Ups Tenders

Ups Tenders

U S COAST GUARD USA Tender

Machinery and Tools...+1Chemical Products
United States
Details: This Is To Be Awarded Lowest Price Technically Acceptable general Requirements 1. Scope  1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.  2. References  coast Guard Drawings  none.  coast Guard Publications  surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements  other References  none. 3. Requirements  3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.  3.2 Period Of Performance. The Period Of Performance For This Work Is 10mar2025-28may2025 3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501. 12314_mla_1224_418 item 1: Tanks (potable Water), Clean And Inspect 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Tank(s): table 1 - List Of Tanks type Of Tank location capacity - 95% (gallons) tank Content Disposal (gallons) potable Water 3-68-3-w 5,916 311 potable Water 3-68-4-w 5,916 311 1.2 Government-furnished Property. none. 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-022, Rev B, Tank Sounding And Moment Of Inertia Tables (asc085013b) (wmsl 751) Only coast Guard Drawing 750-wmsl-100-37, Rev H, Unit 3120 Structure - 1st Platf To 2nd Dk - Fr 64 To Fr 76 (asc100312) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Drawing 750-wmsl-530-001, Rev G, Potable Water Systems Diagram (asc530001) coast Guard Drawing 750-wmsl-530-019, Rev E, Potable Water Unit 3120 (asc530312-pw) coast Guard Publications commandant Instruction Manual M5100.47 (comdtinst M5100.47 (series)), Safety And Environmental Health Manual surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirement For Preservation Of Ship Structures other References american National Standards Institute/american Water Works Association (ansi/awwa) C652, 2019, Disinfection Of Water-storage Facilities the Society For Protective Coatings (sspc) Surface Preparation Specification No.1 (sspc-sp 1), 2016, Solvent Cleaning 3. Requirements 3.1 General. 3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s): · 3.7 Inspection 3.1.2 Tech Rep. none 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: fluid Contents piping ro System Components deck Grating note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of The Equipment Listed Below To Demonstrate Existing Operational Condition. Submit A Cfr. test Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). potable Water Pumps 3.3 Tank Opening. The Contractor Must Open And Ventilate The Confined Spaces In Accordance With Sflc Std Spec 0000, Paragraph 3.3.1.1 (temporary Ventilation) And 3.3.1.2 (confined Or Enclosed Space Entry And Hot Work). The Contractor Must Provide Fall Protection To Cover Tank Manhole Cover When Opened For Ventilation/work. 3.4 Tank Content And Waste Disposal. The Contractor Must Dispose Of Residual Tank Contents Listed In Table 1 And Any Cleaning Fluids In Compliance With All Applicable Federal, State, And Local Laws, Ordinances And Regulations. Notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. Document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. Submit Chain Of Custody Record To The Cor Upon Completion Of Work. 3.5 Temporary Plugs. The Contractor Must Plug All Inlet And Outlet Piping In The Tank To Prevent Contaminants From Entering The Tank Or Piping System. Use Plugs With An Attached Lanyard, Ring Or Other System That Will Ensure Plugs Are Not Lost In The Pipe Openings. 3.5.1 Plug Log. The Contractor Must Keep A Written Record Of All Installed Plugs. Keep A Separate List For Each Tank. Maintain A Plug Accountability Log Posted Immediately Outside The Tank To Prevent Any Of The Installed Temporary Plugs From Being Lost Inside The Tank Or Left Behind Inside At Tank Closure. The Log Must Include The Type And Size Of Each Plug, Installation Date, And Removal Date. Submit This Log To The Cor After Completion Of Work Item Via A Cfr. 3.5.2 The Contractor Must Ensure That All Plugs Are Removed From Each Tank Upon Completion Of Work In The Tank. 3.6 Tank Cleaning. The Contractor Must Clean All Designated Tank Interior Surfaces Free Of All Foreign Materials, Such As Residual Water, Sediment, Sludge, Rust, Or Biological Growth, Taking Care Not To Damage The Coating System (if Applicable). 3.6.1 The Contractor Must Accomplish All Requirements Of Sflc Std Spec 6310, 3.1.6.4 (surface Contaminant Removal) To Achieve The Cleanliness Requirements Of Sspc-sp 1, Including A Low-pressure (maximum 5,000 Psi) Freshwater Wash Down Of The Surfaces When Possible. 3.6.2 Remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. Remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. Wipe The Interior Tank Structure Dry And Free Of All Cleaning Agents. 3.7 Inspection. The Contractor Must Visually Inspect All Tank Interior Surfaces, Including, But Not Limited To Bulkheads, Floor And Overhead Plating, Structural Members, Manhole Cover Surfaces, Fasteners And Gasket Seating Surfaces. Submit A Cir With A Description Of The Following, As Applicable: tank Structural Condition. manhole And Cover Condition. ladder Condition (if Applicable). condition Of Tank Coating, Including Dimensions, Percentage, Location, And Type Of Coating Failure. tank Level Indicator (tli) And/or Float Switch Condition. sounding/vent Tube And Striker Plate Condition. suction And Discharge Piping Condition. fastener Material And Condition. zinc Anode Condition (if Applicable) pit Measurements ultrasonic Thickness (ut) Measurements suction And Discharge Piping Condition inaccessible Areas (if Applicable) 3.7.1 Pit Measurements. The Contractor Must Measure100pitswithin Each Tank/location Listed In Table 1, In Accordance With Sflc Std Spec 0740, Paragraph 3.13 (evaluation Of Pitting Corrosion). The Results Of These Measurements Must Be Included In The Inspection Report, Showing Where Pit Measurements Were Taken And The Depth Of The Pit. 3.7.2 Ultrasonic Thickness (ut) Measurement. The Contractor Must Take Ut Measurements In The Surrounding Area Of Any Pit Measuring Greater Than 25% Of Plate Thickness. Ut Measurements Must Be Taken In The Four Quadrants At An Equal-distant Radius From The Pit Center Until Full Plate Thickness Is Measured. For Bidding Purposes, Assume 200 Ut Measurements Per Tank Listed In Table 1. Ut Measurements Must Be Conducted In Accordance With Sflc Std Spec 0740, Appendix C, Using Coast Guard Drawing 750-wmsl-100-37 As Guidance. The Results Of These Measurements (original Thickness, Measured Thickness, And Any Observed Cracks) And The Locations Where They Were Taken Must Be Included In The Inspection Report. 3.8 Substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Small Corrosions (i.e. Pits < 25% Or Corrosions < 25%). As Designated By The Cor, The Contractor Must Repair Small Pin Holes, Shallow Pitted Substrates (with Remaining Plate Thicknesses Over 75% Of Required Plate Thicknesses), And Fair Corroded Substrates (with Remaining Cross Sections Over 75% Of Required Cross Section Areas), After Removing Coating In Accordance With Sflc Std Spec 6310 And Manufacturers’ Instructions. procure 2 Kits Of Epoxy Fairing Compounds (e.g. Belzona 1111, 0.5 Gallon/5 Kg Kit Or Equivalent) To Conduct Repairs. turn Over All Unused Kits To The Cor. 3.8.1 Ensure The Filling Epoxy Is Compatible With Drinking Water. note “substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Corrosions (i.e. Pits < 25% Or Corrosions < 25%)” Is A Supplement Barrier Intending To Help Delay Penetration. 3.9 Disinfection Preparations. In Preparation For Disinfecting The Potable Water Tank, The Contractor Must Accomplish The Following Tasks: 3.9.1 The Contractor Must Notify The Cor Of Their Intention To Disinfect The Tank 5 Days Ahead Of Time. 3.9.2 Upon Completion Of All Inspections, Repairs, Coatings And Cure Times, The Contractor Must Leave The Tank Open For 24 Hours 3.9.3 Once 24 Hours Has Elapsed, The Contractor Must Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Submit A Cfr With The Completed Plug Log. 3.9.4 Conduct A Final Inspection In The Presence Of A Coast Guard Inspector To Ensure That No Foreign Objects Or Plugs Have Been Left In The Tank. Submit A Cfr Documenting This Final Inspection. 3.9.5 Ensure That No Foreign Objects Enter The Tank Between The Final Inspection And The Tank Disinfection. 3.9.6 The Contractor Must Verify With The Ship’s Health Services Technician Or Medical Liaison, Or A Contractor Supplied Marine Chemist, That Water Supplied For Disinfection Process Meets All Uscg Requirements For Consumption Per Comdtinst M5100.47 Chapter 25. 3.10 Tank Disinfecting. The Contractor Must Disinfect And Treat The Affected Potable Water Tank(s) And Associated Disturbed Piping And Components, As Necessary, To Meet Or Exceed The Requirements Of Awwa C652. 3.10.1 Any Of The Three Methods Of Chlorination Listed In Section 4.3 Of Awwa C652 Is Acceptable, But If Method 1 Is Utilized, Then The Retention Period Must Be 24 Hours. 3.10.2 Appendix B Of Awwa C652 Shows The Chlorine Doses For A Variety Of Disinfection Methods. 3.10.3 Remove And Dispose Of Disinfection Fluids And Flushing Water In Accordance With Paragraph 3.4. Ensure That No One Enters The Tanks Once Disinfection Is Completed. 3.10.4. Tank Closing. At The Earliest Opportunity During The Disinfection Process, The Contractor Must Close The Tank Manhole Cover(s) Using New Gasket Material In Accordance With Coast Guard Drawing 750-wmsl-167-001. Chase Threads On Studs To Ensure Even Installation Of The Access Covers. Renew All Nuts, Washers, And Cotton Grommets (including Those That Are Missing) In Accordance With Coast Guard Drawing 750-wmsl-167-001. 3.10.5 Ship’s Force Will Refill The Tanks With Potable Water Upon Completion Of Disinfection And Flushing Process. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.11 Operational Test, Post Repairs. After Completion Of Work And In The Presence Of The Coast Guard Inspector, The Contractor Must Thoroughly Test And Demonstrate The Equipment Listed Below To Be In Satisfactory Operating Condition. Submit A Cfr. test Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). potable Water Pumps 3.12 Water Quality Verification. The Contractor Must Conduct Halogen Residual, Ph, And Bacteriological Testing Of The Water System For Consumption At The Point-of-use (sinks, Water Fountains, Etc) And Verify With Ship’s Health Services Technician, Medical Liaison, Or Marine Chemist That Potable Water Meets All Uscg Requirements Per Comdtinst M5100.47 Chapter 25. The Contractor Must Clean The Tank Until The Water Passes These Tests. Submit Cfr. 4. Notes this Section Is Not Applicable To This Work Item. 63110_mla_1224_418 item 2: Tanks (potable Water), Preserve (partial) 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Prepare And Coat 33% Of The Surfaces Of The Following Tank(s): table 1 – List Of Tanks location type topcoat Color preserve Level 3-68-4-w potable Water match Existing partial 3-68-3-w potable Water match Existing partial 1.2 Government-furnished Property. none. 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 418a-wmsl-530-001, Rev C, Potable Water Systems Diagram coast Guard Drawing 750-wmsl-085-022, Rev B, Tank Sounding And Moment Of Inertia Tables (asc085013b) (wmsl 751) Only coast Guard Drawing 750-wmsl-100-37, Rev H, Unit 3120 Structure - 1st Platf To 2nd Dk - Fr 64 To Fr 76 (asc100312) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Drawing 750-wmsl-530-019, Rev E, Potable Water Unit 3120 (asc530312-pw) coast Guard Publications surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures surface Forces Logistics Center Standard Specification 8636 (sflc Std Spec 8636), 2022, Temporary Hull Accesses other References the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2016, Bare Metal Power Tool Cleaning 3. Requirements 3.1 General. 3.1.1 Cir. none. 3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative To Accomplish The Following On Site: serve As An Independent Coating Tech Rep. Provide The Services Of An Ampp Certified Coating Inspector (nace Cip Level 2) With Marine Coating Inspection Specialty.. accomplish Applicable Requirements In Sflc Std Spec 0000, Paragraph 3.2.4.2.2 (coating Tech Rep). oversee The Preservation Plan Requirements In Sflc Std Spec 6310, Paragraph 3.2 (preservation Plan). review And Sign Daily Reports Summarizing Work. See Forms Qa-1 Thru Qa-5 Provided In The General Requirements. 3.1.2.1 Qualifications/certifications. The Contractor Must Submit The Coating Tech Rep’s Name, Qualifications/certifications, And Certificate Number(s) To The Contracting Officer Prior To Contract Award.. note this Work Item Requires The Use Of An Nace-certified Tech Rep.the Use Of A Qp-1 Certified Company/contractor Alone Is Not Sufficient. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: tlis piping ro System Components deck Grating 3.1.5 Temporary Access Openings. Due To Limited Access To Work Areas, The Contractor May, With Express Permission Of The Ko (via Submission Of A Cfr), Cut Access Holes To Facilitate Accomplishment Of The Work Specified Herein. Perform All Work Required To Open And Close The Access Openings In Accordance With Sflc Std Spec 8636. 3.1.6 Work Plan. The Contractor Must Provide A Work Plan (preservation Plan Including Protection Plan) For The Tank Preservation Listed In Table 1 In Accordance With Sflc Std 6310, Paragraph 3.2 (preservation Plan) To The Contracting Officer On The First Day Of Contract’s Period Of Performance. 3.1.6.1 Pre-work Preservation Conference. Prior To The Start Of Any Preservation Work, The Contractor Must Facilitate A Conference Meeting With The Ko, Cor, Coast Guard Inspector(s), Contractor And Contractor's Representative Able To Speak To Technical Preservation Details And Requirements. qc/qa Program. The Requirements Of Sflc Std Spec 0000 3.2.4.2.2.3, Contractor's Qc/qa Program (as Outlined In Sflc Std Spec 0000, 3.2.4 Qc/qa Program), material Receipt Conformance (as Outlined In Sflc Std Spec 6310, 3.1.1.2 Material Receipt Conformance), preservation Plan (as Outlined In Sflc Std Spec 6310, 3.2 Preservation Plan), Sflc Std Spec 6310 3.1.1.3.1 And 3.1.9 Must Be Formally Reviewed And Approved By The Ko, pds And Sds. Only Submit Manufacturer's Product Data Sheets (pds) And Safety Data Sheets (sds) If Navsea Approved Astm F718 Sheets Are Not Available. 3.2 In-process Quality Control Measures. The Contractor Must Abide By All The Safety, Preservation, And Quality Control Requirements Specified In Sflc Std Spec 0000, Paragraph 3.2.4.2 (in-process Qc Measures For “critical-coated Surfaces”). Surfaces Being Preserved Are Considered “critical-coated Surfaces”. All Qa Forms And Nace Ii Reports Must Be Submitted To The Cor For Review No Later Than 24 Hours After Completion Of Work. 3.2.1 Daily Reports. At The Conclusion Of Each Work Day , The Contractor Must Provide Daily Reports Generated And Signed By The Coating Tech Rep. Daily Reports Must Summarize Work Accomplished That Current Day, Work To Be Accomplished The Following Day, Any And All Materials Used During Work That Day, Any And All Readings Taken And/or Data Collected (i.e. Environmental Readings, Dft, Wft, Etc…) Identifications Of Work Locations, Time And Type Of Any Inspections Conducted With The Results Of Such Inspection(s) And Must Also Include Descriptions Any Events Of Non-conformance In Relation To The Specification, Applicable References, Standards, And Technical Data Sheets (i.e Astm F718s). 3.2.2 Environmental Readings. Environmental Readings Must Be Accomplished Within The Agreed Upon Hours According To The Interval Outlined In Sflc Std Spec 6310, Appendix D3.1. 3.3 Surface Preservation. The Contractor Must Prepare And Coat 33% Of All Tank Interior Surfaces (including Internal Surfaces Of Manhole Cover(s), Manhole Cover Hull Ring(s) Extending Outward To The Weld Line That Ties The Hull Ring Into The Tank Plating On The Tank Exterior). 3.3.1 Power Tool Clean All Affected Surfaces To “bare Metal” In Accordance With Sspc-sp 11, In Lieu Of Using Abrasive Blasting; And Feather Edges Of Existing Intact Coating To The Prepared Areas, In Order To Provide A Smooth Transition With The New Paint. 3.3.2 Inspection. The Contractor Must Inspect All Cleaned Surfaces And Exposed Substrates Of Areas In Tanks Listed In Table 1 (after Removing/cleaning Surface Covering/coatings And Prior To Priming Substrates) In Accordance With Sflc Std Spec 6310 3.1.8.1 Surface Cleanliness Evaluation – Visual Standards. Submit A Cfr. 3.3.3 Waste And Debris Removal. The Contractor Must Remove All Waste And Debris Generated By The Tank Preservation Process (surface Preparation, Substrate Cleaning, Priming, And Coating). Waste And Debris Must Be Disposed Of In Accordance With Sflc Std Spec 6310, Paragraph 3.1.8.2 (debris Removal And Disposal), Sflc Std Spec 0000, And All Applicable Federal, State, And Local Laws, Ordinances And Regulations. 3.3.4 The Contractor Must Coat The Prepared Surfaces Using The System Specified For "tanks And Voids (potable Water Tanks)" In Sflc Std Spec 6310, Appendix B (cutter And Boat Interior Painting Systems). Select Finish/topcoat Color To Match Existing Adjacent Surfaces. 3.4 Curing. The Contractor Must Ensure Tanks Are Cured In Accordance With The Manufacturer’s Instructions For Nsf/nehc Certification Under The Same Conditions Before Being Filled. note typical Curing Times Are At Least 4 Days, And Range Up To 14 Days Or Longer, Depending On The Paint Selected, Amount Of Surface Area Covered, And Environmental Conditions. See Paint Manufacturer’s Recommendations For Specific Application. caution verify Application And Cure Requirements With Paint Manufacturer Prior To Paint Purchase And Application. Lack Of Attention To Environmental Conditions Can Adversely Impact Paint System Cure, Cause Unnecessary Contract Time Delays, And Negatively Impact Crew Health And Vessel Habitability When Tanks Are Put Back Into Service. do Not Assume Paint Product Data Sheet To Be Accurate. Contact Paint Manufacturer Directly To Verify, As Formulations Change And New Application Information May Be Available. 3.4.1 The Contractor Must Rinse Freshly Painted Potable Water Tanks At Least Twice With Freshwater Before Being Disinfected And Put Into Service. 3.5 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310, Paragraph 3.1.13 (touch-ups And Minor Coating Repairs). 4. Notes this Section Is Not Applicable To This Work Item 53310_mla_0624_418 item 3: Potable Water Pneumatic Tank, Clean And Inspect 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Potable Water Pneumatic Tank(s): table 1 – Pneumatic Tank Information service location capacity (gallons) pressure (psig) potable Water Hydro-pneumatic Tank 3-64-0-e 280 100 1.2 Government-furnished Property. mti item Description nsn/pn qty estimated Cost ($/unit) n bladder, Water nsn: 4510-01-601-2564 p/n: 660603996 1 Ea. $2,936 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-530-001, Rev C, Potable Water Systems Diagram coast Guard Drawing 750-wmsl-530-019, Rev E, Potable Water Unit 3120 (asc 530312-pw) coast Guard Publications coast Guard Technical Publication S6435-tl-mmi-010, 15 February 2015, Angle Relief Valve, Type D50 – Description, Operation, And Maintenance – Rev 9 coast Guard Technical Publication (tp) 7082, Swbs 533, Dec 2020, Potable And Chilled Water Tanks surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References nsf International (nsf) 61/600, 2024, Drinking Water System Components - Health Effects american National Standards Institute/american Water Works Association (ansi/awwa) C652-19, 2020, Disinfection Of Water-storage Facilities 3. Requirements 3.1 General. 3.1.1 Cir. none. 3.1.2 Tech Rep. none. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, (interferences). Known Interferences Include, But Are Not Limited To The Following: piping, Hoses, And Supports water 3.1.4.1 Tank Residual Fluids. Remove And Dispose Of All Tank Residual Fluids In Accordance With All Applicable Federal, State, And Local Laws And Regulations. 3.1.5 Work Locations. The Concerned Work Areas Are Listed In Table 1. See The Applicable Drawings In Section 2 References For Guidance, Locations, And Details. 3.1.6 Materials, Tools, And Services. The Contractor Must Provide Service, Tools, And Materials To Accomplish The Requirements In This Work Item. New Components, Parts, Materials, And Paints With The Same Color, Comparable And Matching Material Properties As The Existing Components/parts. Use References In Sections 1, 2 And Sflc Std Specs For Guidance, Required Materials, And Details. 3.2 Preparation. The Contractor Must Depressurize And Drain The Designated Tank(s) In Table 1 Before Performing Any Work On Them. Dispose Of All Fluids In Accordance With All Applicable Federal, State, And Local Environmental Regulations. Do Not Drain Any Fluids (including Fresh Water) Into Any Space, Bilge Or Exterior Location. note do Not Drain Any Fluids (including Fresh Water) Into Any Space, Bilge Or Exterior Location. 3.3 Operational Test – Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. note coast Guard Personnel Will Operate All Shipboard Equipment And Machinery. 3.4 Cleaning Requirements. The Contractor Must Clean The Tank As Follows: clean All Tank Structure’s Interior Surfaces Free Of All Foreign Materials, Sediment, And Sludge. remove All Persistent Residues, Taking Care Not To Damage The Tank Coating System. remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. collect, Contain, And Dispose Of All Wash Media, Residues, And Cleaning Materials In Accordance With All Federal, State, And Local Laws, Ordinances, And Regulations. 3.4.1 Tank Content And Waste Removal. The Contractor Must Dispose Of Residual Tank Contents And Any Cleaning Fluids In Accordance With All Applicable Federal, State, And Local Laws, Ordinances, And Regulations. notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. submit Document To The Cor Upon Completion Of Work. 3.5 Visual Inspection. The Contractor Must Clean And Visually Inspect The Internal And External Surfaces Of Each Tank For Signs Of Corrosion, Pitting, And Other Damage. If Required By The Pneumatic Tank’s Construction, The Contractor Must Provide And Use A Borescope During The Visual Inspection. Submit A Cfr. 3.6 Surface Preservation. If A Change Request Has Been Authorized And Released, The Contractor Must Prepare And Coat Each Tank’s Interior Surfaces Using The System Specified For “tanks And Voids (potable Water Tanks)” In Sflc Std Spec 6310, Appendix B (cutter And Boat Interior Painting Systems). If Preservation Is For Less Than 100 Percent Of Tank Interior Surfaces, Power Tool Clean All Affected Surfaces To “bare Metal” In Lieu Of Using Abrasive Blasting, And Feather Edges Of Existing Intact Coating To The Prepared Areas To Provide A Smooth Transition With The New Paint. 3.7 Renew Tank Air Bladder. The Contractor Must Renew The Air Bladder In Accordance With Tp 7082 With Provided Gfe. 3.8 Relief Valve Testing. The Contractor Must Remove, Clean, Inspect, Test, And Reinstall The Tank Relief Valve, Cpw-v-013. clean And Visually Inspect All Parts For Defects, Deterioration, Dirt, Scale, Rust, Grease, And Marine Growth. inspect All Valve Openings For Obstructions And Damage To The Valve Seat, Disc, And Body. use The Appropriate Test Fluid, Shop Test The Relief Valve To The Correct Lifting Pressure. ensure That The Valve Seats Correctly After Pressure Relief, Without Simmering, And With Zero Leakage Allowed. adjust The Valve Relief Pressure As Necessary To Obtain The Required Lifting Pressure. after Adjustment, Perform A Final Test To Confirm The Relief Valve's Lifting Pressure With The Coast Guard Inspector Present. reinstall The Relief Valve Upon Completion Of Testing. submit A Cfr With Test Results And All Data Plate Information. 3.9 Tank Closure. After All Authorized Repairs, The Contractor Must Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Submit A Cfr With The Completed Plug Log. 3.9.1 Conduct A Final Inspection In The Presence Of A Coast Guard Inspector To Ensure That No Foreign Objects Or Plugs Have Been Left In The Tank. Submit A Cfr Documenting This Final Inspection. 3.9.2 The Contractor Must Reinstall The Tank(s) To The Original Configuration With New Rubber Gaskets Conforming To Ansi/nsf 61. Renew All Fasteners With Stainless Steel. 3.10 Tank Disinfecting. The Contractor Must Disinfect And Treat The Affected Potable Water Tank(s) And Associated Disturbed Piping And Components, As Necessary, To Meet Or Exceed The Requirements Of Awwa C652. any Of The Three Methods Of Chlorination Listed In Section 4.3 Of Awwa C652 Is Acceptable, But If Method 1 Is Utilized, Then The Retention Period Must Be 24 Hours. appendix B Of Awwa C652 Shows The Chlorine Doses For A Variety Of Disinfection Methods. refill The Tanks With Potable Water Upon Completion Of Disinfection And Flushing Process. remove And Dispose Of Disinfection Fluids And Flushing Water In Accordance With All Applicable Federal, State, And Local Environmental Regulations. ensure That No One Enters The Tanks Once Disinfection Is Completed. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.11 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 4. Notes this Section Is Not Applicable To This Work Item.
Closing Date7 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Chemical Products
United States
Details: Sources Sought Notice Medical Waste Sterilizing Autoclave disclaimer this Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi. response Instructions: do Not Provide More Than 8 Pages, Including Cover Letter Page. submit Your Response Via Email To: Barron.long@va.gov submit Your Response Nlt 14:00 (mst) On Friday February 7th mark Your Response As Proprietary Information If The Information Is Considered Business Sensitive. va Has Identified The Appropriate North American Industry Classification System (naics) Code 332420 - Autoclaves, Industrial-type, Heavy Gauge Metal, Manufacturing With A Small Business Size Of 750 Employees. Please Identify And Explain Any Naics Codes Your Company Believes Would Better Represent The Predominated Work Included In The Attached Statement Of Work Draft / Salient Characteristics List; information Requested From Industry: in Response To The Sources Sought, Interested Contractors Shall Submit The Following Information And Any Capabilities/qualifications Statement To Include But Not Limited To An Overview Of Proposed Solution(s) And A Description Of The Product Your Company Possesses Accordance With The Statement Of Work Draft / Salient Characteristics List. vendor Name: sam Uei #: name Of Manufacturer: manufacturer Address: estimated Delivery Time: sac Fss Contract Number vendor Point Of Contract (poc) Name poc Phone Number: poc Email Address: statement Of Work introduction: the Autoclave Shall Be Delivered Within 120 Calendar Days After The Effective Date Of The Contract. Delivery Dates Specified May Be Adjusted By The Co To Coincide With The Date The Tcpf Will Be Ready To Receive Installation. The Co Will Advise The Contractor Of The New Delivery Date At Least 45 Days Prior To The Original Or Adjusted Delivery Date(s). Deliveries, Cranes, Or Haulage Will Be Arranged With The Contracting Officer Representative (cor), As To Not Interfere With Day-to-day Ancillary Va Medical Services Such As Nutrition/food Service, Laundry Delivery, Maintenance Routes, Etc. the Autoclave Shall Be Delivered Within 120 Days After The Effective Award Date. Installation Of The Autoclave Shall Take Place No More Than 30 Days After The Delivery Date. The 2 Days Onsite Shakedown And 1-day Onsite Training Are Included In The Installation Timeframe. Training Shall Consist Of Both Operator And Maintenance Personnel At A Minimum.â trainingsâ shall Not To Be Conducted Concurrently. The Total Contract Duration Is 150 Days. note: Installation Shall Be Continuous, Without Interruption, Monday Through Friday, Excluding Federal Holidays, Until All Installation And Testing Work Has Been Completed. Installation May Take Place On The Weekends If Pre-approval Is Given By The Cor. site Specific Project Requirements the Contractor Shall Furnish The Supervision, Labor, Equipment, Tools, Safety, Rigging, Hoisting, Supplies And Installation Services Necessary To Meet The Terms And Conditions In Accordance With The Statement Of Work (sow). this Sow Includes Removal Of Trade-in Equipment, Delivery, Installation, And Training Of The New Laundry Equipment Installed. The Equipment And Installation Shall Be Conducted In Conformance With The Sow And Technical Specifications Provided Herein. All Items Provided By The Contractor Shall Be New. The Contractor Shall Not Utilize Any Refurbished Equipment, Machinery, Or Parts. the Autoclave Is To Be Located Within Building 154, Near The Waste Removal Area. within The New Design Layout Of The Autoclave Area, The Contractor Shall Relocate Existing Lighting Fixtures, And Provide New Energy-efficient, Light-emitting Diode (led) Lighting For Any New Workstation Or Storage Area. New Lighting Shall Comply With Va Lighting Design Guide, January 2022; And Shall Be 50 Foot-candles (minimum) Measured 30-inches Above Floor For Workstation Task Areas, And 35 Foot-candles (minimum) For Storage Areas. all Valves Within The Layout Of The Autoclave And Equipment Shall Be Ball Valves With The Appropriate Ratings And That Are Part Of The Scope Of Work Within This Rfq. all Old Piping, Drain Piping, Ductwork, Vents, Hangers, And Water Piping Associated With Equipment Shall Be Removed. all Piping, Water, Steam, Condensate, And Air Will Be New And Originate From The Nearest Header Within 35 Of The New Autoclave And Electrical For The New Equipment Will Originate From The Electrical Panel Identified By The Station. All Piping, Water, Conduit, Steam, Condensate, And Air Lines Within This Rfq Shall Be New. waste Material Sorting/recycling the Contractor Shall Divert Discarded Items And Other Wastes To Recycling Trash Disposal Scheduled Regularly. Items Which Need To Be Sent For Recycling Or Resale Unless Not Feasible Include Pallets, Metals (iron, Copper, Brass, Etc.) Cardboard, Mercury Items, Used Oil, Electronic, Rechargeable Batteries, Wood Products And Debris. the Contractor Shall Not Store Waste Materials And Items Held For Recycling. Waste Materials Shall Be Stored Prior To Pick Up In A Manner That Does Not Allow The Items To Become A Fire, Health, Environmental Or Safety Hazard Or Provide Harborage For Pests And Consistent With Federal, State And Va (listed In Order Of Preference) Laws And Regulations Governing Storage Of Waste Materials. Actions Include Using Drip Drains Pans, Storing Liquid Wastes Or Items That Rot In Closed Containers, Removing Freon From Junked Air Conditioning, Observing Occupational Safety And Health Administration (osha) And National Fire Protection Association (nfpa) Limits On Sizes Of Piles Of Lumber Or Wood Products. Dumpsters Larger Than One And One-half (1 ½) Cubic Yards In Size Must Be Located At Least Ten (10) Feet From Exterior Walls Of Buildings. painted Or Treated Lumber, Paint Chips, A Potential Asbestos Containing, Or Asbestos Contaminated Items Should Not Be Recycled But Shall Be Disposed Of Properly. No Waste Material Disposal Is Allowed On Government Property. the Cor Designated Contractor Staging Area (tbd After Award) Will Be Fully Enclosed Completely With Fencing And Fence Covering Provided By The Contractor. The Fencing Height Shall Be A Minimum Of Six (6) Feet High, With Covering, Signage And Sandbags Or Plastic Temporary Fence Weights. external Equipment/motor Protection Filters Are To Be Provided For All Air Intakes To Include But Not Limited To Washer Extractors, Electronic Boxes, Mechanical Equipment, Etc., Wherever Air Intakes Are Located. These Are Used As A Primary Pre-filtration Defense To Help Prevent Damage And Extensive Maintenance That Large Volumes Of Lint/debris Can Cause. They Are To Fit All Air Intakes, Motors Etc. And Be Made Of Three-dimensional Electrostatic Media And Encased In A 1/8"-3/8" Rigid Magnetic Galvanized Steel Frame And Contain 2 Layers Of Polypropylene Media. The Media Will Not Shed Fibers, Absorb Moisture, Or Promote Bacterial Growth; The Filter Should Be Designed For Uv Protected, And Stands Up To Extreme Outdoor Or Indoor Exposure, Corrosive Chemicals, High Velocity Air Flow, As Well As Industrial Cleaning And Maintenance Handling. the Contractor Shall Supply Lock-out/tag-out Devices For Each Piece Of Equipment. All Lock-out/tag-out And Confined Space (cs) Locations Shall Be Marked And Identified On The Machine With Instructions On Lock-out Or Cs Procedures For The Equipment. These Instructions/procedures Shall Be Permanently Mounted On Each Piece Of Equipment. Lock-out/tag-out Procedures Include All Sources Of Stored Energy, Including But Not Limited To: Electrical, Gas, Water, Air Lines, Hydraulic, Etc. Relief Valves Shall Be Installed For Lock-out/tag-out Locations To Relieve Residual Air Lines Etc. the Contractor Shall Supply One (1) Lock-out And Tag-out Kit With The Lock-out/tag-out Devices For Each Piece Of Equipment. The Kits Shall Turned Over To The Cor. All Lock-out / Tag-out And Permit Required Confined Space (prcs) Locations Shall Be Marked And Identified On The Machine With Instructions On Lock-out Or Prcs Procedures For The Equipment. These Instructions/procedures Shall Be Permanently Mounted On Each Piece Of Equipment. Lock-out/tag-out Procedures Include All Sources Of Stored Energy, Including But Not Limited To: Electrical, Gas, Water, Steam, Condensate, Air Lines, Hydraulic Etc. Relief Valves Shall Be Installed For Lock-out/tag-out Locations To Relieve Residual Air Etc. number And Nomenclature Will Separately Identify All Equipment With No Less Than Two (2) Inch Numbers And Letters. Each Piece Of Equipment Will Be Separately Identified And Labeled. Example: Hot Water Heater 1, Hot Water Storage Tank Etc. The Equipment Shall Be Made Compatible To Meet Production Requirements Specified In The Technical Specifications. contractor Bears All Responsibility For All New Utility Connections. All New Utility Piping That Has Been Added Shall Be Leak Tested (air, Water, Steam And Condensate). connections To Va Supplied Utilities Shall Be Within 35 Of New Equipment Supplied And Electrical Panel Identified. Penetrations In Floors, Walls And Ceilings Not Utilized Will Be Filled With Existing Floor, Wall, And Ceiling Like Material. All Braces, Pipes (air, Gas, Water, Steam, Condensate, Electrical), Conduit And Duct Work That Will Not Be Utilized Shall Be Removed Back To The Source That Pertains To The Equipment Directly Associated With This Rfq. the Contractor Shall Not Damage Equipment Frame, Door Panels, Cylinder, Cylinder Panels, Control Box On The Government Installation. If The Contractor Causes Damages To Any Government Property, The Contractor Shall Replace Or Repair The Damage At No Expense To The Government As The Co Directs. If The Contractor Fails Or Refuses To Make Such Repair(s) Or Replacement(s), The Contractor Shall Be Liable For The Cost, Which May Be Deducted From The Contract Price. existing Equipment That Will Be Re-used Shall Be Protected From Damage During Installation Up To And Including Removal And Replacement Where Necessary To Facilitate Installation Of New Equipment. utility Shutdowns And Hot Work Permits contractor Shall Provide Ten (10) Calendar Days Advance Notice For Any Planned Utility Shutdowns And Should Be Indicated On The Project Schedule. contractor Shall Follow Stations Protocol On Notice Of Any Hot Work Permits Needed. the Tcpf Will Be Open During The Project. The Contractor Will Have Access To The Tcpf Seven Days A Week From 7:00 Am Through 3:30pm. On The Weekends There Will Be A Staff Member On Station To Allow Entrance And Will Monitor The Contractor While They Are On Station. note: With Cor Approval The Contractor May Work Evenings And/or Weekends To Accomplish The Work Required. badge Requirements the Contractor S Personnel (including Subcontractors) Anticipated To Be On Site For More Than Two (2) Days Will Need To Obtain A Piv Badge Through The Va Cor. [note: Piv Badges Require At Least 30 Days To Secure So It Would Be Beneficial For The Contractor To Start This Process Immediately.] site Visit the Contractor Has The Responsibility Of Visiting The Site And Examine The The Installation Area. Failure On The Part Of The Contractor To Accomplish A Site Visit And Become Thoroughly Familiar With All Conditions That May Affect Their Quote Will Be At The Contractor S Risk. the Ft. Harrison Tcpf Will Accommodate Site Visits As They Are Requested. The Site Visits May Be On Different Dates Or All On The Same Date, Depending On If/when Requests Are Made By The Contractor. The Contractor Must Request A Scheduled Date To Visit The Ft. Harrison Tcpf And The Cor Will Determine If The Requested Date Is Available. Site Visit Requests Shall Be Made By Contacting. exemption Certificate the Cor Will Provide A Valid Certificate Of Exemption For The State Of Montana Sales And Use Tax To The Contractor. general Installation Requirements existing Utilities Shall Be Utilized To Meet The Performance Requirements Of The Technical Specifications. Connection Points For All Equipment Shall Be Within 35 Of New Equipment. When Existing Service Lines Require Demolition, They Shall Be Removed Back To The Source. the Contractor Shall Ensure Maximum Utilization Of Existing Equipment Space To Prevent Additional Plumbing, Electrical Or Other Utilities. should Additional Utilities Be Required For The Equipment, These Utilities Shall Be The Responsibility Of The Contractor. Utilities Are Electric, Water, Steam, Condensate And Air Lines. all Exposed Utility/ductwork/piping Systems, Control Boxes And Motors That Are Exposed To Floor Traffic Shall Be Appropriately Guarded And Protected. equipment And Materials Shall Be Suitable For Installation In Available Space, Arranged For Safe, Efficient, And Convenient Operation And Maintenance, And If Applicable With Referenced Specifications To Include A Summary Of Routine Preventative Maintenance For Each Piece Of Equipment. the Contractor Shall Furnish All Labor And Materials Necessary For Storage And Installation Of New Equipment. Installation Shall Include, But Is Not Limited To: all Mounting Holes Shall Be Utilized For Anchoring Equipment. Secure Mounts Shall Be Laid Out In Advance For Review And Approval By The Cor. any And All Penetrations Of Walls, Ceilings And Floors For The Installation Or Removal Of Electrical Conduit, Pipes, Ductwork, Liquid Supply Lines, Communication Wiring, Etc. Shall Be Sealed With An Approved Fire-retardant Material (not Foam) And Shall Match Existing Materials On Both Sides Of The Penetration. contractor Is To Supply New Utility Connections (i.e., Wall/ceiling Mounts, Junction Boxes, Raceways, And Conduits). the Contractor Shall Be Responsible For All Control Wiring Including Disconnects Interconnections, And Conduit. Interconnecting Consists Of All Control Wiring, All Ductwork, Interconnecting Pieces Of Equipment And Outside Vents, All Airlines, And All Connections From Va Supplied Utilities. all Installation And/or Modifications Of Utilities And Structures, Shall Match Existing Materials. No Wooden Platforms Allowed. all Pipes, Vents, Drains, Electrical Boxes, Ductwork, And Conduit Shall Be New. all Pipes And Ductwork Shall Be Insulated. All Conduits And Air Pipes Shall Not Be Painted. All Vents And Drains Shall Be Painted, (refer