Valve Tenders
Valve Tenders
South Eastern Railway - SER Tender
Scraps
Ireps
India
Closing Date20 Mar 2025
Tender AmountRefer Documents
Description: Lot No: Ws/ayma/66/02/24-25/bg/cond./4w/8w/wgn. Description- Iron And Steel Scrap Cutup Parts Of Bg Cond/4w/8w/wgn. Without Contents If Any. 1) Se 10079670806 Boxnm1 (nlb) 2) Se 10079560787 Boxnm1 (nlb) 3) Ne 30048960080 Bcnm1 (nlb) 4) Cr 30018962595 Bcnm1 (nlb) 5) Sc 25099460795 Boxnr (nlb) Steel Body 6) Sc10099508097 Boxnm1 ( Nlb-01 & Wm- 01 ) 7) Se 10079560510 Boxnm1 (wm) 8) Cr 30018962229 Bcnm1 (wm) 9) Se 93077360009 Mboxn (uic) 10) Cr 85019460311 Bvzc. Nb: (1): I) Wagons Are To Be Sold Without 11 Nos. Nlb Trolleys Against Srl. No. 01 To 06 -01. Ii) Wagon To Be Sold With 05 Nos. Wm Trolley Against Srl No. 06 -01 To 08 . Iii) Wagon To Be Sold With 02 Nos. Uic Trolley Against Srl No. 09. Iv) Wagon Serial No. 01 To 09 To Be Sold Without 36 Nos. Wheel Sets With Ctrb, Brake Cylinder Complete, Brake Gear Complete, Hand Brake Set Complete With Connecting Link, Bush, Seam Less Pipe With Fitting For Air Brake Equipment, Distributor Valve, Apm Valve,sab, Coupler Body With Shank Wear Plate, Knuckle, Knuckle Pivot Pin, Coupler Yoke, Yoke Pin, Yoke Pin Support With Wear Plate, High Capacity Draft Gear With Draft Gear Follower Etc And Other Excluded Fitting As Per Latest Excluded Fitting List* V) Wagon Serial No. 10 To Be Sold Without 02 Nos. R/b Wheel Sets , Axle Box Cover Plate , Bg Spring And Brake Gear With Lever Pull Rod Etc . As Per Latest Fitting List . *( It Contains No Trolley )* *excluded Fittings List Letter No. M2/c-19/e.ftg/ 1302 Dt.25.10.2023, Nb(2): Special Condition For Rolling Stock- A) All Excluded Materials Including Wheel Sets And Nlb Trolleys Are To Be Handed Over By The Purchaser At The Nominated Location Suggested By The Concerned Sse For Which They Have To Arrange Labour,tools & Equipment For Loading Of The Excluded Items From Cutting Site And Then Transport It To Nominated Location By Their Own Arrangement/vehicle. They Have To Unload And Stack The Excluded Materials By Their Own Arrangement Including Labour And Hand Over The Same To Concern Stock Holder With Clear Acknowledgement. (b) The Excluded Fittings Should Be Kept Away From The Cutting Lines And Adjacent Areas So That Future Grounding Of Rolling Stock Is Not Hampered In Any Way. The Delivery Of Cut Pieces Of Last 10 Percent Of Lot Size (subject To Minimum Of 01 No. Rolling Stock) Will Commence Only When All Excluded Fittings Arisen Out Of Sold Lot Has Been Successfully Handed Over To Custodian. (c) Delivery Witnessing Official Will Record Following Certificate On Sale Delivery Register. ¿purchaser Has Cleared All Nil Value Item Arisen After Cutting Of Sold Rolling Stock And There Is No Left Over Available At Cutting Site. (d) The Rolling Stock May Either Be On The Cutting Line Or Grounded And May Or May Not Have Trolleys/wheel Set Attached But The Purchaser Needs To Shift To Concerned Location As Advised By Concerned Sse. (e)the Purchaser Is Required To Take Adequate Safety Measures So That No Railway Property In Near Vicinity Of The Cutting Spot/ Loading Point And Unloading Point Is Damaged In Any Way. The Purchaser Will Be Responsible For Any Damage/fire Accident To The Railway Property Caused During Operation And Delivery, And Also He Will Be Solely Responsible Of Any Loss Applied (railway Employee Or Any Other Person) Caused Due To Any Activities Involved While Dismantling /cutting, Transportation Loading And Unloading Of All Excluded Fittings Of The Wagons. Including Wheel Sets And Trolleys. Nb: (3) Delivery Will Be Given In Numbers.
