Survey Tenders
Survey Tenders
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender
Housekeeping Services
United States
Closing Date21 Feb 2025
Tender AmountRefer Documents
Details: Amendment 0002 (02/18/2025): Additional Q&aadditional Q&a Is Incorporated Into The "revised Solicitation Q&a" Document.end Of Amendment 0002.amendment 0001 (02/14/2025): Correction To Sow And Q&athe Responsibility For Supplies Is Hereby Corrected To The Contractor. The Contractor Shall Furnish All Supplies Required To Perform The Scope Of Work As Designated Within The Sow.solicitation Q&a Is Also Uploaded And Attached.end Of Amendment 0001.the Incumbent Contract Was Awarded To Eco-friendly Cleaning Specialist For An Aggregate Of $68,726.40.combined Synopsis/solicitationnon-personal Janitorial Services For The National Weather Service (nws), Weather Forecast Office (wfo) Located In Wakefield, Va(i) this Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice And In Accordance With The Simplified Acquisition Procedures Authorized In Far Part 13. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.(ii) this Solicitation Is Issued As A Request For Quotation (rfq). Submit Written Quotes On Rfq Number 1305m325q0061.(iii) the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-03 (jan 2025).(iv) this Solicitation Is Being Issued As A Total Small Business Set-aside. The Associated Naics Code Is 561720. The Small Business Size Standard Is $22.0 Million. (v) this Combined Solicitation/synopsis Is For Purchase Of The Following Commercial Services:clin 0001 – Base Year (quantity 12 Months)services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Wakefield, Va, In Accordance With The Statement Of Work. Period Of Performance 04/01/2025 Through 03/31/2026.unit Price (per Month): ___________ annual Total: _____________clin 1001 – Option Year 1 (quantity 12 Months)services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Wakefield, Va, In Accordance With The Statement Of Work. Period Of Performance 04/01/2026 Through 03/31/2027.unit Price (per Month): ___________ annual Total: _____________clin 2001 – Option Year 2 (quantity 12 Months)services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Wakefield, Va, In Accordance With The Statement Of Work. Period Of Performance 04/01/2027 Through 03/31/2028.unit Price (per Month): ___________ annual Total: _____________clin 3001 – Option Year 3 (quantity 12 Months)services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Wakefield, Va, In Accordance With The Statement Of Work. Period Of Performance 04/01/2028 Through 03/31/2029.unit Price (per Month): ___________ annual Total: _____________clin 4001 – Option Year 4 (quantity 12 Months)services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Wakefield, Va, In Accordance With The Statement Of Work. Period Of Performance 04/01/2029 Through 03/31/2030.unit Price (per Month): ___________ annual Total: _____________aggregate Total For All Years: ________________________(vi) description Of Requirements Is As Follows:see Attached Statement Of Work Which Applies To Base Year And All Option Years 1 – 4, And Department Of Labor Wage Rates: Wd 2015-4313, Revision No. 28, Dated 12/23/2024, Which Can Be Found On: Https://sam.gov/content/wage-determinationsinvoices To Be Billed Monthly In Arrears. Provide Monthly And Annual Pricing For Each Base And Option Year. Quote Pricing May Be Provided On Attached Sf18 Form Or On Company Letterhead.(vii) date(s) And Place(s) Of Delivery And Acceptance:period Of Performance Shall Be:base Year For A Twelve Month Period 04/01/2025 Through 03/31/2026.option Period 1 For A Twelve Month Period 04/01/2026 Through 03/31/2027.option Period 2 For A Twelve Month Period 04/01/2027 Through 03/31/2028.option Period 3 For A Twelve Month Period 04/01/2028 Through 03/31/2029.option Period 4 For A Twelve Month Period 04/01/2029 Through 03/31/2030.place Of Performance Is 10009 General Mahone Highway, Wakefield, Va 23888.(viii) Far Provision 52.212-1, Instructions To Offerors-commercial Products And Commercial Services (sept 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(ix) Far Provision 52.212-2, Evaluation-commercial Products And Commercial Services (nov 2021), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(x) Far Provision 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. Offerors Are Advised To Include A Completed Copy Of The Provision With Its Offer.