To The Table Below For Colors). All Insulation Shall Be Wrapped With White Pvc Plastic As Indicated Below. Pvc Covering Shall Be A Minimum .030 Thickness. Flow Markings And Identification Of All Pipes, Vents, Ductwork, And Airlines To Equipment Shall Be Appropriately Marked With A Minimum Of Two (2) Inch Letters. Pre-made Adhesives Are Acceptable, Spray-painting Stencils Are Not Acceptable. air Piping: (only Identification/flow Markings) air Intake Ductwork: safety White Pvc (identification And Flow Markings) large Dryer Air Exhaust Ductwork: safety White Pvc Textured Aluminum (identification & Flow Markings) small Dryer Air Exhaust Ductwork: safety White Pvc (identification & Flow Markings) vent Pipe: painted Flat Black (identification And Flow Markings) drain Line: painted Flat Black (identification And Flow Markings) domestic Water: safety White Pvc (identification And Flow Markings) fire Suppression Piping: painted Bright Red (identification And Flow Markings) outside Exposed Ductwork: sealed Watertight And Weather-proofed To Protect From The Environment all Conduits: not Painted installation Of Piping, Sleeves, Inserts, Hangers, And Equipment Shall Be In Accordance With The Installation Design Drawing And Shall Be Sealed By A Licensed Professional Architect And Engineer, Which Were Previously Approved By The Cor. In The Installation Design Drawings, The Contractor Shall Locate Drains, Piping, Sleeves, Inserts, Hangers, And Equipment Out Of The Way Of Windows, Doors, Openings, Light Outlets And Other Services And Utilities. All Piping Shall Be Installed To Comply With Accepted National And Local Plumbing Practices. Mechanical Or Grooved Fittings On Mechanical Piping Are Acceptable. if Necessary To Drill Through Structural Sections, The Contractor Shall Notify The Cor Immediately. The Cor Shall Work With A Structural Engineer To Determine Proper Location. The Cor Shall Instruct Contractor On Structural Location To Continue Work. install Gauges, Thermometers, Valves, And Other Mechanical And Electrical Devices For Ease Of Reading, Operating, And Maintaining. Servicing Shall Not Require Dismantling Of Adjacent Equipment, Electric Or Pipe Work. valve Tags - Furnish And Install Valve Tags On All Compressed Air, Gas, Steam, Condensate And Water Valves On Equipment And Connection Points. Tags Shall Be Engraved With Identification (gas, Air Etc.), Black Filled Identification, Numbers, And Letters Not Less Than ½ Inch High For Number Designation And Not Less Than ¼ Inch For Service Designation On 19 Gauge 1-1/2-inch Round Brass Disc; Tags Shall Be Attached With Brass Hooks Or Brass Chain. trap Tags: Furnish And Install All Steam Trap Tags On Equipment And Connection Points Of The Textile Care Processing Equipment. Tags Shall E Engraved, Black Filled Numbers And Letters Not Less Than ½ Inch High For Number Designation And Not Less Than ¼ Inch For Service Designation On 19 Gauge 1-1/2 Inch Round Brass Disc, Tags Shall Be Attached With Brass Hooks Or Brass Chain. the Contractor Shall Provide Two (2) Valve Lists And Two (2) Steam Trap Lists On Typed Plastic-coated Cards, Sized 8-1/2-inch X 11 Inch Showing Tag Number, Valve Type, Valve Function And Location Area Of Valve For Each Service Or System To The Cor. equipment, Motors, Piping, Ductwork And Any Other Components Or Materials Shall Be Protected Against Physical Damage From Carts With Guardrails Supplied By The Contractor. belts, Chains, Pulleys, Couplings, Motor Shafts, Gears Or Other Moving Parts Shall Be Fully Guarded In Accordance With Osha 1910.219. Guard Parts Shall Be Rigid And Suitably Secured And Be Readily Removable Without Disassembling The Guarded Unit. a Minimum Clearance Of 36 Inches Between Moving Parts And Fixed Objects And 24 Inches Between Non-moving Parts And Fixed Objects Is Required In Accordance With Osha 1910.219. All Conveyor Rollers Shall Have Roll Caps Installed And Guards Will Be Provided Under All Conveyors. plumbing Requirements plumbing grooved Or Mechanical Fittings Are Allowed On Piping. the Contractor Shall Not Use Cast Iron Fittings, And Components Or Malleable/ductile Fittings Anywhere In The High-pressure And Medium Pressure Steam System (15 Psi Or Above). The Contractor Shall Only Use Cast Steel Or Forged Steel Fittings And Components, In Accordance With Applicable Va Master Specifications Found At Https://www.cfm.va.gov/til/spec.asp traps the Contractor Shall Provide Traps On All Sanitary Branch Waste connections From Fixtures Or Equipment Not Provided With Traps. Exposed Brass Shall Be Polished Brass Chromium Plated With Nipple And Set Screw Escutcheons. Concealed Traps May Be Rough Cast Brass. Slip Joints Are Not Permitted On Sewer Side Of Trap. Traps Shall Correspond To Fittings On Cast Iron Soil Pipe Or Steel Pipe Respectively, And Size Shall Be As Required By Connected Service Or Fixture. plumbing Installation in Accordance With The National Standard Plumbing Code, 2021 Edition. pipe Saddles Shall Be Installed On The Outside Of All Insulation And Pvc Coverings. escutcheons Shall Be Installed At All Floors, Wall And Ceiling Locations That Pipe, Conduits, Vents And Ductwork Penetrate. pipe Shall Be Round And Straight. Cutting Shall Be Done With Proper Tools. Pipe, Except For Plastic And Glass, Shall Be Reamed To Full Size After Cutting. all Pipe Runs Shall Be Laid Out To Avoid Interference With Other Work. install Valves With Stem In Horizontal Position Whenever Possible. All Valves Shall Be Easily Accessible. piping Shall Conform To The Following: waste, Storm Water Drain And Vent: Drain To Main Stack As Follows: pipe Size Minimum Pitch 3 Inch And Smaller 1/4 Inch To The Foot 4 Inch And Larger 1/8 Inch To The Foot exhaust Vent extend Exhaust Vents Separately Through Roof. Sanitary Vents Shall Not Connect To Exhaust Vents. insulation Requirements unless Specified In Other Sections Of The Technical Specifications, Cellular Glass Insulation Is Required For Hot Water Piping. A Minimum 1.5 Inches Thick For Hot Water Is Required. All Insulation On Piping And Equipment Shall Be Terminated Square At Items Not To Be Insulated, Access Openings And Nameplates. Cover All Exposed Raw Insulation With Sealer Or Jacket Material That Does Match The Color Of The Insulation. water Piping interior Domestic Water Piping Shall Be Copper Tube, Type L Drawn Per Astm B88. Fittings For Copper Tube Must Be Wrought Copper Or Bronze Castings Conforming To Ansi B16.18 And B16.22. Unions Shall Be Bronze In Accordance With Federal Specification Ww-u-516 With Solder Or Braze Joints Including Adapters For Joining Screwed Pipe To Copper Tubing. air Piping interior To The Building And Outdoor External Air Piping Shall Be Copper Tube. all Piping Shall Be Installed Parallel To Walls And Column Centerlines. Pipe Shall Be Round And Straight. Cutting Shall Be Done With Proper Tools. Except For Plastic And Glass, Pipe Shall Be Reamed To Full Size After Cutting. Copper Piping Work Shall Be Performed In Accordance With Best Practices Requiring Accurately Cut Clean Joints And Soldering In Accordance With The Recommended Practices For The Material And Solder Employed. all Pipe Runs Shall Be Laid Out To Avoid Interference With Other Work. install Ball Valves In Horizontal Position. All Valves Shall Be Easily Accessible. pipe Saddles Shall Be On The Outside Of All Insulation And Pvc Coverings. pipe Escutcheons Will Be Used For All Pipe Penetrations Through Walls, Floors, And Ceilings. electrical Requirements electrical electrical Installation conduits, Fittings, And Electrical Wire all Electrical Installations Shall Conform To Requirements Of The National Electrical Code (nec). install A New Power Disconnect Box For Each Piece Of Equipment. all Electrical Wire Shall Be Copper, Heat Resistant Grade, Thermoplastic Insulated. Control Wiring Shall Be (stranded) Thermoplastic High Heat Nylon (thhn)/thermoplastic Heat And Water-resistant Nylon (thwn) Or Equal. Intermediate Wall Conduit Is Required. Provide Conduit Trapeze Hangers. all Power Wiring Shall Have A Minimum Conduit Size Of 3/4-inch In Diameter. Color Coding Of All Wiring Shall Be In Accordance With Established Nfpa 70. all Low Voltage Communication Wire Used For Data Management Systems, Liquid Supply Systems And Intercoms Shall Be Installed In Minimum 3/4-inch Diameter Protective Conduit. Wire Nuts Shall Not Be Used For Any Connections. electrical Wiring Installation in Accordance With Nfpa 79 Electrical Standard For Industrial Machinery 2021 Edition: wiring Shall Not Be Cut, Abraded, Nor Have Excessive Insulation Stripped, And Shall Be Properly And Tightly Joined At Terminals. wire Nuts Shall Not Be Used, And Solderless Connectors Shall Have Insulation Grip. Wiring Shall Have Adequate Slack To Provide Strain Relief. Wire Nuts Are Only Acceptable For Electrical Installation Of Motors And Terminal Boxes. wiring Shall Be Provided Between Motors, Controllers, Timers, Pushbuttons, Starters, And Limit Switches Installed On Or Within The Equipment And Shall Be Done With Materials As Applicable, Except Liquid Tight Flexible Conduit Shall Be Used Where Required For Belt Adjustment By Moving A Motor Or For Vibration Isolation. all Wiring Shall Terminate In Connection Boxes With Provisions For Connections Beyond The Machine; Each Conductor Shall Be Identified By A Different Color. the Line Voltage Side Of The Work Is A Single Point Demo And Termination To A Prewired Control Cabinet. electrical Identification Installation in Accordance With Nfpa 79 Electrical Standard For Industrial Machinery 2021 Edition: install Nameplates - Center On Device, Cover Plate, Or Enclosure. use Power Source Designations Defined In The Technical Specifications. Indicate Electrical Power Loads Served Using Designations From Electrical Schedules And Designations From The Appropriate Trade Furnishing The Equipment Served. lettering Shall Include Name Of Equipment, The Specific Unit Number, And Any Reference To On/off Or Other Instructions That Are Applicable. all Labeling Shall Be On Laminated Phenolic Nameplates And Shall Be Placed On Equipment. nameplates Shall Be Laminated Phenolic With A Blue Surface (480 Volts)/black Surface (208 Volts) And White Core. Use 1/16-inch Thick Material For Plates Up To 2 Inch X 4 Inch. For Larger Sizes, Use 1/8-inch Thick Material. the Contractor Shall Mark All 4-plex Outlets And Boxes With The Electrical Panel, Circuit, And Branch Identification. electrical Protection the Contractor Shall Provide Any Protective Methodology Or Devices Necessary To Protect The Equipment From: damage Due To Electrical Power Problems, Including Brownouts, Emergency Power Interruptions, Electrical Surges, Sags, And Electrical Storms. any Equipment Located Outside The Building Or On The Roof Shall Have Lightning Protection Installed. data Loss Due To Electrical Power Problems. All Equipment Electronics Shall Be Protected With A Power Monitor Hook-up Point And Power Monitor. existing Equipment That Will Be Re-used Shall Be Protected From Damage During Installation Up To And Including Removal And Replacement Where Necessary To Facilitate Installation Of New Equipment. uninterrupted Power Supply (ups) Shall Be Installed For All Equipment Supplied. (minimum 2-hour Back-up). electrical Receptacles And Outlets receptacles Shall Be Underwriters Laboratories Certified. mounting Screws, Mounting Strap And Terminal Screws Shall Be Brass Or A Copper Alloy Metal. receptacles Shall Have Provisions For Back Wiring From Four (minimum) Separate Wiring Holes And Side Wiring From Four Captivity Held Binding Screws. ground Fault Interrupter (gfi) Four-plex Receptacles Shall Be Single Phase, 20 Ampere, 120 Volts, 2-pole, 3-wire, Us National Electrical Manufacturers Association (nema) 5-2or. the Duplex Type Receptacles Shall Have Break-off Feature For Two Circuit Operation. The Ungrounded Pole Of Each Receptacle Shall Be Provided With A Separate Terminal. the Receptacle Bodies Shall Be White In Color. four-plex Receptacles With Gfi Shall Be An Integral Unit Suitable For Mounting In A Standard Outlet Box. gfi Shall Consist Of A Differential Current Transformer, Solid State Sensing Circuitry And A Circuit Interrupter Switch And Shall Be Rated For Operation On A 160 Hz, 120-volt, 20 Ampere Branch Circuit. The Device Shall Have Nominal Sensitivity To Ground Leakage Current Of Five (5) Milliamperes And Shall Function To Interrupt The Current Supply For Any Value Of Ground Leakage Current Above Five (5) Milliamperes On The Load Side Of The Device. The Device Shall Have A Minimum Nominal Tripping Time Of 1/30th Of A Second. receptacles 20, 30 And 50 Ampere, 250 Volt: Shall Be Complete With Appropriate Cord Grip Plug. weatherproof Receptacles shall Consist Of A Duplex Receptacle, Mounted In Box With Gasket, Weatherproof, Cast Metal Cover Plate And Cap Over Each Receptacle Opening. The Cap Shall Be Permanently Attached To The Cover Plate By A Spring Hinged Flap. The Weatherproof Integrity Shall Not Be Affected When Heavy Duty Specification Or Hospital Grade Attachment Plug Caps Are Inserted. Cover Plates On Outlet Boxes Mounted Flush In The Wall Shall Be Gasket To The Wall In A Watertight Manner. wall Plates wall Plates For Switches And Receptacles Shall Be As Specified By The Cor. Oversize Plates Will Not Be Acceptable. wall Plate Color Shall Be White. standard Nema Design, So That Products Of Different Manufacturers Must Be Interchangeable. for Receptacles Or Switches Mounted Adjacent To Each Other, Wall Plates Shall Be Common For Each Group Of Receptacles Or Switches. the Contractor Shall Provide 4-plex Receptacle At Each Equipment Location For Mechanic S Use. marking Pen Labeling use For All Junction And Outlet Boxes Or Portions Of Junction Boxes With Power Wiring, Communication Systems, Pull And Junction Boxes, And Conduit Installed For Future Use. For All Boxes With Power Wiring, Indicate Appropriate Panel And Circuit Number(s) Where Applicable, Etc. Label Inside Covers In Finished Areas And Outside Covers In Unfinished Areas. Labeling Shall Be Completed Using Permanent, Waterproof, Quick Drying Marking Pen. label Tapes label Each Conductor At Origin And Destination Points And At All Junction Boxes Where Two Or More Feeder Or Control Circuits Are Present. Identify With Branch Circuit Or Feeder Number For Power And Lighting Circuits, And With Control Conductors, Number As Indicated On Schematic And Interconnection Diagrams Or Equipment Manufacturer's Drawings For Control Wiring. Using Cloth, Plastic, Split Sleeve Or Tubing Type Wire And Cable Label Markers. dielectric Fittings provide Dielectric Couplings Or Unions Between Ferrous And Non-ferrous Pipe. In Addition, Provide Threaded Dielectric Unions For Pipe Sizes 2 Inches And Under. For 2-1/2 Inches And Above, Provide Copper And Steel Flanges Electrically Isolated At Gasket And By Sleeves At Bolts. Fittings On Cold Water And Soft Water Lines Shall Be Rated For 100 Psi, 80 Degrees F. Fittings On Other Services Shall Be Rated For The Maximum Pressure And Temperature Conditions Of The Service. Where Copper Piping Is Connected To Steel Piping, Provide Dielectric Connections. prefabricated Roof Curbs galvanized Steel Or Extruded Aluminum 12 Inches Overall Height, Continuous Welded Corner Seams, Treated Wood Nailer, 1-1/2 Inch Thick, 3-pound Density Rigid Mineral Fiberboard Insulation With Metal Liner, And Built-in Curved Cantilever Strip. Provide Raised Cantilever Strip (recessed Mounting Flange) To Start At The Upper Surface Of The Insulation. Curbs Shall Be Constructed For Pitched Roof Or Ridge Mounting As Required To Keep Top Of Curb Level. installation Requirements approval For The Contractor To Proceed With Installation Shall Be Contingent Upon The Acceptance Of The Design Submittals And Written Notification To Proceed With Installation From The Cor. the Contractor Shall Be Responsible For The Determination Of, And Compliance With, Federal, State, And Local Code Requirements, Design Data, And Other Factors Necessary To Design And Install The System. the Contractor Shall Verify The Location Of Extant Utilities. Contractor Shall Connect To Designated Utilities In A Manner Conforming To A Nationally Recognized Code And At A Time Satisfactory To Minimize Or Preclude Disruption To Existing Functions Or Clinical Services. the Contractor Shall Be Responsible For Installation, Which Consists Of Assembling, Positioning, And Mounting Of All Equipment And Connections Of All Cables. The Contractor Is Responsible For Furnishing And Pulling All Interconnecting Wiring And Cabling, Including Wiring, And Cabling To Be Pulled Through Conduit And Raceways. It Is The Responsibility Of The Contractor To Supply And Install Junction Boxes; Wall/ceiling Mounts And Support Structures. the Contractor Shall Provide Certified Field Engineers Or Technicians To Conduct All Necessary Tests During Installation. Contractor Shall Provide Copies Of The Certifications Upon Government Request. the Contractor Shall Inform The Co And Cor Of Any Problems As They Occur In Connection With Installation, Or Issues Which Will Affect Optimum Performance Shall Be Reported Prior To The Start Of Installation. Installation Shall Not Proceed Under Such Circumstances Until Authorized By The Co. availability Of Parts And Service the Quoter Shall Guarantee The Contractor Availability Of Servicing And Replacement Parts For A Period Of Ten (10) Years To The Government For The Laundry Equipment Being Procured Under This Rfq. incorporation Of Documents the Following Documents Are Hereby Incorporated By Reference And Made A Part Of This Rfq. the Equipment And Installation Supplies Shall Conform To The Following Standards: air Moving And Conditioning Association, Inc. (amca) Standards, 2009 Edition. american National Standards Institute (ansi), 2021 Edition. Z8.1-2006 Safety Requirements For Commercial Laundry And Dry Cleaning Operations. femp: Federal Energy Management Program (energy Efficient Product Rating). hvac Duct Construction Standards-metal & Flexible. national Electrical Manufacturers Association (nema), 2021 Edition. national Fire Protection Association (nfpa), 2021 Edition. All Nfpa Standards And Codes. National Electrical Code (nec), 2020 Edition. national Standard Plumbing Code, 2021 Edition. occupational Safety And Health Administration (osha) 29 Cfr 1910. sheet Metal And Air Conditioning Contractors National Association (smacna), 2021 Edition. sheet Metal Contractors National Association Inc. Publication, 2019 Edition. underwriters Laboratories Standards, 2022 Edition. city, County, State, Federal, Va And National Environmental, Fire And Safety Regulations/standards.
Closing Date7 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Description: This Sources Sought Notice Is For Planning Purposes Only And Shall Not Be Considered As An Invitation For Bid, Request For Quotation, Request For Proposal, Or As An Obligation On The Part Of The Government To Acquire Any Products And/or Services. Your Response To This Sources Sought Notice Will Be Treated As Information Only. No Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise Because Of Contractor Submission Of Responses To This Announcement Or The Government Use Of Such Information. This Request Does Not Constitute A Solicitation For Proposals Or The Authority To Enter Negotiations To Award A Contract. No Funds Have Been Authorized, Appropriated, Or Received For This Effort. the Information Provided May Be Used By The Department Of Veterans Affairs In Developing Its Acquisition Approach, Statement Of Work/statement Of Objectives And Performance Specifications. Interested Parties Are Responsible For Adequately Marking Proprietary Or Competition Sensitive Information Contained In Their Response. The Government Does Not Intend To Award A Contract Based On This Sources Sought Notice Or To Otherwise Pay For The Information Submitted In Response To This Sources Sought Notice. the Submission Of Pricing, Capabilities For Planning Purposes, And Other Market Information Is Highly Encouraged And Allowed Under This Sources Sought Notice In Accordance With (iaw) Far Part 15.201(e) the Purpose Of This Sources Sought Notice Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), Hubzone And Other Small Businesses Interested And Capable Of Providing The Products And/or Services Described Below. documentation Of Technical Expertise Must Be Presented In Sufficient Detail For The Government To Determine That Your Company Possesses The Necessary Functional Area Expertise And Experience To Compete For This Acquisition. Responses To This Notice Shall Include The Following: (a) Company Name; (b) Address; (c) Point Of Contact; (d) Phone, Fax, And Email; (e) Uei Number; (f) Cage Code; (g) Tax Id Number; (h) Type Of Small Business, E.g., Services Disabled Veteran Owned Small Business, Veteran Owned Small Business, 8(a), Hubzone, Women Owned Small Business, Small Disadvantaged Business, Or Small Business Hubzone Business, Etc (i) State If Your Business Has An Fss Contract With Gsa, Va Nac, Nasa Sewp, Or Any Other Federal Contract, That Can Be Utilized To Procure The Requirement Listed Below And Provide The Contract Number; And (j) Must Provide A Capability Statement That Addresses The Organization S Qualifications And Ability To Perform As A Contractor For The Work Described Below. requirement: the Va Heartland Network 15 Contracting Office Located At 3450 South 4th Street, Leavenworth, Ks, 66048-5055 Is Seeking A Potential Qualified Contractor To Provide Eyecon 9430 Pill Dispensing System For The Marion Va Medical Center, Located In Marion, Illinois, And The Evansville Health Care Center, Located In Evansville, Indiana. This Is A Brand Name Or Equal Requirement. Please See The Statement Of Work For More Specifics And Details. The North American Industry Classification System Code (naics Code) Is 339112 Surgical And Medical Instrument Manufacturing, Size Standard 1,000 Employees. Based On This Information, Please Indicate Whether Your Company Would Be A Large Or Small Business And Have A Socio-economic Designation As A Small Business, Vosb Or Sdvosb. statement Of Work: Eyecon 9430 description: Provide Eyecon 9430 And Eyecon Interface Controller With Installation And One (1) Year Of Support To Be Used At The Marion, Il Va Medical Center Pharmacy And In The Evansville, In Outpatient Clinic this Solicitation Uses A Brand Name Or Equal Description Of The Product Required. This Permits Prospective Contractors To Offer Products Other Than Those Specifically Referenced By Brand Name. All Offers Must Work With Existing Equipment That Has Already Been Purchased And Is Currently In Use At The Station. minimum Technical Specifications: the Eyecon 9430 Must Be Assembled Within The Manufactured Country Or Show Significant Proof Of An Internationally Recognized Quality Assurance Program. scriptpro Is A Distributor Of The Eyecon 9430. certificate Of Authenticity Will Need To Be Provided the Dispensing System Must Have The Following: safety must Use Barcode Verification To Ensure Accuracy Of Dispensing And Must Work With Scriptpro Label Barcode unit Must Have Means To Track Dispensed Drug Quantities And Contain Image Verification Of Quantities Dispensed. must Come Equipped With Database Of Drug Images For Dispensing Verification. must Include Additional Counting Platters For Penicillin And Sulfa To Avoid Cross Contamination. workflow must Allow For Integration With Scriptpro/vista To Verify Correct Dispensing Quantities. must Fit In Existing Space With A Footprint Of 28 H X 11 W X 17.5 D. must Count With A Count Accuracy Of At Least 99.9%. verification Should Include Easy Work Flow Optics Such As Color Touch Screen. must Include Large Counting Area Of 48 Sq Inches For Larger Quantity Verification. information Technology must Integrate With Current Equipment, Including Scriptpro Dispensing/filling Stations must Interface With Current Scriptpro Equipment. all Equipment Must Be New description quantity eyecon 9430 eyecon Interface Controller 2 2 optional/value Added Features: N/a required Interfaces: Must Interface With Current Scriptpro Equipment. delivery Location(s): department Of Veterans Affairs marion Va Medical Center 2401 West Main Street marion, Il 62959-1188 department Of Veterans Affairs evansville Va Healthcare Center 6211 E Waterford Blvd evansville, In 47715 records Management Obligations applicability this Clause Applies To All Contractors Whose Employees Create, Work With, Or Otherwise Handle Federal Records, As Defined In Section B, Regardless Of The Medium In Which The Record Exists.   definitions Federal Record As Defined In 44 U.s.c. § 3301, Includes All Recorded Information, Regardless Of Form Or Characteristics, Made Or Received By A Federal Agency Under Federal Law Or In Connection With The Transaction Of Public Business And Preserved Or Appropriate For Preservation By That Agency Or Its Legitimate Successor As Evidence Of The Organization, Functions, Policies, Decisions, Procedures, Operations, Or Other Activities Of The United States Government Or Because Of The Informational Value Of Data In Them.   the Term Federal Record: includes [agency] Records.â  does Not Include Personal Materials. applies To Records Created, Received, Or Maintained By Contractors Pursuant To Their [agency] Contract. may Include Deliverables And Documentation Associated With Deliverables. requirements contractor Shall Comply With All Applicable Records Management Laws And Regulations, As Well As National Archives And Records Administration (nara) Records Policies, Including But Not Limited To The Federal Records Act (44 U.s.c. Chs. 21, 29, 31, 33), Nara Regulations At 36 Cfr Chapter Xii Subchapter B, And Those Policies Associated With The Safeguarding Of Records Covered By The Privacy Act Of 1974 (5 U.s.c. 552a). These Policies Include The Preservation Of All Records, Regardless Of Form Or Characteristics, Mode Of Transmission, Or State Of Completion.â  in Accordance With 36 Cfr 1222.32, All Data Created For Government Use And Delivered To, Or Falling Under The Legal Control Of, The Government Are Federal Records Subject To The Provisions Of 44 U.s.c. Chapters 21, 29, 31, And 33, The Freedom Of Information Act (foia) (5 U.s.c. 552), As Amended, And The Privacy Act Of 1974 (5 U.s.c. 552a), As Amended And Must Be Managed And Scheduled For Disposition Only As Permitted By Statute Or Regulation.â  in Accordance With 36 Cfr 1222.32, Contractor Shall Maintain All Records Created For Government Use Or Created In The Course Of Performing The Contract And/or Delivered To, Or Under The Legal Control Of The Government And Must Be Managed In Accordance With Federal Law. Electronic Records And Associated Metadata Must Be Accompanied By Sufficient Technical Documentation To Permit Understanding And Use Of The Records And Data.â  [agency] And Its Contractors Are Responsible For Preventing The Alienation Or Unauthorized Destruction Of Records, Including All Forms Of Mutilation. Records May Not Be Removed From The Legal Custody Of [agency] Or Destroyed Except For In Accordance With The Provisions Of The Agency Records Schedules And With The Written Concurrence Of The Head Of The Contracting Activity. Willful And Unlawful Destruction, Damage Or Alienation Of Federal Records Is Subject To The Fines And Penalties Imposed By 18 U.s.c. 2701. In The Event Of Any Unlawful Or Accidental Removal, Defacing, Alteration, Or Destruction Of Records, Contractor Must Report To [agency]. The Agency Must Report Promptly To Nara In Accordance With 36 Cfr 1230. the Contractor Shall Immediately Notify The Appropriate Contracting Officer Upon Discovery Of Any Inadvertent Or Unauthorized Disclosures Of Information, Data, Documentary Materials, Records, Or Equipment. Disclosure Of Non-public Information Is Limited To Authorized Personnel With A Need-to-know As Described In The [contract Vehicle]. The Contractor Shall Ensure That The Appropriate Personnel, Administrative, Technical, And Physical Safeguards Are Established To Ensure The Security And Confidentiality Of This Information, Data, Documentary Material, Records And/or Equipment Is Properly Protected. The Contractor Shall Not Remove Material From Government Facilities Or Systems, Or Facilities Or Systems Operated Or Maintained On The Government S Behalf, Without The Express Written Permission Of The Head Of The Contracting Activity. When Information, Data, Documentary Material, Records And/or Equipment Is No Longer Required, It Shall Be Returned To [agency] Control Or The Contractor Must Hold It Until Otherwise Directed. Items Returned To The Government Shall Be Hand Carried, Mailed, Emailed, Or Securely Electronically Transmitted To The Contracting Officer Or Address Prescribed In The [contract Vehicle]. Destruction Of Records Is Expressly Prohibited Unless In Accordance With Paragraph (4). the Contractor Is Required To Obtain The Contracting Officer's Approval Prior To Engaging In Any Contractual Relationship (sub-contractor) In Support Of This Contract Requiring The Disclosure Of Information, Documentary Material And/or Records Generated Under, Or Relating To, Contracts. The Contractor (and Any Sub-contractor) Is Required To Abide By Government And [agency] Guidance For Protecting Sensitive, Proprietary Information, Classified, And Controlled Unclassified Information. the Contractor Shall Only Use Government It Equipment For Purposes Specifically Tied To Or Authorized By The Contract And In Accordance With [agency] Policy.â  the Contractor Shall Not Create Or Maintain Any Records Containing Any Non-public [agency] Information That Are Not Specifically Tied To Or Authorized By The Contract.â  the Contractor Shall Not Retain, Use, Sell, Or Disseminate Copies Of Any Deliverable That Contains Information Covered By The Privacy Act Of 1974 Or That Which Is Generally Protected From Public Disclosure By An Exemption To The Freedom Of Information Act.â  the [agency] Owns The Rights To All Data And Records Produced As Part Of This Contract. All Deliverables Under The Contract Are The Property Of The U.s. Government For Which [agency] Shall Have Unlimited Rights To Use, Dispose Of, Or Disclose Such Data Contained Therein As It Determines To Be In The Public Interest. Any Contractor Rights In The Data Or Deliverables Must Be Identified As Required By Far 52.227-11 Through Far 52.227-20. training.  all Contractor Employees Assigned To This Contract Who Create, Work With, Or Otherwise Handle Records Are Required To Take [agency]-provided Records Management Training. The Contractor Is Responsible For Confirming Training Has Been Completed According To Agency Policies, Including Initial Training And Any Annual Or Refresher Training.â  [note: To The Extent An Agency Requires Contractors To Complete Records Management Training, The Agency Must Provide The Training To The Contractor.]â  flow Down Of Requirements To Subcontractors the Contractor Shall Incorporate The Substance Of This Clause, Its Terms And Requirements Including This Paragraph, In All Subcontracts Under This [contract Vehicle], And Require Written Subcontractor Acknowledgment Of Same.â  violation By A Subcontractor Of Any Provision Set Forth In This Clause Will Be Attributed To The Contractor. general. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. Contractors, Contractor Personnel, Subcontractors And Subcontractor Personnel Will Be Subject To The Same Federal Laws, Regulations, Standards, Va Directives And Handbooks, As Va Personnel Regarding Information And Information System Security And Privacy. va Information Custodial Language. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. the Government Shall Receive Unlimited Rights To Data/intellectual Property First Produced And Delivered In The Performance Of This Contract Or Order (hereinafter Contract ) Unless Expressly Stated Otherwise In This Contract. This Includes All Rights To Source Code And All Documentation Created In Support Thereof. The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. The Primary Clause Used To Define Computer Software License (not Data/intellectual Property First Produced Under This Contractor Or Order) Is Far 52.227-19, Commercial Computer Software License. information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Will Be Used Only For The Purposes Specified In The Service Agreement, Sow, Pws, Pd, And/or Contract. The Contractor Shall Not Use Va Information In Any Other Manner Without Prior Written Approval From A Va Contracting Officer (co). The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. va Information Will Not Be Co-mingled With Any Other Data On The Contractor S Information Systems Or Media Storage Systems. The Contractor Shall Ensure Compliance With Federal And Va Requirements Related To Data Protection, Data Encryption, Physical Data Segregation, Logical Data Segregation, Classification Requirements And Media Sanitization. va Reserves The Right To Conduct Scheduled Or Unscheduled Audits, Assessments, Or Investigations Of Contractor Information Technology (it) Resources To Ensure Information Security Is Compliant With Federal And Va Requirements. The Contractor Shall Provide All Necessary Access To Records (including Electronic And Documentary Materials Related To The Contracts And Subcontracts) And Support (including Access To Contractor And Subcontractor Staff Associated With The Contract) To Va, Va's Office Inspector General (oig),and/or Government Accountability Office (gao) Staff During Periodic Control Assessments, Audits, Or Investigations. the Contractor May Only Use Va Information Within The Terms Of The Contract And Applicable Federal Law, Regulations, And Va Policies. If New Federal Information Security Laws, Regulations Or Va Policies Become Applicable After Execution Of The Contract, The Parties Agree To Negotiate Contract Modification And Adjustment Necessary To Implement The New Laws, Regulations, And/or Policies. the Contractor Shall Not Make Copies Of Va Information Except As Specifically Authorized And Necessary To Perform The Terms Of The Contract. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Shall Be Destroyed In Accordance With Va Directive 6500, Va Cybersecurity Program And Va Information Security Knowledge Service. if A Veterans Health Administration (vha) Contract Is Terminated For Default Or Cause With A Business Associate, The Related Local Business Associate Agreement (baa) Shall Also Be Terminated And Actions Taken In Accordance With Vha Directive 1605.05, Business Associate Agreements. If There Is An Executed National Baa Associated With The Contract, Va Will Determine What Actions Are Appropriate And Notify The Contactor. the Contractor Shall Store And Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools Which Are, At A Minimum, Federal Information Processing Standards (fips) 140-2, Security Requirements For Cryptographic Modules (or Its Successor) Validated And In Conformance With Va Information Security Knowledge Service Requirements. The Contractor Shall Transmit Va Sensitive Information Using Va Approved Transport Layer Security (tls) Configured With Fips Based Cipher Suites In Conformance With National Institute Of Standards And Technology (nist) 800-52, Guidelines For The Selection, Configuration And Use Of Transport Layer Security (tls) Implementations. the Contractor S Firewall And Web Services Security Controls, As Applicable, Shall Meet Or Exceed Va S Minimum Requirements. except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor May Use And Disclose Va Information Only In Two Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction After Notification To Va Co (ii) With Written Approval From The Va Co. The Contractor Shall Refer All Requests For, Demands For Production Of Or Inquiries About, Va Information And Information Systems To The Va Co For Response. notwithstanding The Provision Above, The Contractor Shall Not Release Va Records Protected By Title 38 U.s.c. § 5705, Confidentiality Of Medical Quality- Assurance Records And/or Title 38 U.s.c. § 7332, Confidentiality Of Certain Medical Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse Or Infection With Human Immunodeficiency Virus (hiv). If The Contractor Is In Receipt Of A Court Order Or Other Requests For The Above- Mentioned Information, The Contractor Shall Immediately Refer Such Court Order Or Other Requests To The Va Co For Response. information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract Will Be Protected And Secured In Accordance With Va Directive 6500 And Identity And Access Management (iam) Security Processes Specified In The Va Information Security Knowledge Service. any Data Destruction Done On Behalf Of Va By A Contractor Shall Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management, Va Handbook 6300.1, Records Management Procedures, And Applicable Va Records Control Schedules. the Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Directive 6500 And Nist 800-88, Guidelines For Media Sanitization Prior To Termination Or Completion Of This Contract. If Directed By The Cor/co, The Contractor Shall Return All Federal Records To Va For Disposition. any Media, Such As Paper, Magnetic Tape, Magnetic Disks, Solid State Devices Or Optical Discs That Is Used To Store, Process, Or Access Va Information That Cannot Be Destroyed Shall Be Returned To Va.the Contractor Shall Hold The Appropriate Material Until Otherwise Directed By The Contracting Officer S Representative (cor) Or Co. Items Shall Be Returned Securely Via Va-approved Methods. Va Sensitive Information Must Be Transmitted Utilizing Va-approved Encryption Tools Which Are Validated Under Fips 140-2 (or Its Successor) And Nist 800-52. If Mailed, The Contractor Shall Send Via A Trackable Method (usps, Ups, Fedex, Etc.) And Immediately Provide The Cor/co With The Tracking Information. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Shall Be Sent To The Cor/co Within 30 Business Days Of Termination Of The Contract. all Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used To Store, Process Or Access Va Information Will Not Be Returned To The Contractor At The End Of Lease, Loan, Or Trade-in. Exceptions To This Paragraph Will Only Be Granted With The Written Approval Of The Va Co. access To Va Information And Va Information Systems. This Section applies When Any Person Requires Access To Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract. a Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees And Subcontractors Only To The Extent Necessary To Perform The Services Specified In The Solicitation Or Contract. This Includes Indirect Entities, Both Affiliate Of Contractor/subcontractor And Agent Of Contractor/subcontractor. contractors And Subcontractors Shall Sign The Va Information Security Rule Of Behavior (rob) Before Access Is Provided To Va Information And Information Systems (see Section 4, Training, Below). The Rob Contains The Minimum User Compliance Requirements And Does Not Supersede Any Policies Of Va Facilities Or Other Agency Components Which Provide Higher Levels Of Protection To Va S Information Or Information Systems. Users Who Require Privileged Access Shall Complete The Va Elevated Privilege Access Request Processes Before Privileged Access Is Granted. all Contractors And Subcontractors Working With Va Information Are Subject To The Same Security Investigative And Clearance Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information, At No Cost To Scriptpro. The Level And Process Of Background Security Investigations For Contractors Shall Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office Of Human Resources And Administration/operations, Security And Preparedness (hra/osp) Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To Classified Information Or Information Systems Shall Have An Appropriate Security Clearance. Verification Of A Security Clearance Shall Be Processed Through The Special Security Officer Located In Hra/osp. Contractors Shall Conform To All Requirements Stated In The National Industrial Security Program Operating Manual (nispom). all Contractors And Subcontractors Shall Comply With Conditions Specified In Vaar 852.204-71(d); Contractor Operations Required To Be In United States. All Contractors And Subcontractors Working With Va Information Must Be Permanently Located Within A Jurisdiction Subject To The Law Of The United States Or Its Territories To The Maximum Extent Feasible. If Services Are Proposed To Be Performed Abroad The Contractor Must State Where All Non-u.s. Services Are Provided. The Contractor Shall Deliver To Va A Detailed Plan Specifically Addressing Communications, Personnel Control, Data Protection And Potential Legal Issues. The Plan Shall Be Approved By The Cor/co In Writing Prior To Access Being Granted. the Contractor Shall Notify The Cor/co In Writing Immediately (no Later Than 24 Hours) After Personnel Separation Or Occurrence Of Other Causes. Causes May Include The Following: contractor/subcontractor Personnel No Longer Has A Need For Access To Va Information Or Va Information Systems. contractor/subcontractor Personnel Are Terminated, Suspended, Or Otherwise Has Their Work On A Va Project Discontinued For Any Reason. contractor Believes Their Own Personnel Or Subcontractor Personnel May Pose A Threat To Their Company S Working Environment Or To Any Company- Owned Property. This Includes Contractor-owned Assets, Buildings, Confidential Data, Customers, Employees, Networks, Systems, Trade Secrets And/or Va Data. any Previously Undisclosed Changes To Contractor/subcontractor Background History Are Brought To Light, Including But Not Limited To Changes To Background Investigation Or Employee Record. contractor/subcontractor Personnel Have Their Authorization To Work In The United States Revoked. agreement By Which Contractor Provides Products And Services To Va Has Either Been Fulfilled Or Terminated, Such That Va Can Cut Off Electronic And/or Physical Access For Contractor Personnel. in Such Cases Of Contract Fulfillment, Termination, Or Other Causes; The Contractor Shall Take The Necessary Measures To Immediately Revoke Access To Va Network, Property, Information, And Information Systems (logical And Physical) By Contractor/subcontractor Personnel. These Measures Include (but Are Not Limited To): Removing And Then Securing Personal Identity Verification (piv) Badges And Piv Interoperable (piv-i) Access Badges, Va-issued Photo Badges, Credentials For Va Facilities And Devices, Va-issued Laptops, And Authentication Tokens. Contractors Shall Notify The Appropriate Va Cor/co Immediately To Initiate Access Removal. contractors/subcontractors Who No Longer Require Va Accesses Will Return Va- Issued Property To Va. This Property Includes (but Is Not Limited To): Documents, Electronic Equipment, Keys, And Parking Passes. Piv And Piv-i Access Badges Shall Be Returned To The Nearest Va Piv Badge Issuance Office. Once They Have Had Access To Va Information, Information Systems, Networks And Va Property In Their Possessions Removed, Contractors Shall Notify The Appropriate Va Cor/co. training. This Entire Section Applies To All Acquisitions Which Include Section 3. all Contractors And Subcontractors Requiring Access To Va Information And Va Information Systems Shall Successfully Complete The Following Before Being Granted Access To Va Information And Its Systems: va Privacy And Information Security Awareness And Rules Of Behavior Course (talent Management System (tms) #10176) Initially And Annually Thereafter. sign And Acknowledge (electronically Through Tms #10176) Understanding Of And Responsibilities For Compliance With The Organizational Rules Of Behavior, Relating To Access To Va Information And Information Systems Initially And Annually Thereafter; And successfully Complete Any Additional Cyber Security Or Privacy Training, As Required For Va Personnel With Equivalent Information System Or Information Access [to Be Defined By The Va Program Official And Provided To The Va Co For Inclusion In The Solicitation Document I.e., Any Role- Based Information Security Training]. the Contractor Shall Provide To The Cor/co A Copy Of The Training Certificates And Certification Of Signing The Organizational Rules Of Behavior For Each Applicable Employee Within Five Days Of The Initiation Of The Contract And Annually Thereafter, As Required. failure To Complete The Mandatory Annual Training Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Required Training Is Complete. security Incident Investigation. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. the Contractor, Subcontractor, Their Employees, Or Business Associates Shall Immediately (within One Hour) Report Suspected Security / Privacy Incidents To The Va Oit S Enterprise Service Desk (esd) By Calling (855) 673-4357 (tty: 711). The Esd Is Oit S 24/7/365 Single Point Of Contact For It-related Issues. After Reporting To The Esd, The Contractor, Subcontractor, Their Employees, Or Business Associates Shall, Within One Hour, Provide The Cor/co The Incident Number Received From The Esd. to The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved And The Circumstances Surrounding The Incident, Including The Following: the Date And Time (or Approximation Of) The Security Incident Occurred. the Names Of Individuals Involved (when Applicable). the Physical And Logical (if Applicable) Location Of The Incident. why The Security Incident Took Place (i.e., Catalyst For The Failure). the Amount Of Data Belonging To Va Believed To Have Been Compromised. the Remediation Measures The Contractor Is Taking To Ensure No Future Incidents Of A Similar Nature. after The Contractor Has Provided The Initial Detailed Incident Summary To Va, They Will Continue To Provide Written Updates On Any New And Relevant Circumstances Or Facts They Discover. The Contractor, Subcontractor, And Their Employes Shall Fully Cooperate With Va Or Third-party Entity Performing An Independent Risk Analysis On Behalf Of Va. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. va It Contractors Shall Follow Va Handbook 6500, Risk Management Framework For Va Information Systems Va Information Security Program, And Va Information Security Knowledge Service Guidance For Implementing An Incident Response Plan Or Integrating With An Existing Va Implementation. in Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig, And The Va Office Of Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. the Contractor Shall Comply With Va Handbook 6500.2, Management Of Breaches Involving Sensitive Personal Information, Which Establishes The Breach Management Policies And Assigns Responsibilities For The Oversight, Management And Reporting Procedures Associated With Managing Of Breaches. with Respect To Unsecured Protected Health Information (phi), The Contractor Is Deemed To Have Discovered A Data Breach When The Contractor Knew Or Should Have Known Of Breach Of Such Information. When A Business Associate Is Part Of Vha Contract, Notification To The Covered Entity (vha) Shall Be Made In Accordance With The Executed Baa. if The Contractor Or Any Of Its Agents Fails To Protect Va Sensitive Personal Information Or Otherwise Engages In Conduct Which Results In A Data Breach Involving Any Va Sensitive Personal Information The Contractor/subcontractor Processes Or Maintains Under The Contract; The Contractor Shall Pay Liquidated Damages To The Va As Set Forth In Clause 852.211-76, Liquidated Damages Reimbursement For Data Breach Costs. information System Design And Development. This Entire Section applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (to Include The Subcomponents Of Each) Designed Or Developed For Or On Behalf Of Va By Any Non-va Entity. information Systems Designed Or Developed On Behalf Of Va At Non-va Facilities Shall Comply With All Applicable Federal Law, Regulations, And Va Policies. This Includes Standards For The Protection Of Electronic Protected Health Information (phi), Outlined In 45 C.f.r. Part 164, Subpart C And Information And System Security Categorization Level Designations In Accordance With Fips 199, Standards For Security Categorization Of Federal Information And Information Systems And Fips 200, Minimum Security Requirements For Federal Information Systems. Baseline Security Controls Shall Be Implemented Commensurate With The Fips 199 System Security Categorization (reference Va Handbook 6500 And Va Trusted Internet Connections (tic) Architecture). contracted New Developments Require Creation, Testing, Evaluation, And Authorization In Compliance With Va Assessment And Authorization (a&a) Processes In Va Handbook 6500 And Va Information Security Knowledge Service To Obtain An Authority To Operate (ato). Va Directive 6517, Risk Management Framework For Cloud Computing Services, Provides The Security And Privacy Requirements For Cloud Environments. va It Contractors, Subcontractors And Third-party Service Providers Shall Address And/or Integrate Applicable Va Handbook 6500, Va Handbook 6517, Risk Management Framework For Cloud Computing Services And Information Security Knowledge Service Specifications In Delivered It Systems/solutions, Products And/or Services. If Systems/solutions, Products And/or Services Do Not Directly Match Va Security Requirements, The Contractor Shall Work Though The Cor/co To Identify The Va Organization Responsible For Governance Or Resolution. Contractors Shall Comply With Far 39.1, Specifically The Prohibitions Referenced. the Contractor (including Producers And Resellers) Shall Comply With Office Of Management And Budget (omb) M-22-18 And M-23-16 When Using Third-party Software On Va Information Systems Or Otherwise Affecting The Va Information. This Includes New Software Purchases And Software Renewals For Software Developed Or Modified By Major Version Change After The Issuance Date Of M- 22-18 (september 14, 2022). The Term Software Includes Firmware, Operating Systems, Applications And Application Services (e.g., Cloud-based Software), As Well As Products Containing Software. The Contractor Shall Provide A Self- Attestation That Secure Software Development Practices Are Utilized As Outlined By Executive Order (eo)14028 And Nist Guidance. A Third-party Assessment Provided By Either A Certified Federal Risk And Authorization Management Program (fedramp) Third Party Assessor Organization (3pao) Or One Approved By The Agency Will Be Acceptable In Lieu Of A Software Producer's Self- Attestation. the Contractor Shall Ensure All Delivered Applications, Systems And Information Systems Are Compliant With Homeland Security Presidential Directive (hspd) 12 And Va Identity And Access Management (iam) Enterprise Identity Management Requirements As Set Forth In Omb M-19-17, M-05-24, Fips 201-3, Personal Identity Verification (piv) Of Federal Employees And Contractors (or Its Successor), M-21-31 And Supporting Nist Guidance. This Applies To Commercial Off-the-shelf (cots) Product(s) That The Contractor Did Not Develop, All Software Configurations And All Customizations. the Contractor Shall Ensure All Contractor Delivered Applications And Systems Provide User Authentication Services Compliant With Va Handbook 6500, Va Information Security Knowledge Service, Iam Enterprise Requirements And Nist 800-63, Digital Identity Guidelines, For Direct, Assertion-based Authentication And/or Trust-based Authentication, As Determined By The Design And Integration Patterns. Direct Authentication At A Minimum Must Include Public Key Infrastructure (pki) Based Authentication Supportive Of Piv And/or Common Access Card (cac), As Determined By The Business Need And Compliance With Va Information Security Knowledge Service Specifications. the Contractor Shall Use Va Authorized Technical Security Baseline Configurations And Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems In Compliance With Va Baselines Prior To Acceptance Or Connection Into An Authorized Va Computing Environment. If The Defense Information Systems Agency (disa) Has Created A Security Technical Implementation Guide (stig) For The Technology, The Contractor May Configure To Comply With That Stig. If Va Determines A New Or Updated Va Configuration Baseline Needs To Be Created, The Contractor Shall Provide Required Technical Support To Develop The Configuration Settings. Far 39.1 Requires The Population Of Operating Systems And Applications Includes All Listed On The Nist National Checklist Program Checklist Repository. the Standard Installation, Operation, Maintenance, Updating And Patching Of Software Shall Not Alter The Configuration Settings From Va Approved Baseline Configuration. Software Developed For Va Must Be Compatible With Va Enterprise Installer Services And Install To The Default Program Files Directory With Silently Install And Uninstall. The Contractor Shall Perform Testing Of All Updates And Patching Prior To Implementation On Va Systems. applications Designed For Normal End Users Will Run In The Standard User Context Without Elevated System Administration Privileges. the Contractor-delivered Solutions Shall Reside On Va Approved Operating Systems. Exceptions To This Will Only Be Granted With The Written Approval Of The Cor/co. the Contractor Shall Design, Develop, And Implement Security And Privacy Controls In Accordance With The Provisions Of Va Security System Development Life Cycle Outlined In Nist 800-37, Risk Management Framework For Information Systems And Organizations: A System Life Cycle Approach For Security And Privacy, Va Directive And Handbook 6500, And Va Handbook 6517. the Contractor Shall Comply With The Privacy Act Of1974 (the Act), Far 52.224- 2 Privacy Act, And Va Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish A Va Function. the Contractor Shall Ensure The Security Of All Procured Or Developed Information Systems, Systems, Major Applications, Minor Applications, Enclaves And Platform Information Technologies, Including Their Subcomponents (hereinafter Referred To As Information Systems ) Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes Security Configurations, Workarounds, Patches, Hotfixes, Upgrades, Replacements And Any Physical Components Which May Be Necessary To Remediate All Security Vulnerabilities Published Or Known To The Contractor Anywhere In The Information Systems (including Systems, Operating Systems, Products, Hardware, Software, Applications And Firmware). The Contractor Shall Ensure Security Fixes Do Not Negatively Impact The Information Systems. when The Contractor Is Responsible For Operations Or Maintenance Of The Systems, The Contractor Shall Apply The Security Fixes Within The Timeframe Specified By The Associated Controls On The Va Information Security Knowledge Service. When Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Contractor Shall Provide Written Notice To The Va Cor/co That The Patch Has Been Validated As To Not Affecting The Systems Within 10 Business Days. information System Hosting, Operation, Maintenance Or Use. this Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (cloud And Non- Cloud) Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. the Contractor Shall Comply With All Federal Laws, Regulations, And Va Policies For Information Systems (cloud And Non-cloud) That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. Security Controls For Collecting, Processing, Transmitting, And Storing Of Va Sensitive Information, Must Be In Place. The Controls Will Be Tested By Va Or A Va Sanctioned 3pao And Approved By Va Prior To Hosting, Operation, Maintenance Or Use Of The Information System Or Systems By Or On Behalf Of Va. This Includes Conducting Compliance Risk Assessments, Security Architecture Analysis, Routine Vulnerability Scanning, System Patching, Change Management Procedures And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor S Security Control Procedures Shall Be The Same As Procedures Used To Secure Va-operated Information Systems. outsourcing (contractor Facility, Equipment, Or Staff) Of Systems Or Network Operations, Telecommunications Services Or Other Managed Services Require Assessment And Authorization (a&a) Of The Contractor S Systems In Accordance With Va Handbook 6500 As Specified In Va Information Security Knowledge Service. Major Changes To The A&a Package May Require Reviewing And Updating All The Documentation Associated With The Change. The Contractor S Cloud Computing Systems Shall Comply With Fedramp And Va Directive 6517 Requirements. the Contractor Shall Return All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) On Non-va Leased Or Non-va Owned It Equipment Used To Store, Process Or Access Va Information To Va In Accordance With A&a Package Requirements. This Applies When The Contract Is Terminated Or Completed And Prior To Disposal Of Media. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Information Security Knowledge Service Requirements And Nist 800-88. The Contractor Shall Send A Self-certification That The Data Destruction Requirements Above Have Been Met To The Cor/co Within 30 Business Days Of Termination Of The Contract. all External Internet Connections To Va Network Involving Va Information Must Be In Accordance With Va Trusted Internet Connection (tic) Reference Architecture And Va Directive And Handbook 6513, Secure External Connections And Reviewed And Approved By Va Prior To Implementation. Government-owned Contractor-operated Systems, Third Party Or Business Partner Networks Require A Memorandum Of Understanding (mou) And Interconnection Security Agreements (isa). contractor Procedures Shall Be Subject To Periodic, Announced, Or Unannounced Assessments By Va Officials, The Oig Or A 3pao. The Physical Security Aspects Associated With Contractor Activities Are Also Subject To Such Assessments. The Contractor Shall Report, In Writing, Any Deficiencies Noted During The Above Assessment To The Va Cor/co. The Contractor Shall Use Va S Defined Processes To Document Planned Remedial Actions That Address Identified Deficiencies In Information Security Policies, Procedures, And Practices. The Contractor Shall Correct Security Deficiencies Within The Timeframes Specified In The Va Information Security Knowledge Service. all Major Information System Changes Which Occur In The Production Environment Shall Be Reviewed By The Va To Determine The Impact On Privacy And Security Of The System. Based On The Review Results, Updates To The Authority To Operate (ato) Documentation And Parameters May Be Required To Remain In Compliance With Va Handbook 6500 And Va Information Security Knowledge Service Requirements. the Contractor Shall Conduct An Annual Privacy And Security Self-assessment On All Information Systems And Outsourced Services As Required. Copies Of The Assessment Shall Be Provided To The Cor/co. The Va/government Reserves The Right To Conduct Assessment Using Government Personnel Or A Third-party If Deemed Necessary. The Contractor Shall Correct Or Mitigate Any Weaknesses Discovered During The Assessment. va Prohibits The Installation And Use Of Personally Owned Or Contractor-owned Equipment Or Software On Va Information Systems. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow, Pws, Pd Or Contract. All Security Controls Required For Government Furnished Equipment Must Be Utilized In Va Approved Other Equipment (oe). Configuration Changes To The Contractor Oe, Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Use A Va-approved Antivirus Software And A Personal (host-based Or Enclave Based) Firewall With A Va-approved Configuration. The Contractor Shall Ensure Software On Oe Is Kept Current With All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-virus Software And The Firewall On The Non-va Owned Oe. Approved Contractor Oe Will Be Subject To Technical Inspection At Any Time. the Contractor Shall Notify The Cor/co Within One Hour Of Disclosure Or Successful Exploits Of Any Vulnerability Which Can Compromise The Confidentiality, Integrity, Or Availability Of The Information Systems. The System Or Effected Component(s) Need(s) To Be Isolated From The Network. A Forensic Analysis Needs To Be Conducted Jointly With Va. Such Issues Will Be Remediated As Quickly As Practicable, But In No Event Longer Than The Timeframe Specified By Va Information Security Knowledge Service. If Sensitive Personal Information Is Compromised Reference Va Handbook 6500.2 And Section 5, Security Incident Investigation. for Cases Wherein The Contractor Discovers Material Defects Or Vulnerabilities Impacting Products And Services They Provide To Va, The Contractor Shall Develop And Implement Policies And Procedures For Disclosure To Va, As Well As Remediation. The Contractor Shall, Within 30 Business Days Of Discovery, Document A Summary Of These Vulnerabilities Or Defects. The Documentation Will Include A Description Of The Potential Impact Of Each Vulnerability And Material Defect, Compensating Security Controls, Mitigations, Recommended Corrective Actions, Fbonotice Cause Analysis And/or Workarounds (i.e., Monitoring). Should There Exist Any Backdoors In The Products Or Services They Provide To Va (referring To Methods For Bypassing Computer Authentication), The Contractor Shall Provide The Va Co/co Written Assurance They Have Permanently Remediated These Backdoors. all Other Vulnerabilities, Including Those Discovered Through Routine Scans Or Other Assessments, Will Be Remediated Based On Risk, In Accordance With The Remediation Timelines Specified By The Va Information Security Knowledge Service And/or The Applicable Timeframe Mandated By Cybersecurity & Infrastructure Security Agency (cisa) Binding Operational Directive (bod) 22- 01 And Bod 19-02 For Internet-accessible Systems. Exceptions To This Paragraph Will Only Be Granted With The Approval Of The Cor/co. security And Privacy Controls Compliance Testing, Assessment and Auditing. This Entire Section Applies Whenever Section 6 Or 7 Is Included. should Va Request It, The Contractor Shall Provide A Copy Of Their (corporation S, Sole Proprietorship S, Partnership S, Limited Liability Company (llc), Or Other Business Structure Entity S) Policies, Procedures, Evidence And Independent Report Summaries Related To Specified Cybersecurity Frameworks (international Organization For Standardization (iso), Nist Cybersecurity Framework (csf), Etc.). Va Or Its Third-party/partner Designee (if Applicable) Are Further Entitled To Perform Their Own Audits And Security/penetration Tests Of The Contractor S It Or Systems And Controls, To Ascertain Whether The Contractor Is Complying With The Information Security, Network Or System Requirements Mandated In The Agreement Between Va And The Contractor. any Audits Or Tests Of The Contractor Or Third-party Designees/partner Va Elects To Carry Out Will Commence Within 30 Business Days Of Va Notification. Such Audits, Tests And Assessments May Include The Following: (a): Security/penetration Tests Which Both Sides Agree Will Not Unduly Impact Contractor Operations; (b): Interviews With Pertinent Stakeholders And Practitioners; (c): Document Review; And (d): Technical Inspections Of Networks And Systems The Contractor Uses To Destroy, Maintain, Receive, Retain, Or Use Va Information. as Part Of These Audits, Tests And Assessments, The Contractor Shall Provide All Information Requested By Va. This Information Includes, But Is Not Limited To, The Following: Equipment Lists, Network Or Infrastructure Diagrams, Relevant Policy Documents, System Logs Or Details On Information Systems Accessing, Transporting, Or Processing Va Data. the Contractor And At Its Own Expense, Shall Comply With Any Recommendations Resulting From Va Audits, Inspections And Tests. Va Further Retains The Right To View Any Related Security Reports The Contractor Has Generated As Part Of Its Own Security Assessment. The Contractor Shall Also Notify Va Of The Existence Of Any Such Security Reports Or Other Related Assessments, Upon Completion And Validation. va Appointed Auditors Or Other Government Agency Partners May Be Granted Access To Such Documentation On A Need-to-know Basis And Coordinated Through The Cor/co. The Contractor Shall Comply With Recommendations Which Result From These Regulatory Assessments On The Part Of Va Regulators And Associated Government Agency Partners. product Integrity, Authenticity, Provenance, Anti-counterfeit and Anti-tampering. This Entire Section Applies When The Acquisition Involves Any Product (application, Hardware, Or Software) Or When Section 6 Or 7 Is Included. the Contractor Shall Comply With Code Of Federal Regulations (cfr) Title 15 Part 7, Securing The Information And Communications Technology And Services (icts) Supply Chain , Which Prohibits Icts Transactions From Foreign Adversaries. Icts Transactions Are Defined As Any Acquisition, Importation, Transfer, Installation, Dealing In Or Use Of Any Information And Communications Technology Or Service, Including Ongoing Activities, Such As Managed Services, Data Transmission, Software Updates, Repairs Or The Platforming Or Data Hosting Of Applications For Consumer Download. when Contracting Terms Require The Contractor To Procure Equipment, The Contractor Shall Purchase Or Acquire The Equipment From An Original Equipment Manufacturer (oem) Or An Authorized Reseller Of The Oem. The Contractor Shall Attest That Equipment Procured From An Oem Or Authorized Reseller Or Distributor Are Authentic. If Procurement Is Unavailable From An Oem Or Authorized Reseller, The Contractor Shall Submit In Writing, Details Of The Circumstances Prohibiting This From Happening And Procure A Product Waiver From The Va Cor/co. all Contractors Shall Establish, Implement, And Provide Documentation For Risk Management Practices For Supply Chain Delivery Of Hardware, Software (to Include Patches) And Firmware Provided Under This Agreement. Documentation Will Include Chain Of Custody Practices, Inventory Management Program, Information Protection Practices, Integrity Management Program For Sub-supplier Provided Components, And Replacement Parts Requests. The Contractor Shall Make Spare Parts Available. All Contractor(s) Shall Specify How Digital Delivery For Procured Products, Including Patches, Will Be Validated And Monitored To Ensure Consistent Delivery. The Contractor Shall Apply Encryption Technology To Protect Procured Products Throughout The Delivery Process. if A Contractor Provides Software Or Patches To Va, The Contractor Shall Publish Or Provide A Hash Conforming To The Fips Security Requirements For Cryptographic Modules (fips 140-2 Or Successor). the Contractor Shall Provide A Software Bill Of Materials (sbom) For Procured (to Include Licensed Products) And Consist Of A List Of Components And Associated Metadata Which Make Up The Product. Sboms Must Be Generated In One Of The Data Formats Defined In The National Telecommunications And Information Administration (ntia) Report The Minimum Elements For A Software Bill Of Materials (sbom). contractors Shall Use Or Arrange For The Use Of Trusted Channels To Ship Procured Products, Such As U.s. Registered Mail And/or Tamper-evident Packaging For Physical Deliveries. throughout The Delivery Process, The Contractor Shall Demonstrate A Capability For Detecting Unauthorized Access (tampering). the Contractor Shall Demonstrate Chain-of-custody Documentation For Procured Products And Require Tamper-evident Packaging For The Delivery Of This Hardware. viruses, Firmware And Malware. This Entire Section Applies When The Acquisition Involves Any Product (application, Hardware, Or Software) Or When Section 6 Or 7 Is Included. the Contractor Shall Execute Due Diligence To Ensure All Provided Software And Patches, Including Third-party Patches, Are Free Of Viruses And/or Malware Before Releasing Them To Or Installing Them On Va Information Systems. the Contractor Warrants It Has No Knowledge Of And Did Not Insert, Any Malicious Virus And/or Malware Code Into Any Software Or Patches Provided To Va Which Could Potentially Harm Or Disrupt Va Information Systems. The Contractor Shall Use Due Diligence, If Supplying Third-party Software Or Patches, To Ensure The Third-party Has Not Inserted Any Malicious Code And/or Virus Which Could Damage Or Disrupt Va Information Systems. the Contractor Shall Provide Or Arrange For The Provision Of Technical Justification As To Why Any False Positive Hit Has Taken Place To Ensure Their Code S Supply Chain Has Not Been Compromised. Justification May Be Required, But Is Not Limited To, When Install Files, Scripts, Firmware, Or Other Contractor-delivered Software Solutions (including Third-party Install Files, Scripts, Firmware, Or Other Software) Are Flagged As Malicious, Infected, Or Suspicious By An Anti-virus Vendor. the Contractor Shall Not Upload (intentionally Or Negligently) Any Virus, Worm, Malware Or Any Harmful Or Malicious Content, Component And/or Corrupted Data/source Code (hereinafter Virus Or Other Malware ) Onto Va Computer And Information Systems And/or Networks. If Introduced (and This Clause Is Violated), Upon Written Request From The Va Co, The Contractor Shall: take All Necessary Action To Correct The Incident, To Include Any And All Assistance To Va To Eliminate The Virus Or Other Malware Throughout Va S Information Networks, Computer Systems And Information Systems; And use Commercially Reasonable Efforts To Restore Operational Efficiency And Remediate Damages Due To Data Loss Or Data Integrity Damage, If The Virus Or Other Malware Causes A Loss Of Operational Efficiency, Data Loss, Or Damage To Data Integrity. cryptographic Requirement. This Entire Section Applies Whenever The Acquisition Includes Section 6 Or 7 Is Included. the Contractor Shall Document How The Cryptographic System Supporting The Contractor S Products And/or Services Protect The Confidentiality, Data Integrity, Authentication And Non-repudiation Of Devices And Data Flows In The Underlying System. the Contractor Shall Use Only Approved Cryptographic Methods As Defined In Fips 140-2 (or Its Successor) And Nist 800-52 Standards When Enabling Encryption On Its Products. the Contractor Shall Provide Or Arrange For The Provision Of An Automated Remote Key-establishment Method Which Protects The Confidentiality And Integrity Of The Cryptographic Keys. the Contractor Shall Ensure Emergency Re-keying Of All Devices Can Be Remotely Performed Within 30 Business Days. the Contractor Shall Provide Or Arrange For The Provision Of A Method For Updating Cryptographic Primitives Or Algorithms. patching Governance. This Entire Section Applies Whenever The Acquisition Includes Section 7 Is Included the Contractor Shall Provide Documentation Detailing The Patch Management, Vulnerability Management, Mitigation And Update Processes (to Include Third- Party) Prior To The Connection Of Electronic Devices, Assets Or Equipment To Va S Assets. This Documentation Will Include Information Regarding The Follow: the Resources And Technical Capabilities To Sustain The Program Or Process (e.g., How The Integrity Of A Patch Is Validated By Va); And the Approach And Capability To Remediate Newly Reported Zero-day Vulnerabilities For Contractor Products. the Contractor Shall Verify And Provide Documentation All Procured Products (including Third-party Applications, Hardware, Software, Operating Systems, And Firmware) Have Appropriate Updates And Patches Installed Prior To Delivery To Va. the Contractor Shall Provide Or Arrange The Provision Of Appropriate Software And Firmware Updates To Remediate Newly Discovered Vulnerabilities Or Weaknesses For Their Products And Services Within 30 Days Of Discovery. Updates To Remediate Critical Or Emergent Vulnerabilities Will Be Provided Within Seven Business Days Of Discovery. If Updates Cannot Be Made Available By Contractor Within These Time Periods, The Contractor Shall Submit Mitigations, Methods Of Exploit Detection And/or Workarounds To The Cor/co Prior To The Above Deadlines. the Contractor Shall Provide Or Arrange For The Provision Of Appropriate Hardware, Software And/or Firmware Updates, When Those Products, Including Open-source Software, Are Provided To The Va, To Remediate Newly Discovered Vulnerabilities Or Weaknesses. Remediations Of Products Or Services Provided To The Va S System Environment Must Be Provided Within 30 Business Days Of Availability From The Original Supplier And/or Patching Source. Updates Toremediate Critical Vulnerabilities Applicable To The Contractor S Use Of The Third- Party Product In Its System Environment Will Be Provided Within Seven Business Days Of Availability From The Original Supplier And/or Patching Source. If Applicable Third-party Updates Cannot Be Integrated, Tested And Made Available By Contractor Within These Time Periods, Mitigations And/or Workarounds Will Be Provided To The Cor/co Before The Above Deadlines. specialized Devices/systems (medical Devices, Special Purpose systems, Research Scientific Computing). This Entire Section Applies When The Acquisition Includes One Or More Medical Device, Special Purpose System Or Research Scientific Computing Device. If Appropriate, Ensure Selected Clauses From Section 6 Or 7 And 8 Through 12 Are Included. contractor Supplies/delivered Medical Devices, Special Purpose Systems- Operational Technology (sps-ot) And Research Scientific Computing Devices Shall Comply With All Applicable Federal Law, Regulations, And Va Policies. New Developments Require Creation, Testing, Evaluation, And Authorization In Compliance With Processes Specified On The Specialized Device Cybersecurity Department Enterprise Risk Management (sdcd-erm) Portal, Va Directive 6550, Pre-procurement Assessment And Implementation Of Medical Devices/systems, Va Handbook 6500, And The Va Information Security Knowledge Service. Deviations From Federal Law, Regulations, And Va Policy Are Identified And Documented As Part Of Va Directive 6550 And/or The Va Enterprise Risk Analysis (era) Processes For Specialized Devices/systems Processes. all Contractors And Third-party Service Providers Shall Address And/or Integrate Applicable Va Handbook 6500 And Information Security Knowledge Service Specifications In Delivered It Systems/solutions, Products And/or Services. If Systems/solutions, Products And/or Services Do Not Directly Match Va Security Requirements, The Contractor Shall Work Though The Cor/co For Governance Or Resolution. the Contractor Shall Certify To The Cor/co That Devices/systems That Have Completed The Va Enterprise Risk Analysis (era) Process For Specialized Devices/systems Are Fully Functional And Operate Correctly As Intended. Devices/systems Must Follow The Va Era Authorized Configuration Prior To Acquisition And Connection To The Va Computing Environment. If Va Determines A New Va Era Needs To Be Created, The Contractor Shall Provide Required Technical Support To Develop The Configuration Settings. Major Changes To A Previously Approved Device/system Will Require A New Era. the Contractor Shall Comply With All Practices Documented By The Food Drug And Administration (fda) Premarket Submission For Management Of Cybersecurity In Medical Devices And Postmarket Management Of Cybersecurity In Medical Devices. the Contractor Shall Design Devices Capable Of Accepting All Applicable Security Patches With Or Without The Support Of The Contractor Personnel. If Patching Can Only Be Completed By The Contractor, The Contractor Shall Commit The Resources Needed To Patch All Applicable Devices At All Va Locations. If Unique Patching Instructions Or Packaging Is Needed, The Contractor Shall Provide The Necessary Information In Conjunction With The Validation/testing Of The Patch. The Contractor Shall Apply Security Patches Within 30 Business Days Of The Patch Release And Have A Formal Tracking Process For Any Security Patches Not Implemented To Include Explanation When A Device Cannot Be Patched. the Contractor Shall Provide Devices Able To Install And Maintain Va-approved Antivirus Capabilities With The Capability To Quarantine Files And Be Updated As Needed In Response To Incidents. Alternatively, A Va-approved Whitelisting Application May Be Used When The Contractor Cannot Install An Anti-virus / Anti- Malware Application. the Contractor Shall Verify And Document All Software Embedded Within The Device Does Not Contain Any Known Viruses Or Malware Before Delivery To Or Installation At A Va Location. devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Solid State, And Storage Via Chips/firmware) With Va Sensitive information Will Be Returned To The Contractor With Media Removed. When The Contract Requires Return Of Equipment, The Options Available To The Contractor Are The Following: the Contractor Shall Accept The System Without The Drive, Firmware And Solid State. va S Initial Device Purchase Includes A Spare Drive Or Other Replacement Media Which Must Be Installed In Place Of The Original Drive At Time Of Turn- In; Or due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With The Device, If It Is Not Possible For Va To Retain The Hard Drive, Firmware, And Solid State, Then: the Equipment Contractor Shall Have An Existing Baa If The Device Being Traded In Has Sensitive Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact. any Fixed Hard Drive, Complementary Metal-oxide-semiconductor (cmos), Programmable Read-only Memory (prom), Solid State And Firmware On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Pre-approved And Described In The Solicitation, Contract, Or Order. data Center Provisions. This Entire Section Applies Whenever The Acquisition Requires An Interconnection To/from The Va Network To/from A Non-va Location. the Contractor Shall Ensure The Va Network Is Accessed By In Accordance With Va Directive 6500 And Iam Security Processes Specified In The Va Information Security Knowledge Service. the Contractor Shall Ensure Network Infrastructure And Data Availability In Accordance With Va Information System Business Continuity Procedures Specified In The Va Information Security Knowledge Service. the Contractor Shall Ensure Any Connections To The Internet Or Other External Networks For Information Systems Occur Through Managed Interfaces Utilizing Va Approved Boundary Protection Devices (e.g., Internet Proxies, Gateways, Routers, Firewalls, Guards Or Encrypted Tunnels). the Contractor Shall Encrypt All Traffic Across The Segment Of The Wide Area Network (wan) It Manages And No Unencrypted Out Of Band (oob) Internet Protocol (ip) Traffic Will Traverse The Network. the Contractor Shall Ensure Tunnel Endpoints Are Routable Addresses At Each Va Operating Site. the Contractor Shall Secure Access From Local Area Networks (lans) At Co- Located Sites In Accordance With Va Tic Reference Architecture, Va Directive And Handbook 6513, And Mou/isa Process Specified In The Va Information Security Knowledge Service.
