An Approx. 3.4 Km Long Cycle Path Is Being Built Next To Road 1819 Between Habo, Crossing With Private Road 17454.1 Towards St Gölhult And Furusjö, Crossing Sjövägen (west O...
The project includes the demolition/dismantling of two existing elevators as well as the installation of two new elevators in existing elevator shafts at Borlänge C.