(xi) Far Clause At 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services (nov 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. (xii) Far Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (jan 2025), Applies To This Acquisition And Can Be Found In Full Text On The Request For Quote Form Sf18 Attachment. (xiii) Any Additional Contract Requirement(s) Or Terms And Conditions That Apply Can Be Found On The Request For Quote Form Sf18 Attachment. (xiv) Defense Priorities And Allocations System (dpas) And Assigned Rating Does Not Apply.(xv) Quotes Are Required To Be Received In The Contracting Office No Later Than 12:00pm Mst/mdt On Friday, February 21, 2025. All Quotes Must Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.(xvi) Any Questions Regarding This Solicitation Should Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.utilization Of Fedconnect® For Contract Administrationthe Department Of Commerce Will Utilize The Fedconnect® Web Portal In Administering This Award. The Contractor Must Be Registered In Fedconnect® And Have Access To The Fedconnect® Website Located At Https://www.fedconnect.net/fedconnect/. For Assistance In Registering Or For Other Fedconnect® Questions Please Call The Fedconnect® Help Desk At (800) 899-6665 Or Email At Support@fedconnect.net. There Is No Charge For Registration In Or Use Of Fedconnect®.(end)1352.215-72 Inquiries (apr 2010)offerors Must Submit All Questions Concerning This Solicitation In Writing Via Email To Stephanie.mas@noaa.gov. Questions Should Be Received No Later Than 12:00pm Mst/mdt On Friday, February 14, 2025. Any Responses To Questions Will Be Made In Writing, Without Identification Of The Questioner, And Will Be Included In An Amendment To The Solicitation. Even If Provided In Other Form, Only The Question Responses Included In The Amendment To The Solicitation Will Govern Performance Of The Contract.(end Of Clause)52.237-1 Site Visit (apr 1984)offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award.(end Of Provision)a Site Visit Is Highly Recommended But Not Required. Offerors Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. Please Contact Ron Boyle At 757-899-5733 Or Ron.boyle@noaa.gov To Set Up A Time To Visit The Site. All Questions During The Site Visit Should Be Submitted Electronically To Stephanie.mas@noaa.gov.far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services (sep 2023)notice To Offerors: Instructions For Submitting Quotations Under This Request For Quote Must Be Followed. Failure To Provide All Information To Aid In The Evaluation May Be Considered Non-responsive. Offers That Are Non-responsive May Be Excluded From Further Evaluation And Rejected Without Further Notification To The Offeror.1. Submit Pdf Or Microsoft Word Format Quotations To The Office Specified In This Solicitation At Or Before The Time Specified In The Solicitation. Quote Documents Shall Include Signed Copies Of The Sf 18 And Sf 30(s) To Acknowledge The Solicitation And Any Applicable Amendments. Email Quotes Are Required And Can Be Sent To Stephanie.mas@noaa.gov. 2. Offeror Shall Have An Active Registration In The System For Award Management (sam Found At Https://sam.gov/content/home) In Order To Provide A Quote And Be Eligible For Award. Must Provide Their Ueid/cage Code With Their Quote. 3. Offerors Shall Assume That The Government Has No Prior Knowledge Of Them Or Their Capability.4. Offerors Must Provide All Evaluation Criteria In Accordance With Far 52.212-2. Offerors Who Do Not Provide All Evaluation Criteria May Not Be Considered.1. technical Approach And Capability2. past Performance, Including Submission Of Completed Past Performance Questionnaires3. pricethe Government Does Not Accept Responsibility For Non-receipt Of Quotes. It Is The Contractor’s Responsibility To Request And Receive A Confirmation Of The Quote Receipt.far 52.212-2 Evaluation- Commercial Products And Commercial Services (nov 2021) Offers Will Be Evaluated Based On Price And The Factors Set Forth In Paragraph (a). The Evaluation Will Consider The Non-price Technical Solution (technical Approach And Past Performance) To Be Significantly More Important Than Price. However, As Quotes Are Determined To Be More Equal In The Non-price Evaluation Factor, Price Becomes More Important And May Become The Determining Factor For Award. If, At Any Stage Of The Evaluation, All Vendors Are Determined To Have Submitted Equal, Or Virtually Equal, Non-price Technical Solutions, Price Could Become The Factor In Determining Which Vendor Will Receive The Award.the Government Intends To Evaluate The Quotes And Award A