Closing Date17 Feb 2025
Tender AmountRefer Documents 

Oriental Mindoro Tender

Electronics Equipment...+2Electrical and Electronics, Solar Installation and Products
Philippines
Details: Description Republic Of The Philippines Provincial Government Of Oriental Mindoro Capitol Complex, Calapan City 5200, Oriental Mindoro Procurement Division Bids And Awards Committee For Goods And Services (1m And Above) Invitation To Bid Purchase Of Office Supplies And Devices/other Supplies For Use Of Pgom Office Supplies/other Supplies (1st Quarter) Based On Consolidated Annual Procurement Plan For The Year 2025 Ib No. Gsa 2025-02-006 1. The Provincial Government Of Oriental Mindoro, Through The General Fund Intends To Apply The Sum Of Three Million Seven Hundred Thirty Seven Thousand Three Hundred Fifty Eight Pesos And 40/100 Only (php 3,737,358.40) Being The Abc To Payments Under The Contract For Purchase Of Office Supplies And Devices/other Supplies For Use Of Pgom Office Supplies/other Supplies (1st Quarter) Based On Consolidated Annual Procurement Plan For The Year 2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Oriental Mindoro – Procurement Division Goods And Services Section Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Seven (7) Calendar Days Upon Signing Of The Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Item No. Item Description Qty./unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 Office Supplies Adaptor Arch File Ballpen Hi-techpoint V10 Grip (3 Black, 5 Blue) Ballpen Bps Fine (black) Ballpen 0.5 Mm (330 Black, 15 Blue) Ballpen 1.0 (black) Ballpen G2 .07 (30 Blue, 25 Black) Ballpen I-gel Retractable (150 Black, 13 Blue, 20 Violet) Ballpen (37 Black, 25 Blue, 5 Green, 4 Red) Ballpen G .5 (green) Ballpen, Ordinary (black) Ballpen, Retractable (1,198 Black,115 Blue) Bond Paper A3 S-20 70 Gsm Bond Paper A4 70 Gsm Bond Paper A4 80 Gsm Bond Paper A4 100 Gsm Bond Paper Long S-20 70gsm Bond Paper Short S-20 70gsm Bond Paper Long 80 Gsm Subs. 20 Bond Paper Short 80 Gsm Subs. 20 Bond Paper 8.5 X 22 In. Bond Paper Long Colored Bond Paper Short Colored (1 Green, 5 Pink) Bookends (by Pair) Bundy Card Cambric Board Long (10 White,4 Yellow,6 Cream,53 Beige) Cambric Paper Long (white Cream, Beige) Cambric Board Short (4 Green, 65 White, 48 Beige) Cambric Paper Short (white Cream, Beige) Calculator Scientific Calculator Aoc 12 Digits Black Calculator (ws 1410t(14 Digits) Calculator Mx12b Calculator Ribbon (dr120) Carbon Paper, Long Blue Cartolina (assorted) Cd Recordable Cd Re-writable Clear Folder Long Clear Book Long Clear Stationary Tape (3/4 Inchx27 Big Core) Clear Stationary Tape (100mm) Clip Binder, 2" Clip Binder, 1" Clip Binder, 3/4 Clip Binder, Small Clip Board With Cover Colored Paper Asstd. Color L Colored Paper Asstd. Color S Colored Paper Long (green) Computer Headset Computer Mouse With Wire Computer Mouse Wireless Computer Mouse Pad Heavy Duty Combo Cover Plastic (long) Combo Cover Plastic (a4) Combo Cover Plastic (short) Combo Ring 1/2" Combo Ring 1/4" Combo Ring 3/4" Combo Ring 1" Combo Ring 1 1/4 Combo Ring 1 1/2 Combo Ring 2" Specialty Paper (long) Yellow Construction Paper, Asstd. Color Correction Pen Correction Tape Correction Fluid Cutter Big Heavy Duty Cutter Blade, Big Daily Time Cards 100's Date Stamp Double Loop Wires (12.7 Mm 110 Sheet Cap) Double Sided Tape, 1" Heavy Duty Double Sided Tape, 1" Double Sided Tape, .5 Duct Tape 2" Thick Duct Tape 3" Thick Engineer's Field Book Envelope Brown Long Envelope Brown Short Expanded Envelope With Garter Long (635 Green,25 Blue,15 Brown,10 Yellow) Expanded Envelope With Garter Short (10 Green) Expanded Plastic Envelope Long Expanded Plastic Envelope Long Thick W/ Handle Expanding Envelope Long Expanding Folder Long (thick) (blue, Green) Expanding Folder Short Eraser, Big Eraser, Medium External Hard Disk 1tb Fastener, Plastic Fastener Plastic 6 Inches File Box Single File Box Double File Rack Double File Rack Tray 2 Layer File Rack Tray 3 Layer Flash Drive 8gb Flash Drive 16gb Flash Drive 32gb Flash Drive 64gb Folder White Long (rms) Folder Short Folder Ordinary - Long Folder Thick - Long Red Folder Press Board Long (1,426green, 20 Red) Folder Press Board Short (162 Green) Glue - 130gms Glue Padding 500g High Lighter Pen (102 Asstd. Colors, 10 Light Green,38 Green, 3 Blue, 28 Yellow) Hdmi High Speed Cable (15 Meters) Hdmi High Speed Cable (10 Meters) Hdmi Splitter (1 In 4 Out With Power Supply) Illustration Board (1/4) Illustration Board (1/8) Ink Refill 003 65ml (c,m,y) Ink Refill 003 65ml 00v1 For Epson (black) Ink Refill 003 65ml 00v1 For Epson (magenta) Ink Refill 003 65ml 00v1 For Epson (cyan) Ink Refill 003 65ml 00v1 For Epson (yellow) Ink Refill 664 65ml For Epson (black) Ink Refill 664 65ml For Epson (magenta) Ink Refill 664 65ml For Epson (cyan) Ink Refill 664 65ml For Epson (yellow) Ink 001 L6170 Black For Epson Ink 001 L6170 Cyan For Epson Ink 001 L6170 Magenta For Epson Ink 001 L6170 Yellow For Epson Ink #810 Black For Canon Printer Ink #811 Colored For Canon Printer Ink #704 Black For Hp Printer Ink #704 Tri Color For Hp Printer Ink Ts207#745xl For Canon Printer Black Cartridge Ink Ts207#746xl For Canon Printer Colored Cartridge Ink Refill Bt D60 Bk 108ml Ink Refill Bt 5000bk For Brother Printer Ink Refill Bt 5000m For Brother Printer Ink Refill Bt 5000c For Brother Printer Ink Refill Bt 5000y For Brother Printer Ink L3110 Black Ink L3110 Cyan Ink L3110 Yellow Ink L3110 Magenta Ink L360 Black For Epson Printer Ink L360 Yellow For Epson Printer Ink L360 Cyan For Epson Printer Ink L360 Magenta For Epson Printer Ink 003 Black For Epson Printer Ink 003 Yellow For Epson Printer Ink 003 Magenta For Epson Printer Ink 003 Cyan For Epson Printer Ink 008 Black 127ml Ink 008 Cyan 70ml Ink 008 Magenta 70ml Ink 008 Yellow 70ml Ink Lc535xl For Brother Printer Black Ink Lc535xl For Brother Printer Yellow Ink Lc535xl For Brother Printer Magenta Ink Lc535xl For Brother Printer Cyan Ink - T 6641 Refill - Black Ink - T 6643 Refill - Magenta Ink - T 6642 Refill - Cyan Ink - T 6644 Refill - Yellow Ink Universal - Set Ink Universal - Black Ink Universal - Cyan Ink Universal - Magenta Ink Universal - Yellow Ink Universal - Black 100ml Ink Universal - Yellow 100ml Ink Universal - Magenta 100ml Ink Universal - Cyan 100ml Ink 008 Pigment Ink Genuine Set Of 4 Colors Ink Refill 70ml For Epson Cyan Ink Refill 70ml For Epson Magenta Ink Refill 70ml For Epson Yellow Computer Ink 1lt (black) Index Card 1/2 Index Card 5x8 Indexing Tab, Plastic Indexing Tab Multicolor Plastic 7's Intermediate Pad Paper Keyboard Cleaning Brush Laminating Film Long 1.25 Laminating Film Long 2.50 Laminating Film Short 1.25 Laminating Film Short 2.50 Laminator A3/a4 Magazine Box Mailing Envelop White Short Adv. Mailing Envelop White Long Adv. Maintenance Box L6170 (t04d1) Maintenance Box L15150 (original) Manila Paper Masking Tape, 1" Masking Tape, 2" Mechanical Pencil 0.7mm Mechanical Pencil Lead (.05) Mechanical Pencil Lead (.07) Mechanical Pencil Eraser Monitor Screen Protector Anti-radiation 23" Monitor Screen Protector Anti-radiation 21" Nano Tape 1x10m Notebook, Thick With Yarn Notebook, Writing Oil Pastel, 16's Packaging Tape 3" Paper Clip - Small Paper Clip -big Paper Cutter Paste 170 Gms Pencil #2 Pencil Sharpener Pentelpen - Fine (121 Black,15 Blue) Pentelpen - Broad Black Pentelpen - Ink (black) Pet A4 Size For Id Printing Bag Tag Calling Card Making (id Material) (50 Sets) Pvc Binding Cover 300 Microns (clear, A4) Pvc Binding Cover A4 200 Microns (100 Sheets) Pvc Binding Cover 200 Microns (clear, Long) Photo Paper (7 Inkjet, 48 Glossy) Plastic Cover Thick #6 Plastic Cover Thick #6 Yrd Photo Paper A4 Double Sided Post It Tape Flag #683-4 1inchx1.17inch 11,9mm Post It Tape Flag Sign Here Post It Note 5x2 Asst. Color Post It Note 1x3 (5 Green, 10 Asst. Color) Post It Note 2x3 (5 Green, 43 Asst. Color) Post It Note 3x3 Post It Note 3x4 (10 Mint Green, 6 Green, 61 Asst. Color) Post It Note 3x5 Post It Note 4x4 Poster Color 12's Portable Hard Drive 1tb Projector Adjustable Tripod Stand (60-180cm- Height) Puncher 3 Hole No. 321 Puncher - Heavy Duty Push Pin 50s Recorder Record Holder/ Folder Rack - (black) Record Book 500pg Record Book 300pg (46 Green,12 Blue,12 Red,25 Asst. Color) Record Book 200pg (43 Green, 4 Blue, 4 Red, 43 Asst. Color) Report Clear Folder Long Report Clear Folder Short Ring Binder Folder 2 Holes Heavy Duty Rubber Band Small, 350gms Rubber Band Thick Big Rubber Stamp Ruler, Metal, 12" Sd Card 128gb Scissors Heavy Duty Scotch Tape 1/2" Scotch Tape 1" Scotch Tape 2" Signpen Hi-tecpoint V7 Rt (10 Blue,12 Black, Green) Signpen Gtech 0.4 (30 Black, 15 Blue) Signpen Gtech 0.4 (1 Blue,11 Black) Signpen 0.7 Vball (9 Blue, 4 Black) Signpen V10 Grip Signpen V10 Grip (6 Black, 5 Blue) Signpen - Gel Impact, 1.0 (3 Blue,14 Black) Signpen - Gel Impact, Refill (blue) Signpen - Gel Impact, 1.0 (20 Black, 10 Blue) Signpen, I-gel .5 (51 Black,15 Blue,3 Green,3 Pink, 25 Violet) Signpen, Hi-tech V-ball .5 (59 Black,3 Violet,14 Blue,6 Green) Signpen, Hi-tech V-ball .7 (10 Black,26 Blue) Signpen,v .5 Violet Sliding Folder A4 Plastic Hard Board Sliding Folder Long Plastic Hard Board Green Stamp Ink Rubberized Stamp Pad #1 Stamp Pad Ink 950ml Blue Stamp Pad Ink, Violet Med, 30ml Stamp Pad Ink Big 473ml (violet, Blue) Staple Gun Tacker T25 Heavy Duty Staple Wire 23x55 Staple Wire#35 Stapler Heavy Duty Stapler With Remover, #35 Heavy Duty Steno Notebook (30pp) Sticker Paper (27 Matte, 35 Glossy) Sticker Paper For Label (high Gloss) (a4) (100pcs/pack) Tabbing Clear 1/2 Tacker Tacker Wire Tape Dispenser Big Toner Mp2000l2 Dsm 615 Toner Mp 2501sp Toner Kit Black Tk4140-tasklfa 2020 Toner For M2701 Ups 1000va Usb 3.0 Hub Splitter Usb 3.0 Otg Card Reader Vellum Board Long 220gsm (white) Vellum Board Short 220gsm (white) Vellum Board Long 100 Shts 200 Gms Vellum Board Short 100 Shts 200 Gms (2 White,10 Pink,12 Blue,1 Asst. Color) Wifi Router White Mimeo Long White Board 3x2m White Board Marker (61 Black, 2 Blue) White Board Eraser Yellow Pad Other Supplies Adaptor Airfreshner In Canister 320ml (lemon Scent) Airfreshner Spray 320ml (2 Sampaguita,104 Lemon) Airfreshner Spray 120ml (15 Lemon, 6 Blossom & Breeze) Alcohol Gal Alcohol 70% Isopropyl 250ml Alcohol 70% Isopropyl 500ml Car Freshener 320ml (lemon Scent) Airfreshner Spray 320ml (18 Lemon,40 Lavender) Bleaching Liquid (gals) Bleaching Liquid (white, Violet) Basahang Bilog Thick Box Tissue Battery Charger For Aa/aaa Battery Rechargeable Aa 2pc/pack Battery Rechargeable Aaa 2pc/pack Bath Soap (family Size) Bath Soap Regular Bath Soap Small Sachet Battery Aaa Heavy Duty Battery Aa Heavy Duty Battery Aa Black Battery Aaa Black Bulb 18watts Bath Towel Baby Powder 25g Bed Sheet (fitted) Single Bed Sheet Cover, Single (3 In 1) Blanket (333) Chlorine Powder Combo Binding Machine Car Shampoo Chamois Cabinet Medical Certificate Holder 8.5x11 Dark Green Cotton Buds 300/cn Cable Tie Medium Cable Tie Large Deodorant Cake Deodorant Cake W/ Case Deodorant Roll On Detergent Bar Detergent Bar Single Dish Cabinet Dishwashing Liquid 250ml Dishwashing Liquid 600ml Dishwashing Paste Big Disinfectant All-purpose Cleaner Big Disinfectant Spray 510g Disinfectant Spray 340g Disinfectant Spray 275g Disposable Mask Door Mat Rug Thick Door Mat Rubber Dipper Ordinary Dust Pan W/ Broom Dust Pan Big Dust Pan Stainless Eco Bag 35x66 50's Eco Bag 30x50 50's Electric Airpot Electric Fan Escuba Brush Extension Wire (hd 4 Sockets 10mtrs) Extension Wire (hd 4 Sockets 25mtrs) Industrial Extension Cord Wheel (50m) Electrical Tape Big Emergency Light Led Fabric Conditioner 700ml Fabric Conditioner Antibac 900ml Fabric Conditioner Sachet Fabric Conditioner Antibac Ltr Faucet Metal Fluorescent Bulb Led 16 Watts Fluorescent Bulb Led 36 Watts, Day Light Fluorescent Lamp 16w Fork Floor Mop Cloth Floor Mop W/ Handle Floor Scrub Floor Brush With Long Handle Furniture Cleaner Furniture Polish Spray 330ml Garbage Bag 14x14 (green) 100's Garbage Bag Biodegradable 36x48 Garbage Bag Medium Biodegradable Garbage Bag Small Plastic 10's Garbage Bag Large Size (black) Garbage Bag Large Size 10's Garbage Bag Extra Large Thick Garbage Bag Extra Large Thick 100's Garbage Bag Small Garbage Bag Big (1 Black,1 Yellow,1 Green) 100's Garbage Bag Medium (11x11x24) 100's Garbage Bag Biodegradable Large 100's Garbage Bag Small 9x9x20 100's Garbage Bag 13x13x32 Asst. Colors 100's Garbage Bag 16x24 100's Garbage Bag 18.5x18.5x40 Garbage Bag 36x48 100's Garbage Can W/ Cover (16 L) Garbage Can W/ Cover W/ Wheels (80l) Glass & Window Cleaner With Sponge Glass Cleaner Big Spray 500ml Glass Wiper Hand Sanitizer 500ml Hand Towel Hand Towel, Micro Fiber Hand Wash Liquid 250 Ml Hygiene Kit Insecticide Spray Big (12 Water Base) 600ml Leggings (black) Led Bulb 10 Watts Led Bulb 16 Watts Led Bulb 18 Watts Led Bulb 9 Watts Mattress Foam With Cover, 5" Thick, Single Mop Handle Plastic Mop Head #40 Cloth Mop Squeezer Mop Handle Metal Muriatic Acid Big 1000ml Paper Cups 100's Paper Towel Big Paper Towel Big Interfolded Pail W/ Cover 16ltrs Pail W/ Cover 24ltrs Pail W/ Cover Big Pot Holder Powder Detergent 1kl Powder Laundry Sachet Powder Laundry 500g Pranela Rag (10pc/pack) Pillow Case Pillows Panty (3doz Xl, 2doz L) Plate (porcelain) Rechargeable Light Bulb Rechargeable Flash Light Heavy Duty Spin Mop Self-wash Scouring Pad W/ Foam Big Scouring Pad W/ Foam Small Scouring Pad Shoe Lace Steel Wool Storage Box Sando Bag Medium Biodegradable 100's Sando Bag Large Biodegradable 100's Shampoo Spoon Spoon & Fork Sponge Sanitary Napkins Solar Light, Outdoor 800watts Squeeze Sponge Mop Straw Rope (black) - Rolls Table Napkin Tawas Powder 50g Tissue Paper 2 Ply Tissue Paper 3 Ply Tissue Paper 3 Ply (set Of 12) Thumbtacks Toilet Bowl Brush Toilet Bowl Brush Plastic Handle Toilet Bowl Brush With Long Handle Toilet Bowl Cleaner 500ml Toilet Bowl Cleaner 1l Toilet Bowl Cleaner 500ml Toilet Bowl Cleaner 1l Toilet Pump Trash Can Big Trash Can Big W/ Cover Trash Can Small Trash Can W/ Pedal Toothpaste Triple Action (2x 195g) Tornado Mop Big Tornado Mop Head Utility Box W/ Cover Utility Flexi Box Medium Plastic Utility Flexi Box Large Plastic Micro-fiber Gloves Cleaning Cloth Utility Gloves Utility Gloves Cotton W/ Dotted Gloves Water Dispenser, Hot And Cold Water Based Essential Oil For Humidifier 100ml (1 Lavender & Peppermint, 1 Calm Cough, 1 Bugs Away, 1 Warm Cotton, 1 Pure Lavender) Walis Tambo Thick Walis Tinting Irok Wall Clock X-x-x 4 Pcs 5 Pcs 8 Bxs 97 Pcs 345 Pcs 197 Pcs 55 Pcs 183 Pcs 71 Pcs 100 Pcs 100 Pcs 1,313 Pcs 50 Rms 51 Rms 14 Rms 3 Rms 1,638 Rms 727 Rms 3 Rms 3 Rms 7 Rms 15 Rms 6 Rms 8 Pcs 74 Pcs 73 Packs 43 Packs 117 Packs 30 Packs 2 Pcs 3 Pcs 1 Pc 17 Pcs 10 Bxs 5 Bxs 36 Pcs 9 Pcs 50 Pcs 25 Pcs 3 Pcs 30 Rolls 30 Rolls 77 Boxes 89 Boxes 72 Boxes 5 Boxes 5 Boxes 3 Rms 2 Rms 10 Rms 5 Pcs 1 Pc 2 Pcs 8 Pcs 126 Pcs 15 Pcs 58 Pcs 21 Pcs 18 Pcs 10 Pcs 24 Pcs 10 Pcs 5 Pcs 5 Pcs 1 Rm 1 Rm 31 Pcs 427 Pcs 12 Pcs 25 Pcs 9 Tubes 3 Packs 2 Pcs 1 Box 2 Pcs 120 Rolls 21 Rolls 25 Rolls 3 Rolls 10 Pcs 800 Pcs 428 Pcs 685 Pcs 10 Pcs 10 Pcs 18 Pcs 52 Pcs 152 Pcs 24 Pcs 2 Pcs 10 Pcs 1 Pc 129 Boxes 11 Boxes 27 Pcs 8 Pcs 13 Pcs 18 Pcs 6 Pcs 4 Pcs 1 Pc 34 Pcs 9 Pcs 1 Rm 570 Pcs 1,343 Pcs 30 Pcs 1,446 Pcs 162 Pcs 56 Pcs 2 Jar 181 Pcs 1 Pc 1 Pc 1 Pc 4 Pcs 4 Pcs 15 Pcs 42 Pcs 26 Pcs 26 Pcs 26 Pcs 1 Pc 1 Pc 1 Pc 1 Pc 1 Pc 1 Pc 1 Pc 1 Pc 4 Boxes 1 Box 2 Cart 2 Cart 2 Pcs 2 Pcs 48 Boxes 17 Boxes 45 Boxes 46 Boxes 46 Boxes 119 Cart 37 Cart 36 Cart 37 Cart 4 Btls 4 Btls 4 Btls 4 Btls 11 Pcs 11 Pcs 11 Pcs 11 Pcs 5 Btls 5 Btls 5 Btls 5 Btls 4 Crtg 3 Crtg 3 Crtg 3 Crtg 56 Bxs 23 Bxs 23 Bxs 23 Bxs 3 Set 18 Ltrs 8 Ltrs 8 Ltrs 8 Ltrs 15 Btls 10 Btls 10 Btls 10 Btls 1 Pc 1 Pc 1 Pc 1 Pc 3 Btls 500 Pcs 100 Pcs 8 Packs 61 Packs 19 Pad 2 Pcs 181 Pcs 112 Pcs 110 Pcs 75 Pcs 1 Pc 5 Pcs 1 Box 8 Bxs 3 Pcs 1 Pc 15 Pcs 104 Rolls 63 Rolls 46 Pcs 5 Pcs 43 Pcs 4 Pcs 12 Pcs 4 Pcs 1 Roll 25 Pcs 15 Pcs 2 Bxs 51 Rolls 58 Boxes 74 Boxes 1 Pc 6 Btls 264 Pcs 3 Pcs 136 Pcs 76 Pcs 10 Btls 1 Pack 1 Pack 1 Pack 1 Pack 55 Packs 1 Roll 3 Yards 3 Packs 48 Packs 20 Packs 35 Pads 15 Pads 48 Pads 29 Pads 77 Pads 6 Pads 26 Pads 1 Boxes 16 Pcs 1 Pc 1 Pc 21 Pcs 21 Boxes 1 Unit 29 Pcs 102 Pcs 95 Pcs 94 Pcs 30 Pcs 30 Pcs 4 Pcs 1 Box 2 Packs 24 Pcs 25 Pcs 2 Pcs 58 Pcs 5 Rolls 258 Rolls 26 Rolls 22 Pcs 45 Pcs 12 Bxs 13 Pcs 25 Pcs 11 Boxes 17 Boxes 5 Pcs 30 Pcs 97 Pcs 82 Pcs 36 Pcs 12 Pcs 16 Pcs 10 Pcs 1 Pc 12 Pcs 1 Btl 9 Btls 3 Btls 1 Pc 5 Pcs 166 Boxes 2 Pcs 39 Pcs 10 Pcs 62 Packs 100 Packs 5 Packs 1 Pc 1 Box 15 Pcs 1 Pc 1 Pc 2 Pcs 1 Cart 1 Unit 1 Set 3 Pcs 15 Packs 51 Packs 1 Rm 25 Rms 1 Pc 5 Ream 6 Pcs 63 Pcs 7 Pcs 11 Pads 3 Pcs 20 Pcs 106 Tins 21 Tins 7 Gal 35 Btls 221 Btls 2 Pcs 58 Tins 19 Gals 88 Ltrs 164 Pcs 36 Bxs 1 Set 11 Packs 3 Packs 223 Pcs 47 Pcs 22 Pcs 54 Pair 64 Pair 30 Pair 23 Pair 6 Pcs 365 Pcs 25 Pcs 365 Pcs 26 Pcs 365 Pcs 1 Kl 2 Unit 1 Gal 10 Packs 1 Pc 83 Pcs 30 Cons 2 Packs 2 Pack 242 Pcs 26 Pcs 30 Pcs 375 Bar 20 Pcs 1 Unit 447 Btls 74 Btls 86 Jar 29 Btls 8 Tins 71 Tins 23 Tins 10 Bxs 155 Pcs 36 Pcs 25 Pcs 3 Set 11 Pcs 1 Pc 3 Packs 2 Packs 1 Pc 10 Pcs 3 Pcs 3 Rolls 3 Rolls 3 Pcs 4 Rolls 2 Set 7 Pcs 10 Ltrs 862 Scht 7 Ltrs 2 Pcs 13 Pcs 8 Pcs 7 Pcs 2 Doz 10 Pcs 1 Pc 1 Pc 3 Pcs 3 Tins 60 Pcs 13 Pack 206 Pcs 695 Pcs 6 Rolls 1,113 Pcs 50 Rolls 1,000 Pcs 12 Rolls 150 Pcs 3 Bndls 34 Pack 3 Pack 5 Pack 18 Pack 20 Pack 2 Bndls 19 Pack 11 Pcs 2 Pcs 7 Pcs 74 Btls 2 Pcs 29 Btls 64 Pcs 8 Pcs 99 Pcs 365 Pcs 93 Tins 50 Pcs 19 Pcs 9 Pcs 22 Pcs 6 Pcs 50 Pcs 1 Pc 23 Pcs 1 Pc 7 Pcs 1 Btl 3 Packs 23 Rolls 41 Packs 1pc 10 Pcs 5 Pcs 4 Pcs 68 Packs 1,984 Scht 42 Packs 17 Packs 365 Pcs 95 Pcs 5 Doz 12 Pcs 3 Pcs 5 Set 2 Unit 72 Pcs 30 Pcs 31 Pcs 68 Rolls 10 Pcs 3 Pcs 4 Packs 3 Packs 125 Dozen 2 Dozen 4 Dozen 20 Pcs 200 Packs 2 Pcs 3 Pcs 5 Rolls 5 Packs 50 Pcs 165 Rlls 791 Rlls 176 Packs 6 Boxes 3 Pcs 10 Pcs 10 Pcs 85 Btls 28 Ltrs 18 Ltrs 40 Ltrs 3 Pcs 2 Pcs 4 Pcs 8 Pcs 3 Pcs 30 Pcs 22 Pcs 1 Pc 5 Pcs 2 Pcs 6 Pcs 3 Pcs 15 Pcs 15 Pair 1 Pc 5 Btls 47 Pcs 30 Pcs 1 Pc 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Activities Schedule Pre-procurement Conference February 4, 2025 Advertisement/posting Of Ib February 5, 2025  Bulletin Board Of The Pgom February 5, 2025  Pgom Website – Www.ormindoro.gov.ph February 5, 2025  Geps Website – Www.philgeps.net February 5, 2025 Issuance Of Bidding Documents February 5, 2025 To February 24, 2025 Pre-bid Conference February 12, 2025 At 10:00 Am Ppeso Conference Room Deadline Of Submission Of Bids February 24, 2025 At 9:30 Am At Ppeso Conference Room Opening Of Bids In Sealed Envelope February 24, 2025 At 10:00 Am At Ppeso Conference Room A) Eligibility Requirements And Technical Proposal February 24, 2025 At 10:00 Am At Ppeso Conference Room B) Financial Proposal February 24, 2025 At 10:00 Am At Ppeso Conference Room 4. Prospective Bidders May Obtain Further Information From Provincial Government Of Oriental Mindoro-procurement Division Goods And Services Section And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 5, 2025 To February 24, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Provincial Government Of Oriental Mindoro-procurement Division Goods And Services Section Will Hold A Pre-bid Conference On February 12, 2025 At 10:00am At Ppeso Conference Room, Provincial Capitol Complex, Camilmil Calapan City, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Procurement Division Goods And Services Section, On Or Before February 24, 2025 At 9:30 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 24, 2025 At 10:00 Am At Ppeso Conference Room, Provincial Capitol Complex, Camilmil Calapan City Oriental Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Pgom – Procurement Division Goods And Services Section Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Marissa O. Acuzar Bac For Goods And Services Provincial Capitol Complex Camilmil, Calapan City Oriental Mindoro 5200 Antonio M. Magnaye, Jr. Bac Chairperson
Closing Date24 Feb 2025
Tender AmountPHP 3.7 Million (USD 64.5 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: Sources Sought Notice sources Sought: This Is Not A Solicitation For A Proposal, Proposal Abstract, Or Quote. The Purpose Of This Notice Is To Obtain Information Regarding Qualified Business Sources. The Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method. statement Of Work (sow) the Contractor Shall Render Genetic Testing Laboratory Services In Accordance With This Statement Of Work To Support The Health Science Research Department At Durham Va Medical Center Under The Direction Of Dr. Deepak Voora, Executive Director Of National Pharmacogenomics Program At Va Central Office, For The Study/iir Titled, Reducing Veterans' Risk Of Atherosclerotic Cardiovascular Disease Through Pharmacogenomics Informed Statin Prescribing Funded By The Va Durham Healthcare System And Delivered To The Indianapolis Va Health Care System. description: Genomic Medicine Research Has Many Complexities Requiring Specialized Services, Skills, And Expertise, Including Complex Laboratory Analyses Requiring Specialized Equipment And Expertise In The Generation And Interpretation Of Genomic Data; Large Complex Genomic Datasets With Particular Storage, Privacy, And Information Security Requirements; Clinical Expertise In How Genomic Medicine Interventions Might Inform Health Care And Impact Health Outcomes; And Sensitivity To The Ethical, Psychosocial, Legal, And Regulatory Considerations Of Genomic Medicine Research. background: This Research Grant Proposes A Single Center, Randomized Clinical Trial Of Precision Statin Prescribing Versus Usual Care To Be Conducted At The Indianapolis Va Health Care System. Four-hundred And Ten (410) Veteran Patients Who Are At Risk For Cardiovascular Events And Have A Class I Indication For Statin Therapy, But Are Not Currently Prescribed One, Will Be Recruited And Randomly Allocated To Receive Either 1) Genetic Test Report That Provides An Assessment Of Their Risk For Cardiovascular Disease Events Based On A Polygenic Risk Score (prs) For Coronary Artery Disease And Their Risk Of Statin Associated Musculoskeletal Symptoms Based On Slco1b1 Genetic Testing Or 2) Usual Care. Specimens For Genetic Testing Will Be Collected Via Saliva Kit Administered With The Assistance Of Research Staff And Shipped Using A Common Carrier Delivery Service And Standard Chain Of Custody. description Of Work: The Contractor S Laboratory Services Shall Be In Accordance With Clinical Laboratory Improvement Amendments (clia) And Be A College Of American Pathologists (cap) Certified Clinical Diagnostic Genetic Testing Laboratory In Order To Successfully Perform The Required Genetic Testing For This Study. the Performing Laboratory Will Perform Dna Testing For A Prs For Cad And Slco1b1 Based Dna Sequencing, Pcr, Or Array-based Technologies, Analysis, Interpretation, And Reporting For This Study. the Certification And Accreditation (c&a) Requirements Do Not Apply, And That A Security Accreditation Package Is Not Required. primary Contractor Duties Include, But Are Not Limited To: specimen Accessioning, Extraction, And Test Management dna Sequencing And/or Genotyping For polygenic Risk Score (prs) For Coronary Artery Disease Cad genome Wide Genotyping/sequencing whole Genome Imputation variant Calling sample Qc genetic Variant Qc ancestry Specific Prs Calculation For Cad prs Interpretation And Report In Pdf Format slco1b1 Genetic Testing genotyping/sequencing variant Calling sample/variant Qc Star Allele Diplotype And Phenotype Interpretation Based On The Clinical Pharmacogenetics Implementation Consortium (cpic) Guidelines. reporting In Pdf Format each Laboratory Tests Unit Shall Include: saliva Swab Dna Collection Kit genome-wide Genotyping With Illumina Iscan Microarray Technology whole Genome Imputation variant Calling sample Qc (call Rate, Nominal Coverage, Heterozygosity Rate) genetic Variant Qc (genotype Probability) ancestry Specific Prs Calculation For Cad Prs cad Prs Reporting In Pdf Format slco1b1 Testing And Reporting In Pdf Format deliverables: Specific Items To Be Delivered To The Va Investigators, Include, But Are Not Limited To: human Specimen Sample Collection Supplies And Shipping Materials, Compliant With All Current Federal Regulations. clinical Polygenic Risk Score And Slco1b1 Report For Participants Randomized To The Genetic Testing Arm Of The Study. a Required Total Of An Estimated 68 Tests Per Year For Three (3) Years. other Pertinent Information: the Contractor Shall Provide Services For Both Components Of Necessary Testing: 1. Polygenic Risk Score For Coronary Artery Disease And 2. Slco1b1 Genetic Testing. the Contractor Shall Provide An Existing Ldt That They Have Available For The Purposes In This Statement Of Work, As Va Does Not Have An Ldt For These Purposes. The Vendor Shall Have An Existing Ldt As The Va Will Use The Ldt Within One Month Of The Contract Being Awarded. the Contractor Shall Not Work In Conjunction With Another Laboratory For The Polygenic Risk Score Or The Genetic Testing For Slco1b1 As Subcontracting Out And Shipping Samples From One Contractor S Laboratory To Another Is Not Within Best Interest Of The Va S Need At This Time. the Contractor S Services Shall Be Available Readily To Render To Va, In House, At Time Of Contract Award. timeframe: The Estimated Beginning And Ending Dates During Which The Contractor Is Required To Perform Work For Va Durham Are 1/13/2025 To 1/12/2026 With The Option To Renew Yearly Through 1/13/2028. va Information And Information System Security And Privacy Language 1. General. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. Contractors, Contractor Personnel, Subcontractors And Subcontractor Personnel Will Be Subject To The Same Federal Laws, Regulations, Standards, Va Directives And Handbooks, As Va Personnel Regarding Information And Information System Security And Privacy. 2. Va Information Custodial Language. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. a. The Government Shall Receive Unlimited Rights To Data/intellectual Property First Produced And Delivered In The Performance Of This Contract Or Order (hereinafter Contract ) Unless Expressly Stated Otherwise In This Contract. This Includes All Rights To Source Code And All Documentation Created In Support Thereof. The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. The Primary Clause Used To Define Computer Software License (not Data/intellectual Property First Produced Under This Contractor Or Order) Is Far 52.227-19, Commercial Computer Software License. b. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Will Be Used Only For The Purposes Specified In The Service Agreement, Sow, Pws, Pd, And/or Contract. The Contractor Shall Not Use Va Information In Any Other Manner Without Prior Written Approval From A Va Contracting Officer (co). The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. c. Va Information Will Not Be Co-mingled With Any Other Data On The Contractor S Information Systems Or Media Storage Systems. The Contractor Shall Ensure Compliance With Federal And Va Requirements Related To Data Protection, Data Encryption, Physical Data Segregation, Logical Data Segregation, Classification Requirements And Media Sanitization. d. Va Reserves The Right To Conduct Scheduled Or Unscheduled Audits, Assessments, Or Investigations Of Contractor Information Technology (it) Resources To Ensure Information Security Is Compliant With Federal And Va Requirements. The Contractor Shall Provide All Necessary Access To Records (including Electronic And Documentary Materials Related To The Contracts And Subcontracts) And Support (including Access To Contractor And Subcontractor Staff Associated With The Contract) To Va, Va's Office Inspector General (oig), And/or Government Accountability Office (gao) Staff During Periodic Control Assessments, Audits, Or Investigations. e. The Contractor May Only Use Va Information Within The Terms Of The Contract And Applicable Federal Law, Regulations, And Va Policies. If New Federal Information Security Laws, Regulations Or Va Policies Become Applicable After Execution Of The Contract, The Parties Agree To Negotiate Contract Modification And Adjustment Necessary To Implement The New Laws, Regulations, And/or Policies. f. The Contractor Shall Not Make Copies Of Va Information Except As Specifically Authorized And Necessary To Perform The Terms Of The Contract. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Shall Be Destroyed In Accordance With Va Directive 6500, Va Cybersecurity Program And Va Information Security Knowledge Service. g. If A Veterans Health Administration (vha) Contract Is Terminated For Default Or Cause With A Business Associate, The Related Local Business Associate Agreement (baa) Shall Also Be Terminated And Actions Taken In Accordance With Vha Directive 1605.05, Business Associate Agreements. If There Is An Executed National Baa Associated With The Contract, Va Will Determine What Actions Are Appropriate And Notify The Contactor. h. The Contractor Shall Store And Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools Which Are, At A Minimum, Federal Information Processing Standards (fips) 140-2, Security Requirements For Cryptographic Modules (or Its Successor) Validated And In Conformance With Va Information Security Knowledge Service Requirements. The Contractor Shall Transmit Va Sensitive Information Using Va Approved Transport Layer Security (tls) Configured With Fips Based Cipher Suites In Conformance With National Institute Of Standards And Technology (nist) 800-52, Guidelines For The Selection, Configuration And Use Of Transport Layer Security (tls) Implementations. the Contractor S Firewall And Web Services Security Controls, As Applicable, Shall Meet Or Exceed Va S Minimum Requirements. j. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor May Use And Disclose Va Information Only In Two Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction After Notification To Va Co (ii) With Written Approval From The Va Co. The Contractor Shall Refer All Requests For, Demands For Production Of Or Inquiries About, Va Information And Information Systems To The Va Co For Response. k. Notwithstanding The Provision Above, The Contractor Shall Not Release Va Records Protected By Title 38 U.s.c. § 5705, Confidentiality Of Medical Qualityassurance Records And/or Title 38 U.s.c. § 7332, Confidentiality Of Certain Medical Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse Or Infection With Human Immunodeficiency Virus (hiv). If The Contractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, The Contractor Shall Immediately Refer Such Court Order Or Other Requests To The Va Co For Response. l. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract Will Be Protected And Secured In Accordance With Va Directive 6500 And Identity And Access Management (iam) Security Processes Specified In The Va Information Security Knowledge Service. m. Any Data Destruction Done On Behalf Of Va By A Contractor Shall Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management, Va Handbook 6300.1, Records Management Procedures, And Applicable Va Records Control Schedules. n. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Directive 6500 And Nist 800-88, Guidelines For Media Sanitization Prior To Termination Or Completion Of This Contract. If Directed By The Cor/co, The Contractor Shall Return All Federal Records To Va For Disposition. o. Any Media, Such As Paper, Magnetic Tape, Magnetic Disks, Solid State Devices Or Optical Discs That Is Used To Store, Process, Or Access Va Information That Cannot Be Destroyed Shall Be Returned To Va.the Contractor Shall Hold The Appropriate Material Until Otherwise Directed By The Contracting Officer S Representative (cor) Or Co. Items Shall Be Returned Securely Via Va-approved Methods. Va Sensitive Information Must Be Transmitted Utilizing Va-approved Encryption Tools Which Are Validated Under Fips 140-2 (or Its Successor) And Nist 800-52. If Mailed, The Contractor Shall Send Via A Trackable Method (usps, Ups, Fedex, Etc.) And Immediately Provide The Cor/co With The Tracking Information. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Shall Be Sent To The Cor/co Within 30 Business Days Of Termination Of The Contract. p. All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used To Store, Process Or Access Va Information Will Not Be Returned To The Contractor At The End Of Lease, Loan, Or Trade-in. Exceptions To This Paragraph Will Only Be Granted With The Written Approval Of The Va Co. 3. Access To Va Information And Va Information Systems. This Section Applies When Any Person Requires Access To Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract. a. A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees And Subcontractors Only To The Extent Necessary To Perform The Services Specified In The Solicitation Or Contract. This Includes Indirect Entities, Both Affiliate Of Contractor/subcontractor And Agent Of Contractor/subcontractor. b. Contractors And Subcontractors Shall Sign The Va Information Security Rule Of Behavior (rob) Before Access Is Provided To Va Information And Information Systems (see Section 4, Training, Below). The Rob Contains The Minimum User Compliance Requirements And Does Not Supersede Any Policies Of Va Facilities Or Other Agency Components Which Provide Higher Levels Of Protection To Va S Information Or Information Systems. Users Who Require Privileged Access Shall Complete The Va Elevated Privilege Access Request Processes Before Privileged Access Is Granted. c. All Contractors And Subcontractors Working With Va Information Are Subject To The Same Security Investigative And Clearance Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Shall Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office Of Human Resources And Administration/operations, Security And Preparedness (hra/osp) Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To Classified Information Or Information Systems Shall Have An Appropriate Security Clearance. Verification Of A Security Clearance Shall Be Processed Through The Special Security Officer Located In Hra/osp. Contractors Shall Conform To All Requirements Stated In The National Industrial Security Program Operating Manual (nispom). d. All Contractors And Subcontractors Shall Comply With Conditions Specified In Vaar 852.204-71(d); Contractor Operations Required To Be In United States. All Contractors And Subcontractors Working With Va Information Must Be Permanently Located Within A Jurisdiction Subject To The Law Of The United States Or Its Territories To The Maximum Extent Feasible. If Services Are Proposed To Be Performed Abroad The Contractor Must State Where All Non-u.s. Services Are Provided. The Contractor Shall Deliver To Va A Detailed Plan Specifically Addressing Communications, Personnel Control, Data Protection And Potential Legal Issues. The Plan Shall Be Approved By The Cor/co In Writing Prior To Access Being Granted. e. The Contractor Shall Notify The Cor/co In Writing Immediately (no Later Than 24 Hours) After Personnel Separation Or Occurrence Of Other Causes. Causes May Include The Following: (1) Contractor/subcontractor Personnel No Longer Has A Need For Access To Va Information Or Va Information Systems. (2) Contractor/subcontractor Personnel Are Terminated, Suspended, Or Otherwise Has Their Work On A Va Project Discontinued For Any Reason. (3) Contractor Believes Their Own Personnel Or Subcontractor Personnel May Pose A Threat To Their Company S Working Environment Or To Any Companyowned Property. This Includes Contractor-owned Assets, Buildings, Confidential Data, Customers, Employees, Networks, Systems, Trade Secrets And/or Va Data. (4) Any Previously Undisclosed Changes To Contractor/subcontractor Background History Are Brought To Light, Including But Not Limited To Changes To Background Investigation Or Employee Record. (5) Contractor/subcontractor Personnel Have Their Authorization To Work In The United States Revoked. (6) Agreement By Which Contractor Provides Products And Services To Va Has Either Been Fulfilled Or Terminated, Such That Va Can Cut Off Electronic And/or Physical Access For Contractor Personnel. f. In Such Cases Of Contract Fulfillment, Termination, Or Other Causes; The Contractor Shall Take The Necessary Measures To Immediately Revoke Access To Va Network, Property, Information, And Information Systems (logical And Physical) By Contractor/subcontractor Personnel. These Measures Include (but Are Not Limited To): Removing And Then Securing Personal Identity Verification (piv) Badges And Piv Interoperable (piv-i) Access Badges, Va-issued Photo Badges, Credentials For Va Facilities And Devices, Va-issued Laptops, And Authentication Tokens. Contractors Shall Notify The Appropriate Va Cor/co Immediately To Initiate Access Removal. g. Contractors/subcontractors Who No Longer Require Va Accesses Will Return Vaissued Property To Va. This Property Includes (but Is Not Limited To): Documents, Electronic Equipment, Keys, And Parking Passes. Piv And Piv-i Access Badges Shall Be Returned To The Nearest Va Piv Badge Issuance Office. Once They Have Had Access To Va Information, Information Systems, Networks And Va Property In Their Possessions Removed, Contractors Shall Notify The Appropriate Va Cor/co. 4. Training. This Entire Section Applies To All Acquisitions Which Include Section 3. a. All Contractors And Subcontractors Requiring Access To Va Information And Va Information Systems Shall Successfully Complete The Following Before Being Granted Access To Va Information And Its Systems: (1) Va Privacy And Information Security Awareness And Rules Of Behavior Course (talent Management System (tms) #10176) Initially And Annually Thereafter. (2) Sign And Acknowledge (electronically Through Tms #10176) Understanding Of And Responsibilities For Compliance With The Organizational Rules Of Behavior, Relating To Access To Va Information And Information Systems Initially And Annually Thereafter; And (3) Successfully Complete Any Additional Cyber Security Or Privacy Training, As required For Va Personnel With Equivalent Information System Or Information Access [to Be Defined By The Va Program Official And Provided To The Va Co For Inclusion In The Solicitation Document I.e., Any Rolebased Information Security Training]. b. The Contractor Shall Provide To The Cor/co A Copy Of The Training Certificates And Certification Of Signing The Organizational Rules Of Behavior For Each Applicable Employee Within Five Days Of The Initiation Of The Contract And Annually Thereafter, As Required. c. Failure To Complete The Mandatory Annual Training Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Required Training Is Complete. 