Transport Tenders

Transport Tenders

Provincial Police Headquarters In Katowice Tender

Machinery and Tools
Corrigendum : Closing Date Modified
Poland
Closing Soon5 Dec 2024
Tender AmountRefer Documents 
Details: Pkp Linia Hutnicza Szerokotorowa Sp. Z Oo, in Zamość Requests a Price Offer for the delivery of the Products listed in the Proceeding. When offering a Product, the Seller is obliged to present - attach together with the offer its catalog card/characteristics or other documents enabling the assessment of the subject of the Order. The Ordering Party allows the submission of an Offer in the excise duty exemption procedure. By joining the Proceeding, the Offeror accepts the following conditions 1. The unit price includes all costs related to the proper execution of the order and transport costs. 2. Period of validity of the Offer At least 20 days from the end of the Proceeding. 3. Delivery required to: Pkp Lhs Sp. ZO O. Grupa Magazynowa Zamość- Bortatycze Wysokie 3, 22-400 Zamość On Working Days Between 7:30 a.m. and 2:00 p.m. 4. Required Payment Term 30 Days From Receipt Of Invoice And Goods. 5. The Seller Is Obliged To Provide The Following Documents Along With The Delivery: Proof Of Issue (wz), Certificate Or Other Document Confirming The Quality Of The Product, Product Safety (Safety) Cards. Failure To Attach The Above Documents May Constitute Justified Grounds For Refusal Of The Goods For The Buyer. 6. The Seller Is Obliged To Provide The Buyer With Confirmation Of Receipt Of The Order By Electronic Means To The E-mail: A.torzewska@pkp-lhs.pl Within 24 Hours From The Date Of Receipt Of The Order. Lack Of Confirmation Has No Impact On The Obligation To Fulfill The Order. 7. The Seller is obliged to send a Confirmation of the Notification with Reference Numbers Generated in the Sent System, on the Puesc Platform - Customs Service Electronic Services Platform, in the event that the Delivery will be subject to the Road Transport of Goods Monitoring System (Act of 9 March 2017 on the Road Transport of Goods Monitoring System). 8. The Subject of the Order should be delivered in packaging (with protection) corresponding to the properties of the Subject of the Order and the means of transport and protecting it against damage. The cost of packaging (protection) and insurance of the delivery up to the place of delivery is borne by the Seller. Materials without permanent markings should be labeled. 9. The Seller is obliged to provide on the Platform the net unit prices for one liter of the assortment appropriately for a given part of the Subject of the Order. The Price Should Include All Costs And Risks Necessary For The Proper Execution Of The Subject Matter Of The Order, Including Excise Duty, Depending On The Case Specified In Letter A Or B Of This Point, Ie. In the following manner: A) If the Product is Exempt from Excise Duty, Taxed at a 0% rate or the Contractor has the option to apply an exemption - in accordance with Art. 32 of the Act of 6 December 2008 on Excise Duty (Journal of Laws of 2019, item 864, as amended), or in relation to certain products exempt due to their intended use listed in the Regulation of the Minister of Development and Finance on Exemptions from Excise Duty of 28 December 2018 (Journal of Laws of 2018, item 2525), the Contractor is obliged to provide the unit price excluding excise duty, while at the time of delivery he will be obliged to submit an appropriate declaration that he meets the statutory conditions for the indicated group of products, In this case, the delivery of excise goods covered by the exemption from excise duty due to their intended use will take place in compliance with the conditions that entitle the application of the exemption from excise duty, B) If it does not meet the conditions specified in the abovementioned Act on Excise Duty or in the regulations implementing this Act, then the Seller is obliged to include the amount of excise duty in the unit price. The price must be given in Polish Zloty (PLN) 10. The Buyer informs that in accordance with § 81 of the Regulations on the award of contracts for supplies, services and construction works by Pkp Linia Hutnicza Szerokotorowa Spółka Z Oo in Zamość, the value of which does not exceed PLN 100,000.00 gross, the following will be excluded from the contract award procedure: 1) Contractors listed in the lists specified in Council Regulation (EC) No. 765/2006 and Council Regulation (EC) No. 269/2014 or entered on the list on the basis of the decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Act of 13 April 2022 on specific solutions in the scope of counteracting the support of aggression To Ukraine And Those Serving National Security; 2) Contractors whose Beneficial Owner within the meaning of the Act of 1 March 2018 on Combating Money Laundering and Terrorism Financing (Journal of Laws of 2022, items 593 and 655) is a Person Included in the Lists Specified in Council Regulation (EC) No. 765/2006 and Council Regulation (EC) No. 269/2014 or Entered on the List or Being Such a Beneficial Owner from 24 February 2022, Provided That He or She Was Entered on the List Based on the Decision on Entry on the List Determining the Application of the Measure Referred to in Art. 1 Item 3 of the Act of 13 April 2022 on Specific Solutions in the Field of Counteracting Support for Aggression Against Ukraine and Serving the Protection of National Security; 3) Contractors Whose Dominant Entity Within the Meaning of Art. 3 Sec. 1 Item 37 of the Act of 29 September 1994 on Accounting (Journal of Laws of 2021, item 217, 2105 and 2106) is an entity listed in the lists specified in Council Regulation (EC) No. 765/2006 and Council Regulation (EC) No. 269/2014 or entered on the list or being such a parent entity from 24 February 2022, provided that it has been entered on the list on the basis of a decision on entry on the list determining the application of the measure referred to in Art. 1 Item 3 of the Act of 13 April 2022 on specific solutions for counteracting support for aggression against Ukraine and serving to protect national security 11. By submitting the Offer, the Seller confirms that it is not subject to exclusion under § 81 of the Regulations on the Award of Contracts for Supplies, Services and Construction Works by Pkp Linia Hutnicza Szerokotorowa Spółka Z Oo in Zamość, the Value of which does not exceed PLN 100,000.00 Gross, and declares that it does not violate, does not circumvent or facilitate the violation of Sanction Regulations understood as Economic Sanctions, Legal Provisions, Trade Embargoes, Prohibitions, Decisions, Orders and Other Acts and Activities That Have Been Introduced, Imposed or Performed by the Competent Bodies and Structures of the Competent Organizations and Authorities, Including the United Nations, the European Union, the European Economic Area, the Member States of the European Union and the European Economic Area, the United States of America, as well as Other Entities of a Similar Nature in Connection with Restrictive Measures in Relation to Actions Undermining the Territorial Integrity, Sovereignty and Independence of Ukraine or Threatening Them, or Concerning Restrictive Measures in Connection with the Situation in Belarus and the Participation of Belarus in Russia's Aggression Against Ukraine. At the same time, the Buyer undertakes to inform Pkp Lhs Sp. Z Oo of any change in its status to which the submitted Declaration relates. 12. The Buyer does not allow the possibility of offering Goods, the sale of which could violate or circumvent the Sanctions Regulations Introduced in Connection with Russia's Actions Destabilizing the Situation in Ukraine. When submitting an Offer, the Seller is obliged to Indicate the Goods that originate in Russia or are exported from Russia, together with the Cn Code of These Goods, If it plans to supply such Goods when executing the Order. The Buyer reserves that if the Contractor does not clearly demonstrate for Goods that they may be the subject of sale in accordance with Council Regulation (EU) No. 833/2014 of 31 July 2014 concerning restrictive measures in connection with Russia's actions destabilizing the situation in Ukraine (OJ L 229 of 31.7.2014, p. 1, as amended), the Buyer will withdraw from the Purchase and the Seller shall not be entitled to any claims against the Buyer in this respect. 13. The Buyer reserves the right to cancel the Proceedings without giving a reason. 14. By submitting an Offer, the Detailed Terms of the Order Specified in the Proceedings and in the Order Form Constituting Annex No. 1 to the Proceedings are accepted. 15. After the Evaluation of the Offers, the Buyer will inform the Seller who submitted the most advantageous offer that is not subject to rejection about the need to submit a Declaration - constituting Annex No. 2 and 3, signed in accordance with the Representation"