South Eastern Railway - SER Tender
Scraps
Ireps
India
Closing Date25 Mar 2025
Tender AmountRefer Documents
Description: Lot No. Ws/ayma/69/02/24-25/bg/cond./4w/8w/wgn. Description - Iron And Steel Scrap Cutup Parts Of Bg Cond/4w/8w/wgn. Without Contents If Any. 1) Sc 25099409329 Boxnr ( Nlb) Steel Body. 2) Se 30078961637 Bcnm1 (nlb) 3) Se 10079463750 Boxnm1 (nlb) 4) Sr 30069004527 Bcnm1 (nlb) 5) Wr 25089660082 Boxnr (nlb) Steel Body. 6) Sc 25099560570 Boxnr (nlb) Steel Body. 7) Se 10079671414 Boxnm1 (wm) 8) Er 25029564890 Boxnr (wm) Steel Body. 9) Se 10079723670 Boxnr (wm) Steel Body. 10) Se 85079560174 Bvzc. Nb: (1): I) Wagons Are To Be Sold Without 12 Nos. Nlb Trolleys Against Srl. No. 01 To 06. Ii) Wagon To Be Sold With 06 Nos. Wm Trolley Against Srl No. 07 To 09. Iii) Wagon Serial No. 01 To 09 To Be Sold Without 36 Nos. Wheel Sets With Ctrb, Brake Cylinder Complete, Brake Gear Complete, Hand Brake Set Complete With Connecting Link, Bush, Seam Less Pipe With Fitting For Air Brake Equipment, Distributor Valve, Apm Valve,sab, Coupler Body With Shank Wear Plate, Knuckle, Knuckle Pivot Pin, Coupler Yoke, Yoke Pin, Yoke Pin Support With Wear Plate, High Capacity Draft Gear With Draft Gear Follower Etc And Other Excluded Fitting As Per Latest Excluded Fitting List* Iv) Wagon Serial No. 10 To Be Sold Without 02 Nos. R/b Wheel Sets, Axle Box Cover Plate, Bg Spring And Brake Gear With Lever Pull Rod Etc . As Per Latest Fitting List . **excluded Fittings List Letter No. M2/c-19/e.ftg/ 1302 Dt.25.10.2023, Nb(2): Special Condition For Rolling Stock- A) All Excluded Materials Including Wheel Sets And Nlb Trolleys Are To Be Handed Over By The Purchaser At The Nominated Location Suggested By The Concerned Sse For Which They Have To Arrange Labour,tools & Equipment For Loading Of The Excluded Items From Cutting Site And Then Transport It To Nominated Location By Their Own Arrangement/vehicle. They Have To Unload And Stack The Excluded Materials By Their Own Arrangement Including Labour And Hand Over The Same To Concern Stock Holder With Clear Acknowledgement. (b) The Excluded Fittings Should Be Kept Away From The Cutting Lines And Adjacent Areas So That Future Grounding Of Rolling Stock Is Not Hampered In Any Way. The Delivery Of Cut Pieces Of Last 10 Percent Of Lot Size (subject To Minimum Of 01 No. Rolling Stock) Will Commence Only When All Excluded Fittings Arisen Out Of Sold Lot Has Been Successfully Handed Over To Custodian. (c) Delivery Witnessing Official Will Record Following Certificate On Sale Delivery Register. ¿purchaser Has Cleared All Nil Value Item Arisen After Cutting Of Sold Rolling Stock And There Is No Left Over Available At Cutting Site. (d) The Rolling Stock May Either Be On The Cutting Line Or Grounded And May Or May Not Have Trolleys/wheel Set Attached But The Purchaser Needs To Shift To Concerned Location As Advised By Concerned Sse. (e)the Purchaser Is Required To Take Adequate Safety Measures So That No Railway Property In Near Vicinity Of The Cutting Spot/ Loading Point And Unloading Point Is Damaged In Any Way. The Purchaser Will Be Responsible For Any Damage/fire Accident To The Railway Property Caused During Operation And Delivery, And Also He Will Be Solely Responsible Of Any Loss Applied (railway Employee Or Any Other Person) Caused Due To Any Activities Involved While Dismantling /cutting, Transportation Loading And Unloading Of All Excluded Fittings Of The Wagons. Including Wheel Sets And Trolleys. Nb: (3) Delivery Will Be Given In Numbers.
