Transportation Tenders

Transportation Tenders

Philippine National Oil Company - PNOC Tender

Civil And Construction...+3Electrical and Electronics, Solar Installation and Products, Water Storage And Supply
Corrigendum : Closing Date Modified
Philippines
Details: Description Terms Of Reference 1. Project Description The Philippine National Oil Company (pnoc), Under Its Three Arrows Strategy, Is Revolutionizing Sustainable Energy Solutions By Spearheading Rooftop Solar Power Projects For Various Government Buildings. This Initiative Supports The Government's Strategy To Reduce Its Dependence On International Fuel Markets And Promote Renewable Energy Use. In Line With The Inter-agency Energy Efficiency And Conservation Committee (iaeecc) Resolution Of 07 July 2023, Government Entities, Including Government-owned And Controlled Corporations (goccs), State Universities And Colleges (sucs), And Local Government Units (lgus), Are Mandated To Install At Least 20% Of Their Electricity Requirements From Solar Photovoltaic (pv) Systems Or Equivalent Renewable Energy Technologies Within Three Years. Additionally, This Project Aligns With The Government Energy Management Program (gemp), Which Encourages A Minimum 10% Reduction In Electricity Consumption Across All Government Entities. By Ensuring Zero Export Of Energy To The Distribution Grid, This Forward-thinking Project Not Only Reduces Costs But Also Elevates Environmental Stewardship, Setting A New Standard For Green Energy In The Public Sector. Pnoc Invites Submissions From Reputable Organizations (referred To As "the Contractor") Capable Of Providing A Comprehensive Turnkey Solution Encompassing Engineering, Procurement, Construction, Commissioning, And Testing And Commissioning, And One-year Operations And Maintenance (referred To As "epctc") For The Project. The Project Shall Be Named “supply, Delivery, Installation, Testing And Commissioning Of 25kwp Solar Pv Rooftop System At Carmona Water District Admin Building”. The Project Site Is Located At Cityland Subdivision, Brgy. Carmona, Cavite. 2. Objectives Of The Contract The Intent Of The Terms Of Reference Is To Provide The General And Technical Requirements Necessary For The Implementation Of The Project. However, It Is The Contractor’s Obligation To Investigate And Validate All Information Herewith As Part Of Their Work To Be Undertaken. Thus, Any Discrepancies In The Tor In Accordance With Applicable And Generally Accepted Engineering And Construction Practices, Government Rules And Regulation And The Latest Industry Codes And Standards For Solar Pv Development Shall Not Relieve The Contractor Of The Accuracy Of Their Work. A. Define Project Scope: Clearly Outline The Scope Of Work For The Turnkey Epc (engineering, Procurement, And Construction) Contractor, Including Project Preparation, Procurement, Installation, Construction, Testing, Commissioning, And Operation And Maintenance (o&m). B. Establish Deliverables: Specify The Required Deliverables, Including Documentation, Performance Guarantees, And O&m Plans, To Ensure Comprehensive Project Execution And Accountability. C. Set Performance Standards: Provide Criteria For The Performance And Quality Of The Solar Pv Systems, Ensuring They Meet Industry Standards And Regulatory Requirements. D. Detail Compliance Requirements: Ensure The Epc Contractor Adheres To All Relevant Local, National, And International Regulations And Standards, Promoting Safety, Reliability, And Environmental Responsibility. E. Specify Evaluation Criteria: Establish The Criteria For Selecting The Epc Contractor, Focusing On Experience, Technical Expertise, Financial Stability, And The Quality Of The Proposed Solutions. F. Ensure Zero Export Compliance: Mandate That The Solar Pv Systems Operate With Zero Export To The Distribution Grid, Ensuring On-site Energy Optimization And Compliance With Regulatory Requirements. G. Provide Maintenance Guidelines: Include A Comprehensive One-year O&m Plan To Ensure The Longevity, Efficiency, And Optimal Performance Of The Installed Solar Pv Systems. H. Promote Transparency And Reporting: Require Regular Progress Reports From The Epc Contractor To Pnoc, Detailing Project Milestones, Challenges, And Resolutions, Fostering Transparency And Effective Project Management. 3. Approved Budget For The Contract (abc) Pnoc Has An Approved Corporate Budget In The Amount Of One Million Three Hundred Fifty Thousand Pesos (php 1,350,000.00) For The Project. 4. Scope Of Works The Scope Of Work For The Contractor Includes: 4.1. Project Preparation The Contractor Shall Facilitate All Preliminary And General Works On Time So That Any Issues Or Problems Encountered Can Be Addressed. If The Contractor Fails To Timely Execute The Works, Then Any Delays Due To Pending Issues And Problems Shall Be Of The Contractor’s Account. ● Kick-off Meeting The Contractor Shall Schedule A Kick-off Meeting No Later Than Ten (10) Calendar Days Starting From The Date Of Commencement As Stated In The Ntp. The Kick-off Meeting Shall Be Held At Site To Discuss Mobilization And Construction Schedules And Other Details Necessary Prior Project Execution. All Key Personnel Must Be Available During The Kick-off Meeting. ● Mobilization The Contractor Shall Facilitate The Mobilization Of Manpower And Equipment, Including Operating Supplies And Tools Necessary For The Project Immediately After The Kick-off Meeting. ● Temporary Facilities And Storage/staging Area The Contractor Shall Be Provided With A Temporary Headquarters Immediately After The Kick-off Meeting. The Location Of The Headquarters And Storage/staging Area Shall Be Determined With The Consent Of The Building Owner. ● Site Survey And Assessment The Contractor Shall Undertake Its Own Site Survey, Verification, And Assessment, Including Actual Measurements Of Voltage, Current, Frequency And Power Quality For A Period Of Seven (7) Calendar Days Upon Mobilization, Identification Of Access, Etc., To Identify All Necessary Information About The Site Conditions And Design Parameters. Additionally, The Contractor Shall Perform An Energy Yield Assessment To Estimate The Potential Solar Energy Generation In The Installation Site The Assessment Shall Also Include The Condition Of Roof And Existence Of Roof Leaks, And The Safety And Reliability Of The Existing Electrical System(s) And The Whole Installation, And Maintenance Concerns. All Findings And Necessary Engineering Intervention Shall Be Incorporated In The Detailed Project Designs And Engineering Plans And Shall Be Properly Addressed During Construction. ● Permits And Clearances The Contractor Shall Secure The Construction Permit, Safety Permit, Building Permit And Other Approvals, Clearances, And Licenses Necessary Prior To The Start Of Construction And Installation. The Contractor Shall Also Secure Necessary Permits/documents As Required By The Distribution Utility For The Installation Of The Rooftop Solar Pv System On The Installation Site. ● Detailed Project Designs And Engineering Plans The Contractor Shall Submit Detailed Project Designs And Engineering Plans No Later Than Ten (10) Calendar Days Starting From The Date Of Commencement Stated In The Ntp. The Detailed Project Designs And Engineering Plans Must Reflect All Additional Requirements And Information Needed Based On The Reviewed Preliminary Design Drawings. The Detailed Project Designs And Engineering Plans Shall Be Furnished Using Engineering Standard Templates, Adequate, Readable And Must Be Written In English. The Contractor Must Use Computer-aided Design And Drafting Software (cad) Or Equivalent. Likewise, Electronic Components With Built-in Programs And Software Shall Be Accompanied By Their Corresponding Programs And Ladder Logic Diagrams For Submission To Pnoc Prior To The Installation Of The Systems. The Detailed Project Designs And Engineering Plans Shall Be Signed And Sealed By Professional Engineers (electrical And/or Civil/structural Engineer), And Pnoc And Building Owner’s Authorized Representatives. Pnoc Shall Have The Right To Require The Contractor Additional Drawings Or Information As May Be Necessary. The Minimum Number Of Original Copies To Be Produced By The Contractor Shall Be 3 Sets Of A3 Size And 2 Electronic Copies Containing Cad And Pdf Files, As An Advance Copy. The Contractor Must Also Submit A Hard Copy As An Official Document. Pnoc Reserves The Right To Reproduce Any Drawings Or Documents Received From The Contractor As May Be Necessary. To Avoid Revisions, The Contractor May Submit First Draft Drawings Or E-file Via Email Before Printing The Detailed Project Designs And Engineering Plans. 4.2. Procurement The Contractor Shall Be Responsible For The Procurement Of All Equipment And Construction Materials, Including Consumables, Necessary To Complete The Project. All Delivered Equipment And Construction Materials, Including Consumables, Shall Be Subject To Testing And Inspection By Pnoc. Testing And Inspection Includes Visual Checking, Measurement, Validation Of Specifications (in The Nameplates) And Other Applicable Testing Methods As Deemed Necessary. Pnoc Shall Release A Materials Inspection Report (mir) For The Findings Of The Inspected Materials. Any Damage Or Deficiency Shall Be Rectified Or Replaced By The Contractor Without Additional Charges To Pnoc. ● Equipment And Construction Materials The Contractor May Source All Equipment And Construction Materials, Including Consumables Locally Or Abroad Provided These Shall Conform To The Required Design Specifications And Standards. In Case Of Changes In The Source Of Supply Or Brand, The Contractor Shall Submit A Letter Of Request Stating The Reasons For The Changes For Pnoc’s Review And Approval. ● Factory Acceptance Test (fat) The Contractor Must Provide Any Proof That The Manufacturer’s Factory Or Fabricator’s Shop Has Passed The Fat For The Solar Panels And Inverters. All Related Testing Expenses Shall Be Of The Contractor’s Account. Receipt And Acceptance Of The Certified Test Reports And Inspection & Testing Certificate By Pnoc Shall In No Way Relieve The Contractor Of Its Responsibility. ● Handling And Delivery The Contractor Shall Perform Proper Packing, Loading, Transportation, Hauling And Unloading Of Equipment In Accordance With The Manufacturer's Standards And Recommendations. All Duties And Taxes Including Export Permits And Clearances, Insurances And Warranties Shall Be Of The Contractor’s Account. The Equipment And Construction Materials Shall Be Delivered Directly To The Project Site(s). The Contractor Shall Secure Handling And Delivery Manuals From The Manufacturer. The Contractor Shall Notify Pnoc For All Incoming Materials And Submit Delivery Receipt Upon Delivery For Inspection And Acceptance By Pnoc Prior To Installation. All Equipment Shall Be Delivered Unbroken, Not Deformed And Without Cracks And Scratches. In General, The Packaging Of The Equipment Shall Be Based On Generally Accepted Industry Practices Or Standards. Packaging Shall Be Adequate To Prevent Damage From Any Mechanical Stresses That May Occur And To Ensure Safety During Loading, Hauling, Unloading, Unpacking And Storage. Boxes Shall Contain Barcode Sheet/label Showing The Following Information: ✔ Name Of The Manufacturer; ✔ Model Number; ✔ Code No./serial Number; ✔ Product Barcode; And ✔ Manufacturing Date. ● On-site Storage The Contractor Shall Perform On-site Storage Of Equipment And Construction Materials In Accordance With The Manufacturer's Standards And Recommendations. Equipment Shall Be Placed At The Designated Storage/staging Area. The Contractor Shall Secure Equipment On-site Storage Manuals From The Manufacturer. 4.3. Installation And Construction The Contractor Shall Provide All Consumables, Tools, Equipment, And Manpower, Including Ppe, Necessary To Perform The Necessary Works. The Contractor Shall Only Be Allowed To Work At The Designated Area Agreed Upon With Pnoc To Avoid Any Interruptions To The On-going Operations And Activities At The Site. In Case Of Concrete Drilling Or Breaking, The Contractor Must Ensure That Such Work Shall Not Compromise The Integrity Of The Existing Structures. In The Case Of Painting, Appropriate Painting Shall Be Used For The Structures To Be Painted In Accordance With Applicable Standards. The Painting Shall Be Done With A Primer And Topcoat As A Minimum. In The Case Of Earthworks And Concreting, It Shall Be Performed In Accordance With Applicable Codes And Standards. Concrete Foundations Must Be Designed Using Applicable Mixtures And With Reinforcing Bars As Per Standards. The Pv System Shall Be Designed For Simple Mechanical On-site Installation With No Requirement For Welding Or Complex Machinery At The Site. In Extreme Cases Where Welding Or Machinery Is Necessary, The Contractor Shall Submit Welding Methodology. Welding Shall Be Tested As Per Standards. The Contractor Must Also Ensure Minimal Disruption To The Daily Operations Of The Installation Site. ● Pre-leak And Post-leak Test The Contractor Shall Conduct Pre-leak Test Prior To, And After The Installation Of Pv Modules And Appurtenances, Respectively. Schedule Of The Leak Test Shall Be Properly Coordinated With Pnoc And Building Owner Representatives. The Contractor Shall Submit A Leak Test Procedure For Review And Approval By Pnoc Prior To Execution. ● Work Permit The Contractor Shall Coordinate With Pnoc Representative For Every Work To Be Performed Prior To Execution. The Work To Be Performed Shall Specify The Following: ✔ Type Of Work, Such As: Hot Works/cold Work/working At Heights/confined Space/concrete Chipping/excavation Works; ✔ Target Start And End Dates; ✔ Methodology; ✔ Hazard Associated With The Works; ✔ Safety And Precautionary Measures; ✔ Equipment And Construction Materials With Attached Approved Brochures And/or Drawings; And ✔ Equipment, Tools, And Personal Protective Equipment (ppe). ● Mounting And Installation Of Equipment All Equipment Shall Be Mounted In Accordance With Engineering And Construction Standards And Practices And Manufacturers’ Recommendations And Standards And Safety And Health Standards. Spacing, Orientation, And Location Shall Be Based On The Approved Detailed Project Designs And Engineering Plans. ● Cabling And Raceway Routing Dc Cables Shall Be Housed In A Hot Dip Galvanized Cable Tray/ladder With Cover. All Ac Cables Shall Be Housed In Rigid Steel Conduit. Instrumentation And Communication Cables Shall Be Housed In A Separate Uv Rated Conduit. For Buried Cables, It Must Be Housed In A Pvc Pipe With Concrete Trench, Warning Tape Or Tiles Placed Above And Marking Posts At Suitable Intervals On The Surface. The Minimum Depth Of Burial Is 700mm Depending On The Location And Condition Of The Ground Surface. Cables Shall Occupy Less Than 66% Of The Raceway Space And Properly Loop, Not Too Tight To Avoid Any Damages To The Wires. Dc Cables Shall Be Installed In A Manner Which Minimizes Induction Loops Between Positive And Negative Cables. For String Cables, Large Loops Of Excess Dc Cabling Shall Be Avoided. The Raceway Shall Be Placed In A Manner That It Will Not Create Any Obstructions Or Hazards To Operations And Maintenance. The Contractor Shall Use Pull Box/junction Box On All Intersections And Sharp Curves Or Bends And Provide Rubber And Bushing On All Junctions And Endings To Avoid Cut In The Wire Insulation. The Contractor Shall Apply Silicone Sealant, As Applicable, On Raceway Openings To Prevent Access Of Dirt, Water, And Vermin. The Contractor Shall Comply With The Distribution Utility (du) Net-metering Requirements For The Cable Installation And Other Electrical Components. ● Grounding, Termination, And Interconnection All Equipment Shall Have Adequate Grounding. All Cables Shall Be Properly Dressed/secured/fixed And Terminated Using Terminal Lugs, Clamps, Crimps And Solder. There Should Be No Exposed Conductors To Avoid Short Circuits And Arc Flash. The Contractor Shall Request A Schedule For Shutdown For The Interconnection To The Existing Electrical Distribution System. The Contractor Shall Conduct A Torque Test After Termination And Interconnection. ● Lifting Appropriate Lifting Equipment Shall Be Utilized When Performing Heavy Lifting. Access Shall Be Identified To Avoid Obstructions. Schedule Of Lifting Shall Be Properly Coordinated With The Building Owner. ● Foundations And Structural Supports Structural Supports Necessary For The Mounting Of Equipment (e.g., Inverters, Enclosures, Transformers, Pv Modules, Etc.) Shall Be Made Of Hot Dip Galvanized Structural Steel Minimum Of 2 Mm Metal Thickness And Minimum Coating Thickness Of 3 Mils As Per Astm A 386 Or Equivalent. In Case The Galvanized Coating Is Damaged During Installation, The Supplier Shall Apply The Necessary Rectification In Accordance With Astm A 780-01 (standard Practice For Repair Of Damaged And Uncoated Areas Of Hot Dip Galvanized Coatings). Reinforced (with Deformed Bars) Concrete Blocks/ballast Or Foundations May Be Provided To Provide Stability. For Penetrated Supports, It Shall Be Non-corrosive, And Waterproof Using Flashings, Gasket Or Other Approved Chemical Sealing And Coating Material. In Case Of Concrete Penetration, The Anchor Bolts (dowel) Shall Be Made Also Of Hot-dipped Galvanized Or Equivalent. 4.4. Testing And Commissioning The Contractor Shall Conduct Testing And Commissioning For A Minimum Of Seven (7) Days Upon Completion Of The Installation Of The Pv System, To Be Witnessed By Pnoc And Representatives Of The Building Owner. The Schedule And Duration Of The Testing And Commissioning Shall Be Mutually Agreed By The Contractor, Pnoc And Building Owner. However, The Testing And Commissioning Activities Shall Be Satisfactorily Completed Within The Time Required Under The Contract. Any Corrections Resulted From Errors In The Workmanship Or Design Made By The Contractor Which Were Found During The Conduct Of Testing And Commissioning Or Prior To The Rooftop Solar Pv System Operation Thereon, With The Resulting Extra Expenses Due To Repair Or Cost For The Replacement For Damaged Equipment/materials Shall Be Solely Charged To The Account Of The Contractor. Testing And Commissioning Shall Be Performed In A Systematic Process Whereby All Systems And Equipment Are Tested And Brought Into Operation And Performed Interactively According To The Design Intent And In Accordance With The Performance Criteria Set Upon. Equipment And Accessories Shall Be Inspected To Determine The Completeness Of The Pv System And Conformance In Accordance With The Specifications. All Testing Instruments Including Consumables, Temporary Structures, And Manpower Required For The Testing And Commissioning Activities Shall Be Provided And At The Account Of The Contractor. The Contractor Shall Ensure That The Rooftop Solar Pv System Operates With Zero Export To The Distribution Grid By Configuring Inverters To Clip Any Excess Energy Generated. The Contractor Shall Also Arrange The Joint Inspection With The Representatives Of Distribution Utility And The Office Of Building Official (if Applicable) To Conduct Demonstration Of The Required Features Of The Rooftop Solar Pv System. This Is For The Eventual Acceptance Of The System By The Du And Lgu-obo By Furnishing The Necessary Certificates. Pnoc Shall Release A “certificate Of Project Completion” After The Testing And Commissioning Provided That All Works Have Been Performed And All Issues Have Been Addressed. ● Testing And Commissioning Plan The Contractor Shall Submit Tcp/procedures Prior To The Conduct Of Testing And Commissioning For Pnoc’s Review And Approval. The Tcp Shall Include The Following Information: ✔ Itinerary (date) Of The Testing And Commissioning; ✔ Detailed Methodology And Step-by-step Procedures; ✔ List Of Tools And Equipment, Including Ppe, To Be Used; ✔ Manpower Requirement; ✔ Hazards And Safety Protocol; And ✔ Target Results Or Acceptance Criteria. ● Testing And Commissioning Works The Minimum Testing And Commissioning Shall Include The Following: ✔ Inspection And Calibration Of Tools And Testing Instruments; ✔ Visual And Physical (quality And Quantity) Inspection Of The Installed Equipment And Appurtenances; ✔ Torque Test Of All Terminations And Mounting; ✔ Continuity Test (open Circuit And Closed Circuit) Of All Breakers, Fuses, Switches, Protection Devices And Other Equipment With Circuitry; ✔ Insulation Test Of All Dc And Ac Wires Including Grounding (line-to-line And Line-to-ground); ✔ Open Circuit Voltage/ Short Circuit Current String Test; ✔ Polarity Test; ✔ Phase Sequence Test; ✔ Ac Operating Voltage Test; ✔ Inverter Synchronization Test; ✔ Inverter Frequency Test; ✔ Inverter Power Generation Test; ✔ Operating Voltage And Operating Current String Test; ✔ Thermal Scanning; ✔ Optimizer Device Functionality; ✔ Voltage Harmonic Rise - Should Not Be Greater Than 5% Or Inverter Specification (whichever Is Lower); ✔ Lighting Arrester Grounding And Counter Tests; ✔ Anti-islanding Test; ✔ Cease To Energize Test; And ✔ Other Necessary Tests The Minimum Tools And Equipment To Be Used Shall Include The Following: Torque Wrench; Clamp Meter; Irradiance Meter; Thermal Scanner; Power Quality Analyzer; 2-way Radios; Insulation Resistance Tester; Earth Ground Tester; And Lock-out/tag-out The Contractor May Use A Multi-function Instrument That Is Capable Of Performing The Testing And Commissioning Such As A Solar Pv Installation Tester. Personnel Who Will Conduct The Testing And Commissioning Shall Be Equipped With The Minimum Ppe: ✔ Safety Shoes (electrical Hazard Compliant); ✔ Safety Jacket; ✔ Safety Pants; ✔ Electrical Gloves (1kv); And ✔ Protective Eye Glass. The Contractor Shall Also Provide A First-aid Kit And Fire Extinguisher (dry Powder). ● Testing And Commissioning Report The Contractor Shall Submit The Tcr After The Completion Of The Testing And Commissioning. The Tcr Shall Be Reviewed And Accepted By Pnoc And Building Owner Representative(s). 4.5. Operation And Maintenance The Contractor Shall Perform A One-year O&m Support To Pnoc. The Contractor Shall Provide A Comprehensive One-year Maintenance Plan, Which Shall Include, But Not Limited To, Daily Monitoring Of System Performance, Preventive Maintenance And Repair Works, Technical Support In Case Of Unforeseen Decreasing Pv System Performance, And End-user Training. The Training Shall Include, But Not Limited To Lectures And On-site Strategy Covering The Methods Of Operation, Maintenance, Basic Troubleshooting, And Management Of The Facility. All Costs And Expenses For The Training, Except Those Incurred By Pnoc Which Include, But Not Limited To Their Own Transportation And Accommodation Expenses, Shall Be Borne By The Contractor. A Corresponding Certificate Of Completion Shall Be Issued To The Participants In The Training. During The One-year O&m, The Epcc Contractor Shall Guarantee The Minimum Annual Production Of 30,132.00 Kwh For The Rooftop Solar Pv System. If Ever The Minimum Annual Pv Production Was Not Achieved Mainly Due To Uncontrollable Factors, Then No Penalty Will Be Imposed On The Contractor. However, If Defects In Any Of The System Components, Especially In The Inverters, Are Found To Contribute To The Performance Issues Of The Pv System, Then The Contractor Shall Pay A Corresponding Compensation Equivalent To The Total Amount Of Revenue Lost To Pnoc From The Declared Minimum Annual Production Guarantee Of 30,132.00 Kwh. Moreover, The Cost Of Any And All Rework And/or Restoration Of Damaged Properties Due To The Contractor’s Poor Workmanship Or Negligence Shall Be Borne By The Contractor. 5. Deliverables The Contractor Shall Ensure That The Following Deliverables Must Be Provided To Pnoc With Physical Copies As The Official Submission And Electronic Copies As Advance Submissions. Any Later Correction And Changes Found Necessary By Pnoc, And All Resulting Additional Costs And/or Delays Shall Be Of The Contractor’s Account. Pnoc Reserves The Right To Reproduce Any Drawings Or Documents Received From The Contractor As May Be Necessary. The Contractor Shall Provide All The Necessary Deliverables Before The Start Of The Testing And Commissioning, Except For The Deliverables That Need To Be Submitted At Earlier Date For Review And Approval Of Pnoc (e.g., Detailed Project Plan And Timeline, Site And Energy Yield Assessment Reports, Detailed Project Designs And Engineering Plans, And Procurement Records And Equipment Warranties). 5.1. Documentation ● Detailed Project Plan And Timeline ● Site And Energy Yield Assessment Reports ● Detailed Project Designs And Engineering Plans ● Procurement Records ✔ Bill Of Materials ✔ Shop/fabrication Drawings ● Installation And Commissioning Reports ● Wiring And Termination Diagrams ● As-built Drawings (power & Control Circuits) And Electronic Programs/ladder Logic Diagrams ● Equipment And O&m Manuals ● List Of Necessary Spare Parts, Tools, And Consumables ● Warranty Certificates Of The Solar Panels And Balance Of System (bos) And All Other Applicable System Components And Tools 5.2. Performance Guarantees ● Assurance Of System Performance Metrics ● Warranty And Maintenance Agreements 5.3. Operation And Maintenance (o&m) ● Detailed One-year O&m Plan ● Regular Maintenance Schedule And Procedures ● Immediate Response And Repair Protocols ● Performance Monitoring And Reporting ● List Of Necessary Spare Parts, Tools, And Consumables 6. Commencement Date And Period Of Implementation The Commencement Date Of The Project Shall Be Upon Receipt Of Notice To Proceed (ntp). There Will Be Two (2) Main Activities For This Entire Engagement: The Epcc And O&m Support. The Duration Of The Epcc And O&m Support Shall Be Ninety (90) Maximum Days From The Receipt Date Of The Notice To Proceed And 365 Days From The Official Start Of Operation Of The 25 Kwp Rooftop Solar Pv System, Respectively. 7. Payment Terms Milestone Payments Will Be Adopted Where The Payment Shall Be Released Upon Reaching The Specific Project Milestone, To Ensure That These Conform To The Requirements Set For The Purpose. The Payments Are Subject To The Usual Government Accounting And Auditing Requirements. Hence, The Contractor Is Expected To Be Familiar With The Government Accounting And Auditing Manual (gaam). Project Milestone* Percentage Of Payment Completion Of Installation And Testing & Commissioning 90% Handover And Completion Of Training For Building Operators 10% *retention Money: 10% For Every Progress Billing. 8. Evaluation Criteria Bids Exceeding The Identified Approved Budget For The Contract (abc) Will Automatically Be Disqualified. The Selection Of The Contractor Will Be Based On: 8.1. Experience And Track Record In Similar Projects • Bidders Must Have Completed Solar Pv Contracts With A Minimum Total Aggregate Installed Capacity Of 1 Mwp, Where At Least Two (2) Contracts Must Be Fully Operational For The Last Two (2) Years, From The Date Of Bid Submission. • Must Be Compliant With The Iso 9001:2015 Standard On Quality Management System (qms). 8.2. Technical Expertise And Key Personnel The Contractor Shall Employ And Certify To Their Competency The Minimum Key Personnel Dedicated For The Project. Personnel Qty Qualifications Experience Project Manager 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp) ● Minimum Of Three (3) Years’ Experience In Solar Project Management Electrical Design Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp) ● Minimum Of Three (3) Years’ Experience In Design Of Solar Project Structural Design Engineer 1 Shall Be Licensed Civil Engineer ● Has Completed At Least Three (3) Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Minimum Of Three (3) Years’ Experience In Structural Integrity Assessment Project Site Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three (3) Years Of Experience In Project Supervision Of Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Safety Officer 1 With Bachelor’s Degree And Either Bosh Or Cosh Certification ● Minimum Of Three (3) Years Of Experience In Construction. Qa/qc Engineer 1 Shall Be Licensed Electrical Engineer ● Minimum Of Three (3) Years Of Experience In Construction Of Solar Pv Projects. Testing And Commissioning Engineer 1 Shall Be Licensed Electrical Engineer ● Has Completed At Least Three ● (3) Years’ Experience In Testing And Commissioning Of Solar Pv Projects, One (1) Of Which With At Least 50% Of The Project Capacity (kwp); Must Have Adequate Knowledge In Inverter Programming Configuration And Programmable Logic Controllers. The Contractor May Nominate The Personnel In Dual Positions, Except For The Project Manager, For As Long As They Are Qualified And Capable Of Doing Multiple Tasks And With The Assurance That It Can Deliver The Work On Time Without Compromising The Quality. 