background Levels. Additional Signs May Need To Be Posted Following Construction Of Workplace Enclosure Barriers. shut Down And Lock Out Electric Power To All Work Areas As Necessary If Wet Conditions Warrant. Provide Temporary Power And Lighting. Ensure Safe Installation (including Ground Faulting) Of Temporary Power Sources And Equipment By Compliance With All Applicable Electrical Code Requirements And Osha Requirements For Temporary Electrical Systems. shut Down And Lock Out All Heating, Cooling And Air Conditioning System (hvac) Components That Are In, Supply Or Pass Through The Work Area. Seal All Intake And Exhaust Vents In The Work Area With Tape And 6 Mil Polyethylene. Also Seal Any Seams In System Components That Pass Through The Work Area. Remove All Hvac System Filters And Place In Labeled 6 Mil Polyethylene Bags For Staging And Eventual Disposal As Mold Contaminated Waste. due To Hvac Being Offline During Winter Conditions, Contractor To Provide Temporary Heat To Maintain Indoor Temperature Of 60 Degrees Fahrenheit Throughout Building. the Contractor Shall Provide Sanitary Facilities For Remediation Personnel Outside Of The Enclosed Work Area And Maintain Them In A Clean And Sanitary Condition Throughout The Project. seal Off All Windows, Doorways, Elevator Openings, Corridor Entrances, Drains, Ducts, Grills, Grates, Diffusers, Skylights, And Any Other Openings Between The Work Area And Uncontaminated Areas Outside Of The Work Area With 4 Mil Polyethylene Sheeting And Tape. barrier Walls Will Be Constructed Of 4 Mil Polyethylene Sheeting Extending From The Ceiling To Floor. workplace Exits worker Decontamination Enclosure System: worker Decontamination Enclosure Systems Shall Be Provided At All Locations Where Workers Will Enter Or Exit The Work Area. worker Decontamination Enclosure Systems Constructed At The Work Site Shall Utilize 6 Mil Opaque White Or Black Polyethylene Sheeting Or Other Acceptable Materials For Privacy. Detailed Descriptions Of Portable, Prefabricated Units, If Used, Must Be submitted For The Owner's Approval. Plans Must Include Floor Plan With Dimensions, Materials, Size, Thickness, Plumbing, And Electrical Utilities. the Worker Decontamination Enclosure System Shall Consist Of At Least A Clean Room And An Airlock. entry And Exit From The Decontamination Enclosure System Chamber Shall Be Through Curtained Doorways Consisting Of Two Sheets Of Overlapping Polyethylene Sheeting. One Sheet Shall Be Secured At The Top And Left Side, The Other Sheet At The Top And Right Side. Both Sheets Shall Have Weights Attached To The Bottom To Ensure That They Hang Straight And Maintain A Seal Over The Doorway When Not In Use. the Clean Room Shall Be Sized To Adequately Accommodate The Work Crew. Benches Shall Be Provided As Well As Hooks For Hanging Up Street Clothes. Shelves For Storing Respirators Shall Also Be Provided In This Area. Clean Work Clothes: Clean Disposable Clothing, Replacement Filters For Respirators, Towels, And Other Necessary Items Shall Be Provided In Adequate Supply In The Clean Room. A Location For Postings Shall Also Be Provided In This Area. Whenever Possible, A Lockable Door Shall Be Used To Permit Access Into The Clean Room From Outside The Work Area. Lighting, Heat, And Electricity Shall Be Provided As Necessary For Comfort. This Space Shall Not Be Used For Storage Of Tools, Equipment Or Materials, Or As An Office Space. waste Container Pass Out Airlock: the Waste Container Pass Out Airlock Shall Be The Same As The Exit Entry Airlock. emergency Exits: emergency Exits Shall Be Established And Clearly Marked With Duct Tape Arrows Or Other Effective Designations To Permit Easy Identification From Anywhere Within The Work Area. They Shall Be Secured To Prevent Access From Uncontaminated Areas And Still Permit Emergency Exiting. These Exits Shall Be Properly Sealed With Polyethylene Sheeting Which Can Be Cut To Permit Egress If Needed. These Exits May Be The Worker Decontamination Enclosure, The Waste Pass Out Airlock And/or Other Alternative Exits Satisfactory To Fire Officials. isolation Of The Workplace maintenance Of Enclosure Systems: following Completion Of The Construction Of All Polyethylene Barriers And Decontamination System Enclosures, Allow Overnight Settling To Ensure That Barriers Will Remain Intact And Secured To Walls And Fixtures Before Beginning Actual Remediation Activities. all Polyethylene Barriers Inside The Workplace, In The Worker Decontamination Enclosure System, In The Waste Container Pass Out Airlock And At Partitions constructed To Isolate The Work Area From Occupied Areas Shall Be Inspected At Least Twice Daily, Once Prior To The Start Of Each Day's Remediation Activities. Document Inspections And Observations In The Daily Project Log. damage And Defects In The Enclosure System Are To Be Repaired Immediately Upon Discovery. negative Pressure To Be Monitored With A Continuous Reading Device. A Record Of This Shall Be Furnished To The Owner. Use Smoke Tubes To Test The Effectiveness Of The Barrier System When Directed By The Owner. at Any Time During The Remediation Activities After Barriers Have Been Erected, If Visible Material Is Observed Outside Of The Work Area Or If Damage Occurs To Barriers, Work Shall Immediately Stop, Repairs Be Made To Barriers, And Debris/residue Cleaned Up Using Appropriate Hepa Vacuuming And Wet Mopping Procedures. install And Initiate Operation Of Negative Pressure Ventilation Equipment As Needed To Provide One Air Change In The Work Area Every 15 Minutes Or Produce A Static Pressure Of -0.02 Inches Of Water Column. (see Section 2.02 (a)) Openings Made In The Enclosure System To Accommodate These Units Shall Be Made Airtight With Tape And/or Caulking As Needed. If More Than One Unit Is Installed, They Should Be Turned On One At A Time, Checking The Integrity Of Wall Barriers For Secure Attachment And The Need For Additional Reinforcement. Ensure That Adequate Power Supply Is Available To Satisfy The Requirements Of The Ventilating Units. Negative Pressure Ventilation Units Shall Be Exhausted To The Outside Of The Building Whenever Feasible. Additional Negative Pressure Ventilation Units May Be Exhausted Inside The Work Area To Provide Continuous Air Cleaning. They Shall Not Be Exhausted Into Occupied Areas Of The building. Twelve-inch Extension Ducting Shall Be Used To Reach From The Work Area To The Outside When Required. Careful Installation, Air Monitoring And Daily Inspections Shall Be Done To Ensure That The Ducting Does Not Release Fibers Into Uncontaminated Building Areas. once Constructed And Reinforced As Necessary, With Negative Pressure Ventilation Units In Operation As Required, Test Enclosure For Leakage Utilizing Smoke Tubes. Repair Or Reconstruct As Needed. workplace Entry And Exit Procedures personnel Entry And Exit: all Workers And Authorized Personnel Shall Enter The Work Area Through The Worker Decontamination Enclosure System. Workers Shall Not Eat, Chew, Or Smoke Once They Have Entered The Work Area. Eating May Take Place Just Outside The Clean Room. Smoking, At Any Time During The Project, Is Prohibited On The Campus. all Personnel, Before Entering The Work Area, Shall Read And Be Familiar With All Posted Regulations, Personal Protection Requirements (including Workplace Entry And Exit Procedures) And Emergency Procedures. A Sign Off Sheet Shall Be Used To Acknowledge That These Procedures Have Been Reviewed And Understood By All Personnel Prior To Entry. all Personnel Shall Proceed First To The Clean Room And Appropriately Don Respiratory Protection And Launderable And/or Disposable Coveralls, Head Covering, And Foot Covering. Hard Hats, Eye Protection, And Gloves Shall Also Be Utilized If Required. Clean Respirators And Protective Clothing Shall Be Provided And Utilized By Each Person For Each Separate Entry Into The Work Area. personnel Wearing Designated Personal Protective Equipment Shall Proceed From The Clean Room Through The Airlock Into The Main Work Area. before Leaving The Work Area All Personnel Shall Remove Gross Contamination From The Outside Of Respirators And The Outer Protective Clothing By Brushing And/or Wet Wiping Procedures. Each Person Shall Clean Bottoms Of Protective Footwear Just Prior To Entering The Airlock. personnel Shall Proceed To The Airlock Where They Remove The Outer Protective equipment Except Respirators. Deposit Disposable And/or Launderable Clothing Back Into The Work Area Into Appropriately Labeled Containers For Disposal And/or laundering. reusable, Contaminated Footwear Shall Be Stored In The Airlock When Not In Use In The Work Area. Upon Completion Of Remediation, It Shall Be Disposed Of As Mold Contaminated Waste. Rubber Boots May Be Decontaminated At The Completion Of The Remediation Project For Reuse. still Wearing Respirators, Personnel Shall Proceed To The Clean Room, Clean The Outside Of The Respirators And The Exposed Face Area Under Running Water Prior To Removal Of Respirator. Various Types Of Respirators Will Require Slight Modification Of These Procedures. don Clean Disposable And/or Launderable Clothing If There Will Be Later Reentry Into The Work Area Or Street Clothes If It Is The End Of The Work Shift. these Procedures Shall Be Posted In The Clean Room And Equipment Room. waste Container Pass Out Procedures: mold Contaminated Waste That Has Been Containerized Shall Be Transported Out Of The Work Area Through The Waste Container Pass Out Airlock Or Through The Worker Decontamination Enclosure If A Separate Airlock Has Not Been Construction. waste Pass Out Procedures Shall Utilize Two Teams Of Workers, An "inside" Team And An "outside" Team. the Inside Team Wearing Appropriate Protective Clothing And Respirators For Inside The Work Area Shall Clean The Outside, Including Bottoms, Containers (bags, Drums, Or Wrapped Components) Using Hepa Vacuums And Wet Wiping Techniques And transport Them Into The Waste Container Pass Out Airlock. the Outside Team, Wearing Appropriately Assigned Respirators, Shall Enter The Airlock From The Outside Of The Work Area, Remove Them From The Airlock To The Outside. No Worker From The Outside Team Shall Further Enter The Work Area Through This Airlock. The Exit From This Airlock Shall Be Secured When Not In Use To Prevent Unauthorized Entry. personnel Protection Requirements training: prior To Commencement Of Remediation Activities, The Contractor Shall Have One Person Designated As A Competent Supervisor. This Person Shall Be On-site At All Times. special On-site Training On Equipment And Procedures Unique To This Job Site Shall Be Performed As Required. training In Emergency Response And Evaluation Procedures Shall Be Provided. respiratory Protection: all Respiratory Protection Shall Be Provided To Workers In Accordance With The Written Respiratory Protection Program, Which Includes All Items In osha 29 Cfr 1910.134 (b)(1-11). This Program Shall Be Posted In The Clean Room Of The Worker Decontamination Enclosure System. workers Shall Be Provided With Personally Issued, Individually Identified Respirators. respirator Types Shall Be Utilized According To The Following Schedule: full Face Air Purifying Respirators With Dual Hepa Filters Shall Be Utilized By Workers During Remediation Operations. full Face Powered Air Purifying Respirators Equipped With Hepa Filters May Be Used During Remediation Activities. fit Testing: workers Must Perform Positive And Negative Air Pressure Fit Tests Each Time A Respirator Is Put On, Wherever The Respirator Design So Permits. Powered Air Purifying Respirators Shall Be Tested For Adequate Flow As Specified By The manufacturer. workers Shall Be Given A Qualitative Fit Test In Accordance With Procedures Detailed In The Osha Lead Standard (29 Cfr 