Vehicle Tenders
Vehicle Tenders
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 9.7 Million (USD 168.8 K)
Details: Description Invitation To Bid 1. The Department Of Public Works And Highways (dpwh) Cavite 3rd Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 5. Name Of Contract : Convergence And Special Support Program - Special Road Fund - Motor Vehicle User's Charge (mvuc) As Per R.a. 11239 - Improvement Of Intersection At Cavite-batangas Rd - K0044 + 864 Contract Id No. : 25dq0066 Contract Location : Silang, Cavite Scope Of Works : Off-carriageway Improvement: Flaring Of Intersections / Improvement Of Intersections Approved Budget For The Contract : Php 9,799,963.21 Net Length : 117.00 L.m. Source Of Funds : Regular Infra Fy 2025 Contract Duration : 90 C.d. Size Range : Small B License Category : C & D Cost Of Bidding Documents : Php 10,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh) Cavite 3rd District Engineering Office, And Inspect The Bidding Documents At The Address Given Below During Weekdays From 8am – 5pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 07, 2025 – January 28, 2025 @ 8am-5pm From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents (amount Indicated On The Above Table). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh) Cavite 3rd District Engineering Office, Will Hold A Pre-bid Conference On January 15, 2025 @ 9:00 A.m. At 2nd Floor Bidding Room, Dpwh, Cavite 3rd Deo, Phase 7 Carmona Estates, Brgy. Lantic, Carmona City, Cavite, And Through Video Conferencing Via Zoom And Live-streamed On Youtube Https://www.youtube.com/channel/ucslhgizplwhwv3noujroi4g Which Shall Be Opened To Prospective Bidders. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_cavite3@dpwh.gov.ph For Electronic Submission On Or Before January 28, 2025 @ 9:00 A.m. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On January 28, 2025 @ 9:00 A.m. At 2nd Floor Bidding Room, Dpwh, Cavite 3rd Deo, Phase 7 Carmona Estates, Brgy. Lantic, Carmona City, Cavite. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below Or Through Video Conferencing Via Zoom And Live-streamed On Youtube Https://www.youtube.com/channel/ucslhgizplwhwv3noujroi4g. Late Bids Shall Not Be Accepted. 10. If At The Time Of The Post – Qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b) (ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject To Be Bid. 11. For This Particular Contract, The Department Of Public Works And Highways (dpwh), Cavite 3rd District Engineering Office Intends To Apply The Pilot Implementation Of Dpwh Standard Specifications For Project Quality Assurance, Volume Iv, During The Project Implementation. 12. The Department Of Public Works And Highways (dpwh), Cavite 3rd District Engineering Office, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Reimart Regin P. Bautista Bac Chairperson Chief, Planning And Design Section Email Address: C3deo.procurement@gmail.com Ramil L. Juliano Bac Secretariat Head Procurement Unit Email Address: C3deo.procurement@gmail.com Department Of Public Works And Highways Cavite 3rd District Engineering Office Phase 7 Carmona Estates, Brgy. Lantic, Carmona City, Cavite 14. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph; Philgeps.gov.ph For Online Bid Submission At Electronicbids_cavite3@dpwh.gov.ph January 07, 2025 Approved By: Reimart Regin P. Bautista Chief, Planning And Design Section
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n711.9|bu5|7176054385|derek.j.ford5.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
the Purpose Of This Amendment Is To Extend The Solicitation Close Date To 21 Jan 2025.
all Other Terms And Conditions Remain The Same.
\
the Purpose Of This Amendment Is To Include The Part Number Tab201 As An Authorized Part For Repair.
all Other Terms And Conditions Remain The Same.
\
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Derek.j.ford5.civ@us.navy.mil.
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003
f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
g. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
- Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq)
h. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
evaluation Factors:
evaluation Utilizing Simplified Acquisition Procedures The Government Will Issue An Order Resulting From This Request For Quotation Tothe Responsible Offeror Whose Quotation Results In The Best Value To The Government, Considering Both Price And A Non-price Factors. The Following Factors Will Be Used To Evaluate
quotations:
1) Price.
2) Past Performance. The Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications
between Contracting Parties, Proactive Management, And Customer Satisfaction.
3) Supplier Performance Risk As Described In Dfars 252.204-7024.