8.2.1. Roles Of The Key Personnel ● Project Manager - Shall Be The Single Point Of Contact With Pnoc For All Matters Pertaining To The Project. The Project Manager Shall Always Be Available During Weekly Meetings And In Cases Where His/her Presence Is Needed. ● Electrical Design Engineer - Shall Be Responsible For The Engineering Design Of The Pv System. The Design Team Shall Always Be Available During Meetings Pertaining To The Design And Specifications. ● Structural Design Engineer – Shall Be Responsible For The Validation Of The Structural Integrity Of The Building(s). ● Project Site Engineer - Shall Be In-charge Of The Overall Supervision Of The Project Execution. The Project Engineer Shall Always Be Available At The Site During The Epcc. During The Three-year O&m Period, He/she Shall Conduct All Required O&m Activities For The Project. ● Safety Officer – Shall Ensure The Safety And Health Of All Personnel Involved In The Construction By Monitoring And Assessing Possible Hazards In The Area. ● Qa/qc Engineer – Shall Ensure That All Delivered Materials And Works Performed Are Within Standards And Specifications. ● Testing And Commissioning Engineer – Shall Lead The Proper Testing And Commissioning Of The Pv System. 9. Project Schedule As Part Of Bid Submission, The Contractor Shall Provide The Project Schedule, Which Should Include Key Milestones Such As: 9.1. Completion Of Site And Energy Yield Assessments. 9.2. Procurement And Delivery Of Equipment. 9.3. Completion Of Installation And Commissioning. 9.4. Handover And Training For Building Operators. 9.5. One-year O&m Period. The Contractor Shall Use Applicable Software Or Computer Programs In Presenting The Project Schedule. 10. Preliminary Design Drawings The Preliminary Design Shall Be Provided For The Rooftop Solar Pv System To Give An Overview Of The Project To Be Developed, As Part Of The Bid Submission Of The Contractor. This Must Be Adequate And Sufficient To Understand The Concept And Orientation Of The Pv System Being Proposed. Design Drawings Shall Be Submitted In A3 Size, Including, But Not Limited To The Following: Sheet Content Cover Page Project Title G / 1 List Of Drawings, Legend And General Notes G / 2 Project Location Map, Site Development Plan, Project Site Conditions And Technical Features E / 1 Tapping Point E / 2 Single Line/riser Diagram E / 3 Dc And Ac Load Schedule Calculation E / 4 Control And Monitoring System Topology E / 5 Solar Pv Array Stringing Plan E / 6 Dc, Ac And Communication Cable Routing Details E / 7 Proposed Grounding System Location And Wiring E / 8 Ct And Metering Installation E / 9 Lightning Arrester And Grounding S / 1 Solar Pv Array Mounting & Framing Details S / 2 Inverters Station And Tapping Point Station Details S / 3 Access Ladders/railings For Maintenance S / 4 Concrete Roof Deck Foundation And Calculation (as Needed) 11. Compliance With Industry Standards And Codes Without Limiting The Contractor’s Obligations, All Engineering And Construction/installation Works Performed, All Equipment Furnished, And All Tests Carried Out Under This Engagement Shall Be Undertaken In Accordance With The Latest Industry Standards And Regulation, Including, But Not Limited To The Following: ● Grid Code Or Distribution Code ● Distribution Services And Open Access Rules (dsoar) ● Philippine Electrical Code (pec) ● National Building Code Of The Philippines (nbcp) ● National Fire Protection Association Standards (nfpa) ● National Structural Code Of The Philippines (nscp) ● Revised Fire Code Of The Philippines Of 2008 ● International Electrotechnical Commission (iec) Standards ● Underwriter’s Laboratories Inc. (ul) And/or Factory Manual (fm) Or Equivalent Standards 12. Weekly Construction Meetings And Progress Reports The Contractor Shall Conduct Weekly Construction Meetings To Be Held Either On Site Or Online And Provide Progress Reports. Progress Reports Must Be Submitted To Pnoc Also At A Weekly Basis, Which Shall Include Program Of Work, Materials Delivery Status And Accomplishment And Target Report. For Urgent Matters, Pnoc May Advise Emergency Meetings. ● Program Of Work – Shall Include Pert/cpm, S-curve, Bar Chart, Manpower, And Equipment Utilization Schedule. The Contractor Shall Utilize Applicable Software Or Computer Programs In Presenting The Program Of Work. ● Materials Delivery Status – Shall Reflect The Status Of All Materials Being Procured Including The Descriptions, Quantity, Name Of Suppliers, Purchased Order Number, Eta Site, Etc. ● Accomplishment And Target Report – Shall Be Presented In Ms Powerpoint Or Equivalent. It Should Include The Percentage Of Weekly Accomplishments, Safety Reports And Targets. In Case Of Delays Or Slippage, The Contractor Shall Provide A Detailed “catch-up” Plan. 13. Workmanship Workmanship Shall Follow The Iso 9001:2015 Standard On Quality Management System (qms). The Contractor Shall Accept Full Responsibility For Its Work In The Design, Specifications, Procurement, Fabrication, Manufacture, Construction, Erection, Installation, Calibration And Testing, Quality Control, Documentation, Testing And Commissioning And Performance Testing. The Contractor Shall Be Responsible For The Safety And Security Of Its Personnel Within The Project Site(s) And Provide Proper Personal Protective Equipment (ppe). The Contractor Shall Also Be Responsible For All Compliance With The Distribution Utility (du) And Energy Regulatory Commission (erc) Requirements To Attain Smooth Synchronization And Commercial Operation. The Contractor Shall Be Deemed Solely Liable For All Its Suppliers And Subcontractors And Shall Compensate Pnoc Against All Third-party Claims Or Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Supplied Equipment Or Any Part Thereof. 14. Certificate Of Acceptance Certificate Of Acceptance For Accomplished Works Shall Be Issued To The Contractor By Pnoc To Certify Its Successful Execution And Performance. ● A Certificate Of Partial Project Completion Shall Be Issued After The 90% Completion Of The Scope Of Work; And ● A Certificate Of Final Acceptance Shall Be Issued By Pnoc After The Completion Of The Defects And Liability Period And The Submission Of Warranty Certificates And Security. 15. Project Turnover The Project Shall Be Turned Over To Pnoc Upon Completion Of The Scope Of Work. The Contractor Shall Issue An Endorsement Letter For Proper Turnover. 16. Warranty Certificates The Contractor Shall Turnover The Warranty Certificates For The Following Structures And Equipment To Pnoc Prior To Issuance Of Certificate Of Final Acceptance: ● A Twenty-five (25)-year Linear Power Warranty From The Manufacturer On The Solar Pv Modules With At Least Eighty Percent (80%) Power Output Guaranteed At Twenty-five (25) Years. The Solar Pv Module Manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Modules Were Installed According To Its Requirements And Specifications For Installation. ● A Fifteen (15)-year Warranty On The Permanent Structures Which Include Mounting And Racking Systems Used In The Rooftop Solar Pv System. ● A Ten (10)-year Warranty From The Manufacturer On The Solar Pv Modules. The Pv Module-manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Pv Modules Were Installed According To Its Requirements And Specifications For Installation. ● A Five (5)-year Warranty From The Manufacturer On The Inverters. The Inverter Manufacturer Shall Confirm That The Warranty Applies On An “as Installed Basis,” I.e., It Will Confirm The Inverters Were Installed According To Its Requirements And Specifications For Installation. ● A One (1)-year Warranty For Safety And Protection Devices, Cables, Instrumentation, And Control/ Communication Devices Including Software, Ip Cameras And Web Portal And All Other Accessories Used In The Solar Pv System. 17. Defects And Liability Period Defects And Liability Period Shall Include Servicing Of Defective Goods And Services Under The Warranty Obligations And Conditions Stipulated In The Contract. Repairs, Troubleshooting, And Other After-sales Support To Commence Within Seven (7) Calendar Days Upon Receipt Of Notification From Pnoc. Replacement For Locally Available Components Shall Not Exceed Fifteen (15) Calendar Days Upon Receipt Of Notification From Pnoc. Replacement For Imported Components Shall Not Exceed Sixty (60) Calendar Days Upon Receipt Of Notification From Pnoc. 18. Spare Parts, Tools, And Consumables The Contractor Shall Supply The Necessary Spare Parts, Tools, And Consumables For The Installation, Testing And Commissioning, As Well As The Operation And Maintenance Of The Project. These Items Will Be Turned Over To Pnoc Upon Completion Of Testing And Commissioning. Particulars Qty Unit Electrical Pliers 6" 1 Unit Electrical Pliers 8" 1 Unit Long Nose Pliers 6" 1 Unit Long Nose Pliers 8" 1 Unit Side Cutter Pliers 6" 1 Unit Side Cutter Pliers 8" 1 Unit Allen Wrench (black Iron), Metric 1 Set Crimping Tools (rj45) 1 Unit Screwdriver (flat, 8") 1 Unit Screwdriver (cross, 8") 1 Unit Adjustable Wrench 1 Unit Combination Wrench (applicable Sizes) 1 Set Toolbox 20" (big) 1 Unit Clamp Meter (1,000volts; With Rogowski Coil) 1 Unit Vice Grip 8" 1 Unit Torque Wrench 3/8” Square Drive With Complete Set Of Sockets (solar Pv For Distribution Panel) 1 Set Portable Washer With Pump, 7.5mpa Pressure, 5 Liter/minute 1 Unit 16 Ton Quick Hydraulic Crimper Cable Plier Tool Kit, 16-300mm/11 Die 1 Unit Dry Chemical Fire Extinguisher (10 Pounds) 1 Unit Rj 45 Connector (100pcs Per Pack) 1 Pack Electrical Tape (0.16mm X 19mm X 8meters; Black) 5 Roll Cable Tie (uv Resistant; 12”; 100pcs Per Pack) 1 Pack Rubber Tape (18mm X 8meters; Black) 1 Length Others (please Specify, If Needed) 19. Allied Services 19.1. Markings And Labeling The Contractor Shall Provide Markings And Labelling On All Electrical Equipment (including Wires) In Accordance With Applicable Codes And Standards Or As Otherwise Agreed Upon With The Building Owner. Markings Shall Be Clearly Visible, Located Visibly On The Equipment, Constructed And Installed To Remain Eligible For The Whole Of The Design’s Life Of 25 Years. The Marking And Labeling Shall Be Compliant With The Following Codes: ● Pec Article 6.90 And Article 1.10 ● Ul 696 19.2. Safety Signages And Fire Extinguishers The Contractor Shall Provide Safety Signages As Per Standards Including Warnings For High Voltage, Cable Burial, Etc. The Contractor Shall Likewise Provide A Fire Extinguisher To Be Mounted Near Each Of The Identified Solar Array Stations, Inverter Station And Tapping Point Station As Per Design Drawings. 19.3. Power Supply The Contractor Shall Provide Power Supply, Complete With Protection Devices (e.g., Circuit Breakers, Avr, Etc.) For Equipment That Will Require Power Such As Poe Hub, Inverter Controller, Router, Etc. The Contractor Shall Identify The Location Of The Tapping Source And Request Permission To The Building Owner. 19.4. Water Source The Contractor Shall Coordinate With The Building Owner For The Location Of The Water Source To Be Used During Maintenance (e.g., Pv Module Cleaning). 19.5. Canopy In Case An Inverter Station Or Any Equipment Is Placed Outdoors, A Canopy Shall Be Provided As Per Manufacturer’s Standards And Recommendation. 19.6. Access Platforms, Stairs And Safety Handrails The Contractor Shall Provide Access Such As Sufficient Portable Access Ladder Along The Pv Facility For Safety And Protection During Construction And Pnoc’s Operations And Maintenance. The Contractor Shall Provide Anchors At Strategic Locations For Safety Harnesses. 19.7. Relocation Or Modification Of Existing Structures The Pv System Shall Be Designed With No Requirement For Relocation Or Modification Of The Existing Structures. In Extreme Cases When Relocation Or Modification Of Existing Structures Is Necessary, The Contractor Shall Submit Modification Or Relocation Plan To Ensure That The Structures Shall Be Maintained, Restored Or Upgraded. 20. Available Data And Schedule Of Site Inspection Potential Bidders Can Access The Relevant Site Data (e.g., Electric Consumption Information, Plans, And Drawings) Via The Following Link: • Https://bit.ly/carmona-water-district The Site Inspection Is Scheduled For October 22 And 25, From 9:00 Am To 12:00 Pm (can Be Subject To Change). Bidders Must Inform Pnoc Representatives In Advance Using The Contact Details Provided Below: • Louie Aaron L. Razon: +639564761790 • Richard Miguel D. Allauigan Jr.: +639178460403 • Patrick Jose Iv V. Andaya: +639369318841 21. Technical Specifications And Standards 21.1. Design Calculations The Design Of The Pv System Shall Be For A Minimum Service Life Of Twenty-five (25) Years. Design Shall Consider Service Conditions That Will Affect The Performance Of The Solar Pv System Such As Irradiation, Uv Radiation, Temperature Variations, Rainfall Intensity, Humidity, Pollution Etc. Design Shall Be Able To Protect And Harness The Equipment From Natural Calamities Such As Earthquake, Tropical Typhoons, Cyclones And Wind Gustiness Prevailing In The Philippines. 21.1.1. Electrical Design Maximum Dc Voltage Per String Shall Not Exceed 1500 Volts At A Temperature Of 15 Degrees Celsius. Minimum Dc Voltage Per String Shall Be More Than The “minimum Input Voltage” Of The Inverter At A Temperature Of 50 Degrees Celsius. Minimum Dc Voltage Per String After 20 Years Shall Be More Than The “minimum Input Voltage” Of The Inverter At A Temperature Of 50 Degrees Celsius. Maximum Dc Power Per Array (combination Of Strings) Shall Be Less Than The Maximum Allowable Generator Power Of Inverter. Maximum Voltage Drop Between Equipment To Equipment Shall Not Exceed 1% On Dc System And 5% On Ac System. 21.1.2. Structural Design Seismic Loading Shall Be Selected To Ensure The Performance Criteria Set Out Below Are Achieved: ● All System’s Components Which Are Critical To The Generation Of Electricity Shall Remain Undamaged And Operational Following A Moderate Earthquake; ● In Case Of A Massive Earthquake, The Damage To Structures And Equipment Shall Be Limited To That Which Can Be Repaired Sufficiently Quickly For The Generation Of Electricity To Resume Safely Within Thirty (30) Days, Unless Otherwise The Main Building Has Collapsed; And ● Potential Costs Of Repair Or Replacement And The Duration Of Inability To Generate Electricity After A Large Seismic Event Shall Be Minimized. The Wind Resistant Design Required For The Facility Shall Be At Minimum Of 270 Kph. In Case The Basis For Wind Resistant Design In The Latest National Structural Code Of The Philippines (nscp) Is Higher, Then Nscp Shall Govern. 21.2. Minimum Pv System Components Specifications 21.2.1. Solar Pv Modules The Modules Must Follow The Iec 61215 Standards (i.e., Crystalline Silicon Terrestrial Photovoltaic Modules; Design Qualification And Type). These Shall Be Made Of Monocrystalline Material Solar Cells, Tested In Extreme Weather Conditions, And Equipped With Safety Protection Mechanisms. These Shall Also Have A Minimum Efficiency Of 17% At Standard Testing Conditions (stc). The Solar Pv Panels Supplied Must Include A Performance Warranty Guaranteeing No More Than 2% Efficiency Degradation In The First Year And No More Than 0.5% Annual Degradation Thereafter. At The End Of 25 Years, The Panels Must Still Produce At Least 85% Of Their Original Rated Power Output. The Solar Pv Modules Supplied Must Be Manufactured By A Tier 1 Manufacturer As Defined By Industry-recognized Standards Such As Bloomberg New Energy Finance (bnef) Or Equivalent. 21.2.2. Pv Mounting System The Pv Mounting System Shall Be Suited To The Environment And Atmospheric Conditions (e.g., Corrosion, Salt). Structures Shall Be Fixed, Metallic And Have Appropriate Design And Adequate Strength Which Can Withstand The Load Of The Modules, Cyclonic And High Wind Velocities As Applicable To The Site Condition. The Material Shall Be Robust And Non-corrosive, Made From Anodized Structural Grade Aluminum 6005 T5 And/or Stainless-steel Components Or Equivalent. Use Of Different Metals Shall Be Avoided Where Practically Possible To Prevent Galvanic Corrosion. The Structure Shall Prevent Water Accumulation. The Mounting System Must Be Compliant To As/nzs1170.2:2011 Amdt 2-2012 Standard Or Equivalent. 21.2.3. Inverter The Inverter To Be Used Shall Be String Type, Weatherproof And Equipped With A Safety Protection Mechanism. The Inverter Shall Be Compatible With The Existing Electrical System. The Inverter And Its Appurtenances Shall Be State-of-the-art With Energy Management And Communication System And Maximum Power Point Trackers (mppt) For Optimum Performance. The Inverter Shall Have Efficiency Of Not Less Than 98.5%, With A 10-year Guaranteed Service Life. It Also Must Have The Following Minimum Communication Specifications: Wlan/ethernet, Wi-fi, And 4g/3g/2g. The Mounting Shall Be Robust And Non-corrosive, Made From Hot-dipped Galvanized Structural Steel Or Equivalent. The Foundation Shall Be Fixed And Secured. The Inverter Shall Have Adequate Spacing, Free From Obstructions And Well Ventilated. 21.2.4. Inverter Controller The Inverter Controller Shall Be The Central Communication Unit For System Monitoring, Recording Data And Controlling. It Shall Be Capable Of Interconnection Of Other Measuring Devices Such As Solarimeter, Weather-meter, Etc. 21.2.5. Dc Combiner In Cases Where Design Requires The Need For A Dc Combiner, The Dc Combiner Shall Be Made Of Glass-fiber Reinforced Polyester Material Or Approved Equivalent. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. Mounting May Be Wall-mounted Type Or Stand-alone Support. The Dimensions And Thickness Are As Per Manufacturer’s Standard. It Shall Be Rated 1500vdc Minimum. The Dc Combiner Shall Have Appropriate Cable Entry Points, With Cable Glands, Fitted For Input And Output Cables And A Lockable Door. The Dc Combiner Shall Be Equipped With Auxiliaries Such As Circuit Breakers, Surge Protection Devices And Grounding Terminals, Mounted On Din Rail Or Equivalent And With Adequate Spacing For Easy Termination And Testing. Auxiliaries Shall Conform To Iec Standards Or Equivalent. All Circuit Breakers And Fuses Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Voltage Rating Shall Be A Minimum Of 1000vdc. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.6. Ac Combiner Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. Mounting May Be Wall-mounted Type Or Stand-alone Support. The Dimensions And Thickness Are As Per Manufacturer’s Standard. It Shall Be Rated 0.6/1kv Minimum. The Ac Collector Shall Have Appropriate Cable Entry Points, With Cable Glands, Fitted For Input And Output Cables And Lockable Doors. The Ac Collector Shall Be Equipped With Auxiliaries Such As Circuit Breakers (mounted On Busbar With Adequate Spacer) And Neutral And Grounding Terminal Mounted On Din Rail Or Equivalent And With Adequate Spacing For Easy Termination And Testing. Auxiliaries Shall Conform To Iec Standards Or Equivalent. All Circuit Breakers Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Minimum Voltage Rating Shall Be Equivalent To Inverter Output Voltage. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.7. Transformer In Cases Where Design Requires The Need For A Transformer, The Transformer Configuration Shall Be Based On The System Configuration Or Topology Between The Inverter I.e., Tn-s, Tn-c, Tn-c-s, Tt And It And Grounding Configuration And Voltage. Depending On The Location, The Transformer Shall Either Be Outdoor Type Or Indoor Type In Compliance With Nema Or Ip Standards. The Compartment Shall Be Metal-enclosed And Non-corrosive. The Transformer Shall Be Dry-type, Self-cooled And Floor Mounted. The Foundation Shall Be Equipped With An Anti-vibration Pad Or Equivalent. The Transformer Shall Be Ul/iec Listed Or Equivalent. 21.2.8. Transient Voltage Surge Suppressor With Isolation Switch The Tvss Shall Be Capable Of Bi-directional Filtering Of Harmonics And Surges That May Be Created From The Pv System And From The Grid. The Surge Protection Devices Shall Be Compatible With The Existing Electrical System. The Ampere-interrupting Capacity (aic) Rating Of The Devices Shall Be Equal To Or Greater Than The Available Fault Current To Which They Might Be Subjected. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. It Shall Be Rated 0.6/1kv Minimum. 21.2.9. Pv Generation (revenue) Meter Including Ct/pt And Terminals The Pv Generation (revenue) Meter Shall Be Digital Multi-function Power Meters Complete With Cts And Potential Fuses. The Meter Shall Conform To The Following Minimum Requirements: ● Iec Or Ansi Revenue Metering Standards (i.e., Class 0.3 Accuracy); And ● Capable Of Providing Outputs And Terminal Strips For Remote Monitoring And Data Acquisition Using Rs485 Or Equivalent. The Meter Shall Be Boxed In A Standard Enclosure With A Viewing Window Made Of Fiberglass Or Equivalent. 21.2.10. Ecb Main Disconnect Switch The Enclosed Circuit Breaker Shall Act As The Main Fault Current Protection Device And Disconnect Switch To Isolate The Solar Pv System From The Existing Electrical System. Enclosure Protection Shall Be Sealed, Dust Proof, Vermin, Waterproof And Sturdy – Compliant To Ip65/nema 3r Or Equivalent. The Dimensions And Thickness As Per Manufacturer’s Standard. It Shall Be Rated 0.6/1kv Minimum. The Circuit Breaker Shall Be Compliant With Iec 60947 Part I-iii, Is 60947 Part I-iii And En 50521 Or Equivalent. The Minimum Voltage Rating Shall Be Equivalent To System Voltage. The Ampere Trip/ampere Frame, Number Of Poles And Other Mechanical Parameters Shall Be As Per Design Standards. 21.2.11. Cables Pv Cables Shall Be Copper Type. It Shall Be Uv-rated, Sunlight-resistant, Water-proof Protection And Manufactured Under Ul Standard. It Shall Be Designed And Manufactured In Accordance With: ● Iec 60811: Insulation And Fire Protection ● Iec 60227 And Iec 60502: Design ● Iec 60228: Conductors ● Ul 1581 (xeno-test), Iso 4892-2 (method A) Or Hd 506/a1-2.4.20: Dc Solar Cables All Power Cables Shall Be Of Xlpe Insulated With Pvc Sheathed, 0.6/1kv Single Or Multicore, Stranded Copper Conductor. The Conductor Shall Be Made From Electrical Purity Copper For Power Cables And Annealed High Conductivity Copper For Control Cables. Conductors Shall Be Stranded For Copper Power Cables And Solid For Copper Control Cables. All Cables Shall Be Designed To Withstand The Mechanical, Electrical, And Thermal Stresses Under The Steady State And Transient/ Fault Conditions. All Cables Shall Be Suitable For High Ambient Temperature, High Humidity And Tropical Climatic Conditions. All Cables Shall Be Color Coded As Per Iec 60364 And Should Be Provided With Tag/marking. All Cable Ties Should Be Uv Protected And Can Withstand High Heat Stress Without Damaging The Cables. Cable Ties Shall Conform To En 50146 And Iec 62275 Standards. Cables To Be Supplied Are Categorized As Follows: Particular Description Requirement Pv String Cables Cables From Pv Strings To Dc Enclosures Must Be 2 X 6mm2 Dc Enclosure Cables Cables From Dc Enclosures To Inverters As Per Pec Standards Inverter Cables Cables From Inverters To Ac Collector As Per Pec Standards Ac Collector Cables Cables From Ac Collector To Transformer As Per Pec Standards Transformer Cables Cables From Transformer To Ecb For Disconnect Switch As Per Pec Standards Tapping Point Cables Cables From Ecb For Disconnect Switch To Tapping Point As Per Pec Standards Grounding Cables Cables For Grounding As Per Pec Standards Neutral Cables Cables For Neutral As Per Pec Standards Communication Cables Cables For Controls And Monitoring Utp, Ethernet, Cat5/cat6 Power Supply Cables Cables For 220-240v Power Supply As Per Pec Standards 21.2.12. Raceways (cable Trays, Conduits, Pvc Pipes And Fittings, Accessories) Cable Trays And Fittings Shall Be Hot-dipped Galvanized With A Minimum Of 2mm Thickness In Accordance With Iec Standards Or Equivalent. Conduit Shall Be Rigid Steel In Accordance With Iec Standards Or Equivalent. Pvc Systems That Are To Be Buried Underground Shall Conform To Iec 61386 Part 24 Standards Or Equivalent. Raceways Shall Be Color Coded As Per Standards Or As Per Existing Color Coding Of The Building. 21.2.13. Lightning Arrester And Grounding System In Cases Where Design Requires The Need For A Lightning Arrester And Grounding System, The Lightning Protection Shall Be Made Of Conventional Lightning Protection Or The Early Streamers Emission (ese) Type. It Shall Be Equipped With A Lightning Strike Counter. The Protection Radius Shall Cover The Whole Solar Pv Facility. The Grounding System Shall Have A Maximum Resistivity Of 5 Ohms. The Size And Diameter Of Bare Copper And Grounding Rod Shall Be As Per Standard. The Safety Protection Devices Shall Provide Optimum Filtering In Relation To The Specification Of Inverter And Pv Panels. The Surge Protection Device Shall Be Compact And Shall Comply In Accordance With The Ul 1449 3rd Edition Testing, Ansi/ieee C62 And Ansi/ieee Std. 1100-1999 The Surge Protection Devices Shall Be Compatible With The Existing Electrical System. The Ampere-interrupting Capacity (aic) Rating Of The Devices Shall Be Equal To Or Greater Than The Available Fault Current To Which They Might Be Subjected. The Grounding Wires Shall Be Placed In A Standard Uv-rated Pvc Or Equivalent. 21.2.14. Pv Monitoring And Data Acquisition System (internet Connection) The Pv Monitoring And Data Acquisition System Shall Be Capable Of Both Remote And Onsite Access And Monitoring Via A Subscription-free Online Platform. The System Shall Be Able To Provide The Following Minimum Data: ● Energy Generation (kwh); ● Power (kw); ● Power Factor; ● Voltage; ● Current; ● Irradiance; ● Weather; And ● Temperature The System Shall Be Capable Of Detecting Failures And Fault Conditions. Data Transmission Shall Be Real-time And Shall Be Equipped With Safety And High-security Protocol. The Data Shall Be Displayed In Graphical Trends And In Figures. Historical Data Shall Be Available For A Minimum Of One (1) Year. 21.2.15. Cctv/ip Surveillance Camera The Cctv/ip Surveillance Camera Shall Be Capable Of Onsite Monitoring, Continuous Recording, And Remote Access And Monitoring Via A Subscription-free Online Platform. Viewing Shall Be Real-time And Can Operate 24/7. Video Recording Shall Be Capable For A Minimum Of One (1) Month. The Camera Shall Be Robust, Weatherproof And With High-resolution. Type Fixed Bullet Video Camera 2 Units Resolution 1080hd Enclosure Weatherproof, Outdoor Ip65 Or Equivalent, Minimum Hard Disk Drive 2tb Sata 6.0gb/s Cache 64mb Surveillance Type Nvr Minimum 8 Channel Ip Camera, Resolution Minimum Of 1920x1080 Poe Hub/switch 8 Ports Cpe/router/modem 1 × Usb 2.0 Port For Connecting 4g/3g Modem As Wan Backup; 4 × Gigabit Wan/lan Ports; Non-wifi Router 21.2.16. Communication And Control Cables, Radio Transmission Or Fiber Optics Or Equivalent If Long Distance Controls Are Needed, A Radio Transmission Or Fiber Optics Or Any Equivalent Communication Protocol May Be Used. In The Case Of Wireless Communication, It Shall Be Equipped With Reliable Communication Equipment Such That It Will Not Create Unacceptable Delays And Interference That Would Compromise The Operability Of The Whole System.
Closing Date12 Nov 2024
Tender AmountPHP 1.3 Million (USD 23.3 K)