1910.1025, Appendix D, Qualitative Fit Test Protocols) For All Respirators To Be Used On This Remediation Project. An Appropriate administered Quantitative Fit Test May Be Substituted For The Qualitative Fit Test. documentation Of Adequate Respirator Fit Must Be Provided To The Owner. no One Wearing A Beard Shall Be Permitted To Don A Respirator And Enter The Work Area. protective Clothing: disposable Clothing Including Head, Foot, And Full Body Protection Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. launderable Clothing, If Required, Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors. hard Hats, Protective Eyewear, Gloves, Rubber Boots, And/or Other Footwear Shall Be Provided As Required For Workers And Authorized Visitors. Safety Shoes May Be Required For Some Activities. commencement Of Work enclosure Systems Have Been Constructed And Tested. negative Pressure Ventilation Systems Are Functioning Adequately. all Pre-remediation Submissions, Notifications, Postings, And Permits Have Been Provided And Are Satisfactory To The Owner. all Equipment For Remediation, Cleanup, And Disposal Are On Hand. all Worker Training Is Completed. contractor Receives Written Permission From The Owner To Commence Remediation. removal/cleaning Procedures protection Of Materials Not Being Removed: materials That Are Not Being Removed Are To Be Protected From Any Damage That May Occur During Work. The Acoustic Ceiling Tile Suspension Grid Is To Be Cleaned Yet Remain In Place And Is Not To Be Damaged During The Removal Of The Tiles. level One: clean And Isolate Active Work Areas In Accordance With Section 3.01. wet All Mold Containing Materials With An Approved Biocide Solution Using Equipment Capable Of Providing A Fine Spray Mist, To Reduce Airborne Concentrations When The Material Is Disturbed. Keep All Removed Material Wet Enough To Prevent Release Until It Can Be Containerized For Disposal. removal And Cleaning: all Acoustic Ceiling Tiles, All Carpet Throughout The Entire Building Are To Be Removed And Properly Disposed Of. non-porous Materials - All Non-porous Surfaces Are To Be Cleaned Using A detergent Solution Or Solution Of Contractor's Choice That Will Re Move Mold. Hepa Vacuums May Be Used Along With The Solution For Cleaning. all Materials Need To Be Dried. Examples Of Non-porous Materials Include: metal glass hard Plastics plumbing Fixtures all Hvac Diffusers Are To Be Removed, Thoroughly Cleaned (as Detailed Above) And Set Aside Per Owner S Direction To Be Re-installed Later. semi-porous (e.g. Wood Doors, Unsealed Concrete) All Semi-porous Surfaces Are To Be Cleaned Using A Detergent Solution Or Solution Of Contractor's Choice That Will Remove Mold. This Solution Must Be Approved By Owner. Hepa Vacuums May Be Used Along With The Solution For Cleaning. All Materials Need To Be Dried. Examples Of Semi-porous Materials Include: wood concrete porous Materials - Remove All Porous Materials Where Visible Mold Growth Or Evidence Of Moisture Is Present. The Materials Should Be Removed, Bagged And Discarded. Examples Of Porous Materials Include: drywall insulation Of All Types carpet (all Being Removed, Regardless Of Evidence) acoustic Ceiling Tiles (all Being Removed, Regardless Of Evidence) containers (6 Mil Polyethylene Bags) Shall Be Sealed When Full. Bags Shall Not Be Overfilled. They Should Be Securely Sealed To Prevent Accidental Opening And Leakage By Tying Tops Of Bags In An Overhead Knot Or By Taping In gooseneck Fashion. Do Not Seal Bags With Wire Or Cord. Bags Shall Be Decontaminated On Exterior Surfaces By Wet Cleaning And Hepa Vacuuming. large Components Removed Intact May Be Wrapped In 2 Layers Of 6 Mil Polyethylene Sheeting Secured With Tape For Transport To The Landfill. mold Containing Waste With Sharp Edged Components (e.g., Nails, Screws, Metal Lath, Tin Sheeting) Will Tear The Polyethylene Bags And Sheet And Shall Be Reinforces With Extra Bags Or Wrapping. cleanup Procedure remove And Containerize All Visible Accumulations Of Mold Containing Material And Mold Contaminated Debris Utilizing Rubber Dust Pans, Rubber Squeegees, Hepa vacuums, Etc. remove All Containerized Waste From The Work Area And Waste Container Pass Out Airlock. decontaminate All Tools And Equipment And Remove At The Appropriate Time In The Cleaning Sequence. inspect The Work Area For Visible Residue. If Any Accumulation Of Residue Is Observed, It Will Be Assumed To Be Mold And The Work Area Must Be Re-cleaned. the Work Area Shall Be Cleaned Until It In Compliance With Criteria Agreed Upon By The Contractor And Owner Prior To Initiation Of Remediation Activities. following The Satisfactory Completion Of Clearance Criteria Remaining Barriers May Be Removed And Properly Disposed Of. A Final Visual Inspection By The Owner Shall Ensure That No Contamination Remains In The Work Area. Unsatisfactory Conditions May Require Additional Cleaning And Air Monitoring (see Section 3.11, Reestablishment Of The Work Area). clearance Testing following The Completion Of Cleanup Operations, The Remediation Contractor Shall Notify The Owner (or Industrial Hygiene Consultant Selected By Owner) When The Building Area Is Ready For Clearance Testing. Remediation Contractor Will Not Be Responsible For Performing Clearance Testing. The Owner (via Contracted Industrial Hygienist) Shall Arrange For Collecting Samples. 3.10 Disposal Procedures general: as The Work Progresses, To Prevent Exceeding Available Storage Capacity Onsite, Sealed And Labeled Containers Of Mold Containing Waste Shall Be Removed And Stored In The Dumpster On-site Until It Is Transported To The Prearranged Disposal Location. all Waste Shipment Records Shall Be Delivered To The Owner. A Recommended Record Keeping Format Utilizes The Waste Shipment Record (wsr) Which Includes The Names And Addresses Of The Generator (owner), Contractor, Transporter, And Disposal Site, The Estimated Quantity Of The Mold Waste And The Type Of Containers Used. transportation To The Landfill: once Drums, Bags And Wrapped Components Have Been Removed From The Work Area, They Shall Be Loaded Into An Enclosed Truck Or Dumpster For Transportation. any Debris Or Residue Observed On Containers Or Surfaces Outside Of The Work Area Resulting From Cleanup Or Disposal Activities Shall Be Immediately Cleaned Up Using Hepa Filtered Vacuum Equipment And/or Wet Methods As Appropriate. large Metal Dumpsters Are Sometimes Used For Mold Waste Disposal. These Should Have Doors Or Tops That Can Be Closed And Locked To Prevent Vandalism Or Other Disturbance Of The Bagged Mold Debris And Wind Dispersion Of Mold Fibers. Bags Shall Be Placed, Not Thrown, Into These Containers To Avoid Splitting. disposal At The Landfill: upon Reaching The Landfill, Trucks Are To Approach The Dump Location As Closely As Possible For Unloading Of The Mold Containing Waste. bags, Drums, And Components Shall Be Inspected As They Are Off Loaded At The Disposal Site. Waste Containers Shall Be Placed On The Ground At The Disposal Site, Not Pushed Or Thrown Out Of The Trucks. following The Removal Of All Containerized Waste, The Truck Cargo Area Shall Be Decontaminated Using Hepa Vacuums And/or Wet Methods To Meet The No Visible Residue Criteria. 3.11 Re-establishment Of The Work Area And Systems re-establishment Of The Work Area Shall Only Occur Following The Completion Of Cleanup Procedures And After Clearance Criteria Have Been Met And Documented To The Satisfaction Of The Owner. the Contractor And Owner Shall Visually Inspect The Work Area For Any Remaining Visible Residue. Evidence Of Contamination Will Necessitate Additional Cleaning Requirements In Accordance With Section 3.07. following Satisfactory Clearance Of The Work Area, Remaining Polyethylene Barriers May Be Removed And Disposed Of As Mold Contaminated Waste. at The Discretion Of The Contractor, Mandatory Requirements For Personal Protective Equipment May Be Waived Following The Removal Of All Barriers. re-secure Mounted Objects Removed From Their Former Positions During Area Preparation Activities. relocate Objects That Were Removed To Temporary Locations Back To Their Original Positions. reestablish Hvac, Mechanical And Electrical Systems In Proper Working Order. Remove Contaminated Hvac System Filters And Dispose Of As Mold Contaminated Waste. Decontaminate Filter Assembly Using Hepa Vacuums And Wet Cleaning Techniques. Install New Filters In Hvac Systems. Dispose Of Old Filters. repair All Areas Of Damage That Occurred Because Of Remediation Activities. period Of Performance upon Notice To Proceed, Contractor Shall Have 30 Calendar Days To Complete The Scope Detailed In This Document.

ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY LEON CAMPUS Tender

Laboratory Equipment and Services
Corrigendum : Closing Date Modified
Philippines
Closing Date15 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)
Details: Description Lot 1: Agricultural Equipments - Php 350,850.00 (abc) 1 Digital Water Quality Tester "5 In 1 Water Quality Tester Includes: Ph, Ec, Tds, Salinity, And Thermometer; Battery Powered; Waterproof Rating: Ip67 Display Size: 33*24mm Item Size: 180 * 37mm / 7.1 * 1.5in Item Weight: 86g / 3.0ounce" 5 Set 2 Digital Refractometer 0-93% Digital Brix Refractometer Sugar Content Measuring 1 Set 3 Refractometer Handheld Refractometer (brix Refractometer); Inlusions Are Transport Case, Pipette, Calibration Screwer And Guide 3 Set 4 Current Meter River Current Water Velocity Portable Flow Meter For Open Channel; Measure Velociy, Flow Rate And Depth 1 Set 5 Turbidimeter Portable Turbidimeter Microcomputer Accuracy Testing With Range From 0-200 Ntu; Size:210*75*70mm/8.3*3.0*2.8in; Product Inclusions: Turbidimieter, Power Cable, Glass, Storage Box 1 Set 6 Dissolved Oxygen Analyzer Ph Meter And Dissolved Oxygen Tester Water Quality Tester Set 2 Set 7 Rain Gauge 8 In/200mm Diamter Rain Gauge Stainless Steel; Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow, Mountinf Tripod And Parts Can Are Detachable For Easy Cleaning 5 Set 8 Rain Gauge Capacity: 11"/280mm; Resolution: 0.01"/0.2mm; Diameter Size 4"*14h (102mm*356mm); Set Includes A Receiving Funnel, Internal Measuring Tube, Outercylinder For Overflow And Mounting Tripod/bracket And Parts Can Are Detachable For Easy Cleaning 5 Set 9 Rain Gauge Plastic Rain Gauge: Approx Size:25cm*4.5cm*2.7cm 5 Pc 10 Sling Psychrometer Slide Rule; Dimension 1" Dia * 7-1/2" Length; Non-mercury, Black Plastic 5 Unit 11 Soil Detector 6 In 1 Soil Detector (rotatable); With Sensitive Sensing Probe; Soil Ph, Soil Fertility, Soil Temperature, Soil Moisture, Environmental Illumination, Humidity; Battery Powered; Led Large Screen Display 5 Set Lot 2: Scientific Materials And Equipment - Php 249,400.00 (abc) 1 Digital Analytical Balance Capcity: 500g; Accuracy: 0.001g; Tray Size: Ø 120 Mm; Dimensions 320*195*280mm; With Screen Display; With Dual Power Supply; Stainless Steel Plate And Bubble Level 2 Unit 2 Digital Weighing Scale Capacity: 10kg; Resolution: 0.1g Digital Precision Electronic Weighing Balance W/ Counting Table Top Scale; Tare Function Stainless Steel Pan With Level Bubble; Dual Power Supply; Scale Pan Size: 180*180mm; Dimension: 260*180*64mm 2 Unit 3 Digital Food Weighing Scale Weigh Range: 0.1 G-3000g; Resolution:0.01g; Dimensions:4.1*5.0 In With Stainless Steel Plate Dimension Of 3.9*3.9 In; Battery Power Supply 3 Unit 4 Digital Food Thermometers "stainless Steel Probe; Weight: 36g; Size: 22.5*2cm Power Supply: Built-in Battery, Can Be Used Directly" 3 Unit 5 Digital Food Thermometers Digital Thermometer Infrared Laser Gun With Led Screen; Size: 75*50*145mm;battery Powered 2 Unit 6 Thermocouples Digital Thermocouple With Dual Channels 4 Probes Handheld; Battery Powered 2 Set 7 Sieves Standard Laboratory Test Sieves; 8 In/20cm Diameter And Height Of 5cm; Filter Mesh With Grit Size #10, #12, #14, #16, And #18 2 Set 8 Bulk Density Apparatus Astm 1895 Apparent Bulk Density Apparatus; Wieght = 9 Kg, Dimensions: 240x330x520mm (wxdxh) 2 Set 9 Tachometer Laser Digital Non-contact Tachometer; Measuring Range: 2.5-99999 Rpm; Lcd Screen With White Backlight, Meauring Distance:2-20in(50-500mm); Dimension 145*85*35mm; Auto Power Off; Battery Power Supply 3 Set 10 Tachometer Contact Digital Handheld Tachometer; Lcd Screen; Battery Powered; Item Size: Approx. 