Moravskoslezsky Region Road Administration, Contribution Organization Tender

Others
Czech Republic
Closing Soon6 Dec 2024
Tender AmountCZK 165.2 K (USD 6.9 K)
Details: The subject of the Public Contract is the conclusion of a contract for work with one contractor for the implementation of construction works related, in particular, to the removal of the torn-off part of the bridge Ev. C. 4525-2a In Široka Niva Village. It also involves excavation of a groove for a new block, reinforcement, formwork and also backfilling with suitable soil. Necessary work also includes the repair of the railing on the outlet. On the inlet side, it is necessary to adjust the slope and recess for the foundation, add concrete to the wings, reinforce and backfill with sorted material from the excavation. The work will be carried out to the extent necessary due to damage to the bridge Ev. C. 4525-2a Natural Disaster (floods) in the Territory of the Moravian-Silesian Region V 09/2024. The Contractor will ensure the Processing of Transport Engineering Measures – I.e. Workplace Marking, According to Tp 66 For Marking Workplaces On Land Communications. If the Item Amount for Other and Ancillary Costs is not part of the Statement, the Participant will estimate these Costs under Other Items. The Estimated Implementation Time Is Set For 15 Calendar Days. The Client Requests That The Contractor Carry Out The Work Also On Weekends (Saturdays And Sundays), If Possible. The work will be carried out depending on the current climatic conditions under the conditions of compliance with technological procedures and standards for their implementation. The conclusion of the contract for the work will be carried out after the end of the procurement procedure, due to the need for the early implementation of the construction works. The Client Assumes That Construction Works Will Be Completion By 04/2025 At The Latest Depending On Climatic Conditions. This Public Order of Small Scale is Implemented on the Basis of the Decision of the Governor of the Moravian-Silesian Region No. 8/2024 Dated 16/09/2024, Ordering Owners of Ground Communications to Immediately Carry Out Buildings, Construction Works, Land Improvements or Removal of Buildings and Vegetation for the Purpose of Mitigating or Averting Threats Resulting from the Crisis Situation and Decision of the Governor of the Moravian-Silesian Region No. 16/2024 From 13/11/2024, Extending the State of Danger Until 13/12/2024.

