Transportation Tenders
Transportation Tenders
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 2.3 Million (USD 39.6 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Construction Of Multi-purpose Building (gym) (brgy. Hilera) 1. The Municipality Of Jaen, Through The 20% Development Fund Cy 2025 Intends To Apply The Sum Of Two Million Three Hundered Thousand Pesos (2,3000,000.00) Being The Abc To Payments Under The Contract For Construction Of Multi-purpose Building (gym) (brgy. Hilera) (gym)/ Itb-2025-20% Df-07. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Construction Of Multi-purpose Building (gym) (brgy. Hilera).completion Of The Works Required 180 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Multi-purpose Building (gym) (brgy. Hilera). With Project Identification Number Itb-2025-20% Df-07. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2025 In The Amount Of P 2,300,000.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until June 17, 2025, Tuesday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is: Construction Of Multi-purpose Building (gym) (brgy. Hilera) 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Construction Of Multi-purpose Building (gym) (brgy. Hilera) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 46,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 115,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until June 17, 2025, Tuesday (180 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 1.6 Million (USD 27.6 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehablitation Of Boudary Arch 1. The Municipality Of Jaen, Through The 20% Development Fund Cy 2025 Intends To Apply The Sum Of One Million Six Hundered Thousand Pesos (1,600,000.00) Being The Abc To Payments Under The Contract For Concreting Of Road Brgy. San Jose/ Itb-2025-20% Df-05. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehablitation Of Boudary Arch. Completion Of The Works Required 150 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehablitation Of Boudary Arch. With Project Identification Number Itb-2025-20% Df-05. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 1,600,000.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until May 19, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehablitation Of Boudary Arch. 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Projectrehablitation Of Boudary Arch. 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 32,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 80,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until May 19, 2025 (150 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+2Road Construction, Drainage Work
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 4.5 Million (USD 77.6 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Construction Of Drainage And Road Shoulder (brgy. Dampulan) 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of Four Million Five Hundred Thousand Pesos (4,500,000.00) Being The Abc To Payments Under The Contract For Construction Of Drainage And Road Shoulder (brgy. Dampulan)/ Itb-2025-odpap-07. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Construction Of Drainage And Road Shoulder (brgy. Dampulan) Completion Of The Works Required 210 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Construction Of Drainage And Road Shoulder (brgy. Dampulan) . With Project Identification Number Itb-2025-odpap-07. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P4,500,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until July 18, 2025, Friday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is: Construction Of Drainage And Road Shoulder (brgy. Dampulan) 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Construction Of Drainage And Road Shoulder (brgy. Dampulan) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 90,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 225,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until July 18, 2025, Friday (210 C.d.) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
MISSILE DEFENSE AGENCY MDA USA Tender
Aerospace and Defence
United States
Closing Date7 Jan 2025
Tender AmountRefer Documents
Details: Missile Defense Agency (mda) An/tpy-2 Radar Program Request For Information naics: 334511 psc: Ac25 agency: Other Defense Agencies office: Missile Defense Agency location: Mda-sna solicitation Number: N/a reference-number: 24-mda-11952 notice Id: Mda25snrfi02 distribution Statement A. Approved For Public Release; Distribution Is Unlimited. approved For Public Release: 5-nov 2024 i. Description a. An/tpy-2 Description: the Missile Defense Agency’s Ground Sensors Directorate (mda/sn) Is Conducting Market Research To Determine Industry Interest And Capability To Support Future Requirements For Its Army Navy/transportable Radar Surveillance And Control Model-2 (an/tpy-2). the Requirements Include Hardware And Software Development Development (to Include Radar Modeling And Simulation); Production Of Components, Spares, Fleet Refurbishment, And Capability Upgrades; And Operations And Sustainment Of An/tpy-2 Radars. Responses To This Request For Information (rfi) May Address All Or Part Of These Requirements. The Government Invites Industry To Provide Feedback On Contracting Strategy For The Requirements To Include Combination Of Requirements, Contract Type, And Areas That Would Be Accomplished Well Through Small Business Set Aside Versus Full And Open Competition. this Rfi Is Issued Solely For Information And Planning Purposes – It Does Not Constitute A Request For Proposal (rfp) Or Promise To Issue An Rfp In The Future. This Rfi Does Not Commit The Government To Establish A Contract For Any Of The Requirements. Further, Mda Is Not Seeking Proposal Nor Will It Accept Proposals. All Costs Associated With Responding To This Rfi Will Be Solely At The Respondent’s Expense. Participation In Future Agency Transactions And Procurement Opportunities Is Not Contingent On Responding To This Rfi. Mda Will Not Provide Feedback For Any Submission. ii. An/tpy-2 Radar Major Requirement Area Descriptions a. Development 1. Software Maintenance current Software Primarily Developed In Ada Language 2. Software Upgrades open Architecture To Accommodate Integration Of 3rd Part Algorithms modular Design new Capability Development acquisition tracking discrimination debris Mitigation electronic Protection post-intercept Assessment fault Tolerance active Bias Monitoring And Reporting radar Integrated Satellite Monitoring And Calibration space Situational Awareness/space Domain Awareness target Object Map raid Handling long Range High Sensitivity low And High Elevation full Azimuth Coverage 3. Hardware Upgrades digital Receiver/exciter (drex) wideband Digital Signal Processing arbitrary Waveform Generator digital Array Architecture Upgrades To The An/tpy-2 Antenna Equipment Unit additional Distributed, Passive Or Active Phased Array Panels To Support Mission Objectives Against Advanced Threats. Performance Information Is Desired For These Potential Upgrades. 