165*60*28mm; Set Inlcusion: Digital Tachometer, 2 Measurement Idler Wheels, 2 Measurement Touch Tips, Lengthening Bar, Portable Bag And User Manual 3 Set 11 Steel Cabinet Steel Cabinet: Dimension: 90*46*185cm; 2-door Locker With One Side For Long Tools Storage 2 Unit 12 Steel Cabinet Steel Cabinet Dimension: 90*46*185cm; 2-door Lock With 4 Adjustable Shelves 2 Unit 13 Digital Vernier Caliper Digital Vernier Caliper; 150 Mm Metal 60inch Pure Stainless; Withlcd 5 Pc 14 Digital Anemometer Digital Anemometer With Data Hold Backlight Function 3 Set 15 Sound Level Meter Digital Sound Level Meter Decibel Moinitoring; Measurement Range: 30-130db With Spongeball; Inclusions: Sound Level Meter, Operation Manual, 1 Spongeball 2 Set 16 Aluminum Tool Box Set "multiple Layered Tool Box With: Layer 1. 1x Multiprise Plier 250mm, 1x Diagonal Cutting Pliers 150mm, 1x Pliers 1/2 Long Round 150mm, 1x Universal Plier 150mm 1x All-rounder, 1x Thumb Wrench 250 Mm, 1x Box 6 Compartment Layer 2. 1x Magnetic Bimonthly Torpedo Level 25cm, 1x Measure 5m X 19mm Bimatiere Tylon, 8x Screwdriver - Bit Holder- Ph1-ph2- Pz1-pz2- Mechanic 6.5x1505.5x100-3x75, 1x Test Screwdriver, 9x Clés Males (1.5-2-2.5-3-4-5-6-8-10) Layer 3. 1x Hacksaw, 1x Pen Lamp, 1x Cutter 18mm, 1x Hammer Wooden Handle 300g Layer 4. 1x Ratchet 72 Teeth 1/4’’, 10x 1/4’’ (6-sided) Sockets: 5.5 – 6 – 7 – 8 – 9 – 10 – 11 – 12– 13 – 14 Mm, 2x 1/4’’ Extensions: 75 Mm – 150 Mm, 1x 1/4’’ Bit Holder, 1x 1/4’’ Universal Cardan, 1x Ratchet 72 Teeth 1/2’’, 16x 1/2’’ (6-piece) Sockets: 10 – 11 – 12 – 13 – 14 – 15 – 16 –17 – 18 – 19 – 21 – 22 – 24 – 27 – 30 – 32 Mm, 2x 1/2’’ Extensions: 75 Mm – 250 Mm, 1x Universal Cardan 1/2’’, 3x Sockets For 1/2’ Candle: 16 – 19 – 21 Mm, 12x Combination Wrenches: 8 – 9 – 10 – 11 – 12 – 13 – 14 –15 – 16 – 17 – 18 – 19 Mm, 1x 1/4"" 25mm Screw Bit Box – 61pcs In Pre-formed Foam" 1 Set Lot 3: Surveying Materials And Equipment - Php 199,750.00 (abc) 1 Total Station Theodolite Digital Theodolite Surveying Instrument High Accuracy 30x Electronic With Laser; Main Unit, Tool Kit, Plumb Bob, Rain Cover, Rechargeable Battery, Battery Charger, Aa Dry Battery Case, Operational Manual, Heavy Duty Carrying Case 1 Unit 2 Tripod Surveying Instrument Aluminum Tripod Double Lock With Extended Length Upto 1.7m; Head Diameter 160mm; 3kg Weight 1 Unit 3 Measuring Staff Stadia Rod Surveying Stadia Rod Extended Upto 5m; Retracted Length 0.5m 3 Pc 4 Range Pole Range Pole,3m-3 Section For Surveying 3 Pc 5 Marking Pins Surveying Color Scheme: Red And White; 50 Pc 6 Heavy Duty Measuring Tape 100m Tape Measure Fiber Glass, High Quality, Heavy Duty Meter Tape Ruler Wheel 5 Pc 7 Steel Tape 5m Steel Measuring Tape-heavy Duty 5 Pc

Municipality Of Banaue, Ifugao Tender

Textile, Apparel and Footwear
Philippines
Closing Date23 Jan 2025
Tender AmountPHP 327.8 K (USD 5.5 K)
Details: Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee Banaue, Ifugao Invitation To Bid For Provincial Meet Uniform Publication No. Itb - G-2025-1-a 2nd Publication The Local Government Unit Of Banaue, Ifugao, Through The Lgu Fund Intends To Apply The Sum Of Three Hundred Twenty-seven Thousand Eight Hundred Seventy Pesos (php 327,870.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For Provincial Meet Uniforms Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Banaue, Ifugao, Now Invites Bids For Supply And Delivery Of The Provincial Meet Uniforms With The Following Descriptions; Item No. Quantity Unit Of Issue Description Of Article Estimated Unit Cost Total Estimated Cost 1 T-shirts (cotton, Round Collar With Print)-yellow 7 Pcs Extra Small 190.00 1,330.00 56 Pcs Small 200.00 1,200.00 34 Pcs Medium 210.00 7,140.00 3 Pcs Large 220.00 660.00 4 Pcs Teens 190.00 760.00 2 Pcs Size 18 180.00 360.00 7 Pcs Size 20 180.00 1,260.00 17 Pcs Small 200.00 3,400.00 87 Pcs Medium 210.00 18,270.00 34 Pcs Large 220.00 7,480.00 2 Pcs Extra Large 230.00 460.00 2 Polo Shirt, With Collar- Full Sublimation 18 Pcs Small 550.00 9,900.00 31 Pcs Medium 550.00 17,050.00 66 Pcs Large 550.00 36,300.00 4 Pcs Extra Large 550.00 2,200.00 1 Pcs 3 Xl 550.00 550.00 1 Pcs 5 Xl 550.00 550.00 3 Jersey (shorts And Tanggo) Full Sublimation - 11 Pcs Small 800.00 8,800.00 28 Pcs Medium 800.00 22,400.00 18 Pcs Large 800.00 14,400.00 4 White T-shirts With Red Sleeve (raglan, Round Collar With Print) See Attached Size 1 Extra Small 400.00 400.00 6 Small 400.00 2,400.00 8 Medium 400.00 3,200.00 1 Large 400.00 400.00 5 16 Pcs Red Jogging Pant For Arnis (garterize With Draw String Waist, Single Face Stretchable) See Attached Size 1 Extra Small 600.00 600.00 6 Small 600.00 3,600.00 8 Medium 600.00 4,800.00 1 Large 600.00 600.00 6 9 Pcs Wushu Sandra (yellow And Black, Boxing Suite Style, Microshiny With Event Print And Team Banaue)-all In Medium Size 1,600.00 14,400.00 7 Swimsuit(1 Pc Spandex.,polyster,fit,shapes And Lining)elem-8; Sec- 4 - 4 Pcs Extra Small 1,100.00 4,400.00 4 Pcs Small 1,100.00 4,400.00 1 Pcs Medium 1,100.00 1,100.00 1 Pcs Size 18 1,100.00 1,100.00 2 Pcs Size 20 1,100.00 2,200.00 8 Swimming Trunks-(spandex Lightweight And Breathable Materials And Elastic Waistband)elem-10; Sec- 4 - 4 Pcs Small 1,100.00 4,400.00 4 Pcs Medium 1,100.00 4,400.00 1 Pcs Size 18 1,100.00 1,100.00 5 Pcs Size 20 1,100.00 5,500.00 9 Arnis - 8 Pcs Arnis Sword 600.00 4,800.00 8 Pcs Daggers 400.00 3,200.00 6 Pair Wooden Sword 300.00 1,800.00 6 Pcs Daggers 400.00 2,400.00 8 Pcs Arnis Padded Stick (red) 350.00 2,800.00 8 Pcs Arnis Padded Stick (blue) 350.00 2,800.00 8 Pcs Kicking Pad 200.00 1,600.00 10 Wushu - 2 Pair Boxing Gloves (12 Ounce) 1,800.00 3,600.00 2 Pcs Groin Protectors (male) 800.00 1,600.00 2 Pcs Groin Protectors (female) 800.00 1,600.00 2 Pcs Head Gears (1blue, 1 Red) 700.00 1,400.00 2 Pair Shin Guard 500.00 1,000.00 11 Chess - 2 Set Chess Mat (big Size) 600.00 1,200.00 12 Swimming - 10 Kls Chlorine 200.00 2,000.00 10 Pair Hand Paddles Small 400.00 4,000.00 1 Pcs Kickboard 2,000.00 2,000.00 4 Pair Ear Plug 700.00 2,800.00 2 Pcs Nose Clip 450.00 900.00 5 Pcs Pull Bouys 300.00 1,500.00 13 Teakwando - 5 Pcs Junior Size Mouth Guard 250.00 1,250.00 5 Pcs Senior Size Mouth Guard 250.00 1,250.00 2 Pcs Sensor Socks Generation 2 600.00 1,200.00 14 Badminton - 10 Pcs Tube -shuttle Cock 1,000.00 10,000.00 10 Pcs Badminton Net 400.00 4,000.00 15 Basketball - 2 Pcs Basketball (size 7) 3,000.00 6,000.00 1 Pc Timer 700.00 700.00 Table Tennis - 4 Pcs Table Tennis Ball-3 Star 300.00 1,200.00 16 Volleyball - 4 Pcs Volloyball Balls (2 Male, 2 Famale) 3,000.00 12,000.00 2 Pc Volleyball Net 600.00 1,200.00 2 Pair Antenna (male & Female) 500.00 1,000.00 Sepak - 8 Pcs Takraw Balls (male) 1,000.00 8,000.00 4 Pcs Takraw Balls (female) 1,000.00 4,000.00 17 Athletics - 2 Pcs Timer 500.00 1,000.00 4 Pcs Javeline 1,000.00 4,000.00 4 Pcs Discus Throw 1,000.00 4,000.00 1 Pc Measuring Tape 600.00 600.00 Total 327,870.00 Delivery Of The Goods Is On Site At The Municipal Hall, Poblacion, Banaue, Ifugao Bidders Should Have Completed, Within [7 Calendar Days] From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 3. Interested Bidders May Obtain Further Information From Bac Secretariat, At The Municipal Mayor’s Office, Banaue, Ifugao And Inspect The Bidding Documents At The Address Given During 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting January 15, 2025 To January 21, 2025 From The Address Given And Upon Payment Of A Non-refundable Fee For The Documents In The Amount Of Five Hundred Pesos Only (php.500.00) 4. Bids Must Be Duly Received By The Bac Secretariat At The Bids And Awards Committee On January 23, 2025 At 1:30pm Before The Bid Opening. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be At 2:00 Pm On January 23, 2025 At Bids And Awards Committee, Mayor’s Office Conference Hall. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 5. The Local Government Unit Of Banaue, Ifugao, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 6. For Further Information, Please Refer To: Bids And Awards Committee Mbac Office, Municipal Hall, Poblacion, Banaue, Ifugao Date Publication: January 14, 2025 Samson D. Cabbigat Bac Chairperson

City Of Malabon Tender

Healthcare and Medicine
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 30 Million (USD 516.9 K)
Details: Description Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon 1. The City Government Of Malabon, Through The Malasakit Fund Intends To Apply The Sum Of Thirty Million Pesos Only (p 30,00,000.00), Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Malabon Now Invites Bids From Eligible Bidders For Procurement Of Various Equipments For The Enhancement Of Medical Services Of Ospital Ng Malabon. Delivery Of Goods Is Required Within The Period Specified Under Section Vi. Schedule Of Requirements. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act,” And Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To R.a. 5183 And Subject To Commonwealth Act 138. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat And Inspect The Bidding Documents At The Address Given Below From December 19 – January 8, 2025; 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee In The Amount Of Twenty Five Thousand Pesos (p 25, 000. 00). 6. The City Government Of Malabon Will Hold A Pre-bid Conference On December 27, 2024 (friday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. 7. Bids Must Be Delivered To The Address Below On Or Before January 8, 2025 (wednesday); 12:00 N.n. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms Set In The Amount Stated In Itb Clause 18. 