Purchase Order Based On The Offeror’s Initial Quote; Therefore, The Offeror’s Initial Quote Should Contain The Offeror’s Best Terms From A Non-price Technical Solution And Price Standpoint. The Government Reserves The Right Not To Award A Purchase Order Depending On The Quality Of The Quote(s) Submitted And The Availability Of Funds. Furthermore, The Government May Waive Informalities And Minor Irregularities Or Omissions In Quotes Received.the Government May Make Award To Other Than The Lowest-priced Offeror Or The Offeror With The Highest Technical Rating If The Contracting Officer Determines That To Do So Would Result In The Best Value To The Government. The Government Will Not Make An Award At A Significantly Higher Overall Price To Achieve Only Slightly Superior Performance Capability. (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. Paragraph (a) Is Hereby Completed As Follows: Evaluation Will Be Based On The Following: 1. technical Approach And Capability. The Offeror’s Overall Technical Approach Will Be Evaluated To Assess The Government's Level Of Confidence In The Offeror’s Understanding Of, Approach To, And Ability To Successfully Perform The Requirements As Described In The Statement Of Work. Provide A Detailed Description Of The Company’s Experience Performing Similar Services. A Detailed Technical Approach Write-up Describing How The Offeror Will Perform This Service Is Required To Be Submitted With The Quote Regardless Of Whether A Site Visit Was Made Or Not. The Technical Approach Write-up Must Not Be A Reiteration Of The Statement Of Work, But How Your Company Plans On Performing The Tasks Listed In The Attached Statement Of Work. (i.e. Performance Checklists, Anticipated Number Of Employees, Anticipated Hours At The Facility And/or Confirmation Of Supplies Being Provided, Etc.)2. past Performance. Quote Shall Include At Least Two References From At Least Two Separate Contracts For Similar And Relevant Recent Services Within The Past Two Years Including The Name, Phone Number, Full Address, And E-mail Address Of The Reference To Demonstrate The Offeror’s Capability To Successfully Perform The Services Listed In The Statement Of Work. The Offeror Is Required To Fill Out Blocks 1-4 And Send The Attached Past Performance Questionnaire To The References Provided By The Offeror In Their Submission, And Email The Completed Survey Form Directly To Stephanie.mas@noaa.gov By The Closing Date And Time Of This Solicitation. The Government Reserves The Right To Consider Past Performance Report Forms Received After The Due Date And Time Of The Solicitation, Past Performance Questionnaires Submitted From Previous Solicitations, And To Contact References For Verification Or Additional Information.the Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications Between Contracting Parties, Proactive Management And Customer Satisfaction. The Government Will Use Its Discretion To Determine The Sources Of Past Performance Information Used In The Evaluation, And The Information May Be Obtained From References Provided By The Offeror, The Agency’s Knowledge Of Offeror Performance, Other Government Agencies Or Commercial Entities, Or Past Performance Databases, And Will Be Based On Responsiveness, Quality, And Customer Services. Offerors Lacking Relevant Past Performance History, Or For Whom Past Performance Information Is Either Not Available Or Has Not Been Submitted To The Government, Will Receive A Neutral Rating For Past Performance. A Good Past Performance Rating Provides Higher Confidence Than A Neutral Or Satisfactory Rating.1. price. The Government Will Evaluate The Price Quote For Completeness And Reasonableness In Relation To The Rfq Requirements. Quoted Prices Must Be Entirely Compatible With The Non-price Technical Solution.the Government Intends To Award A Trade-off, Single Firm Fixed-price Purchase Order On An All Or None Basis With Payment Terms Of Net 30. (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.(end Of Provision)
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender
Housekeeping Services