4. Architecture To Optimize Performance On An X86-based Supercomputer And The Implementation Of A Drex performance Improvements, Including, But Not Limited To, Analysis And Implementation Of Parallel Processing, Multicore Computing, Field Programmable Gated Arrays, And Advanced Real-time Processing Capabilities re-architecture Including, But Not Limited To, Analysis And Implementation Of Secure Server Configurations Eliminating, Mitigating, And Limiting Cyber Vulnerabilities 5. System Engineering support Software, Software Databases, And Hardware Upgrades Including New Functionality And Evolving Threats. systems Engineering Includes Configuration Management, Requirements Development And Analysis, Software Capabilities Performance Assessment, Qualification, Formal Test, And Requirements Verification. Systems Engineering Support Is Also Required To: support Radar System Integration And Test With The Terminal High Altitude Area Defense (thaad) Weapon System At The Prime Contractor’s System Integration Laboratory (sil) For Development And Flight Test Activities support Radar System Integration And Test With Command, Control, Battle Management & Communication (c2bmc) Weapon System At The Prime Contractor’s Sil For Development And Flight Test Activities. support United States Government (usg) And Foreign Military Sales (fms) Development And Support Efforts. support Software And Hardware Engineering Technical Reviews Via Incremental Development Such As Agile Methodologies. adhere To Guidance And Develop Program Documentation Including But Not Limited To Management Plans, Quality, Safety, Security, Reliability, Risk, Program Protection, Cybersecurity, Integration, Interoperability, Capability Roadmaps, Concept Of Operations (conops), Trade Studies, Cost, Schedule And Performance, Working Groups, Contract Execution, Development Oversight, And Reporting. develop And Maintain Operation Mission Plans/profiles (omps) Across Several Geographical Locations. flight And Ground Test Planning, Execution, And Analysis. software Engineering Releases (er), Formal Releases (fr), And Maintenance Releases (mr) To Support Material Release Of Capabilities For Technical Capability Declaration (tcd) And Operational Capability Baseline (ocb) Concurrence. support Radar Software Independent Verification And Validation (iv&v) At The Government’s Software Engineering Directorate (sed). 6. Engineering Support facilitate Maintenance Efforts Which May Include But Are Not Limited To: trade Studies hardware Obsolescence Studies hardware Redesign technology Insertion refurbishment Efforts. 7. Modeling And Simulation systems Engineering, Development, Maintenance, Test, Verification And Validation Of Real-time And Non-real-time Digital End-to-end Radar Models And Real-time Hwil Radar Driver For An/tpy-2. digital Radar Models And Hwil Driver Should Accurately Simulate And/or Stimulate Tactical An/tpy-2, While Maintaining The Fidelity Of Complex Radar Scenes Presented To The Model And Simulation. Complex Radar Scenes Typically Include Simple And Advanced Threats Comprised Of Multiple Objects And Scatterers, And The Effects As They Propagate Through An Air Picture. The Air Picture Captures Weather, Environmental, And Other Effects. Examples Include But Are Not Limited To Precipitation, Sky Noise, Tropospheric Effects, And Intercept Debris. Complex Radar Scenes May Also Incorporate Electronic Attack. model Development, Verification, Validation, And Accreditation Must Support Tactical Development, Test And Fielding In Accordance With The Mda Phased Implementation Plan And Integrated Master Test Plan. hwil Radar Drivers, Aligned To Tactical Radar Capabilities, Are Required For Development And Testing Of The Radar Software, And Are Required Early In The Radar Software Development Timeline Due To Increasingly Complex Radar Capabilities. Therefore, Hwil Radar Drivers Must Be Developed As Part Of The Agile Radar Development Cycle To More Closely Coordinate With Radar Development Efforts, And Must Be Integrated With The Hwil Radar Representation As Part Of The Development Cycle. due To Increasing Stakeholder Needs For Digital Radar Models Early In The Radar Software Development Cycle, Digital Radar Models, With Capabilities Aligned To Tactical Radar Software Releases, Are Required Along The Same Timeline As Radar Software Releases, To Include Radar Software Engineering Releases And Formal Releases. Therefore, Digital End-to-end Radar Models Should Utilize Wrapped Tactical Code (wtc) Methodology, As Applicable, Using Radar Software Source Code With Appropriate Interfaces To Operate In Both Real-time And Non-real-time As Either Standalone Models Or As Part Of Integrated System Simulations Such As End-to-end Digital Integrated System Simulation (ediss). models And Simulations Should Implement Tactical Messages And Interfaces That Integrate Into Interoperable Frameworks Such As The Osf For Ground Test Integrated System Simulation (gtiss) And Ediss. integration Of Digital Radar Models And Hwil Radar Drivers With Simulation Frameworks Such As The Osf For Gtiss And Ediss. maintenance And Test Of Cots Hardware Used By Digital Radar Models And Hwil Radar Drivers To Ensure Models Meet Cybersecurity And Performance Requirements Needed To Satisfy Intended Use Cases. development And Maintenance Of Current Applicable Cybersecurity Documentation For Each Radar Model In Order To Support Risk Management Framework (rmf) Authorization. Implement Applicable Cybersecurity Requirements And Solutions Into System Development Life Cycle (sdlc). development Of Rmf Package And Support Cybersecurity And Software Assurance (swa) Requirements And Activities For Each Radar Model. Provide Rmf Continuous Monitoring. development And Maintenance Of Radar Model Training