Don Emilio Del Valle Memorial Hospital Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date16 Dec 2024
Tender AmountPHP 5 Million (USD 85.1 K)
Details: Description Subject : Design And Build Of Dedvmh Central Waste Holding Area Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives The Purpose Of This Project Is To Expand Capacity Of Central Waste Storage To Manage Increased Waste From Hospital Growth, Enhancing Safety And Compliance With Health And Environmental Standards. The Area Will Be Organized To Streamline Waste Collection, Segregation, And Removal, Improving Staff Efficiency While Implementing Sustainable Features To Minimize Environmental Impact. The Design Will Also Be Scalable To Accommodate Future Hospital Expansions, With Secure Access Points To Ensure The Safety Of Personnel And Waste Management Staff, Creating A Safe, Organized, And Regulation-compliant Environment. The Design Must Also Conform To The Standards Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3), Doh Manual On Healthcare Waste Management, 4th Edition, R.a. 9003: Ecological Solid Waste Management Act, R.a. 6969: Toxic And Hazardous Substances & Nuclear Waste Act, And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Central Waste Holding Area - Loading Area For Two (2) Wheeler Truck - Loading Dock - Housing For Stainless Steel Storage Tank And Fiberglass Pressure Tank Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To:  Review And Confirm The Submitted Design Documents.  Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule.  Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - Foundation; Includes Slabs, Beams And Girders D) Architectural Works I) Exterior Walls – All Exterior Wall Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Industrial Exhaust Fan At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank With Shallow Well Jet Pump - Stainless Steel Storage Tank With Enclosure - Drainage System H) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). B. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. C. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. D. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. E. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category C&d “small B” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To:  Low-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 1-storey Building. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 5 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 5 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 5 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Central Waste Holding Area 5% - 7% Of Abc Construction Of Dedvmh Central Waste Holding Area 93% - 95% Of Abc Total Abc Php 5,000,000.00 The Approved Budget For The Design-build Contract Is Five Million Pesos (php 5,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital Central Waste Holding Area. Detailed Architectural And Engineering Design Services Shall Not Exceed Seven Percent (7%) Of The Approved Budget Cost (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Is The Entire Building Inclusive Of Taxes And Duties. Proposal Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is One Hundred Eighty (180) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 120 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons.  Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In:  Recognition And Avoidance Of Unsafe Conditions  Workplace Safety And Health Requirements  Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties.  Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency.  Plan Must Be In Writing For Employers With Greater Than 10 Employees  All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/ Or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General:  Ceiling Height Should Be At Least 4.00 Meters. Material Should Be Of Pvc Ceiling Panels Or Any Washable Ceiling Tiles For Easy Maintenance.  All Floor And Wall Should Be Tiled For Easy Cleaning And Maintenance.  Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair.  Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain  Loading Area Must Accommodate Two (2) 10-wheeler Truck And The Reinforced Concrete Flooring Must Be 200 Mm Thick, With Class A Concrete Mixture  Loading Dock Height Must Be At Least 600 Mm From Finish Floor Line Of Loading Area. For General Illumination, Provide At Least 150 Lux.  Refer To Doh Manual On Healthcare Waste Management, 4th Edition A: Infectious; B: Sharps; C: Pathological/anatomical, D: Pharmaceutical; E: Chemical, F: Radioactive , G: General Waste  Refer To R.a. 9003: Ecological Solid Waste Management Act  Refer To R.a. 6969: Toxic And Hazardous Substances & Nuclear Waste Act  Refer To Admin Order No. 2008-0021, Dated July 30, 2008, Subject: Gradual Phase-out Of Mercury In All Philippine Health Care Facilities And Institutions Ground Floor – Central Waste Holding Area • Work Area - This Room/area Is Where Janitor Places Waste Bins Carts/trolleys, Stores Cleaning Tools, Supplies And Ppes, Cleans/washes The Waste Bins And Trolleys, Weighs And Records Volumes Of Waste, And Performs Hand Washing. This Will Also Include Dedicated Spaces For Storing Waste Bins, Carts, Trolleys, Cleaning Tools, Supplies, And Ppes. It Will Feature A Comfort Room, A Storage Room With Shelving, And Directly Accessible Space For A Weighing Scale. The Area Will Also Provide Space For A High-pressure Washer, Waste Bins/carts/trolleys, A Fire Extinguisher, And A Floor Strainer For Efficient Cleaning And Waste Management Processes. Additionally, A Provision For An Exhaust Fan Will Be Included To Ensure Proper Ventilation, And The Area Will Be Equipped With A Roll-up Door For Easy Access And Functionality. - Planning Relationships: A. Within Central Waste Holding Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Equipment And Accessory: E. Provide At Least Two (2) Units Industrial Exhaust Fan At Ceiling And Wall. F. Provide At Least One (1) Unit Fire Extinguisher. • Hazardous Waste Room - This Room/area Is Dedicated For Storage Of Hazardous Waste Before Treatment (a. Infectious; B. Sharps; C. Chemical; D. Pharmaceutical; E. Pathological/anatomical). The Room Will House Waste Bins/carts/trolleys, A Refrigerator, And Include A Provision For An Exhaust Fan Above Door Height. It Will Feature A Double Swing Metal Door And Biohazard Signage In Accordance With Annex E:1: Emb And Other Universally Accepted Hazard Symbols From The Healthcare Waste Management Manual, Fourth Edition. - Planning Relationships: A. Within Central Waste Holding Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Equipment And Accessory: E. Provide At Least One (1) Unit Industrial Exhaust Fan At Wall. • Non-biodegradable Recyclable Waste - This Room/area Is Dedicated For Storage Of Non-biodegradable/recyclable Waste Before Being Transferred To Material Recovery Facility Or Before Subjected For Recycling. The Room Will House Waste Bins/carts/trolleys And Include A Provision For An Exhaust Fan Above Door Height. It Will Feature A Double Swing Metal Door And Biohazard Signage In Accordance With Annex E:1: Emb And Other Universally Accepted Hazard Symbols From The Healthcare Waste Management Manual, Fourth Edition. - Planning Relationships: A. Within Central Waste Holding Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Equipment And Accessory: E. Provide At Least One (1) Unit Industrial Exhaust Fan At Wall. • Biodegradable Recyclable Waste - This Room/area Is Dedicated For Storage Of Biodegradable Waste Before Being Picked Up By The Local Waste Transporter. The Room Will House Waste Bins/carts/trolleys, And Include A Provision For An Exhaust Fan Above Door Height. It Will Feature A Double Swing Metal Door And Biohazard Signage In Accordance With Annex E:1: Emb And Other Universally Accepted Hazard Symbols From The Healthcare Waste Management Manual, Fourth Edition. - Planning Relationships: A. Within Central Waste Holding Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Equipment And Accessory: E. Provide At Least One (1) Unit Industrial Exhaust Fan At Wall. • Mercury Containing Devices/lamps - This Room/area Is Dedicated For Storage Of Mercury-containing Devices/lamps Before Being Collected By Denr-accredited Tsd (treatment/storage/disposal) Facility. The Room Will House Cabinet With Shelves And Include A Provision For An Exhaust Fan Above Door Height. It Will Feature A Double Swing Metal Door And Biohazard Signage In Accordance With Annex E:1: Emb And Other Universally Accepted Hazard Symbols From The Healthcare Waste Management Manual, Fourth Edition. - Planning Relationships: A. Within Central Waste Holding Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Equipment And Accessory: E. Provide At Least One (1) Unit Industrial Exhaust Fan At Wall. • Toilets/comfort Rooms - One Comfort Room For Both Male And Female. - Planning Relationships: A. Within Central Waste Holding Area Work Area - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Access Ramps - Ramps Designed To Provide A Smooth, For Janitors To Move Waste Bins, Carts, And Trolleys Efficiently. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. Xii. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards.  Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects  Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General  All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies.  Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans.  Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans.  Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters.  Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters.  Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans  The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans  All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details.  Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing.  Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing.  Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes.  Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings.  The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans.  Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01.  Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections  Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans  Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures.  Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections.  The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans  Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows  Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. 8. Details  Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design.  Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation.  Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles.  Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following:  Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line  Road Network And Curbs And Sidewalks  Parking Spaces  Reference Location Of Existing Trees  Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line  Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides:  The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments.  The Inner Zone Shall Include The Wards.  The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services.  The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers.  There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks.  In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation.  Covered Walkways Shall Be Provided For Access And Connection To All The Buildings.  Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans  The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised.  The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans.  Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements.  Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls  Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works.  Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission.  Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 3. Floors  If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design.  Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections.  The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works  The Following Rooms Shall Have A Minimum Ceiling Height: A. All Rooms/storages – 4000mm., To Accommodate The Ceiling-mounted Or Light  Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details.  If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details.  Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould.  Material Should Be Of Pvc Ceiling Panels Or Any Washable Ceiling Tiles For Easy Maintenance. 5. Doors And Windows  All Doors Shall Have Metal Doors.  Aluminum Frames Of Glass Doors Shall Be Powder-coated.  Door Finish And Color Shall Be Approved First Before Application.  All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines.  Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details.  All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details. 6. Stairs, Ramps And Corridors  Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344.  Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall.  Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These.  Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories  Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor.  Electrical Light Switches Shall Be Located By The Knob Side Of The Door.  Electrical Switches And Outlets Shall Be Installed Plumb And Level.  Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers.  Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344.  A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies.  Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage.  Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works  The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details.  Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details.  Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details.  The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting  Painted Interior Wall Shall Be At Least In Gloss Latex Finish Or Any Type Of Paints Applicable As Washable Or Easily Maintained, And Shall Be In Anti-bacterial And Odor-absorbent Paint Finish.  Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified.  Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following:  Gutter, Eaves, And Parapet  Ceiling - Covelight, Special Connections And Design, Mouldings, Valances  Ramps - Handrail Design And Floor Pattern  Doors, Windows And Gates - Grille Works,  Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/nurse Station Counter  Special Carpentry Works, E.g. Partitions, Cabinetry  Building And Room Signages And Wayfinding Systems  Other” Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Work Area, Including Furniture And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Storage C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials  Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels.  Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles.  Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material.  Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick.  Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified.  Aluminum T-runners Shall Be Powder Coated.  Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings.  Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xiii. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xiv. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works  Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House.  The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa.  The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System  Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp);  For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System  For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant.  For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System  Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System  Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Building Facilities Sanitary/plumbing System 1. Provide Details Of The Following:  Fiberglass Pressure Tank (40g Minimum Capacity With Shallow Well Jet Pump Of At Least 1 Hp)  Stainless Steel Storage Tanks, Grade 304 With Enclosure. E. Summary Of Materials  Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings)  Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified)  Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp)  300mm Dia. And Above, Reinforced Concrete Pipe (rcdp)  Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb  Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover  Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888  Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified)  Floor Drains/deck Drains; Cast Iron Brass (bps Certified)  Gutter Drains; Cast Iron Dome Type Brass (bps Certified)  Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Trench Grating; Galvanized/stainless Steel Iron Grates  Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified)  Water Closet-tank Type Push Button Flush  Lavatory - (pedestal/counter Type) With C-spout Spray Faucet  Urinal-wall Hung Flush Valve Type F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xv. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System  The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse.  An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building.  Hazard Classification Shall Be Light Hazard Occupancy.  Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M.  Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing.  All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System.  Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller.  Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes.  Hydraulic Calculations Report Shall Be Based On Npfa-13 Format.  Fire Extinguisher On Every Room/storage Should Be Type Abc. C. Ventilation And Air Conditioning System  The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation 2. Floor Layout Of The Ventilation Location Of The Industrial Exhaust Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Equipment Schedule And Details Drawings Of Ventilating System.  Industrial Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Storages And Work Areas.  Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In Work Area. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. -end Of Mechanical Works Design Parameters- Xvi. Design Parameters (electrical Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances  Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System  Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System  Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Provide Details Of The Following:  Lighting Fixtures/luminaires  Panelboard And Circuit Breakers  Switchgear And Other Metering Devices  Electrical And Hospital Equipment  Installation And Termination Of Auxiliary And Other Special Devices And Equipment  Power And Telephone Handholes (as May Be Required)  Pedestal And Service Entrance To Bldg.  Grounding System Layout  Substation/power House And Electrical Room  Transformer And Generator Mounting  Others As May Be Required. C. Summary Of Materials  General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency.  Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied.  Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure.  Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40.  Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size.  Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality.  Ventilation System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation System. 2. Floor Layout Of The Ventilation System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Industrial Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Rooms. B) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In Work Area. -end Of Electrical Works Design Parameters- Xvii. Design Parameters (green And Safe Health Facilities)  Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards.  Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety  Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government.  The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals.  In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities.  Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency  Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun.  Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain.  Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System.  Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials.  Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc.  Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible.  Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology.  Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals.  All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security.  Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms.  Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene  Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank  Use Of Waterless Urinals And Dual Flush Water Closets.  Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets.  Use Of Water-saving Shower Heads  For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act.  A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied.  Waterless Urinals Must Be Provided For Male Toilets.  There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility  Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability  Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint.  Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used.  Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability  Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop.  Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing.  Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality  Harvest Natural Daylight If Applicable. Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xviii. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement  Contractor’s Temporary Facility And Lay Down Yard.  Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos  Material Testing (rsb, Chb, Concrete, Steel)  Safety Requirements (warning Signs, Hardhat, Etc.)  As Built Plan  Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work  Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction.  All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative  Soil Excavation And Soil Treatment  Restoration Of Any Damaged Properties During The Construction  Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor  Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers.  No Implementation Of The Project Without An Approved Plan And Other Related Documents.  Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules.  Shall Abide By The Medical Center Hospital House Rules  Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative  Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements  All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives.  Soil Investigation  Concrete Strength Testing  Reinforcing Bar Strength Testing  Concrete Masonry Unit (cmu) Testing  All Plumbing And Sanitary System  Automatic Fire Sprinkler System  Ventilation And Air Conditioning System  All Electrical System  And Other Tests That Necessary To Perform To Ensure The Quality Of The Project  All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives.  The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation.  No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative  Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Fire Alarm System 2. Security System Cctv Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.