(end Of Provision)
quotes Shall Be Received No Later Than The Date Specified In The Solicitation In Order To Be Considered. Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Power Supply .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=mil-std-973 | | | |091005|a| |05|
3. Requirements
3.1 Cage Code/reference Number Items - The Power Supply Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;15420 58ms1-025
53711 6782644
06es8 Tab201;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.2.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 ;item Will Be Manufactured In Accordance With Navy Reference Drawing 6782644 Rev. D, Cage 53711;
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n7m3.11|anc|7176055415|nicole.diehl@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|combo|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
option For Increased Quantity (mar 1989)|1|365 Days|
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334111|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: ________
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________
all Pricing Is Firm. Please Consider The Following When Providing Price:
include Repair Price With All Costs Associated With Receipt And Complete Repair Of Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts And Wear Damage.
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The
option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Cro Module .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Cro Module Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 8494296-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date28 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n711.17|aad|717-605-1318|taylor.r.arroyo2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|combo|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|333914|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
the Purpose Of This Amendment Is To Notate The Extension Of The Offer Due Datefrom 23 Dec 2024 To 28 Jan 2025. All Other Terms And Conditions Remainunchanged.
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Taylor.r.arroyo2.civ@us.navy.mil
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Exclusion. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003
f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
g. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
- Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq)
h. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Fixture Assembly, G .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Fixture Assembly, G Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;94756 27540-514-21;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon16 Jan 2025
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|tbd|tbd|tbd|n00104|tbd|tbd|see Schedule Page|tbd|tbd|tbd|tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334511|1350||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 142 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25.
your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract. Check One: Firm-fixed-price ___ Estimated ___ Nte ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Computer,radar Sim .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Computer,radar Sim Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;03956 4305803-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Closing Date6 Feb 2025
Tender AmountRefer Documents
Description: Contact Information|4|n7m2.22|bsg|see Email|alexander.w.stimeling.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
critical Safety Item (aug 2011)|4|all Items In The Schedule||||
option For Increased Quantity (mar 1989)|1|365 Days|
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334610|1250 Employees||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 60 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information: Quote Amount And Rtat
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location
o Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The
option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree.
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Interface Unit,auto .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Interface Unit,auto Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 7635870;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|navsup|eay|717-605-7043|daniel.c.shepley.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
desired And Required Time Of Delivery (june 1997)|29|clin 0001|20|274 Days Aro|||||||||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|combo|n/a|to Be Determined (tbd)|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
progress Payments (nov 2021)|4|||||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
buy American - Free Trade Agreements - Israeli Trade Act (nov 2023)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-free Trade Agreements--israeli Trade Act Certificate (nov 2023)|3||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4|||||
annual Representations And Certifications (may 2024)|13|334220|1250||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|electronic Mail|
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
the Offer Due Date For This Solicitation Is Hereby Extended Until 4:30 Pm Eastern Usa Time On Friday, 24-january-2025.
please Submit Offers Earlier If Possible, But Definitely Not Later Than This Revised Due Date As Late Submissions Will Not Be Accepted.
all Other Terms And Conditions Remain Unchanged.
\
the Offer Due Date For This Casrep Solicitation Is Hereby Extended To Wednesday, 20-november-2024. All Offers Must Be Received By 4:30 Pm Eastern Usa Time On This Date As No Late Offers Will Be Accepted.
all Other Terms And Conditions Remain Unchanged.
\
the Offer Due Date For All Responses To This Solicitation Is Hereby Extended By 30 Days To Monday, 21-october-2024.
all Offers Are Due By 4:30 Pm Eastern Usa Time On 21-oct-2024. Please Submit Earlier, If Possible, But Definitely Not Later.
all Other Terms And Conditions Remain Unchanged.
\
all Freight Is Fob Origin.
this Solicitation Is For A Buy. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection Is Required.
o Unit Price: __________ Firm
o Extended Total Price: __________ Firm
o Offer Valid For: ________ (days) (desired Is 210 Days / Minimum Is 180)
o Procurement Turnaround Time In Days (ptat): __________
o Awardee Cage: __________
o Government Source Inspection Cage, If Not At Source: __________
o Final Acceptance / Packaging Cage, If Not At Source: __________
o Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example): ________________
important Traceability Notice: If You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide A Letter/official Email From The Oem Confirming Your Company Is Authorized As An Authorized Distributor Of Their Items.
submit Your Offer No Later Than Due Date And Time Specified In The Solicitation. Late Proposals Will Not Be Accepted.
offerors Should Submit All Questions No Later Than One (1) Week Prior To The Initial Solicitation Closing Date. The Government Is Not Required To Answer Questions Received After This Date. Unless Otherwise Stated In An Amendment, Extensions To The Solicitation
due Date Will Not Extend The Date For Questions From Potential Offerors.
the Government Intends To Award A Single Contract Under This Request For Proposal (rfp). The Government Also Intends To Award Without Discussion, So All Questions Or Requested Amendments Should Be Addressed Prior To Closing. The Government Reserves The Right To
contact Offerors For Clarification, Or Conduct Discussions If The Procurement Contracting Officer Determines Discussions Necessary In Accordance With Far 15.306(a).