Materials. Conduct As Needed, Hands-on Training To End-users And Stakeholders. support For Use Of Models And Simulations In Events, Including But Not Limited To The Following: performance Assessment warfighter Exercises And Training element Development And Verification tactical Software Verification Testing ground Test (gt) integrated Ground Test (gti) distributed Ground Test (gtd) continuous Digital Assessment (cda) tactical Evaluation tactical Performance Verification test And Operational Mission Plan Analysis & Development pairwise Testing flight Test Pre-mission Testing flight Test Spmt flight Test Element Pre-mission Analysis post-flight Reconstruction (pfr) And Satellite-pass Reconstruction system Post-flight Reconstruction (spfr) For Validation & Anchoring element Post-flight Reconstruction (epfr) For Validation & Anchoring continuous Development And Integration (cdi) And Opportunistic Test system Federated Verification Event (sfve) special Studies live And Hwil Events For Data Collection To Support Radar Fielding Decisions b. Production 1. Production Components hardware Production, Integration, Test, And Delivery Of Components And End Items To Mitigate Obsolescence, Increase End Item Quantities, And Provision Spares. Components And End Items Include, But Are Not Limited To: spares For Radar Components (including Gallium Nitride (gan) Transmit Receive Integrated Microwave Modules (trimms)) digital Receiver/exciter (drex) Upgrade Kits advanced Signal Processing Server/network Kits With Interconnection Kits an/tpy-2 Cooling Equipment Unit (ceu) Upgrade Kits baseline Upgrade: Heat Exchangers, Motor Controllers, And Associated Hardware an/tpy-2 Antenna Equipment Units (aeu) baseline Upgrade: Control Panel, Variable Frequency Drives, And Associated Hardware ac/dc Converters 2. Engineering Support maintenance And Sustainment Efforts Which Include, But Are Not Limited To: trade Studies hardware Obsolescence Studies hardware Redesign technology Insertion refurbishment Efforts 3. Systems Engineering redesign For Out-of-production Mitigation, Fabrication, Integration, Test (design Verification, Qualification, And Acceptance) Evaluation, Documentation, And Delivery Of Radar Hardware. Systems Engineering Includes Cost, Schedule, Technical, Performance, And Reliability Risk Management Processes To Mitigate Program And Schedule Risk. 4. Program Support configuration Management quality Assurance operations And Program Security Requirements missile Defense Agency Assurance Provisions (map) And Parts, Materials, And Processes Mission Assurance Plan (pmap); And Safety manufacturing Qualification Processes 5. Integrated Logistics component, Part, And End Item Marking And Tracking component And End Item Integration, Calibration, And Acceptance Testing sparing Strategy Development, Spare Production, And Spare Delivery management And Tracking Of Government Furnished Equipment/material 6. Program Management integrated Approach To Monitoring And Reporting Cost, Schedule, And Fiscal Status technical Reviews/technical Interchange Meetings integrated Product Team Organization, Inclusive Of Government Participation 7. Test Functions activities Necessary To Confirm Component And End Item Performance In Accordance With Requirements. Tests May Be Conducted At Government Owned Ranges And Test Facilities, In Addition To Contractor Owned Facilities. Tasks Are Conducted In Accordance With Department Of Defense And Other Government Regulatory Guidance. c. Operations And Sustainment 1. Radar Operation And Maintenance Support (at Multiple Sites) diagnose Hardware And Software Failures provide Software And Hardware Maintenance As Primary Maintainer For All Levels Of Maintenance 2. Radar Logistics Support establishment And Maintenance Of Permanently Deployed Site Support Team At Oconus Locations establishment And Maintenance Of Deployable Site Support Team At Conus Locations line Replaceable Unit (lru) Repair And Return provide Subject Matter Expertise (sme) To Depot When Required For Mei Refurbishments inventory Control And Management spares Management logistics Operations training Development And Delivery For Soldiers And Contractor Personnel world-wide Deployment, Transportation Coordination, Set-up, And Tear-down Of The An/tpy-2 Radar Fleet (both Forward-based And Terminal High Altitude Area Defense (thaad) Radars) 3. Sustaining Engineering support For All An/tpy-2 Radars To Facilitate Maintenance Efforts, Which May Include But Are Not Limited To Trade Studies And Analysis, Hardware Obsolescence Studies, Hardware Redesign, Technology Insertion, And Refurbishment Efforts. engineering Analysis And Studies sustainment Of Legacy Software Builds failure Review And Corrective Action System (fracas) mission Assurance/quality Support obsolescence Management obsolescence Forecasting obsolescence Mitigation Recommendations obsolescence Redesigns As Required fleet Retrofits As Required iii. Instructions For Submission a. Deadline respondents To This Rfi Are Invited To Prepare And Submit Responses, No Later Than 60 Calendar Days From The Release Date Of This Rfi. The Government Does Not Intend To Extend This Due Date. b. Required Documents 1. Executive Summary executive Summary (not To Exceed 5 Pages Or Slides, Excluding 1.d. Below) That Includes: a. A Summary Matrix Indicating Interest In Competing For One Or More Requirement Area Listed Above. b. Indication If The Respondent Possesses A Facility Clearance And To What Level. c. Descriptive Data: i. Company Name ii. Specify If Us Or Foreign Owned iii. Point Of Contact (poc) iv. Poc Address v. Poc Telephone And Fax Numbers vi. Poc E-mail Address vii. Duns Number viii. Cage Code And/or Tax Id Number ix. Business Size Standard And Applicable Naics Codes x. Socio-economic Category, If Applicable (e.g. Woman-owned Small Business, Hubzone Small Business; Etc.) d. Indicate Whether Government Furnished Technical Data Would Be Required In Order To Facilitate The Execution Of The Capabilities Identified In Response To This Rfi. List And Describe This Data (does Not Count Toward Page Limit For Executive Summary) e. Indicate Whether The Respondent Is Currently Performing As A Mda Teams Or Teams-next Prime Or Subcontractor (include Contract Name (s) And Number (s)). f. Recommend Break Out Of For Requirement Areas And Areas That Could Be Set-aside For Small Business g. Provide Existing Multiple Award Schedule (mas) Or Other Government-wide Requirement To Be Evaluated As A Possible Acquisition Strategy h. Provide Feedback Regarding Consolidation Or Break-out Of Requirements, Contract Type, And Areas That Would Be Accomplished Well Through Small Business Set Aside Versus Full And Open Competition. 