8. Bid Opening Shall Be On January 8, 2025 (wednesday); 2:00 P.m. At The Bac Conference, 8th Floor Malabon City Hall, F. Sevilla Blvd., Malabon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 9. The City Government Of Malabon Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information Please Refer To: (originally Signed) Florlinda Ayroso Head- Bac Secretariat (originally Signed) Mr. Alexander T. Rosete Chairperson - Bids And Awards Committee 1 Unit Automated Identification/anticrobial Sensitivity Testing Machine Weight: 15/30/60 75 Kg/105 Lbs Electrical Power Requirements: • 110/120 Vac (50-60 Hz) • 220/240 Vac (50-60 Hz) Heat Dissipated: 1025 Btu/hr (nominal) Environmental Requirements: • Operating Ambient Temperature Range: 15 Degrees Celsius To 30 Degree Celsius (59 Degree F-86 Degree F) • Operating Humidity Range: 20% To 80% Relative Humidity, Non-condensing Altitude: Up To 2000 Meters Note: Should Be Compatible With Bact/alert Culture Machine 1 Unit Gel Card Laboratory Centrifuge And Incubator For Crossmatching Laboratory Centrifuge Microprocessor Controlled Touch Panel Digital Display Dc Brushless Low-noise Motor Shock Absorber For Reducing Vibration Damping And Automatic Balance Technical Specification: Model: Invitrocent Ref 00710 Max Speed:4000rpm Max Rcf: 1640 X G Max Capacity: 24 Invitrogel Cards Speed Accuracy: + 50rpm. Time Setting Range: 1~99 Min. Power Supply: ~22ov + 10% 60hz 5a Noise: < 65db (a) Dimension: (wxdxh) 370mmx432mmx260mm Package Dimension 570mmx425mmx305mm Weight: Gw; 16.5 Kg; Nw: 15kg Environment Requirements Temperature: 10°c~35°c Laboratory Incubator Microprocessor-controlled High-performance Incubator Accommodates Up To 24 Gel Cards Technical Data: Model: Invitrotherm; Ref0097020 Power Supply: Ac220v+ 50hs-60hz Fuse: 250v 3a 5x20 Temperature Range 35°c ~50°c Accuracy Of The Temperature < + 0.5 Heating Time: (from 20°c To 37°c Min Timing Range 1sec~99min 59sec Display Accuracy: 0.1°c Ambient Temperature: 5°c~30°c Dimensions (wxdxh): 280mm X 380mm X 115mm Weight 6.0kg 1 Unit Immuno-analyzer Throughout: Up To 180 Tests/hour, Measurement Principle: Micron Super Paramagnetic Particles Platform With Alkaline Phosphatase (alp) Labeled Reagents And Amppd Substrate Sample Assembly: Sample Feeder: Continuous Sample Loading And Offloading, Sample Positions: 50, Sample Probe: Steel Probe, Liquid Level Detection, Cl;ot Detection, Horizontal And Vertical Collision Protection, Sample Volume: 10-200ul, With Increment Of 1ul Reagents Assembly: Reagent Disk: 15 Reagent Positions, Continuous Loading, Real-tome Mixing For Magnetic Particles, Cooling System: 2-8'c, Reagent Pack: 50 Tests/pack, 100 Tests/pack, Reagent Scanning:built-in/external Bar Code Reader, Reagent Probe:steel Probe, Liquid Level Detection, Clot Detection, Horizontal And Vertical Collision Protection, Reagent Volume: 10-200ul, With Increment Of 1ul Substrate System: Substrate Bottle: 300/500 Tests Per Bottle, Bottom Piercing, Substrate Loading"patients Who Fail To Arrive For A Scheduled Appointment Will No Longer Receive The Free Thyroid Check-up.: Capable Of Continuous Loading During Testing, Substrate Heating: Constant Heating, Aspiration Volume: 200ul Magnetic Separation Unit: Separation Assembly: 3-phase Magnetic Separation, Temperature: Accuracy: 37+0.3'c Measurement And Reaction System: Detection Mode: Photon Counting, Signal Detector: Photom Multiple (pmt) Photo Counter, Pmt Calibration: Led Reference Module, Incubation Positions: 82, Temperature: Accuracy:37+0.3'c, Mixing Unit: Non-touch Vortexer Mixing Cuvette Loading And Waste Collection: 1 Unit Abg Machine Throughout: Results In 1 Minute After Sample Aspiration Sample Volume:140jul Quality Control: 3 Or 5 Levels Qc, External Electronic Simulator Display: 7-inch Color Lcd Display, 800*480 Interface: 4 X Usb 2.0 Host, 1 X Rs232, Wlan Input Device: Touch Screen And Bar Code Scanner Power Supply: 100-240vac, 50/60hz Battery: 500mah Rechargeable Lithium-ion Battery, 50 Samples Continuous Testing Dimensions (w*h*d): 283*153*310 Mm Weight: 3.65 Kg Operation Environment: 10 C-31 C; %rh: 25%-80%; 70-106.6 Kpa 1 Unit Bpap Machine Ipap/epap: 4-40cm H20/4-25cm H20 • Ventilation Modes: Capap, S, S/t, Pc, T • Target Tidal Volume: 200-1500ml • Breath Rate: 0-40bpm • With Good Humidification System • Alarms For: Patient Disconnection, Apnea, Low Minute Ventilation, Low Tidal Volume, And High Respiratory Rate • Monitoring For: Pressure, Tidal Volume, Minute Ventilation, Respiration Rate, Leak • Filters: Foam And Optional Ultra-fine Filters • Data Management: Encore Pro2 And Direct View Software Compatible With Oximetry Module, Advanced Detection Of Residual Respiratory Events (apnea/hypopapnea Index, Obstructed Airway Apnea, Clear Airway Apnea, Hypoapnea, Periodic Breathing, Large Leak And Snore) 1 Unit Cpap Machine The Res Med Air Sense™ 11 Auto Set With Humid Air Automatically Adjusts Pressure Levels Based On Your Breathing Patterns Throughout The Night. A Crisp, Color Lcd Touchscreen Lets You Customize The Device’s Settings And View Sleep Data. The Machine Includes An Integrated, Heated Humidifier And Climate Line Air Heated Tubing. Chose Between The Standard Humid Air™ Model (tubing Not Included) Or Humid Air™ Model With Climate Line Air™ 11 Tube Included. Temperature And Humidity Can Be Manually Adjusted Or Set For Automatic Climate Control “for Him” And “for Her” Algorithms Are Available Auto-ramp Up To 45 Minutes In 5-minute Increments Climate Line Air Tubing* Included For Automatic Climate Control (not Included With Standard Model) Personal My Air Assistant Guides You Through Device Installation And Therapy Acclimation Care Check-in Feature Provides Coaching And Troubleshooting For New Users Dimensions: 3.72” X 10.71” X 5.45” Weight: 2.3 Lbs. Sound Level: 27 Dba 1 Unit Mechanical Ventilator Modes Available: Vc-ac, Pc-ac, Vc-simv, Pc-simv Pip: 20-70 Cm Of H 2 O (adjustable In Steps Of 1) Peep: 0-20 Cm Of H 2 O (adjustable In Steps Of 1) Inspiratory: Expiratory Ratio (i:e): 1:0.3 - 1:4 (adjustable In Any Ratio) Respiratory Rate (bpm): 10 – 40 Breaths Per Minute In Increments Of 2 Tidal Volume: 150 Ml – 800 Ml In Steps Of 50 Unique On-graph Incentive To Show Current Best Values • Test Quality Advisory Messages And Quality Report • Fully Compliant To Ats/ers 2005 Guidelines • Available With Both Disposable Or Reusable Turbine Flow Meter • Elegant And Robust Carrying Case 2 Units Cardiac Monitor Introduction: Multi Parameter Patient Monitor For High-end Specialist – 12.1”(10.4”) High Resolution(800×600) With Maximum 9 Wave Forms – Standard Configuration: Ecg, Spo2, Nibp, Resp, 2temp, 2ibp – 6 Kinds Of Virtual Screen – 3ch Ecg : Full 7 Ecg & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V) – 12ch Ecg : Full 12 Ecg & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V1, V2, V3, V4, V5, V6) – 13 Arrhythmia Analysis & Pacemaker Detection – 7days Tabular And Graphic Trend Data Save Multi High-end Functions: – Drug Dose Calculation, Ecg Recall, Mini Trend, Ico, Color Change, Nibp Stat, Nibp Venous Stat, Oxy-crg, Patient Information, Temp Td – Touch Screen (option) – Easy S/w Upgrade Using Sd Card (max 2gbyte) – Durable And Light Long Li-ion Battery Operation (std 1pack: 2hr, 2pack: 4hr) – Lan And Wireless Lan – Variable And World Best Etco2 Module – Oridion’s Microstream Etco2 – Respronics’s Mainstream (c5), Sidestream (loflo) – Hrv, Apg Detection – 12.1″(10.4″) High Resolution(800×600) – Provides Clear Visibility From Long Distance And Any Angle – Maximum 9 Wave Forms – Supreme Standard Configuration And Extensionability – Standard: Ecg, Spo2, Nibp, Respiration, 2temp, 2ibp – Optional: Standard + 4temp, 4ibp, Ico, Etco2, 12ch Ekg, Touch Screen, 3ch Printer – Small Size But Large Virtual Screen – 12.1” Monitor Provides 72.6”(12.1” X 6) View Effect By Using 6 Virtual Screens. – 10.4” Monitor Provides 62.4”(10.4” X 6) View Effect By Using 6 Virtual Screens. – Perfect 3ch Ecg (std.) And 12ch Ekg(opt.) Will Make You Ecg Analysis Specialist. – Livegraphy Waveform By Votem’s Digital Filter Technology – 3ch Ecg (std.) Displays Full 7 Ecg Waves & St Segment Analysis (lead I, Ii, Iii, Avr, Avl, Avf, V) 2 Units Incubator Standard Features: ●servo Control Mode: Air Temperature, Skin Temperature; ● Parameter Displaying: Set Temperature,air Temperature, Skin Temperature, Internal Humidity, Heat Power Rate; ● Audible & Visual Alarms: Power Failure, Sensor Failure, Higher & Lower Temp, Air & Skin Temperature Override,fan Failure, System Failure; ● >37℃preset Mode: Power Failure Reset Memory, Alarm Silence, Keypad Lock, Self-test Function; ● Hood With Dual Slope; 6 Hand-ports; ● Rs-232 Output Connector (use For Network System); ●iv Poles; ●protective Guard Rail; ●storage Cabinets. Specification Of Hood: Mattress To Hood: 450 Mm Observation Side Of Hood: Two Incline Operate Port: 6 (2 Iris Ports) Tubing Grommets: 4 Front Access Panel: 826×310 Mm Technical Specifications: Power Requirement ≤400va Temperature Control Mode: Air And Skin Servo Control Air Temp Control Range: 20℃~37℃ Temperature Override Mode To: 20℃~39℃ Skin Temp Control Range: 30℃~37℃ Temperature Override Mode To: 30℃~38℃ Temperature Fluctuation: ≤0.5℃ Mattress Temperature Uniformity: ≤0.8℃ Temperature Rise Time: ≤45 Min Noise Level Within Hood Environment: ≤55d Alarms Power Failure Alarm Fan Failure Alarm Sensor Failure Alarm High Air Temperature Alarm: +3.0℃ Low Air Temperature Alarm: -3.0℃ High Skin Teperature Alarm: +1.0℃ Low Skin Temperature Alarm: -1.0℃ Over Air Temperature Alarm: ≤38.0℃; ≤40.0℃ Over Skin Temperature Alarm: ≤38.0℃; ≤39.0℃ System Failure Alarm Alarm Silence Function Operational Condition 2 Units Infant Warmer Temperature Control Range: 25°c-37°c Temperature Override Mode To 38°c Temperature Sensor Accuracy: <0.3°c Mattress Surface Temperature Uniformity: <2.0°c Temperature Rise Time: <45mins Heat Output Indicate: 0-100% In 10% Radiant Box Horizon Angle Adjust Range 0-90° Adjustable In Step-less Bed Tilt Adjustment: Continues Adjustable In +10° 2 Units Bilirubin Light/photo-therapy Machine Device Classification Type Of Protection Against Electric Shock Class I Degree Of Protection Against Ingress Of Liquids And Particulate Matter (iec 60601-1) Ipx0 Mode Of Operation Continuous Classification In Accordance With Eu Directive 93/42/eec Iia Umdns Code/gmdn Code 13-037/35239 Physical Attributes Bililux Photo Therapy Light Length ≤39 Cm (15.4 In) Width ≤19 Cm (7.5 In) With Quick-connect Plug Height ≤8 Cm (3.1 In) Weight (without Options/accessories) ≥1.2 Kg (2.7 Lb) Bililux Spring Arm Length, Spring Arm Fully Folded ≤61 Cm (24 In) Length, Spring Arm Fully Extended ≤106 Cm (41.7 In) Weight (without Options/accessories) ≤1.5 Kg (3.3 Lb) Bililux Trolley (with Spring Arm) Height (trolley At Lowest Position And Spring Arm Fully Folded) ≤132 Cm (52 In) Height (trolley At Highest Position, Lower Arm Fully Extended, And Upper Arm At 45° Angle) ≤213 Cm (83.9 In) Weight (without Options/accessories) ≤14.9 Kg (32.8 Lb) Total Mass Including Safe Working Load 18.1 Kg (39.9 Lb) 2 Units Portable Or Light Kl04l-iii Vertical4-reflector Luminescence Shadowless Lamp Kl04l-iii Luminescence Shadowless Lamp Adopts Light Source From Different Positions For Focus To Eliminate Shadows Of Different Parts Of Medical Workers Vertical Mobile Setup With Braking Device Is Not Limited By The Space Of Surgical Room And Is Safe And Reliable In Use Illumination: > 50,000lx (at 1m Distance) Color Temperature: 4000k+500k Mains Voltage: Ac220v+10%50hz Bulb Voltage: Ac24v Bulb Power Input Power: 120va 1 Unit Orthopedic Instrument Set Contents: 77 Pieces With Tray • 1 Pc. Knife Handle #3 • 2 Pcs. Knife Handle #4 • 1 Pc. Mayo Dissecting Scissor Straight 5 1/2″ (14cm) • 1 Pc. Mayo Dissecting Scissor Curved 5 1/2″ (14cm) • 1 Pc. Mayo Dissecting Scissor Straight 6 3/4″ (14cm) • 1 Pc. Mayo Dissecting Scissor Curved 6 3/4″ (14cm) • 1 Pc. Metzenbaum Scissor Curved 7″ (17.8cm) • 1 Pc. Esmarch Bandage And Cast Shears 8″ (20.3cm) • 1 Pc. Tissue Forcep 6″ (15.2cm) 1x2t • 1 Pc. Tissue Forcep 6″ (15.2cm) 4x5t • 2 Pcs. Adson Tissue Forceps 4 3/4″ (12.1cm) 1x2t • 6 Pcs. Crile Forcep 6 1/4″ (15.9cm) Curved • 4 Pcs. Rochester Ochsner Forcep Straight 8″ (20.3cm) • 6 Pcs. Backhaus Towel Clamp 5 1/4″ (13.3cm) • 1 Pc. Mayo Hegar Needle Holder 8″ • 1 Pc. Crile Wood Needle Holder 6″ • 1 Set Us Army Retractor 8 1/2″ Set Of 2 Pcs. • 1 Pc. Israel Retractor 9″ (22.9cm) 4 Prong Blunt • 1 Pc. Volkman Retractor 8 3/4″ (922.2cm) 4 Prong Sharp • 2 Pcs. Volkman Retractor 8″ (20.3cm) X 3/4″ (19cm) 4 Prong Blunt • 1 Pc. Bennett Bone Elevator 9 1/2″ (24.1cm) Small • 1 Pc. Bennett Bone Elevator 9 1/2″ (24.1cm) Large • 6 Pcs. Allis Tissue Forcep 6″ (15.2cm) 4x5t • Pc. Frazier Ferguson Suction Tube Fr-8 (2.6mm) • 1 Pc. Frazier Ferguson Suction Tube Fr-12 (4mm) • 1 Pc. Beyer Rongeur 7″ (17.8cm) Curved • 2 Pcs. Schnidt Tonsil Forcep 7 1/2″ (19.1cm) • 1 Pc. Ruskin Bone Cutting Forcep 7 1/2″ (19.2cm) Angled • 1 Pc. Stile-luer Rongeur 8 3/4″ (22.2cm) Curved • 2 Pcs. Kern Bone Holding Forcep 7″ (22.9cm) • 1 Pc. Lane Bone Holding Forcep 13″ (33cm) W/ Ratchet • 1 Pc. Lowman Bone Clamp 4 1/2″ (12.7cm) • 1 Pc. Lowman Bone Clamp 7 1/4″ (20.3cm) • 2 Pcs. Bone Hook 9″ (22.9cm) Sharp • 1 Pc. Miltex Mallet 11 (27.9cm) 16oz (454g) • 1 Pc. Bone File 9 ¾’ 3 Units Infusion Pump Delivery Rate: 1-1000ml/h.01-999.9ml/h Delivery Limit Range: 01-9999ml Pumping Mechanism: Linear Peristaltic Finger Accuracy: + 5 (ml/h Control Mode/with Approved Iv Set) K.v.o Rate: 