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Details: Amendment 0003 (01/01/2025): Solicitation Q&asee Attachment "solicitation Q&a" For All Responses To Inquiries Submitted By The Due Date/time.end Of Amendment 0003.amendment 0002 (12/19/2024): Solicitation Extendedthe Solicitation Due Date And Time Is Hereby Extended To Friday, January 17, 2024 At 12:00pm Mst/mdt Due To Limited Availability For Site Visits During The End Of The Calendar Year.end Of Amendment 0002amendment 0001 (12/19/2024): Incumbent Informationthe Incumbent Contract Was Awarded To Superior Janitorial Group Llc For An Aggregate Of $70,620.00.end Of Amendment 0001combined Synopsis/solicitationnon-personal Janitorial Services For National Weather Service (nws), Weather Forecast Office (wfo) Located In Tallahassee, Fl(i) this Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice And In Accordance With The Simplified Acquisition Procedures Authorized In Far Part 13. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.(ii) this Solicitation Is Issued As A Request For Quotation (rfq). Submit Written Quotes On Rfq Number 1305m325q0035.(iii) the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-01 (nov 2024).(iv) this Solicitation Is Being Issued As A Total Small Business Set-aside. The Associated Naics Code Is 561720. The Small Business Size Standard Is $22.0 Million. (v) this Combined Solicitation/synopsis Is For Purchase Of The Following Commercial Services:clin 0001 – Base Yearservices, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2025 Through 02/28/2026.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 1001 – Option Year 1services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2026 Through 02/28/2027.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 2001 – Option Year 2services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2027 Through 02/29/2028.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 3001 – Option Year 3services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2028 Through 02/28/2029.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 4001 – Option Year 4services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2029 Through 02/28/2030.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________aggregate Total For All Years: ________________________(vi) description Of Requirements Is As Follows:see Attached Statement Of Work Which Applies To Base Year And All Option Years 1 – 4, And Department Of Labor Wage Rates: Wd 2015-4569, Revision No. 24, Dated 07/22/2024, Which Can Be Found On: Https://sam.gov/content/wage-determinationsinvoices To Be Billed Monthly In Arrears. Provide Monthly And Annual Pricing For Each Base And Option Year. Quote Pricing May Be Provided On Attached Sf18 Form Or On Company Letterhead.(vii) date(s) And Place(s) Of Delivery And Acceptance:period Of Performance Shall Be:base Year For A Twelve Month Period 03/01/2025 Through 02/28/2026.option Period 1 For A Twelve Month Period 03/01/2026 Through 02/28/2027.option Period 2 For A Twelve Month Period 03/01/2027 Through 02/29/2028. Option Period 3 For A Twelve Month Period 03/01/2028 Through 02/28/2029. Option Period 4 For A Twelve Month Period 03/01/2029 Through 02/28/2030. Place Of Performance Is 1017 Academic Way, Tallahassee, Fl 32306.(viii) Far Provision 52.212-1, Instructions To Offerors-commercial Products And Commercial Services (sept 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(ix) Far Provision 52.212-2, Evaluation-commercial Products And Commercial Services (nov 2021), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(x) Far Provision 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. Offerors Are Advised To Include A Completed Copy Of The Provision With Its Offer.(xi) Far Clause At 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services (nov 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. (xii) Far Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (nov 2024), Applies To This Acquisition And Can Be Found In Full Text On The Request For Quote Form Sf18 Attachment. (xiii) Any Additional Contract Requirement(s) Or Terms And Conditions That Apply Can Be Found On The Request For Quote Form Sf18 Attachment. (xiv) Defense Priorities And Allocations System (dpas) And Assigned Rating Does Not Apply.(xv) Quotes Are Required To Be Received In The Contracting Office No Later Than 12:00pm Mst/mdt On Friday, January 3, 2025. All Quotes Must Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.(xvi) Any Questions Regarding This Solicitation Should Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.utilization Of Fedconnect® For Contract Administrationthe Department Of Commerce Will Utilize The Fedconnect® Web Portal In Administering This Award. The Contractor Must Be Registered In Fedconnect® And Have Access To The Fedconnect® Website Located At Https://www.fedconnect.net/fedconnect/. For Assistance In Registering Or For Other Fedconnect® Questions Please Call The Fedconnect® Help Desk At (800) 899-6665 Or Email At Support@fedconnect.net. There Is No Charge For Registration In Or Use Of Fedconnect®.