2. White Paper for Each Major Requirement Area Identified Above In Which The Respondent Expresses Capability/interest, Submit A White Paper (not To Exceed 10 Pages) That Discusses Capabilities, Recommended Alternatives, Associated Non-recurring Engineering Costs, And Associated Risks And Mitigation Strategies. Note: Risk Mitigation Strategies Should Address: i. Development Or Improvement Of X-band Radar Capabilities And Hardware Including Experience, Manufacturing Processes, Integration Approaches, And Testing. ii. Production Of An/tpy-2 Radar System Components. Mitigation Of Any Production Learning Curve Impacts (trained Personnel, Maintenance, And Situational Awareness, Etc.). iii. Failure Examination And Root Cause Analysis Of Failed Weapon System Components. iv. Development Of Tactically-aligned An/tpy-2 Models On The Timeline Required v. Mitigation Of Any M&s Learning Curve Impacts 3. Capability Brief for Each Major Requirement Area Identified Above In Which The Respondent Expresses Capability/interest, Submit A Capability Brief Discussing (not To Exceed 30 Slides) The Respondent’s Capabilities To Perform The Requirement Area(s) Identified Above And Relevant Experience. The Brief Should Include: i. A Schedule Estimate Highlighting Initial Capability Delivery/availability. ii. If Your Response Addresses A Subset Of A Requirement Area Identified In The Executive Summary Versus The Entire Requirement, Address How Any Seams/gaps Would Be Mitigated. iii. Description Of Any Experience With Mda Mission Assurance Provisions (map) And Parts, Materials And Processes (pmp) Compliance. iv. Description Of Any Experience With Configuration Management Processes And Tools During Development And Production. v. Identification Of Any Software Capability Maturity Model Integration (cmmi) Designations 4. Data Requirements provide A Detailed List And Description Of Documentation Requirements For A Technical Library To Support Your Development Of A Future Competitive Proposal, Organized By Requirements Area Identified Above, Should Mda Compete Any Or All Of These Requirements. No Government Information Will Be Supplied In Conjunction With This Request For Information. 5. Small Business Considerations because One Objective Of This Rfi Is To Determine The Capability Of Small Business To Meet The Requirements Contained Herein, And To Inform The Acquisition Strategy With Regard To Setting Aside Any Future Acquisition For Small Businesses, Small Businesses Are Encouraged To Respond To This Request For Information For Those Areas Of The Listed Requirement In Which They Have An Interest. Mda Request The Following Information: the Prime Small Business Contractor Responding To This Rfi Must Include Their Past Experience In Managing Subcontractors On Similar Requirements, And If Applicable, Include Subcontractor Or Teaming Partners’ Past Experience Applicable To Requirements Specified In This Rfi. responsible Small Businesses Planning Teaming Arrangements To Meet The Support Requirements Listed Above Are Expected To Articulate The Portions Of Work That The Prime Small Business Intends To Perform As Well As Articulate The Portions That Subcontractors Or Teaming Partners (if Applicable) Will Perform. Responses Must Include Business Size And Business Socio-economic Category Of All Subcontractors Or Teaming Partners Identified To Perform Work Associated With The Naics For This Rfi. c. Additional Information proprietary Information Is Neither Sought Nor Desired By Mda. If Such Information Is Submitted, It Must Clearly Be Marked "proprietary" On Every Sheet Containing Such Information, And The Proprietary Information Must Be Segregated To The Maximum Extent Practicable From Other Portions Of The Response (e.g., Use An Attachment Or Exhibit). Respondents Are Responsible For Adequately Marking Propriety Information Contained In Their Response. The Government Intends To Use Third Party, Non-government (contractor) Support Personnel As Subject Matter Experts In The Review Of Responses Received, Including The Review Of Any Marked Or Unmarked Proprietary Information Provided. Appropriate Non-disclosure Agreements Have Been Executed Between The Third Party, Non-government (contractor) Support Personnel And The Government And Are On File With The Government. A Submission Of A Response To This Rfi Constitutes The Respondent’s Acknowledgement And Agreement That The Information Provided In The Response, Including Any Marked Or Unmarked Proprietary Or Source Selection Information, May Be Disclosed To These Third Party, Non-government (contractor) Support Personnel. d. Point Of Contact For Submissions questions Regarding This Announcement Shall Be Submitted In Writing By E-mail To The Contracting Officer. Submit All Questions No Later Than 30 Calendar Days From The Release Date Of This Rfi. Although The Government Will Attempt To Answer All Questions Submitted, The Government Is Under No Obligation To Answer Any Questions Submitted After 30 Calendar Days From The Release Date Of This Rfi. Verbal Questions Will Not Be Accepted. all Non-proprietary Questions And Answers Will Be Distributed Via E-mail To All Respondents. Validated Proprietary Questions And Answers Will Be Addressed With Individual Companies And Will Not Be Distributed Via E-mail. based On The Responses From Industry, Industry Days And One-on-ones May Be Scheduled In The Future. contracting Office Address: missile Defense Agency, Mda/snk building 5224, Martin Rd, Attn: Vbiii redstone Arsenal, Al, 35898, United States primary Point Of Contact: john Michael, Procuring Contracting Officer, Ground Sensors Contracts email: John.michael@mda.mil secondary Point Of Contact: kimberly Black, Procuring Contracting Officer, Ground Sensors Contracts email: Kimberly.black@mda.mil
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date9 Jan 2025
Tender AmountRefer Documents
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9||||||||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
type Of Contract (apr 1984)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The
fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This Contract.
