Tenders of Veterans Affairs, Department Of Usa
Tenders of Veterans Affairs, Department Of Usa
Sorry!
No Active
Tenders of Veterans Affairs, Department Of Usa
foundCheck archived
Tenders of Veterans Affairs, Department Of Usa
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
J065--fy25: Preventive And Corrective Maintenance And Repair For Philips High Cost / High Tech Medical Devises
Closing Date31 Jul 2024
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
Dh10--windows 2019 Software Upgrade | Rfi
Closing Date31 Jul 2024
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
6515--521-24-3-4175-0978 - Equipment: Epredia Histostar Embedding Workstation -- Research
Closing Date31 Jul 2024
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
9999--precision Medicine Ncptsd (va-24-00060494)
Closing Date1 Aug 2024
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
Statement Of Work (sow)
for
prep And Pack Stations
veterans Health Administration
14 February 2024
*all Items Herein That Mention Brand Name Products May Be Substituted For A Like Or Similar Item*
1. Introduction
this Solicitation Is To Provide The Robert J. Dole Vamc With ( 6 ) Prep And Pack Stations And 1 Wrapping Workstation For Use In The Sterile Processing Services For Preparing Instrumentation For Surgical Procedures.
2. Scope Of Work
the Contractor Shall Provide All Personnel, Equipment, Tools, Materials, Supervision, Hardware, Installation, Trainings, And Any Necessary Educational Materials Needed For The Successful Utilization Of The Workstations By Robert J. Dole Vamc Staff.
3. Installation & Clean Up
contractor Representatives Must Check In With Either The Contracting Officer’s Representative (cor), Supervisor, Assistant Chief, Or Nurse Manager. When They Arrive On-site And Check Out Upon Completion Of Work Each Day.
contractor On-site Visits Shall Be Coordinated With The Cor (or Designee) Before Being Scheduled Or Conducted.
contractor Staff Shall Always Be Professional And Shall Take All Necessary Precautions To Maintain A Safe Environment For The Occupants.
contractor Shall Protect All Items From Damage. The Contractor Shall Take Precaution Against Damage To The Building(s), Grounds, And Furnishings. The Contractor Shall Repair Or Replace Any Items Related To Building(s) Or Grounds Damaged Accidentally Or On Purpose Due To Actions By The Contractor.
4. Technical Requirements
A. Salient Features:
stainless Steel
electro-mechanical Height-adjustability
table Pegboard, Standard Pegs Throughout
integrated Footrest
pc Tower Shelf Mounted To Underside.
tabletop Ruler Is Etched Into The Surface Of Assembly And Packing Tables.
pull Out Shelf Stores Work Area Underneath Prep And Pack Tables.
table Light Hood
lighted Shelves
led Light Bar
led Magnifier Task Light
on/off Switch, And Dimmable Lighting
wall Bracket For Mounting Accessories
the Ergotron® Wall Mounted Keyboard And Monitor Arm
the Ergotron® Vesa Scanner Shelf
wall Mounted Rail For Plastic Shelf Bins
plastic Shelf Bins
prep And Pack Organization Rail Lets Users Hang Peel Pouch Rolls, Stickers, And Other Sterilization Materials.
storage Drawer
two-pronged Hook To Hang Brushes And Accessories.
suspended Shelf Mounted Underneath Ergonomic Workstations
b. Technical Requirements:
60”l X 32”w Height-adjustable Workstation
power: 15a, 120v, Or 60h Required
5. Training
the Contractor Shall Provide An On-site Training Program For Sps Personnel.
training For Sps Personnel Must Provide Sps Staff With The Tools And Knowledge To Fully Operate The Devices And Conduct Checks Per The Manufacturer’s Instructions And Hospital Regulations, As Well As Answer Any Questions Personnel May Have Regarding The New Equipment.
contractor Shall Coordinate All Training Dates With Cor (or Designee) Who Will Communicate Internally With Appropriate Va Staff.
contractor Shall Maintain Records Of Training Participants And Whether Training Was Completed Or Not, To Be Provided To Cor Upon Request.
if Applicable, Contractor Shall Include All Travel, Registration, And Other Associated Costs To Provide This Training In Their Proposal.
contractor Shall Protect All Items From Damage. The Contractor Shall Take Precaution Against Damage To The Building(s), Grounds, And Furnishings. The Contractor Shall Repair Or Replace Any Items Related To Building(s) Or Grounds Damaged Accidentally Or On Purpose Due To Actions By The Contractor.
6. Warranty/maintenance Service
the Warranty Shall Include All Manufacturer Recommended Preventive Maintenance Procedures For Its Duration.
the Contractor Shall Provide At Minimum A 3-year Warranty.
the Warranty Shall Include The Following: All Parts, All Accessories, And All Software Shall Be Covered Under The Manufacturer’s Warranty And Shall Include All Parts And Labor.
the Contractor Shall Provide Documentation Of All Work Completed (corrective Maintenance, Preventive Maintenance, Software Updates, Etc.) Within 3 Business Days Of Completion To The Contracting Officer’s Representative Or Designee.
the Warranty Period Shall Not Begin Until After The Dole Vamc Cor Or Designee Has Accepted The Products Delivery, Installation, And Functionality.
the Contractor Shall Provide Documentation Of All Work Completed (corrective Maintenance, Preventive Maintenance, Etc.) Within 3 Business Days Of Completion To The Contracting Officer’s Representative Or Designee.
7. Security Requirements
the C&a Requirements Do Not Apply, And A Security Accreditation Package Is Not Required.
8. Hours Of Work
normal Hours Of Operation Are Monday Through Friday, 8:00 A.m. To 4:30 P.m. Central Standard Time, Excluding Federal Holidays. The Government Hereby Provides Notice And Contractor Hereby Acknowledges Receipt That Government Personnel Observe The Listed Days As Holidays:
new Year's Day January 1
martin Luther King's Birthday Third Monday In January
president's Birthday Third Monday In February
memorial Day Last Monday In May
juneteenth June 19
independence Day July 4
labor Day First Monday In September
columbus Day Second Monday In October
veterans Day November 11
thanksgiving Day Fourth Thursday In November
christmas December 25
9. Period Of Performance
the Contractor Shall Have System Fully Installed No Later Than 90 Days After Contract Award. Coordination Between The Contracting Officer And The Site Point-of-contact/contracting Officer’s Representative Will Be Required After Contract Award To Establish The Start Date To Complete Any Required Site Preparations.
10. Delivery & Location Information
robert J. Dole Medical Facility
building 34 Nx Warehouse
5500 East Kellogg
wichita Kansas, 67218
Closing Date1 Aug 2024
Tender AmountRefer Documents