Moravskoslezsky Region Road Administration, Contribution Organization Tender

Chemical Products
Czech Republic
Closing Soon6 Dec 2024
Tender AmountCZK 221.2 K (USD 9.2 K)
Details: The subject of the Public Contract is the conclusion of a contract for the work with one contractor for the execution of construction works on the bridges Ev. C. 45720-6 AND 45720-7 In the Municipality of Slezská Rudoltice, Damaged As a Result of a Natural Disaster (flood) in the Moravian-Silesian Region in September 2024. Within the Bridge Ev. C. 45720-6 In particular, it concerns the removal of deposits, the rehabilitation of the stone level, the repair of the existing stone pavement, which was melted with the help of cement mortar jointing. Cleaning of the joint, recessing for the protective foot and the realization of the concrete foundation will also be carried out. Within the Bridge Ev. C. 45720-7 Is For Removal Of Deposit, Repair Of Existing Stone Paving, Including Cement Mortar Jointing And Repair Of Damaged Bridge Arch On The Inlet Side Of The Left Bank. The Contractor will ensure the Processing of Transport Engineering Measures – I.e. Workplace Marking, According to Tp 66 For Marking Workplaces On Land Communications. If the Item Amount for Other and Ancillary Costs is not part of the Statement, the Participant will estimate these Costs under Other Items. The Estimated Implementation Time Is Set For 15 Calendar Days. The Client Requests That The Contractor Carry Out The Work Also On Weekends (Saturdays And Sundays), If Possible. The work will be carried out depending on the current climatic conditions under the conditions of compliance with technological procedures and standards for their implementation. The conclusion of the contract for the work will be carried out after the end of the procurement procedure, due to the need for the early implementation of the construction works. The Client Assumes That Construction Works Will Be Completion By 04/2025 At The Latest Depending On Climatic Conditions. This Public Order of Small Scale is Implemented on the Basis of the Decision of the Governor of the Moravian-Silesian Region No. 8/2024 Dated 16/09/2024, Ordering Owners of Ground Communications to Immediately Carry Out Buildings, Construction Works, Land Improvements or Removal of Buildings and Vegetation for the Purpose of Mitigating or Averting Threats Resulting from the Crisis Situation and Decision of the Governor of the Moravian-Silesian Region No. 16/2024 From 13/11/2024, Extending the State of Danger Until 13/12/2024.

Central Commerce Committee Of Navantia S A , S M E Tender

Corrigendum : Closing Date Modified
Spain
Closing Date11 May 2025
Tender AmountEUR 96 Million (USD 101.4 Million)
Tender Id: 5100003330-SERVICIO DE TRANSPORTE | People Transportation Service And Other Services In Ría De Ferrol.

President Of The Comarca Alto Gallego Tender

Spain
Closing Date12 May 2025
Tender AmountEUR 2.8 Million (USD 2.9 Million)
Tender Id: 2104 transporte esqui alpino | Transportation of Schoolchildren in Regional Alpine Ski Programs