1ml/h-10ml/h (adjustable) Purge Rate: 1-1000ml/h (adjustable) Bolus: 1-1000ml, 1-9999ml (adjustable) Dimension: 100x190x250 (mm)/weight:3.5kg) Power: Ac110-230v, 50/60hz Or Dc9, 6v, Dc24v (1a) Battery Type: N-cd (standard)/ni-mi+ (option) Operating Time: 4 Hours (at 125ml/h) 1 Unit 2d Echo Bed 19”-38” Height Range Meets The Americans With Disabilities Act (ada) Low Height Requirement Of 17”-19” For Patient Transfer, While Ensuring Ergonomic Standing Posture For Staff • Optional Battery Operation • Dual Rapid Release Drop Sections Provide Unhindered Access To The Patient • 65° Fowler Positioning Increases Comfort Of/for Patients With Shortness Of Breath • +/- 15° Trendelenburg Helps Restore Patient’s Blood Pressure • Improved Features: New Handrail Design, Improved Single Pedal Braking System, Foley Bag Hook, Hand Control Storage, Battery Operation 1 Unit X-ray Tube Varian Rad-14, 0.6-1.2 Focal Spot, Diamond Housing X Ray Tube - 89011n 3 Units Examining Table • Examination And Treatment Table, Hamilton Type, With Drawer And Compartment Door, Upholstered Three Section Top, Provided With Stirrup And Sliding Foot Stool. • Size: 58 Inc. X 20 Inc. X 34 Inc. 3 Units Transfer Stretcher Bed Technical Specifications Frame: Powder Coated Steel Or Better Backraise Inclination: Atleast 0 To 35 Degrees Has Adjustable Height Side Guard: Made Of Abs Plastic Or Better Castor Wheels: Manufacturer's Standard Max Load: At Least 150kg Weight: Manufacturer's Standard Dimensions: L X W X H = 2000mm X 700mm X 700mm, ± 100mm On Each Dimension Accessories: -has Oxygen Cylinder Holder -has Iv Pole Holder Located In 4 Different Positions -with One Iv Pole 1 Unit Vein Scanner Technical Specifications • Type: Light Weight, Mobile • For Obese/bloated, Neonate, Pedia, Elder And Dark Skin Patients • Display: Dlp Display Or Better • Infrared Wavelength: At Least 850nm • Image Resolution: At Least 856*480 Pixels • Visible Vein Size: ≥1 Mm Or Better • Penetration Depth: ≤8 Mm • Optimal Imaging Distance: At Least 15 ~ 25cm • Mode: Basic, Inverse And Enhanced • Imaging Color: Single Color And Mixed Colors • Image Sizes: Has Small, Medium And Large Sizes • Brightness: Adjustable To Low, Medium And High • Power Supply: 220v, 50/60hz • Battery Type: Rechargable Lithium Battery At Least 3000mah • Battery Capacity: At Least 2 Hours Fully Charged • Dimension: Manufacturer's Standard • Net Weight: Manufacturer's Standard • Accessories: - Battery And Charger - Charging Cord - Trolley With 5 Castor Wheels 1 Unit Newborn Hearing Test Machine Specifications: • Display: At Least 42.7mm X 33.4mm Or 1.7 In X 1.3in • Resolution: At Least 160x128 • Dimension: Manufacturer's Standard • Weight: Manufacturer's Standard • Warm-up Time <5s Or Shorter • Boot-up Time: 1min Or Shorter • Mode Of Operation: Continous • Connectors - Oae: Hdmi Connector For Connection To The Micro Probe - Usb: Micro Usb • Data Interface - Pc Connection: Micro Usb - Printing: Wireless Connection • User Feedback - Accoustic: Integrated Speaker - Visual: Color Display Oled - User Interface: Oled Display To Provide User Information And Progress Of Measurement • Battery - Type: Rechargeable Thium-ion Np 120 Or Better - Capacity: 1700 Mah Or Better - Expected Life Time: 3 Years Or Better - Battery Life: 15 Hours On Time • Memory: At Least 500 Test Dpoae • Stimulus - Frequency Range: 1500 Hz To 12 Hz - Frequency Accuracy: <1% - Nominal Frequency: F2 - F2/f1 Ratio: 1.2 - Level Range: 40db Spl To 70db Spl - Level Accuracy: ± 1.5db Or Better - Default Level (l1/l2): 65db / 55db Spl With In Ear Calibration - Transducer: Oae - Recording - Probe Fit Check: Low Frequency Level Loss - Display: Snr Bars Or Line Diagram With Oae And Noise Level Per Frequency - Pass Criteria - Snr Criteria: 6db - Frequency For Pass: 3 Transducer • Oae Probe • Microphone: - 20 Db Spl At 2 Khz (1 Hz Bandwith) • System Noise: - 13 Db Spl At 1 Khz (1 Hz Bandwith) • Cable Length: At Least 110 Cm Or 43in • Connector: Hdmi Or Better Printer • Print Mode: Thermal Dot Matrix Print • Printing Width: At Least 48 Mm (1.9in) • Resolution: 8 Dots/mm (203 Dots Per In (dpi)) • Dots Per Line: At Least 384 Dots Accessories And Inclusions • Battery Pack: 2 - Cell Li-ion Battery Pack 7.4 V -1500 Mah • Eartips: Box Of Eartips • Set Of Probe Tubes Standard Certifications • Device Certification From Nhsrc • Device Certification From Fda 1 Unit Automated External Defibrillator (aed) • Two-button Operation: On/off, Discharge (shock Button) • Voice Prompts: Voice Command That Gives Instruction To The User In Operating The Device • Automatically Evaluates Patient Impedance For Proper Pad Contact. • Automatically Analyses Patient Condition For Shockable Or Non-shockable Rhythms • Patient Ecg Can Be Acquired Through Defibrillator Pads • Energy Output Accuracy: ± 15% • Pulse Shape: Biphasic • Charge Time: Maximum Of 15 Seconds • Battery Capacity: Capable Of Providing At Least 200 Discharges At Maximum Energy • Replaceable Battery • Visible And Audible Indicators: - Low Battery - Pad Skin Contact/disconnection - Aed Status • Defibrillator Pads: Self-adhesive, Disposable And Non-polarized - At Least Ten (10) Pairs For Adult - At Least Ten (10) Pairs For Pedia

NATIONAL POLICE COMMISSION REGION VIII Tender

Electrical Goods and Equipments...+3Machinery and Tools, Electrical and Electronics, Furnitures and Fixtures
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 699 K (USD 11.9 K)
Details: Description No. Complete Description Of Item(s) Qty Unit Abc Unit Price Total Price 1 2 In 1 Floor Scrub Brush/glass Scrape W/ Long Handle 2 Pc 1,000.00 2 2 Tier Trolley Cart (no Handle), Wheels With Stopper, Size 15" X 25" 1 Pc 5,000.00 3 6 Gang Extension Board (extension Cord) With Switch, 1m 1 Unit 500.00 4 Acrylic Table Name Stand Holder (3x12) 40 Pc 20,000.00 5 Acrylic Table Name Stand Holder (a4 Portrait) 6 Pc 3,000.00 6 Air Diffuser With Essential Oil 1 Pc 1,500.00 7 "airconditioning Unit Specifications: Split Type, 2.5hp, Inverter+installation" 1 Unit 50,000.00 8 Alcohol, Ethyl, 68%-72% 3 Gal 1,185.00 9 Anti-virus Subscription For 3-5 Users 2 Subscription 6,000.00 10 Ballpen, Black 80 Pc 1,200.00 11 Battery, Aa 10 Pc 2,000.00 12 Battery, Dry Cell Size A, Two (2) Pc Per Blister Pack 10 Pack 820.00 13 Biometric 1 Unit 15,000.00 14 Broom, Soft Tambo 5 Pc 680.00 15 Bulldog Paper Clamp 80mm 3 Box 600.00 16 Cable Tie, 100s, Black, 6 Inches, 4x150mm 1 Pack 35.00 17 Carbon Film, Pe, Blue, Size : 216mmx330mm 4 Pack 956.00 18 Carbon Film, Pe, Black, Size : 210mmx297mm 4 Pack 884.00 19 Carpenter Measurement Tape 1 Pc 500.00 20 Certificate Holder 30 Pc 1,800.00 21 Cleaner, Toilet Bowl And Urinal 10 Bottle 420.00 22 Cleaning Rubber Gloves 2 Box 1,000.00 23 Clear Glue, With Sponge Tip, Atleast 50cc 11 Pc 275.00 24 Clip, Backfold, All Metal, Clamping:19mm (-1mm) 5 Box 50.00 25 Clip, Backfold, All Metal, Clamping:25mm (-1mm) 4 Box 120.00 26 Clip, Backfold, All Metal, Clamping:32mm (-1mm) 10 Box 300.00 27 Clip, Backfold, All Metal, Clamping:50mm (-1mm) 8 Box 448.00 28 Clipboard, Black, Long 1 Pc 60.00 29 Clip, Paper, Vinyl/plastic Coat, Length 50mm Min 5 Box 150.00 30 Correction Tape 31 Pc 372.00 31 Crimping Tool 1 Pc 1,000.00 32 Data Box Filer, Red Color 30 Pc 4,950.00 33 Detergent Powder, 1kl 20 Pack 1,100.00 34 Dishwashing Liquid, 500ml 25 Bottle 4,500.00 35 Disinfectant Liquid 5 Gal 2,000.00 36 Disinfectant Spray, Aerosol Type 440g 20 Bottle 2,800.00 37 Divider Partition/room Divider 5.5ft H X 15" W (4 Panels) 1 Unit 4,000.00 38 Electric Drill 1 Unit 2,000.00 39 Electric Fan, Stand, 18" 3 Unit 7,350.00 40 Electric Fan, Wall Mount 1 Unit 2,500.00 41 Envelope, Expanding, Kraftboard,for Legal Size Doc (brown Color) 1 Box 1,800.00 42 Envelope, Long, Brown 25 Pc 325.00 43 Envelope, Mailing, White, 70gsm 2 Box 866.00 44 Executive Chair, Good Quality/heavy Duty 2 Unit 15,000.00 45 Exhaust Fan, 12 Inches 1 Unit 1,300.00 46 Expanding Folder, Long, Green 100 Pcs 2,000.00 47 Expanding Folder, Long, Orange 1 Box 900.00 48 Extension Wire (5m, 4 Sockets) 5 Pc 1,500.00 49 External Drive 1tb Hard Drive Portable Storage Plug And Play Usb 3.2 Gen 1 Type A To Micro B 4 Unit 12,000.00 50 Fastener, All Metal 3 Box 285.00 51 Fastener, Plastic 6 Box 270.00 52 Flash Drive, 16gb Capacity 6 Unit 1,800.00 53 Floor Matting (toyota Innova) 1 Set 5,000.00 54 Folder, Pressboard, Legal, White 2 Pack 3,780.00 55 Folder, Tagboard, For Legal Size Documents (brown) 1 Pack 322.00 56 Folder, Tagboard, For Legal Size Documents (white) 8 Pack 2,800.00 57 Folder, Tagboard, For Legal Size Documents (white) 50 Pc 750.00 58 Foot Rug, Cotton 24 Pc 2,400.00 59 Glass Cleaner, Spray 500ml 2 Can 400.00 60 Glass Cleaner, Sponge & Wiper Double, Long 2 Pc 500.00 61 Glue, All Purpose, 200g 8 Jar 600.00 62 Hand Sanitizer, 500ml 6 Bottle 2,394.00 63 Hand Soap, Liquid, 500ml 20 Bottle 4,000.00 64 Hand Towel, White 12 Pc 1,200.00 65 Hdmi, 10m 1 Pc 1,500.00 66 Hdmi To Vga, Wire Connector, 5meters 5 Pc 5,000.00 67 Insecticide, Aerosol Type 9 Can 3,150.00 68 Ink Gi-790, Black 4 Bottle 1,400.00 69 Ink Gi-790, Cyan 3 Bottle 1,050.00 70 Ink Gi-790, Magenta 3 Bottle 1,050.00 71 Ink Gi-790, Yellow 3 Bottle 1,050.00 72 Ink Brother, Bt5000c (cyan) 3 Bottle 1,050.00 73 Ink Brother, Bt5000m (magenta) 3 Bottle 1,050.00 74 Ink Brother, Bt5000y (yellow) 3 Bottle 1,050.00 75 Ink Brother, Btd60bk (black) 5 Bottle 1,750.00 76 Ink, Brother, T-420w Dcp, Black 21 Bottle 8,295.00 77 Ink, Brother, T-420w Dcp, Cyan 14 Bottle 5,530.00 78 Ink, Brother, T-420w Dcp, Magenta 14 Bottle 5,530.00 79 Ink, Brother, T-420w Dcp, Yellow 14 Bottle 5,530.00 80 Ink Epson, 003, Black 27 Bottle 9,450.00 81 Ink Epson, 003, Cyan 17 Bottle 5,950.00 82 Ink Epson, 003, Magenta 17 Bottle 5,950.00 83 Ink Epson, 003, Yellow 17 Bottle 5,950.00 84 Laminating Machine 1 Unit 2,750.00 85 Laminating Sheets, Long 1 Ream 500.00 86 "laptop Specifications: • Operating System: Windows 10® • Processor: Intel® Core™ I5 • Memory: 8gb • Storage: 1 Tb 2.5-inch 5400 Rpm • Graphics: Intel® Uhd Graphics, Supporting Opengl® 4.5, Opencltm 2.1, Microsoft® Directx® 12 • Display: 14"" • Optical Drive: N/a • Networking: Gigabit Ethernet 10/100/1000 • Wireless: 802.11a/b/g/n/acr2+ax (pre-standard) Wireless Lan + Bluetooth® 5.0 • Card Reader: Sd Card Reader • Camera: 720p Hd Audio/video Recording; Super High Dynamic Range Imaging (shdr) • Speaker: Four Built-in Stereo Speakers; Two Built-in Microphones • I/o Ports • Usb Type-c Port Supporting: • Usb 3.1 Gen 1 (up To 5 Gbps) • Displayport Over Usb-c • Usb Charging 5 V; 3 A • Dc-in Port 5 Or 9 Or 15 Or 20 V; 60 W • Three Usb 3.1 Gen1 Ports With One Featuring Power-off Usb Charging • Sd Card Reader • Hdmi® Port With Hdcp Support • External Display (vga) Port • Ethernet (rj-45) Port • Dc-in Jack For Ac Adapter • Adapter: 45w • Battery: 3-cell Li-ion Battery; Up To 11 Hours Battery Life • Keys & Controls: • Acer Finetip Keyboard With International Language Support • Multi-gesture Touchpad, Supporting Two-finger Scroll, Pinch And Rotate --with Wireless Mouse --with Headset --bag" 1 Unit 50,000.00 87 "laptop Operating System: Windows 11 Home Single Language, Processor: Intel® Core™ Ultra 5, Model: 125h, Tetradeca-core (14 Core™) Display & Graphics: Intel® Arc™ Graphics, Shared Memory, 35.6 Cm (14"") Lcd, Comfyview (matte), 2240 X 1400 Resolution, 60 Hz Refresh Rate, Memory: 16 Gb Lpddr5x, Memory Card Reader: Yes (microsd), Storage: 512 Gb Ssd (pci Express 4.0), Network & Communication : Ieee 802.11ax Wireless Lan, Gigabit Ethernet, Built-in Devices: Microphone: Yes, Finger Print Reader: Yes, Number Of Speakers: 2, Interfaces/ports: Hdmi: Yes, Usb 3.2 Gen 1 Type-a Ports: 2, Total Usb Ports: 4, Usb Type-c Docking Iii, Usb4 Ports: 2, Input Devices: Touchpad, Keyboard With Backlight, Oceanglass Touchpad, Battery Information: Lithium