(end)1352.215-72 Inquiries (apr 2010)offerors Must Submit All Questions Concerning This Solicitation In Writing Via Email To Stephanie.mas@noaa.gov. Questions Should Be Received No Later Than 12:00pm Mst/mdt On Friday, December 27, 2024. Any Responses To Questions Will Be Made In Writing, Without Identification Of The Questioner, And Will Be Included In An Amendment To The Solicitation. Even If Provided In Other Form, Only The Question Responses Included In The Amendment To The Solicitation Will Govern Performance Of The Contract.(end Of Clause)52.237-1 Site Visit (apr 1984)offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award.(end Of Provision)a Site Visit Is Highly Recommended But Not Required. Offerors Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. Please Contact Jennifer Nichols At 850-942-8833 Ext. 222 Or Jennifer.nichols@noaa.gov To Set Up A Time To Visit The Site. All Questions During The Site Visit Should Be Submitted Electronically To Stephanie.mas@noaa.gov.far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services (sep 2023)notice To Offerors: Instructions For Submitting Quotations Under This Request For Quote Must Be Followed. Failure To Provide All Information To Aid In The Evaluation May Be Considered Non-responsive. Offers That Are Non-responsive May Be Excluded From Further Evaluation And Rejected Without Further Notification To The Offeror.1. Submit Pdf Or Microsoft Word Format Quotations To The Office Specified In This Solicitation At Or Before The Time Specified In The Solicitation. Quote Documents Shall Include Signed Copies Of The Sf 18 And Sf 30(s) To Acknowledge The Solicitation And Any Applicable Amendments. Email Quotes Are Required And Can Be Sent To Stephanie.mas@noaa.gov. 2. Offeror Shall Have An Active Registration In The System For Award Management (sam Found At Https://sam.gov/content/home) In Order To Provide A Quote And Be Eligible For Award. Must Provide Their Ueid/cage Code With Their Quote. 3. Offerors Shall Assume That The Government Has No Prior Knowledge Of Them Or Their Capability.4. Offerors Must Provide All Evaluation Criteria In Accordance With Far 52.212-2. Offerors Who Do Not Provide All Evaluation Criteria May Not Be Considered.1. technical Approach And Capability2. past Performance, Including Submission Of Completed Past Performance Questionnaires3. pricethe Government Does Not Accept Responsibility For Non-receipt Of Quotes. It Is The Contractor’s Responsibility To Request And Receive A Confirmation Of The Quote Receipt.far 52.212-2 Evaluation- Commercial Products And Commercial Services (nov 2021) Offers Will Be Evaluated Based On Price And The Factors Set Forth In Paragraph (a). The Evaluation Will Consider The Non-price Technical Solution (technical Approach And Past Performance) To Be Significantly More Important Than Price. However, As Quotes Are Determined To Be More Equal In The Non-price Evaluation Factor, Price Becomes More Important And May Become The Determining Factor For Award. If, At Any Stage Of The Evaluation, All Vendors Are Determined To Have Submitted Equal, Or Virtually Equal, Non-price Technical Solutions, Price Could Become The Factor In Determining Which Vendor Will Receive The Award.the Government Intends To Evaluate The Quotes And Award A Purchase Order Based On The Offeror’s Initial Quote; Therefore, The Offeror’s Initial Quote Should Contain The Offeror’s Best Terms From A Non-price Technical Solution And Price Standpoint. The Government Reserves The Right Not To Award A Purchase Order Depending On The Quality Of The Quote(s) Submitted And The Availability Of Funds. Furthermore, The Government May Waive Informalities And Minor Irregularities Or Omissions In Quotes Received.the Government May Make Award To Other Than The Lowest-priced Offeror Or The Offeror With The Highest Technical Rating If The Contracting Officer Determines That To Do So Would Result In The Best Value To The Government. The Government Will Not Make An Award At A Significantly Higher Overall Price To Achieve Only Slightly Superior Performance Capability. (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. Paragraph (a) Is Hereby Completed As Follows: Evaluation Will Be Based On The Following: 1. technical Approach And Capability. The Offeror’s Overall Technical Approach Will Be Evaluated To Assess The Government's Level Of Confidence