Liikenne Ja Viestint Virasto Tender

Others
Finland
Details: The Finnish Transport and Communications Agency Traficom has the objective of establishing a dynamic purchasing system (dps) targeted by expert services for smart transport,maion and mobility services. “Acquisn of Expert Services may be Cusen and Intelligent Transportation Services, and Other Intelligence, Road Automation, Road Management and Technologies for Development and Implementation of National and International Tasks, As:” • From the Quality of Applications for Eu Projects or Financial Programs, and Change Reporting • From the National, Emerging and Implementation” Preparation of meetings and occasions » • Producing information and findings » Support for authorities in Technical and Legal Questions,'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''s mandates may be Determinate Projects or Long-term Service Purchases for Either Traficom or the Transport Agency's Impactive. As a rule, execution of assignments requires scientific, technical or research skills. Assignments should usually be reviewed by the report and the report Introduction Ma Jol Either Finnish or English.”, “The mandates are usually €15,000 to €70,000 and the mandates are $10-20 per year. “All the data presented in this Prior Information Notice are Preliminary and Preliminary Information. Preliminary notice does not link the Purchase Entity to any Solution. """
Closing Date31 Dec 2027
Tender AmountNA 

Liikenne Ja Viestint Virasto Tender

Others
Finland
Details: The Finnish Transport and Communications Agency Traficom has the objective of establishing a dynamic purchasing system (dps) targeted by expert services for smart transport,maion and mobility services. “Acquisn of Expert Services may be Cusen and Intelligent Transportation Services, and Other Intelligence, Road Automation, Road Management and Technologies for Development and Implementation of National and International Tasks, As:” • From the Quality of Applications for Eu Projects or Financial Programs, and Change Reporting • From the National, Emerging and Implementation” Preparation of meetings and occasions » • Producing information and findings » Support for authorities in Technical and Legal Questions,'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''s mandates may be Determinate Projects or Long-term Service Purchases for Either Traficom or the Transport Agency's Impactive. As a rule, execution of assignments requires scientific, technical or research skills. Assignments should usually be reviewed by the report and the report Introduction Ma Jol Either Finnish or English.”, “The mandates are usually €15,000 to €70,000 and the mandates are $10-20 per year. “All the data presented in this Prior Information Notice are Preliminary and Preliminary Information. Preliminary notice does not link the Purchase Entity to any Solution. """
Closing Date31 Dec 2027
Tender AmountNA 