Department Of Education Division Of Ilocos Sur Tender

Machinery and Tools
Philippines
Closing Date11 Dec 2024
Tender AmountPHP 2.3 Million (USD 39.7 K)
Details: Description Invitation To Bid Pb-020-2024 Supply And Delivery Of Technical Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools 1. The Department Of Education, Schools Division Of Ilocos Sur Through The Republic Act No. 11975 – Fy 2024 Gaa (sub-allotment Release Order No. Roi-24-1175) Intends To Apply The Sum Of Two Million Three Hundred Thirty-six Thousand Two Hundred Eighty Pesos (p2,336,280.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Project Supply And Delivery Of Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools. Bids Received Higher Than The Abc Shall Be Automatically Rejected At Bid Opening. Item No. Project Description Qty. Unit Unit Cost Abc For The Project (in Php) Tvl Tools & Equipment (bread And Pastry Production) 1 Air Compressor With Airbrush Cake Decorating Set (medium) Pc 1 2,414.00 2,414.00 2 Beater (standard) Pc 6 287.00 1,722.00 3 Board, Chopping, 6 Color Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Set 6 920.00 5,520.00 4 Boiler, Double (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) Set 1 1,955.00 1,955.00 5 Bowl, Mixing (6 Pcs/set) Pc 12 2,415.00 28,980.00 6 Cake Pans, Round #4, #6, #8, #10, #12, #14, #16 Pc 6 1,725.00 10,350.00 7 Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tiers Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3: 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Pc 6 1,725.00 10,350.00 8 Cake Turn Table (body Shape: Circular Material: Cast Aluminum Plate. And Cast-iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm) Pc 3 1,265.00 3,795.00 9 Coupler (tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case) Pc 13 207.00 2,691.00 10 Cup, Measuring (for Solid) The Standard 4 Measuring Cup Sizes Are: 1 Cup, 1/2 Cup, 1/3 Cup And 1/4 Cup Set 12 977.00 11,724.00 11 Cup, Measuring, 250 Ml For Liquid Pc 12 632.00 7,584.00 12 Cup, Measuring, 500ml For Liquid Pc 12 747.00 8,964.00 13 Cutter, Dough (stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Length: 15 Cm X Width: 11 Cm X Thickness: 1.2mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) Pc 1 402.00 402.00 14 Cutter, Pie (medium) Pc 6 460.00 2,760.00 15 Flour Sifter, Hand Cranked (standard) Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm (minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh #30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Pc 6 747.00 4,482.00 16 Grater 4 Sided (s) Pc 6 402.00 2,412.00 17 Knife, Kitchen (s) Pc 6 747.00 4,482.00 18 Knife, Pallet (s) Pc 6 573.00 3,438.00 19 Ladle, 3 0z Pc 6 241.00 1,446.00 20 Loaf Pan Big Pc 6 862.00 5,172.00 21 Loaf Pan, Medium Pc 6 517.00 3,102.00 22 Loaf Pan, Small Pc 6 126.00 756.00 23 Muffin Pan, Big Pc 6 448.00 2,688.00 24 Muffin Pan, Medium Pc 6 414.00 2,484.00 25 Muffin Pan, Small Pc 6 322.00 1,932.00 26 Pie Pan, 10 Inches Diameter Pc 6 517.00 3,102.00 27 Pie Pan, # 6, #8, #10 Set 6 1,265.00 7,590.00 28 Pillars, Cake (big) Pc 6 517.00 3,102.00 29 Piping Bag (100 Pcs Per Pack) (m) Pack 25 241.00 6,025.00 30 Rectangular Pan, (7” X 11”) Pc 4 263.00 1,052.00 31 Rolling Pins (3cm X 10 Cm) Pc 12 402.00 4,824.00 32 Rubber Scraper (m) Pc 12 207.00 2,484.00 33 Sauce Pan 22cm Pc 13 632.00 8,216.00 34 Sheet Pan (m) Pc 15 517.00 7,755.00 35 Spoon, Measuring (plastic) ¼ Teaspoon, ½ Teaspoon, 1 Teaspoon, And 1 Tablespoon Set 26 287.00 7,462.00 36 Spoon, Wooden (s) Pc 15 92.00 1,380.00 37 Strainer Stainless (m) Pc 15 212.00 3,180.00 38 Tip, Decorating X 24 (small To Large) Set 23 632.00 14,536.00 39 Weighing Scale, 10 Kgs (digital) Pc 13 2,875.00 37,375.00 40 Weighing Scale,5 Kgs, (digital) Pc 13 1,265.00 16,445.00 41 Wire Whisk, Medium Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Pc 13 286.00 3,718.00 Sub Total 259,851.00 Tvl Tools & Equipment (computer System Servicing) 42 Allen Wrench (set Of 10 Pieces: 1.5 Mm, 2 Mm, 2.5 Mm, 3 Mm, 4 Mm, 5 Mm, 5.5 Mm, 6 Mm, 8 Mm, 10 Mm;) Set 50 450.00 22,500.00 43 Anti-static Device (anti-static Wrist Strap) Adjustable And Elastic Wristband With Integrated 1 Mega Ohm Resistor Pc 50 250.00 12,500.00 44 Combination Pliers, 8" Pc 50 350.00 17,500.00 45 Crimping Tool (rj 11/45) Pc 52 450.00 23,400.00 46 Desoldering Pump (plastic Or Aluminum Housing) Pc 52 250.00 13,000.00 47 Electric Drill, Portable (rated Voltage: 220 / 240 Volts, Ac 60 Hz Power In Watts: 550 To 650 Watts) Pc 4 4,000.50 16,002.00 48 External Optical Drive Cd-r Dvd-r (interface: Usb 3.0 Or Better; 2. Compatibility: Windows 2000, Xp, Vista, 7, 8, 10, Apple Mac, Linux Or Better; 3. Read Speed: At Least 8x Dvd, At Least 24x Cd; 4. Write Speed: At Least 4x Dvd, At Least 16x Cd) Pc 6 1,000.00 6,000.00 49 Flash Drive (1tb) Pc 52 850.00 44,200.00 50 Flashlight, Head-mounted (rechargeable) Minimum Of 160 Lumens; Beam Distance: Minimum Of 150 Meters; Includes 220 V Ac Charger/power Adaptor (or Equivalent) Pc 50 550.00 27,500.00 51 Hub / Switch ( Standards And Protocols: Ieee 802.3, Ieee802.3u, Ieee802.3x Csma/cd Interface: 8 10/100mbps Ports, Auto-negotiation, Auto-mdi/mdix External Power Supply Adapter: 100-240vac,50/60hz Fanless Data Rates: 10/100mbps At Half Duplex; 20/200mbps At Full Duplex Led Indicator: Power, 1, 2, 3, 4, 5, 6, 7, 8 Dimensions: 5.3 X 3.1 X 0.9 In. (134.5 X 79 X 22.5mm) (approx.) Pc 42 2,000.00 84,000.00 52 Lan Cable Tester (1. Package Contents: 8-port 10/100mbps Desktop Switch, Power) Pc 50 252.00 12,600.00 53 Long Nose Pliers, 8" Pc 50 200.00 10,000.00 54 Multimeter, Digital (auto Range/data Hold/back Light/ Led Lamp/diode Test/triode Test/continuity/ Overload Protection/low Battery Indication/auto Power Off/short-circuit Protection. Display: True Rms, 6000 Counts, 3 5/6 Digits Overload Display: Display Ol Dc Voltage:600mv/6v/60v/600v(0.5%+3), 1000v (0.5%+3) Ac Voltage:600mv/6v/60v/600v/750v (0.8%+5) Dc Current:600a/6000a/60ma/600ma/10a (1.2%+3) Ac Current:600a/6000a/60ma/600ma/10a (1.5%+3) Resistance:600/6k/60k/600k/(1.0%+3) ,6m/60m (1.5%+3) Capacitance: 10nf/100nf/1000nf/10uf/100uf/1000uf (4.0%+5), 10mf/100mf(5.0%+5 Pc 40 800.00 32,000.00 55 Patch Panel (48 Ports) Cat6 Cable Material: Abs Plastic Application: Utp(unshielded) Certification: Rohs, Iso, Ce Rj45 Connector: Two Rows (1-24 Ports & 25-48 Ports) Transport Package: 1pcs/box Pc 50 2,500.00 125,000.00 56 Pc Video Camera (5.0 Mega Pixel Web Camera, Usb-type; With Microphone For Laptop And Desktop Pc Use; Resolution: At Least 640 X 480; Support Windows Xp/7/8/equivalent Mac Os Or Later Versions) Pc 20 500.00 10,000.00 57 Phillip’s Screwdriver, 8" Insulated Pc 50 250.00 12,500.00 58 Precision Screwdriver Set (1 Set Comes With The Following: 3 X Phillips Tip No. 00, 0, And 1; 6 X Standard Tip No. 1, 1.2, 1.4, 1.8, 2.4, And 3.0; 1 X Awl; 1 X Magnet; Plastic Storage Case;) Set 50 500.00 25,000.00 59 Soldering Iron, 60w Pc 50 250.00 12,500.00 60 Standard Screwdriver (flat), 8” Insulated Pc 50 250.00 12,500.00 61 Uninterruptible Power Supply (ups) Battery (included): Lithium-ion Battery Or Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte: Leakproof Voltage: Nominal Input Voltage: 230v, 50/60hz Output Power Capacity: 600va (minimum) Pc 40 4,000.00 160,000.00 62 Usb External Hd 1tb Pc 10 3,500.00 35,000.00 63 Wire Stripper (10 Awg To 24 Awg Length: 7 Inches (minimum) Pc 54 250.00 13,500.00 64 Wireless Access Point ( Access Point Dual Band Wi-fi Band / Data Transfer Rate: 867 Mbps At 5 Ghz And 300 Mbps At 2.4ghz Band Operating Modes: Access Point (ap), Bridge, Wireless Client, Repeater Interface: One 10/100m Ethernet Port(rj45), Support Passive Poe Power On/off Button And Reset Button Comes With External Power Supply: 5vdc-12vdc / 0.5a-1.0a Dimensions ( L X W X D ): (76-191 ×47-125 ×30-68mm) Pc 50 1,500.00 75,000.00 Subtotal 802,202.00 Tvl Tools & Equipment (cookery) 65 Apple Corer (material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Pc 10 444.00 4,440.00 66 Bain Marie, Table ( Type: Bain Marie Table (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Source: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 4 20,700.00 82,800.00 67 Blender, Electric (material Housing: Plastic (polypropylene) Jar Height: 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220volts/ 240volts, 50hz/ 60hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades) Pc 4 2,875.00 11,500.00 68 Board, Chopping/cutting, Plastic (board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) Pc 20 289.00 5,780.00 69 Boiler, Double (stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Sides Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 3 Liters (minimum) Pc 2 2,128.00 4,256.00 70 Braising Pan, Medium Pc 10 1,494.00 14,940.00 71 Can Opener (stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Pc 4 242.00 968.00 72 Casserole, Medium Pc 10 702.00 7,020.00 73 Casserole, Small Pc 12 669.00 8,028.00 74 Colander, Medium Pc 10 340.00 3,400.00 75 Colander, Small Pc 10 303.00 3,030.00 76 Cup, Measuring (for Solid) (cup, 1/2 Cup, 1/3 Cup, 1/4 Cup And 1/8 Cup.) Set 10 518.00 5,180.00 77 Dispenser, Paper Towel (abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Pc 10 403.00 4,030.00 78 Stand Fan, Electric (metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220/240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Pc 5 1,495.00 