In The Offeror’s Understanding Of, Approach To, And Ability To Successfully Perform The Requirements As Described In The Statement Of Work. Provide A Detailed Description Of The Company’s Experience Performing Similar Services. A Detailed Technical Approach Write-up Describing How The Offeror Will Perform This Service Is Required To Be Submitted With The Quote Regardless Of Whether A Site Visit Was Made Or Not. The Technical Approach Write-up Must Not Be A Reiteration Of The Statement Of Work, But How Your Company Plans On Performing The Tasks Listed In The Attached Statement Of Work. (i.e. Performance Checklists, Anticipated Number Of Employees, Anticipated Hours At The Facility And/or Confirmation Of Supplies Being Provided, Etc.)2. past Performance. Quote Shall Include At Least Two References From At Least Two Separate Contracts For Similar And Relevant Services Including The Name, Phone Number, Full Address, And E-mail Address Of The Reference To Demonstrate The Offeror’s Capability To Successfully Perform The Services Listed In The Statement Of Work. The Offeror Is Required To Fill Out Blocks 1-4 And Send The Attached Past Performance Questionnaire To Those References Provided By The Offeror In Their Submission, And Email The Completed Survey Form Directly To Stephanie.mas@noaa.gov By The Closing Date And Time Of This Solicitation. The Government Reserves The Right To Consider Past Performance Report Forms Received After The Due Date And Time Of The Solicitation And To Contact References For Verification Or Additional Information.the Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications Between Contracting Parties, Proactive Management And Customer Satisfaction. The Government Will Use Its Discretion To Determine The Sources Of Past Performance Information Used In The Evaluation, And The Information May Be Obtained From References Provided By The Offeror, The Agency’s Knowledge Of Offeror Performance, Other Government Agencies Or Commercial Entities, Or Past Performance Databases, And Will Be Based On Responsiveness, Quality, And Customer Services. Offerors Lacking Relevant Past Performance History, Or For Whom Past Performance Information Is Either Not Available Or Has Not Been Submitted To The Government, Will Receive A Neutral Rating For Past Performance.3. price. The Government Will Evaluate The Price Quote For Completeness And Reasonableness In Relation To The Rfq Requirements. Quoted Prices Must Be Entirely Compatible With The Non-price Technical Solution.the Government Intends To Award A Trade-off, Single Firm Fixed-price Purchase Order On An All Or None Basis With Payment Terms Of Net 30. (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.(end Of Provision)
EllisDon Construction Services Inc Tender
Aerospace and Defence
Canada
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project. Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number: 71947 Title: Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu), including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division Scope Of Work 01 45 00 Surveying 01 45 00 Material Testing 01 45 00 Third Party Inspection (roof, Structural, Geotechnical) 01 52 00 Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19 Tower Cranes 01 54 23 Scaffolding 02 41 19 Selective Demolition 03 11 00 Concrete Formwork 03 15 00 Concrete Accessories 03 20 00 Reinforcing Steel 03 30 00 Concrete Supply 03 35 00 Concrete Placing & Finishing 03 45 00 Precast Specialties 04 00 00 Masonry 05 10 00 Structural Steel 05 30 00 Metal Decking 05 50 00 Miscellaneous Steel 05 70 00 Ornamental (specialized) Metals 06 20 00 Millwork / Architectural Woodwork 07 10 00 Damp Proofing & Waterproofing 07 40 00 Metal Roofing, Cladding & Siding 07 50 00 Membrane Roofing 07 80 00 Firestopping & Fireproofing 07 90 00 Caulking 08 10 00 Openings – Doors, Frames & Hardware 08 33 00 Coiling Doors & Grilles 08 34 16 Hanger Doors 08 35 00 Folding Doors & Grilles 08 36 00 Overhead Doors 08 40 00 Aluminum Entrances, Storefronts & Curtain Wall 08 80 00 Glazing 08 87 00 Window Film 09 21 16 Gypsum Board Assemblies 09 51 14 Acoustic Panels 09 60 00 Flooring 09 66 00 Tiling 09 67 00 Fluid Applied Flooring 09 69 00 Access Flooring 09 90 00 Painting 10 11 00 Visual Display Boards 10 14 00 Signage 10 22 19 Demountable Partitions 10 26 00 Wall, Corner, Door Protection 10 28 00 Bathroom Accessories & Toilet Partitions 10 51 00 Lockers 10 75 00 Flagpoles 11 30 00 Appliances 11 61 00 Theater And Stage Equipment 11 66 00 Athletic Equipment 11 81 29 Fall Arrest Systems 11 98 00 Detention Equipment 12 00 00 Furnishings 12 20 00 Window Coverings 14 20 00 Elevator & Lifts 21 00 00 Fire Suppression 22 00 00 Mechanical – Plumbing 23 00 00 Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00 Integrated Automation 26 00 00 Electrical 28 10 00 Access Control 31 00 00 Earthworks 31 60 00 Piling 32 10 00 Paving 32 16 00 Sidewalk Curb & Gutter 32 31 00 Fencing 32 90 00 Landscaping 33 00 00 Utilities & Underground 34 73 00 Airfield Construction - Apron 41 22 00 Overhead Cranes 48 16 00 Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.