Keski pohjanmaan Sosiaali Ja Terveyspalvelukuntayhtym Soite Tender

Others
Finland
Details: The contracting entity sets up a dynamic purchasing system that will be entered in to acquire the transport services required by the subscriber.” Transporters are not automatically involved in the procurement system, but they must apply for it separately and agree to the requirements and the terms. The purpose of the Transportation Service is to primarily fill the dynamic purchasing system. “All traffic controllers who wish to handle Personal and Short-Traffic Transports, as well as Transports mentioned in the Later Stage Other Description of Services, must be registered in this Purchase System during its Termination. The first application for a dynamic purchasing system ended on 31 July 2020 at 16:00. On the basis of the incoming Offers, the Board of Directors will make the first Applicant Decision during August 2020.” “Dynamic Procurement System may submit Applications for the entire Duration of the Library on the Offer Service.fi website. The duration of the dynamic purchasing system is 60 K. "Subscriber Accepted to the dynamic purchasing system All applicants submitting applications who comply with the Applicant'stuability requirements. Applicability requirements Described in the Espd form, Section of the transfer plus Other Terms and Prices and Terms in the Appendix and Service Description Annex.
Closing Date22 May 2025
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
United States
Details: Amendment 1 - 10/18/2024 amendment 1 Issued 10/18/24 To Incorporate The Following: Responses To Questions; Revisions To Initial Synopsis/soliciaition Notice; Response Date Extension To 11/12/24, 4pm. The Amendment Is Provided As An Attachment To This Notice. synopsis/soliciaition Notice Updated 10/18/24 Per Amendment 1 Revisions: procurement Description through Its Design Excellence Program, The U.s. General Services Administration (gsa) Commissions Our Nation’s Most Talented Creative Professionals To Design Outstanding Federal Workplaces. These Projects Embody An Exemplary Integrated Process Whose Results Deliver Enduring Value To Taxpayers. Gsa Defines Quality As The Thoughtful Expression Of Artistry, Local Culture, And Democratic Values Like Civic Participation, Accessibility, And Transparency, Achieved In Balance With Affordability, Constructability, Reliability, And Industry-leading Sustainable Performance. Design Excellence Is The Means By Which Gsa Realizes The Guiding Principles For Federal Architecture, Which President Kennedy Authorized In 1962, And It Is One Of The Agency’s Primary Vehicles For Catalyzing Positive, Inclusive Change In Local Communities. continuing This Legacy Of World-class Public Architecture, Gsa Announces An Opportunity For Design Excellence For Projects In Occupied Federally Owned Or Leased Office Buildings, Courthouses, And Land Ports Of Entry (lpoe's) Throughout Region 9. These Projects Are To Demonstrate The Value Of True Integrated Design That Balances Aesthetics, Cost, Constructability, And Reliability; And Create Environmentally Responsible And Superior Workplaces For Civilian And Federal Employees. this Is A Multiple Award Indefinite Delivery Indefinite Quantity (idiq) Contract(s) For Architect Engineer (ae) Services Covering Projects Located In The Following Four (4) Geographic Zones Of Region 9: zone 1 - States Of Arizona And Nevada zone 2 - Northern California (california Counties Of Del Norte, Siskiyou, Modoc, Humboldt, Trinity, Shasta, Lassen, Mendocino, Tehama, Plumas, Glenn, Butte, Sierra, Lake, Colusa, Yuba, Nevada, Placer, Sonoma, Napa, Yolo, Sutter, El Dorado, Marin, Solano, Sacramento, Amador, Alpine,san Francisco, Contra Costa, San Joaquin, Calaveras, Toulumne, Mono, Inyo, San Mateo, Alameda, Stanislaus, Mariposa, Santa Cruz, Santa Clara, Merced, Madera, San Benito, Fresno, Monterey, Kings, Tulare) zone 3 - Southern California (california Counties Of San Diego, Imperial, Orange, Riverside, Santa Barbara, Ventura, Los Angeles, San Bernardino, San Luis Obispo, Kern) zone 4 - State Of Hawaii And Pacific Territories multiple Awards May Be Made As A Result Of This Announcement, And The Government Anticipates Making Between Three (3) To Six (6) Awards Per Geographic Zone. However, The Ultimate Number Of Contracts Per Zone Will Be Determined By Gsa After The Assessment Of Qualified Contractors During The Solicitation Stage To Ensure Coverage In All Zones. this Procurement Is A 100% Total Small Business Set Aside. Prime Ae Firms Must Be A Small Business In Order To Be Considered. Consultants To The Prime Ae Firms Are Not Required To Be Small Businesses. the Naics Code Is 541310 - Architectural Services; The Small Business Size Standard Is $12.5 Million (average Annual Receipts). prime Ae Firms Who Are Interested In Performing Work In Multiple Zones Must Submit A Separate Technical Qualification Package For Each Zone. The Prime Ae Firms Must Have An Active Main Office And/or Branch Office Located Within The Applicable Geographical Zone As Of The Date Proposals Are Due In Order To Be Considered; If An Award Is Issued, The Zonal Office Must Remain Open And Active For The Duration Of The Contract Period. Consultants To The Prime Ae Firm Are Not Required To Have An Active Office In The Geographical Zone The Prime Ae Firm Will Be Performing In. An Active Main Office And/or Branch Office Is Defined As A Non-temporary Office From Which Business Is Regularly Conducted By The Prime Ae Firm. Prime Ae Firms Will Be Required To Certify They Meet The Specified Local Office/ Geographic Limitations In Your Submission. at The Time Of Technical Qualification Package Submission, Interested Prime Ae Firms Must Have An Active Registration In The System For Award Management (sam). Active Registration Must Also Be Complete As Applicable If The Prime Ae Firm Is A Partnership, Corporation, Association, Joint Venture, Or Other Legal Entity. Prime Ae Firms Will Be Required To Provide A Copy Of Your Active Sam Record As Well As Any Executed Agreements If Applicable (such As An Executed Joint Venture Agreement) In Your Submission. the Awarded Contracts Will Be For A Period Of One (1) Base Year With Four (4) Consecutive One (1) Year Option Periods. the Minimum Guarantee Will Be $1,000 For The Base Year Period Only. the Total Aggregate Maximum Order Limitation (mol) Per Awarded Contract, Covering The Base Year Period And Four (4) Consecutive One (1) Year Option Periods, Shall Not Exceed $25 Million. task Orders Issued Under The Awarded Contracts May Range In Value From $10,000.00 To $4,000,000.00, However There Will Be No Single Task Order Minimum Or Maximum Limit Specified. Prime Ae Firms Will Be Required To Comply With Brooks Act Procedures And Applicable 6% Statutory Limitation. this Procurement Will Be Conducted In Accordance With Brooks Act Public Law 92-582, And As Implemented In Federal Acquisition Regulation (far) Part 36.6, General Services Administration Acquisition Manual/ Regulation (gsam/ Gsar) Part 536.6. Under This Process The Government Will Award To The Most Highly Qualified Prime Ae Firms With Whom It Can Negotiate A Fair And Reasonable Price. this Is A Request For Technical Qualifications Only; This Is Not A Request For Proposal. An Ae Evaluation Board Comprised Of Gsa Personnel Will Evaluate The Technical Qualification Packages. general Description Of Contract Services prime Ae Firms, And Consultants As Applicable, Are Required To Be Licensed/ Registered Within The Applicable State(s) For Each Geographic Zone They Are Interested In And Must Conform To All Laws, Rules, And Requirements Of That State Governing The Profession Of Architecture Or Engineering. the Services Required Under This Contract May Include, But Are Not Limited To, The Following: 1. Comprehensive Design Services Including The Preparation Of Construction Documents For Repair And Alteration, And Tenant Improvement Projects. Typical Projects May Include Repair, Improvement And/or Remodeling Of Building Interior Space, And Building Systems And Features, Including But Not Limited To: Interior And Exterior Finishes, Landscaping, Civil, Mechanical, Plumbing, Electrical, Structural, Fire Safety, Blast, Anti-ram, And Ballistic Protection, Elevators, Environmental, And Roofing Components/systems. Project Locations/ Spaces May Include Courthouse And Federal Facilities, Historic Buildings, Border Stations, Child Care Facilities, Lease Locations, Renovation And/or Alteration Of Fire Protection Systems, Administrative Facilities, Warehouses, Road And Parking Lots, Walkways, Plazas, And Other Existing Systems And Facilities. 2. Comprehensive Design Services Including The Preparation Of Construction Documents For New Construction Of Courthouses And Federal Facilities. 3. Preparation Of Designs, Plans, Specifications, Estimates, Record Drawings, Space Planning, Technical Studies And Reports, Surveys And Construction Inspection Services For Projects. Projects May Involve Work In Specialty Areas Such As Alterations In Historic Buildings Or Asbestos Abatement Work. 4. Professional Disciplines Required May Include Architectural Designer, Landscape Designer, Mechanical Engineer, Structural Engineer, Hvac Engineer, Electrical Engineer, Civil Engineer, Historic Preservation Architect, Acoustical Engineer, Blast Consultant, Interior Designer, Cost Estimator, Cad Operator, Building Information Management, Fire Safety, Security Systems Consultant, Asbestos, Acoustical, Seismic, Environmental Engineering, Energy Consultant, Telecommunication, Building Forensics, Waterproofing, And Geotechnical Engineering. These Professional Disciplines May Also Assist Gsa Staff Engaged In Scope Development, Shop Drawing Review, Master Planning, Feasibility Studies, Programming, Interior Design, Change Management, Design Review, Construction Administration And Inspection, Elevator Evaluation/design, Signage Design, And Various Technical Studies Including Building Engineering Reports, Workplace Engagement Studies, Program Of Requirements, Post Occupancy Analysis, , Historic Structure Reports, Determinations Of Eligibility, National Register Of Historic Places Nominations, Historic Building Preservation Plans, Seismic And Structural Evaluations, Energy Studies For Design Of Energy Upgrades, Roof Evaluations, Fire Safety Review/studies, And Handicapped Accessibility (abaas) Reviews. 5. Comprehensive Project Planning Services For Large New Construction And Major Renovation Projects, Including Surveys Of Existing Conditions And Field Investigations, Site Selection And Evaluation, Planning And Program Studies, Feasibility Studies, Cost Estimates, Inventory Of Existing Furniture, Fixtures, And Equipment, And Other Services. The Budget Assessments May Include Cost Analysis As Well As Cost Estimating. 6. Design Services May Include Green/sustainable Design With A Goal Of Leed Certification And Sites Certification For Select Projects. Other Sustainable Design Requirements May Apply, Such As The Use Of Recycled And Environmentally Responsible Materials, Achievement Of Energy And Water Efficiency Goals, Design For Indoor Environmental Quality, Sustainable Site Design, And Sustainable Urban Design. 7. Other Professional Services Of An Architectural Or Engineering Nature, Or Incidental Services, That Members Of The Ae Professions (and Individuals In Their Employ) May Logically Or Justifiably Perform, Including Studies, Investigations, Surveying And Mapping, Tests, Evaluations, Consultations, Comprehensive Planning, Program/project Management, Conceptual Designs, Plans And Specifications, Value Engineering, Construction Phase Services, Soils Engineering, Drawing Reviews, Architectural Photography, Preparation Of Operating And Maintenance Manuals, And Other Related Services. 8. Environmental Surveys, Reports, Studies, And Designs For The Clean-up, Removal, Monitoring And/or Abatement Of Asbestos, Hazardous/toxic Materials And Petroleum Products. 9. Spatial Data Management (sdm) Program For Creating, Updating And Maintaining Spatial Data And Associated Computer Aided Drawings (cad) To Accurately Reflect The Federal And Leased Inventory. prime Ae Firms Must Have The Ability To Provide Comprehensive Design And Post Construction Contract Services, Which May Include Rfi And Submittal Reviews. prime Ae Firms Must Be Able To Perform Drafting Of Above Work In A Computer System Compatible With The Latest Version Of Autocad And Building Information Modelling Software And Provide Construction Specifications Using The Latest Version Of Masterformat. The Prime Ae Firm Must Also Be Able To Provide Design In Both English And Metric, As Applicable. each Contract Awardee Must Have The Capability To Concurrently Perform Design And Engineering Work For At Least Five (5) Gsa Projects. in Performance Of The Contract, The Selected Prime Ae Firm May Be Required To Include On Its Team The Following Design Disciplines And Specialty Consultants: Architect, Electrical Engineer, Mechanical Engineer, Plumbing, Structural Engineer, Civil Engineer, Cost Estimating, Fire Protection Engineer, Interior Designer, Historic Preservation Architect, Landscape Architect, Vertical Transportation/ Elevator Consultant, Blast Consultant, Materials Conservation, Sustainability, And Hazardous Materials. selection Process the Selection Of Between Three (3) To Six (6) (or More) Single Award Ae Idiq Contracts Per Geographic Zone Will Be Made Using A Two-stage Process As Follows: stage I - The Technical Qualifications And Experience Of Proposed Prime Ae Firms Will Be Evaluated From The Initial Technical Qualification Package, Including Review Of Their Complete Team Of Engineers And Consultants. A Short-list Will Be Established Of The Prime Ae Firms Determined To Be The Most Highly Technically Qualified. The Short-listed Prime Ae Firms Will Be Invited To Continue With Stage Ii Of The Selection Process. stage Ii - Interviews Will Be Conducted With The Short-listed Prime Ae Firms. The Short-listed Prime Ae Firms Will Be Ranked, And The Top-ranked Firms Will Be Selected To Receive The Solicitation And Conduct Negotiations. stage 1 Submission Requirements prime Ae Firms That Fully Meet The Requirements Described In This Notice Are Invited To Submit A Technical Qualification Package To Include The Following, In The Order Listed: cover Letter Referencing The Sam.gov Announcement Number And Briefly Describing The Firm And Its Location, The Geographic Zone They Wish To Be Considered For, Organizational Makeup, Noteworthy Accomplishments, And The Proposed Working And Legal Relationship Between Its Components If The Prime Ae Firm Is A Partnership, Corporation, Association, Joint Venture, Or Other Legal Entity. acknowledgement Of All Amendments Posted Prior To The Closing Date. active Sam Record. executed Agreement(s), If Applicable. standard Form (sf) 330 Architect Engineer Qualifications Part I & Ii responses To The Submission Requirements And Evaluation Criteria Listed Below. prime Ae Firms Shall Submit Separate Complete Technical Qualification Packages For Each Geographic Zone The Firm Is Interested In Being Considered For. only Electronic Submissions In Pdf Format Will Be Accepted; No Hard Copies Will Be Accepted Or Reviewed. pdf Submissions Shall Be Concise And Organized, In 8 1/2" X 11" Format, And The Assembled Content Shall Not Exceed One Hundred And Twenty-five (125) Pages. All Assembled Pages In The Pdf Submissions Shall Be Continuously Numbered, Meaning The Cover Letter, Table Of Contents, Cover Pages, Etc. Are To Be Included In The Continuously Numbered Pages; There Are No Exclusions Allowed In The Specified Page Limitation. ensure The Submission Clearly Identifies The Information Being Submitted For Each Evaluation Factor, Either By Using Cover Pages For Each Evaluation Factor Content Or By Annotating At The Top Of Each Page Which Evaluation Factor(s) The Information Applies To. sf 330 Instructions: prime Ae Firms Are To Complete And Submit A Current Sf 330 Part I & Ii. All Sections Of The Sf330 Must Be Filled Out In Their Entirety And Must Address All Elements Identified Under The Stage 1 Evaluation Criteria. interested Firms With More Than One (1) Office Must Indicate On Their Sf 330 The Staffing Composition Of The Office In Which The Work Will Be Performed Under The Specified Geographic Zone. Include A Completed Part Ii Only For Each Proposed Consultant/ Subcontractor Listed In Part I - Section C. in Addition To The Standard Instructions Provided On The Sf 330, The Following Are Supplemental Instructions For Sf 330 Part I Sections Under This Announcement: section C: The Prime Ae Firm Should Prioritize Team Members And Only Provide Those That Are Essential To Creating The Most Well-rounded Team. section E: The Prime Ae Firm Should Prioritize And Provide Those That Best Represent The Firm's Ability To Accomplish The Requirements Of This Contract. Ceos And Other Executive Personnel Should Not Be Submitted Unless They Will Have Direct Responsibility For Accomplishing The Task Orders Under This Contract. It Is Required That The Lead Architectural Designer And The Primary Point Of Contact That Would Be Responsible For Managing This Contract And Assigning Task Orders Be Included. It Is Recommended That The Key Personnel Directly Responsible For Work Submitted In Section F Should Also Be Included. section F: All Projects Provided Should Be Designed And Completed Within The Last Ten (10) Years; "designed And Completed" Means The Design Work And Associated Construction Work For A Submitted Project Are Both To Have Been Completed In The Last Ten (10) Years. The Prime Ae Firm May Submit The Same Projects For Multiple Evaluation Factors If They Address The Specified Information Required For Each. Ensure Each Project Specifically Notes Which Factor It Is Being Submitted For. Ensure That An Accessible Owner Point Of Contact Including Name, Title, Address, Current Email Address And Current Phone Number Is Provided. section G: Indicate Key Personnel And Consultant/ Subcontractors Who Participated In The Example Projects Under Section F. section H: Certification Is Required By The Prime Ae Firm That They Have An Active Main Office And/or Branch Office Located Within The Applicable Geographic Area They Wish To Be Considered; The Last Entry Under This Section Must Read "i Hereby Certify That The Prime Ae Firm Listed In Section C Meet(s) The Geographic Limitations Stated In The Synopsis For This Contract". stage 1 Evaluation Criteria the Evaluation Criteria And Associated Relative "weight" For Each Criteria Element Is As Follows: 1. Specialized Experience (35%) 2. Professional Qualifications And Experience Of Key Personnel (25%) 3. Past Performance (20%) 4. Project Management And Quality Control Plan (10%) 5. Geographic Location (5%) 6. Small Business Socio-economic Categories (5%) the Evaluation Criteria And Submission Requirements For Each Are Further Described Below: 1. Evaluation Factor No. 1: Specialized Experience (35%) this Factor Considers The Prime Ae Firm’s Specialized Experience For Projects That Meet The Submittal Requirements Project Definition For This Factor. The Prime Ae Firm Shall Provide Their Most Relevant Experience In Response To Gsa’s “requirements Under The Contract” Description And Demonstrate Success In Appropriately Addressing Complex Design, Research, Innovation, And Strategy Issues Such As Unique Requirements, Significance Of Community Or Cultural Context On Building Or Interior Design, Image, Function, Scale, Scope, Complexity, And Experience Or Perception Of Users. The Prime Ae Firm Shall Demonstrate Innovation In Design, Research, Construction And Project Management Approaches Using Integrated Multidisciplinary Teams On A Range Of Projects Including But Not Limited To Innovative Building Design Solutions, Strategic Endeavors, And Efforts To Achieve Sustainable Solutions. The Prime Ae Firm Shall Also Demonstrate Experience Providing Services Ranging From Pre-design Studies Through Construction Administration; Highlight Areas Of Concentration Or Competence And Range Of Expertise In Diverse Areas Such As Workplace Strategy, Change Management And/or Historic Preservation; Highlight Achievements In Resolution Of Technical Issues Such As Abaas Improvements, Security Design And Energy Projects. the Standard For This Factor Is Met When: the Prime Ae Firm Demonstrates Success In Addressing Complex Design And/or Challenges Through Evidence Of Experience Addressing The Elements Above. additional Consideration Under This Factor: more Weight May Be Given For Firms Who Submit Projects Reflecting Any Of The Following- (1) Experience With Projects Owned By Public Agencies, Including But Not Limited To Federal, State, And Municipal Agencies. (2) Awards Or Other Forms Of Public Recognition From Nationally Recognized Organizations Demonstrating Excellence In Design. submittal Requirements For Factor 1: the Prime Ae Firm Must Submit Three (3) Projects Total For This Factor, No More And No Less. For Each Project, Submit A Maximum Three (3) Page Narrative, Including Any Photographs And Drawings, That Illustrate Specialized Experience Of Projects Where The Construction Was Completed Within The Last Ten (10) Years, And Each Having A Construction Value Of $1 Million Or More. Projects Submitted May Be For Both Renovations And New Construction. 2. Evaluation Factor No. 2: Professional Qualifications And Experience Of Key Personnel (25%) this Factor Considers The Prime Ae Firm’s Professional Qualifications, Experience Of Key Personnel, And Design Philosophy. The Prime Ae Firm Shall Demonstrate Professional Qualifications And Experience Of The Proposed Key Personnel Assigned To This Project Necessary For Satisfactory Performance Of The Required Services. Qualifications And Experience Of The Prime Ae Firm’s Key Personnel Will Be Reviewed First; Then The Overall Proposed Team Qualifications And Experience Will Be Reviewed To Ensure They Will Provide Necessary Support To The Prime Ae Firm To Perform The Required Services. The Prime Ae Firm Shall Also Address The Principal Or Lead Designer’s Philosophy To Include Past Work That Exhibits A Balance Of Design Quality With Other Factors That Affect Public Architecture Including Security, Review Processes, And Budget And Schedule. the Standard For This Factor Is Met When: the Prime Ae Firm Submits All Required Information Demonstrating The Qualifications, Experience, And Design Philosophy As Described. additional Consideration Under This Factor: more Weight May Be Given For Firms Who Submit Information Addressing Any Of The Following - (1) The Degree To Which Any Of The Key Personnel’s Qualifications Are Superior (2) History Of Leadership In Volunteer Organizations Related To The Field Of Architecture, Engineering, And Construction. (3) Awards Or Other Forms Of Public Recognition From Nationally Recognized Organizations Demonstrating Excellence In Design. (4) A Design Philosophy That Provides Evidence Of Flexibility, Innovation, Balance, And Awareness Of Design Excellence In Public Architecture. submittal Requirements For Factor 2: the Prime Ae Firm Shall Provide A Narrative Description, Not To Exceed Two (2) Pages, Summarizing The Principal Or Lead Designer’s Philosophy And Approach To Project Solutions And Providing Examples. Information Provided May Include Appropriate Graphic Material. the Prime Ae Firm Must Submit Resumes Of Proposed Team Members, Not To Exceed Two (2) Pages Each, For Personnel In The Following Disciplines: (1) Prime Architect (one Individual Can Fulfill More Than One Role) principal (architect Of Record) lead Designer project Manager (individual Responsible For Task Orders) (2) Consultants Of Record civil Engineer structural Engineer mechanical Engineer electrical Engineer plumbing Engineer fire Protection Engineer historic Preservation Architect interior Designer landscape Architect resumes Must Indicate Professional Qualification Of Team Members, Including Education, Professional Certification And Licensure, Relevant Experience, Any Specialized Expertise, And The Length Of Service With The Firm. Include And Clearly Identify Resumes For Individuals Who Will Serve As Principal/architect Of Record, Lead Designer, And Project Manager(s), As Well As The Lead Designers In Each Discipline (whether They Are A Part Of The Prime Ae Firm Or A Sub-consultant). resumes Submitted Must Demonstrate Familiarity With New Construction And/or Renovation Projects In Occupied Buildings Where The Construction Was Completed Within The Last Ten (10) Years, And Each Having A Construction Value Of $1 Million Or More. 3. Evaluation Factor No. 3: Past Performance (20%) this Factor Considers The Prime Ae Firm Past Performance On A Range Of Projects Of Varying Scopes, Scales, And Complexities. The Prime Ae Firm’s Role On Each Project Submitted Must Be Identified, Including Demonstrated Success At Collaborative Relationships With Consultants If Applicable. in Evaluating Past Performance For Projects That Meet The Submittal Requirements Project Definition For This Factor, The Government May Review The Contractor Performance Assessment Reporting System (cpars) Database And/or Past Performance Questionnaires (ppq) Submitted By The Prime Ae Firm. Points Of Contact Provided For Projects Submitted Under This Factor And Other Factors May Be Contacted, And The Government May Also Review Any Other Source Of Past Performance Information At Its Discretion. Evaluation Of Past Performance Is A Subjective Assessment Based On Consideration Of All Relevant Facts And Circumstances. It Will Not Be Based On Absolute Standards Of Acceptable Performance. In The Case Of An Offeror Without A Record Of Past Performance, Or For Whom Information On Past Performance Is Not Available, That Offeror Will Be Given Neither A Favorable Nor An Unfavorable Evaluation Regarding Past Performance. the Standard For This Factor Is Met When: the Prime Ae Firm’s Overall Past Performance Record Demonstrates Satisfactory Performance On Three (3) Projects That Meet The Submittal Requirements Project Definition For This Factor. submittal Requirements For Factor 3: the Prime Ae Firm Must Submit Three (3) Projects Total For This Factor, No More And No Less. For Each Project, Submit A Maximum Three (3) Page Narrative, Including Any Photographs And Drawings, Where The Construction Was Completed Within The Last Ten (10) Years, And Each Having A Construction Value Of $1 Million Or More. Include Tangible Evidence Such As Certificates, Awards, Peer Recognition, Etc., Demonstrating Design Performance. Projects Submitted May Be For Both Renovations And New Construction. Each Project Specified Is To Clearly Identify The Project Name, Design Contract Number (if Applicable), Location Of Work, Design Contract Value, Construction Value, And Accurate Client Reference Information Including Name, Title, Address, Email, And Phone Number. Points Of Contact Provided For Projects Submitted Under Other Evaluation Criteria May Be Contacted. additionally, The Prime Ae Firm Must Submit A Ppq Or Copy Of The Completed Cpars Evaluation For Each Of The Three (3) Projects Submitted Under This Factor. The Ppq Or Cpars Evaluation Pages Are In Addition To The Three (3) Page Maximum Narrative Specified For Each Project. 4. Evaluation Factor 4: Project Management And Quality Control Plan (10%) this Factor Evaluates The Prime Ae Firm’s Project Management And Quality Control Plan, Which Provides A Plan Specific To This Idiq Contract. At A Minimum, The Submitted Plan Must Clearly Identify Key Roles And Lines Of Communication, And Must Explain Steps To Ensure Cost And Schedule Control, Quality Control, Project Team Capacity, And Requirements For All Review Stages And Submittals. the Project Management And Quality Control Plan Must Also Demonstrate The Capacity Of The Prime Ae Firm To Accomplish Multiple, Large And Small Projects Simultaneously, And The Ability To Sustain The Loss Of Key Personnel While Accomplishing The Work Within The Required Time Limits. Under The Anticipated Idiq Contract, Each Contract Awardee Must Have The Capability To Concurrently Perform Design And Engineering Work For At Least Five (5) Gsa Projects/ Task Orders. the Standard For This Factor Is Met When: the Prime Ae Firm Demonstrates The Following - the Methods To Deliver Quality Design Or Deliverable While Maintaining Cost And Schedule Controls. the Capability To Respond To The Government’s Needs In A Timely Manner. the Capability To Perform And Balance Multiple Task Orders Concurrently And To Balance Competing Needs Of Multiple Customers. their Ability, Methods, And Processes To Adequately Staff Project Teams. submittal Requirements For Factor 4: the Prime Ae Firm Shall Submit A Project Management And Quality Control Plan, Six (6) Pages Maximum, That Demonstrates The Firm’s Approach For Delivering Individual Projects And Addresses How The Plan Will Be Catered To The Anticipated Idiq Contract, As Described Above. 5. Evaluation Factor 5: Geographic Location (5%) this Factor Evaluates The Prime Ae Firm’s Knowledge Of Local Conditions Within The Geographical Zone(s) In Which They Wish To Be Considered For Contract Award Including Design And Project Strategies Used For Solutions To Design Issues Specific To Local, Environmental, And Geographic Areas Within A Zone. This Must Include Project Delivery Processes, Construction Methodologies, And Related Involvement Or To The Consultants. This Factor Also Considers The Prime Ae Firm’s Familiarity Of The Applicable Geographic Area’s Architectural Standards And Codes, Building Codes, Environmental Regulations, Soil Conditions, Seismic Requirements, And Agency Regulations. the Standard For This Factor Is Met When: the Prime Ae Firm Clearly Demonstrates Knowledge Of Local Conditions And Familiarity With Applicable Geographic Areas Standards And Codes, As Described Above. submittal Requirements For Factor 5: the Prime Ae Firm Must Submit Three (3) Projects Total For This Factor, No More And No Less, And Must Provide A Maximum Of Three (3) Page Narrative For Each Project, Including Any Photographs And Drawings As Applicable, For A Total Of Three (3) Projects Where The Construction Was Completed Within The Last Ten (10) Years, And Each Having A Construction Value Of $1 Million Or More, Describing The Prime Ae Firm’s Knowledge Of Locality Criteria Described Above. Projects Submitted May Be For Both Renovations And New Construction. 6. Evaluation Factor No. 6: Small Business Socio Economic Categories: Hubzone, Sdvosb, Wosb (5%) this Factor Considers The Prime Ae Firms Status As A Small Business Concern In The Following Socio-economic Categories: Historically Underutilized Business Zone (hubzone) Small Business Concern; Service-disabled Veteran Owned Small Business (sdvosb) Concern; Women-owned Small Business (wosb) Concern. including This Factor In The Evaluation Of The Prime Ae Firm Will Result In A Higher Evaluation Rating Being Given To Firms Who Fall Within One Of The Specified Socio-economic Categories. the Standard For This Factor Is Met When: the Prime Ae Firm Provides Confirmation Of Their Small Business Socio-economic Status Within One Or More Of The Specified Categories, If Applicable. submittal Requirements For Factor 6: the Prime Ae Firm Must Submit Proof Of Current Sba Certification Within The Socio-economic Category Specified. stage Ii Process Summary the Names Of The Short-listed Prime Ae Firms Who Will Be Invited To Participate In Stage Ii Of The Selection Process Will Be Published On Sam.gov. This Publication Will Be The Only Notice For Prime Ae Firms Who Submit Stage I Technical Qualification Packages And Are Not Short-listed Will Receive. Short-listed Prime Ae Firms Will Be Provided More Detailed Information On The Stage Ii Process. prime Ae Firms Slated For Interviews Will Be Asked To Present Information On The Evaluation Factors. The Primary Presenter Must Be The Proposed Project Manager/ Lead Project Architect, With Assistance From Up To Two (2) Additional Team Members As Necessary. Interviews Will Be Conducted Via Google Meet. following The Technical Review And Interview Process The Final Selected Prime Ae Firms Will Be Requested To Provide Pricing To Include Overhead Rates, Profit Rates And Hourly Rates For The Anticipated Disciplines For Use In Negotiating Fixed Price Task Orders. notice To Prime Ae Firms prime Ae Firms Submitting Qualification Packages Under This Notice Must Be A Small Business Firm With A Main Office And/or Branch Office In Each Of The Geographic Zone(s) They Are Interested In Being Considered For. Additionally, Failure To Address Each Of The Evaluation Factors And Provide The Requested Information May Result In Failure To Qualify. it Is The Prime Ae Firms Responsibility To Monitor Sam.gov For Any Changes To This Announcement. questions: the Deadline For Submitting Questions Is October 4, 2024, 4:00 Pm Pt. Questions Must Be Submitted In Writing Via Email To Heather Caney, Contracting Officer At Heather.caney@gsa.gov. Questions Received After The Date Specified Will Not Be Accepted Or Responded To. An Amendment Will Be Issued To Provide Responses To All Questions Received By The Deadline. all Questions Received In Writing By The Closing Date And Time Have Been Responded To Under Amendment 1. No Additional Questions Will Be Accepted Or Responded To. closing Date And Time: prime Ae Firms Which Possess The Qualifications To Perform The Services Described In This Notice Are Invited To Submit Their Complete Technical Qualification Package No Later Than November 12, 2024, 4pm Pt. The Email Submission Must Clearly Identify The Synopsis/solicitation Number And The Applicable Geographic Zone For Which The Prime Ae Firm Is To Be Considered. For Prime Ae Firms Submitting For Multiple Zones, Send A Separate Email For Each Zone. all Submissions Shall Be Sent Via Email To Heather Caney, Contracting Officer At Heather.caney@gsa.gov. only Electronic Pdf Submissions Will Be Considered. No Late Submissions Will Be Accepted. it Is The Prime Ae Firm’s Responsibility To Ensure Technical Qualification Packages Are Complete And Submitted Early Enough To Be Received By The Contracting Officer Before The Deadline, And To Confirm Receipt Before The Deadline. Technical Qualification Packages Which Are Received By The Contracting Officer Later Than The Time Noted Will Be Rejected And Will Not Be Considered. the Maximum File Size For Email Submissions Is 25 Mb. Gsa Has Occasionally Experienced Delays In Delivery Of Emails From The Gsa Server To An Email Account. Therefore, Prime Ae Firms Need To Plan Accordingly. list Of Attachments: the Following Are A List Of Attachments Provided With This Notice: 1. Ppq (word) 2. Sf330 Part 1 & 2 With Form Instructions (pdf) 3. Sf330 - Part 1 (pdf) 4. Sf330 - Part 2 (pdf) 5. Sf330 - Extra Section C (pdf) 6. Sf330 - Extra Section E (pdf) 7. Sf330 - Extra Section G (pdf) 8. Sf330 - Extra Section H (pdf) 9. Amendment 1 - 10/18/2024 (pdf)
Closing Date13 Nov 2024
Tender AmountRefer Documents 