required Rtat: 0180 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint Foreach Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ## (000)___ Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation:
a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under This Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such Prices Are Based On The
contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;rix Industries; Drawing Number ( ;28953; ) ;76-b10824-1; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
electronic Cont ;76-b10824-1; P/n, ;7rh 1680 016511835 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
electronic Cont ;rix Industries; Company Name , ;4900 Industrial Way, Benicia Ca 94510-1006; Address , ;28953; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 3 Million (USD 51.7 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Sapang) 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of Three Million Pesos (3,000,000.00) Being The Abc To Payments Under The Contract For Rehabilitation/reconstruction Of Road (bargy. Sapang)/ Itb-2025-odpap-04. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Sapang) Completion Of The Works Required 180 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2024, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2024, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Sapang). With Project Identification Number Itb-2025-odpap-04. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 3,000,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until May 19, 2025, Monday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road (bargy. Sapang) 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Rehabilitation/reconstruction Of Road (bargy.sapang) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 60,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 150,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until May 19, 2025, Monday (150 C.d.) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.8 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. Pinanggaan 1. The Municipality Of Jaen, Through The Special Education Fund Cy 2024 Intends To Apply The Sum Of Three Million Seven Hundered Thousand Pesos (3,700,000.00) Being The Abc To Payments Under The Contract For Rehabilitation / Reconstruction Of Road Brgy. Pinanggaan/itb-2025-20% Df-01. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Rehabilitation / Reconstruction Of Road Brgy. Pinanggaan. Completion Of The Works Required 150 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Rehabilitation/reconstruction Of Road Brgy. Pinanggaan. With Project Identification Number Itb-2025-20% Df-01. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 3,700,000.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until May 19, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road Brgy. Pinanggaan. 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project Rehabilitation/reconstruction Of Road Brgy. Pinanggaan. 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 74,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 185,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until May 19, 2025 (150 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Date20 Feb 2025
Tender AmountRefer Documents
Details: This Sources Sought Notice Is For Planning Purposes Only And Shall Not Be Considered As An Invitation For Bid, Request For Quotation, Request For Proposal, Or As An Obligation On The Part Of The Government To Acquire Any Products And/or Services. Your Response To This Sources Sought Notice Will Be Treated As Information Only. No Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise Because Of Contractor Submission Of Responses To This Announcement Or The Government Use Of Such Information. This Request Does Not Constitute A Solicitation For Proposals Or The Authority To Enter Negotiations To Award A Contract. No Funds Have Been Authorized, Appropriated, Or Received For This Effort. the Information Provided May Be Used By The Department Of Veterans Affairs In Developing Its Acquisition Approach, Statement Of Work/statement Of Objectives And Performance Specifications. Interested Parties Are Responsible For Adequately Marking Proprietary Or Competition Sensitive Information Contained In Their Response. The Government Does Not Intend To Award A Contract Based On This Sources Sought Notice Or To Otherwise Pay For The Information Submitted In Response To This Sources Sought Notice. the Submission Of Pricing, Capabilities For Planning Purposes, And Other Market Information Is Highly Encouraged And Allowed Under This Sources Sought Notice In Accordance With (iaw) Far Part 15.201(e). the Purpose Of This Sources Sought Notice Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), Hubzone And Other Small Businesses Interested And Capable Of Providing The Products And/or Services Described Below. documentation Of Technical Expertise Must Be Presented In Sufficient Detail For The Government To Determine That Your Company Possesses The Necessary Functional Area Expertise And Experience To Compete For This Acquisition. Responses To This Notice Shall Include The Following: (a) Company Name; (b) Address; (c) Point Of Contact; (d) Phone, Fax, And Email; (e) Uei Number; (f) Cage Code; (g) Tax Id Number; (h) Type Of Small Business, E.g., Services Disabled Veteran Owned Small Business, Veteran Owned Small Business, 8(a), Hubzone, Women Owned Small Business, Small Disadvantaged Business, Or Small Business Hubzone Business, Etc.;
(i) State If Your Business Has An Fss Contract With Gsa, Va Nac, Nasa Sewp, Or Any Other Federal Contract, That Can Be Utilized To Procure The Requirement Listed Below And Provide The Contract Number; And (j) Must Provide A Capability Statement That Addresses The Organization S Qualifications And Ability To Perform As A Contractor For The Work Described Below. requirement: the Va Heartland Network 15 Contracting Office Located At 3450 South 4th Street, Leavenworth, Ks, 66048-5055 Is Seeking Potential Qualified Contractor To Provide Maintenance And Support On The Dss Rx Pyxis Inpatient Vista Interface To The Va St. Louis Healthcare System, Jefferson Barracks Pharmacy And John Cochran Pharmacy Locations. the North American Industry Classification System Code (naics Code) Is 541519 (other Computer Related Services), Size Standard Of $34million. Based On This Information, Please Indicate Whether Your Company Would Be A Large Or Small Business And Have A Socio-economic Designation As A Small Business, Vosb Or Sdvosb. important Information: the Government Is Not Obligated To, Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Source Sought Synopsis Request. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To An Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Currently A Total Set-aside For Service-disabled Veteran Owned Small Business Firms Is Anticipated Based On The Veterans Administration Requirement With Public Law 109-461, Section 8127 Veterans Benefit Act. However, If Response By Service-disabled Veteran Owned Small Business Firms Proves Inadequate, An Alternate Set-aside Or Full And Open May Be Used. responses To This Notice Shall Be Submitted Via Email To Maria Riza Owen At Maria.owen2@va.gov. Telephone Responses Will Not Be Accepted. Responses Must Be Received No Later Than Thursday, February 20, 2025, At 1:00pm Cst. If A Solicitation Is Issued It Shall Be Announced At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Responses To This Sources Sought. Responses To This Source Sought Notice Are Not A Request To Be Added To A Prospective Bidders List Or To Receive A Copy Of The Solicitation.
notice To Potential Offerors: All Offerors Who Provide Goods Or Services To The United States Federal Government Must Be Registered In The System For Award Management (sam Located On The Web At Www.sam.gov). Additionally, All Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Who Respond To A Solicitation On This Project Must Be Registered With The Sba Vetcert At Https://veterans.certify.sba.gov/ statement Of Work
dss Rx Pyxis Inpatient Vista Interface Maintenance And Support Services
st. Louis Va Healthcare System i. General Information (a) Service Agreement: The Va St. Louis Health Care System Is Requesting To Establish A Service Contract For Maintenance And Support On The Dss Rx Pyxis Inpatient Vista Interface Located At Jefferson Barracks Pharmacy In Clinic Building 55 And John Cochran Pharmacy Locations. the St. Louis Facilities Are Located At: va St. Louis Healthcare System John Cochran Division 915 N. Grand Blvd. St. Louis, Mo 63106 va St. Louis Healthcare System Jefferson Barracks Division 1 Jefferson Barracks Dr. St. Louis, Mo 63125 (b) Scope Of Work: The Contractor Shall Supply All Labor, Travel, Materials, Equipment, Tools, Supervision, And All Incidentals Required To Complete Software Subscription Maintenance And Support Of The Equipment In The Following List: item
manufacturer
part Number
location
1
document Storage Systems Inc. Dssrx-pyxis Logistics-va-pl
va St. Louis Health Care System
2
document Storage Systems Inc.