5. Security Incident Investigation. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. a. The Contractor, Subcontractor, Their Employees, Or Business Associates Shall Immediately (within One Hour) Report Suspected Security / Privacy Incidents To The Va Oit S Enterprise Service Desk (esd) By Calling (855) 673-4357 (tty: 711). The Esd Is Oit S 24/7/365 Single Point Of Contact For It-related Issues. After Reporting To The Esd, The Contractor, Subcontractor, Their Employees, Or Business Associates Shall, Within One Hour, Provide The Cor/co The Incident Number Received From The Esd. b. To The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved And The Circumstances Surrounding The Incident, Including The Following: (1) The Date And Time (or Approximation Of) The Security Incident Occurred. (2) The Names Of Individuals Involved (when Applicable). (3) The Physical And Logical (if Applicable) Location Of The Incident. (4) Why The Security Incident Took Place (i.e., Catalyst For The Failure). (5) The Amount Of Data Belonging To Va Believed To Have Been Compromised. (6) The Remediation Measures The Contractor Is Taking To Ensure No Future Incidents Of A Similar Nature. c. After The Contractor Has Provided The Initial Detailed Incident Summary To Va, They Will Continue To Provide Written Updates On Any New And Relevant Circumstances Or Facts They Discover. The Contractor, Subcontractor, And Their Employes Shall Fully Cooperate With Va Or Third-party Entity Performing An Independent Risk Analysis On Behalf Of Va. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. d. Va It Contractors Shall Follow Va Handbook 6500, Risk Management Framework For Va Information Systems Va Information Security Program, And Va Information Security Knowledge Service Guidance For Implementing An Incident Response Plan Or Integrating With An Existing Va Implementation. e. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig, And The Va Office Of Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. f. The Contractor Shall Comply With Va Handbook 6500.2, Management Of Breaches Involving Sensitive Personal Information, Which Establishes The Breach Management Policies And Assigns Responsibilities For The Oversight, Management And Reporting Procedures Associated With Managing Of Breaches. g. With Respect To Unsecured Protected Health Information (phi), The Contractor Is Deemed To Have Discovered A Data Breach When The Contractor Knew Or Should Have Known Of Breach Of Such Information. When A Business Associate Is Part Of Vha Contract, Notification To The Covered Entity (vha) Shall Be Made In Accordance With The Executed Baa. h. If The Contractor Or Any Of Its Agents Fails To Protect Va Sensitive Personal Information Or Otherwise Engages In Conduct Which Results In A Data Breach Involving Any Va Sensitive Personal Information The Contractor/subcontractor Processes Or Maintains Under The Contract; The Contractor Shall Pay Liquidated Damages To The Va As Set Forth In Clause 852.211-76, Liquidated Damages Reimbursement For Data Breach Costs 6. Information System Design And Development. This Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (to Include The Subcomponents Of Each) Designed Or Developed For Or On Behalf Of Va By Any Non-va Entity. a. Information Systems Designed Or Developed On Behalf Of Va At Non-va Facilities Shall Comply With All Applicable Federal Law, Regulations, And Va Policies. This Includes Standards For The Protection Of Electronic Protected Health Information (phi), Outlined In 45 C.f.r. Part 164, Subpart C And Information And System Security Categorization Level Designations In Accordance With Fips 199, Standards For Security Categorization Of Federal Information And Information Systems And Fips 200, Minimum Security Requirements For Federal Information Systems. Baseline Security Controls Shall Be Implemented Commensurate With The Fips 199 System Security Categorization (reference Va Handbook 6500 And Va Trusted Internet Connections (tic) Architecture). b. Contracted New Developments Require Creation, Testing, Evaluation, And Authorization In Compliance With Va Assessment And Authorization (a&a) Processes In Va Handbook 6500 And Va Information Security Knowledge Service To Obtain An Authority To Operate (ato). Va Directive 6517, Risk Management Framework For Cloud Computing Services, Provides The Security And Privacy Requirements For Cloud Environments. c. Va It Contractors, Subcontractors And Third-party Service Providers Shall Address And/or Integrate Applicable Va Handbook 6500, Va Handbook 6517, Risk Management Framework For Cloud Computing Services And Information Security Knowledge Service Specifications In Delivered It Systems/solutions, Products And/or Services. If Systems/solutions, Products And/or Services Do Not Directly Match Va Security Requirements, The Contractor Shall Work Though The Cor/co To Identify The Va Organization Responsible For Governance Or Resolution. Contractors Shall Comply With Far 39.1, Specifically The Prohibitions Referenced. d. The Contractor (including Producers And Resellers) Shall Comply With Office Of Management And Budget (omb) M-22-18 And M-23-16 When Using Third-party Software On Va Information Systems Or Otherwise Affecting The Va Information. This Includes New Software Purchases And Software Renewals For Software Developed Or Modified By Major Version Change After The Issuance Date Of M22-18 (september 14, 2022). The Term Software Includes Firmware, Operating Systems, Applications And Application Services (e.g., Cloud-based Software), As Well As Products Containing Software. The Contractor Shall Provide A Self Attestation That Secure Software Development Practices Are Utilized As Outlined By Executive Order (eo)14028 And Nist Guidance. A Third-party Assessment Provided By Either A Certified Federal Risk And Authorization Management Program (fedramp) Third Party Assessor Organization (3pao) Or One Approved By The Agency Will Be Acceptable In Lieu Of A Software Producer's Self Attestation. e. The Contractor Shall Ensure All Delivered Applications, Systems And Information Systems Are Compliant With Homeland Security Presidential Directive (hspd) 12 And Va Identity And Access Management (iam) Enterprise Identity Management Requirements As Set Forth In Omb M-19-17, M-05-24, Fips 201-3, Personal Identity Verification (piv) Of Federal Employees And Contractors (or Its Successor), M-21-31 And Supporting Nist Guidance. This Applies To Commercial Off-the-shelf (cots) Product(s) That The Contractor Did Not Develop, All Software Configurations And All Customizations. f. The Contractor Shall Ensure All Contractor Delivered Applications And Systems Provide User Authentication Services Compliant With Va Handbook 6500, Va Information Security Knowledge Service, Iam Enterprise Requirements And Nist 800-63, Digital Identity Guidelines, For Direct, Assertion-based Authentication And/or Trust-based Authentication, As Determined By The Design And Integration Patterns. Direct Authentication At A Minimum Must Include Public Key Infrastructure (pki) Based Authentication Supportive Of Piv And/or Common Access Card (cac), As Determined By The Business Need And Compliance With Va Information Security Knowledge Service Specifications. g. The Contractor Shall Use Va Authorized Technical Security Baseline Configurations And Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems In Compliance With Va Baselines Prior To Acceptance Or Connection Into An Authorized Va Computing Environment. If The Defense Information Systems Agency (disa) Has Created A Security Technical Implementation Guide (stig) For The Technology, The Contractor May Configure To Comply With That Stig. If Va Determines A New Or Updated Va Configuration Baseline Needs To Be Created, The Contractor Shall Provide Required Technical Support To Develop The Configuration Settings. Far 39.1 Requires The Population Of Operating Systems And Applications Includes All Listed On The Nist National Checklist Program Checklist Repository. h. The Standard Installation, Operation, Maintenance, Updating And Patching Of Software Shall Not Alter The Configuration Settings From Va Approved Baseline Configuration. Software Developed For Va Must Be Compatible With Va Enterprise Installer Services And Install To The Default Program Files Directory With Silently Install And Uninstall. The Contractor Shall Perform Testing Of All Updates And Patching Prior To Implementation On Va Systems. i. Applications Designed For Normal End Users Will Run In The Standard User Context Without Elevated System Administration Privileges. j. The Contractor-delivered Solutions Shall Reside On Va Approved Operating Systems. Exceptions To This Will Only Be Granted With The Written Approval Of The Cor/co. k. The Contractor Shall Design, Develop, And Implement Security And Privacy Controls In Accordance With The Provisions Of Va Security System Development Life Cycle Outlined In Nist 800-37, Risk Management Framework For Information Systems And Organizations: A System Life Cycle Approach For Security And Privacy, Va Directive And Handbook 6500, And Va Handbook 6517. l. The Contractor Shall Comply With The Privacy Act Of1974 (the Act), Far 52.224-2 Privacy Act, And Va Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish A Va Function. m. The Contractor Shall Ensure The Security Of All Procured Or Developed Information Systems, Systems, Major Applications, Minor Applications, Enclaves And Platform Information Technologies, Including Their Subcomponents (hereinafter Referred To As Information Systems ) Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes Security Configurations, Workarounds, Patches, Hotfixes, Upgrades, Replacements And Any Physical Components Which May Be Necessary To Remediate All Security Vulnerabilities Published Or Known To The Contractor Anywhere In The Information Systems (including Systems, Operating Systems, Products, Hardware, Software, Applications And Firmware). The Contractor Shall Ensure Security Fixes Do Not Negatively Impact The Information Systems. n. When The Contractor Is Responsible For Operations Or Maintenance Of The Systems, The Contractor Shall Apply The Security Fixes Within The Timeframe Specified By The Associated Controls On The Va Information Security Knowledge Service. When Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Contractor Shall Provide Written Notice To The Va Cor/co That The Patch Has Been Validated As To Not Affecting The Systems Within 10 Business Days. 7. Information System Hosting, Operation, Maintenance Or Use. this Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (cloud And Noncloud) Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. a. The Contractor Shall Comply With All Federal Laws, Regulations, And Va Policies For Information Systems (cloud And Non-cloud) That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. Security Controls For Collecting, Processing, Transmitting, And Storing Of Va Sensitive Information, Must Be In Place. The Controls Will Be Tested By Va Or A Va Sanctioned 3paoand Approved By Va Prior To Hosting, Operation, Maintenance Or Use Of The Information System Or Systems By Or On Behalf Of Va. This Includes Conducting Compliance Risk Assessments, Security Architecture Analysis, Routine Vulnerability Scanning, System Patching, Change Management Procedures And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor S Security Control Procedures Shall Be The Same As Procedures Used To Secure Va-operated Information Systems. b. Outsourcing (contractor Facility, Equipment, Or Staff) Of Systems Or Network Operations, Telecommunications Services Or Other Managed Services Require Assessment And Authorization (a&a) Of The Contractor S Systems In Accordance With Va Handbook 6500 As Specified In Va Information Security Knowledge Service. Major Changes To The A&a Package May Require Reviewing And Updating All The Documentation Associated With The Change. The Contractor S Cloud Computing Systems Shall Comply With Fedramp And Va Directive 6517 Requirements. c. The Contractor Shall Return All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) On Non-va Leased Or Non-va Owned It Equipment Used To Store, Process Or Access Va Information To Va In Accordance With A&a Package Requirements. This Applies When The Contract Is Terminated Or Completed And Prior To Disposal Of Media. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Information Security Knowledge Service Requirements And Nist 800-88. The Contractor Shall Send A Self-certification That The Data Destruction Requirements Above Have Been Met To The Cor/co Within 30 Business Days Of Termination Of The Contract. d. All External Internet Connections To Va Network Involving Va Information Must Be In Accordance With Va Trusted Internet Connection (tic) Reference Architecture And Va Directive And Handbook 6513, Secure External Connections And Reviewed And Approved By Va Prior To Implementation. Government-owned Contractor-operated Systems, Third Party Or Business Partner Networks Require A Memorandum Of Understanding (mou) And Interconnection Security Agreements (isa). e. Contractor Procedures Shall Be Subject To Periodic, Announced, Or Unannounced Assessments By Va Officials, The Oig Or A 3pao. The Physical Security Aspects Associated With Contractor Activities Are Also Subject To Such Assessments. The Contractor Shall Report, In Writing, Any Deficiencies Noted During The Above Assessment To The Va Cor/co. The Contractor Shall Use Va S Defined Processes To Document Planned Remedial Actions That Address Identified Deficiencies In Information Security Policies, Procedures, And Practices. The Contractor Shall Correct Security Deficiencies Within The Timeframes Specified In The Va Information Security Knowledge Service. f. All Major Information System Changes Which Occur In The Production Environment Shall Be Reviewed By The Va To Determine The Impact On Privacy And Security Of The System. Based On The Review Results, Updates To The Authority To Operate (ato) Documentation And Parameters May Be Required To Remain In Compliance With Va Handbook 6500 And Va Information Security Knowledge Service Requirements. g. The Contractor Shall Conduct An Annual Privacy And Security Self-assessment On All Information Systems And Outsourced Services As Required. Copies Of The Assessment Shall Be Provided To The Cor/co. The Va/government Reserves The Right To Conduct Assessment Using Government Personnel Or A Third-party If Deemed Necessary. The Contractor Shall Correct Or Mitigate Any Weaknesses Discovered During The Assessment. h. Va Prohibits The Installation And Use Of Personally Owned Or Contractor-owned Equipment Or Software On Va Information Systems. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow, Pws, Pd Or Contract. All Security Controls Required For Government Furnished Equipment Must Be Utilized In Va Approved Other Equipment (oe). Configuration Changes To The Contractor Oe, Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Use A Va-approved Antivirus Software And A Personal (host-based Or Enclave Based) Firewall With A Va-approved Configuration. The Contractor Shall Ensure Software On Oe Is Kept Current With All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-virus Software And The Firewall On The Non-va Owned Oe. Approved Contractor Oe Will Be Subject To Technical Inspection At Any Time. i. The Contractor Shall Notify The Cor/co Within One Hour Of Disclosure Or Successful Exploits Of Any Vulnerability Which Can Compromise The Confidentiality, Integrity, Or Availability Of The Information Systems. The System Or Effected Component(s) Need(s) To Be Isolated From The Network. A Forensic Analysis Needs To Be Conducted Jointly With Va. Such Issues Will Be Remediated As Quickly As Practicable, But In No Event Longer Than The Timeframe Specified By Va Information Security Knowledge Service. If Sensitive Personal Information Is Compromised Reference Va Handbook 6500.2 And Section 5, Security Incident Investigation. j. For Cases Wherein The Contractor Discovers Material Defects Or Vulnerabilities Impacting Products And Services They Provide To Va, The Contractor Shall Develop And Implement Policies And Procedures For Disclosure To Va, As Well As Remediation. The Contractor Shall, Within 30 Business Days Of Discovery, Document A Summary Of These Vulnerabilities Or Defects. The Documentation Will Include A Description Of The Potential Impact Of Each Vulnerability And Material Defect, Compensating Security Controls, Mitigations, Recommended Corrective Actions, Fbonotice Cause Analysis And/or Workarounds (i.e., Monitoring). Should There Exist Any Backdoors In The Products Or Services They Provide To Va (referring To Methods For Bypassing Computer Authentication), The Contractor Shall Provide the Va Co/co Written Assurance They Have Permanently Remediated These Backdoors. k. All Other Vulnerabilities, Including Those Discovered Through Routine Scans Or Other Assessments, Will Be Remediated Based On Risk, In Accordance With The Remediation Timelines Specified By The Va Information Security Knowledge Service And/or The Applicable Timeframe Mandated By Cybersecurity & Infrastructure Security Agency (cisa) Binding Operational Directive (bod) 22-01 And Bod 19-02 For Internet-accessible Systems. Exceptions To This Paragraph Will Only Be Granted With The Approval Of The Cor/co. 8. Security And Privacy Controls Compliance Testing, Assessment and Auditing. This Entire Section Applies Whenever Section 6 Or 7 Is Included. a. Should Va Request It, The Contractor Shall Provide A Copy Of Their (corporation S, Sole Proprietorship S, Partnership S, Limited Liability Company (llc), Or Other Business Structure Entity S) Policies, Procedures, Evidence And Independent Report Summaries Related To Specified Cybersecurity Frameworks (international Organization For Standardization (iso), Nist Cybersecurity Framework (csf), Etc.). Va Or Its Third-party/partner Designee (if Applicable) Are Further Entitled To Perform Their Own Audits And Security/penetration Tests Of The Contractor S It Or Systems And Controls, To Ascertain Whether The Contractor Is Complying With The Information Security, Network Or System Requirements Mandated In The Agreement Between Va And The Contractor. b. Any Audits Or Tests Of The Contractor Or Third-party Designees/partner Va Elects To Carry Out Will Commence Within 30 Business Days Of Va Notification. Such Audits, Tests And Assessments May Include The Following: (a): Security/penetration Tests Which Both Sides Agree Will Not Unduly Impact Contractor Operations; (b): Interviews With Pertinent Stakeholders And Practitioners; (c): Document Review; And (d): Technical Inspections Of Networks And Systems The Contractor Uses To Destroy, Maintain, Receive, Retain, Or Use Va Information. c. As Part Of These Audits, Tests And Assessments, The Contractor Shall Provide All Information Requested By Va. This Information Includes, But Is Not Limited To, The Following: Equipment Lists, Network Or Infrastructure Diagrams, Relevant Policy Documents, System Logs Or Details On Information Systems Accessing, Transporting, Or Processing Va Data. d. The Contractor And At Its Own Expense, Shall Comply With Any Recommendations Resulting From Va Audits, Inspections And Tests. Va Further Retains The Right To View Any Related Security Reports The Contractor Has Generated As Part Of Its Own Security Assessment. The Contractor Shall Also Notify Va Of The Existence Of Any Such Security Reports Or Other Related Assessments, Upon Completion And Validation. e. Va Appointed Auditors Or Other Government Agency Partners May Be Granted Access To Such Documentation On A Need-to-know Basis And Coordinated Through The Cor/co. The Contractor Shall Comply With Recommendations Which Result From These Regulatory Assessments On The Part Of Va Regulators And Associated Government Agency Partners. 9. Product Integrity, Authenticity, Provenance, Anti-counterfeit And Anti-tampering. This Entire Section Applies When The Acquisition Involves Any Product (application, Hardware, Or Software) Or When Section 6 Or 7 Is Included. a. The Contractor Shall Comply With Code Of Federal Regulations (cfr) Title 15 Part 7, Securing The Information And Communications Technology And Services (icts) Supply Chain , Which Prohibits Icts Transactions From Foreign Adversaries. Icts Transactions Are Defined As Any Acquisition, Importation, Transfer, Installation, Dealing In Or Use Of Any Information And Communications Technology Or Service, Including Ongoing Activities, Such As Managed Services, Data Transmission, Software Updates, Repairs Or The Platforming Or Data Hosting Of Applications For Consumer Download. b. When Contracting Terms Require The Contractor To Procure Equipment, The Contractor Shall Purchase Or Acquire The Equipment From An Original Equipment Manufacturer (oem) Or An Authorized Reseller Of The Oem. The Contractor Shall Attest That Equipment Procured From An Oem Or Authorized Reseller Or Distributor Are Authentic. If Procurement Is Unavailable From An Oem Or Authorized Reseller, The Contractor Shall Submit In Writing, Details Of The Circumstances Prohibiting This From Happening And Procure A Product Waiver From The Va Cor/co. c. All Contractors Shall Establish, Implement, And Provide Documentation For Risk Management Practices For Supply Chain Delivery Of Hardware, Software (to Include Patches) And Firmware Provided Under This Agreement. Documentation Will Include Chain Of Custody Practices, Inventory Management Program, Information Protection Practices, Integrity Management Program For Sub-supplier Provided Components, And Replacement Parts Requests. The Contractor Shall Make Spare Parts Available. All Contractor(s) Shall Specify How Digital Delivery For Procured Products, Including Patches, Will Be Validated And Monitored To Ensure Consistent Delivery. The Contractor Shall Apply Encryption Technology To Protect Procured Products Throughout The Delivery Process. d. If A Contractor Provides Software Or Patches To Va, The Contractor Shall Publish Or Provide A Hash Conforming To The Fips Security Requirements For Cryptographic Modules (fips 140-2 Or Successor). e. The Contractor Shall Provide A Software Bill Of Materials (sbom) For Procured (to Include Licensed Products) And Consist Of A List Of Components And Associated Metadata Which Make Up The Product. Sboms Must Be Generated In One Of The Data Formats Defined In The National Telecommunications And Information Administration (ntia) Report The Minimum Elements For A Software Bill Of Materials (sbom). f. Contractors Shall Use Or Arrange For The Use Of Trusted Channels To Ship Procured Products, Such As U.s. Registered Mail And/or Tamper-evident Packaging For Physical Deliveries. g. Throughout The Delivery Process, The Contractor Shall Demonstrate A Capability For Detecting Unauthorized Access (tampering). h. The Contractor Shall Demonstrate Chain-of-custody Documentation For Procured Products And Require Tamper-evident Packaging For The Delivery Of This Hardware. summary: this Is A Sources Sought Notice And Not A Request For Quotes. This Request Is Solely For The Purpose Of Conducting Market Research To Enhance Vha S Understanding Of The Market S Offered Products, Services, And Capabilities. The Government Will Not Pay Any Costs For Responses Submitted In Response To This Sources Sought. this Sources Sought Notice Provides An Opportunity For Respondents To Submit Their Notice Of Ability, And Their Available Products And Services In Response To The Requirement. Vendors Are Being Invited To Submit Information Relative To Their Potential Of Fulfilling This Requirement In The Form Of A Capability Response That Addresses The Specific Requirement Identified In This Sources Sought. this Sources Sought Is To Facilitate The Contracting Officer S Review Of The Market Base, For Acquisition Planning, Size Determination, And Procurement Strategy. response Commitment: i. Response: all Potential Sources Are Invited To Submit, In Writing, A Capability Statement With Sufficient Information To Substantiate Your Business Is Reasonably Capable Of Performing The Work. The Capability Statement Must Clearly Demonstrate A Business S Ability To Fulfill The Requirement. The Burden Of Proof Rests With The Contractor; Therefore, Written Responses Must Provide Clear And Unambiguous Evidence To Substantiate Capabilities Appropriate To Satisfy This Need. a. Capability Statement With General Understanding Of The Industry And Current Knowledge And Subcontract Networks That Would Be Used To Support The Requirement As Identified Herein. Subcontractors Will Need The Security Requirements Listed In This Sources Sought. Submittals Furnished Will Not Be Returned To The Sender. No Debriefs Will Be Conducted. Eligibility In Participating In A Future Acquisition Does Not Depend Upon A Response To This Notice. responses Shall Provide Administrative Information, And Shall Include The Following As A Minimum: Company Name, Sam Uei Number, Company Mailing Address, Phone Number, Fax Number, Name And Title Of Designated Point Of Contact And E-mail Of Designated Point Of Contact. company Business Size And Status (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Women-owned Small Business, Etc.), The Number Of Years In Business. b. Proprietary Information Is Neither Requested Nor Desired. If Such Information Is Submitted, It Must Clearly Be Marked "proprietary" On Every Sheet Containing Such Information, And The Proprietary Information Must Be Segregated To The Maximum Extent Practicable From Other Portions Of The Response (e.g., Use An Attachment Or Exhibit). submit Responses Email Only To Karly.gabrysiak@va.gov ii. Timeline: a. This Request Will Close On 01/06/2025 At 8am Est. notes: 1. This Sources Sought Is For Planning Purposes Only, And Does Not Constitute A Commitment, Implied Or Otherwise, That A Procurement Action Will Follow. The Department Of Veterans Affairs Will Use The Information Submitted In Response To This Notice At Its Discretion And Will Not Provide Comments To Any Submission; However, The Department Of Veterans Affairs Reserves The Right To Contact Any Respondent To This Notice For The Sole Purpose Of Enhancing The Department Of Veteran Affairs Understanding Of The Notice Submission. 2. The Content Of Any Responses To This Notice May Be Reflected In Any Subsequent Solicitation, Except For Content Marked Or Designated As Business Confidential Or Proprietary Which Will Be Fully Protected From Release Outside The Government. the Department Of Veteran Affairs Contracting Office Point Of Contact: name: Karly Gabrysiak title: Contract Specialist e-mail Address: Karly.gabrysiak@va.gov
Closing Date6 Jan 2025
Tender AmountRefer Documents 

The City Government Of Baguio Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Materials For Smart City Command Center 15,500,000.00 22 Unit 16 Port Poe Switch - 16 Port Poe Switch - Cpu Core Count 1 Cpu Nominal Frequency 800 Mhz Size Of Ram 256 Mb Storage Size 16 Mb Storage Type Flash Mtbf Approximately 200'000 Hours At 25c Cooling Type Passive Poe-out Ports Ether1-ether16 Poe Out 802.3af/at Max Out Per Port Output (input 18-30 V) 1.1 A Max Out Per Port Output (input 30-57 V) 0.6 A Max Total Out (a) 2.8a (18v-30v) & 1.4a (48v-57v) X2 10/100/1000 Ethernet Ports 16 Number Of 1g Ethernet Ports With Poe-out 16 Sfp+ Ports 2 Certification Ce, Eac, Rohs Ip Ip54 Warranty :1 Year 88 Unit Adjustable Stainless Steel Strapping Band - Adjustable Stainless Steel Strapping Band - Material: Stainless Steel 304 Width: 1/2 Inch Thickness: 0.5 Mm Length: 30 Meters 44 Unit Cable Loop Holder - Cable Loop Holder - Galvanized Steel Pole Mountable 4 Branches At Least 400mmx400mm 1 Box Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable 40 Unit Cctv Channel License - Cctv Channel License - Single Anpr Camera Connection For Use With Central Software Warranty :perpetual Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Unit Cctv Lpr Camera - Cctv Lpr Camera - Camera Image Sensor 1/1.8″ Progressive Scan Cmos Max. Resolution 2688 × 1520 Min. Illumination Color: 0.001 Lux @ (f1.2, Agc On) Shutter Time 1/25 S To 1/100,000 S Day & Night Ir Cut Filter Lens Focal Length & Fov 2.8-12 Mm: Horizontal: 113.5° To 39°, Vertical: 58.4° To 22.7°, Diagonal: 141.3° To 44.3° Aperture 2.8-12 Mm: F1.38, 8-32 Mm: F1.7, 10-50 Mm: F1.7 Illuminator Built-in Supplement Light Type Ir Light Built-in Supplement Light Range Up To 40 M Ir Wavelength 850 Nm Video Main Stream 50 Hz: 25 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Sub-stream 50 Hz: 25 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Video Compression H.264 And H.265 Encoding Main Stream: H.265/h.264/mjpeg Sub-stream: H.265/h.264/mjpeg Video Bit Rate 32 Kbps To 16 Mbps Protocols Tcp/ip,icmp,http,https,ftp,sftp,dhcp,dns,ddns,rtp,rtsp,rtcp,ntp,smtp,snmp,igmp,qos,ipv4/ipv6,udp,ssl/tls,isup,arp,802.1x Simultaneous Live View Up To 6 Channels Road Traffic And Vehicle Detection Coverage Up To 3 Lane(s) Smart Function Traffic Flow Detection:average Speed, Traffic Flow, Queuing Length, And Traffic Status Incident Detection: Congestion, Stopped Vehicle, Lane Change, Wrong-way Driving, Speeding, Low-speed Driving Capture Speed Range 5 To 120 Km/h Blocklist And Allowlist Max. 50000 Records Warranty :2 Years Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 5 Unit Cctv Nvr - Cctv Nvr - Supports Redundant Power Supply To Improve The System Stability Supports Hdd Hot Swap With Raid0, Raid1, Raid5, Raid 6, And Raid10 Storage Scheme Configurable. Either Normal Or Hot Spare Working Mode Is Configurable To Constitute An N+1 Hot Spare System. Supports Some Specialist Cameras, Including People Counting Camera/anpr (automatic Number Plate Recognition) Camera/fisheye Camera Supports Video Analytic Functions Such As Vehicle Detection, License Plate Recognition --video & Audio Input -ip Video Input 128-ch -incoming/outgoing Bandwidth 576 Mbps/512 Mbps -incoming/outgoing Bandwidth (raid Mode) 576 Mbps/512 Mbps -tls Outgoing Bandwidth 128 Mbps, Or 64 Mbps (when Raid Is Enabled) --video & Audio Output -protocol Hikvision, Acti, Arecont, Axis, Bosch, Brickcom, Canon, Hunt, Onvif (version 2.5), Panasonic, Pelco, Rtsp, Samsung, Sony, Vivotek, Zavio --video & Audio Output -hdmi Output Two Independent Hdmi Outputs Of 4k Resolution. Resolution: 4k (4096 × 2160), 4k (3840 × 2160)/30hz, 2k (2560 × 1440)/60hz, 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz -vga Output 1-ch. Resolution: 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz --video & Audio Decoding -decoding Format H.265, H.265+, H.264, H.264+, Mpeg4, Mjpeg (for Hikvision Ip Camera Only) -video Resolution 32 Mp/24 Mp/12 Mp/8 Mp/7 Mp/6 Mp/5 Mp/4 Mp/3 Mp/1080p/uxga/720p/vga/4cif/dcif/2cif/cif/qcif *: 32 Mp And 24 Mp Is Only Available For Channel 1 To 4 When Ultra Hd Resolution Mode Is Enabled -synchronous Playback Up To 16 Channels -capability 1-ch@32 Mp (8160 × 3616, 30 Fps)/5-ch@8 Mp(30 Fps)/10-ch@4 Mp(30fps)/20-ch@1080p(30 Fps)/40-ch@720p(30 Fps) *: The Length Or Width Of Camera Resolution (each Track) Cannot Exceed 4096 Pixels --hdd -interface 16 Sata Interfaces Supporting Hot-plug -capacity Up To 10 Tb For Each Hdd -storage Extension 1 × Esata Interface, 2 × Mini Sas Interface (optional) --raid Raid Type Raid0, Raid1, Raid5, Raid 6, And Raid10 --network Management -protocol Ipv6, Https, Upnp, Snmp, Ntp, Sadp, Smtp, Nfs, Iscsi, Pppoe, Ddns Network Interface 4, Rj45 10m/100m/1000m Self-adaptive Ethernet Interface --external Interface -usb Interface Front Panel: 2 × Usb 2.0; Rear Panel: 2 × Usb 3.0 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) -alarm Input/output 16/8 --general -power Supply 100 To 240 Vac, 50 To 60hz, 5 A -fan Redundant Dual Ball Bearing Fan; Speed Adjustable -consumption (without Hdd) ≤ 140w -warranty :2 Years 1. Responsibility Of The Supplier 1.1 Supply And Delivery Of Ict Equipment 1.2 Inventory Of The Items Deliverd With The Following Details 1.2.1 Brand 1.2.2 Model 1.2.3 Serial Number 1.2.4 Quantity 1.3 The Bidder Must Ensure That All Components Delivered Will Be Brand New 1.4 All Equipment Provided Must Be Compatible And Working With The Cctv System As A Whole 1.5 Materials And Equipment Delivery Within 90 Days 1.6 Cctv Contractor Should Have Manufacture Authorization And Certification. 1.7 Contractor Must Have A Valid Iso 9001:2015 Certificate 1.8 All Equipment Provided Must Be Capable/compatible To Interconnect With The Existing Systems Located At The Smart City Command Center (sc3) To Be Viewable And Configurable In The Sc3. 80 Unit Cctv Nvr Surveillance Hard Drive - Designed And Built To Handle Heavy Surveillance Workloads Advanced Vibration Management Capacity 10tb Interface Sata 6 Gb/s Max. Sustained Transfer Rate Od (mb/s) 250mb/s Cache (mb) 256 Tarnish Resistant Yes Mtbf 1,500,000 Hr Warranty :2 Years 15 Set Command Center Desktop Computer - Minimum Specifications: Operating System: Microsoft Windows 11 Pro 64bit Processor: Intel Core I5 14600k Turbo Frequency 5.3ghz 14 Cores/20 Threads, 24mb Cache, Socket Lga1700 Cpu Air Cooler: Twin Tower Cpu Air Cooler, With 6x6mm Sintered Copper Heatpipes, With 2x140mm Fans Motherboard: B760 Chipset, Lga1700 Socket, Ddr5 4xdimm Matx Form Factor Ram: Ddr5 5600mhz, 32gb (dual 2x16gb) Memory Modules Gpu: Rtx 4070, 12gb Gddr6/gddr6x Ssd: 512gb Capacity R/w 560/520 Mb/s 3d Tlc Ssd 2.5 Inch Form Factor Hdd: Capacity 2tb, 7200 Rpm, 256mb Cache, 3.5 Inch Form Factor Power Supply: 1000 Watts, 80 Plus Gold Certified, Fully Modular, With 120mm Smart Hydraulic Bearing (hyb) Fan, With Active Pfc, Mtbf: >100,000 Hours Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Case: Tempered Glass Mid Tower Atx Case With At Least 3 Fans Monitor: 2 Units, 24 Inches, Resolution: Fhd 1920 X1080, Aspect Ratio:16:9, Brightness: 250cd, Color Gamut Ntsc 72%, Refresh Rate: 100hz, Response Time: 5ms(gtg), Connectivity: 1x Hdmi 1x Displayport Keyboard: Usb Connectivity, With Backlight, Rubber Dome, Usb Connectivity, Multi-key Anti-ghosting, Polling Rate: 1000hz, Cable Type: Attached, Braided, Cable Length: 5.9ft Mouse: Usb Connectivity, Optical Sensor, Mouse Button Durability: 30m L/r Click, Cable: 1.8m Tangle Free Rubber, Dpi: 12,400 Dpi Ups: Max Configurable Power (watts) 650 Watts / 1.2kva, At Least 3 Universal Socket Warranty :2 Years 2 Unit Command Center Field Laptop - Command Center Field Laptop - Intel Core I7-13700hx Processor (30 Mb Smart Cache, 2.1 Ghz Performance-core With Turbo Boost Max Technology 3.0 Up To 5.0 Ghz, Overclock Capable) 1x 16gb Of Ddr5 4800mhz System Memory, Upgradable To 32 Gb Using Two Sodimm Modules 2x 512gb Nvme Ssd; Total Of 1tb 16 Display With Ips (in-plane Switching) Technology, Wqxga 2560 X 1600, High-brightness (500 Nits) Nvidia® Geforce Rtx 4060 With 8 Gb Of Dedicated Vram Warranty :2 Years 2 Unit Command Center Printer - Command Center Printer - A3 Wi-fi Duplex All-in-one Ink Tank Printer Print Speed Of Up To 25.0 Ipm Prints Up To A3+ (for Simplex) Automatic Duplex Printing Ultra-high Page Yield Of 7,500 Pages (black) And 6,000 Pages (colour) Wi-fi, Wi-fi Direct, Ethernet Printer Type: Print, Scan, Copy, Fax With Adf Minimum Ink Droplet Volume: 3.8 Pl Print Direction: Bi-directional Printing Nozzle Configuration:800 X 1 Nozzles Black, 256 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 2400 Dpi Automatic 2-sided Printing: Yes (up To A3) Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 43 Sec Per Photo (border) / 52 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 32.0 Ppm / 22.0 Ppm *2 Iso 24734, A4 Simplex (black / Colour): Up To 25.0 Ipm / 12.0 Ipm *2 Iso 24734, A4 Duplex (black / Colour): Up To 16.0 Ipm / 9.0 Ipm *2 Iso 24734, A3 Simplex (black / Colour): Up To 13.5 Ipm / 6.0 Ipm *2 Iso 24734, A3 Duplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm *2 Warranty :1 Year Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 5 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Unit Command Center Video Wall Controller - Command Center Video Wall Controller - Interface Alarm In Alarm Out 8-ch Alarm Out 8-ch Alarm In Serial Interface Rs-232 (rj45) × 1, Rs-485 × 1 Usb Interface Usb 2.0 × 2 Network Interface Rj45 × 2, 10 M/100 M/1000 Mbps Self-adaptive Ethernet Interface Optic Interface × 2 100 Base-fx/1000 Base-x Supports Optoelectronic Self-adaptation Video Walls 1 Video Wall Size <= 8 Layers Per Screen 1080p × 3 Or 4k × 1.5 Layers Layers Per Screen × Output Interface(s) Split Window Yes Scene Auto-switch Delay 3s Auto-switching Plans Support 256 Auto-switching Plans Max. Input Resolution 4k Audio Encoding Format G722.1, G711u, G711a, Aac-lc Video Output Interface Type Hdmi 1.4 Video Output Interface(s) 8 Video Decoding Resolution Up To 32 Mp Warranty:2 Years 8 Unit Command Center Video Wall Display - Command Center Video Wall Display - Display Panel Diagonal Size Class 55 Measured 54.6 Resolution 3,840 X 2,160 (16:9) Brightness (typ.) 700 Nit Orientation Landscape/portrait Haze 25% Contrast Ratio (typ.) 4,000:1 Type Va Active Display Area 1,209.6 (h) X 680.4 (v) Pixel Pitch (mm) 0.315 X 0.315 Color Gamut Ntsc 72% Operation Hour 24/7 Connectivity / Sound Input Video Dp 1.2 (1), Hdmi 2.0 (3) Audio N/a Usb Usb 2.0 X 2 Tuner N/a Output Audio Stereo Mini Jack Wifi / Bt O/o External Control Rs232c (in/out), Rj45 Speaker 10w 2ch Mechanical Spec Dimension (mm / In.) With Heavy Duty Full Motion Tv Wall Mount Warranty :3 Year 44 Unit Din Rail Mount - Din Rail Mount - 35mm At Least 7.5mm Depth Aluminum 22 Unit Electrical Box Enclosure - Electrical Box Enclosure - Electricalbox Panel Box Metal Enclosure(ip66, Nema 4 & 12) 300x250x150 Mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Molded Case Circuit Breaker Mccb30a 220v 2 Pole Din Rail Mount Type X1 Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Rail Mount Type X1 Grounding Bus Bar With Insulator X1 Din Rail Mount Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 6 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Roll Fiber Optic Connectivity - Fiber Optic Connectivity - Fiber Optic Connectivity 2.0 Kms 4 Core Fiber Optic Cable Maintenance Of Outside And Inside Plant Equipment To Smart City Command Center For 1 Year 1 Unit Fiber Optic Fusion Equipment - Fiber Optic Fusion Equipment - Fiber Alignment Core/cladding Motor Number 6 Motors Splicing Time 5s Heating Mode 15s, Can Be Customized According To The External Environment Fiber Type Single-mode Fiber (smf/g.652), Bif/g.657); Suitable For Single Mode, Multi-mode, Bare Fiber, Tail Fiber, Drop Cable, Jumper, Invisible Fiber Fusion; The Cladding Diameter 80-150μm Splicing Loss 0.02db(sm)、0.01db(mm)0.04db(ds/nzds) Splicing Mode Automatic Focusing Core Alignment, Conventional/high Precision Welding Splicing Way Automatic, Semi-automatic Opm Wavelength: 850nm、1300nm、1310nm、1490nm、1550nm、1625nm、980nm、1270nm、1577nm、1650nm/measurement Range: -50+26dbm Absolute Error: <0.3db (-50dbm ~+3dbm Range) Battery Capacity 7800mah Large Capacity Lithium Battery Charging Time ≤3.5; It Can Continuously Weld And Heat About 260 Cores Magnification 320x (x Or Y Axis Single Display) 200x (x And Y Axis Dual Display) Fiber Diameter Coating Diameter: 80-150μm/coating Diameter: 100-1000μm Cutting Length Coating Layer 250μm Below: 8-16mm/coating Layer 250-1000μm: 16mm Heat Shrink Tube 60mm、50mm、40mm、25mm Tensile Testing Standard 2n Display 5 Inch Tft Color Display Screen Return Loss Better Than 60 Db Product Protection Waterproof, Dustproof And Fall Proof Warranty :1 Year 44 Unit Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upcto Lc/upc3 Meter 44 Unit Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upcto Sc/upc3 Meter 45 Unit Gigabit Rj-45 Surge Protector Arrester - Gigabit Rj-45 Surge Protector Arrester - Protects Your Ethernet Device From The Damage Of Lightning & Surge Gigabit 10/100/1000 Specification: Connectors: Rj-45 Material: Shielded Aluminum Alloy 44 Unit Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulatorat Least 8 Way At Least 8x12mm² 2 Roll Grounding Cable Pure Copper Wire - Grounding Cable 4mm Pure Copper Wire Round Solid 100m Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 7 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Grounding Rod And Clamp Copper Plated - Grounding Rod And Clamp Copper Plated - "grounding Rod Full Set - (1pc Grounding Rod + 1 Pc Grounding Clamp) Size: Approximately 50cm Length X 0.9cm Diameter" 22 Unit Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang 15 Amperes Capacity/ Maximum 3,750watts 1 Lot Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of All Outside Plant Project Equipment In Outside Project Sites Outside Of The Smart City Command Center 1 Lot Installation, System Integrations And Configuration Of All Inside Plant Project Equipment - Installation, System Integrations And Configuration Of All Inside Plant Project Equipment In The Smart City Command Center Such As The Hikcentral Camera License, Integration To Existing Hikcentral Software And Integration Of Existing Cctv Cameras Into New Nvr 22 Unit Iot Box Panelbox Metal Enclosure (ip66,nema4 & 12) 500x300x200mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Heavy Duty Surface Type Extension Outlet 4 Gang Terminal Block Distribution 2 Input 4 Output Push-in Type 40 Unit Lpr Camera Arm Mount - Gi Pipe Extension Arm 1.5-3 Meters 40 Unit Lpr Camera Memory Card - Product Capacity Covering 128g The Storage Mediumis Tlc Particles Long Reading And Writing Times, Which Can Meet More Than 1000 Cycles Optimized For Long Time On-board Video Recording, Offering More Stable Reading And Writing Experience Operating Voltage 2.7v~3.6v Compatibility Sd 6.1 Working Life 1,000 Cycles Storage Medium Tlc Speed Class Write/read Speed 64gb:up To 35/100mb/s 128gb:up To 70/100mb/s256gb:up To 90/100mb/s Durability 10,000 Insertion/removal Cycles Uhs-i Sdr104 Type Sdxc 40 Unit Lpr Camera Vertical Pole Mount - Vertical Pole Mounting Bracket Installed On The Cross Bar Galvanized Steel Sheet And Steel Material With Surface Spray Treatment Can Be Used For New Bullet Camera Outdoor Greycolo Must Be Compatible With Cctv Camera 22 Roll Metal Flexible Conduit 1 Inch - Metal Flexible Conduit 1 Inch 30 Meters Per Roll 44 Unit Molded Case Circuit Breaker Mccb 30a - Molded Case Circuit Breaker Mccb 30a 220v 2 Pole Din Rail Mount Type 22 Unit Molded Case Circuit Breaker Mccb 63a - Molded Case Circuit Breaker Mccb 63a 220v 2 Pole Din Rail Mount Type 22 Unit Poe Switch Power Supply - Power Supply 48v 2a 96w With Us Plug Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 8 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Residual Current Circuit Breaker 63a 220v - Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Railmount Type 44 Unit Sfp+ Module Lc Connector Type - Gigabit Single-mode Wdm Bi-directional Sfp Module Spec: Lc Connector, Tx:1550nm/rx:1310nm, Single-mode, 20 Km 7 Roll Solidwire Awg#12 - Solidwire Awg#12 75m Per Roll Use For Termination Inside Iot Box 7 Roll Solidwire Awg#16 - Solid Wire Awg#16 75m Per Roll Use For Termination Inside Iot Box 66 Unit Terminal Block Distribution 2 Input 4 Output - Terminal Block Distribution 2 Input 4 Output Push-in Type This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Brands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business For Use Of Cmo Mitd Under Pr No. 1 Please Refer To Attached Terms Of Reference In The Associated Components Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature
Closing Date10 Jan 2025
Tender AmountPHP 15.5 Million (USD 267 K)

Department Of Agriculture Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Details: Description Invitation To Bid For The Supply And Delivery Of Various Common-used Office Supplies 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The Gaa Fy 2025 Intends To Apply The Sum Of Six Million Two Hundred Ninety-four Thousand One Hundred Twenty-two Pesos And Fifty Centavos (php6,294,122.50) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Supply And Delivery Of Various Common-used Office Supplies With Project Identification Number Da-rfo 1-2025-goods-033. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Item No. Specifications Qty. Unit Unit Cost Total Cost 1 Automatic Voltage Regulator (avr), 3000w 4 Unit 5,500.00 22,000.00 2 Battery Charger For Aa & Aaa, With Aa Rechargeable Battery 54 Pc 1,700.00 91,800.00 3 Battery, Aa, Alkaline, 4pcs/pack 132 Pack 90.00 11,880.00 4 Battery, Aa, Rechargeable 2pcs/pack (2450 Mah) 63 Pack 700.00 44,100.00 5 Battery, Aaa, Alkaline 4pcs/pack 141 Pack 120.00 16,920.00 6 Battery, Aaa, Rechargeable 2pcs/pack (800 Mah) 9 Pack 500.00 4,500.00 7 Cfl Bulb 18 Watts 59 Pc 200.00 11,800.00 8 Extension Outlet 4 Gang W/ Switch (1.5m) 18 Unit 950.00 17,100.00 9 Flashlight, Rechargeable 5 Pc 400.00 2,000.00 10 Laser Pointer Presenter 7 Pc 800.00 5,600.00 11 Led, Lightbulb (daylight 9 Watt) 70 Pc 200.00 14,000.00 12 Tape, Electrical, 19mm X 16mm 32 Pc 60.00 1,920.00 13 Universal Extension Wheel (10m) 12 Unit 2,200.00 26,400.00 14 Universal Outlet Extension Cord, 6 Gang W/ Switch, 2-3 Meters Cord Length 17 Unit 1,200.00 20,400.00 15 Alcohol (500ml, Isoprophyl 70%) 343 Bot 110.00 37,730.00 16 Alcohol (gal, Isoprophyl 70%) 46 Gal 600.00 27,600.00 17 Ballpen, 0.5mm, Fine Black 4193 Pc 10.00 41,930.00 18 Ballpen, 0.5mm, Fine Blue 2616 Pc 10.00 26,160.00 19 Ballpen, 0.5mm, Fine Red 139 Pc 10.00 1,390.00 20 Ballpen, 0.7mm, Fine, Black 1188 Pc 12.00 14,256.00 21 Ballpen, 0.7mm, Fine, Blue 1142 Pc 12.00 13,704.00 22 Ballpen, 0.7mm, Fine, Red 50 Pc 12.00 600.00 23 Ballpen, Bp-s Fine, Black 679 Pc 25.00 16,975.00 24 Ballpen, Bp-s Fine, Blue 406 Pc 25.00 10,150.00 25 Ballpen, Bp-s Fine, Red 174 Pc 25.00 4,350.00 26 Bank Envelope (11 X 7 Inch) 75 Pc 3.50 262.50 27 Bond Paper, (11"x17") Tabloid Size, Subs 24 / 80 Gsm 20 Ream 550.00 11,000.00 28 Bond Paper, (8.5x11) Letter, Subs 20 / 70 Gsm 78 Ream 280.00 21,840.00 29 Bond Paper, (8.5x11) Letter, Subs 24 / 80 Gsm 49 Ream 320.00 15,680.00 30 Bond Paper, (8.5x13) Legal, Subs 20 / 70 Gsm 686 Ream 300.00 205,800.00 31 Bond Paper, (8.5x13) Legal, Subs 24 / 80 Gsm 490 Ream 350.00 171,500.00 32 Bond Paper, A3, Subs. 20 / 70 Gsm 50 Ream 465.00 23,250.00 33 Bond Paper, A3, Subs. 24 / 80 Gsm 20 Ream 530.00 10,600.00 34 Bond Paper, A4, Subs 20 / 70 Gsm 904 Ream 290.00 262,160.00 35 Bond Paper, A4, Subs 24 / 80 Gsm 558 Ream 330.00 184,140.00 36 Book Ends, Metal 5 Pair 200.00 1,000.00 37 Carbon Paper, Long 2 Pack 195.00 390.00 38 Cartolina, White, 20pcs/pack 15 Pack 90.00 1,350.00 39 Certificate Holder, A4 Size W/ Plastic Cover 623 Pc 50.00 31,150.00 40 Clear Folder, Morocco Long, Blue 30 Book 22.00 660.00 41 Clear Folder, Morocco Short, Blue 10 Book 20.00 200.00 42 Clearbook Refil, 20 Holes, 10pcs/pack 10 Pack 50.00 500.00 43 Clip Board, Data Board. 8.5"x11" 22 Pc 90.00 1,980.00 44 Clip Board, Data Board. 8.5"x13" 148 Pc 100.00 14,800.00 45 Clip, Bulldog 2" 344 Pc 8.00 2,752.00 46 Clip, Bulldog 3'' 324 Pc 15.00 4,860.00 47 Colored Paper 8 1/2 X 11" 10's/pack 22 Pack 30.00 660.00 48 Colored Paper, A4, Light Blue 37 Ream 200.00 7,400.00 49 Columnar Notebook, 10 Cols 10 Pad 35.00 350.00 50 Columnar Notebook, 12 Cols 18 Pad 35.00 630.00 51 Construction Paper (assorted) 10 Sheets Per Pack 40 Pack 30.00 1,200.00 52 Corkboard, 2x3 Ft 2 Pc 900.00 1,800.00 53 Corkboard, 3ft X 4 Ft 1 Pc 2,000.00 2,000.00 54 Correction Pen 70 Pc 20.00 1,400.00 55 Correction Tape 5mm X 8m 562 Pc 30.00 16,860.00 56 Cotton (500 Grams) 1 Roll 150.00 150.00 57 Crayons, 8 Colors 12 Pack 20.00 240.00 58 Cutter Blade, Big 12 Box 30.00 360.00 59 Cutter, Heavy Duty 46 Pc 100.00 4,600.00 60 Dating And Stamping Machine, Self Inking (dated 2024 And Up) 42 Pc 500.00 21,000.00 61 Envelope, Ordinary, Long Brown 1525 Pc 4.00 6,100.00 62 Envelope, Ordinary, Short Brown 243 Pc 3.00 729.00 63 Eraser (for Pencil) 161 Pc 15.00 2,415.00 64 Expanding Envelope, Kraft, Legal Size 335 Pc 15.00 5,025.00 65 Expanding Envelope, Hard Plastic With Garter (pvc Type), Legal Size 76 Pc 90.00 6,840.00 66 Expanding Envelope, Plastic Long (thick) 230 Pc 35.00 8,050.00 67 Expanding Envelope, Plastic Long With Handle 355 Pc 90.00 31,950.00 68 File Box W/ Cover (blue) 233 Pc 410.00 95,530.00 69 File Box W/ Cover (red) 136 Pc 410.00 55,760.00 70 File Rack, 3 Layers, Heavy Duty 24 Pc 500.00 12,000.00 71 Film Index (with Sign Here Note) 219 Pack 55.00 12,045.00 72 Film Index Rainbow Color 158 Pack 45.00 7,110.00 73 Folder Expanding, Legal Size (green, Glossy) 1574 Pc 18.00 28,332.00 74 Folder Expanding, Short (green, Glossy) 50 Pc 15.00 750.00 75 Folder Long Ordinary, Kraft, Thick 1196 Pc 6.00 7,176.00 76 Folder Long Ordinary, White, Thick 3869 Pc 6.00 23,214.00 77 Folder Plastic Clear W/ Slide (a4) (thick Plastic) 66 Pc 35.00 2,310.00 78 Folder Plastic Clear W/ Slide (legal) (thick Plastic) 178 Pc 40.00 7,120.00 79 Folder, Morocco, Legal (blue) Not Glossy 140 Pc 25.00 3,500.00 80 Folder, Morocco, Legal (green) Not Glossy 92 Pc 25.00 2,300.00 81 Folder, Morocco, Short (blue) Not Glossy 107 Pc 18.00 1,926.00 82 Folder, Morocco, Short (green) Not Glossy 35 Pc 18.00 630.00 83 Glue Gun Heavy Duty Big 8 Pc 360.00 2,880.00 84 Glue Stick, Big 102 Pc 12.00 1,224.00 85 Glue, Multi-purpose 240 Grams 12 Bot 150.00 1,800.00 86 Highlighter, Blue 55 Pc 40.00 2,200.00 87 Highlighter, Green 95 Pc 40.00 3,800.00 88 Highlighter, Orange 83 Pc 40.00 3,320.00 89 Highlighter, Pink 78 Pc 40.00 3,120.00 90 Highlighter, Yellow 91 Pc 40.00 3,640.00 91 I.d. Holder W/ Lace 4"x6" 100 Pc 45.00 4,500.00 92 Illustration Board, 1 Whole 15 Pc 70.00 1,050.00 93 Index Card (3"x5") 50s/pack 24 Pack 45.00 1,080.00 94 Laminating Film A4 Size 100pcs/pack 250 Mic 34 Pack 1,200.00 40,800.00 95 Lead, For Mechanical Pencil 0.5mm 12pc/tube 2 Tube 30.00 60.00 96 Lever Arch File, Blue, File Top, Size: Approx. (11 X 13.5 X 2.5 Inches) 20 Pc 195.00 3,900.00 97 Lever Arch File, Blue, Landscape, Size: Approx. (11 X 13.5 X 2.5 Inches) 40 Pc 195.00 7,800.00 98 Lever Arch File, Blue, Size: Approx. (15.5 X 9.5 X 3 Inches) 45 Pc 195.00 8,775.00 99 Magazine File Box (5"x9"x15-3/4") 60 Pc 110.00 6,600.00 100 Mailing Envelope, White, 500pcs/box 18 B0x 290.00 5,220.00 101 Manila Paper 1 Whole 276 Sheet 5.00 1,380.00 102 Marker Permanent Ink Refill 30ml, Black (pilot) 36 Bot 110.00 3,960.00 103 Marker Permanent Ink Refill 30ml, Blue (pilot) 32 Bot 110.00 3,520.00 104 Notebook (80 Leaves) 1040 Pc 45.00 46,800.00 105 Official Record Book (300 Pages) Aprox. Size: (8.5 X 11) 73 Book 250.00 18,250.00 106 Official Record Book (500 Pages) Aprox. Size: (8.5 X 11) 100 Book 280.00 28,000.00 107 Paper Cutter With Board, Wood Base, 12x15 3 Unit 1,200.00 3,600.00 108 Paper Cutter,steel Base W/ Ruler & Presser 15'x12' 1 Unit 2,000.00 2,000.00 109 Paper Fastener (plastic) 100 Box 40.00 4,000.00 110 Paper Fastener, (metal) 207 Box 70.00 14,490.00 111 Paper, Ruled Pad, 90 Leaves (yellow Pad) 35 Pad 45.00 1,575.00 112 Parchment Paper, Long, 10sheets/pack (cream) 48 Pack 35.00 1,680.00 113 Parchment Paper, Short, 10sheets/pack (cream) 58 Pack 30.00 1,740.00 114 Paste With Applicator, 200 Grams 4 Jar 80.00 320.00 115 Pencil With Eraser No.2 (12pcs/box) 212 Box 72.00 15,264.00 116 Pencil, Mechanical, 0.5mm Lead 56 Pc 47.75 2,674.00 117 Permanent Marker (black) (bullet Type) (super Color Marker) 225 Pc 45.00 10,125.00 118 Permanent Marker (black) (chisel Type) (super Color Marker) 174 Pc 55.00 9,570.00 119 Permanent Marker (blue) (bullet Type) (super Color Marker) 195 Pc 45.00 8,775.00 120 Permanent Marker (blue) (chisel Type) (super Color Marker) 117 Pc 55.00 6,435.00 121 Permanent Marker (red) (bullet Type) (super Color Marker) 57 Pc 45.00 2,565.00 122 Permanent Marker (red) (chisel Type) (super Color Marker) 70 Pc 55.00 3,850.00 123 Philippine National Flag, Size: 90cm X 150cm 12 Pc 102.00 1,224.00 124 Photo Paper, Glossy, A4, 20pcs/pack 67 Pack 150.00 10,050.00 125 Plastic Twine, One Kilo Per Roll 18 Roll 80.00 1,440.00 126 Puncher, Heavy Duty, 2 Holes 12 Unit 200.00 2,400.00 127 Push Pin, Hammer Head Type, Assorted Colors, 100s/box 13 Box 50.00 650.00 128 Ring Binder, 1" 5 Pc 45.00 225.00 129 Ring Binder, 1/2 " 5 Pc 20.00 100.00 130 Rotary Pencil Sharpener 2 Pc 300.00 600.00 131 Rubber Band, Large Size 15 Box 150.00 2,250.00 132 Ruler Metal 12 Inch 9 Pc 50.00 450.00 133 Ruler Plastic 12 Inch 5 Pc 20.00 100.00 134 Scissors Heavy Duty Big 8" (stainless) 63 Pair 120.00 7,560.00 135 Screw Fastener 3" 438 Pc 10.00 4,380.00 136 Screw Fastener 4" 357 Pc 12.00 4,284.00 137 Sign Pen V5, Black 415 Pc 55.00 22,825.00 138 Sign Pen V5, Blue 387 Pc 55.00 21,285.00 139 Sign Pen V5, Green 55 Pc 55.00 3,025.00 140 Sign Pen, 1.0mm, Black 177 Pc 75.00 13,275.00 141 Sign Pen, 1.0mm, Blue 146 Pc 75.00 10,950.00 142 Sign Pen, Black Pentel Gel Type 0.5 539 Pc 95.00 51,205.00 143 Sign Pen, Blue Pentel Gel Type 0.5 400 Pc 95.00 38,000.00 144 Specialty Board, Cream, 8.5x11, 10pcs/pack (b-board) 673 Pack 35.00 23,555.00 145 Specialty Board, Cream, 8.5x13, 10pcs/pack (b-board) 648 Pack 40.00 25,920.00 146 Specialty Board, White, 8.5x11, 10pcs/pack (b-board) 225 Pack 35.00 7,875.00 147 Specialty Board, White, 8.5x13, 10pcs/pack (b-board) 408 Pack 40.00 16,320.00 148 Stamp Pad Ink Black 50ml 13 Pc 45.00 585.00 149 Stamp Pad Ink Red 50ml 4 Pc 45.00 180.00 150 Stamp Pad Ink Violet 50ml 23 Pc 45.00 1,035.00 151 Stamp Pad Standard Size Black 7 Pc 40.00 280.00 152 Stamp Pad Standard Size Violet 4 Pc 40.00 160.00 153 Staple Wire #35 297 Box 40.00 11,880.00 154 Stapler, #35 Heavy Duty With Staple Remover 57 Unit 400.00 22,800.00 155 Stapler, Long Reach Heavy Duty 3 Unit 500.00 1,500.00 156 Sticker Paper (high Gloss, Inkjet Friendly 10sheets/pack) A4size 75 Pack 95.00 7,125.00 157 Sticker Paper (high Gloss, Inkjet Friendly 10sheets/pack), Long 123 Pack 100.00 12,300.00 158 Sticker Paper (high Gloss, Inkjet Friendly 10sheets/pack), Short 55 Pack 90.00 4,950.00 159 Sticky Notes (2"x1.5") 100 Sheets/pad 126 Pad 25.00 3,150.00 160 Sticky Notes (2"x2"), 100 Sheets/pad 141 Pad 30.00 4,230.00 161 Sticky Notes (3"x2"), 100 Sheets/pad 127 Pad 40.00 5,080.00 162 Sticky Notes (3"x3"), 100 Sheets/pad 222 Pad 40.00 8,880.00 163 Sticky Notes (3"x4), 100 Sheets/pad 158 Pad 50.00 7,900.00 164 Sticky Notes (3"x5"), 100 Sheets/pad 215 Pad 50.00 10,750.00 165 Super Glue / Shoe Glue 3 Grams 6 Pc 50.00 300.00 166 Super Permanent Marker, Fine Black (industrial) (sharpie) 35 Pc 90.00 3,150.00 167 Tape Dispenser, Heavy Duty (1") 9 Pc 150.00 1,350.00 168 Tape Double Sided Thin 24mm White 95 Pc 40.00 3,800.00 169 Tape Double Sided Adhesive W/ Foam Green, 2" 94 Roll 230.00 21,620.00 170 Tape Double Sided Adhesive W/ Foam Green, 1" 84 Roll 150.00 12,600.00 171 Tape Duct, Color Blue 2" 62 Roll 110.00 6,820.00 172 Tape Duct, Color Grey 2" 78 Roll 110.00 8,580.00 173 Tape, Masking, 1/2" 47 Roll 21.00 987.00 174 Tape, Masking, 24mm, 1", 100m 95 Roll 35.00 3,325.00 175 Tape, Masking, 48mm, 2", 100m 301 Roll 70.00 21,070.00 176 Tape, Packaging, 48mm, 2", 100m 88 Roll 55.00 4,840.00 177 Tape, Transparent, 24mm, 1", 100m 170 Roll 30.00 5,100.00 178 Tape, Transparent, 48mm, 2", 100m 126 Roll 52.00 6,552.00 179 Tracing Paper, Per Cut, 20x30, 8085 Thick 2 Pc 20.00 40.00 180 Whiteboard, 3ft X 4ft 7 Pc 2,000.00 14,000.00 181 Whiteboard, 5ft X 3ft 6 Pc 2,800.00 16,800.00 182 Air Freshener, 280ml (lemon Fresh) 163 Can 240.00 39,120.00 183 Air Freshener, Scented Gel, 180 Grams 98 Pc 220.00 21,560.00 184 Bathroom Cleaner (approx. 900ml) 29 Bot 300.00 8,700.00 185 Bathroom Soap, 90 Grams 16 Pc 50.00 800.00 186 Bleach Colored 1 Ltr 62 Bot 130.00 8,060.00 187 Bleach White 1 Ltr 63 Bot 100.00 6,300.00 188 Broom, Ceiling, Bamboo 23 Pc 170.00 3,910.00 189 Broom, Soft 5 Pc 170.00 850.00 190 Broom, Stick 14 Pc 40.00 560.00 191 Car Freshener 42 Grams, Organic Canister, Assorted Scent 63 Can 240.00 15,120.00 192 Detergent Bar, Long 12 Bar 80.00 960.00 193 Detergent Powder, W/ Fabric Conditioner 1kg 43 Pack 150.00 6,450.00 194 Dishwashing Liquid (250ml) 402 Bot 70.00 28,140.00 195 Disinfectant Spray, 170g 89 Can 280.00 24,920.00 196 Door Mat, Cloth Rectangle 105 Pc 60.00 6,300.00 197 Dust Pan, Plastic Big 2 Pc 80.00 160.00 198 Fabric Conditioner 800 Ml 14 Bot 250.00 3,500.00 199 Face Towel (cotton), Good Morning 159 Pc 30.00 4,770.00 200 Floor Mop With Bucket (360degrees Rotating Micro Fiber Head) 3 Set 1,500.00 4,500.00 201 Furniture Cleaner, 300ml 32 Can 300.00 9,600.00 202 Garbage Bag, Black, Gusseted Type Thick Plastic, 10's/roll, (small) 55 Roll 70.00 3,850.00 203 Garbage Bag, Black, Thick Plastic, 10's/pack, (large), Heavy Duty 145 Pack 100.00 14,500.00 204 Garbage Bag, Black, Thick Plastic, 10's/pack, (xl) Heavy Duty 37 Pack 130.00 4,810.00 205 Garbage Bag, Black, Thick Plastic, 10's/pack, (xxl) Heavy Duty 239 Pack 150.00 35,850.00 206 Garbage Bag, Black, Thick Platic, 10's/pack, (medium), Heavy Duty 168 Pack 80.00 13,440.00 207 Glass Cleaner, Big Sprayer Type 7 Bot 197.00 1,379.00 208 Glass Squeezer W/ Handle 1 Pc 125.00 125.00 209 Hand Sanitizing Gel, 60ml 15 Bot 60.00 900.00 210 Insecticide Spray (aerosol) 400ml 73 Can 350.00 25,550.00 211 Laundry Brush 4 Pc 30.00 120.00 212 Laundry Gloves (medium) 1 Pc 200.00 200.00 213 Liquid Handwash (antibacterial) 400ml 123 Bot 140.00 17,220.00 214 Microfiber, Cleaning Cloth 35cm X 35cm 47 Pc 60.00 2,820.00 215 Mop W/ Squeezer (squeez Mop) 26 Pc 350.00 9,100.00 216 Pail W/ Cover (16l) 18 Pc 200.00 3,600.00 217 Paper Towel, Interfold 144 Pack 120.00 17,280.00 218 Push Brush (floor Brush) 20 Pc 130.00 2,600.00 219 Scrub Sponge, Heavy Duty 116 Pc 60.00 6,960.00 220 Scrubbing Pads, Heavy Duty 25 Pc 40.00 1,000.00 221 Table Napkin, Pre Folded 13 Pack 100.00 1,300.00 222 Tissue Paper, 2-ply, 12 Rolls/pack 422 Pack 180.00 75,960.00 223 Tissue Paper, 3-ply, @ 4rolls/pack 213 Pack 160.00 34,080.00 224 Toilet Bowl Brush W/ Box 57 Pc 92.00 5,244.00 225 Toilet Bowl Pump 2 Pc 60.00 120.00 226 Toilet Deodorant Cake, 50 Grams 108 Pc 50.00 5,400.00 227 Trash Bin, Plastic W/ Cover, 11l Capacity 6 Pc 150.00 900.00 228 Trash Bin, Plastic W/ Cover, 25l Capacity 1 Pc 250.00 250.00 229 White Facial Tissue (200mmx200mm)2ply 210 Box 110.00 23,100.00 230 Cd Rewritable, 700mb 80min. W/ Case 603 Pc 50.00 30,150.00 231 Dvd-rewritable W/ Case 6 Pc 90.00 540.00 232 External Hard Drive (1 Tb) Usb 3.0 27 Unit 4,700.00 126,900.00 233 External Hard Drive, Ssd (1 Tb) Usb 3.0/type C 15 Unit 6,000.00 90,000.00 234 Flash Drive , Usb 16gb, Plug In Play 3 Pc 490.00 1,470.00 235 Flash Drive, 32gb Ultra Usb Driver (otg); Micro-usb & Usb Connectors 42 Pc 1,300.00 54,600.00 236 Flash Drive, Usb 32 Gb 31 Pc 1,000.00 31,000.00 237 Flash Drive, Usb 64 Gb 119 Pc 1,500.00 178,500.00 238 Hdmi Cable, 10m 5 Pc 600.00 3,000.00 239 Hdmi Cable, 5m 3 Pc 300.00 900.00 240 Keyboard, Usb Type 36 Pc 450.00 16,200.00 241 Keyboard, Wireless 5 Pc 600.00 3,000.00 242 Microsd Memory Card, 32gb 1 Pc 1,000.00 1,000.00 243 Microsd Memory Card, 64gb 2 Pc 1,800.00 3,600.00 244 Mouse Optical, (usb) 15 Pc 300.00 4,500.00 245 Mouse For Laptop, Optical 50 Pc 440.00 22,000.00 246 Mouse Optical, Wireless 21 Pc 630.00 13,230.00 247 Mouse Pad 119 Pc 30.00 3,570.00 248 Powerbank 10000mah 5 Pc 1,500.00 7,500.00 249 Powerbank 20000mah 50 Pc 2,500.00 125,000.00 250 Uninterruptible Power Supply (ups), 500va - 600va 12 Pc 4,500.00 54,000.00 251 Usb Hub, 3.0, 4 Port 5 Pc 500.00 2,500.00 252 Usb Lan Wireless Adapter 8 Unit 1,000.00 8,000.00 253 Wireless Usb Presenter 2 Unit 2,200.00 4,400.00 254 Ink Brother, Bt5000m, Magenta 36 Bottle 490.00 17,640.00 255 Ink Brother, Bt5000m, Yellow 36 Bottle 490.00 17,640.00 256 Ink Brother, Bt5000m, Cyan 41 Bottle 490.00 20,090.00 257 Ink Brother, Bt6000m, Black 30 Bottle 490.00 14,700.00 258 Ink Cartridge, Canon Cl-36, Colored (for Canon Mobile Printer) 13 Cart 1,600.00 20,800.00 259 Ink Cartridge, Canon Cl-811 Colored 3 Cart 2,000.00 6,000.00 260 Ink Cartridge, Canon Pg-35, Black (for Canon Mobile Printer) 10 Cart 1,100.00 11,000.00 261 Ink Cartridge, Canon Pg-810 (canon) 3 Cart 1,900.00 5,700.00 262 Ink Cartridge, Hp62, Black (hp Office Jet 200 Mobile Printer) 5 Cart 1,500.00 7,500.00 263 Ink Cartridge, Hp62, Tricolor (hp Office Jet 200 Mobile Printer) 5 Cart 1,800.00 9,000.00 264 Ink, Hp Gt 51 Black 2 Bottle 400.00 800.00 265 Ink, Hp Gt 52 Cyan 2 Bottle 400.00 800.00 266 Ink, Hp Gt 52 Magenta 2 Bottle 400.00 800.00 267 Ink, Hp Gt 52 Yellow 2 Bottle 400.00 800.00 268 Ink Epson T6731 Black (epson) 6 Bottle 800.00 4,800.00 269 Ink Epson T6732 Cyan (epson) 6 Bottle 800.00 4,800.00 270 Ink Epson T6733 Magenta (epson) 6 Bottle 800.00 4,800.00 271 Ink Epson T6734 Yellow (epson) 6 Bottle 800.00 4,800.00 272 Ink Epson T6735, Light Cyan (epson) 3 Bottle 800.00 2,400.00 273 Ink Epson T6736, Light Magenta (epson) 3 Bottle 800.00 2,400.00 274 Ink Epson, T6641, Black 70ml 22 Bottle 450.00 9,900.00 275 Ink Epson, T6642, Cyan 70ml 9 Bottle 450.00 4,050.00 276 Ink Epson, T6643, Magenta 70ml 13 Bottle 450.00 5,850.00 277 Ink Epson, T6644, Yellow 70ml 14 Bottle 450.00 6,300.00 278 Ink Epson, 001, Black 179 Bottle 700.00 125,300.00 279 Ink Epson, 001, Cyan 138 Bottle 600.00 82,800.00 280 Ink Epson, 001, Magenta 138 Bottle 600.00 82,800.00 281 Ink Epson, 001, Yellow 137 Bottle 600.00 82,200.00 282 Ink Epson, 003, Black 679 Bottle 500.00 339,500.00 283 Ink Epson, 003, Cyan 465 Bottle 500.00 232500 284 Ink Epson, 003, Magenta 483 Bottle 500.00 241,500.00 285 Ink Epson, 003, Yellow 451 Bottle 500.00 225500 286 Ink Epson, 008, Black 37 Bottle 1,200.00 44,400.00 287 Ink Epson, 008, Cyan 28 Bottle 900.00 25,200.00 288 Ink Epson, 008, Magenta 29 Bottle 900.00 26,100.00 289 Ink Epson, 008, Yellow 29 Bottle 900.00 26,100.00 290 Toner Cartridge, Fuji Xerox S1810/s2010/s2220/s2420 (ct201911) 3 Cart 5,400.00 16,200.00 291 Toner Cartridge, Fuji Xerox S2011/s2320/s2520 (ct202384) 1 Cart 5,400.00 5,400.00 292 Toner Cartridge, Hp Laserjet P1102, Ce285a (85a) 25 Cart 5,000.00 125,000.00 293 Toner Cartridge, Kyocera (tk 1175) Monochrome 4 Cart 9,500.00 38,000.00 294 Toner Cartridge, Sharp Ar-6026n (mx-238ft) 5 Cart 9,500.00 47,500.00 295 Toner Cartridge, Lexmark (mx321) 2 Cart 10,000.00 20,000.00 296 Hp Color Laserjet Toner 206a, Black 7 Cart 9,500.00 66,500.00 297 Hp Color Laserjet Toner 206a, Cyan 1 Cart 9,500.00 9,500.00 298 Hp Color Laserjet Toner 206a, Magenta 1 Cart 9,500.00 9,500.00 299 Hp Color Laserjet Toner 206a, Yellow 1 Cart 9,500.00 9,500.00 300 Ink Brother Btd60bk 8 Bottle 510.00 4,080.00 301 Certificate Holder, Legal Size W/ Plastic Cover 400 Pc 60.00 24,000.00 302 Specialty Board, Cream, A4 8.2x11.7, 10pcs/pack (b-board) 300 Pack 30.00 9,000.00 303 Specialty Board, White, A4 8.2x11.7, 10pcs/pack (b-board) 105 Pack 30.00 3,150.00 304 Ink Cartridge, Hp 682, Black 3 Cart 550.00 1,650.00 305 Ink Cartridge, Hp 682, Tri-color 3 Cart 550.00 1,650.00 306 Index Card (5"x8") 50s/pack 3 Pack 65.00 195.00 307 Screw Fastener 1" 200 Pc 7.00 1,400.00 308 Screw Fastener 2" 198 Pc 8.00 1,584.00 309 Plastic Fastener (5 Pcs/pack) Double Lock 220 Pack 25.00 5,500.00 310 Notebook, A6 Size, 200 Pages 115 Pc 60.00 6,900.00 311 Notebook, A7 Size, 200 Pages 100 Pc 50.00 5,000.00 312 Usb 3.1 Otg Flashdrive, Type C, 128 Gb 51 Pc 3,000.00 153,000.00 313 Notebook, A5 Size, Soft Leather Cover, 200 Sheets 80 Pc 200.00 16,000.00 314 Gel Ink Sign Pen, 0.4 100 Pc 90.00 9,000.00 315 Gel Ink Sign Pen, 0.3 100 Pc 90.00 9,000.00 316 Toner Cartridge, Fujifilm Apeos 2150 Nda 5 Cart 3,500.00 17,500.00 317 Whiteboard 2ft X 2 Ft 2 Piece 2,000.00 4,000.00 318 Clamp - Stapler Remover 5 Pcs 30.00 150.00 319 Portable Bluetooth/wireless Speaker With Trolley (free Microphone) 1 Unit 6,695.00 6,695.00 320 Dishwashing Liquid Diy Kit, Lemon Scent (for 15-16 Liters Output) 25 Set 400.00 10,000.00 321 Fabric Conditioner Diy Kit, Sunrise Fresh Scent (for 20 Liters Output) 25 Set 450.00 11,250.00 322 Liquid Handsoap Diy Kit, Antibac Scent (for 15-16 Liters Output) 25 Set 400.00 10,000.00 323 Sack For 50kls Capacity (size: 64cm X 104cm) 76 Pc 15.00 1,140.00 324 Printer Ribbon, Epson Lq 310 2 Cart 250.00 500.00 325 Stackable Storage Box With Cover And Wheels (155l) 3 Pcs 1,100.00 3,300.00 Total 6,294,122.50 Delivery Schedule: Delivery Schedule: Sixty (60) Working Days From Receipt Of Ntp Drop-off Point: Da-rfo 1, City Of San Fernando, La Union Delivery Of The Goods Is Required Within Sixty (60) Working Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From January 7-27, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 14 January 2025, 3:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 27 January 2025, 3:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 27 January 2025, 3:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ January 6, 2025 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-033
Closing Date27 Jan 2025
Tender AmountPHP 6.2 Million (USD 107.3 K)

Department Of Health Treatment And Rehabilitation Center Tender

Machinery and Tools
Philippines
Details: Description Bids And Awards Committee Request For Quotation Reference No.: 2025-02-046 Date: February 17, 2025 Procurement Title: Procurement Of Commonly Used Supplies Materials (1st Quarter) Pr Reference No: 2025-02-093/089 & 2025-01-046/043approved Budget Of The Contract (abc): Php 755,408.61 Name Of Supplier: _________________________________________ Contact No: _______________________ Contact Email Adress.: _______________________ Address: ________________________________________ Delivery Term: Based On The Submitted Annex A Delivery Place: Batangas Iii Liyang Pilar,bataan Please Quote Your Best Offer For The Following Items Described Herein Subject To Terms And Conditions And/or Technical Specifications And Within The Approved Budget For The Contract. Submit Your Quotation Duly Signed By Your Representative Through Registered Or Electronic Mail At The Above Address Not Later Than February 21, 2025 10:00am Subject To The Following: S Terms And Conditions: 1.) Doh Trc Bataan Reserves The Right To Reject, Accept And Waive Any Defects In The Price Quotation. 2.) All Entries Shall Be Typed Or Written In A Clear And Legible Manner. 3.) All Prices Offered Herein Are Valid, Binding And Effective For Sixty (60) Calendar Days From The Deadline Of Submission. Alternative Bids Shall Be Rejected. 4.) Price Quotation/s Shall Be Denominated In Philippine Peso And Shall Include All Incidental Expenses (tax, Delivery, Etc.,) 5.) Award Of Contract/purchase Order Shall Be Made To The Lowest Quotation, Which Complies To The Technical Specifications Required. In Case Of Tie Quotations, The Bac Shall Adopt And Employ “toss Coin” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005 6.) Salient Provisions Of The Revised Irr (rirr) Of Republic Act (ra) 9184: Section 68 - Liquidated Damages And Section 69 - Imposition Of Administrative Penalties Shall Be Observed. 7.) All Services Rendered/delivered Items Shall Be Subject To Inspection And Acceptance. Payment Will Be Process Within 30 Days Upon The Receipt Of Service/delivery Of Items. Additional Requirement For Submission: 1.) Philgeps Registration Number Or Certificate 2.) Notarized Omnibus Sworn Statement 3.) Valid Business Permit/mayor’s Permit 4.) Latest Income/business Tax Return 5.) Blank Copy Of Delivery Receipt/charge Sales Invoice And Collection Receipt/invoice (for New Suppliers) 6.) Valid Certificate Of Product Registration (cpr) From Food And Drug Administration (fda) (for Procurement Of Drugs And Medicine/medical Supplies) 7.) Batch Notification, Lot Release From Food And Drug Administration (fda) Or Its Equivalent (for Procurement Of Specific Drugs And Medicines) 8.) Valid Certificate Of Medical Device Notification From Food And Drug Administration (fda) Or Its Equivalent (for Procurement Of Medical Device) 9.) Valid License To Operate From Fda (whether It Is A Manufacturer, Importer, Seller Or Distributor) (for Procurement Of Drugs And Medicine/medical Supplies/medical Device) 10.) Brochure With Picture Of Quoted Item. Respectfully Yours, Sgd Chazell Irrah I. Bon Head, Bac Secretariat Item No. Unit Item Description Qty Abc/ceiling Price Per Unit Brand* Unit Cost Total 1 Unit 1000va Ups Micropower (600w) Mini Tower Line Interactive Switching Available Capacity: 600w Input Power: 190~240va (50~60hz) Output Power: 220~230va(50- 60hz) 2 X 12v7ah Battery Backup Time: 1~5min 1 Year Warranty 5.00 4,180.00 2 Piece 30 Inches, 5-layer Storage Rack Steel150 Kgs Capacity Per Sheleasy Boltless Assembly Durable Powder Coat Finish Center Support Beampowder Coated White Or Black Finish 2.00 3,300.00 3 Box Ballpoint Pens Black, 0.5mm 12 Pcs Per Box 1.00 68.20 4 Pack Battery, Dry Cell, Size Aaa, 4pcs/pack 4.00 27.50 5 Gallon Bleaching Solution, 3785ml 137.00 209.00 6 Ream Bond Paper 500 Sheets Per Box A4 Size : 210mm X 297mm 80 Gsm 7.00 360.80 7 Piece Clearbook, A4 Color Black/* For A4 Size Documents, Refillable, Material: Plastic" 20.00 56.10 8 Piece Clearbook, A4 Color Red /* For A4 Size Documents, Refillable, Material: Plastic" 20.00 56.10 9 Piece Clearbook, A4 Color Yellow /* For A4 Size Documents, Refillable, Material: Plastic" 20.00 56.10 10 Roll Cling Wrap, 18x500 M, Pvc Food Grade Cling Film 2.00 865.70 11 Piece Data Folder, Vertical, Black 14.00 91.30 12 Sachet Dishwashing Liquid 17ml 2,000.00 8.14 13 Gallon Dishwashing Liquid, 1 Gallon, Calamansi Scent, Anti Bacterial Formula 12.00 161.70 14 Piece Double Sided Tape 1 Inch 3.00 25.30 15 Unit Eco-tank L3210 A4 All-in-one Ink Tank Printer 1.00 11,000.00 16 Bottle 003 Ink, Black 63.00 306.90 17 Bottle 003 Ink,cyan 42.00 317.90 18 Bottle 003 Ink,magenta 42.00 317.90 19 Bottle 003 Ink,yellow 42.00 317.90 20 Bottle 005 Ink,black 10.00 656.70 21 Bottle 774 Ink Black 7.00 656.70 22 Bottle 664 Black Ink Bottle 15.00 306.90 23 Bottle 664 Cyan Ink Bottle 10.00 317.90 24 Bottle 664 Magenta Ink Bottle 9.00 317.90 25 Bottle 664 Yellow Ink Bottle 10.00 317.90 26 Piece Expanding Envelope, Legal, Green 40.00 33.00 27 Piece Fly Paper, 2 Sheets, Insecticide Flypaper Bait 30.00 41.80 28 Piece Foot Rug (big/square) 10.00 55.00 29 Pack Hairnet, 24-inch Disposable Bouffant Cap, Color White, 100 Pcs Per Pack 5.00 115.50 30 Piece Heavy Duty Scrub With Sponge, 100mmx75mmx30mm 40.00 33.00 31 Piece Id Holder, Transparent, Water Proof 100.00 7.70 32 Piece Id Lace, Blue, Cotton 100.00 11.00 33 Piece Id Lace, Red, Cotton 100.00 11.00 34 Piece Id Lace, Yellow, Cotton 100.00 11.00 35 Unit Ink Tank Printer L5590 Printer Type: Print, Scan, Copy, Fax With Adf Print Direction: Bi-directional Printing Technolgy: Precisioncore Printhead Nozzle Configuration: 400 X 1 Nozzles Black, 128 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 1200 Dpi (with Variable-sized Droplet Technology) Dimensions (w X D X H): 375 X 347 X 237 Mm Weight: 5.2 Kg 1.00 18,204.45 36 Unit Ink Tank System Printer Ecotank L5290 1.00 18,150.00 37 Piece Insecticide, Multi Insect Killer Protector 500 Ml 1.00 385.00 38 Unit Iprint-a3/a4 Laminator Machine Hot/cold/reverse 220v Heavy Duty Laminating Machine Only 1.00 4,620.00 39 Piece Kitchen Towel, Absorbent Cloth 30x60cm 6.00 25.30 40 Piece Kitchen Towel, Interfolded, 120 Pulls, Pack Of 3, 200mmx200mm 40.00 114.40 41 Unit L49 Office Table 4.00 17,160.00 42 Gallon Liquid Bleach 20.00 209.00 43 Piece Long Arm Faucet Stainless Steel 30.00 275.00 44 Piece Mop Head 4.00 176.00 45 Piece Mop Head, Durable Heavy Duty, Cotton 4.00 176.00 46 Piece Mop With Steel Handle (removable Mophead) 10.00 319.00 47 Piece Note Book (composition Notebook) Grade 3, 80mleaves 200.00 22.00 48 Unit Office Chair 3.00 3,404.50 49 Pack Office Laminating Film, Legal, 20s 1.00 275.00 50 Packs Paper Cups, 8 0z High Quality , 50 Pcs Per Pack 3.00 55.00 51 Piece Personalized Name Stamp (document Controller Secretary) 1.00 437.57 52 Piece Personalized Name Stamp (document Controller) 1.00 437.57 53 Piece Personalized Stamp (controlled Copy) 1.00 437.57 54 Piece Personalized Stamp (master Copy) 1.00 437.57 55 Piece Personalized Stamp (obsolete) 1.00 437.57 56 Pack Photo Paper Glossy A4 4.00 110.00 57 Set Plastic Broom And Dustpan Set, 91cm (35.8inches ) Long Handle Broom And Dust Pan Set, Made Of Soft And Durable Broom Bristles 2.00 198.00 58 Box Plastic Gloves, Clear Free Food Grade Gloves, 100 Pcs Per Box 5.00 52.80 59 Pc Plastic Utility Box 50l 6.00 438.90 60 Bundle Plastic, Linao 6x10, 1000 Per Bundle 10.00 312.40 61 Piece Powdered Soap 60gms 80.00 7.15 62 Piece Push Brush Wood Durable Nylon Deck Brush Wooden Handle ( 16" ) Push Broom Scrub Brush 12.00 165.00 63 Piece Refill For Clearbook A4 Size 27.00 34.10 64 Pack Sandwich/ Bread Grease Proof Bag, 50 Pcs Per Pack, 20x21cm 20.00 96.80 65 Pack Specialty Paper, 100s 2.00 335.50 66 Piece Stamp Pad Ink Black - Stamp Pad Ink 50ml - No Mess, Non-spill Bottle - Smooth Re-inking - Color: Black 3.00 22.00 67 Bottle Stamp Pad Ink Bluestamp Pad Ink Blue - Stamp Pad Ink 50ml - No Mess, Non-spill Bottle - Smooth Re-inking - Color: Blue 3.00 22.00 68 Piece Stamp Pad Ink Red - Stamp Pad Ink 50ml - No Mess, Non-spill Bottle - Smooth Re-inking - Color: Red 3.00 22.00 69 Pack Table Napkin, Quarter Folded, 350 Sheets, 250x300mm 4.00 166.10 70 Pack/roll Trash Bag 2xl , Green 50.00 96.80 71 Pc Utility Box 55l 47.00 705.43 72 Packs A4 Specialty Paper, 90gsm, White 10’s 9.00 37.50 73 Pcs A4 Certificate Frame 12.00 130.00 74 Can Air Freshener Aerosol Type/ Spray Mist, Net Content: 280ml Or 150g, (min.), Assorted Scents (at Least Two (2) Scents), Material Safety Data Sheet Showing Information On Specific Gravity, Packaging: Twelve (12) Cans Per Box, Individually Shrink Wrapped. 22.00 280.00 75 Pack Battery, Dry Cell, Aaa Voltage:1.5 Volts, Type: Alkaline, No Mercury And Cadmium Added/mercury And Cadmium Free, Positive Polar Ends Must Be Marked, Shelf Life: Five (5) Years (min.) From Date Of Acceptance, With Cautionary Advice 9.00 128.00 76 Pack Battery, Dry Cell, Aa Voltage:1.5 Volts, Type: Alkaline, No Mercury And Cadmium Added/mercury And Cadmium Free, Positive Polar Ends Must Be Marked, Shelf Life: Five (5) Years (min.) From Date Of Acceptance, With Cautionary Advice 24.00 94.00 77 Piece Broom (walis Tambo) Gross Weight (max.): 500 Grams, Handle: Cylindrical, Wood, Smooth Finish, Plastic Coated, Must Be Suitable For Hanging, Diameter Of Handle {min.): 19mm, Length Of Handle {min.): 510mm, Dry Weight Of The Tiger Grass {min.): 250 Grams, Length Of Tiger Grass: 300mm, With Upper Stitch (min.): 20, Lower Stitch (min.): 30, Side Stitch: Manufacturer's Standard, Per Attached Illustration Showing The Design/construction 36.00 170.00 78 Piece Broom (walis Ting-ting) Made Of Mature Coconut Midribs, Grip Material: Braided Yantok Or Nylon, Standard Size:, Grip Circumference: At Least 150mm, Grip Width: At Least 20mm, Top: Measured 150mm, Usable Length: At Least 760mm, Rib Count: At Least 350 Pieces 53.00 78.00 79 Bottle Cleaner, Toilet And Urinal Color: Clear Or Blue, Net Content (min.): 1,000ml, Fully Miscible In Water, Not Chlorine Based, Does Not Contain Inorganic Acids, Non-volatile Content (max.): 5% (w/w), Viscosity At 25°c (min.): 114 Cp, Rigid Plastic Bottle, With Adequate Instructions For Proper Usage And Disposal 9.00 239.00 80 Plastic Container Cleanser, Scouring Powder Net Weight (min.): 350 Grams, Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item, Container Must Have Adequate Dispensing Apertures, With Adequate Instructions For Proper Usage And Disposal. 21.00 65.00 81 Piece Clearbook, A4 For A4 Size Documents, Refillable, Material: Plastic Cover: Opaque Plastic, Dimension (min.): 310mm X 235mm O Thickness (-0.02mm): 0.50mm Pocket: Transparent Plastic, Number Of Pockets: Twenty (20), Thickness (-0.005mm): 0.040mm Color: Assorted (black, Blue, Red, Yellow) 6.00 150.00 82 Box Clip, Backfold, 19mm All Metal, Clamping Length (-1mm): 19mm, Clamping Depth (min.): 10mm, Thickness Of Metal (min.): 0.20mm, Diameter Of Clip Handles (min.): 1.0mm, Binding Capacity: At Least 5.5 Mm, Shall Pass The Required Test And Evaluation 1.00 17.00 83 Box Clip, Backfold, 25mm All Metal, Clamping Length (-1mm): 25mm, Clamping Depth (min.): 13mm, Thickness Of Metal (min.): 0.22mm, Diameter Of Clip Handles (min.): 1.20mm, Binding Capacity: At Least 9.5 Mm, Shall Pass The Required Test And Evaluation 10.00 26.00 84 Box Clip, Backfold, 32mm All Metal, Clamping Length (-1mm): 32mm, Clamping Depth (min.): 14mm, Thickness Of Metal (min.): 0.30mm, Diameter Of Clip Handles (min.): 1.45mm, Binding Capacity: At Least 12 Mm, Shall Pass The Required Test And Evaluation 20.00 36.00 85 Piece Data File Box With Closed Ends, Outside Dimension:width (min.): 125mm/height (min.): 230mm/length (min.): 400mm, Material:chipboard (min.): 3mm Thick/leatherette Paper For Outside Cover/coated Paper For Inside Cover, Front Of The Box:with Finger Ring And Pocket For Label Insert, Color Black. 59.00 229.00 86 Piece Dater Stamp Frame: Steel And Plastic Or Sturdy All Plastic Frame, Four Band Date And 12 Year Band, Date Format: Manufacturer's Standard, Self-inking Stamp Pad, Acceptable Colors: Black, Violet Or Red, With Locking Mechanism, With Removable And Refillable Ink Pad, Single Color, Size Of Imprint (min.): 30mm X 45mm. 6.00 450.00 87 Pouch Detergent Powder, All-purpose Net Weight (-2.5%): One (1) Kilogram, Ethylene-diamine-tetra-acetate (edta) And Alkylphenol Ethoxylates (apeo) Shall Not Be Detected, With Adequate Instructions For Proper Usage And Disposal. 