Hansel Oy Tender

Others
Finland
Details: Hansel Ltd’s aim is to establish a dynamic purchasing system, which is targeted at the User Services of the premises and the provision of complementary or separate supplementary services as defined by the Customer in the performance plug-in Terms and Conditions for Customers in the Customer’s Accounts or Defined by the Customer”, “The user services of the premises may be tailored to the operating environment only as a result of the Sharing Services” Cleaning services and Services Assistant Tasks.", "Cleaning Services Contain: ""; Maintenance and Basic Cleanings"; Separate Order Additional Services" The acquisjen and distribution of goods and services associated with the cleaning task (such as the acquista of sanitary supplies and dishwasher materials) Separately subscribed Maintenance and Fundamental Services, such as Custody Services Caused by Orders » » • Procurement and/or Pro Lisä Supplementary Services, such as Exchange Service, Customer’s Own Own carpet maintenance service, Transportation of Collection Paper to Waste Collection Point, Proning of Data Protection Maäls and Disposing of Requirements Inher, Wheel Services Services » “Security services may be Mm. ”; Aula, Reception, Office Support and Guardian Services”; “Safety and Awakening Services”; “Supporting of Safety and Awakening”; “Local or Circulating Guards”; “Safetytarkastus”; “Safety Checks”; “Asssistant Doctors Can Be Mm
Closing Date31 Dec 2025
Tender AmountNA 

Department Of Social Welfare And Development Region Xii Tender

Others
Philippines
Details: Description Department Of Social Welfare And Development Field Office Xii Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Philippine Bidding Documents For The Procurement Of Office Supplies For Slp Staff For 2024 (lot 1 To Lot 6) Project Identification No. Dswd12-slp-2024-10-023 Government Of The Republic Of The Philippines Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...11 1. 12 2. 12 3. 12 4. 12 5. 12 6. 13 7. 13 8. 13 9. 14 10. 14 11. 14 12. 14 13. 15 14. 15 15. 16 16. 16 17. 16 18. 16 19. 16 20. 17 21. 17 Section Iii. Bid Data Sheet …………………………………………………..18 Section Iv. General Conditions Of Contract ……………………...………..23 1. 24 2. 24 3. 24 4. 24 5. 25 6. 25 Section V. Special Conditions Of Contract ………………………………….26 Section Vi. Schedule Of Requirements ……………………………………....29 Section Vii. Technical Specifications …………………………………………45 Section Viii. Checklist Of Technical And Financial Documents …………..62 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Invitation To Bid For The Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Staff For 2024 (lot 1 To Lot 6) 1. The Department Of Social Welfare And Development Field Office Xii, Through The General Appropriations Act 2024 Intends To Apply The Sum Of The Amount Being The Abc To Payments Under The Contract For Each Following Lot/item: A. Five Hundred Thirty Four Thousand Three Hundred Nineteen Pesos Only (₱534,319.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of South Cotabato Cluster For 2024 (lot1); B. One Hundred Thirty One Thousand Two Hundred Twenty Three Pesos Only (₱131,223.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Rpmo For 2024 (lot2); C. Three Hundred Thousand Three Hundred Six Pesos Only (₱300,306.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sultan Kudarat For 2024 (lot3); D. Four Hundred Sixty Four Thousand Six Hundred Seventy Two Pesos Only (₱464,672.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sultan Kudarat For 2024 (lot4); And E. One Hundred Forty Nine Thousand Thirty Three Pesos Only (₱149,033.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-i For 2024 (lot5) F. Two Hundred Twelve Thousand Ninety Six Pesos Only (₱212,096.00) For Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-ii For 2024 (lot6) 2. The Department Of Social Welfare And Development Field Office Xii Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Social Welfare And Development Field Office Xii – Bids And Awards Committee Secretariat Office And Inspect The Bidding Documents At The Address Given Below During 8:00a.m. To 5:00 P.m.. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 15, 2024 To October 31, 2024, 5:00 P.m. From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Approved Budget For The Contract Bid Docs Amount Lot 1 – ₱ 534,319.00 ₱1,000.00 Lot 2 – ₱ 131,223.00 ₱1,000.00 Lot 3 – ₱ 300,306.00 ₱1,000.00 Lot 4 – ₱ 464,672.00 ₱1,000.00 Lot 5 – ₱ 149,033.00 ₱1,000.00 Lot 6 – ₱ 212,096.00 ₱1,000.00 Total – ₱ 1,791,649.00 Php 5,000.00 (maximum Fee For Sale Of Bidding Documents) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. [note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots.] 6. The Department Of Social Welfare And Development Field Office Xii Will Hold A Pre-bid Conference On October 23, 2024, 10:30 A.m. At Dswd Field Office 12, Regional Center, Brgy. Carpenter Hill, Koronadal City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before November 04, 2024, 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening And Evaluation Shall Be On November 04, 2024, 10:30 A.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Social Welfare And Development Field Office Xii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Dswd 12 – Bac Secretariat Head Administrative Division – Procurement Section Dswd Field Office 12, Regional Center, Brgy. Carpenter Hills, Koronadal City, 9506 Procurement.fo12@dswd.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://fo12.dswd.gov.ph/bid-bulletin/ Https://www.philgeps.gov.ph October 14, 2024 Jackiya A. Lao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Department Of Social Welfare And Development Field Office Xii Wishes To Receive Bids For The Procurement Of Office Supplies For Slp Staff For 2024 (lot 1 To Lot 6), With Identification Number Dswd12-slp-2024-10-023. The Procurement Project (referred To Herein As “project”) Is Composed Of One Lot Or Item, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2024 Approved Gaa In The Amount Of One Million Seven Hundred Ninety One Thousand Six Hundred Forty Nine Pesos Only (₱1,791,649.00) 2.2. The Source Of Funding The Approved Gaa 2024. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On October 23, 2024, 10:30 A.m. And At Its Physical Address Department Of Social Welfare And Development Field Office 12, Regional Center, Brgy. Carpenter Hills, Koronadal City As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, On/or Before October 26, 2024 Or At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In The Bds. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until March 04, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items, Which Shall Be Awarded As Separate Contracts Per Item. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply And Delivery Of Office Equipment, Supplies, And Consumables. B. Completed Within At Least Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱ 10,686.38 For Lot 1 ₱ 2,624.46 For Lot 2, ₱ 6,006.12 For Lot 3, ₱ 9,293.44 For Lot 4, ₱ 2,980.66 For Lot 5, And ₱ 4,241.92 For Lot 6 Or The Amount Equivalent To Two Percent (2%) Of Abc If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱ 26,715.95 For Lot 1, ₱ 6,561.15 For Lot 2, ₱ 15,015.30 For Lot 3, ₱ 23,233.60 For Lot 4, ₱ 7,451.65 For Lot 5, And ₱ 10,604.80 For Lot 6 Or The Amount Equivalent To Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.1 1. All Forms Must Be Submitted Using The Prescribed Format Provided By The Procuring Entity And Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder, Otherwise, Bids Shall Be Subject To An Outright Disqualification. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Supplier Of The Notice Of Post Qualification From The Bac That The Supplier Has The Lowest Calculated Bid (lcb) Or Single Calculated Bid (scb), The Supplier Shall Submit And/or Present The Following Requirements For Post Qualification In Accordance To Section 34 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra9184: 1. Present Original Copy Of The Following: A. A. Latest Income Tax Return And Business Tax Return ( For 2nd Quarter Of 2024) B. B. Latest Value Added Tax (vat) Return ( For 2nd Quarter Of 2024, If Applicable) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing & Payment System (efps) Shall Be Accepted. C. Valid Philgeps Registration Certificate (platinum Membership) (all Pages) D. Valid Registration Certificate From Securities And Exchange Commission (sec) For Corporations, Or From Department Of Trade And Industry (dti) For Sole Proprietorship, Or From Cooperative Development Authority (cda) For Cooperatives; E. Valid Business/mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Bidder Is Located; F. Valid Tax Clearance Per Eo 398, Series Of 2005, As Finally Reviewed And Approved By The Bir; G. Bureau Of Internal Revenue (bir) Registration Certificate. H. Copy Of Contracts Or Po’s, Notice Of Award (noa) And Notice To Proceed (ntp) For All On-going Contracts I. End-user’s Acceptance, Official Receipt (duplicate Or Triplicate Copy) Or Sales Invoice With Collection Receipt/s (duplicate Or Triplicate Copy) Relative To Single Largest Completed Contract J. Company Profile And Organizational Chart. Company Printed Brochure May Be Included. K. Vicinity Map/location Of The Business. L. Other Appropriate Licenses And Permits Required By Law And Stated In The Bidding Documents. Failure To Submit Any Of The Post-qualification Requirements On Time, Or A Finding Against The Veracity Thereof, Shall Disqualify The Bidder For Award. Provided In The Event That A Finding Against The Veracity Of Any Of The Documents Submitted Is Made, It Shall Cause The Forfeiture Of The Bid Security In Accordance With Section 69 Of The Irr Of Ra 9184. Note: For Post Qualification Purposes Only 20.3 Each Bidder Shall Submit The Following In One (1) “mother” Envelope Duly Sealed And Labeled, Containing Two (2) Sets Of Envelopes: First Envelope Containing At Least One (1) Set Of Duly Signed And Sealed Eligibility And Technical Documents Second Envelope Containing At Least One (1) Set Of Duly Signed And Sealed Financial Bid Documents 20.4 All Envelopes Shall Be Labeled/marked As Follows: To : Jackiya A. Lao Chairperson Bids And Awards Committee Dswd-field Office 12 From :_______________________________ (name Of Bidder In Capital Letters) Address: _______________________________ (address Of Bidder In Capital Letters) Project: Procurement Of Office Supplies For Slp Provincial Staff Of South Cotabato Cluster For 2024 (lot1) Procurement Of Office Supplies For Slp Provincial Staff Of Rpmo For 2024 (lot2) Procurement Of Office Supplies For Slp Provincial Staff Of Sultan Kudarat For 2024 (lot3) Procurement Of Office Supplies For Slp Provincial Staff Of Sargen For 2024 (lot4) Procurement Of Office Supplies For Slp Provincial Staff Of Cc-i For 2024 (lot5) Procurement Of Office Supplies For Slp Provincial Staff Of Cc-ii For 2024 (lot6) Bid Ref No.: Itb No. Dswd12-slp-2024-10-023 (lot1) Dswd12-slp-2024-10-023 (lot2) Dswd12-slp-2024-10-023 (lot3) Dswd12-slp-2024-10-023 (lot 4) Dswd12-slp-2024-10-023 (lot 5 Dswd12-slp-2024-10-023 (lot 6) Approved Budget For The Contract : Lot 1 ₱534,319.00 Lot 2 ₱131,223.00 Lot 3 ₱300,306.00 Lot 4 ₱464,672.00 Lot 5 ₱149,033.00 Lot 6 ₱212,096.00 Do Not Open Before: 04 November 2024; 10:30 A.m. 21.2 No Further Instructions Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Shall Be One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Purchase Order Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – Not Applicable Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. Transportation – Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 The Terms Of Payment Shall Be As Follows: Payment Must Correspond To The Value Of Goods Delivered And Accepted After The Appropriate Inspection Acceptance Procedures Proof Of Deliveries) Must Be Signed By Authorized Person To Support Claims For Payment. 4 The Inspections And Tests Shall Be Conducted By The Dswd Inspection Committee, Final Acceptance By The Dswd Acceptance Committee, And End-user. Section Vi. Schedule Of Requirements A. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of South Cotabato Cluster For 2024 (lot1) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Book Paper, A4 70gsm 315 Box/es 315 Box/es Delivery Of The Goods Is Required One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Correction Tape 5mm X 8m 62 Piece/s 62 Piece/s 3 Fastener, 70mm Plastic 10 Box/es 10 Box/es 4 Epson Ink 003, Black 20 Piece/s 20 Piece/s 5 Epson Ink 664, Black 20 Piece/s 20 Piece/s 6 Staple Wire #35 32 Piece/s 32 Piece/s 7 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 35 Pad/s 35 Pad/s 8 Ballpen. 0.5 Black 165 Piece/s 165 Piece/s 9 Ballpen. 0.5 Blue 164 Piece/s 164 Piece/s 10 Sign Pen, 0.5 Black 7 Piece/s 7 Piece/s 11 Gel Ink Pen, 0.7 Black 96 Piece/s 96 Piece/s 12 Gel Ink Pen, 0.7 Blue 96 Piece/s 96 Piece/s 13 Stapler With Remover #35 32 Piece/s 32 Piece/s 14 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 2 Unit /s 2 Unit /s Note: Delivery Term: Note: One Time Delivery To The Provincial Cluster Office (po) Located At Koronadal City And Inspection Should Also Be Done In Pco-koronadal City. Delivery Terms Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco South Cotabato, South Cotabato Gymnasium, Koronadal City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ B. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Rpmo For 2024 (lot2) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Pentel Pen, Black 10 Piece/s 10 Piece/s Delivery Of The Goods Is Required One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Epson 003, Black 20 Piece/s 20 Piece/s 3 Epson 003, Cyan 10 Piece/s 10 Piece/s 4 Epson 003, Magenta 10 Piece/s 10 Piece/s 5 Epson 003, Yellow 10 Piece/s 10 Piece/s 6 Vellum, Board A4 200gsm, 10 Sheets Per Pack 100 Pack/s 100 Pack/s 7 Binder Clip, Small 20 Piece/s 20 Piece/s 8 Binder Clip, Medium 20 Piece/s 20 Piece/s 9 Binder Clip, Large 10 Piece/s 10 Piece/s 10 Notepad 2"x3 10 Pad/s 10 Pad/s 11 Notepad 3"x4 10 Pad/s 10 Pad/s 12 Paper Clip Vinyl Jumbo 55mm 10 Box/es 10 Box/es 13 Paper Clip Vinyl Small 33mm 10 Box/es 10 Box/es 14 Pencil Eberhard Faber's Wood Clinched Bonding Technology No. 2 10 Piece/s 10 Piece/s 15 Gel Ink Pen, 0.7 Black 10 Piece/s 10 Piece/s 16 Gel Ink Pen, 0.7 Blue 10 Piece/s 10 Piece/s 17 Stapler With Remover #35, Durable Metal Stapler, Tacking & Pinning And Double Duty. Weight: 0.196kg Production Dimension: 5in X 2in X 2in Material Type: Metal 5 Piece/s 5 Piece/s 18 Stapler Wire #35 45 Box/es 45 Box/es 19 Staple Remover Plier Type Stainless Steel Lifting Mechanism For Easily Lifting, Gripping And Removing Staples Lightweight And Compact. 8 Piece/s 8 Piece/s 20 Certificate Holder A4 (not Glass) 100 Piece/s 100 Piece/s 21 Power Saving Wireless Mouse 2 Piece/s 2 Piece/s 22 Book Paper, A4, 70gsm 15 Box/es 15 Box/es 23 Ruler Plastic 12inches 10 Piece/s 10 Piece/s 24 Scissors 8 Inches Stainless Steel 10 Piece/s 10 Piece/s 25 Glue 130g, Elmer's Glue 2 Piece/s 2 Piece/s 26 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 12 Pack/s 12 Pack/s 27 Rubberband 50grams Small 2 Box/es 2 Box/es 28 Scanner Wireless High-speed Desktop Scanner | 2.8-inch Touchscreen | Scans Up To 40ppm1 1 Unit 1 Unit 29 Multifunction Printer Black One Size / Eu Plug Colour • With Scanner • Inkjet • Wireless • Wi-fi • Usb • Cloud Ready 1 Unit 1 Unit 30 Lever Arch Top Clip, A4 5 Piece/s 5 Piece/s 31 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 2 Piece/s 2 Piece/s 32 Record Book 200page: Hardbound Covers With Turned And Folded Edges. Weight Per Pack: 200pages, 0.336kg 5 Piece/s 5 Piece/s 33 Highlighter, Neon Colors 5 Piece/s 5 Piece/s 34 Scotch Tape, 1", 50meters 5 Piece/s 5 Piece/s 35 Ballpen, 0.5 Black 10 Piece/s 10 Piece/s 36 Blade Cutter Knife 6inches 2 Piece/s 2 Piece/s 37 Stand File Box Color Black 5 Piece/s 5 Piece/s 38 Double Sided Tape 10meters 10 Piece/s 10 Piece/s Note: Note: One Time Delivery To The Rpmo Located At Koronadal City And Inspection Should Also Be Done In Koronadal City. Delivery Terms Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Dswd Xii, Purok Bumanaag, Brgy. Zone Iii, Koronadal City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ C. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sultan Kudarat For 2024 (lot3) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Ballpen, 0.5 Black 120 Piece/s 120 Piece/s Delivery Of The Goods Is Required One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Binder Clip, 19mm 5 Box/es 5 Box/es 3 Binder Clip, 25mm 10 Box/es 10 Box/es 4 Book Paper, A4,70gsm 490 Ream/s 490 Ream/s 5 Book Paper,long,70gsm 5 Ream/s 5 Ream/s 6 Certificate Paper A4 5 Pack/s 5 Pack/s 7 Certificate Holder, A4 24 Piece/s 24 Piece/s 8 Correction Tape 5mm X 8m 50 Piece/s 50 Piece/s 9 Epson Ink 003, Black 112 Piece/s 112 Piece/s 10 Epson Ink 003, Cyan 35 Piece/s 35 Piece/s 11 Epson Ink 003, Yellow 35 Piece/s 35 Piece/s 12 Epson Ink 003, Magenta 30 Piece/s 30 Piece/s 13 Cannon Ink 003, Black 10 Piece/s 10 Piece/s 14 Cannon Ink 003, Cyan 5 Piece/s 5 Piece/s 15 Cannon Ink 003, Yellow 5 Piece/s 5 Piece/s 16 Cannon Ink 003, Magenta 5 Piece/s 5 Piece/s 17 Fastener, 70mm 50 Box/es 50 Box/es 18 Folded Brown Long (100s) 300 Piece/s 300 Piece/s 19 Glue 130g 5 Piece/s 5 Piece/s 20 Highlighter, Neon Colors 24 Piece/s 24 Piece/s 21 Lever Arch File 3", Black 10 Piece/s 10 Piece/s 22 Marker, Permanent , Black , Blue , Red 24 Piece/s 24 Piece/s 23 Marker, Permanent , Black 2 Piece/s 2 Piece/s 24 Note Pad, 2" X 3 35 Pad/s 35 Pad/s 25 Note Pad, 3" X 3 35 Pad/s 35 Pad/s 26 Paper Clip Vinyl Jumbo 55mm 17 Box/es 17 Box/es 27 Paper Clip Vinyl Jumbo 33mm 17 Box/es 17 Box/es 28 Pencil, Eberhard Faber's Woodlinched Bonding Technology No.2 24 Piece/s 24 Piece/s 29 Plastic Envelope, Legal 5 Piece/s 5 Piece/s 30 Rubberband, 50g Small 2 Box/es 2 Box/es 31 Scissors 8" Stainless Steel 5 Pair/s 5 Pair/s 32 Sharpener Desk Heavy Duty 1 Piece/s 1 Piece/s 33 Gel Ink Pen, 0.7 Black 120 Piece/s 120 Piece/s 34 Staple Wire # 35 30 Box 30 Box 35 Stapler, Heavy Duty 2 Piece/s 2 Piece/s 36 Stapler With Remover #35 3 Piece/s 3 Piece/s 37 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 2 Piece/s 2 Piece/s 38 Cork Board 40x60 2 Piece/s 2 Piece/s 39 Vellum Board, Long, 10sheets Per Pack 2 Pack/s 2 Pack/s 39 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Borderless Printing Up To 4r 1 Unit 1 Unit 40 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 66 Pad/s 66 Pad/s Note: One Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco, City Hall Of Tacurong, Sultan Kudarat General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ D. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sargen Cluster For 2024 (lot4) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Book Paper A4, 70gsm 117 Box/es 117 Box/es Delivery Of The Goods Is Required One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Correction Tape 5mm X 8m 80 Piece/s 80 Piece/s 3 Fastener, 70mm 140 Box/es 140 Box/es 4 Epson Ink 003, Black 74 Piece/s 74 Piece/s 5 Epson Ink 003, Magenta 36 Piece 36 Piece 6 Epson Ink 003, Blue 36 Piece 36 Piece 7 Epson Ink 003, Yellow 36 Piece 36 Piece 8 Epson Ink 664, Black (10) 36 Piece 36 Piece 9 Epson Ink 664, Magenta 14 Piece 14 Piece 10 Epson Ink 664, Blue 14 Piece 14 Piece 11 Epson Ink 664, Yellow 14 Piece 14 Piece 12 Brother Compatible Toner Cartridge Tn660 Guranteed High Quality Compatible Toner Cartridge 101% Brand New. Not Remanufactured Or Refilled. Factory Sealed. Made With All New Parts. 4 Piece 4 Piece 13 Staple Wire #35 30 Box/es 30 Box/es 14 Notepad, 3" X 4 70 Pad/s 70 Pad/s 15 Staple Remover #35 30 Piece/s 30 Piece/s 16 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 96 Pack/s 96 Pack/s 17 Printer All In One Print, Scan, Copy Connectivity: Usb/ Lan/ Wifi/ Wifi Direct/ Lan Compact Integrated Tank Design Print Speeds Up To 15.5ipm For Black And 8.5ipm For Colour Auto-duplex Printing Adf Capability Epson Smart Panel Borderless Printing Up To A4 Size Warranty Of 2 Years Of 50,000 Pages, Whichever Comes First Powered By Epson Heat-free Technology 2 Unit 2 Unit 18 Laser Multi-function Monochrome Printer Monochrome (black & White Only) Print, Scan, Copy, Adf, Wi-fi Automatic 2-sided Print Print Up To Long/legal Scan/copy Up To Long/legal Via Adf Scan/copy Up To Short/a4 Via Flatbed Glass Toner Cartridge Powder 1 Unit 1 Unit 19 Sign Pen, 0.5 Black 85 Piece/s 85 Piece/s 20 Sign Pen, 0.5 Blue 85 Piece/s 85 Piece/s 21 Gel Ink Pen, 0.7 Black 85 Piece/s 85 Piece/s 22 Gel Ink Pen, 0.7 Blue 85 Piece/s 85 Piece/s 23 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 35 Piece/s 35 Piece/s 24 Paper Cip Vinyl Jumbo 55mm 70 Box/es 70 Box/es 25 Paper Cip Vinyl Jumbo 33mm 70 Box/es 70 Box/es 26 Scissors 8" Stainless Steel 36 Piece/s 36 Piece/s 27 Folder Brown Long (100pcs/ Per Ream) 35 Ream/s 35 Ream/s Note: One Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco, City Hall Of General Santos City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ E. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-i For 2024 (lot5) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Via Epson Smart Panel Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 1 Unit 1 Unit Delivery Of The Goods Is Required One Time Delivery To Provincial Cluster Offices And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Epson Ink 664, Black 11 Piece/s 11 Piece/s 3 Epson Ink 003, Black 38 Piece/s 38 Piece/s 4 Epson Ink 003, Yellow 2 Piece/s 2 Piece/s 5 Epson Ink 003, Cyan 2 Piece/s 2 Piece/s 6 Epson Ink 003, Magenta 2 Piece/s 2 Piece/s 7 Fastener 70mm 55 Box/es 55 Box/es 8 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 11 Piece/s 11 Piece/s 9 Staple Heavy Duty With Remover #35 11 Piece/s 11 Piece/s 10 Staple Wire #35 22 Box/es 22 Box/es 11 Scissors 8" Stainless Steel 11 Piece/s 11 Piece/s 12 Gel Ink Pen, 0.7 Black 55 Piece/s 55 Piece/s 13 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 58 Pack/s 58 Pack/s 14 Book Paper, A4, 70gsm 56 Box/es 56 Box/es 15 Correction Tape 5mm X 8m 33 Piece/s 33 Piece/s 16 Paper Clp Vinyl Jumbo 55mm 33 Box/es 33 Box/es 17 Folder Brown Long (100pcs/ Per Ream) 5 Ream/s 5 Ream/s Note: Delivery Term: "one Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. " Place Of Delivery / Venue: Slp Pco, Kidapawan, North Cotabato General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ F. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-ii For 2024 (lot6) The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Ballpen, 0.5 Black 35 Piece/s 35 Piece/s Delivery Of The Goods Is Required One Time Delivery And Within 30 Working Days Upon The Receipt Of The Approved Po 2 Ballpen, 0.7 Black 35 Piece/s 35 Piece/s 3 Book Paper, A4 70gsm 400 Ream/s 400 Ream/s 4 Book Paper, Long 70gsm 10 Ream/s 10 Ream/s 5 Epson Ink 003, Black 40 Piece/s 40 Piece/s 6 Epson Ink 003, Cyan 20 Piece/s 20 Piece/s 7 Epson Ink 003, Yellow 20 Piece/s 20 Piece/s 8 Epson Ink 003, Magenta 18 Piece/s 18 Piece/s 9 Pencil, Eberhard Faber's Woodclinched Bonding Technology No.2 30 Piece/s 30 Piece/s 10 Sign Pen, 0.5 Black 35 Piece/s 35 Piece/s 11 Sign Pen, 0.5 Blue 35 Piece/s 35 Piece/s 12 Gel Ink Pen, 0.7 Black 35 Piece/s 35 Piece/s 13 Gel Ink Pen, 0.7 Blue 35 Piece/s 35 Piece/s 14 Staple Wire #35 23 Box/es 23 Box/es 15 Printable Sticker Paper A4 50pcs 48 Pack/s 48 Pack/s 16 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Via Epson Smart Panel Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 2 Unit/s 2 Unit/s 17 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 67 Pack/s 67 Pack/s Note: Delivery Term: "one Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. " Place Of Delivery / Venue: Slp Pco, Midsayap, North Cotabato General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness, And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification. Technical Specifications A. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of South Cotabato Cluster For 2024 (lot1) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Book Paper, A4 70gsm 315 Box/es 2 Correction Tape 5mm X 8m 62 Piece/s 3 Fastener, 70mm Plastic 10 Box/es 4 Epson Ink 003, Black 20 Piece/s 5 Epson Ink 664, Black 20 Piece/s 6 Staple Wire #35 32 Piece/s 7 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 35 Pad/s 8 Ballpen. 0.5 Black 165 Piece/s 9 Ballpen. 0.5 Blue 164 Piece/s 10 Sign Pen, 0.5 Black 7 Piece/s 11 Gel Ink Pen, 0.7 Black 96 Piece/s 12 Gel Ink Pen, 0.7 Blue 96 Piece/s 13 Stapler With Remover #35 32 Piece/s 14 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 2 Unit /s Note: Delivery Term: One Time Delivery To The Provincial Cluster Office (po) Located At Koronadal City And Inspection Should Also Be Done In Pco-koronadal City. Delivery Terms Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco South Cotabato, South Cotabato Gymnasium, Koronadal City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ B. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Rpmo For 2024 (lot2) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Pentel Pen, Black 10 Piece/s 2 Epson 003, Black 20 Piece/s 3 Epson 003, Cyan 10 Piece/s 4 Epson 003, Magenta 10 Piece/s 5 Epson 003, Yellow 10 Piece/s 6 Vellum, Board A4 200gsm, 10 Sheets Per Pack 100 Pack/s 7 Binder Clip, Small 20 Piece/s 8 Binder Clip, Medium 20 Piece/s 9 Binder Clip, Large 10 Piece/s 10 Notepad 2"x3 10 Pad/s 11 Notepad 3"x4 10 Pad/s 12 Paper Clip Vinyl Jumbo 55mm 10 Box/es 13 Paper Clip Vinyl Small 33mm 10 Box/es 14 Pencil Eberhard Faber's Wood Clinched Bonding Technology No. 2 10 Piece/s 15 Gel Ink Pen, 0.7 Black 10 Piece/s 16 Gel Ink Pen, 0.7 Blue 10 Piece/s 17 Stapler With Remover #35, Durable Metal Stapler, Tacking & Pinning And Double Duty. Weight: 0.196kg Production Dimension: 5in X 2in X 2in Material Type: Metal 5 Piece/s 18 Stapler Wire #35 45 Box/es 19 Staple Remover Plier Type Stainless Steel Lifting Mechanism For Easily Lifting, Gripping And Removing Staples Lightweight And Compact. 8 Piece/s 20 Certificate Holder A4 (not Glass) 100 Piece/s 21 Power Saving Wireless Mouse 2 Piece/s 22 Book Paper, A4, 70gsm 15 Box/es 23 Ruler Plastic 12inches 10 Piece/s 24 Scissors 8 Inches Stainless Steel 10 Piece/s 25 Glue 130g, Elmer's Glue 2 Piece/s 26 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 12 Pack/s 27 Rubberband 50grams Small 2 Box/es 28 Scanner Wireless High-speed Desktop Scanner | 2.8-inch Touchscreen | Scans Up To 40ppm1 1 Unit 29 Multifunction Printer Black One Size / Eu Plug Colour • With Scanner • Inkjet • Wireless • Wi-fi • Usb • Cloud Ready 1 Unit 30 Lever Arch Top Clip, A4 5 Piece/s 31 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 2 Piece/s 32 Record Book 200page: Hardbound Covers With Turned And Folded Edges. Weight Per Pack: 200pages, 0.336kg 5 Piece/s 33 Highlighter, Neon Colors 5 Piece/s 34 Scotch Tape, 1", 50meters 5 Piece/s 35 Ballpen, 0.5 Black 10 Piece/s 36 Blade Cutter Knife 6inches 2 Piece/s 37 Stand File Box Color Black 5 Piece/s 38 Double Sided Tape 10meters 10 Piece/s Note: Delivery Term: Note: One Time Delivery To The Rpmo Located At Koronadal City And Inspection Should Also Be Done In Koronadal City. Delivery Terms Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Dswd Xii, Purok Bumanaag, Brgy. Zone Iii, Koronadal City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ C. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sultan Kudarat For 2024 (lot3) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Ballpen, 0.5 Black 120 Piece/s 2 Binder Clip, 19mm 5 Box/es 3 Binder Clip, 25mm 10 Box/es 4 Book Paper, A4,70gsm 490 Ream/s 5 Book Paper,long,70gsm 5 Ream/s 6 Certificate Paper A4 5 Pack/s 7 Certificate Holder, A4 24 Piece/s 8 Correction Tape 5mm X 8m 50 Piece/s 9 Epson Ink 003, Black 112 Piece/s 10 Epson Ink 003, Cyan 35 Piece/s 11 Epson Ink 003, Yellow 35 Piece/s 12 Epson Ink 003, Magenta 30 Piece/s 13 Cannon Ink 003, Black 10 Piece/s 14 Cannon Ink 003, Cyan 5 Piece/s 15 Cannon Ink 003, Yellow 5 Piece/s 16 Cannon Ink 003, Magenta 5 Piece/s 17 Fastener, 70mm 50 Box/es 18 Folded Brown Long (100s) 300 Piece/s 19 Glue 130g 5 Piece/s 20 Highlighter, Neon Colors 24 Piece/s 21 Lever Arch File 3", Black 10 Piece/s 22 Marker, Permanent , Black , Blue , Red 24 Piece/s 23 Marker, Permanent , Black 2 Piece/s 24 Note Pad, 2" X 3 35 Pad/s 25 Note Pad, 3" X 3 35 Pad/s 26 Paper Clip Vinyl Jumbo 55mm 17 Box/es 27 Paper Clip Vinyl Jumbo 33mm 17 Box/es 28 Pencil, Eberhard Faber's Woodlinched Bonding Technology No.2 24 Piece/s 29 Plastic Envelope, Legal 5 Piece/s 30 Rubberband, 50g Small 2 Box/es 31 Scissors 8" Stainless Steel 5 Pair/s 32 Sharpener Desk Heavy Duty 1 Piece/s 33 Gel Ink Pen, 0.7 Black 120 Piece/s 34 Staple Wire # 35 30 Box 35 Stapler, Heavy Duty 2 Piece/s 36 Stapler With Remover #35 3 Piece/s 37 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 2 Piece/s 38 Cork Board 40x60 2 Piece/s 39 Vellum Board, Long, 10sheets Per Pack 2 Pack/s 39 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Borderless Printing Up To 4r 1 Unit 40 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 66 Pack/s Note: Delivery Term: One Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco, City Hall Of Tacurong, Sultan Kudarat General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ D. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Sargen For 2024 (lot4) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Book Paper A4, 70gsm 117 Box/es 2 Correction Tape 5mm X 8m 80 Piece/s 3 Fastener, 70mm 140 Box/es 4 Epson Ink 003, Black 74 Piece/s 5 Epson Ink 003, Magenta 36 Piece 6 Epson Ink 003, Blue 36 Piece 7 Epson Ink 003, Yellow 36 Piece 8 Epson Ink 664, Black (10) 36 Piece 9 Epson Ink 664, Magenta 14 Piece 10 Epson Ink 664, Blue 14 Piece 11 Epson Ink 664, Yellow 14 Piece 12 Brother Compatible Toner Cartridge Tn660 Guranteed High Quality Compatible Toner Cartridge 101% Brand New. Not Remanufactured Or Refilled. Factory Sealed. Made With All New Parts. 4 Piece 13 Staple Wire #35 30 Box/es 14 Notepad, 3" X 4 70 Pad/s 15 Staple Remover #35 30 Piece/s 16 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 96 Pack/s 17 Printer All In One Print, Scan, Copy Connectivity: Usb/ Lan/ Wifi/ Wifi Direct/ Lan Compact Integrated Tank Design Print Speeds Up To 15.5ipm For Black And 8.5ipm For Colour Auto-duplex Printing Adf Capability Epson Smart Panel Borderless Printing Up To A4 Size Warranty Of 2 Years Of 50,000 Pages, Whichever Comes First Powered By Epson Heat-free Technology 2 Unit 18 Laser Multi-function Monochrome Printer Monochrome (black & White Only) Print, Scan, Copy, Adf, Wi-fi Automatic 2-sided Print Print Up To Long/legal Scan/copy Up To Long/legal Via Adf Scan/copy Up To Short/a4 Via Flatbed Glass Toner Cartridge Powder 1 Unit 19 Sign Pen, 0.5 Black 85 Piece/s 20 Sign Pen, 0.5 Blue 85 Piece/s 21 Gel Ink Pen, 0.7 Black 85 Piece/s 22 Gel Ink Pen, 0.7 Blue 85 Piece/s 23 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 35 Piece/s 24 Paper Cip Vinyl Jumbo 55mm 70 Box/es 25 Paper Cip Vinyl Jumbo 33mm 70 Box/es 26 Scissors 8" Stainless Steel 36 Piece/s 27 Folder Brown Long (100pcs/ Per Ream) 35 Ream/s Note: Delivery Term: One Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco, City Hall Of General Santos City General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ E. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-i For 2024 (lot5) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Via Epson Smart Panel Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 1 Unit 2 Epson Ink 664, Black 11 Piece/s 3 Epson Ink 003, Black 38 Piece/s 4 Epson Ink 003, Yellow 2 Piece/s 5 Epson Ink 003, Cyan 2 Piece/s 6 Epson Ink 003, Magenta 2 Piece/s 7 Fastener 70mm 55 Box/es 8 Puncher Heavy Duty 70mm Weight: 0.533kg Product Dimension: 6.5in X 2in X 4in Material Type: Metal 11 Piece/s 9 Staple Heavy Duty With Remover #35 11 Piece/s 10 Staple Wire #35 22 Box/es 11 Scissors 8" Stainless Steel 11 Piece/s 12 Gel Ink Pen, 0.7 Black 55 Piece/s 13 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 58 Pack/s 14 Book Paper, A4, 70gsm 56 Box/es 15 Correction Tape 5mm X 8m 33 Piece/s 16 Paper Clp Vinyl Jumbo 55mm 33 Box/es 17 Folder Brown Long (100pcs/ Per Ream) 5 Ream Note: Delivery Term: One Time Delivery To The Provincial Cluster, Within 30 Working Days Upon The Receipt Of The P.o. Place Of Delivery / Venue: Slp Pco, Kidapawan, North Cotabato General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ F. Dswd12-slp-2024-10-023 Procurement Of Office Supplies For Slp Provincial Staff Of Cc-ii For 2024 (lot6) Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Ballpen, 0.5 Black 35 Piece/s 2 Ballpen, 0.7 Black 35 Piece/s 3 Book Paper, A4 70gsm 400 Ream/s 4 Book Paper, Long 70gsm 10 Ream/s 5 Epson Ink 003, Black 40 Piece/s 6 Epson Ink 003, Cyan 20 Piece/s 7 Epson Ink 003, Yellow 20 Piece/s 8 Epson Ink 003, Magenta 18 Piece/s 9 Pencil, Eberhard Faber's Woodclinched Bonding Technology No.2 30 Piece/s 10 Sign Pen, 0.5 Black 35 Piece/s 11 Sign Pen, 0.5 Blue 35 Piece/s 12 Gel Ink Pen, 0.7 Black 35 Piece/s 13 Gel Ink Pen, 0.7 Blue 35 Piece/s 14 Staple Wire #35 23 Box/es 15 Printable Sticker Paper A4 50pcs 48 Pack/s 16 All In One Printer Print, Scan, Copy Compact Integrated Tank Design High Yield Ink Bottles Spill-free, Error-free Refilling Wi-fi & Wi-fi Direct Seamless Setup Via Epson Smart Panel Borderless Printing Up To 4r Printer Functions: Print, Scan, Copy Print Method: On-demand Inkjet (piezoelectric) Maximum Resolution: 5760 X 1440 Dpi 2 Unit 17 Sticky Notes Stylish Film Index Pet Sign Here Arrow Flag, Waterproof (with At Least 5 Different Colors, Including Pink And Blue) 67 Pack/s Note: Delivery Term: One Time Delivery To The Provincial Cluster. Delivery Terms Within 30 Working Days Upon The Receipt Of The Approved P.o. General Requirements: The Supplier Must Attach A Certification Of Satisfactory Performance For All Its Completed Government Projects For The Last Year. Any Unsatisfactory Performance Will Result In Disqualification In Accordance With The Rdc Resolution Conforme: Name Of Company: _____________________________________________________ Signature Of Bidder Or Authorized Representative: ______________________________ Name And Designation: ___________________________________________________ Date: _______________________ Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (k) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (l) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Soon4 Nov 2024
Tender AmountPHP 1.7 Million (USD 30.9 K)