Eastern Railway - ER Tender
Ireps
India
Closing Soon17 Mar 2025
Tender AmountRefer Documents
Description: Cond. Wagon Sl No. [1] Er 98028808814, Type- Bfkhn, [2] Sr 98068060012, Type- Bfkn, [3] Cr 30018864752, Type- Bcnm1, [4] Cr 30018704263, Type- Bcnm1, [5] Sr 30068861084, Type- Bcnm1, [6] Cr 30018804215, Type- Bcnm1, [7] Cr 30018862345, Type- Bcnm1, [8] Cr 30018764878, Type- Bcnm1. Excluded Items Of Wagons Sl No-1 And Sl No-8 Are As Follows: 1) Wheel Set With Axle- 04 Nos. (one No Wheel Set With Axle Consists Of Two Wheel Disc & One Axle), 2) Ctrb-08 Nos, (3) Brake Cylinder-01 No, 4) Draft Gear- 02 Nos, 5) Coupler Body-02 Nos, 6) Yoke- 02 Nos, 7) Yoke Pin-02 Nos, 8) Yoke Supporting Plate- 02 Nos, 9) Yoke Pin Support Plate- 02 Nos, 10) All Sorts Of Bolster Springs, 11) Distributor Valve (ci)- 01 No, 12) Slack Adjuster- 01 No, 13) Hand Brake Wheel-02 Nos, 14) Knuckle- 02 Nos, 15) Anchor Plate With Safety Plate- 02 Nos, 16) Brake Beam Complete For Casnub Bogie- 04 Nos, 17) Equalising Lever With Bush- 04 Nos, 18) Bogie Brake Push Rod- 02 Nos, (nb-apm-not Included As A Excluded Item As This Item Is Not Fitted In The Aforesaid Wagon.) Excluded Items Of Wagon Sl No-2 To Sl No-7 Are As Follows: 1) Wheel Set With Axle- 04 Nos. (one No Wheel Set With Axle Consists Of Two Wheel Disc & One Axle), 2) Ctrb-08 Nos, (3) Bogie-02 Nos (cusnub 22 Nlb), 4) Brake Cylinder-01 No, 5) Draft Gear-02 Nos, 6) Coupler Body-02 Nos, 7) Yoke- 02 Nos, 8) Yoke Pin-02 Nos, 9) Yoke Supporting Plate- 02 Nos, 10) Yoke Pin Support Plate- 02 Nos, 11) All Sorts Of Bolster Springs, 12) Distributor Valve (ci)- 01 No, 13) Slack Adjuster- 01 No, 14) Hand Brake Wheel- 02 No, 15) Knuckle- 02 Nos, 16) Anchor Plate With Safety Plate- 02 Nos, 17) Brake Beam Complete For Casnub Bogie- 04 Nos, 18) Equalising Lever With Bush- 04 Nos, 19) Bogie Brake Push Rod- 02 Nos. (nb-apm-not Included As A Excluded Item As This Item Is Not Fitted In The Aforesaid Wagons.) Nb: Bogies (02 Nos) Not Included In The Excluded Items Of Wagon Sl No-1 And Sl No.-8 As This Wagon Is Fitted With Casnub 22w(m)- Bogies With Wide Horn Which Are No Longer In Use In Any Of The Current Design Wagon Vide Edme/frt/rly Bd's L/no-2018/m(n)/60/4, Dated-14/11/2019 & This Wagon Should Be Sold & Disposed With Bogies. The Wagons Are To Be Disposed Off Except Excluded Items Vide Crse/kkk's L/no. Mc/300/pt.xx, Dt. 10.04.2024. Wagon Sl No-2 To 7 Will Be Sold Without Bogies & Wagon Sl No-1 And Sl No-8 Will Be Sold With Bogies. Excluded Items As Mentioned Above Are To Be Returned To The Custodian By The Purchaser During Return Over Programme.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Soon17 Mar 2025
Tender AmountRefer Documents
Description: Contact Information|4|n741.6|gdh|n/a|tyreese.c.smith.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice And Receiving Report ||tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|332919|750 Emp||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
all Freight Is Fob Origin. Any Resulting Contract Will Be In Accordance To The Terms And Conditions Of Thebasic Ordering Agreement #n0010424gz901
the Resultant Award Of This Repair Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
government Source Inspection (gsi) Is Required.
your Quote Should Include The Following Information: Quote Amount And Rtat
unit Price:__________
total Price:__________
repair Turnaround Time (rtat): _______ Days
repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth
regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This
contract.
return Material Authorization # (rma), If Applicable:__________ Awardee Info & Performance Location
awardee Cage: __________
inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________
facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Valve,linear,direct .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=mil-std-130 | | |k |000115|a| | |
3. Requirements
3.1 Cage Code/reference Number Items - The Valve,linear,direct Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall
be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other
contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures.
cage___ref. No.
;78062 3189120-33;
3.2 Marking - This Item Shall Be Physically Identified In Accordance With Mil-std-130.
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
2831-2840 of 3732 active Tenders