35.00 180.00 88 Can Disinfectant Spray Aerosol Type, Net Content Per Can: 400 Grams (min), Crisp, Clean Scent, With Broad-spectrum Activity: Kills Different Types Of Bacteria, Fungi And Viruses As Identified On The Label, Active Ingredients Shall Be Indicated On The Label, Sufficient Amount Of Propellant To Totally Expel Content, Shall Not Contain Ethylene-diamine-tetra-acetate (edta) Nor Alkyl Phenol Ethoxylates (apeo), With Detailed Instructions On Maximizing Product Performance And Indications For The Proper Waste Disposal And The Recyclability Of The Container. 29.00 480.00 89 Unit Electric Fan, Ceiling Mount, Orbit Type Blade: Metal, Number Of Blades (min.): Three (3), Blade Size (min.): 400mm, Grill: Metal, Speed Control: Three (3) Speed Setting, With Remote Switch Box, With Mounting Base And Screws, Motor: Fully Enclosed, 220- 240 Volts, 60 Hz, With Operating/user's Manual (english Translation), Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item, With Ps Quality Or Icc Mark, Warranty: One (1) Year On Parts And Service. Five (5) Years On Motor. 1.00 3,000.00 90 Box Envelope, Documentary, Legal Material: Kraft, For Legal Size Documents, Size (-2mm) : 254mm X 381mm, Basis Weight (-5%): 150gsm, Thickness (min.): 0.22mm. 2.00 2,250.00 91 Box Envelope, Expanding, Kraft Kraft, Smooth Surface, Size (-3mm): 380mm X 250mm, Expansion (-3mm): 50mm, Thickness (min.): 0.38mm, With String And Eyelet Or Elastic Strap. 2.00 2,400.00 92 Piece Envelope, Expanding, Plastic Material: Polypropylene Plastic, Secure Heat-sealed Joints, With Elastic Strap, Size (l X H) (-2mm): 380mm X 260mm, Thickness (min.): 0.50mm, Width Expansion (min.): 30mm, Assorted Colors: Red, Blue, Green. 13.00 60.00 93 Piece Eraser, Felt, Blackboard/whiteboard Eraser Material: Felt, Overall Size (lx Wx T) (min.): 125mm X 45mm X 21mm, Thickness Of Felt (min.) : 18mm, Thickness Of Board (min.): 3mm. 5.00 22.00 94 Piece Eraser, Plastic/rubber Material: Plastic/rubber, Shape: Rectangular, Use: For Erasing Wood-cased And Mechanical Pencil Impressions, Dimension (l X W T) (min.): Equivalent Volume Of 8,350mm3 ,shall Pass Erasing Quality Test. 2.00 17.00 95 Unit External Hard Drive Capacity: 1tb, Storage Media: 2.5"sata Hdd, System Compatibility: Windows, Mac Os And Linux Os, Certificates: Ce/ Fcc/ Bsmi, Warranty: Three (3) Years, Key Feature:1.shockproof Protection/2.with Led Light Indicator, Interface (min.): Usb 3.2 Gen 1, Operation: Dc Sv (power Supplied Through Usb), Case Material: Rubber/plastic, With Operating/user's Manual (english Translation), Accessories (min.): With Usb 3.0 Cable, Shall Pass Functional And Durability Test 6.00 4,300.00 96 Box Fastener, Metal Material: Metal, The Fasteners Shall Be Free From Burrs, Sharp Or Rough Edges Or Corners, It Shall Be Clean And Free From Any Defects That May Affect Its Appearance Or Serviceability, Thickness: Base With Prongs And Compressor (min.): 0.30mm, Width:compressor (min.): 9mm/base (min.): 9mm, Prongs (min.): 4.5mm, The Distance Between The Two Holes Shall Be 70mm (±0.smm) Center-to-center, Able To Hold 25mm Thick Of Multipurpose Paper (70gsm) 47.00 60.00 97 Set File Tab Divider, Legal For Legal Size Documents, Material: Bristol Board, Size:leaf:length (min.):330mm/width (min.): 216mm, Tab:length (min.): 68mm, Width (min.): 15mm, In Sequential Order Basis Weight (-5%): 153 Gsm, Thickness (min.): 0.22mm, Five (5) Colors Per Set: Blue, White, Yellow, Green, Red, Etc. 1.00 41.00 98 Can Floor Wax, Paste Type, Red Paste Type, Color: Red, Petroleum Based, Application: For Wood And Cemented Surfaces, Net Weight (min.): 450 Grams, Physical Properties:drying Time (max.): One (1) Hour On A Wood Surface, Abrasiveness: No Evidence Of Abrasive Matter, Non-volatile Matter, %w (min.): 17%. 3.00 147.00 99 Pack Folder With Tab, Legal Material: Tagboard/carrier/foldcote/cupstock Board, For Legal Size Documents, Leaf Dimension (±lmm): 240mm X 365mm, Tab (±2mm): 13mm, Scoring (±2mm): 20mm From Edge Of Folder, The Folder Shall Be Smooth-finished And Non-blot On Both Sides Using A Permanent Marker, Other Physical Properties:grammage, G/m? (-5%): 270/thickness, Mm (-5%): 0.36/tearing Resistance, Mn, Md+ Cd (min.): 2940/stiffness, Mn.m, (taber) Md+ Cd {min.): 13 15.00 700.00 100 Pack Folder, L-type,legal For Legal Size Documents,material: Plastic,size (min.): 235mm X 346mm,thickness {min.): 0.17mm,transparent For Easy Identification Of Contents,color Green. 7.00 108.00 101 Box Glue, All Purpose Gross Weight (min.): 240 Grams, Shall Conform With The Following Tests:free Formaldehyde (max.): 0.1/adhesive Strength -- No Slippage On Pasted Part/solid Content (min.): 30% Ph: 4 To 8, Container: Plastic Squeeze Type Bottle With Twist-cap Dispenser., The Brand And Expiry Date Shall Be Stamped/engraved/ Embossed/ Printed/permanently Stickered On Each Bottle. The Expiry Date Shall Be At Least One Year From The Date Of Delivery., There Should Be No Unpleasant Odor. 8.00 129.00 102 Bottle Hand Soap, Liquid, 500ml Scented, Form: Liquid, Minimum Of 80% Kill Bactericidal/germicidal Property Against Staphylococcus Aureus, Volume (net Content): 500ml, Bottle: Pump Dispenser Plastic, Individually Shrink Wrapped, Ethylene-diamine-tetra-acetate (edta) And Alkylphenol Ethoxylates (apeo) Shall Not Be Detected, With Adequate Instructions For Proper Usage And Disposal. 24.00 150.00 103 Cart Ink Cartridge, Epson C13t664100 (t6641), Black C13t664100 (t6641), Black 9.00 350.00 104 Cart Ink Cartridge, Epson C13t664200 (t6642), Cyan C13t664200 (t6642), Cyan 5.00 350.00 105 Cart Ink Cartridge, Epson C13t664300 (t6643), Magenta C13t664300 (t6643), Magenta 4.00 350.00 106 Cart Ink Cartridge, Epson C13t664400 (t6644), Yellow C13t664400 (t6644), Yellow 4.00 350.00 107 Can Insecticide, Aerosol Type Aerosol, Kerosene Based,quick Kill Contact And Residual Type,cautionary Scent/odor Required,multi-insect Killer,net Content Per Can: 600ml (min), Sufficient Amount Of Propellant To Totally Expel Content.,material Safety Data Sheet Showing Information On Specific Gravity. 11.00 450.00 108 Piece Light Emitting Diode (led), Light Bulb Power Consumption: 6-7 Watts, Color Temperature: 6,500 Kelvin, Lumen Output: Not Less Than 530 Lumens, Frequency Rating: 60hz, Color Rendering Index: 80 +/-10% , Input Voltage: 85-265 Volts, Ac , Socket Base: E27, Light Color: Cool Daylight, Power Factor: Not Less Than 0.90, Average Life: Not Less Than 15,000 Hours, Operating Temperature: > 35°c, Brand Shall Be Engraved/embossed/printed On The Item, Packaging:in Individual Box, One Hundred (100) Pieces Per Carton. 42.00 90.00 109 Piece Marker, Permanent, Black Ink Color: Black, Blue, Red,tip: Felt Writing/line Width (min.): 1.smm, Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item.,material And Structure:,the Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Will Easily Cap And Decap;,the Ink Reservoir Shall Be Stable To Prevent Leakage When Stored And The Ink Flow Out Adequately Upon Use; And The Tip Of The Pen Shall Be Of Suitable Firmness And Good Structure That Will Regulate The Flow Of Ink.,shall Comply With The Following Parameters: Writing Performance Test,drying Performance Test, Resistance To Water Test. 27.00 42.00 110 Piece Marker, Whiteboard, Black Ink Color: Black, Blue, Red, Tip: Felt, Writing/line Width (min.): 1.smm, Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item., Material And Structure: The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Will Easily Cap And Decap; The Ink Reservoir Shall Be Stable To Prevent Leakage When Stored And The Ink Flow Out Adequately Upon Use; And The Tip Of The Pen Shall Be Of Suitable Firmness And Good Structure That Will Regulate The Flow Of Ink. Shall Comply With The Following Parameters: Writing Performance Test, Drying Performance Test, Resistance To Water Test. 23.00 60.00 111 Unit Mop Bucket, Heavy Duty, Hard Plastic Heavy Duty, Material: Hard Plastic, Approximate Size (min.), Width: 370mm, Length: 475mm, Height: 245mm, Capacity: 30 Liters, With Four (4) Heavy Duty Rotating Wheels/ball Casters, With Squeezer, With Precautionary Markings. 1.00 4,441.00 112 Pad Note Pad, Stick On, 3" X 3" Size (l X W):width (-2%):76 Mm, Length (-2°â): 76 Mm, Basis Weight (min.): 70gsm, Sheet Thickness (min.): 0.09mm, One Hundred (100) Sheets Per Pad, Adhesive Width Orientation Shall Be On Either Side. E Brand Shall Be Printed On The Endpaper. Assorted Colors: Yellow, Pink, Green, Orange, Shall Pass The Performance Tests. 16.00 25.00 113 Pad Note Pad, Stick On, 50mm X 76mm (2" X 3") Min Size (l X W): Width (min.): 50mm, Length (-2°â): 76mm, Basis Weight (min.): 70gsm, Sheet Thickness (min.): 0.09mm, One Hundred (100) Sheets Per Pad, Adhesive Orientation Shall Be On The Shorter Side., Brand Shall Be Printed An The Endpaper. Assorted Colors: Yellow, Pink, Green, Orange, Shall Pass The Performance Tests. 30.00 18.00 114 Pad Note Pad, Stick On, 76mm X 100mm (3" X 4") Min Size (l X W): Width (-2%): 76mm, Length (min.): 100mm, Basis Weight (min.): 70gsm, Sheet Thickness (min.): 0.09mm, One Hundred (100) Sheets Per Pad, Adhesive Width Orientation Shall Be On The Longer Side.,brand Shall Be Printed On The Endpaper. Assorted Colors: Yellow, Pink, Green, Orange, Shall Pass The Performance Tests. 15.00 35.00 115 Box Paper Clip, Vinyl/plastic Coated, 33mm Wire Diameter (min.): 0.80mm Length Of Clip (min.): 33mm, Total Length Of Wire Used (min.): 102mm,assorted Colors,shall Pass The Performance Test. 12.00 17.00 116 Unit Paper Shredder Can Shred Papers, Paper Clips, Staples, Credit Cards And Compact Discs (cds),cross-cut,waste Bin Capacity (min.): Thirty (30) Liters,sheet Capacity: Sixteen (16) Sheets (min.) Using 70gsm; Or Twelve (12) Sheets (min.) Using 80gsm Of Paper.,intake Throat Width (min.): 220mm,cut/shred Size (max.): 4mm X 40mm,cutting Speed (min.): 4m/min.,electric Motor (min.): 200 Watts,continuous Run Time (min.): Twenty (20) Minutes,automatic Start/stop Control,mobility: With Or Without Casters (with Lock If With Casters),additional Salient Specifications:with Overheat Protection Function,with Jam Protection,with Reverse Function,safety Features: Manufacturer's Standard.,silent Operation (max.): Shredder Designed For Reduced Noise In Shared Workspaces Or Department Copy Rooms With Decibel Level (db) Of 70,mess Reduction System: Shredder Features An Automatic Or Manual Cleaning Cycle That Prevents Paper Build-up On Cutters. With A Sensor That Lets The User Know When To Empty The Bin.,with Operating/user's Manual (english Translation),brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item,warranty: Two (2) Years,standby Mode When Not In Use. 1.00 34,589.00 117 Unit Paper Trimmer / Cutting Machine, Table Top Table Top And Non Skid, Guillotine Paper Cutter, With Ruler Marking And Paper Size Markings Printed On The Base - B7, B6, A5, B5, A4, B4, Legal, And A3, Includes Securable Sliding Paper Size Marker/gauge, Paper Capacity (min.): 25 Sheets Of 70 Gsm Paper, With Stationary Blade Guard, Blade Is Made Of Removable High Quality Hardened Stainless Steel, Metal Structure: Base, Adjustable Paper Clamp Handle, Paper Clamp, Removable Cutter Handle, Cutter Lock, Blade Assembly Cover, Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item, Warranty: One (1) Year On Parts And Services. 1.00 1,179.00 118 Ream Paper, Multicopy, A4 Basis Weight (-3%): 80gsm,size (±2mm In Either Direction): A4, 210mm X 297mm,sheet Count (min.): 500 Sheets Per Ream,trim Sizes Shall Be Along Machine Direction Or Long Grain,intended Application: For Laser Printer, Standard Office Copier, Etc.,paper Shall Be At Least Elemental Chlorine Free {ecf),inner Lining And Flute Of The Carton Box Shall Be 100% Recycled Fiber. 206.00 232.00 119 Ream Paper, Multi-purpose, 70gsm (min.), Legal Basis Weight (min.): 70gsm, Size (-l2mm In Either Direction): Legal, 216mm X 330mm, Sheet Count (min.): 500 Sheets Per Ream, Trim Sizes Shall Be Along Machine Direction Or Long Grain. 28.00 240.00 120 Ream Paper, Multi-purpose, A4 Basis Weight (min.): 70gsm,.size (±2mm In Either Direction): A4, X 297mm,sheet Count (min.): 500 Sheets Per Ream,trim Sizes Shall Be Along Machine Direction Or Long Grain,intended Application: For Laser Printer, Standard Office Copier, Etc.,paper Shall Be At Least Elemental Chlorine Free (ecf).,inner Lining And Flute Of The Carton Box Shall Be 100% Recycled Fiber. 62.00 210.00 121 Piece Puncher, Paper, Heavy Duty Punching Capacity: Thirty (30) Sheets Of 70gsm Multipurpose Paper,with Two Hole Guide,diameter Of Hole (±0.5): 7.00 Mm,construction/structure:the Operating Handle, Base And Frame Shall Be Connected To Each Other And Be Capable Of Smooth Repetitive Operation. Easy Insertion Of Paper.the Distance Between The Two Holes Shall Be 70mm (±0.5mm) Center-to-center. O The Punching Depth Shall Be 12mm (±lmm).the Puncher Shall Be Provided With A Handle Lock.the Receptacle Base Shall Fit Snugly Under The Puncher Base And Shall Not Chip Off, Break, Crack, Warp Or The Like. 8.00 200.00 122 Box Rubber Band, No. 18 Net Weight (min.): 350 Grams,width (min.): 1.00 Mm,thickness(min):1.00 Mm,lay Flat Length (+20%): 80mm,tensile Strength (min.): 9.81mpa,elongation (min.): 500%" 4.00 200.00 123 Pair Scissors, Symmetrical / Asymmetrical Straight Trimmers Intended For Cutting Papers, Plastic, And Rubber.,dimension (refer To The Illustration),l1 (13mm): 178mm,l2 (13mm): 87mm,length And Thickness Of The Cutting Blade : Manufacturer's Standard,construction/quality:,blades Shall Be Made Of Stainless Steel.,the Tip Of The Cutting Blade Shall Be Blunt.,blades Shall Be Flat And Shall Be Joined By A Binding Rivet/screw.,scissors Shall Be Adjusted For Proper Contact So That The Sharpened Edges Slide Against Each Other When The Handles (bows) Opposite To The Pivot Are Closed.,all Scissors Shall Be Furnished With Asymmetrical Or Symmetrical Bow Handles Made Of Rigid Plasric/rubber.,materials Shall Be Free From Any Defects And Imperfections Which Might Affect The Serviceability Of The Finished Product. Shall Pass The Performance Test. 13.00 50.00 124 Piece Sign Pen, Extra Fine Tip, Black Ink Color: Black, Blue, Red, Type: Liquid Or Gel, Tip: 0.5mm, Needle Type, With Non-slip Rubber Grip, With Metal Clip, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km {min). 220.00 38.00 125 Piece Stamp Pad, Felt Stamp Pad Container: Material: Combination Of Plastic And Metal, Metallic Component Shall Be Resistant To Rust, Thickness Of Metal (min.): 0.25mmm Plastic Component Shall Be Resistant To Impact And Ink. Stamp Pad Bed: Material: Felt, Pre-inked, Ink Shall Be Free From Any Offensive Odor. Thickness (min.): Smm, Width (min.): 61mm, Length (min.): 102mm, Shall Pass The Performance Tests, Brand Shall Be Engraved/embossed/printed/permanently Stickered On The Item 10.00 50.00 126 Box Staple Wire, Standard Five Thousand (5,000) Wires Per Box, Made Of Metal Wire Coated With Any Anti-corrosion Material, Dimensions, In Mm:width (w) (+0.15mm/-0.20mm): 12.70 O Leg Length (l) (±0.2mm): 6.00mm/thickness (d) (± 0.0smm): 0.40 O Width (e) (± O.osmm), Number Of Wires Per Strip (min.): One Hundred (100), Shall Pass The Penetration Test, The Staples Shall Be Preformed And Cemented Together In Strip Form One Behind The Other, The Staples Shall Have Parallel Legs At Right Angles To The Crown. They Shall Easily Exit Without Clogging And Jamming The Stapler, Both Ends Of The Staples Shall Have Either Blunt Or Chisel Point Ends, Staples Shall Be Free From Burrs And Sharp Or Rough Edges, And Other Defects Which Might Affect The Appearance Or Serviceability Of The Leg. 44.00 37.00 127 Piece Stapler, Standard Type Loading Capacity (min.): 200 Staple Wires, Staple Pusher Shall Be A Metal Piece And Not Spring. Construction/structure: The Handle, Base And Frame Shall Be Connected Respectively And Be Smooth In Repetitive Actuation;loading Of The Staple Wire In The Staple Magazine Shall Be Easily Done;the Stapler Shall Be Constructed Such That The Staple Wire Will Not Jam Or Drop Out During Staplin, The Base Shall Be So Constructed That It Is Equipped With Clincher Block Having The Guide Groove Aligned With The Driver Blade So That It Can Bind Properly And Easily, The Driver Blade Shall Be Able To Push Out And Drive The Loaded Staple Wire Without Deformation; Each Part Shall Have Rigidity In Meeting The Performance Of The Stapler; As Per Attached Illustration Showing The Parts Of The Stapler, However Design May Vary; Shall Pass The Performance Test. 9.00 150.00 128 Piece Tape Dispenser, Table Top Table Top,weight (min.): 1.2kg,body Made Of Molded Plastic, Smooth Finish,non-skid Full Base Padding,with Serrated Cutting Blade,shall Hold 24mm Wide Tapes With Up To 75mm Core,shall Pass The Performance Test,assorted Colors: Red, Blue, Green, Black 5.00 142.00 129 Roll Tape, Electrical Made Of Polyvinyl Chloride (pvc), Width (±1.0 Mm): 19mm, Length (min.): 20 Meters, Thickness (min.): 0.15mm, Adhesive Strength (min.):normal State, N (kgf): 3.198 (0.326), Tensile Load (min.):normal State, N (kgf): 29.43 (3.0) After Heating, N (kgf): 29.43 (3.0), Elongation, % (min.):normal State: 100 O Afterheating:80, Dielectric Strength (min.):withstand Voltage: 5000 V, Color: Black, Ps Quality Or Icc Certificate 9.00 25.00 130 Roll Tape, Masking, 24mm Width (±1mm): 48mm, Usable Length (min.): 50 Meters, Thickness (max.): 0.25mm, Adhesion Strength (min.): 8.5n/24mm Width, Breaking Strength (min.): 85n/24mm Width 120.00 48.00 131 Roll Tape, Masking, 48mm Width (±1mm): 48mm, Usable Length (min.): 50 Meters, Thickness (max.): 0.25mm, Adhesion Strength (min.): 8.5n/24mm Width, Breaking Strength (min.): 85n/24mm Width 47.00 85.00 132 Roll Tape, Packaging, 48mm Color: Tan, Width (±lmm): 48mm, Usable Length (min.): 50 Meters, Base Material: Biaxially-oriented Polypropylene, Thickness (min.): 0.040mm, Adhesion Strength (min.): 6n/24mm, Breaking Strength (min.): 14n/24mm 3.00 50.00 133 Roll Tape, Transparent, 24mm Width (±1mm): 24mm, Usable Length (min.): 50 Meters, Base Material: Biaxially-oriented Polypropylene, Thickness (min.): 0.040mm, Adhesion Strength (min.): 6n/24mm, Breaking Strength (min.): 14n/24mm, The Tape Shall Be Wound Uniformly Around A Core. 83.00 31.00 134 Roll Tape, Transparent, 48mm Width (±1mm): 48mm, Usable Length (min.): 50 Meters, Base Material: Biaxially-oriented Polypropylene, Thickness (min.): 0.040mm, Adhesion Strength (min.): 6n/24mm, Breaking Strength (min.): 14n/24mm, The Tape Shall Be Wound Uniformly Around A Core. 11.00 50.00 135 Pack Tissue, Interfolded Paper Towel Basis Weight: 34gsm (+/-2gsm),sheet Dimension: Width: 200mm (±3mm) Length: 200mm (±3mm),raw Materials From 100% Recycled Fiber,total Number Of Sheets Per Pack: 150 Pulls,number Of Ply: One (1) Ply, Paper Shall Be At Least Elemental Chlorine Free (ecf) 74.00 66.00 136 Pack Toilet Tissue Paper, 2 Ply Weight (min.): 28gsm,sheet Dimensions:,width Of Sheet (±3mm): 100mm,length Of Sheet (-5mm): 114mm,acidity, Ph (min.): 6 ,tensile Strength, Kn/m (min.):md: 0.12, Cd: 0.03,absorption Time For Each Sheet Using 0.01ml Water, Sec. (max.): 30,100% Recycled Pulp ,paper Shall Be At Least Elemental Chlorine Free (ecf),150 Pull Per Roll (300 Sheets), (min.),shall Be Evenly And Firmly Wound To Form A Roll Which Is Sufficiently Rigid To Withstand Normal Handling And Usage.,roll Shall Be Perforated Across The Full Width Such That Each Sheet Can Be Easily Torn Off Along The Perforations,toilet Tissue Shall Not Have Noticeable Dust On The Surface Of Sheets. 57.00 185.00 137 Roll/pack Trashbag, Xxl Size Made From Polyethylene (pe) Plastic, Pe Shall Contain A Minimum Of 30% Post-consumer Material, Tubular Type, With Tie, Color: Black, White Or Green, Tear Resistant, Leak-proof Bottom Seal, Dimension (-6mm): 939.8 Mm X 1016.0 Mm (37" X 40"), Thickness (min.): 0.02mm, Tensile Strength At Break: Astm D882,one Way (min.): 15n/mm, Other Way (min.): 12n/mm, Elongation At Break: Astm D882, One Way (min.): 400%, Other Way (min.): 600%. 320.00 110.00 138 Box Ballpen 0.05mm (black) Ballpoint Pens Black, 0.5mm 12pcs Per Box 18 62.00 139 Pack Board Paper Long 200 Gsm. 10 Sheets Per Pack Size:long (13x8.5") Color: White 15 38.00 140 Bottle Epson 001 Ink Black Epson Original Ink Sealed With Box Color: Black Capacity: 135ml. (per Bottle) Black Ink Bottle: Approx Page Yield: 7,500 Pages Order Code:001 (c13t03y100) 2 532.00 141 Bottle Epson 001 Ink Magenta Product Specification: Epson Original Ink Sealed With Box Color:magenta Capacity: 70ml. (per Bottle) Magenta Ink Bottle: Approx Page Yield: 6000 Pages (composite Yield) Order Code: 001 (c13t03y300) 1 332.00 142 Bottle Epson 001 Ink Yellow Product Specification: Epson Original Ink Sealed With Box Color:yellow Capacity: 70ml. (per Bottle) Yellow Ink Bottle: Approx Page Yield: 6000 Pages (composite Yield) Order Code: 001 (c13t03y400) 1 332.00 143 Bottle Epson 001 Ink Cyan Product Specification: Epson Original Ink Sealed With Box Color:cyan Capacity: 70ml. (per Bottle) Cyan Ink Bottle: Approx Page Yield: 6000 Pages (composite Yield) Order Code: 001 (c13t03y400) 1 332.00 144 Box Large File Rubber Band (500x15x3mm) 50pcs / Box 10 322.00 145 Piece Magnetic White Board Eraser: Magnetic Board Eraser Drywipe Marker Cleaner Office Whiteboard 5 60.00 146 Pairs Metal Book Stand Nonskid Heavy Duty Bookend Home Office Article Oraganizing Tool: Metal Book Stand Nonskid Size: 20.8x16.8x13.8cm 50 88.00 147 Pcs Nano Double Sided Tape 10mm X 3 M Multipurpose Wall Tape Adhesive Strips Removable Mounting Tape 20 49.00 148 Box Paper Fastener /metal/8 Inches, 100 Pcs 70mm In Between Holes 10 182.00 149 Ream Paper Multi-purpose, A3 500 Sheets Per Ream A3 Size : 297mm X 420mm Color: White Thickness: 70gsm 30 454.55 150 Pack Specialty Paper 8.5x11 90gsm 10 Sheets Per Pack Size: 8.5x11 Inches Color: Pale Cream 20 20.00 151 Pcs Storage Box 28 L, Black, Cardboard Size: L 40cm X W28cm X H29 Cm Cardboard 9 478.50 152 Pack Glossy Photo Sticker Paper A4, High Quality Paper,a4 Size, 150 Gsm, Glossy Waterproof, 20 Sheets Per Pack 20 211.00 ***nothing Follows*** *suppliers With No Indicated Brand And Model For The Quoted Items Will Be Disqualified From The Selection Of Suppliers. This Project Will Be Awarded As: After Having Carefully Read And Accepted The Terms And Condition, I/we Quote You On The Item At Prices Noted Above. _____________________________ Name /signature Of Representative ¬¬ Will Not Participate Due To: _____________________________ Name /signature Of Representative
Closing Date21 Feb 2025
Tender AmountPHP 755.4 K (USD 13 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Details: Notice Of Sources Sought The Purpose Of This Sources Sought Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses (sdvosb), Veteran Owned Small Businesses (vosb), And Small Businesses Interested And Capable Of Providing The Services Requested, As Well As Any Large Businesses. The Results From This Source Sought Notice Will Be Used To Determine The Appropriate Set-aside. The Intended Contract Is A Firm-fixed Price Service Contract. The Department Of Veterans Affairs, Nco20 Is Looking For Vendor Sources For The Following Requirement: A Blanket Purchase Order (base + 4 Option Years) For Urinalysis Testing See Attachments For More Information: Attachment A: V20 Estimated Urinalysis Test List Volume Attachment B: V20 Participating Medical Centers And Pocs Attachment C: V20 Bpa Price List (must Be Filled Out) Required Information In Your Response To Sources Sought: In Order To Be Considered A Valid Source That Can Impact The Set-aside Determination Of A Possible Future Solicitation, Potential Contractors Shall Provide, At A Minimum, The Following Information To Peter.park2@va.gov By Below Response Deadline: 1) Company Name, Address, And Point Of Contact, Phone Number, E-mail Address, And Uei. Provide Any Existing Gsa/fss Contract Number This Requirement Can Be Fulfilled Under. 2) Please Identify Your Company S Size In Comparison To The Anticipated North American Industry Classification System (naics) Code 334516 Analytical Laboratory Instrument Manufacturing. To Be Considered A Small Business Your Company Must Have Less Than 1,000 Employees. This Notice Is To Determine The Marketplace For This Specific Requirement. Please Check One Of The Following: [ ] Yes [ ] No Service Disabled Veteran Owned Small Business (sdvosb) [ ] Yes [ ] No Veteran Owned Small Business (vosb) [ ] Yes [ ] No Small Business Manufacturers [ ] Yes [ ] No All Other Small Business (sb) [ ] Yes [ ] No Other Than Small Business 3) Any Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Who Respond To A Solicitation On This Project Must Provide A Sba Certification And Be Registered With U.s. Small Business Administration Veteran Small Business Certification (vetcert) Located At Https://veterans.certify.sba.gov/. 4) Only Authorized Service Representatives/providers Of The Manufacturer Will Be Considered. No Used, Refurbished, Remanufactured, Or Counterfeit Parts Will Be Allowed. Please Provide A Proof Of Authorized Service Provider Letter From Manufacturer. 5) Please Complete The Attached Price List (attachment C). This Is Not A Quote. 6) Capabilities Statement Addressing The Requirements In The Statement Of Work To Include: References For Similar Services Currently Being Provided Or Previously Provided At The Required Service Levels As Outlined In The Statement Of Work. The Government Is Not Obligated To Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Sources Sought Notice. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Notice To Potential Offerors: All Offerors Who Provide Goods Or Services To The United States Federal Government Must Be Registered In The System Award Management (sam Located On The Web At Www.sam.gov). It Is Desirable That Any Offeror To Have Completed Their Business Online Representations And Certifications Application In The System For Award Management (sam). Service Address: Various Stations In Nco 20 See Attachment Point Of Contact: Peter Park Contracting Officer Peter.park2@va.gov Response Deadline: 12/20/2024 By 3:00pm Pacific Time Statement Of Work: Bpa For Visn 20 Cprr Urinalysis Testing Bpa Language The Government Will Award A Cprr Bpa To A Single Contractor For Urinalysis Testing. Contractor Agrees To The Following Terms Of The Bpa Exclusively With Visn 20 And Awarded In The Final Bpa. Under This Agreement, The Bpa Holder Shall Provide Cprr Urinalysis Testing For All Visn20 Medical Facilities. The Vha Facilities Within Visn20 Listed On This Bpa Are Authorized To Order Any Item Listed On The Price/cost Schedule At The Listed Price. No Items May Be Ordered Off This Bpa Unless They Are Listed On The Price/cost Schedule. Additional, Related Items May Be Added Without Further Competition To The Price/cost Schedule With The Award Of A Modification By The Administering Contracting Officer (co). The Administering Co Is The Only Vha Employee Authorized To Modify This Bpa. Obligation Of Funds This Bpa Does Not Obligate Any Funds. The Government Is Only Obligated To The Extent Of Authorized Task Orders Issued Under This Bpa. Period Of Agreement This Bpa Is Effective From The Date Of Award For A Period Of 5 Years. Option To Extend The Term Of The Bpa The Government May Extend The Term Of This Bpa For A Period Of Up To Six (6) Months, Exercisable In Increments Of Not Less Than One (1) Month. By Written Notice To The Contractor At Any Time Prior To The Expiration Of The Bpa, Provided That The Government Shall Give The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 30 Days Before The Bpa Expires. The Preliminary Notice Does Not Commit The Government To An Extension. Prices And Terms Visn20 Has Provided An Estimated Annual Volume By Test As Reflected In Attachment A. Pricing Is Based On The Average Annual Test Volume. The Government Estimates The Volumes As Listed In Attachment A But Does Not Guarantee Volumes As Listed; They Are Estimates Only And The Government Doesn T Guarantee That All Listed Stations Will Participate In The Bpa. The Government Estimates, But Does Not Guarantee, That Individual Bpa Orders Placed Against This Agreement May Reach $825,000.00/per Order. This Order Limit May Be Increased By Mutual Agreement Of The Parties As Necessary, In Whole Or Part. The Authorized Ceiling Limit Of The Agreement Is Set At $4,500,000.00 Over The Period Covered By The Agreement; This Ceiling Is Also Not A Guarantee. The Ceiling Limit May Also Be Raised In Association With Order Limit Increases Or Other Conditions Which, By Mutual Agreement Of The Parties, Maybe Considered Necessary. Authorization For Individual Task Orders Above The Stated Task Order And/or Ceiling Limits Must Be Coordinated Through The Contracting Officer Before Larger Valued Orders Can Be Issued And Prior To Commencement Of Work. All Unauthorized Work, Regardless Of Amount, Will Be Processed Through The Ratification Process. Price/cost Schedule Estimated Quantities And Pricing Per Facility Order Placement All Properly Warranted Cos Serving Visn20 Are Authorized To Place Orders Under This Bpa. Task Orders Will Be Placed Against This Bpa Using Outlook Email Messages, Electronic Data Interchange (edi), Fax Internet Portal, Paper Or Oral Communications. Delivery Order Oversight Each Ordering Location Will Designate A Contracting Officer's Representative (cor) Or Poc (if Dollar Amounts Warrant A Cor, And Subject To Co Approval), Who Will Be Responsible For Verifying Contract Compliance And Certify Invoices. Requirement Specifications / Statement Of Work Scope: The Contractor Shall Provide Automated Clinical Laboratory Urinalysis Testing For Urine Dipstick Chemistries, Urine Microscopic Analysis, And Body Fluid Analysis (as Applicable) To Produce Cost Per Reportable Results (cprr) For The Locations Listed Below. Installation And Operational Training Will Be Provided By The Vendor At The Government S Facility. Vendor Will Provide Field Service Support. Vendor Will Also Supply Government With Sufficient Supplies, Reagents, And Training To Execute The Urinalysis Analyzer In The Performance Of The Testing Listed For Each Site Based On Estimated Patient Results Per Month. Equipment Will Be Defined By The Facility. Participating Locations: Alaska Va Healthcare System: 1201 North Muldoon Road, Anchorage, Ak 99504 Boise Va Medical Center: 500 West Fort Street. Boise, Id 83702 Eugene Health Care Center: 3355 Chad Dr., Eugene, Or 97408 Va Portland Health Care System: 3710 Sw U.s. Veterans Hospital Road, Portland, Or 97239 Roseburg Va Health Care System: 913 Nw Garden Valley Blvd., Roseburg, Or 97471 Va Southern Oregon Rehabilitation Center: 8495 Crater Lake Hwy., White City, Or 97503 Va Puget Sound Health Care System - American Lake Division: 9600 Veterans Dr Southwest, Tacoma, Wa 98493 Va Puget Sound Health Care System: 1660 S. Columbian Way, Seattle, Wa 98108 Mann-grandstaff Va Medical Center: 4815 N. Assembly Street, Spokane, Wa 99205 Jonathan M. Wainwright Memorial Va Medical Center: 77 Wainwright Drive, Walla Walla, Wa 99362 Map And Locations For Medical Centers And Clinics Within The Visn 20 Northwest Network Can Be Found At The Following Link: Https://www.va.gov/directory/guide/region.asp?id=1020. General Requirements: Leased (cost Per Reportable Result) Equipment. All Related Consumables And Supplies. All Necessary Service To Keep Equipment In Manufacturer's Operating Conditions, Both Preventive Maintenance And Emergency Repairs. Training For Personnel Operating Equipment. Cost Per Reportable Result Cprr: Cost Per Patient Reportable Result (cprr): As Defined In The Federal Supply Schedule Fsc Group 66, Part Iii, Cost-per-test Clinical Laboratory Analyzers - Contractors Are Required To Provide A Price For A Reportable Patient Result. The Per Patient Reportable Result Price Shall Include Costs Covering: (1) 5-year Equipment Use, (2) All Reagents, Standards, Vendor Provided Quality Controls, Supplies, Consumable/disposable Items, Parts, Accessories, And Any Other Item Required For The Proper Operation Of The Contractor S Equipment And Necessary For The Generation Of A Patient Reportable Result. This Per Patient Reportable Result Price Shall Also Encompass All Costs Associated With Dilution; Repeat And Confirmatory Testing Required To Produce A Single Patient Reportable Result. It Shall Also Include The Material To Perform As Well As All Other Costs Associated With Quality Control, Calibration And Correlation Study Testing That Is Prescribed By The Clinical And Laboratory Standards Institute (clsi). (3) All Necessary Maintenance To Keep The Equipment In Good Operating Condition (this Element Includes Both Preventive Maintenance And Emergency Repairs) And (4) Training For Government Personnel. Contractors Shall Provide Delivery, Installation And Removal Of Equipment At No Additional Charge. Parameters: The Calculation For Price And Quantity Of Reagents In The Annual List Included In The Contract As Based On An Estimated Annual Number Of Reportable Results Provided By The Government. The Annual Quantities Of Supplies Shall Be Sufficient For Testing As Long As The Reportable Results Are Submitted In Compliance With The Following Parameters: Numbers Of Reportable Results Actually Performed By The Government Are Within Ten Percent Of The Annual Estimated Reportable Results As Indicated By The Annual Supply List. Use Of The Instrument(s) Are In Accordance With Instrument Usage Information Provided By Government (primary, Back-up Or Alternate). Test Volumes Are Determined By The Government. No More Than 10 Percent Repeats. Two Levels Of Quality Control To Be Run As Required By The Manufacturer Every Test Day. Calibrators For Periodic Calibration Checks And Demand To Validate Systems Following Major Repair Or Resolution Of Negative Quality Control Trends. Adjustments: The Government And Vendor Will Conduct Ongoing Reviews No Less Than Annually To Monitor Contract Performance Against Agreed Upon Efficiencies, Operational Assumptions, And Product Utilization (cppr Parameters). The Vendor Will Notify The Government When Such Reviews Indicate An Adjustment To The Quarterly Standing Order Shipments May Be Required. The Government Will Cooperate With The Vendor In The Conduct Of The Reviews. Vendor, Their Personnel, And Their Sub Vendors Shall Be Subject To The Federal Laws, Regulations, Standards, And Va Directives And Handbooks Regarding Information And Information System Security As Delineated In This Contract.839.201 Contract Clause For Information And Technology Security. Equipment: Vendor Will Provide Urinalysis Analyzer(s) For Lease To Meet Visn20 Facilities Usage Needs. Installation: The Vendor Shall Deliver And Install All Rented Or Purchased Equipment Under This Contract After An Order Is Placed. Equipment Shall Be Installed Within 30 Business Days After Receipt Of Order. Equipment Shall Not Be Considered Installed Until Va Employee Certifies That The Equipment Is Properly Functioning And Has The Necessary Supplies To Perform Its Required Function. The Vendor Shall Maintain A Record Of Installation To Include: Location, Model Number, Serial Number, And Date Of Installation. Removal: The Vendor Shall Un-install And Remove All Rented Equipment Under This Bpa From The Requesting Facility Upon Request. Equipment Shall Be Removed Within 30 Days Of Request. Equipment Shall Be Considered Removed Upon A Va Employee Certification That The Equipment And All Accessories Have Been Taken By An Employee Of The Vendor And There Is No Disruption And /or Damage To The Surrounding Area. The Vendor Shall Maintain A Record Of Removal To Include: Location, Model Number, Serial Number, And Date Of Removal. Equipment Requirements: Vendor Shall Provide Urinalysis Systems That Meet The Following Requirements: Instrument Shall Include Chemical Analysis Of Urine (to Include Bilirubin, Urobilinogen, Ph, Specific Gravity, Glucose, Protein, Blood, Nitrites, Ketones And Leukoesterase) Without Interference From Urines With Common Abnormal Colors (red, Orange, Etc.). Instrument Shall Also Identify Formed Elements Including But Not Limited To, Red Blood Cells, White Blood Cells, Epithelial Cells (differentiating Transitional, Renal, And Squamous) Crystals, Casts, Bacteria, And Yeast Without The Need To Consistently Verify With Manual Microscopy. There Must Be A Direct, Automated Specimen Pathway Between The Chemistry Urinalysis Specimen Sampling And Testing And The Microscopic Urinalysis Sampling And Testing. Equipment Shall Provide Accurate Test Assay Results For Sample Specimens Up To The Manufacturer's Defined Maximum Tests Per Hour Without Excessive Malfunctions, Breakdowns, Or Service Calls. Instrumentation Shall Have Auto Reflex Testing Capability For Specimens Which Require Sediment Analysis. System Shall Have A Minimum Throughput Of 60 Samples Per Hour On The Microscopic Side. The Instrument Shall Have Customer Defined Rule Criteria To Reduce The Number Of Manual Reviews And Off-line Testing Required By The Operator. The System Shall Have The Ability For Auto-validation, Should The Facility Choose To Auto Validate Results. Instrument Shall Auto-classify Formed Elements With Limited Review By The Operator. Microscopic Analysis Must Be Fully Quantitative. Microscopic Analysis Must Have The Ability For The Instrument To Identify Cellular Microscopic Components And Provide Reviewable Digital Images. Instrument Must Offer Limited To No Carryover From Sample To Sample To Reduce Interference. Instrument Must Have The Ability To Continuously Feed At Least 300 Chemistry Strips Without Operator Re-load. Time From Standby To Operation Processing Samples Is Less Than 3 Minutes. Time Required For Routine Maintenance Activities Shall Take Less Than 30 Minutes Daily And Less Than 30 Minutes Weekly/monthly. All Testing Shall Be Fda Approved, Including Body Fluids If Available. Current Waste Stream Analysis And Sds (safety Data Sheets) Shall Be Provided To All Locations. Editable Electronic Copy In Clsi (clinical And Laboratory Standards Institute) Format Of Operating Procedures Shall Be Furnished With Each Instrument Supplied To All Participating Facilities. Testing Shall Include Current Laboratory Assays, But The Va Reserves The Right To Add Additional Tests To Test Menu. Protocols In Place For Various Degrees Of Urine Turbidity. A Selection Of Instruments Will Be Available Based On Volume, Test Menu Needs And Throughput Requirements Of Each Individual Facility. Instrument