7,475.00 79 Fire Extinguisher (with Contents) Capacity 5 - 6 Kgs Rechargeable Cylinder Metal Working Pressure Of Cylinder: 400 Psi Pc 1 2,875.00 2,875.00 80 Fish Poacher, Medium (oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm) Pc 10 2,076.00 20,760.00 81 Fork, Carving (square Shape Prong Prong Material: High Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prongs Comes With Square - Shaped Prongs And Pointed Tips Abs Plastic Triple-riveted Handle) Pc 10 593.00 5,930.00 82 Fork, Kitchen (body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle: Abs Plastic Number Of Tines: 2 Tines With Tapered End Pc 10 248.00 2,480.00 83 Frying Pan, Large Pc 10 438.00 4,380.00 84 Frying Pan, Medium Pc 10 334.00 3,340.00 85 Frying Pan, Small Pc 12 296.00 3,552.00 86 Funnel, S/s, Medium Pc 10 242.00 2,420.00 87 Funnel, S/s, Small Pc 10 207.00 2,070.00 88 Garbage Bin (material: Hard Plastic, Polypropylene Dimension: Diameter-26 Cm X Height-47 Cm (minimum) Capacity: 4 Gallons (minimum) Removable Dome Shape Lid With Spring Return Swivel) Pc 4 863.00 3,452.00 89 Glass Rack (body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 ½ Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case) Pc 12 817.00 9,804.00 90 Ice Cream Scooper (medium) Pc 2 288.00 576.00 91 Knife, Boning (28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets) Pc 10 564.00 5,640.00 92 Knife, Chef (chef's Knife Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) Pc 10 449.00 4,490.00 93 Knife, Cleaver (forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets) Pc 10 552.00 5,520.00 94 Knife, Oyster (stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) Pc 10 547.00 5,470.00 95 Light, Emergency (metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector ) Pc 1 2,013.00 2,013.00 96 Meat Slicer (die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 10 3,220.00 32,200.00 97 Pastry Tube (standard) Pc 10 633.00 6,330.00 98 Peeler, Y-type (stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Pc 10 275.00 2,750.00 99 Pepper And Salt Mill (round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices) Pc 10 1,380.00 13,800.00 100 Piping Bag (transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) Pc 10 242.00 2,420.00 101 Plate Rack (body Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) Pc 12 2,099.00 25,188.00 102 Preparation Table With Sink (stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Tabletop And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) Pc 10 4,485.00 44,850.00 103 Pressure Cooker (polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring) Pc 2 5,520.00 11,040.00 104 Roasting Pan (medium) Pc 10 1,840.00 18,400.00 105 Scissor, Kitchen (body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum) Width: 7.5 Cm (minimum) Pc 10 448.00 4,480.00 106 Siever, Small (stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Pc 10 677.00 6,770.00 107 Skimmer, Fine (stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Pc 10 758.00 7,580.00 108 Skimmer, Spider (stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm(minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Pc 10 472.00 4,720.00 109 Soup Cup Rack (polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm) Pc 12 1,553.00 18,636.00 110 Soup Ladle, 12 Oz Pc 10 472.00 4,720.00 111 Soup Ladle, 3 Oz Pc 10 300.00 3,000.00 112 Soup Ladle, 6 Oz Pc 10 403.00 4,030.00 113 Soup Ladle, 8 Oz Pc 10 455.00 4,550.00 114 Spatula (stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches) Pc 8 294.00 2,352.00 115 Spoon, Kitchen (stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type) Pc 8 403.00 3,224.00 116 Spoon, Kitchen (slotted) Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type With Slot At Least 6 Rectangular Slots Preferably With A Packing Case Heat Resistant Up To 220 ° C Pc 8 386.00 3,088.00 117 Spoon, Measuring (body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. (7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) Set 8 291.00 2,328.00 118 Spoon, Parisienne Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Pc 8 301.00 2,408.00 119 Spoon, Serving (stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Pc 24 365.00 8,760.00 120 Spoon, Wooden Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Pc 8 92.00 736.00 121 Stock Pot, Large (stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) Capacity: 20 Quarts (22.7 Liters) Oven Safe To 350⁰f And Dishwasher Safe. Pc 5 2,703.00 13,515.00 122 Strainer Chinois, Small Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Pc 5 380.00 1,900.00 123 Strainer Chinois, Medium (stainless Steel Strainer Diameter: 14 Cm (minimum) Strainer Depth: 13 Cm (minimum) Handle Length: 15 Cm (minimum) With 1 Mm (approx.) Fine Mesh Handle Has Provision For Hanging Pc 5 420.00 2,100.00 124 Strainer Medium, Fine Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Pc 8 248.00 1,984.00 125 Strainer Small, Fine Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) Fine Mesh Pc 8 240.00 1,920.00 126 Tenderizer, Medium Cast Aluminum Overall Length: 26 Cm (minimum) Dual-sided Hammer, Square Head: 6 Cm X 6 Cm (minimum) Ridged Surface With Rows Of Dull, Pyramid-shaped Spikes Weight: 250 Grams To 500 Grams Pc 8 559.00 4,472.00 127 Thermometer, Pocket /pin Tubular Pen Style Digital Thermometer Product Size: 100 Mm X 40 Mm X 14 Mm (minimum) Display Size: 40 Mm X 20 Mm (minimum) Prove Length: 200 Mm (minimum) Measuring Range: -50 °c To 300 °c (-58 ⁰f To 372 ⁰f) Resolution: 0.1 °c / 0.2 °f Pc 10 880.00 8,800.00 128 Tong, 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 10 322.00 3,220.00 129 Tong, 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Pc 10 291.00 2,910.00 130 Tray, Baking, Small Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) Body Thickness: 0.7- 1.0 Mm Pc 10 548.00 5,480.00 131 Tray, Utility Rectangular Material: Stainless Steel Dimension: Length- 48 Cm X Width-32 Cm X Height-2.5 Cm (minimum) Reinforced Edges Pc 12 644.00 7,728.00 132 Turner 3" X 6" Pc 10 541.00 5,410.00 133 Utility Cart Plastic, Polypropylene(pp) Dimension: (l X W X H) 84 Cm X 43 Cm X 95 Cm (minimum) Capacity: 330 Lbs (150 Kg) Loads (minimum) Three (3) Shelving With At Least 25 Cm Distance Between Shelves Tub Shelf Measure (l X W X D) 84 Cm X 43 Cm X 7 Cm (minimum) With Four (4) Swivel Caster, 10 Cm Diameter, Two Which Have Locking Brakes Pc 2 14,713.00 29,426.00 134 Weighing Scale, 1 Kg, Digital Engineering Plastic And Stainless-steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm) 163 Mm X 245 Mm X 79 Mmm (minimum) Pc 6 1,630.00 9,780.00 135 Weighing Scale, 5 Kg Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Pc 10 1,794.00 17,940.00 136 Wire Skimmer, Small Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Pc 10 408.00 4,080.00 137 Wire Whisk, Heavy Duty: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Pc 2 564.00 1,128.00 138 Wire Whisk, Medium Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 488.00 4,880.00 139 Wire Whisk, Small Balloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 372.00 3,720.00 140 Wok, Medium: Round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Pc 10 771.00 7,710.00 141 Wok, Small Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Pc 10 679.00 6,790.00 142 Working Table Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Pc 5 13,628.00 68,140.00 143 Zester Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe Pc 10 397.00 3,970.00 Sub Total 702,982.00 Tvl Tools & Equipment (food And Beverages Services) 144 Chair, Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimension: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box Pc 50 1,955.00 97,750.00 145 Coffee Pot, 2 Pints Round Material: Stainless Steel With Cover Capacity: 2 Pints Outside Diameter: 90 -110 Mm Over-all Height: 200 - 230 Mm Thickness: 0.5 - 1 Mm Pc 4 1,139.00 4,556.00 146 Container, Creamer Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter: 50 - 65 Mm Height: 80 - 105 Mm Color: White Pc 10 288.00 2,880.00 147 Cups And Saucers 5-6 Oz. 1. Material: Porcelain 2. Capacity: 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color: White 5. The Item Must Be Of Good Quality Packed In Carton Box Pc 24 403.00 9,672.00 148 Fork, Cocktail Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Type: Rounded Tip Handle Over-all Length: 110 - 165 Mm Width: 20 - 30 Mm (minimum) Handle Thickness: 2 Mm To 4 Mm Handle Length: 75 - 90 Mm Small, Colo: Silver The Item Must Be Branded And Have Good Quality. Pc 24 173.00 4,152.00 149 Fork, Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance: Stainless Steel, Highly Polished, With Plain Design, Rounded Tip Handle Length: 150 Mm - 175 Mm Width: 20 – 30mm Handle Thickness: 1.5mm - 3 Mm Number Of Tines: 4 Handle: 130 Mm (minimum) Color: Silver Pc 24 173.00 4,152.00 150 Fork, Dinner Fork Body Shape: Fork Shape Material / Appearance: Stainless Steel, Highly Polished, With 4tines Over - All Length: 120 - 175 Mm Thickness Of Handle: 2 - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality Pc 24 196.00 4,704.00 151 Fork, Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance: Stainless Steel, Highly Polished, With Plain Design Over-all Length: 180 - 215 Mm Fork Width: 1.5 Mm - 3 Mm Fork Thickness: 1 Mm - 2 Mm Number Of Tines: 4 Length Handle: 120 - 130 Mm Handle Thickness: 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch Pc 24 288.00 6,912.00 152 Fork, Oyster (4 To 5-1/2 Inches In Overall Length.) Pc 24 173.00 4,152.00 153 Glass, Champagne Flute Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Pc 24 288.00 6,912.00 154 Glass, Collins Tumbler Body Shape: Round Material: Clear Glass Capacity: 10 Oz To 14 Oz Thickness: 1.5 -3 Mm (minimum) Packed In Carton Box Pc 24 173.00 4,152.00 155 Glass, Juice / Hi- Ball Material: Clear Glass Type: Hi-ball Height: 140 - 160 Mm Bottom Diameter: 50 -70 Mm Top Diameter: 50 - 70 Mm Thickness: 2 - 4 (minimum) Capacity: 8 Oz. To 10 Oz. Dishwasher Safe The Item Must Be Branded And Good Quality Pc 24 518.00 12,432.00 156 Glass, Pilsner (iced Tea Glass) Type: Flared Rim Body Shape: Round Slender Material: Clear Glass Capacity: 20 Oz. To 23 Oz. Over-all Length: 22 -25 Cm Thickness Of Glass: 1 -3 Mm With Flared Rim And Slender Shape Packed In Carton Box The Item Must Have Good Quality Pc 24 288.00 6,912.00 157 Glass, Red Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity: 250 -300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 85 - 90 Mm Base Diameter: 75 - 85 Mm Base Thickness: 2 - 4 Mm Pc 24 403.00 9,672.00 158 Glass, White Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 - 3 Mm Over -all Length: 200 -220 Mm Capacity: 270 - 300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 75 - 85 Mm Base Diameter: 70 - 80 Mm Base Thickness: 2 - 5 Mm Pc 24 443.00 10,632.00 159 Gravy Boats Boat Shape With Handle Material: Stainless Steel Capacity: 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Pc 4 225.00 900.00 160 Ice Bucket, 2 Liters With Tongs Circular Set Includes: Ice Bucket Material: Stainless Steel Diameter: 140 - 180 Mm Height: 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity: 2 Liters (minimum) Pc 5 471.00 2,355.00 161 Knife, Butter Stainless Steel W/ Highly Polished Appearance Over-all Length: 140 Mm - 150 Mm Handle Thickness: 3 Mm - 5 Mm With Dull Edge And Rounded Tip Pc 24 127.00 3,048.00 162 Knife, Dinner Flat With Round Tip Material / Appearance: Stainless Steel Blade Highly Polished Handle Material: Stainless Steel Overall Length: 160 - 190 Mm Blade Thickness: 2 - 4 Mm Handle Thickness: 3 - 6 Mm Pc 24 213.00 5,112.00 163 Knife, Fish Flat With Pointed Tip Material / Appearance: Stainless Steel, Highly Polished W/ Plain Design Overall Length: 200 - 220 Mm Width Blade: 20 - 25 Mm Thickness Of Blade: 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 164 Menu Folder (a4 (297mm X 210 Mm) And A5 (210 Mm X 148 Mm) Pc 5 518.00 2,590.00 165 Napkin Holder Rectangular Material: Stainless Steel With Highly Polished Appearance Dimension: Width: 70 - 90 Mm X Length: 150 - 170 Mm Thickness: 0.7 Mm -2 Mm Packed In Plastic Pouch Pc 6 247.00 1,482.00 166 Order Pads Rectangular Material: 80gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Pc 5 58.00 290.00 167 Pepper And Salt Mill: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Pc 20 1,380.00 27,600.00 168 Plate Covers Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Pc 8 305.00 2,440.00 169 Plate, Dessert, 7”to 8” Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color: White Inner Diameter: 145 To 165 Mm Thickness: 3 To 6 Mm Pc 24 207.00 4,968.00 170 Plate, Dinner, 10” Circular Material: Porcelain With No Design Color: White Inner Diameter: 200 Mm - 215 Mm Outer Diameter: 250 - 260 Mm Thickness: 3 Mm - 6 Mm Pc 24 437.00 10,488.00 171 Plate, Fish, 8” To 9” Circular Material: Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color: White Inner Diameter: 165 Mm - 190 Mm(minimum) Thickness: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 172 Round Table (8's) (54” Or 60”) Pc 10 9,034.00 90,340.00 173 Salad Forks (6” Long) Pc 24 127.00 3,048.00 174 Salad Knife 8” Pc 24 207.00 4,968.00 175 Salad Plates 7” To 8” Pc 24 242.00 5,808.00 176 Salt And Pepper Shakers Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Pc 4 207.00 828.00 177 Sauce Ladles Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Pc 10 403.00 4,030.00 178 Server, Cake Stainless Steel Blade, Highly Polished Appearance 2. Over-all Length: 220 To 270 Mm 3. Width: 60 - 80 Mm 4. Thickness: 1.5 Mm To 2 Mm 5. Handle: 120 -140 Mm Long, Non-toxic Plastic 6. Shape: Shovel-shaped 7. Color: Silver Pc 10 571.00 5,710.00 179 Service Forks : Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Pc 6 207.00 1,242.00 180 Service Tray: Rectangular Material: Plastic (pp) Size: 14 Inches X 18 Inches X 1 Inch (minimum) Colo: Any Pc 6 518.00 3,108.00 181 Show/service/ Base Plates 11” To 14” Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Set 6 1,208.00 7,248.00 182 Side Plates Or Bread Plates 6” Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness: 3 Mm - 6mm Pc 24 242.00 5,808.00 183 Side Towels Rectangular Material: Oxford Polyester Soft Cloth Over-all Length: 640 - 680 Mm Over-all Width: 420 -460 Mm Color: Plain White Pc 10 349.00 3,490.00 184 Silver Platter Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Pc 10 570.00 5,700.00 185 Soup Bowl Circular Material: Porcelain Capacity: 24 Oz. (minimum) Pc 24 437.00 10,488.00 186 Soup Ladle Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -235 Mm Ladle Bowl Details: 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Pc 10 366.00 3,660.00 187 Soup Tureen Round Material: Stainless Steel Capacity: 7 - 11 Quart Size: 60 X 35 X 32 Cm (minimum) Pc 10 695.00 6,950.00 188 Spoon, Dessert Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length: 175 To 190 Mm Thickness: 2 Mm - 3 Mm Shorter Handle: 120 -130 Mm Color: Silver Pc 24 125.00 3,000.00 189 Spoons, Service Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Pc 6 136.00 816.00 190 Spoons, Soup (cream And Consume) Round Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length: 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Pc 24 160.00 3,840.00 191 Steak Knife (5”) Pc 24 251.00 6,024.00 192 Sugar Container Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Pc 10 288.00 2,880.00 193 Tablecloth, 54 X 54 Inches Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 942.00 9,420.00 194 Tablecloth, 64x64 Inches Rectangular Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 1,208.00 12,080.00 195 Table Napkins, Cloth, 16” X 16” Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Color: Plain White Pc 60 424.00 25,440.00 196 Table Skirting Cloth Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch Pc 10 2,185.00 21,850.00 197 Table, Square/rectangular (4's Or 6's) Square/rectangle Materia: High Density Polyethylene Tabletop Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Pc 4 5,382.00 21,528.00 198 Tea Pot, 2 Pints Porcelain Type Body Shape: Round With Handle And Pouring Spout Material: Porcelain Capacity: (2 Pint) Color: White Pc 10 1,139.00 11,390.00 199 Teaspoon Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Pc 24 92.00 2,208.00 200 Tong, 8 Inches Standard Material: Stainless Steel Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 7 291.00 2,037.00 201 Tooth Pick Holder Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch Pc 10 101.00 1,010.00 202 Tray Stand Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Pc 5 2,282.00 11,410.00 203 Tray, Bill Folders/ Change Height: 190 - 220 Mm 3. Width: 120 -140 Mm 4. Thickness: 2 Mm To 3 Mm (minimum) 5. Color: Black Pc 5 271.00 1,355.00 204 Tray, Round (bar) Round Material: (pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Pc 8 443.00 3,544.00 205 Water Goblet Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Pc 24 124.00 2,976.00 206 Water Pitcher Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Pc 10 516.00 5,160.00 Sub Total 571,245.00 Total Amount 2,336,280.00 2. The Department Of Education, Schools Division Of Ilocos Sur Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Calendar Days. Bidders Must Have Completed, Within 10 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criteria As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Deped, Schools Division Of Ilocos Sur, And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. Until 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 22-december 10, 2024 (until 9:00 A.m.) From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb Amounting To Five Thousand Pesos (p5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Deped, Schools Division Of Ilocos Sur Will Hold A Pre-bid Conference On November 29, 2024, At 10:00 A.m. At The Schools Division Office, Bantay, Ilocos Sur, And/or Through Videoconferencing/webcasting Via Google Meet Using The Link: Https://meet.google.com/tjb-zntu-yys Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before December 12, 2024, 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 12, 2024, At 9:01 A.m. At The Given Address Below And/or Through And/or Virtual. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Deped, Schools Division Of Ilocos Sur Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Before Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Marillac D. Quinsaat Head – Bac Secretariat Department Of Education, Schools Division Of Ilocos Sur Zone V, Bantay, Ilocos Sur, 2727 Email Address: Ilocos.sur@deped.gov.ph 12. You May Visit The Website/s: For Downloading Of Bidding Documents: Depedilocossur.info Date Of Issue: November 22, 2024 Joye D. Madalipay, Ceso Vi Chairperson, Bids And Awards Committee