Ion (li-ion), 65 Wh, 13 Hours Maximum Battery Run Time, Power Description: 100 W Maximum Power Supply Wattage Physical Characteristics Height: 14.90 Mm, Width: 312.9 Mm, Depth: 217.9 Mm, Weight: 1.32 Kg, Product Color: Silver" 1 Unit 47,000.00 88 Laptop, Core I5 1 Unit 34,000.00 89 "laptop Specification: Size 14"" Processor • Intel® Coretm I7 Memory • 8 Gb Of Onboard Dual-channel Lpddr5 System Memory. Storage - 1 Terabyte Display Panel/ Resolution • 14"" Display With Ips (in-plane Switching) • Ultra Slim Design Operating System • Windows 11 Home With Microsoft Office With Bag, Wireless Mouse, Mouse Pad & Speaker" 1 Unit 45,000.00 90 Light Bulb, Led, 3w 25 Pc 3,000.00 91 Light Bulb, Led, 7w 50 Pc 6,000.00 92 Marker, Flourescent, 3 Assorted Colors Per Set 1 Set 43.00 93 Marker, Permanent, Black, Bullet Type 5 Pc 150.00 94 Marker, Permanent, Black, Broad 1 Box 400.00 95 Marker, Permanent, Black, Broad 5 Pc 400.00 96 Marker, Whiteboard, Black 1 Pc 15.00 97 Marker, Whiteboard, Black, Felt Tip Bullet Type 15 Pc 300.00 98 Marker, Whiteboard, Blue 1 Pc 15.00 99 Marker, Whiteboard, Green 1 Pc 15.00 100 Marker, Whiteboard, Red 1 Pc 15.00 101 Micro Sd Memory Card 8 Gb 6 Pc 1,260.00 102 Micro Sd Memory Card 16 Gb 6 Pc 1,770.00 103 "mini Refrigerator Specifications: 2 Door, 2.8 Cu Ft; Gross Capacity - 78l; Net Capacity - 67l" 1 Unit 11,000.00 104 Mouse Pad W/ Cushion & Arm Rest 8 Pc 1,200.00 105 Multi-purpose Printer : Wifi-enabled, With Feeder And Fladbed Scanner, Photocopying Feature, Ink Refillable 2 Unit 20,000.00 106 Note Pad, Stick On Size: 1.3x 4.4 Cm 4 Pc 300.00 107 Note Pad, Stick On Size: 50mm X 76mm 10 Pad 500.00 108 Note Pad, Stick On, 76mm X 76mm (3"x3") Min 21 Pad 1,050.00 109 Note Pad, Stick On 76mm X 100mm (3"x5") 11 Pad 550.00 110 "office Chair Specifications: Width: 65 Cm Depth: 55 Cm Height: 92 Cm Seat Height: 44 Cm Seat & Backrest: Plywood + Foam Covered With Mesh Fabric. Armrest: Polypropylene (pp) Plastic. Frame & Leg: Metal Tube In Chrome Plating Finish." 2 Unit 7,000.00 111 Paper Cutter A4 (210mm X 257mm) 1 Pc 3,000.00 112 Paper, Multicopy, Size: 8.5" X 11" 5 Ream 1,025.00 113 Paper, Multi-purpose, A4 45 Ream 10,350.00 114 Paper, Multi-purpose, Legal, 13", 70 Gsm 17 Ream 3,230.00 115 Paper, Photo, Glossy 10 Pack 1,500.00 116 Paper, Photo, Matte, A4 23 Pack 2,300.00 117 Paper, Specialty, White, Long, 250gsm 1 Pack 163.00 118 Paper, Specialty, (8.5 X 13) 1 Box 1,500.00 119 Paper, Specialty, A4 (cream Color 10s) 25 Pack 3,750.00 120 Paper, Specialty, A4 (cream Color 10s) 3 Ream 3,000.00 121 Paper, Sticker, Glossy 3 Pack 1,140.00 122 Picture Frame, Wall Mount, Wooden Design, A4 Size 4 Pc 396.00 123 Plastic Foot Rug 6 Meter 4,500.00 124 Portable Power Supply , (40,000-60,000mah)150w 2 Unit 11,000.00 125 Puncher, Paper, Heavy Duty, With Two Hole Guide 6 Pc 900.00 126 Rags, All Cotton, 1kilo Per Bundle 3 Bundle 159.00 127 Rechargeable Battery, Aa 6 Pc 600.00 128 Rechargeable Battery, Aaa 4 Pc 800.00 129 Rechargeable Batteries And Charger Nimh 2 Set 2,000.00 130 Rechargeable Wireless Mouse And Keyboard Set 5 Set 7,500.00 131 Record Book, 500 Pages 5 Book 600.00 132 Ribbon Cartridge For Lx310 Epson 2 Cart 1,020.00 133 Rollerball Pen, Black, 0.7mm With Grip 2 Pc 170.00 134 Rubber Band,70mm Min Lay Flat Length (#18) 2 Box 400.00 135 Ruler, Plastic, 12inches 8 Pc 400.00 136 Scissors, Symmetrical, Blade Length: 65mm Min 6 Pair 198.00 137 Sd Card Reader Usb 3.0/usb C Memory Card Reader, Otg Card Adapter, 5gbps Transmission Speed, Fusse Built-in 4 Pc 2,600.00 138 Sign Pen, Liquid/gel Ink, 0.5mm Needle Tip, Black 45 Pc 1,665.00 139 Sign Pen, Liquid/gel Ink, 0.7mm Needle Tip, Black 1 Box 250.00 140 Sign Pen, Liquid/gel Ink, 0.7mm Needle Tip, Black 21 Pc 777.00 141 Sign Pen, Liquid/gel Ink, 0.7mm Needle Tip, Blue 1 Box 250.00 142 Sign Pen, Liquid/gel Ink, 0.7mm Needle Tip, Blue 11 Pc 1,199.00 143 Sign Pen, Liquid/gel Ink, 0.7mm Needle Tip, Green 2 Pc 78.00 144 Sign Pen, Liquid/gel Ink, 1.0mm Needle Tip, Blue 30 Pc 690.00 145 "smart Tv Specifications: 40 Inch Display, Hdr 10, Full Hd (1080p), Led Display Panel, Dolby Audio, Android 10 Or More Os, Bluetooth 5.0, Hdmi And Usb Compatible, Power Capacity Ac 100-240v 50/60hz, Power Input 36 W" 1 Unit 22,000.00 146 Stamp, Dater, Rubber 3 Pc 300.00 147 Stamp Pad, Blue 2 Pc 200.00 148 Stamp Pad Ink, Purple Or Violet, 50ml (min.) 4 Bottle 500.00 149 Stamp Pad, Violet Small Size 3 Pad 120.00 150 "stapler, Standard Type, Load Cap: 200 Staples Min (with Staple Wire Remover)" 9 Pc 1,800.00 151 Staple Remover, Plier Type 9 Pc 423.00 152 Staple Wire, Standard, (26/6) 4 Box 232.00 153 Steel Cabinet, 3 Layers 1 Unit 10,000.00 154 Tape, Double Adhesive, 12mm X 10m 1 Roll 35.00 155 Tape, Double Adhesive, 19mm X 30m 2 Roll 90.00 156 Tape, Double Adhesive, 24mm 10 Roll 700.00 157 Tape, Masking, 24mm X 50mm 28 Roll 1,960.00 158 Tape, Masking, 48mm 2 Roll 200.00 159 Tape Packaging Width: 48mm X 50m 10 Roll 700.00 160 Tape, Transparent, 24mm X 50m 38 Roll 2,660.00 161 Tape, Transparent, 48mm 5 Roll 350.00 162 Tarpaulin Plain White With Eyelet 3x5 For Standee 3 Pc 900.00 163 Thread (high Quality) For Bookbinding, Black 20 Roll 4,000.00 164 "tissue, Interfold Paper Towel" 81 Pack 4,050.00 165 Trashbag, Small Size 25 Pack 3,750.00 166 Trashbag, Large Size 25 Pack 2,500.00 167 Trashbag, Medium Size 25 Pack 2,000.00 168 Trashbin, Medium 7 Pc 3,500.00 169 Twine Plastic 3 Roll 201.00 170 Usb Signature Pad With Pen 1x5 3 Set 36,000.00 171 Water Dispenser, Bottom Load 1 Unit 15,000.00 -nothing Follows-

Amt Peitz Tender

Civil And Construction...+2Others, Civil Works Others
Germany
Closing Date19 Jan 2025
Tender AmountRefer Documents 
Details: The fire station, with associated ancillary and functional rooms, was built around 1994. The building plot is fully developed and located on the public road "Sand". The existing building was built using monolithic masonry construction. The functional area is a two-storey building with a reinforced concrete solid ceiling and a wooden roof structure. In the single-storey building area of the two existing vehicle parking spaces, the building structure consists of steel frames with projecting masonry walls. In the roof area, aerated concrete roof panels (hebel) were laid on the steel frames described and then covered with roof tiles as a water-bearing layer. Due to the interim development and variety of tasks of the Drachhausen local fire department, the addition of a new small garage with a building area of approx. 50 m² is planned on the eaves side rear of the building. A structural connection (access) to the new garage space should be possible from the existing vehicle garage. A building permit for the planned building extension was applied for from the responsible building authority of the Spree-Neiße district and has now been obtained. A rear, eaves-level building extension of approx. 5.0 m x 10.0 m is planned for the existing single-storey vehicle parking garage. The extension should also preferably be built from monolithic aerated concrete masonry (d = 30.0 ... 36.5 cm), with a ring beam top. The roof support structure should be made of wood and then covered with roof tiles on a rainproof sub-roof as a continuation/extension of the existing roof covering. The new garage area will not be heated. The electrical installation in the area of the new vehicle garage should be carried out as an extension of the existing electrical system. Performance data for the planned construction: - Construction site equipment; - Excavation work - Floor area approx. 60 m²; - Concrete work for foundation body - base slab made of reinforced concrete D = 20 cm - approx. 50 m²; - Bricklaying - external walls made of aerated concrete - approx. 20 m³ with ring beams etc.; - Steel construction work for new ridge purlin support; - Carpentry - approx. 2.50 m³ of timber for roof truss and approx. 60 m²³ of roof sheathing; - Roofing - approx. 55 m² of roof area with roof tiles and associated roof plumbing work; - Joinery, windows, external and internal doors and gate systems; - Drywall construction with roof insulation - approx. 50 m²; - Plastering - inside approx. 130 m² and outside approx. 70.0 m²; - Screed laying work - approx. 50 m² - Painting work - approx. 200 m² of wall and ceiling areas and approx. 50 m² of floor area; - Electrical installation work, as an extension of the existing electrical system; - Outdoor facility fixing - approx. 70 m² in extension of the existing surface fixing;

U S COAST GUARD USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Closing Date22 Jan 2025
Tender AmountRefer Documents 
Details: The United States Coast Guard Surface Forces Logistics Center Has A Requirement To Open, Inspect, Report And Possible Overhaul Of The Below Item And Is Requesting Quotations: 1. This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Outlined In Far Subpart 12.6, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. 2. Solicitation Number 70z04025qzb018 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-02, Dated January 3, 2025. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded Because Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation Which If Timely Received, Shall Be Considered By This Agency. 3. This Acquisition Will Be Issued Under Naics 811210. 4. Nsn: 5895-12-395-9484 Control Monitor oem: Rolls-royce Solutions Gmbh pn: B00e50207391/s0002 qty: 3 Ea open, Inspect, Report With Possible Repair In Accordance With The Overhaul Description And Oem Specs. inspection Cost $__________ Each (this Cost Will Be Paid If Items Are Beyond Economic Repair) firm Fixed Repair Price $___________ Each. 5. These Parts Are Used For The U. S. Coast Guard Patrol Boat Product Line. Substitute Parts Or Part Numbers Are Not Acceptable. The Uscg Does Not Own The Rights To The Proprietary Data And Therefore Cannot Provide Drawings, Specifications, Or Schematics For These Parts. It Is The Government’s Belief That Only Rolls-royce Solutions Gmbh And Or Their Authorized Repair Facility Can Obtain The Required Technical And Engineering Data, And Genuine Oem Parts, Required To Successfully Repair These Items. Concerns Having The Expertise And Required Capabilities To Repair These Items Are Invited To Submit Complete Information Discussing The Same With Three (3) Calendar Days From The Day This Notice Is Posted. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Repair Facility And Verifying The Oem Will Supply Only Genuine Oem Parts. 6. Packing And Marking: each Unit Shall Be Individually Preserved And Wrapped For Protection Against Deterioration For A Period Of 2 Years Minimum. Each Unit Shall Be Packed Individually In It’s Own Wooden Box Which Shall Be Capable Of Providing Adequate Protection To The Item During Multiple Shipments. Mare Each Box In Legible Black Print Lettering With The Following Information. national Stock Number 5895-12-395-9484 item Name Control-monitor part Number X00e50204217/s0002 gov’t Order Number 70z08025p29****** coast Guard Sflc Material, Condition Code “a” 7. Delivery: delivery Is Required 02 Dec 2025. Please Provide Your Proposed Delivery To Address Below. Deliveries Are To Be Made Monday Through Friday Between The Hours Of 7:00 Am To 1:00 Pm. delivery Shall Be F.o.b. Destination To: united States Coast Guard (sflc) receiving Room, Bldg. #88 2401 Hawkins Point Road baltimore, Md 21226. estimated Delivery Date: _________________ 8. Inspection And Acceptance: F.o.b. Destination inspection And Acceptance Shall Take Place After Verification Of Preservation, Individual Packaging And Marking Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. the Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition. In Addition, The Following Language Applies To This Provision: 9. Multiple Awards Will Not Be Made. Vendor Shall Provide An All-or-nothing Quote For The Requirement Identified In (5) Above. 