Overseas Workers Welfare Administration - OWWA Tender

Automobiles and Auto Parts
Philippines
Details: Description Philippine Bidding Documents Bidding For The Supply And Delivery Of Motor Vehicle Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 12 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 12 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 13 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 14 16. Deadline For Submission Of Bids …………………………………………………. 14 17. Opening And Preliminary Examination Of Bids ………………………………….. 14 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 15 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..19 1. Scope Of Contract ………………………………………………………………… 20 2. Advance Payment And Terms Of Payment ……………………………………….. 20 3. Performance Security ……………………………………………………………. 20 4. Inspection And Tests ……………………………………………………………… 20 5. Warranty …………………………………………………………………………. 21 6. Liability Of The Supplier ………………………………………………………….. 21 Section V. Special Conditions Of Contract ………………………………….22 Section Vi. Schedule Of Requirements ……………………………………....25 Section Vii. Technical Specifications …………………………………………26 Section Viii. Checklist Of Technical And Financial Documents …………..31 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dmw – Department Of Migrant Workers Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Owwa – Overseas Workers Welfare Administration Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Rwo – Regional Welfare Office Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Invitation To Bid For The Supply And Delivery Of Motor Vehicle (brand New 2024 Model Passenger Van) 1. The Overseas Workers Welfare Administration (owwa) Regional Welfare Office Xi (rwo Xi), Through The General Appropriations Act Cy 2024 Intends To Apply The Sum Of Two Million Ninety Thousand Pesos (php 2,090,000.00) Being The Abc To Payments Under The Contract For Bidding For The Supply And Delivery Of Motor Vehicle (brand New 2024 Model Passenger Van), Pb-10-2024. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Owwa Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required On Or Before March 1, 2025. Bidders Should Have Completed, Within The Last Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Owwa Rwo Xi Bac Secretariat. The Bidding Documents Can Be Viewed At The Owwa Website At Www.owwa.gov.ph Click The “bids And Awards” Icon. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 8 To November 21, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Two Thousand Pesos (php 2,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, Or By Facsimile, Or 6. The Owwa Will Hold A Pre-bid Conference On 08 November 2024, 1:30 P.m. Through A Hybrid Face-to-face Conference And Video Conferencing Or Webcasting Via Zoom, Which Shall Be Open To Prospective Bidders. (see Attached Guidelines On The Conduct Of Pre-bid Conference). 7. Bids Must Be Duly Received By The Bac Secretariat In A Sealed Envelope Or Electronic Submission On Or Before 21 November 2024, 11:00 A.m. Late Bids Shall Not Be Accepted. (see Attached Guidelines On Bid Submission). 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 21 November 2024, 1:30 Pm Through Hybrid Face-to-face Conference And Via Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Owwa Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Name Of Officer : Anne A. Alban Name Of Office : Owwa Rwo Xi Address : Lynjun Alegre-sardidobesjc Bldg., Candelaria St., Ecoland Ii, Davao City Mobile Number : 0951-374-1457 Whatsapp/viber : 0951-374-1457 Email Address : Region11@owwa.gov.ph Owwadavao11@gmail.com Owwadavaoprocurement@gmail.com Facebook Page : Https://bit.ly/owwadavaoprocurement Website Address : Www.owwa.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.bidding.owwa.gov.ph For Online Bid Submission: Please Check Attached Guidelines On The Bid Submission Mayette A. Almano Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Owwa Rwo Xi Wishes To Receive Bids For The Bidding For Supply And Delivery Of Motor Vehicle (brand New 2024 Model Passenger Van) With Identification Number Pb-10-2024. The Procurement Project (referred To Herein As “project”) Is Composed Of One (1) Unit, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Cy 2024 In The Amount Of Two Million Ninety Thousand Pesos (php2,090,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days From The Date Of Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 2 – One Project Having Several Items Grouped Into Several Lots, Which Shall Be Awarded As Separate Contracts Per Lot. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply And Delivery Of Motor Vehicle (brand New 2024 Model Passenger Van). B. Completed Within The Last Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 12 The Price Of The Goods Shall Be Quoted Ddp In Owwa Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amount A. The Amount Of Not Less Than Forty-one Thousand Eight Hundred Pesos (php 41,800.00), Equivalent To Two Percent 2% Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than One Hundred Four Thousand Five Hundred Pesos (php 104,500.00), Equivalent To Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One (1) Lot Abc – Php 2,090,000.00 20.2 Not Applicable 21.2 Not Applicable Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184. 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: “the Delivery Terms Applicable To The Contract Are Ddp Delivered In Owwa Rwo Xi. In Accordance With Incoterms.” “the Delivery Terms Applicable To This Contract Are In Owwa Rwo Xi. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is: Name Of End-user : Anne A. Alban Name Of Office : Owwa Rwo Xi Contact Number : 0951-374-1457 Email Address : Owwadavao11@gmail.com Owwadavaoprocurement@gmail.com Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: [indicate The Applicable Inspections And Tests] Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months 1 Brand New 2024 Model Passenger Van 1 Unit 1 Units Will Be Delivered Within Ninety (90) Days Upon Receipt Of Notice To Proceed. Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness , And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Procurement Of One (1) Unit Brand New 2024 Model Passenger Van Particulars Description Engine And Transmission Model: Latest Available Brand New Model Body Type: Passenger Van Transmission: Minimum 6-speed Manual Diesel Displacement: At Least 2,755cc But Not More Than 3,000cc Number Of Cylinders: 4 Number Of Valves: 16 Fuel Type: Diesel Euro 4 Compliant Power: At Least 176 Ps Torque: At Least 420 N-m Body Dimension Width: At Least 1950 Mm Number Of Doors: 4 Doors (2-side Doors For Driver And Front Passenger, One (1) Side Sliding Door And A Tailgate Seats Capacity: Standard Capacity Of 15 Passengers Seat Material: Fabric Tires And Wheels Tire Size: At Least 215/70r16 Steel W/ Full Cap Safety Security Equipped With At Least A Driver And Front Passenger Side Airbags, Seatbelts Rear Suspension: Mcpherson Strut/rigid Axle With Leaf Spring Brakes: Ventilated Disc/drum Equipped With Variable Power Steering And Anti-lock Brake System (abs), Alarm With Reverse Camera Color White Inclusions 1. Tint, Rust Proofing, Vinyl Floor Mats And Seat Cover 2. Free Labor On Periodic Maintenance Service For 1,000 And 5,000 Kms Check-up 3. Standard Tools, Jack And Ewd 4. Three (3) Years Lto Registration 5. One (1) Year Tpl Insurance 6. One (1) Year Gsis Comprehensive Insurance 7. Maintenance And Warranty Manual In Leather Holder Warranty Three (3) Years From The Date Of Acceptance Of The End-user Or 100,000 Kilometers From The Date Of Acceptance, Whichever Comes First Green Public Procurement Requirement (gppb) The Supplier Shall Demonstrate Guarantee The Availability Of Parts For The Specific Vehicle Model For At Least 7 Years From The Same Production Of The Particular Model Ceases. Other Requirements 1. Only Direct Dealers Are Allowed To Bid; 2. Bidders Should Have Completed, Within The Last Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project; 3. Inspection Of Vehicles During Post-qualification Shall Be Made Within The Showroom Of The Direct Dealer. 4. Availability Of Spare Parts All Over The Philippines; 5. Bidder Must Have Authorized/accredited Service Centers Nationwide; 6. After Sales Service - Submission Of Certificate Of After Sales Service And Availability Of Spare Parts Within The Warranty Period With The List Of Authorized/accredited Service Centers In The Philippines Indicating The Address, Contact Numbers And Contact Person; 7. Manuals – Supplier Shall Provide Maintenance Manuals In English Language; 8. Original Warranty/guarantee Certificates Shall Be Issued In The Name Of The Overseas Workers Welfare Administration Regional Office Xi (owwa Rwo Xi); 9. Owwa Rwo Xi Reserves The Right To Inspect Or Test The Commodities And/or Materials Within The Showroom Of The Supplier And Accept Or Reject Any Or All Of The Items Delivered Not In Accordance With The Required Specifications. All Costs Of Testing Shall Be For The Account Of The Supplier; 10. The Winning Bidder Shall Warrant That The Goods Subject To The Contract Is Free From Latent Defects Which Are Not Apparent During The Inspection And Testing Periods; Total Budgetary Requirements Two Million Ninety Thousand (php 2,090,000.00) Fund Source Available Funds Of Capex Cy 2024 Terms Of Payment Government Terms Delivery Period Within Ninety (90) Calendar Days From The Receipt Of The Notice To Proceed (ntp) Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ A) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ B) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ C) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ D) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ E) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ F) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ G) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ H) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ I) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ J) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. 24 Financial Component Envelope ⬜ (a) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (b) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding For The Supply And Delivery Of Motor Vehicle Guidelines I. Payment Of Non-refundable Bidding Documents Fee Manual Payment 1. Bidder/representative Shall Request For Order Of Payment For The Payment Of Bidding Document At The 3rd Floor Lynjun Alegre-sardiro Besjc Bldg., Candelaria Street, Ecoland Ii, Davao City. 2. Bidder/representative Shall Pay The Corresponding Amount Either Cash Or Check To The Collection Unit Which Is Also Located At 3rd Floor. Payment Of Non-refundable Fee Should Not Be Later Than The Submission Of Bids. 3. Bidder/representative Shall Received The Bidding Documents Upon Payment Of The Bid Price. Ii. Pre-bid Conference 1. Prospective Bidders Shall Submit A Letter Request Signifying Their Intention To Participate In The Pre-bid Conference Either By Mail Or Through Email At Owwadavaoprocurement@gmail.com/owwadavao11@gmail.com Before The Scheduled Activity. 2. The Bac Secretariat Shall Assign A Number To Each Representative For Proper Sequence/ Arrangement During The Open Forum. 3. Each Representative Shall Be Given A Period Of Thirty (30) Minutes To Raise Questions And/or Clarifications During The Conference. If There Are Still Questions Or In Need Of Clarifications After The Time Limit, The Representative May Submit A Letter Addressed To The Bac Chairperson. The Bac Shall Issue A Supplemental Bid Bulletin To Address The Issues And Concerns. Iii. Bid Submission 1. Bidders Shall Submit Their Bids Proposal At Room 1, Afu, 3rd Floor Lynjun Alegre-sardido Besjc Bldg., Ecoland Ii, Davao City Or Via Email At Owwadavao11@gmail.com Or Owwadavaoprocurement@gmail.com Before The Closing Date And Time. For Electronic Submission The Supplier Shall Comply With The Following Requirements: O Use A Two-factor Security Procedure Consisting Of An Archive Format Compression (winrar Or Winzip) And Password Protection To Ensure The Security, Integrity And Confidentiality Of The Bids Submitted; And O Allows Access To A Password-protected Bidding Documents On Opening Date And Time. The Passwords For Accessing The File Will Be Disclosed By The Bidders Only During The Actual Bid Opening Which May Be Done In Person Or Face-to-face Through Videoconferencing, Webcasting Or Similar Technology; 2. Bidders Shall Submit Their Bids Manually, Postal Mail Or Electronic Submission Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents In Two (2) Password-protected Bidding Documents In Compressed Archive Folders, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements As Specified In The Bidding Documents, And The Second Shall Contain The Financial Component Of The Bid. Likewise, The Authorized Representative Shall Submit An Affidavit Attesting That The Submitted Electronic Documents, Electronic Messages, And Electronic Signatures Are Authentic. Format Of Bid Submission:  Technical Component Folder - Password Protected  Financial Component Folder – Password Protected Note:  The Technical Component Folder And Financial Component Folder Shall Contain All The Required Documents As Specified In The Checklist Of Technical And Financial Documents As Indicated In The Bidding Documents. 3. Bidding Documents Not In Compressed Archive Folders And Are Not Password Protected, Shall Be Rejected. However, Bid Not Properly Compressed And Password-protected, As Required In The Bidding Documents, Shall Be Accepted, Provided That The Bidder Or Its Duly Authorized Representative Shall Acknowledge Such Condition Of The Bid As Submitted. The Bac Shall Assume No Responsibility For The Improperly Compressed Or Password-protected Folder, Or For Its Premature Opening. 4. Upon Receipt Of The First And Second Envelopes, Bac Secretariat Shall Generate A Bid Receipt Page For The Official Time Of Submission Which Can Be Saved Or Printed By The Bidder. 5. Bidders May Modify Or Withdraw Their Bid At Any Time Before The Deadline For The Submission And Receipt Of Bids. Bidders Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Only Be Allowed To Send Another Bid Equally Secured, Properly Identified, And Labelled As A “modification” Of The One Previously Submitted. The Time Indicated In The Latest Bid Receipt Page Generated Shall Be The Official Time Of Submission. 6. Bids Submitted After The Deadline Shall Not Be Accepted. Iv. Eligibility Check And Bid Opening Via Zoom 1. The Bac Shall Open The Submitted Bids After The Scheduled Deadline During The Hybrid Conference And/or Via Zoom Meeting. 2. Only Those Who Paid The Corresponding Fee And Submitted Their Bid Before The Deadline Shall Be Provided With The Details And Link To Be Used During The Meeting. 3. Only One (1) Authorized Representative Of The Company Shall Be Allowed To Participate In The Meeting; 4. The Passwords For Accessing The Bidding Documents Shall Be Disclosed By The Bidders Only During The Actual Bid Opening For Electronic Documents. V. Submission Of Original Bid Documents For Electronic Submission. The Bac Shall Notify The Lowest/single Calculated Bidder And Request For The Submission Of Original Bid Documents For Post Qualification And Evaluation. Vi. Tie-breaking Method In Case Of Two Or More Bidders Are Determined And Declared As The Lowest Calculated Responsive Bidder (lcrb), Using The Dicing Method With The Following Mechanics: 1. Based On The Time Sequence Of Bid Submission Of Eligible Bidders, The Bac Chair Or Representative Shall Roll The Dice In A Designated Container, In Favour Of The First Bidder Or Bidder A, Bidder B And So On. 2. For Each Bidder, The Bac Chair Or Representative Shall Roll The Dice Three (3) Times And The Total Points Shall Be The Sum Of The Dots To Make The Final Score. 3. The Determination Of The Winner Shall Be Based On The Highest Points Earned In The Final Score. 4. In Case Of Another Tie, The Bac Chair Or Representative Shall Repeat The Method Of Tie Breaking Until A Winner Is Declared. For Guidance And Information Of All Concerned. Mayette A. Almano Bac Chairperson Format For Bid Submission Thru Email Project Title: Bidding For The Supply And Delivery Of Motor Vehicle (brand New 2024 Model Of Passenger Van) Identification No.: Pb-10-2024 Submitted By: _______________________ (printed Name And Designation) Authorized Representative _______________________ Name Of Company _______________________ Company Address _______________________ Contact Nos. _______________________ Fax No. [attached Two (2) Password-protected Bidding Documents In Compressed Archive Folders, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements As Specified In The Bidding Documents, And The Second Shall Contain The Financial Component Of The Bid.] Bidding Forms 1. Bid Form 2. Contract Agreement Form 3. Omnibus Sworn Statement 4. Bid Securing Declaration Form 5. Statement Of All Ongoing Gov’t & Private Contracts 6. Statement Of Slcc In Gov’t & Private Contracts Completed 7. Price Schedule Appendix “1” Bid Form For The Procurement Of Goods [shall Be Submitted With The Bid] _________________________________________________________________________ Bid Form Date : _________________ Project Identification No. : _________________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To [supply/deliver/perform] [description Of The Goods] In Conformity With The Said Pbds For The Sum Of [total Bid Amount In Words And Figures] Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Of Agent Currency Commission Or Gratuity ________________________________________________ ________________________________________________ ________________________________________________ (if None, State “none”) ] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of [name Of The Bidder] As Evidenced By The Attached [state The Written Authority]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: ___________________________________________________________________ Legal Capacity: _____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________ Date: ___________________ Contract Agreement Form For The Procurement Of Goods (revised) [not Required To Be Submitted With The Bid, But It Shall Be Submitted Within Ten (10) Days After Receiving The Notice Of Award] _________________________________________________________________________ Contract Agreement This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part; Whereas, The Entity Invited Bids For Certain Goods And Ancillary Services, Particularly [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures In Specified Currency] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Integral Part Of This Agreement, Viz.: I. Philippine Bidding Documents (pbds); I. Schedule Of Requirements; Ii. Technical Specifications; Iii. General And Special Conditions Of Contract; And Iv. Supplemental Or Bid Bulletins, If Any Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; Performance Security; Notice Of Award Of Contract; And The Bidder’s Conforme Thereto; And Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders, And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures] Or Such Other Sums As May Be Ascertained, [named Of The Bidder] Agrees To [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] Agrees To Pay The Above-mentioned Sum In Accordance With The Terms Of The Bidding. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. [insert Name And Signature] [insert Signatory’s Legal Capacity] For: [insert Procuring Entity] [insert Name And Signature] [insert Signatory’s Legal Capacity] For: [insert Name Of Supplier] Acknowledgment [format Shall Be Based On The Latest Rules On Notarial Practice] Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] _________________________________________________________________________ Republic Of The Philippines) City Of _______________________) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Statement Of All Ongoing Gov’t & Private Contracts Statement Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : ___________________________________________________ Business Address : ___________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost Notice Of Award And/or Notice To Proceed / Letter Of Confirmation Or Similar Documents (signed By The Owner Or Authorized Representative) In Terms Of Contract Price The “undelivered Portion” Column Pertains To The Contract Balance. Submitted By : ___________________________________________________ (printed Name & Signature) Designation : ___________________________________________________ Date : ___________________________________________________ Statement Of Slcc In Gov’t & Private Contracts Completed Statement Of Slcc In Government & Private Contracts Completed Which Are Similar In Nature Business Name : ___________________________________________________ Business Address : ___________________________________________________ Name Of Contract A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Note: This Statement Shall Be Supported With: 1. Contract 2. Certificate Of Completion 3. Certificate Of Acceptance Submitted By : ___________________________________________________ (printed Name & Signature) Designation : ___________________________________________________ Date : ___________________________________________________ Price Schedule For Goods Offered From Within The Philippines [shall Be Submitted With The Bid If Bidder Is Offering Goods From Within The Philippines] ______________________________________________________________________________ For Goods Offered From Within The Philippines Name Of Bidder ________________________ Project Id No._________ Page ___of___ 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col 9) X (col 4) Name: ___________________________________________________________________ Legal Capacity: ____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________
Closing Soon7 Nov 2024
Tender AmountPHP 2 Million (USD 36 K)