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Radome .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Radome Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No. ;7y193 H410177-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon10 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n7m1.9|bud|na|brett.m.hassick.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|see Schedule|see Schedule|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334412|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Reason For This Amendment Is To:
extend The Due Date To 01/10/25. All Pricing Must Be Firm-fixed-price.
see Continuation Pages For Details. This Amendment Makes No Other Changes.
\
accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule.
all Freight Is Fob Origin.
this Rfq Is For A Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Executionn. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of 90 Days.
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By Navy Cav Or Proxycav As Stated In Navsupwssfa24 Or Navsupwssfa25.
please Complete And Return The Following Information: Quote Amount And Rtat
- Unit Price: $_________________
- Total Price: $________________
- Repair Turnaround Time (rtat): _____________ Days
if Your Company Is Not Quoting The Government's Repair Turnaround Time (rtat) Or Earlier, Please Provide Your Company's Capacity Constraints:
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The "f" Condition
asset At The Contractors Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This Contract.
- All Pricing Is Firm-fixed-price. Include Repair Price With All Costs Associated With Receipt And Complete Repair Of Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, And Wear Damage.
- Return Material Authorization # (rma) (if Applicable): ______________
- Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq): __________________ Testing And Evaluation If Beyond Repair Or Beyond Economical Repair
- T&e Fee/price (if Asset Is Determined Br Or Ber): If An Item Is Determined Br Or Ber, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br Or Ber, The Contracting Officer Will Negotiate A Reduced Contract
price, Not-to-exceed (nte) $______________ Associated With The Repair Effort To Reflect The Br Or Ber Status Of The Equipment.
- The T&e Fee/price (if Asset Is Determined Br Or Ber) Was Determined Based On: _____________________________. Awardee Info And Performance Location
- Awardee Cage: _____________
- Inspection & Acceptance Cage (if Not The Same As The Awardee Cage): _______________
- Facility/subcontractor Cage (where The Asset Should Be Shipped), (if Not The Same As The Awardee Cage): __________ Iot Compare Repair Price To Price To Buy New
- New Unit Price: $_________________
- New Unit Delivery Lead-time: ________________ Days
important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A
price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section
shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $_______________ Up To A Maximum Of $_________________.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;21877 6869451-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n7m2.25|bwn|see Email|marcus.a.hill21.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving||tbd|n00104|tbd|tbd|see Schedule|see Schedule|see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
critical Safety Item (aug 2011)|4|all Items In The Schedule||||
option For Increased Quantity (mar 1989)|1|365 Days|
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334412|750 Employees||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
if Your Company Has A Basic Ordering Agreement (boa) For The Items Under This Solicitation, The Following Applies To This Solicitation And The Resultant Contract:
this Solicitation �resultant Order� Is Issued Under And Pursuant To The Provisions Of The Basic Ordering Agreement (boa). The Terms And Conditions Of The Agreement Are Hereby Incorporated By Reference And, Except As Provided Herein By This Order, Remain In Full
force And Effect. If Any Conflict Arises In The Terms Of This Solicitation �resultant Order� Order Versus The Terms In The Boa, Theterms Of The Boa Shall Apply. Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: 83 Days
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The
option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;53711 5190104;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n7m3.11|anc|7176055415|nicole.diehl@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|combo|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
option For Increased Quantity (mar 1989)|1|365 Days|
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|325998|650||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
all Freight Is Fob Origin.
this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
the Government Is Seeking A Repair Turnaround Time (rtat) Of: ________
government Source Inspection (gsi) Is Required.
please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work.
your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days
if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to
exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As "awardee Cage": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As "awardee Cage":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________
all Pricing Is Firm. Please Consider The Following When Providing Price:
include Repair Price With All Costs Associated With Receipt And Complete Repair Of Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts And Wear Damage.
the Government Intends To Add An Option Quantity To The Resultant Contract. In Reference To The Option Quantity, The Government May Increase The Quantity Of Supplies Called For In The Schedule At The Unit Price Specified. The Contracting Officer May Exercise The
option By Written Notice To The Contractor Within The Number Of Days In Far 52.217-6 Herein. Delivery Of The Added Items Shall Continue At The Same Rate As The Like Items Called For Under The Contract, Unless The Parties Otherwise Agree.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Module,lo Hpoi .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
3. Requirements
3.1 Cage Code/reference Number Items - The Module,lo Hpoi Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be
performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor
or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;93346 8494301-1 03538 8494301-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-130, Rev N, 16 Nov 2012; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
8751-8760 of 8898 active Tenders