10. Award Will Be Made To The Lowest Price Offeror, That Is Deemed Technical Acceptable. the Contractor Shall Provide A Total Firm Fixed Price With Inspection Fee For All Necessary Equipment And Shipping Cost To Addresses Shown Under Delivery. vendor Must Be Registered At Https://www.sam.gov Prior To Quote Submittal. each Offeror’s Record In Fapiis Will Be Reviewed Prior To Award. Award Will Not Be Made To Any Offeror Who Has Any Adverse Financial Information Or Exclusions. 11. Offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), With Their Offer, If This Information Is Not Already Included In Https://www.sam.gov. 12. The Clause At 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023), Applies To This Acquisition. 13. Far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Product And Commercial Services (jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 (19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704and10 U.s.c. 4655). __(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) __(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). __(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. __(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of 52.204–30. x(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] __(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. __(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. __(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.637s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). __(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 2020)(15u.s.c.644(r)). __(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15u.s.c. 637(a)(17)). x(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). x(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). x (33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). x(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. __(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. x(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. __(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). __(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). __(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78and E.o. 13627). x(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) (42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11,ozone-depleting Substancesandhigh Global Warming Potential Hydrofluorocarbons(may 2024) (e.o. 13693). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may 2024)(e.o. 13693). __(49)52.223-20, Aerosols(may 2024)(e.o. 13693). __(50)52.223-21, Foams (may 2024) (e.o. 13693). __(51)(i)52.224-3privacy Training(may 2024)(5 U.s.c. 552 A). __(ii)alternatei(jan 2017)of52.224-3. __(52)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. x(53)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(nov 2023)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(54)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x(55)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(56)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(57)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(58)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea (nov2007) (42u.s.c.5150). __(59)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(60)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(61)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). x(62)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(63)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(64)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(65)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(66)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(67)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). x(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206and41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206and41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (a)definitions. As Used In This Clause— kaspersky Lab Covered Articlemeans Any Hardware, Software, Or Service That– (1)is Developed Or Provided By Akaspersky Lab Covered Entity; (2)includes Any Hardware, Software, Or Service Developed Or Provided In Whole Or In Part By Akaspersky Lab Covered Entity; Or (3)containscomponentsusing Any Hardware Or Software Developed In Whole Or In Part By Akaspersky Lab Covered Entity. kaspersky Lab Covered Entitymeans– (1)kaspersky Lab; (2)any Successor Entity To Kaspersky Lab, Including Any Change In Name, E.g., “kaspersky”; (3)any Entity That Controls, Is Controlled By, Or Is Under Common Control With Kaspersky Lab; Or (4)any Entity Of Which Kaspersky Lab Has A Majority Ownership. (b)prohibition. Section 1634 Of Division A Of Thenational Defenseauthorization Act For Fiscal Year 2018 (pub. L. 115-91) Prohibits Government Use Of Anykaspersky Lab Covered Article. The Contractor Is Prohibited From— (1)providing Anykaspersky Lab Covered Articlethat The Government Will Use On Or After October 1, 2018; And (2)using Anykaspersky Lab Covered Articleon Or After October 1, 2018, In The Development Of Data Or Deliverables First Produced In The Performance Of The Contract. (c)reporting Requirement. (1)in The Event The Contractoridentifies Akaspersky Lab Covered Articleprovided To The Government During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or Any Other Source, The Contractorshallreport,in Writing, To Thecontracting Officeror, In The Case Of The Department Of Defense, To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (c)(1) Of This Clause: (i)within 3 Business Days From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Brand; Model Number (original Equipment Manufacturer (oem) Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Report Pursuant To Paragraph (c)(1) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Of Akaspersky Lab Covered Article, Any Reasons That Led To The Use Or Submission Of Thekaspersky Lab Covered Article, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofkaspersky Lab Covered Articles. (d)subcontracts. The Contractorshallinsert The Substance Of This Clause, Including This Paragraph (d), In All Subcontracts Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232. definitions. As Used In This Clause- backhaulmeans Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet). covered Foreign Countrymeans The People’s Republic Of China. covered Telecommunications Equipment Or Servicesmeans– (1)telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities); (2)for The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities); (3)telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or (4)telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of Acovered Foreign Country. critical Technologymeans– (1)defense Articles Or Defense Services Included On Theunited Statesmunitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations; (2)items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled- (i)pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or (ii)for Reasons Relating To Regional Stability Or Surreptitious Listening; (3)specially Designed And Prepared Nuclear Equipment, Parts Andcomponents, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities); (4)nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5)select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or (6)emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817). interconnection Arrangementsmeans Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. reasonable Inquirymeans An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Ofcovered Telecommunications Equipment Or Servicesused By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. roamingmeans Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High. substantial Or Essential Componentmeans Anycomponentnecessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service. (b)prohibition. (1)section 889(a)(1)(a) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. (2)section 889(a)(1)(b) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. This Prohibition Applies To The Use Ofcovered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. (c)exceptions.this Clause Does Not Prohibit Contractors From Providing— (1)a Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (2)telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (d)reporting Requirement. (1)in The Event The Contractor Identifiescovered Telecommunications Equipment Or Servicesused As Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractorshallreport The Information In Paragraph (d)(2) Of This Clause To Thecontracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractorshallreport To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (d)(1) Of This Clause (i)within One Businessdayfrom The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplierunique Entity Identifier(if Known); Suppliercommercial And Government Entity (cage) Code(if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Ofcovered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofcovered Telecommunications Equipment Or Services. (e)subcontracts.the Contractorshallinsert The Substance Of This Clause, Including This Paragraph (e) And Excluding Paragraph (b)(2), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns(feb 2024)(15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2015)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi) (a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii) (a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. 14. Electronic Submission Of Payment Requests (a) Definitions. As Used In These Instructions - (1) “payment Request” Means A Bill, Voucher, Invoice, Or Request For Contract Financing Payment With Associated Supporting Documentation. The Payment Request Must: Comply With The Requirements Identified In Far 32.905(b), “content Of Invoices” And The Applicable Payment Clause Included In This Contract. In Addition, Discount Offerings And Small Business Status If Available Shall Be Stated. If Travel Was Allowable And Approved, Components In Accordance With Far 31.205-46 Shall Be Provided. (b) The Contractor Shall Submit Payment Requests Electronically Using The Invoice Processing Platform (ipp). The Contractor Will Submit Payment Requests Using The Blank Form In Ipp. (c) Information Regarding Ipp, Including Ipp Customer Support Contact Information, Is Available At Www.ipp.gov Or Any Successor Site. (d) Ipp Enrollment Information Is At Https://www.uscg.mil/fincen/ipp/. additional Clauses hsar 3052.212-70contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items. as Prescribed In (hsar) 48 Cfr 3012.301, Insert The Following Clause: contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items (sep 2012) the Contractor Agrees To Comply With Any Provision Or Clause That Is Incorporated Herein By Reference To Implement Agency Policy Applicable To Acquisition Of Commercial Items Or Components. The Provision Or Clause In Effect Based On The Applicable Regulation Cited On The Date The Solicitation Is Issued Applies Unless Otherwise Stated Herein. The Following Provisions And Clauses Are Incorporated By Reference: [the Contracting Officer Should Either Check The Provisions And Clauses That Apply Or Delete The Provisions And Clauses That Do Not Apply From The List. The Contracting Officer May Add The Date Of The Provision Or Clause If Desired For Clarity.] (a)provisions. x 3052.247-72 F.o.b. Destination Only. (end Of Clause) 15. Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable. 16. Quotes Are Due Not Later Than 22 Jan 2025, By 10:00 Am Eastern Daylight Savings Time (dst). 17. All Questions Regarding This Notice Shall Be Submitted In Writing To Donna Scandaliato No Later Than Jan 22, 2024. Quote Shall Be Emailed To Donna.m.scandaliato@uscg.mil.