Landeshauptstadt Potsdam Tender

Others
Germany
Closing Date17 Dec 2024
Tender AmountRefer Documents 
Details: The state capital Potsdam uses municipal companies and holdings to fulfil its municipal tasks within the framework of economic activity to ensure the provision of public services. The current holding portfolio consists of more than 50 companies, most of which are organised as limited liability companies and in some cases in related corporate groups. The corporate groups and individual companies are particularly active in the areas of construction and housing, supply and disposal, transport, healthcare, economic development and culture. According to Section 91 Paragraph 6 Bbgkverf, as part of the participation report, for the first time for the financial year beginning in 2012 and thereafter every ten years, detailed evidence of the continued fulfillment of the legal requirements under - Section 91 Paragraph 2 No. 1 Bbgkverf (fulfillment of the public purpose), - Section 91 Paragraph 3 Sentences 1 and 3 Bbgkverf (compliance with the principle of subsidiarity) and - Section 91 Paragraph 5 Bbgkverf (compliance with the requirements for the provision of ancillary services) must be kept. The state capital of Potsdam is obliged to keep evidence of the admissibility of economic activity under Section 91 Bbgkverf at regular intervals. For the first time, corresponding evidence was kept on the basis of the 2013 financial year and the result of the audit was published in the participation report. In order to comply with the ten-year cycle, a repeated audit of the investment portfolio of 51 companies, which has been further developed in the meantime, is now to be carried out on the basis of the 2023 financial year. The aim of the audit according to Section 91 Paragraph 2 No. 1, Paragraph 3 Sentences 1 and 3 and Paragraph 5 Bbgkverf is to carry out a brief initial and inventory analysis of the investment portfolio on the basis of the annual financial statements for the 2023 financial year, taking into account the initial audit from 2014, as well as to consider and assess the necessity of the economic activity of the state capital Potsdam with regard to the existing municipal companies and corporate groups, taking into account tax, legal, economic and social, cultural, educational and economic policy aspects. The special features of the municipality's mandatory and voluntary tasks and the maintenance of municipal influence within the framework of the economic activities of the state capital Potsdam must be included in the analysis and the resulting recommendations for action and presented in a final report. The individual test steps must be documented in a comprehensible manner. Interim test results must be made available to the state capital Potsdam at intervals of at least four weeks during the service period. The term of the contract begins on the day following the award of the contract. The services owed must be submitted for acceptance by June 30, 2025.

Universit Degli Studi Di Napoli Federico II Dipartimento Di Medicina Molecolare E Biotecnologie Mediche Tender

Italy
Closing Date23 Jan 2025
Tender AmountEUR 300 K (USD 316.8 K)
Details: The Ideal Flow Cytometer For The Analytical Needs Envisaged In The Project Is A Benchtop Automatic Spectral Flow Cytometer Equipped With 3 405/488/638nm Lasers, Spatially Separated, With Signal Transmission From The Flow Cell Through Optical Fibers To Detection Decks. Implementable Over Time, With The Arrangement On Each Plane Of An Optical System Made Up Of Gratings For Signal Dispersion And An Array Of Pmts Equal To 35 Pmts For The 405 Laser, 32 Pmts For The 488nm Laser And 26 Pmts For The 638 Nm Laser, For A Total Of 86 Pmts For The Detection Of Fluorescence And Two Detectors For The Detection Of Fsc/ssc, I.e. 88 Detectors, Such As To Allow A Multi-parametric Analysis Of At Least 26 Markers Simultaneously. The Instrument Must Be Equipped With A Standard Autosampler That Supports The Acquisition Of Samples From Different Types Of Support: Racks Of 24 Facs Tubes (5 Ml Tubes) And Multiwell Plates With 96-384 Wells Of Different Formats. The Autosampler Must Have A Cooling System (peltier) At 4°c, To Prevent The Degradation Of The Samples During Acquisition And A Cleaning Station Which Ensures Washing Of The Acquisition Probe When Passing From One Tube/well To Another. Leading To A Reduction In Carry-over Of 0.1%; It Is Also Equipped With A Stirring System In Different Modes Selectable By The Operator. Furthermore, The Flow Cytometer Must Be Characterized By Guided And Automated Procedures For The Start-up, Cleaning And Shutdown Phases. The Software Must Have A User-friendly Interface And Tools That Guide The User In The Set-up Of The Experiment (experiment Designer), In The Acquisition And Definition Of The Spectral Library, In The Identification Of Autofluorescent Populations And In The Subsequent Unimixing Viewer For Pmts Voltage Adjustments. The Analyzer Must Have A Workstation That Includes: Operating System: Windows® 10 Pro 64 Bit Processor: Intel® Xeon® 6248 2.5 Ghz 20 Core Memory: 256 Gb Ddr4 Graphics Card: Nvidia Quadro P2200 Storage: 8tb Hdd 2 Ethernet Ports 4 Display Ports Dvd Disc Drive The Software With An Intuitive And Simple Interface, Which Offers The Possibility Of Creating Different Accounts Associated With Each User. The Transport, Delivery, Installation And Testing Services Of The Supply Are The Responsibility Of The Supplier. After The First Familiarization Training With The Instrument During Installation, The Contractor Will Have To Carry Out A Further Specialized Training Course At The Installation Site. The Supplier Must Mandatorily Guarantee A 12-month Warranty On The Equipment From The Testing Date. The Tender Documents Are Available For Free, Unlimited And Direct Access At: (url) Https://www.unina.it/ateneo/gare/consultazione-preliminare-mercato.

Central Commerce Committee Of Navantia S A , S M E Tender

Transportation and Logistics
Corrigendum : Closing Date Modified
Spain
Closing Date5 May 2025
Tender AmountEUR 1 Million (USD 1.1 Million)
Tender Id: DCA-5100014437-Servicio transporte personas | People Transportation Service and Other Related Services of the Cartagena Dock
8611-8620 of 8645 active Tenders