dssrx-pyxis Logistics-va-pl-am
va St. Louis Health Care System
3
document Storage Systems Inc.
dss-inst-r
va St. Louis Health Care System this Work Will Be Completed In Accordance With Manufacturer S Recommendations, Joint Commission Standards, Design Specifications, And The Specifications, Terms, And Conditions Of This Contract. (c) Background: This Contract Is Issued To Ensure The Continuous Reliability Of The Rx Framework On The Dss Pyxis Inpatient Vista Interface Software And Ancillary Equipment Identified In The Statement Of Work. The Equipment Is Critical For Continuous Pharmacy Procedures At All Va Medical Centers Within The Visn And The Reliable And Accurate Operation Of The Equipment At All Times Is Considered Critical To
the Health Of Patients. (d) Performance Period: The Contractor Shall Begin The Work Required Under This Sow Commencing With The Effective Date Of August 10, 2025, Unless Otherwise Directed By The Contracting Officer (co) And Shall Provide Continuous Service Until The Date Of Contract Expiration. The Contract Would Be For One Year With Renewal Options For An Additional Four Years. (e) Type Of Contract: Firm-fixed-price (f) Extension Of Contract: This Contract May Be Extended In Accordance With Far Clause 52.237-3 Continuity Of Services, In Order To Transition The Services To A Successor. ii. Equipment To Be Serviced each Of The Following Items Is To Be Serviced In Accordance With The Specifications, Terms And Conditions Of This Contract: item
manufacturer
part Number
location
1
document Storage Systems Inc. Dssrx-pyxis Logistics-va-pl
va St. Louis Health Care System
2
document Storage Systems Inc.
dssrx-pyxis Logistics-va-pl-am
va St. Louis Health Care System
3
document Storage Systems Inc.
dss-inst-r
va St. Louis Health Care System iii. Services To Be Provided the Contractor Shall Provide Software Support Services, Including Emergencies, On The Dss Rx Pyxis Framework. (a) Summary Of Services a. Software Subscription Maintenance And Support i. M-f 8a-7p Est
ii. Includes Bug Fixes B. Minor Release Upgrades C. Telephone Support (b) Parts the Contractor Shall Have Ready Access To All Parts, Including Unique And/or High Mortality Replacement Parts. All Parts Supplied Shall Be Compatible With Existing Equipment. The Contract Shall Include All Parts Except -if Applicable - Those Parts Specifically Listed As Being Excluded. The Contractor Shall Use Only New Original Equipment Manufacturer (oem) Or Oem-approved Parts. All Parts Shall Be Of Current Manufacture And Have Complete Versatility With The Presently Installed Equipment. All Parts Shall Perform Identically To The Original Equipment Specifications. Parts Removed From Another System, Rebuilt And/or Used, Shall Not Be Installed Without Specific Approval By The Contracting Officer And The Contracting Officer S Representative (cor). All Defective Parts Replaced Become The Property Of The Contractor, Unless Otherwise Specified By The Co, Cor Or Alternate Cor. no Excluded Parts Are Listed. (c) Service Manuals/tools/equipment a. The Va Shall Not Provide Tools, Test Equipment, Service Manuals Or Service Diagnostic Software To The Contractor. Contractor Shall Obtain, Have On File, And Make Available To Its Fse All Operational And Technical Documentation (such As Operational And Service Manuals, Schematics And Parts List) Which Are Necessary To Meet The Performance Requirements Of This Contract. The Location And Listing Of The Service Manuals, By Name And/or The Manuals Themselves Shall Be Provided To The Co Upon Request. b. The Contractor Shall Provide The Cor, Pharmacy Manager, And The Biomedical Engineering Shop Supervisor Copies Of All Documentation That Pertains To Any Software Upgrade Or Repair. c. Copies Of The Latest Version(s) Of All Documentation And Licensing Agreements, Which Shall Include Operation, Service And Diagnostic Software. The Cor Shall Have Access To The Same Operation, Service, Diagnostic Software, And Documentation As The Oem's Fse. Contractor Shall Provide To The Cor Oem Service Bulletins For The Equipment Covered Under This Contract. All Documentation And Service Bulletins, Etc. Shall Be Provided Within 30 Days Of Award In Either Hard Copy Or Electronic Format. Any Future Service Bulletins Generated During The Contract Period Shall Be Provided To The Cor Within 30 Days Of Receipt In Either Hard Copy Or Electronic Format. (d) Services Not Covered By Contract co Or Cor Authorization For Any Work Outside The Scope Of This Contract Must Be Received Prior To Performance Of Work Or Payment Will Not Be Authorized. (e) Removal Of Equipment approval From The Co Must Be Obtained Before Removing Any Equipment From The Va Medical Facility. No Transportation Charges Will Be Allowed For Either The Repairperson Or Equipment To Or From The Contractors Facility. The Contractor Will Be Responsible For All Damage Or Loss Of Equipment. A Loaner Of The Same Type And Functionality Of The Equipment Removed, If Required, Shall Be Furnished, Installed And Made Fully Operational By The Contractor Without Additional Cost. iv. Condition Of Equipment all Equipment Is Currently Fully Operational Per Required Standards. The Contractor Will Be Provided An Opportunity To Visit The Va Medical Centers, Examine The Equipment, And Note In Writing To The Co Any Condition Which May Affect The Contractor S Performance Of This Contract. With The Exception Of Any Conditions So Noted The Contractor Accepts Responsibility For The Equipment Described In Section Ii In "as Is" Condition. Failure To Inspect The Equipment Prior To Contract Award Will Not Relieve The Contractor From Performance Of The Requirements Of This Contract. v. Definitions/acronyms a. Co Contracting Officer, Network Contracting Office (nco) 15.
b. Cor Contracting Officer S Representative Appointed Under The Contract.