U S COAST GUARD USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Closing Date22 Jan 2025
Tender AmountRefer Documents 
Details: The United States Coast Guard Surface Forces Logistics Center Has A Requirement To Open, Inspect, Report And Possible Overhaul Of The Below Item And Is Requesting Quotations: 1. This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Outlined In Far Subpart 12.6, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. 2. Solicitation Number 70z04025qag129 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-02, Dated January 3, 2025. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded Because Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation Which If Timely Received, Shall Be Considered By This Agency. 3. This Acquisition Will Be Issued Under Naics 811210. 4. Nsn: 2925-01-603-2033 oem: Electronic Control Arc 3000 M pn: Qcarc3002-aa03 qty: 4 Ea open, Inspect, Report With Possible Repair In Accordance With The Overhaul Description And Oem Specs. inspection Cost $__________ Each (this Cost Will Be Paid If Items Are Beyond Economic Repair) firm Fixed Repair Price $___________ Each. 5. These Parts Are Used For The U. S. Coast Guard Patrol Boat Product Line. Substitute Parts Or Part Numbers Are Not Acceptable. The Uscg Does Not Own The Rights To The Proprietary Data And Therefore Cannot Provide Drawings, Specifications, Or Schematics For These Parts. It Is The Government’s Belief That Only Quantum Marine Engineering, Inc. And Or Their Authorized Repair Facility Can Obtain The Required Technical And Engineering Data, And Genuine Oem Parts, Required To Successfully Repair These Items. Concerns Having The Expertise And Required Capabilities To Repair These Items Are Invited To Submit Complete Information Discussing The Same With Three (3) Calendar Days From The Day This Notice Is Posted. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Repair Facility And Verifying The Oem Will Supply Only Genuine Oem Parts. 6. Packing And Marking: each Unit Shall Be Individually Preserved And Wrapped For Protection Against Deterioration For A Period Of 2 Years Minimum. Each Unit Shall Be Packed Individually In It’s Own Wooden Box Which Shall Be Capable Of Providing Adequate Protection To The Item During Multiple Shipments. Mare Each Box In Legible Black Print Lettering With The Following Information. national Stock Number 2925-01-603-2033 item Name Electronic Control Arc 3000 M part Number Qcarc3002-aa03 gov’t Order Number 70z08025p29****** coast Guard Sflc Material, Condition Code “a” 7. Delivery: delivery Is Required 02 Dec 2025. Please Provide Your Proposed Delivery To Address Below. Deliveries Are To Be Made Monday Through Friday Between The Hours Of 7:00 Am To 1:00 Pm. delivery Shall Be F.o.b. Destination To: united States Coast Guard (sflc) receiving Room, Bldg. #88 2401 Hawkins Point Road baltimore, Md 21226. estimated Delivery Date: _________________ 8. Inspection And Acceptance: F.o.b. Destination inspection And Acceptance Shall Take Place After Verification Of Preservation, Individual Packaging And Marking Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. the Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition. In Addition, The Following Language Applies To This Provision: 9. Multiple Awards Will Not Be Made. Vendor Shall Provide An All-or-nothing Quote For The Requirement Identified In (5) Above. 10. Award Will Be Made To The Lowest Price Offeror, That Is Deemed Technical Acceptable. the Contractor Shall Provide A Total Firm Fixed Price With Inspection Fee For All Necessary Equipment And Shipping Cost To Addresses Shown Under Delivery. vendor Must Be Registered At Https://www.sam.gov Prior To Quote Submittal. each Offeror’s Record In Fapiis Will Be Reviewed Prior To Award. Award Will Not Be Made To Any Offeror Who Has Any Adverse Financial Information Or Exclusions. 11. Offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), With Their Offer, If This Information Is Not Already Included In Https://www.sam.gov. 12. The Clause At 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023), Applies To This Acquisition. 13. Far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Product And Commercial Services (jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 (19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704and10 U.s.c. 4655). __(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) __(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). __(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. __(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of 52.204–30. x(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] __(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. __(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. __(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.637s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). __(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 2020)(15u.s.c.644(r)). __(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15u.s.c. 637(a)(17)). x(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). x(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). x (33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). x(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. __(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. x(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. __(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). __(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). __(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78and E.o. 13627). x(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) (42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11,ozone-depleting Substancesandhigh Global Warming Potential Hydrofluorocarbons(may 2024) (e.o. 13693). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may 2024)(e.o. 13693). __(49)52.223-20, Aerosols(may 2024)(e.o. 13693). __(50)52.223-21, Foams (may 2024) (e.o. 13693). __(51)(i)52.224-3privacy Training(may 2024)(5 U.s.c. 552 A). __(ii)alternatei(jan 2017)of52.224-3. __(52)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. x(53)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(nov 2023)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(54)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x(55)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(56)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(57)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(58)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea (nov2007) (42u.s.c.5150). __(59)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(60)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(61)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). x(62)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(63)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(64)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(65)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(66)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(67)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). x(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206and41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206and41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (a)definitions. As Used In This Clause— kaspersky Lab Covered Articlemeans Any Hardware, Software, Or Service That– (1)is Developed Or Provided By Akaspersky Lab Covered Entity; (2)includes Any Hardware, Software, Or Service Developed Or Provided In Whole Or In Part By Akaspersky Lab Covered Entity; Or (3)containscomponentsusing Any Hardware Or Software Developed In Whole Or In Part By Akaspersky Lab Covered Entity. kaspersky Lab Covered Entitymeans– (1)kaspersky Lab; (2)any Successor Entity To Kaspersky Lab, Including Any Change In Name, E.g., “kaspersky”; (3)any Entity That Controls, Is Controlled By, Or Is Under Common Control With Kaspersky Lab; Or (4)any Entity Of Which Kaspersky Lab Has A Majority Ownership. (b)prohibition. Section 1634 Of Division A Of Thenational Defenseauthorization Act For Fiscal Year 2018 (pub. L. 115-91) Prohibits Government Use Of Anykaspersky Lab Covered Article. The Contractor Is Prohibited From— (1)providing Anykaspersky Lab Covered Articlethat The Government Will Use On Or After October 1, 2018; And (2)using Anykaspersky Lab Covered Articleon Or After October 1, 2018, In The Development Of Data Or Deliverables First Produced In The Performance Of The Contract. (c)reporting Requirement. (1)in The Event The Contractoridentifies Akaspersky Lab Covered Articleprovided To The Government During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or Any Other Source, The Contractorshallreport,in Writing, To Thecontracting Officeror, In The Case Of The Department Of Defense, To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (c)(1) Of This Clause: (i)within 3 Business Days From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Brand; Model Number (original Equipment Manufacturer (oem) Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Report Pursuant To Paragraph (c)(1) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Of Akaspersky Lab Covered Article, Any Reasons That Led To The Use Or Submission Of Thekaspersky Lab Covered Article, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofkaspersky Lab Covered Articles. (d)subcontracts. The Contractorshallinsert The Substance Of This Clause, Including This Paragraph (d), In All Subcontracts Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232. definitions. As Used In This Clause- backhaulmeans Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet). covered Foreign Countrymeans The People’s Republic Of China. covered Telecommunications Equipment Or Servicesmeans– (1)telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities); (2)for The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities); (3)telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or (4)telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of Acovered Foreign Country. critical Technologymeans– (1)defense Articles Or Defense Services Included On Theunited Statesmunitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations; (2)items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled- (i)pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or (ii)for Reasons Relating To Regional Stability Or Surreptitious Listening; (3)specially Designed And Prepared Nuclear Equipment, Parts Andcomponents, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities); (4)nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5)select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or (6)emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817). interconnection Arrangementsmeans Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. reasonable Inquirymeans An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Ofcovered Telecommunications Equipment Or Servicesused By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. roamingmeans Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High. substantial Or Essential Componentmeans Anycomponentnecessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service. (b)prohibition. (1)section 889(a)(1)(a) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. (2)section 889(a)(1)(b) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. This Prohibition Applies To The Use Ofcovered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. (c)exceptions.this Clause Does Not Prohibit Contractors From Providing— (1)a Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (2)telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (d)reporting Requirement. (1)in The Event The Contractor Identifiescovered Telecommunications Equipment Or Servicesused As Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractorshallreport The Information In Paragraph (d)(2) Of This Clause To Thecontracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractorshallreport To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (d)(1) Of This Clause (i)within One Businessdayfrom The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplierunique Entity Identifier(if Known); Suppliercommercial And Government Entity (cage) Code(if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Ofcovered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofcovered Telecommunications Equipment Or Services. (e)subcontracts.the Contractorshallinsert The Substance Of This Clause, Including This Paragraph (e) And Excluding Paragraph (b)(2), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns(feb 2024)(15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2015)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi) (a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii) (a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. 14. Electronic Submission Of Payment Requests (a) Definitions. As Used In These Instructions - (1) “payment Request” Means A Bill, Voucher, Invoice, Or Request For Contract Financing Payment With Associated Supporting Documentation. The Payment Request Must: Comply With The Requirements Identified In Far 32.905(b), “content Of Invoices” And The Applicable Payment Clause Included In This Contract. In Addition, Discount Offerings And Small Business Status If Available Shall Be Stated. If Travel Was Allowable And Approved, Components In Accordance With Far 31.205-46 Shall Be Provided. (b) The Contractor Shall Submit Payment Requests Electronically Using The Invoice Processing Platform (ipp). The Contractor Will Submit Payment Requests Using The Blank Form In Ipp. (c) Information Regarding Ipp, Including Ipp Customer Support Contact Information, Is Available At Www.ipp.gov Or Any Successor Site. (d) Ipp Enrollment Information Is At Https://www.uscg.mil/fincen/ipp/. additional Clauses hsar 3052.212-70contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items. as Prescribed In (hsar) 48 Cfr 3012.301, Insert The Following Clause: contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items (sep 2012) the Contractor Agrees To Comply With Any Provision Or Clause That Is Incorporated Herein By Reference To Implement Agency Policy Applicable To Acquisition Of Commercial Items Or Components. The Provision Or Clause In Effect Based On The Applicable Regulation Cited On The Date The Solicitation Is Issued Applies Unless Otherwise Stated Herein. The Following Provisions And Clauses Are Incorporated By Reference: [the Contracting Officer Should Either Check The Provisions And Clauses That Apply Or Delete The Provisions And Clauses That Do Not Apply From The List. The Contracting Officer May Add The Date Of The Provision Or Clause If Desired For Clarity.] (a)provisions. x 3052.247-72 F.o.b. Destination Only. (end Of Clause) 15. Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable. 16. Quotes Are Due Not Later Than 22 Jan 2025, By 10:00 Am Eastern Daylight Savings Time (dst). 17. All Questions Regarding This Notice Shall Be Submitted In Writing To Donna Scandaliato No Later Than Jan 22, 2024. Quote Shall Be Emailed To Donna.m.scandaliato@uscg.mil.

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________