Department Of Education Tender

Machinery and Tools
Corrigendum : Closing Date Modified
Philippines
Details: Description To: All Prospective Proponents 1. The Department Of Education, Through Its Bids And Awards Committee (bac) Iv, Requests Price Quotation For The Project Supply And Delivery Of Automotive Tools With A Total Approved Budget For The Contract (abc) Of Philippine Pesos Three Hundred Four Thousand Five Hundred Six And 01/100 (php304,506.01). Lot Description Qty. Unit Price Ceiling (php) Total Price Ceiling (php) 1 Scan Tool / Intelligent Tester 1 Set 74,506.67 74,506.67 2 Coil Spring Compressor (portable) 3 Pcs 2,199.67 6,599.00 3 Air Compressor 1 Unit 154,064.33 223,400.34 Impact Wrench (hydraulic) 2 Pcs Portable Impact Wrench 1 Pc Floor Jack (crocodile Type) 5 Tons 2 Pcs Floor Jack (crocodile Type) 3 Tons 2 Pcs Jack Stands 3 Pairs Socket Wrench 2 Set Combination Wrench 3 Set Screwdriver 3 Set Allen Wrench (t-handle) 2 Set Torque Wrench 3 Set Mechanical Pliers 3 Set Circlip /snap Ring Plier Set 2 Set Electricians Tool Kit Set 3 Set Impact Deep Socket Wrench Set 3 Set Description And Details Of The Project Are Provided In The Project Reference, Hereto Attached As Appendix “a”. 2. Said Quotation Shall Be Received On Or Before 10:00 A.m. On November 04, 2024 By Courier Or By Hand-delivery At The Address Given Below: Bids And Awards Committee Iv Rm. M-512, 5th Floor, Mabini Bldg. Deped Complex, Meralco Avenue, Pasig City, Philippines Depedcentral.bacsecretariat@deped.gov.ph 3. The Successful Proponent Must Be Able To Meet The Following Requirements: 3.1. The Terms And Conditions Provided As Item V Of The Project Reference As May Be Applicable, As Well As The Provisions Of The Irr Of R.a. 9184 Are Deemed To Be Read Into This Project. 3.2. The Schedule Of Requirements, As Indicated In Item Vi Of The Project Reference; And 3.3. The Technical Specifications Which Lists The Details Of The Requirements As Indicated In Item Vii Of The Project Reference. Supplier’s Business Name: Tin: Address: Telephone No.: Fax No.: E-mail: Authorized Representative’s Signature Over Printed Name And Designation: Date: 4. The Proponent Is Required To Submit A Financial Proposal Indicating Its Price For The Required Lot. The Approved Budget For The Contract Philippine Pesos Three Hundred Four Thousand Five Hundred Six And 01/100 (php304,506.01). For Purposes Of The Evaluation, Comparison And Ranking Of Bids/offers, The Proponent Who Submitted The Single / Lowest Calculated Responsive Quotation Shall Be Awarded The Contract After Evaluation By The Bids And Awards Committee (bac) Iv. 5. The Quotation Shall Be Enclosed In A Sealed Envelope And Addressed To The Bac Secretariat At The Address Given Above. The Envelope Should Have The Rfq Number Boldly And Conspicuously Identified. 5.1. It Is The Exclusive Responsibility Of The Proponent To Ensure That The Sealed Envelope Containing The Quotation Reaches The Above Address Before The Time And Date Indicated In Item No. 2. If Being Delivered By Hand, The Quotation Must Be Delivered At The Above Address During Official Working Hours. Delivery To Any Other Person Or Office Will Be At The Risk Of The Proponent And Will Not Constitute Timely Delivery. Quotations Received After The Aforementioned Closing Time Or Deadline May Be Rejected. 5.2. Based On The Above-stated Provisions, The Proponent's Quotation Sent By Email Will Not Be Accepted And Will Be Considered As Rejected. 6. The Quotation Should Be Valid For Thirty (30) Calendar Days From The Due Date Indicated Above. 7. Deped Reserves The Right To Request Any Additional Information That It Deems Necessary In Order To Make Any Decision On Any Quotation. 8. Any Quotation Not Supported By The Information Requested In This Rfq Or Requested During Evaluation, Or Is Patently Non-complying With The Rfq Requirements May Not Be Considered. 9. Deped Reserves The Right To Accept Or Reject Any Quotation, To Annul The Procurement Process, Or Not To Award The Contract Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. Submission Of Quotation In Response To This Request Shall Be Construed As Commitment To Undertake The Services In Accordance With The Terms And Conditions, Specifications, And Schedule Of Implementation Set Forth In This Rfq. Asec. Malcolm S. Garma Bac Iv Chairperson Received Copy: ___________________________________________________ Remarks: _______________________ Project Reference I. Project Title: Supply And Delivery Of Automotive Tools Ii. Project Owner: Department Of Education – Administrative Service – General Services Division (as-gsd) Iii. Objective: To Procure The Project Supply And Delivery Of Automotive Tools The Most Effective And Prompt Manner, Primarily Considering Time And Resource Constraints. Iv. Eligibility, Technical And Financial Requirements/ Documents: The Proponent With The Single / Lowest Calculated Quotation (scq Or Lcq) Shall Submit The Requirements Indicated Below Within Five (5) Calendar Days From Receipt Of Notice From The Bac, Which Documents Shall Be Validated To Determine If The Proponent Is Technically, Legally And Financially Capable Prior To The Award: (i) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Is Located; (ii) Philgeps Registration Number; (iii) Duly Notarized Omnibus Sworn Statement (see Attached Annex “a”) • If A Partnership, Corporation, Cooperative, Or Joint Venture, Please Provide Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate As Stated In Item No. 2 Of The Attached Omnibus Sworn Statement); (iv) Income Tax Returns (annual Income Tax Returns Of The Preceding Tax Year); (v) Business Tax Returns (value Added Tax Or Percentage Tax Returns Covering The Previous Six Months); In Addition, The Supplier With The Scb Or Lcb Shall Submit The Samples Indicated Below Within Five (5) Calendar Days From Receipt Of Notice From The Bac. (i) One (1) Sample Each Of 17 Items Shall Be Provided By The Winning Supplier During Post-qualification. To Facilitate Post-qualification, The Proponent At Its Option May Submit In Advance, I.e., Together With Its Quotation, The Above Requirements And Other Documents As May Be Required. Non-submission Of Any Of The Documents Shall Be A Ground For Post-disqualification. In The Case Of A Joint Venture, Or If The Parties Intend To Enter Into A Joint Venture, The Requirements Are As Indicated In The Revised Implementing Rules And Regulations Of Republic Act No. 9184. V. Terms And Conditions Of Contract: A. Instructions 1. The Proponent Shall Be Responsible For Sourcing Its Goods/equipment, And Shall Make The Deliveries In Accordance With The Schedule, And Specifications Of The Award. Failure Of The Proponent To Comply With This Provision Shall Be Ground For Cancellation Of The Award Issued To The Proponent. 2. The Proponent Shall Pick-up The Contract Or Purchase Order (po), And Notice To Proceed (ntp) Issued In Its Favor Within Three (3) Calendar Days From The Date Of Receipt Of Notice To That Effect. A Fax Transmission Or Electronic Mail Shall Constitute An Official Notice To The Proponent. Thereafter, If The Contract Or Po Remains Unclaimed, The Contract Or Po Shall Be Cancelled. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Proponent Shall Be Precluded From Proposing Or Submitting Substitute Quotation(s) Or Item(s). 3. The Proponent Who Accepted A Contract Or Po, And Ntp But Failed To Deliver The Required Goods Within The Time Called For In The Contract Or Po Shall Be Disqualified From Participating In Deped Or Any Of Deped Units’ Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a. 9184 And Its Revised Irr Against The Proponent. 4. Rejected Deliveries Shall Be Construed As Non-delivery, And Shall Be Replaced By The Proponent Subject To Liquidated Damages For Delayed Deliveries. 5. All Duties, Excise, And Other Taxes And Revenue Charges Shall Be Paid By The Proponent. 6. All Transactions Are Subject To Applicable Withholding Taxes Per Relevant Revenue Regulations Of The Bureau Of Internal Revenue (bir) Withholding Of Credible Value Added Tax And/or Expanded Value Added Tax Per Revenue Regulation(s) Of The Bir. B. Delivery And Documents The Goods Shall Be Delivered At Deped Complex, Meralco Ave., Pasig City. Risk And Title To The Goods Will Pass From The Proponent To Deped Upon Receipt And Final Acceptance Of The Goods At Their Final Destination. The Goods Must Conform To And Comply With The Standards Mentioned In The Schedule Of Requirements, As Indicated In Annex “b” And Technical Specifications As Indicated In Annex “c”. Upon Delivery Of The Goods To The Delivery Site, The Proponent Shall Notify Deped Through As-gsd And Present The Following Documents: I. Original And 4 Copies Of The Proponent’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; Ii. Original And Four Copies Of The Proponent‘s Warranty Certificate, Where Applicable; Iii. Original (white Copy) And Scanned Copy Stored In Cd/dvd/flash Drive Of The Pre-numbered Inspection And Acceptance Report (iar) And Delivery Receipt (dr) Detailing The Number And Description Of Items Received And Duly Signed And Dated By The Authorized Receiving Personnel (arp). For This Purpose, The Deped’s Representative At The Project Site Shall Be Mr. Idan Ray D. Magbanua, And The Designated Inspectorate Team. Packaging As May Be Applicable For Goods To Be Delivered And As May Be Indicated In The Contract Or Po, The Proponent Shall Provide Such Packaging As Is Required To Prevent Damage Or Deterioration During Transit To Their Final Destination. The Packaging Shall Be Well Protected From Damage During Transport. It Should Be Reinforced With Impact-resistant Material And It Should Be Well-packed. Incidental Services The Proponent Shall Provide Orientation To The End-user On The Properly Use/handling Of The Supplied Goods. Transportation Transport Of The Goods Shall Be Arranged By The Proponent, And Related Costs Shall Be Included In The Contract/po Price. Deped Accepts No Liability For The Damage Of Goods During Transit. Risk And Title To The Goods Will Not Pass To Deped Until Its Receipt And Final Acceptance At The Final Destination, Through Its Authorized Receiving Personnel. C. Schedule Of Payment The Proponent May Submit A Request For Payment Based The Following: (i) Cumulative Quantities Of Items Delivered Based On The Schedule Of Deliveries And Other Relevant Terms And Conditions Of The Contract; (ii) Duly Signed Delivery Receipt(s); (iii) Inspection And Acceptance Report(s), Including Certification By The Proponent, As Approved By The Duly Authorized Deped Representative, That The Items Have Been Delivered And/or Properly Installed And Commissioned In Accordance With The Contract. Other Delivery Documents As May Be Subsequently Prescribed By Deped Shall Be Provided By The Proponent. One Hundred Percent (100%) Of The Contract/po Price Shall Be Paid To The Proponent Within 60 Calendar Days, Subject To Existing Government Disbursement Procedure, Upon Delivery And Acceptance Of Goods By The Duly Authorized Deped Representative, And Receipt Of The Billing Statement Of Account. (note: The Supplier Must Furnish A Copy Of The Above-mentioned Documents To The End-user [(as-gsd)] And The Contract Management Division Of The Procurement Management Service, Central Office.) Payments Shall Be Subject To The “warranty” Provision In The Form Of Either Retention Money In An Amount Equivalent To At Least 1% Of The Payment, Or A Special Bank Guarantee In The Amount Equal To At Least 1% Of The Contract Price Required In Section 62 Of Ra 9184 And Its Irr. Release Of The Retention Money Shall Be At The Expiration Of The Warranty Period, Or The Remaining Amount In Case It Has Been Utilized Pursuant To The Warranty Provision. D. Inspections Inspection Or Pre-delivery Inspection (pdi), Where Applicable For Goods To Be Delivered, Shall Be Conducted By Deped Through The Duly Designated Inspectorate Team. The Inspection Or Pdi Shall Be Made Upon Notice To The Deped Of The Readiness Of The Goods For Inspection. The Proponent Shall Coordinate With Deped, Through The Procurement Management Service-contract Management Division (procms-cmd), On The Conduct Of Inspection Or Pre-delivery Inspection (pdi). Any Request For Inspection Or Pdi Shall Be Done In Writing, And Contain The Following Information: A. Project Title And Contract/po Number; B. Specific Goods For Inspection; C. Quantity Of Goods For Inspection; D. Venue/address Of Inspection Site; And E. Proposed Schedule Of Inspection Which Must Be At Least Three (3) Calendar Days From The Submission Of The Request. The Request For Inspection Or Pdi Shall Be Addressed To Procms-cmd, And Must Be Submitted Through Email At Procms.cmd@deped.gov.ph. Prior To And For Purposes Of Inspection, The Proponent Shall Ensure Convenient Access To The Goods For Inspection. The Proponent Shall Assign Personnel To Undertake The Handling, Unpacking, Assembly, Commissioning, Dissassembly, Repacking, Resealing And Sorting Of The Goods Prior To, During And After The Inspection. Deped Shall Have The Right To Visit And Inspect The Proponent’s Premises Covered By The Contract/po, At Any Time Or Stage Of Contract Implementation, To Monitor And Assess The Proponent’s Capacity To Discharge Its Contractual Obligations. Goods With Defects Or Non-compliant With The Required Technical Specifications Upon Delivery Shall Be Rejected, Orally Or In Writing, By Deped And Replaced By The Proponent In Accordance With The Warranty Provision. The Replacement Goods For This Reason Shall Be Subject To Re-inspection. Goods Are Considered Defective When They Are Unfit For The Use For Which It Is Intended Or Its Fitness For Such Use Is Diminished To Such An Extent That, Had Deped Been Aware Thereof, It Would Not Have Acquired It Or Would Have Given A Lower Price For It. Defects In The Goods Can Either Be Patent Or Latent. A Patent Defect Is One That Is Apparent To The Buyer Or Normal Observation. It Is An Apparent Or Obvious Defect. On The Other Hand, A Latent Defect Is One That Is Not Apparent To The Buyer By Reasonable Observation. A Latent Defect Is Hidden Or One That Is Not Immediately Determinable. E. Warranty Six Months Comprehensive Warranty For The Goods Will Be Applied. The Said Warranty Period Shall Reckon From The Date Of Issuance Of The Certificate Of Final Acceptance By The Deped That The Delivered Goods Have Been Duly Inspected And Accepted (i.e. Final Acceptance). The Obligation For The Warranty Shall Be Covered By Special Bank Guarantee In The Amount Equivalent To One Percent (1%) Of The Total Contract Price. Replacement And/or Repair Of The Goods May Be Requested Within The Warranty Period. Replacement And/or Repair Shall Be Made Immediately Upon Claim Or Request Therefor. In Case The Proponent Opts For Retention Money, The Amount Shall Only Be Released After The Lapse Of The Entire Warranty Period, Unless During The Remainder Of The Warranty Period, The Retention Money Is Substituted With A Special Bank Guarantee As Prescribed Above. The Special Bank Guarantee Shall Not Contain Any Deletion, Crossing-out, Expunction, Or Any Form Of Correction. Otherwise, Deped May Reject Such Security If Any Such Intercalation, Superimposition Or Alteration Affects Any Materials Information Or Feature Of The Document. Vi. Schedule Of Requirements As Indicated In Annex ”b”. Vii. Technical Specifications As Indicated In Annex “c”. Viii. General Instructions To Suppliers 1. This Request For Quotation (rfq) Form Is Deped’s Standard Rfq To Be Used When Deped Solicits Quotations For The Procurement Of Goods And Services. It Is A Standard Template That Suppliers Must Follow In Order To Prepare And Submit Their Quotations For Consideration By Deped. 2. This Rfq Is Composed Of Three (3) Lots. Prospective Proponents Shall Submit Their Quote For Three (3) Lots. Quotation That Exceeds The Abc For The Said Lot Shall Be Rejected. 3. The Proponent Must Fill Up The Spaces With The Required And Correct Information Including The Offered Brand, Model, Make And Specifications, As Well As The Total Price Of The Item Or The Items In The Lot. They Shall Likewise Indicate The Total Price Of The Said Lot. 4. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes, Duties And/or Levies To Be Paid And Other Incidental Costs To The Delivery Site/s If The Contract Is Awarded. 5. Award Of Contract Shall Be Made To The Single/lowest Quotation Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. The Rfq Form Must Be Duly Signed And Accomplished, Either Typewritten Or Written In Indelible Ink. Any Correction Made To The Prices, Rates Or To Any Information Shall Be Rewritten In Indelible Ink And Initialed By The Person Signing The Rfq Form. 6. The Proponent Shall Accomplish, Provide Correct And Accurate Information And Submit, Together With The Request For Quotation (rfq), The Following Attached Documents: (i) Schedule Of Requirements (annex “b”); (ii) Technical Specifications (annex “c”); And (iii) Financial Proposal (annex “d”) Otherwise, Non- Submission Of Which Shall Result To Automatic Disqualification Of Proposal. The Proponent Should Not Need To Fill Out The Attached Purchase Order (po) Under Annex "e". 7. The Proponent Requiring Any Clarifications Of The Request For Quotation Document May Refer To: Asec. Malcolm S. Garma Bids And Awards Committee Iv Department Of Education Room M-511, 5thfloor, Mabini Bldg., Deped Complex, Meralco Avenue, Pasig City Tel Nos. 8633-9343 / 8636-6542 Depedcentral.bacsecretariat@deped.gov.ph Look For: Ms. Mailyn B. Almodiel (project In Charge) Ix. Financial Proposal Quotation Form As Indicated In Annex “d”. Annex “a” Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] Republic Of The Philippines) City/municipality Of ____________________________________) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Its Association Or Relation With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End- User Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examine All Of The Bidding Documents; B. Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of __________, 20____ At ______________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Rules On Notarial Practice] Annex “b” Schedule Of Requirements Supply And Delivery Of Automotive Tools Lot Description Quantity Delivery Period 1 Scan Tool / Intelligent Tester 1 Set Fifteen (15) Calendar Days’ Period Upon The Receipt Of Notice To Proceed 2 Coil Spring Compressor 3 Pcs 3 Air Compressor 1 Unit Impact Wrench Hydraulic 2 Pcs Impact Wrench Portable 1 Pc Floor Jack (3 Tons) 2 Pcs Floor Jack (5 Tons) 2 Pcs Jack Stands 3 Pairs Socket Wrench 2 Set Combination Wrench 3 Set Screwdriver Set 3 Set Set Of Allen Wrench (t-handle) 2 Set Adjustable Torque Wrench Handle 3 Pcs Mechanical Pliers 3 Set Circlip Pliers 2 Set Electricians Tool Kit Set 3 Set Impact Deep Socket Wrench Set 3 Set A. Delivery Schedule Complete Delivery Of The Goods Shall Be Made Within Fifteen (15) Calendar Days’ Period Upon The Receipt Of Notice To Proceed (ntp) B. Project Site Goods Shall Be Delivered To Administrative Service- General Service Divisions, Department Of Education, Deped Complex, Meralco Avenue, Pasig City. C. Delivery And Receiving Instructions The Supplier Shall Observe The Following Instructions: 1) Goods As Specified In This Schedule Of Requirements And/or Technical Specifications Shall Be Delivered Only To The Address Indicated Herein. 2) The Proponent Shall Notify The Indicated Authorized Receiving Personnel At The Project Site At The Scheduled Date Of Delivery At Least Three (3) Working Days In Advance And Shall Ensure That The Authorized Receiving Personnel Of The Deped Is Present During The Date And Time Of Delivery. 3) The Proponent Shall Make Delivery Or Deliveries To The Project Site On Regular Working Days, During Office Hours From 8:00 A.m. To 2:00 P.m. The Authorized Receiving Personnel Reserves The Right To Refuse To Receive/accept Delivered Goods Made Before 8:00 A.m. To 2:00 P.m., And On Non-working Days. 4) The Proponent Shall Coordinate With Deped Bureau Of Learning Resources – Office Of The Director For Purposes Of Inspection And Acceptance. 5) During The Delivery, Delivery Receipts Must Be Signed By Mr. Albert Alano, Chief Of Asset Management Division Or His Authorized Representative. D. Evaluation Of Quotations Quotations Shall Be Compared And Evaluated On The Basis Of The Following Criteria: 1) Completeness Of Submission 2) Compliance With Technical Specifications 3) Price-lowest Unit Cost Statement Of Compliance After Having Carefully Read And Accepted Your Request For Quotation And Its Terms And Conditions, I/we Quote You On The Item/s At Price Noted In The Rfq. The Quotation Shall Be Binding Upon Us For Thirty (30) Calendar Days Reckoned From Last Day Of Submission Indicated In The Submission Requirements. The Corresponding Award On Contract Shall Be Accepted By Us At Any Time Before Expiration Of This Period. The Deped- Bids And Awards Committee Iv Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. _____________________________________________________________________________ Name And Signature Of Provider’s Authorized Representative Annex “c” Technical Specifications General Requirements/specifications: To Provide The Necessary Supplies Automotive Tools For The Preventive Maintenance And Emergency Repair Of Service Vehicles Of The Department. Detailed Technical Specifications Lot Description Quantity Statement Of Compliance (state Comply Or Not Comply) Bidder’s Actual Offer 1 Scan Tool / Intelligent Tester Functional: To Interface With, Diagnose, And Reprogram Vehicle Control Modules. Performance: -retrieves Module Information From Body Chasis, Powertrain, Information & Communication -quickly Detect And Display Faults And Trouble Code. - Covers Domestic/ Asian / European Vehicle Manufactures. -the Unique Dedicated Services Section Includes All Reset, Epb, Abs/ Srs And Sas Services. -automatic System And Software Updates. Design: -atleast 8 Inch Full-color Led Screen Display. -atleast 1024x600 Resolution. Brand New 1 Set 2 Coil Spring Compressor Functional: Using On All Vehicles Equipped With Macpherson Struts To Rapidly Compress The Coil Spring For Replacement Of Shock Absorber, Spring Set, Repair Bent Struts And Damaged Spindles. Performance: - Compress Spring At 10mm Increments - 1/2-inch Drive Ratchet Design: -double-ended Jaws With Safety Hooks. - Forged Steel Brand New 3 Pcs 3 Air Compressor Functional: Putting Atmospheric Air Under High Pressure, “compressing” The Air And Converting Its Potential Energy Into Kinetic Energy That It Stores In An Air Tank For Use. Performance - Belt Driven - Maximum Pressure: 115 Psi - Tank Capacity: Maximum Of 155 Liters - Displacement: 16.3 Cubic Feet Per Minute (cfm) Design: - Single Phase - Rubberized Wheel With Handle Brand New 1 Unit Impact Wrench Hydraulic Functional: Tightening Or Loosening Nuts Quickly. They Are Essentially Small Handheld Electric Or Pneumatic Motors That Can Rotate Socket Wrenches At High Speed. Performance: - 1/2" Square Drive - Air Pressure: Maximum Of 90 Psi - Load Speed: Maximum Of 7,000 Rpm - Twin Hammer Mechanism Design - 1/4" Hose Inlet - 3/8" Air Hose - Weight: At Least 5.7 Lbs - Length: At Least 7.3" Brand New 2 Pcs Impact Wrench Portable Functional: Tightening Or Loosening Nuts Quickly. They Are Essentially Small Handheld Electric Or Pneumatic Motors That Can Rotate Socket Wrenches At High Speed. Design: - Cordless And Rechargeable - Brushless - Rubberized Soft Grip - 4.9 Lbs Weight Inclusion: - 40volts Lithium-ion (li-ion) Battery W/ 1 Spare Battery - Charger Environmental Interface: Power Saving Brand New 1 Pc Floor Jack (3 Tons) Functional: Has Horizontal Pistons And A Long Arm Which Provides The Vertical Motion For Lifting. Performance: - Max Lifting Capacity Of 3 Tons - Double Pump - Lifting Height: Up To 500mm Or 1.6 Ft. - Weight: Up To 35 Kgs Design: -hydraulic - Low Profile - Steel Material Brand New 2 Pcs Floor Jack (5 Tons) Functional: Has Horizontal Pistons And A Long Arm Which Provides The Vertical Motion For Lifting. Performance: - Max Lifting Capacity Of 5 Tons -double Pump - Lifting Height: Up To 500mm Or 1.6 Ft. - Weight: 45 Kgs Design: -hydraulic - Low Profile - Steel Material Brand New 2 Pcs Jack Stands Functional: A Jack Stand Is A Metal Height-adjustable Mechanical Device That Is Used To Support The Weight Of A Lifted Vehicle. Most Commonly, They Are Placed Underneath The Car As A Safety Net To Protect Against A Vehicle Falling On A Body Part. Performance: - Quickly And Safely Lock The Position With The Included Locking Pin. - Circular Base Pads Allow For Maximum Stability And Safety. - Includes 2 Jack Stands. Design: - Made From High-grade Steel - With Four Steel Feet - 3 Tons Per Pair - With A Rubber Top Post Brand New 3 Pairs Socket Wrench Functional: Socket Wrenches Are Widely Used Hand Tools For Easy Tightening And Loosening Of Common Fasteners, Typically Nuts And Bolts. Performance: They Work The Same Way As Standard Spanners And Wrenches, But Their Ratcheting Design Allows The User To Apply Torque More Easily, With Less Strain And Fatigue. Design: - Hexagon Head - Chromium-vanadium Steel / Alloyed Steel Included The Following: - 1pcs 1/4" Drive Ratchet Wrench,45t - 13pcs 1/4" Drive Socket: 4mm To 14mm - 1pcs 1/4" Drive Universal Joint - 2pcs 1/4" Drive Extension Bar 50mm 100mm - 1pcs 1/4" 114mm Sliding T Bar - 1pcs 1/4" 150mm Flexible Extension Bar - 1pcs 1/2" Drive Ratchet Wrench,45t - 18pcs 1/2" Drive Socket - 8mm To 32mm - 1pcs 1/2" Drive Universal Joint - 2pcs 1/2" Drive Extension Bar 125mm 250mm - 1pcs 1/2" 250mm Sliding T Bar - 2pcs Spark Plug Socket 16mm 21mm Brand New 2 Set Combination Wrench Functional: Combination Wrenches Have A Closed Loop On One Side (box-end) For Hexagonal Or Square Nuts, While The Other End Is An Open U-shape (open-end) Performance: These Wrenches Are Often Used For Nuts That Are Hard To Loosen. The Closed End Can Loosen The Nut, While The Open End Is Then Used To Unscrew It Fully. Design: - Flexible Ratchet Spanner - Chromium-vanadium Steel / Alloyed Steel - Sizes 8mm To 19mm Brand New 3 Set Screw Driver Set Functional: A Screwdriver Is A Simple And Common Tool Used To Install Or Remove Screws. Performance: Screwdrivers Perform Simple Functions In A Simple Design And Come In Several Types Depending On The Shape Of The Screw. Design: - Bi-material Handle - Magnetic Tip Holds Screws Securely -black Chrome Plating And Nickel-coated Tips - Chromium-vanadium Steel / Alloyed Steel - Philips Screwdriver: Ph1 X 3 In., 1pc Ph2 X 4 In, And 1pc Ph3 X 6 In - Slotted Or Flathead Screwdriver: 1pc Sl3/16 In X 4 In, 1pc Sl1/4 In X 4 In, And 1pc Sl5/16 In X 6 In - Robertson Head/ Square Screwdriver: 1pc Sq1 X 3 In And 1pc Sq2 X 4 In Brand New 3 Set Set Of Allen Wrench (t-handle) Functional: Hex Keys, Commonly Known As Allen Keys/wrenches In The Uk And Various Other Countries, Are A Very Simple Hand Tool Of The General Spanner And Socket Family. Performance: Used For Tightening And Loosening Hexagonal Bolts And Other Compatible Fasteners. Quantity: At Least 8pcs Per Set Of T-handle Torx/hex Wrench Design: - Sizes:2x75mm To10x200mm Or 2 To 10 Metric - Chromium-vanadium Steel / Alloyed Steel Brand New 2 Set Adjustable Torque Wrench Handle Functional: It Is A Fundamental Element In General Mechanics, Tire Changing Operations And Industrial Maintenance & Repair Industries, To Ensure Customers' Safety. Performance: Used To Control And Apply A Specific Torque To A Fastener Such As A Bolt Or A Nut. - 1/2" Drive - Torque Range: 40 To 200 N.m - Forward And Reverse Torque Capability - High Accuracy With A Control Mechanism -click Torque Wrench - Heavy Duty Design: - Chromium-vanadium Steel / Alloyed Steel - Society Automotive Engineers (sae)/metric Scales For Foot-pound And Newton-meter Applications. - 10-100 Ft-lbs Torque - Locking Trigger - Length: 30.2 Inches Brand New 3 Pcs Mechanical Pliers Functional: Slip-joint Pliers Have Grooved Jaws, And The Pivot Hole In One Member Is Elongated So That The Member Can Pivot In Either Of Two Positions In Order To Grasp Objects Of Different Size In The Most Effective Way. Performance: Hand-operated Tool For Holding And Gripping Small Articles Or For Bending And Cutting Wire. Design: Material: Plastic, Chromium-vanadium Steel Product Dimensions: 34l X 25.9w Centimetres Handle Material: Plastic, Steel Item Weight: 3 Pounds Grip Type: Non-slip Inclusion: - 1pc 8" High Leverage Combination Pliers - 1pc 7" High Leverage Diagonal Cutting Pliers - 1pc 8" High Leverage Long Nose Pliers - 1pc 10" Pump Plierss Brand New 3 Set Circlip Pliers Functional: There Are Two Types Of Pliers. On External Pliers The Head Opens When The Handle Is Squeezed And The Circlip Is Pushed Out. Performance: Circlip Pliers Are Special Pliers For Installing Or Removing Circlips On Shafts Or Insides Bores. Design: - 2pcs 180° - 2pcs 90° - Carbon Steel - Size:7"/180mm Brand New 2 Set Electricians Tool Kit Set Functional: Electrical Tools Are Tools Used To Work On An Electrical System. Performance: These Can Include A Wide Range Of Tools Such As Wire And Cable Cutters, Wire Strippers, Coaxial Compression Tools, Telephony Tools, Wire Cutter/strippers, Cable Tie Tools, Accessories, And Even More. Design: Electrician Tools Set Include: Digital Multimeter With Alkaline Battery - 6" Adjustable Wrench - 6" Long Nose Plier - 6" Diagonal Cutting Pliers - 7" Combination Plier - 6" Wire Stripper - 5.5 Mm Slotted Screwdriver - Snap-off Blade Knife - 3m/10'' Steel Measuring Tape - Flashlight - 4''x45m Pvc Insulating Tape - Tweezers 125mm - 5 5" Electrician's Scissors Brand New 3 Set Impact Deep Socket Wrench Set Functional: They Provide Added Accessibility In Limited Spaces And In Hard-to-reach Places All While Retaining Their Ability To Tighten Or Loosen. Performance: Deep Impact Sockets Are Made To Be Used With Impact Tools. - 1/2" Drive Design: - Sizes:10mm To 24mm - Length: 78mm - Heat Treatment - Chromium-vanadium Steel / Alloyed Steel Brand New 3 Set Statement Of Compliance I Hereby Commit To Provide The Above Specified Requirements In Compliance With The Technical Specifications For The Project: Supply And Delivery Of Automotive Tools ___________________________________________________________ Name And Signature Of Authorized Representative Supplier’s Business Name: Tin: Address: Telephone No.: Fax No.: E-mail: Authorized Representative’s Signature Over Printed Name And Designation: Date:
Closing Soon4 Nov 2024
Tender AmountPHP 304.5 K (USD 5.2 K)

Province Of Occidental Mindoro Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Province Of Occidental Mindoro Municipality Of Abra De Ilog Invitation To Bid Construction Of Retaining Wall 1. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Through The 20% Development Fund Intends To Apply The Sum Of Three Million Six Hundred Thousand Pesos Only. (p 3,600,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Retaining Wall Infra # 03-2024 For Each Lot. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit Of Abra De Ilog, Occidental Mindoro Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required 80 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From October 30, 2024 To November 26, 2024; 8:00 Am To 5:00 Pm Procuring Entity And Inspect The Bidding Documents At Bac Office Local Government Unit Of Abra De Ilog, Occ. Mindoro. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 30, 2024 To November 26, 2024; 8:00 Am – 5:00 Pm During Weekdays Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only ( Php 5,000.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees On Or Before The Opening Of Bid. 6. The Local Government Unit Of Abra De Ilog Will Hold A Pre-bid Conference On November 8, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office, Municipal Building Lgu, Abra De Ilog, Occ. Mindoro. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On November 26, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Local Government Unit Of Abra De Ilog Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Engr. Adriel S. Dacara Municipal Engineer Office Of The Municipal Engineer Abra De Ilog, Occ. Mindoro 0939-925-5745 Asdhteb@gmail.com Linda B. Ramos Municipal Budget Officer Bac Chairperson Bac Office Municipal Building Barangay Poblacion, Abra De Ilog, Occ. Mindoro Baclguabradeilog@yahoo.com Cp# 0908-888-7026 September 30, 2024 Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Abra De Ilog, Occ. Mindoro Invites Bids For The Construction Of Retaining Wall, With Project Identification Number Infra No 03-2024. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Construction Of Retaining Wall In The Amount Of Three Million Six Hundred Thousand Pesos Only (p 3,600,000.00) 2.2. The Source Of Funding Is: A. 20% Development Fund 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On November 8, 2024; 2:30 Pm At Bac Office, Municipal Building, Lgu Abra De Ilog, Occ. Mindoro. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Removal Of Structure & Obstraction, Excavation For Structures, Embankment, Steel Works, Structural Concrete – Class A, Cement Plastering, Formworks & Falseworks, Metal Structures, Asbc & Pccp. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 Sub-contracting Not Allowed 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Project Engineer General Engineer Road Construction Foreman General Construction Road Construction 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Road Grader 80.4 Hp/6710a 1 Road Roller 10 Mt 1 Water Truck 1000 Gal 1 One Bagger Mixer 5hp 1 Concrete Vibrator Blade 14 Inch/7.5 Hp 1 Concrete Saw Blade 12 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P 100,000.00 (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P 250,000.00 (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 20 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 Not Applicable 4.1 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] Not Applicable 7.2 [select One, Delete The Other.] Five (5) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 120 Calendar Days 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 10 Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Total Contract Price. 13 The Amount Of The Advance Payment Is 15% Of The Total Contract Price 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Excluded For Payment. Not Applicable 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is Before Final Inspection. (november 24, 2023) The Date By Which “as Built” Drawings Are Required Is Before Final Inspection. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 1% Of The Total Contract Price Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Annex Bid In To Separate Folder Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.
Closing Date26 Nov 2024
Tender AmountPHP 3.6 Million (USD 62.1 K)
3991-4000 of 4008 active Tenders