c. Esr - Engineering Service Report - Documentation Provided By The Vendor Of The Services Rendered For Each Incidence Of Work Performance Under The Terms And Conditions Of The Contract.
d. Fse - Field Service Engineer - A Person Who Is Authorized By The Contractor To Perform Maintenance (corrective And/or Preventive) Services On The Avahcs Premises.
e. Nfpa - National Fire Protection Association.
f. Oem Original Equipment Manufacturer.
g. Osha Occupational Safety And Health Administration.
h. Pm - Preventive Maintenance Inspection. Services Which Are Periodic In Nature And Are Required To Maintain The Equipment In Such Condition That It May Be Operated In Accordance With Its Intended Design And Functional Capacity With Minimal Incidence Of Malfunction Or Inoperative Conditions.
i. Unscheduled Repairs Emergency Services Required To Restore Equipment To Working Condition Outside Normal Hours Of Coverage.
j. Ul Underwriter S Laboratories vi. Conformance Standards contractor Shall Ensure That The Equipment Functions In Conformance With The Latest Published Edition Of The Applicable Standards; Including But Not Limited To Joint Commission, Nfpa-99, Ul, Osha, Va, Cdrh, Etc. And The Manufacturer's Performance Standards/ Specifications As Used When The Equipment Was Originally Procured And That Any Upgrades/updates Will Meet The Stated Standards/specifications. vii. Hours Of Coverage a. The Contractor Will Provide All Required Services Within The Normal Business Hours (8:00 Am To 7:00 Pm (est) M-f). b. All Services Shall Be Performed During These Normal Hours Of Coverage Unless One Of The Following Conditions Exists:
i. The Contractor Wishes To Furnish Services At A Time That Is Outside Of The Normal Hours Of Coverage, At No Additional Cost To The Government, The Contractor Submits A Request To The Cor Prior To The Proposed Start Of The Work And The Request Is Approved In Writing By The Cor Before Work Is Begun.
ii. The Cor Directs That The Services Be Furnished At A Time That Is Outside The Normal Hours Of Coverage And The Additional Cost Is Recommended By The Cor And Authorized By The Co. c. Work Performed Outside The Normal Hours Of Coverage Must Be Preapproved By The Co, Cor Or Alt Cor. The Contractor Will Provide A Written Estimate Of The Charges Prior To Approval Of The Work. d. Work Performed Outside The Normal Hours Of Coverage At The Request Of Fse/contractor Shall Be Considered Service Performed During Normal Hours Of Coverage. e. There Will Be No Additional Charge For Time Spent Waiting At The Site During Or After The Normal Hours Of Coverage For Delivery Of Parts. note: Hardware/software Update/upgrade Installations Shall Be Scheduled And Performed During Normal Hours Of Coverage At No Additional Charge To The Government. viii. Federal Holidays Observed By The Va Medical Center new Year S Day,
martin Luther King, Jr. Day,
president S Day (washington S Birthday),
memorial Day,
juneteenth Day
independence Day,
labor Day,
columbus Day,
veterans Day,
thanksgiving Day,
christmas Day,
and Any Other Day Specifically Designated By The President Of The United States. xi. Documentation/reports no Later Than Seven (7) Business Days After The Conclusion Of Any Maintenance Or Repair The Contractor Will Provide To The Cor Or Alt Cor A Signed Detailed Service/inspection Report Listing All Devices, All Repairs For Each Device, Parts Used To Maintain Or Repair The Devices And Operating Efficiency Of The Devices. The Service/inspection Report Shall Contain, At A Minimum, The Following Information:
(a) Date And Time Of The Technician S Arrival On Station.
(b) Type, Model, And Serial Number(s) Of All Equipment On Which Maintenance Was Performed.
(c) Total Time Spent Performing Maintenance (exclusive Of Any Travel Time).
(d) Detailed Narrative Description Of Work Performed.
(e) Complete List Of Parts Replaced.
(f) Comments As To The Cause Of The Malfunction When Applicable
(g) Date And Time The Repair/preventive Maintenance Was Completed. x. Security Requirements upon Arrival At The Va Medical Center, All Contractor Personnel Shall Be Required To Report To The Va Medical Center Police For A Temporary Id And Then To The Cor For Check-in. This Check-in Process Is Mandatory. When The Service Is Completed, The Personnel Shall Be Required To Check Out With The Cor, Biomedical Engineering Shop Supervisor Or Pharmacy Manager. The Contractor's Field Service Employee Shall Wear Visible Identification At All Times While On The Premises Of The Va Medical Center. xi. Competency Of Contractor Personnel a. The Contractor Must Have An Established Business, With An Office And Full-time Staff. The Staff Includes A "fully Qualified" Fse And A "fully Qualified" Fse Who Will Serve As The Backup. b. Fully Qualified" Is Based Upon Training And Experience In The Field. For Training, The Fse(s) Must Have Successfully Completed A Formal Oem Certified (or Equivalent) Training Program For All Equipment To Be Maintained And All Equipment To Be Utilized In The Performance Of The Contract. For Field Experience, The Fse(s) Must Have A Minimum Of Two Years Of Experience In The Installation, Calibration, Maintenance And Repair Of The Specific Equipment Identified In Section Ii. c. All Work Shall Be Performed By "fully Qualified" Competent Fses. The Contractor Shall Provide Written Assurance Of The Competency Of Their Personnel And A List Of Credentials Of Approved Fses. The Co May Authenticate The Training Requirements By Request Training Certificates Or Credentials From The Contractor At Any Time For Any Personnel Who Are Providing Services. The Co And/or The Cor Or Alt Cor Specifically Reserve The Right To Reject Any Of The Contractor's Personnel And Refuse Them Permission To Work On Equipment. d. If Subcontractor(s) Are Used, They Must Meet The Same Competency Standards As Contractor Personnel And Be Preapproved By The Co. The Contractor Shall Submit Any Proposed Change In Subcontractor(s) To The Co For Approval Or Disapproval. xii. Exposure To Blood Borne Or Infectious Material there Is A Potential For Exposure To Blood Borne Or Other Infectious Material With Equipment Throughout The Medical Centers. All Maintenance Persons Must Use The Universal Precautions (i.e. Decontamination Of Medical Equipment, Wearing Protective Gloves, Aprons And Goggles) During Cleaning And Maintenance/repair Procedures. xiii. Test Equipment the Contractor Shall Provide The Cor Or Alt Cor With A Copy Of The Current Calibration Certification Of All Test Equipment Which Is To Be Used By The Contractor In The Performance Of This Contract. Test Equipment Calibration Shall Be Traceable To A National Standard. xiv. Identification, Parking, Smoking And Va Regulations a. Contractor S Personnel Shall Wear Visible Identification at All Times While On The Premises Of The Va. Identification Shall Include, As A Minimum, The Employee S Name, Position, And The Contractor S Trade Name. b. It Is The Responsibility Of The Contractor To Park In The Appropriate Designated Parking Areas. Information On Parking Is Available From Va Police Service. Va Will Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor Under Any Conditions. c. Possession Of Weapons Is Prohibited. Enclosed Containers, Including Tool Kits, Shall Be Subject To Search. Violations Of Va Regulations May Result In Citation Answerable In The United States (federal) District Court, Not Local District, State Or Municipal Court. d. Smoking Is Prohibited Inside All Va Buildings And On All Va Premises. e. Possession Of Weapons Is Prohibited. Enclosed Containers, Including Tool Kits, Shall Be Subject To Search. Violations Of Va Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State Or Municipal Court.