Shall Allow Patient Sample To Be Used For Repeats Or Reruns On The Same Or Different Instrument. All Instruments Must Be New (non-refurbished) Equipment. Contractor Shall Provide All Upgrades To The Equipment Hardware And Operating System Software, At No Additional Cost To The Government. (note Current Va Security Regulations Require Windows Based Operating Systems Be Windows 10 Or Higher). Instruments That Have The Ability To Have Access To The Internet Must Follow Va It Security Policies. The Internet Access Must Be Verified And Adhered To Before And During All Internet Access. Contractor S Software Is Required To Be Compatible And Interface Immediately Upon Award With Governmental Systems Which Include Cprs, Vista, And Cerner. Contractor Must Provide Evidence With Their Solicitation Response That Their Software Is Already Accepted For Use By Vha It Systems. All Equipment Shall Come With Any Required Accessories To Perform Normal Duties, To Include But Not Limited To, Properly Programmed Printers And Monitors, And Ups. The Analyzers Will Be Va Laboratory Information System (lis) Interfaceable, And The Vendor Will Supply Lis Specifications And Assist With The Interface Connections. Operation Of Software Uses Minimal Computer Strokes To Move From Testing To Reagent To Data Analysis Or/and Other Screens. Size Of Instrumentation Shall Be No More Than 65 W X 21 D. If Stand Is Required, It Is Included In The Contract At No Additional Cost. Upgrades Shall Be Delivered And Installed Within 60 Days Of Issuance To The Commercial Market. An Operator's Manual Shall Be Furnished With Each Instrument Supplied To Va And Updates To Manual Shall Be Provided In A Timely Manner. Uptime Guarantee/ Performance Penalty: Vendor Agrees That All Equipment Provided Shall Be Operable And Available For Use No Less Than 98% Of Operational Time Per Month. Each Instrument At Site Shall Be Computed Separately. Operational Time Is 24 Hours Per Day 7 Days A Week. Downtime Is Defined As When The Vendor Is Not Able To Produce Clinically Acceptable Results On The System Monitor And Will Be Computed From The Time The Government Notified The Hotline During Normal Working Hours Until The Field Service Engineer Returns The Instrument To The Government And The Government Can Produce Acceptable Clinical Results. Scheduled Maintenance Is Excluded From Downtime. Method Validations: Once The Instrument Has Been Installed According To The Vendor Specifications At The Government Location The Vendor Will Supply A Technical Representative To Perform Method Validation Studies During All Equipment Installations At All Facilities. The Method Validations Will Be Completed To Include The Necessary Studies Required For Clinical Laboratory Information Act (clia), College Of American Pathologist (cap) And Department Of Veterans Affairs (va) Regulatory Agencies And Shall Include Precision, Linearity And Current System To New System Correlations As Well As Establishment Of Normal And Therapeutic Ranges. The Va Will Not Accept Equipment Until It Passes All Validation Testing. Validation Testing Will Be Conducted On The Facilities Primary And Secondary Testing Methods. The Va Will Provide All The Samples Necessary For The Validation Studies. Maintenance And Repairs: Vendor Shall Provide Preventative And Corrective Maintenance Per Manufacturer's Recommendation. This Shall Include Software Upgrades And Parts And Labor, To Maintain All Urinalysis Equipment And Accessories. At A Minimum, Preventative Maintenance Shall Be Twice Annually, Beginning Six (6) Months After Installation. Vendor Will Furnish All Transportation, Equipment, Tools And Labor To Accomplish The Required Maintenance. Emergency Repairs Shall Be Performed After Initial Telephone Notification That The Equipment Is Inoperative. The Field Service Representative Will Call To Schedule Onsite Service Within 2 Hours Of Notification From Technical Assistance Hotline If Necessary. The Vendor Shall Provide The Government With A Designated Point Of Contact And Telephone Number And Shall Make Arrangements To Enable His Maintenance Representative To Receive Such Notification. Telephone Service Support Shall Be Available 24 Hours/day,7days A Week. Onsite Field Service Support Shall Be Available Monday- Friday 8am- 4:30 Pm (local Time). Onsite Repairs Shall Be Initiated Within 24 Hours Of First Notification From Technical Hotline To Field Service Engineer. Efforts Shall Be Made By The Vendor To Minimize Disruption To Governments And Employees (i.e. Reschedule If Work Interferes With Normal Operation, Access Equipment When Convenient To The Needs Of The Va, Etc.) Vendor Shall Maintain Cleanliness Of Work Area And Minimize Dust And Contaminants To Areas Adjacent To The Job Site. Vendor Shall Furnish A Malfunction Incident Report To The Installation Upon Completion Of Repair Call Within 2 Business Days After The Completion Of Work. The Report Shall Include As A Minimum The Following: Date And Time Notified. Date And Time Of Arrival. Serial Number, Type And Model Number(s) Of Equipment. Time Spent For Repair. Description Of Malfunction And Repair. Proof Of Repair That Included Documentation Of A Sample Run Of Quality Control Verifying Acceptable Performance. Each Instrument Provided By The Vendor Shall Maintain An Uptime Of 98% In Each Month Of The Term Of The Agreement. During The Term Of The Contract, Should The Repair Record Of Any Individual Piece Of Laboratory Equipment Reflect A Downtime Of 5% Or Greater Of The Normal Working Days In One Calendar Month, It Is The Responsibility Of The Vendor To Immediately Replace The Broken Laboratory Equipment With New Equipment At No Additional Cost To The Government. The Responsibility For Maintaining The Equipment Furnished In Operating Condition In Accordance To Manufacturer's Instruction, Shall Solely Be The Responsibility Of The Vendor. The Contractor Shall Not Leave A Service Call Open Pending Verification That Repairs Are Completed By The Contractor's Maintenance Personnel. For Each Instrument Provided, The Vendor Shall Treat Each Notification For An Emergency/repair Service Call Form The Government As A Separate And New Service Call. The Following Are Guaranteed Throughout The Life Of This Contract: Priority Scheduling Of Requests For Service. Unlimited Emergency Service. No Charges For Labor, Travel Or Any Other Related Expenses. Unlimited Parts. No Charge For Replacement Parts Which Become Marginal Or Defective Due To Normal Use During Agreement Period. Factory Authorized Product Updates And Modifications. Installed At No Additional Charge For Improved Product Performance And Reliability. Factory Trained And Authorized Service Engineers. Continual Upgrading And Certification Of Engineers In Latest Instrument Technology. Training: With The Exception Of Specific Training Requirements Stated Herein, Which Shall Have Precedence; Vendor Shall Provide "operator" Training In Accordance With The Terms, Conditions, And Provisions Of The Vendor's Existing Federal Supply Service Contract. Listed Below Are The Training Requirements: The Vendor Shall Provide, At No Cost To The Government, On-site Training And Key Operator Training For At Least 2 Operators Per Instrument Per Site. Provide Initial In-depth Training For Two Key Operators At The Facility And For Each Individual Instrument Provided. Provide Annual Training For One Va Equipment Operator, Per Each Instrument, For The Participating Medical Center. Provide On-site Vendor Operator Training For All Personnel Who Will Run Instrument With Training Provided For All Applicable Shifts. The Vendor Shall Have An On-going Training Program For Employees By The Technical Service Representatives On Any New Products Or Updates On The Product Lines. All Materials For Training Will Be Provided At No Additional Cost To The Government. The Vendor Will Provide Competency Assessment Protocols For Use At Each Site Consistent With Federal (clia) And Cap Training Requirements. Reagents, Controls And Supplies: Routine Reagents, Controls And Disposables (supplies) For Chemical And Microscopic Urinalysis Testing Shall Be Provided By The Vendor And Shall Adhere To The Following Requirements. Reagents Including Controls And Disposables Shall Be Identified Prior To Delivery. Reagents Including Controls And Disposables To Be Listed In A Separate Table. The Table Should Include Annual Reagent Volumes, Costs, And Shipping Charges For Each Quarterly Standing Order Delivery. Reagent Manufacturer Shelf Life Shall Be No Less Than 12 Months. Reagents For The Analyzer Are Marked For Easy Recognition By The Operator And Shall Contain The Appropriate Facility Purchase Order Number In The Delivery Address. Vendor Will Supply A List Of Reagents, Controls And Disposables That Will Be Shipped As Part Of The Order. Supplies Will Be Shipped On A Standing Order Schedule, Agreed Upon By The Government And Vendor. All Or Part Of A Future Quarterly Standing Order May Be Advanced Up To 10 Days Ahead Of The Scheduled Ship Date Of The Standing Order. Delivery Shall Be Within Four (4) Business Days Of The Prior Agreed Upon Shipment Date Or It Shall Be Considered Late. Vendor Will Provide Sufficient Reagents And Supplies For Performance Of Patient Results For All Visn 20 Sites. Consumables Will Be Provided On Demand As Needed If The Consumable Allotments Are Insufficient To Meet The Needs Of The Facility. Vendor Shall Supply All Changes To The Maintenance Schedules That Affect Reagent Or Cleaning Reagent Volumes And Shall Be Coordinated With The Va Facility Point Of Contact To Implement The Changes In Accordance With Manufacturer's Recommendations. Space Availability: All Proposed Urinalysis Equipment Must Fit The Existing Space At Each Visn 20 P&lms Facility's, Without The Need For Renovation Work. Small Scale Re-arrangement Of Furniture Is Acceptable. Fitting Existing Space Shall Include Conforming To The Current Structural Parameters Of Each Lab, In Each Facility, In Terms Of Delivery, Installation And Lab Space. (i.e., Equipment Size, Weight, Packaged Size For Delivery, Electrical/voltage). Special Requirements: In Addition To The General Requirements For The Urinalysis Cprr Requirements Stated Above, The Contractor Shall Meet The Following Special Requirements: Equipment Shall Have A Fully Established Va Veterans Health Information Systems And Technology Architecture (vista) Computer System And Cerner Interface Program Via Data Innovations Middleware, With All Downloads/software Necessary To Transfer Data Into Patient Files In Va Vista And Cerner Computer Systems Via Data Innovations Middleware, At No Additional Cost To Va. Provide Bi-directional Interface With Data Innovations And Appropriate Quality Control Analysis System And All Components Necessary To Interface With Va Vista And Cerner Computer System. The Contractor Shall Provide An Auto Verification Package Through Data Innovations For Validation Utilizing The Instrument Manager Which Includes Rules And Technical Support For The Duration Of This Contract. Contractor Shall Assist In The Establishment, Testing, Deployment, And Troubleshooting In The Full Capacity Of The Middleware Before Implementation Date. The Contractor Is Responsible For Verifying Any Software Upgrades With The Instrument During Its Life, Will Be Compatible With Data Innovations Middleware. Contractor Shall Provide Automated, Walk-away Urinalysis Chemistry Analyzer With Peripherals With Direct, Automated Sample Pathway To An Automated, Walk-away Microscopic Urinalysis Analyzer With Peripherals For Sampling And Testing. Shall Provide Data Backup. Systems Shall Provide Ease Of Use (uncomplicated Menus), With Minimal Maintenance Required. Shall Provide Flexibility In Test Volumes. Shall Be Easy To Troubleshoot. Provide Extended Expiration Date Of Supplies. Uninterruptible Power Supply (surge Protection, Battery Backup) Provided By Vendor For All Associated Electrical Instruments And Ancillary Components Excluding Printer. Provide A Water System, If Required. If A Printer Is Required To Produce Patient Or Qc Reports, One Shall Be Provided Per System And Replaced If Broken. Cessation Of Testing: If, For Any Reason, Contractor Ceases Testing Of Any Urinalysis Assays, The Contractor Must Notify The Va Contracting Office And Laboratories, 60 Calendar Days Prior To The Change. Until A New Solicitation Can Be Issued, Or The Problem Resolved, The Contractor Shall Be Held Liable For All Costs If Performance Is Ceased, As The Lab Facility May Have To Resort To Outsourcing The Tests In Order To Continue Patient Care. The Vendor Will Be Responsible For The Following: Cost Per Reportable Result Program Reagents, Controls And Supplies: Routine Reagents And Disposables. Reagents Including Controls And Disposables To Be Listed In Separate Table. Vendor Will Supply A List Of Reagents, Controls And Disposables That Will Be Shipped As Part Of The Agreement. Supplies Will Be Shipped On A Standing Order Schedule, Agreed Upon By Government And Vendor. All Or Part Of A Future Quarterly Standing Order May Be Advanced Up To 10 Days Ahead Of The Scheduled Ship Date Of The Standing Order. Vendor Will Provide Sufficient Reagents And Supplies For Performance Of Patient Results For All Visn 20 Sites. The Quality Of The Products Shall Be High Enough To Satisfy Proficiency Testing Standards Of The College Of American Pathologists (cap) And The Joint Commission (tjc). Changes In Maintenance Schedules That Affect Reagent Or Cleaning Reagent Volumes Will Be Approved By The Vendor In Accordance With Manufacturer's Recommendations. Additional Reagents, If Required, Will Be Provided By The Vendor At No Additional Charge. The Government Will Be Responsible For The Following: Cost Per Reportable Result Program: Cppr Periodic Payments: Refer To Attachment A For Volumes. Test Description Estimated Volume Per Year Price Per Reportable. During The Agreement The Government Will Report By The 10th Of Each Month, To The Vendor In Writing Or Electronically, The Number Of Reportable Results Generated In The Previous Month. The Vendor Will Invoice The Government Based On The Report Of Reportable Tests. Laboratory Manager Or Designee Will Act As Contracting Officer Representative (cotr) For This Contract. Security: Returning Leased Equipment Constitutes A Risk. Va Employees Must Sanitize Va Sensitive Information Residing On Leased Equipment Before Releasing That Equipment From Direct Va Control, Or The Media Will Not Be Returned Upon Termination Of The Contract. Per Visn 20 Va Information Security Policies, No Hard Drives Or Computer Disks Containing Va Patient Information Will Be Removed From Va Facilities. At The Time Of Turn-in Or Removal Due To Failure, The Va Facility Will Remove All Sensitive Data From Information Systems Storage Devices Or Render The Data From These Systems Unreadable. No Federal Information Processing Equipment Will Be Discontinued From Rental/lease Or Exchange Without Compliance With This Require. Contract Personnel Will Not Have Direct Access To A Va System Or Va Sensitive Information. All Work/maintenance Will Be Accomplished By Va Laboratory Personnel As An Intermediary. If Contract Leased/purchased Equipment Contains Sensitive Information (pii/phi) To Be Directly Uploaded To/downloaded From Va Systems, A Mou/isa Shall Be Established Between The Vendor And Va. Unidirectional, Deidentified Data From Contract Leased/purchased Equipment To The Va Network Shall Be Protected In Accordance With Established Va Security Policy. Quality Assurance Monitoring: The Contractor Service Requirements Are Summarized Into Performance Objectives That Relate Directly To Mission Essential Items. The Performance Thresholds Briefly Describe The Minimum Acceptable Levels Of Service Required For Each Requirement. These Thresholds Are Critical To Mission Success. Information And Information System Security/privacy General Contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be Subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks As Va And Va Personnel Regarding Information And Information System Security. Access To Va Information And Va Information Systems A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Task Order. All Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va Information Are Subject To The Same Investigative Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Must Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office For Operations, Security, And Preparedness Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To National Security Programs Must Have A Valid Security Clearance. National Industrial Security Program (nisp) Was Established By Executive Order 12829 To Ensure That Cleared U.s. Defense Industry Contract Personnel Safeguard The Classified Information In Their Possession While Performing Work On Contracts, Programs, Bids, Or Research And Development Efforts. The Department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With Defense Security Service (dss). Verification Of A Security Clearance Must Be Processed Through The Special Security Officer Located In The Planning And National Security Service Within The Office Of Operations, Security, And Preparedness. Custom Software Development And Outsourced Operations Must Be Located In The U.s. To The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad And Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor Must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed To Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of Communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be An Evaluation Factor. The Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When An Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves The Contractor Or Subcontractor's Employ. The Contracting Officer Must Also Be Notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination. Va Information Custodial Language Information Made Available To The Contractor Or Subcontractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used Only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written Agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor's Rights To Use Data As Described In Rights In Data - General, Far 52.227-14(d) (1). Va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The Contractors/subcontractor's Information Systems Or Media Storage Systems In Order To Ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met. If Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The Contractor Must Ensure That Va's Information Is Returned To The Va Or Destroyed In Accordance With Va's Sanitization Requirements. Va Reserves The Right To Conduct On Site Inspections Of Contractor And Subcontractor It Resources To Ensure Data Security Controls, Separation Of Data And Job Duties, And Destruction/media Sanitization Procedures Are In Compliance With Va Directive Requirements. Prior To Termination Or Completion Of This Contract, Contractor/ Subcontractor Must Not Destroy Information Received From Va, Or Gathered/ Created By The Contractor In The Course Of Performing This Contract Without Prior Written Approval By The Va. Any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Of The Contract. The Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use, Disclose And Dispose Of Va Information Only In Compliance With The Terms Of The Contract And Applicable Federal And Va Information Confidentiality And Security Laws, Regulations, And Policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And Policies Become Applicable To The Va Information Or Information Systems After Execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special Publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good Faith To Implement The Information Confidentiality And Security Laws, Regulations, And Policies In This Contract. The Contractor/subcontractor Shall Not Make Copies Of Va Information Except As Authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve Electronic Information Stored On Contractor/subcontractor Electronic Storage Media For Restoration In Case Any Electronic Equipment Or Data Used By The Contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Must Be Appropriately Destroyed. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality, Privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12. If A Vha Contract Is Terminated For Cause, The Associated Baa Must Also Be Terminated And Appropriate Actions Taken In Accordance With Vha Handbook 1600.01, Business Associate Agreements. Absent An Agreement To Use Or Disclose Protected Health Information, There Is No Business Associate Relationship. The Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A Minimum, Fips 140-2 Validated. The Contractor/subcontractor's Firewall And Web Services Security Controls, If Applicable, Shall Meet Or Exceed Va's Minimum Requirements. Va Configuration Guidelines Are Available Upon Request. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va Information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction, Or (ii) With Va's Prior Written Approval. The Contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or Inquiries About, Va Information And Information Systems To The Va Contracting Officer For Response. Notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va Records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance Records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With Human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, That Contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To The Va Contracting Officer For Response. For Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va Sensitive Information But Does Not Require C&a Or An Mou-isa For System Interconnection, The Contractor/subcontractor Must Complete A Contractor Security Control Assessment (csca) On A Yearly Basis And Provide It To The Cor. Information System Design And Development Information Systems That Are Designed Or Developed For Or On Behalf Of Va At Non-va Facilities Shall Comply With All Va Directives Developed In Accordance With Fisma, Hipaa, Nist, And Related Va Security And Privacy Control Requirements For Federal Information Systems. This Includes Standards For The Protection Of Electronic Phi, Outlined In 45 C.f.r. Part 164, Subpart C, Information And System Security Categorization Level Designations In Accordance With Fips 199 And Fips 200 With Implementation Of All Baseline Security Controls Commensurate With The Fips 199 System Security Categorization (reference Appendix D Of Va Handbook 6500, Va Information Security Program). During The Development Cycle A Privacy Impact Assessment (pia) Must Be Completed, Provided To The Cor, And Approved By The Va Privacy Service In Accordance With Directive 6507, Va Privacy Impact Assessment. The Contractor/subcontractor Shall Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems Using The Va Federal Desktop Core Configuration (fdcc), And The Common Security Configuration Guidelines Provided By Nist Or The Va. This Includes Internet Explorer 7 Configured To Operate On Windows Xp And Vista (in Protected Mode On Vista) And Future Versions, As Required. The Standard Installation, Operation, Maintenance, Updating, And Patching Of Software Shall Not Alter The Configuration Settings From The Va Approved And Fdcc Configuration. Information Technology Staff Must Also Use The Windows Installer Service For Installation To The Default "program Files" Directory And Silently Install And Uninstall. Applications Designed For Normal End Users Shall Run In The Standard User Context Without Elevated System Administration Privileges. The Security Controls Must Be Designed, Developed, Approved By Va, And Implemented In Accordance With The Provisions Of Va Security System Development Life Cycle As Outlined In Nist Special Publication 800-37, Guide For Applying The Risk Management Framework To Federal Information Systems, Va Handbook 6500, Information Security Program And Va Handbook 6500.5, Incorporating Security And Privacy In System Development Lifecycle. The Contractor/subcontractor Is Required To Design, Develop, Or Operate A System Of Records Notice (sor) On Individuals To Accomplish An Agency Function Subject To The Privacy Act Of 1974, (as Amended), Public Law 93-579, December 31, 1974 (5 U.s.c. 552a) And Applicable Agency Regulations. Violation Of The Privacy Act May Involve The Imposition Of Criminal And Civil Penalties. The Contractor/subcontractor Agrees To: Comply With The Privacy Act Of 1974 (the Act) And The Agency Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish An Agency Function When The Contract Specifically Identifies: The Systems Of Records (sor); And The Design, Development, Or Operation Work That The Contractor/ Subcontractor Is To Perform Include The Privacy Act Notification Contained In This Contract In Every Solicitation And Resulting Subcontract And In Every Subcontract Awarded Without A Solicitation, When The Work Statement In The Proposed Subcontract Requires The Redesign, Development, Or Operation Of A Sor On Individuals That Is Subject To The Privacy Act; And Include This Privacy Act Clause, Including This Subparagraph (3), In All Subcontracts Awarded Under This Contract Which Requires The Design, Development, Or Operation Of Such A Sor. In The Event Of Violations Of The Act, A Civil Action May Be Brought Against The Agency Involved When The Violation Concerns The Design, Development, Or Operation Of A Sor On Individuals To Accomplish An Agency Function, And Criminal Penalties May Be Imposed Upon The Officers Or Employees Of The Agency When The Violation Concerns The Operation Of A Sor On Individuals To Accomplish An Agency Function. For Purposes Of The Act, When The Contract Is For The Operation Of A Sor On Individuals To Accomplish An Agency Function, The Contractor/subcontractor Is Considered To Be An Employee Of The Agency. "operation Of A System Of Records" Means Performance Of Any Of The Activities Associated With Maintaining The Sor, Including The Collection, Use, Maintenance, And Dissemination Of Records. "record" Means Any Item, Collection, Or Grouping Of Information About An Individual That Is Maintained By An Agency, Including, But Not Limited To, Education, Financial Transactions, Medical History, And Criminal Or Employment History And Contains The Person's Name, Or Identifying Number, Symbol, Or Any Other Identifying Particular Assigned To The Individual, Such As A Fingerprint Or Voiceprint, Or A Photograph. "system Of Records" Means A Group Of Any Records Under The Control Of Any Agency From Which Information Is Retrieved By The Name Of The Individual Or By Some Identifying Number, Symbol, Or Other Identifying Particular Assigned To The Individual. The Vendor Shall Ensure The Security Of All Procured Or Developed Systems And Technologies, Including Their Subcomponents (hereinafter Referred To As "systems"), Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes, But Is Not Limited To Workarounds, Patches, Hotfixes, Upgrades, And Any Physical Components (hereafter Referred To As Security Fixes) Which May Be Necessary To Fix All Security Vulnerabilities Published Or Known To The Vendor Anywhere In The Systems, Including Operating Systems And Firmware. The Vendor Shall Ensure That Security Fixes Shall Not Negatively Impact The Systems. The Vendor Shall Notify Va Within 24 Hours Of The Discovery Or Disclosure Of Successful Exploits Of The Vulnerability Which Can Compromise The Security Of The Systems (including The Confidentiality Or Integrity Of Its Data And Operations, Or The Availability Of The System). Such Issues Shall Be Remediated As Quickly As Is Practical, But In No Event Longer Than 10 Days. When The Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Vendor Will Provide Written Notice To The Va That The Patch Has Been Validated As Not Affecting The Systems Within 10 Working Days. When The Vendor Is Responsible For Operations Or Maintenance Of The Systems, They Shall Apply The Security Fixes Within 10 Days. All Other Vulnerabilities Shall Be Remediated As Specified In This Paragraph In A Timely Manner Based On Risk, But Within 60 Days Of Discovery Or Disclosure. Exceptions To This Paragraph (e.g. For The Convenience Of Va) Shall Only Be Granted With Approval Of The Contracting Officer And The Va Assistant Secretary For Office Of Information And Technology. Information System Hosting, Operation, Maintenance, Or Use For Information Systems That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities, Contractors/subcontractors Are Fully Responsible And Accountable For Ensuring Compliance With All Hipaa, Privacy Act, Fisma, Nist, Fips, And Va Security And Privacy Directives And Handbooks. This Includes Conducting Compliant Risk Assessments, Routine Vulnerablity Scanning, System Patching And Change Management Procedures, And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor's Security Control Procedures Must Be Equivalent, To Those Procedures Used To Secure Va Systems. A Privacy Impact Assessment (pia) Must Also Be Provided To The Cor And Approved By Va Privacy Service Prior To Operational Approval. All External Internet Connections To Va's Network Involving Va Information Must Be Reviewed And Approved By Va Prior To Implementation. Adequate Security Controls For Collecting, Processing, Transmitting, And Storing Of Personally Identifiable Information (pii), As Determined By The Va Privacy Service, Must Be In Place, Tested, And Approved By Va Prior To Hosting, Operation, Maintenance, Or Use Of The Information System, Or Systems By Or On Behalf Of Va. These Security Controls Are To Be Assessed And Stated Within The Pia And If These Controls Are Determined Not To Be In Place, Or Inadequate, A Plan Of Action And Milestones (poa&m) Must Be Submitted And Approved Prior To The Collection Of Pii. Outsourcing (contractor Facility, Contractor Equipment Or Contractor Staff) Of Systems Or Network Operations, Telecommunications Services, Or Other Managed Services Requires Certification And Accreditation (authorization) (c&a) Of The Contractor's Systems In Accordance With Va Handbook 6500.3, Certification And Accreditation And/or The Va Ocs Certification Program Office. Government- Owned (government Facility Or Government Equipment) Contractor-operated Systems, Third Party Or Business Partner Networks Require Memorandums Of Understanding And Interconnection Agreements (mou-isa) Which Detail What Data Types Are Shared, Who Has Access, And The Appropriate Level Of Security Controls For All Systems Connected To Va Networks. The Contractor/subcontractor's System Must Adhere To All Fisma, Fips, And Nist Standards Related To The Annual Fisma Security Controls Assessment And Review And Update The Pia. Any Deficiencies Noted During This Assessment Must Be Provided To The Va Contracting Officer And The Iso For Entry Into Va's Poa&m Management Process. The Contractor/subcontractor Must Use Va's Poa&m Process To Document Planned Remedial Actions To Address Any Deficiencies In Information Security Policies, Procedures, And Practices, And The Completion Of Those Activities. Security Deficiencies Must Be Corrected Within The Timeframes Approved By The Government. Contractor/subcontractor Procedures Are Subject To Periodic, Unannounced Assessments By Va Officials, Including The Va Office Of Inspector General. The Physical Security Aspects Associated With Contractor/ Subcontractor Activities Must Also Be Subject To Such Assessments. If Major Changes To The System Occur That May Affect The Privacy Or Security Of The Data Or The System, The C&a Of The System May Need To Be Reviewed, Retested And Re- Authorized Per Va Handbook 6500.3. This May Require Reviewing And Updating All Of The Documentation (pia, System Security Plan, Contingency Plan). The Certification Program Office Can Provide Guidance On Whether A New C&a Would Be Necessary. The Contractor/subcontractor Must Conduct An Annual Self Assessment On All Systems And Outsourced Services As Required. Both Hard Copy And Electronic Copies Of The Assessment Must Be Provided To The Cor. The Government Reserves The Right To Conduct Such An Assessment Using Government Personnel Or Another Contractor/subcontractor. The Contractor/subcontractor Must Take Appropriate And Timely Action (this Can Be Specified In The Contract) To Correct Or Mitigate Any Weaknesses Discovered During Such Testing, Generally At No Additional Cost. Va Prohibits The Installation And Use Of Personally-owned Or Contractor/ Subcontractor- Owned Equipment Or Software On Va's Network. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow Or Contract. All Of The Security Controls Required For Government Furnished Equipment (gfe) Must Be Utilized In Approved Other Equipment (oe) And Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Be Equipped With, And Use, A Va-approved Antivirus (av) Software And A Personal (host-based Or Enclave Based) Firewall That Is Configured With A Va- Approved Configuration. Software Must Be Kept Current, Including All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-viral Software And The Firewall On The Non-va Owned Oe. All Electronic Storage Media Used On Non-va Leased Or Non-va Owned It Equipment That Is Used To Store, Process, Or Access Va Information Must Be Handled In Adherence With Va Handbook 6500.1, Electronic Media Sanitization Upon: (i) Completion Or Termination Of The Contract Or (ii) Disposal Or Return Of The It Equipment By The Contractor/subcontractor Or Any Person Acting On Behalf Of The Contractor/subcontractor, Whichever Is Earlier. Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used By The Contractors/ Subcontractors That Contain Va Information Must Be Returned To The Va For Sanitization Or Destruction Or The Contractor/subcontractor Must Self-certify That The Media Has Been Disposed Of Per 6500.1 Requirements. This Must Be Completed Within 30 Days Of Termination Of The Contract. Bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The Vendor At The End Of Lease, For Trade-in, Or Other Purposes. The Options Are: Vendor Must Accept The System Without The Drive; Va's Initial Medical Device Purchase Includes A Spare Drive Which Must Be Installed In Place Of The Original Drive At Time Of Turn-in; Or Va Must Reimburse The Company For Media At A Reasonable Open Market Replacement Cost At Time Of Purchase. Due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain The Hard Drive, Then; The Equipment Vendor Must Have An Existing Baa If The Device Being Traded In Has Sensitive Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact; And Any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Pre- Approved And Described In The Purchase Order Or Contract. A Statement Needs To Be Signed By The Director (system Owner) That States That The Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place And Completed. The Iso Needs To Maintain The Documentation. Security Incident Investigation The Term "security Incident" Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/ Subcontractor Shall Immediately Notify The Cor And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/ Subcontractor Has Access. To The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident (including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant. With Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. Liquidated Damages For Data Breach Consistent With The Requirements Of 38 U.s.c. 5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract. The Contractor/subcontractor Shall Provide Notice To Va Of A "security Incident" As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. Each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following: Nature Of The Event (loss, Theft, Unauthorized Access); Description Of The Event, Including: Date Of Occurrence; Data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code; Number Of Individuals Affected Or Potentially Affected; Names Of Individuals Or Groups Affected Or Potentially Affected; Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text; Amount Of Time The Data Has Been Out Of Va Control; The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised (made Accessible To And Usable By Unauthorized Persons); Known Misuses Of Data Containing Sensitive Personal Information, If Any; Assessment Of The Potential Harm To The Affected Individuals; Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And Privacy Incidents, As Appropriate; And Whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $42.00 Per Affected Individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals Consisting Of The Following: Notification; One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least 3 Relevant Credit Bureau Reports; Data Breach Analysis; Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution; One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs. Security Controls Compliance Testing On A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-day's Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time. Training All Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete The Following Before Being Granted Access To Va Information And Its Systems: Sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix E Relating To Access To Va Information And Information Systems; Successfully Complete The Va Cyber Security Awareness And Rules Of Behavior Training And Annually Complete Required Security Training; Successfully Complete The Appropriate Va Privacy Training And Annually Complete Required Privacy Training; And Successfully Complete Any Additional Cyber Security Or Privacy Training, As Required For Va Personnel With Equivalent Information System Access [to Be Defined By The Va Program Official And Provided To The Contracting Officer For Inclusion In The Solicitation Document - E.g., Any Role-based Information Security Training Required In Accordance With Nist Special Publication 800-16, Information Technology Security Training Requirements.] The Contractor Shall Provide To The Contracting Officer And/or The Cor A Copy Of The Training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete.
Closing Date7 Jan 2025
Tender AmountRefer Documents 

Monetary Authority Of Singapore Tender

Electrical Generators And Transformers...+1Electrical and Electronics
Singapore
Tender Id: MAS000ETQ25000012 / CSD/Q/24/UPS/FN/068 | Invitation To Quote For Comprehensive Maintenance Of Uniterruptible Power Supply System At Mas Premise Loading
Closing Date18 Feb 2025
Tender AmountRefer Documents 
5041-5050 of 5051 archived Tenders