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 2 Million (USD 34.5 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla) 1. The Municipality Of Jaen, Through The Other Development Programs And Projects Cy 2025 Intends To Apply The Sum Of Two Million Pesos (2,000,000.00) Being The Abc To Payments Under The Contract For Rehabilitation/reconstruction Of Road (bargy. Langla)/ Itb-2025-odpap-02. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla) Completion Of The Works Required 120 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2025, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2025, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road (bargy. Langla). With Project Identification Number Itb-2024-odpap-02. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 2,000,000.00 2.2.the Source Of Funding Is: Other Development Programs And Projects Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until April 19, 2025, Saturday. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road (bargy. Langla) 2.2 The Funding Source Is: The Other Development Programs And Projects Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project: Rehabilitation/reconstruction Of Road (bargy. Langla) 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 40,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 100,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until April 19, 2025, Saturday (210 C.d.) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2025, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2025, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
Municipality Of Jaen, Nueva Ecija Tender
Civil And Construction...+1Road Construction
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 4.3 Million (USD 74.2 K)
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipal Government Of Jaen Bids And Awards Committee December 19, 2024 Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo 1. The Municipality Of Jaen, Through The 20% Development Fund Cy 2025 Intends To Apply The Sum Of Four Million Three Hundered Thousand Pesos (4,300,000.00) Being The Abc To Payments Under The Contract For Rehabilitation / Reconstruction Of Road Brgy. San Pablo/itb-2025-20% Df-02. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Jaen Now Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo. Completion Of The Works Required 180 Calendar Days. Bidders Should Have Completed, Within The Last Ten (10) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Of The Local Government Unit Of Jaen And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00 Pm, Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On December 19, 2024 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 9, 2024, 01:30 Pm At The Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 8. Bid Opening Shall Be On January 9, 2024, 02:00 Pm At Bac Office, 2nd Floor, Municipal Hall Building, Brgy. Sapang, Jaen Nueva Ecija. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. The Municipality Of Jaen Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Municipality Of Jaen Anthony S. De Luna Bac Secretariat Municipal Hall Building Brgy. Sapang, Jaen Nueva Ecija December 19, 2024 Medel J. Lopez Bac Chairman 1.scope Of Bid The Procuring Entity, Municipality Of Jaen Invites Bids For The Invitation To Bid For Rehabilitation/reconstruction Of Road Brgy. San Pablo. With Project Identification Number Itb-2025-20% Df-02. 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Year 2024 In The Amount Of P 4,300,00.00 2.2.the Source Of Funding Is: 20% Development Fund Cy 2025 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1.only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.the Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3.for Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4.the Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7.subcontracts A.subcontracting Is Not Allowed. 8.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 9.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3.a Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4.a List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5.a List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 10.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 12.bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 13.bid And Payment Currencies 14.1.bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2.payment Of The Contract Price Shall Be Made In: A.philippine Pesos. 14.bid Security 15.1.the Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2.the Bid And Bid Security Shall Be Valid Until June 18, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit Two Copies Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 18.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3.in All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 19.post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20.signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 1 The Procuring Entity Is The Municipality Of Jaen The Name Of The Contract Is:rehabilitation/reconstruction Of Road Brgy. San Pablo. 2.2 The Funding Source Is: The 20% Development Fund Cy 2025 Of Jaen, Nueva Ecija The Name Of The Project Rehabilitation/reconstruction Of Road Brgy. San Pablo. 3 No Further Instructions 5.1 Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2 The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.4 No Further Instructions 6 No Further Instructions 7.1 “subcontracting Is Not Allowed” 10.1-10.2 The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4 No Further Instructions. 10.5 A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 14.2 “no Further Instructions.” 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than P 86,000.00 , If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less P 215,000.00 If Bid Security Is In Surety Bond. 15.2 Bids Will Be Valid Until June 18, 2025 (180 C.d..) 16 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. 17 The Address For Submission Of Bids Is The Chairperson, Bids & Awards Committee, Thru Bac Secretariat At 2nd Floor Municipal Building, Sapang, Nueva Ecija. The Deadline For Submission Of Bids Is On January 9, 2024, 01:30 Pm At 1:30 P.m. 18.1 The Place Of Bid Opening Is 2nd Floor Bac Office, Municipal Building, Sapang, Nueva Ecija. The Date And Time Of Bid Opening Is January 9, 2024, 01:30 Pm At 02:00 P.m. 19 Bid Modification Is Not Allowed. 19.3 No Further Instructions. 20.21 Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use, One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post Qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons.
9141-9150 of 9256 archived Tenders