Kunin village Tender
Civil And Construction...+1Civil Works Others
Czech Republic
Closing Date28 Jan 2025
Tender AmountRefer Documents
Details: The subject of the public contract is the demolition of a residential building in the village of Kunín, No. 20. The building is located near a road (I-class road). It is a building from the 1950s. The built-up area of the building is 447.50 m2. A partially basement building with two above-ground floors and a residential attic. The foundations are made of brick, made of stone of various thicknesses. The load-bearing masonry is mainly made of solid burnt and unburnt bricks. The non-load-bearing masonry - partitions are also made of Cpp. The ceilings are made of wooden beams. The roof structure in the central part of the building is hipped, the peripheral extensions are covered with a hipped roof. The roof covering is ceramic (main part) and a combination of PVC/trapezoidal sheet metal (extensions). Demolition work will be carried out by gradual mechanical dismantling of the supporting horizontal and vertical structures from the roof of the building towards the foundation structures. The use of explosives is not considered during demolition work. Demolition work in the vicinity of the Class I road will be carried out with maximum caution so as not to disturb it in any way. Asbestos was not detected during the construction survey carried out by the designer. All processing of rubble and waste will be ensured by the contractor, as well as the disposal of residual materials. Upon handover of the work, the contractor will submit documents on the method of waste disposal. Demolition work will be carried out on the investor's land. Neighboring land will not be used for demolition. The exception is Parcel No. 121, on which part of the building is also located. According to the Kn, this parcel has over 30 owners and the parcel as such serves as a local road for the given street. The work will be carried out according to the project documentation "Demolition Survey of the Apartment Building - Kunín No. 20" and the list of works prepared by: Lukáš Pavlínek, No. 615, 75623 Jablůnka, Ičo: 171 13 512 in June 2024 and the consent to the removal of the building Ref. No. 878/2024/ba dated 16.05.2024, issued by the Building Office, the Office of the Municipality of Suchdol Nad Odrou. A detailed specification of the subject of the public contract, as well as the commercial and payment terms, is contained in the annexes to this tender documentation.
PUBLIC BUILDINGS SERVICE USA Tender
Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents.
if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10
cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report
houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal
(1) Contents
· Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror.
· A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement.
· Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010)
(a) Submission Of Certified Cost Or Pricing Data Is Not Required.
(b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested.
77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90
exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision
of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects
that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance,
evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes
standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp
services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions
asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In
pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents
Details: This Announcement Is Not A Request For Proposal. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. the Department Of Veterans Affairs Is Seeking A Qualified Architect-engineering (ae) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project 526-23-107 Replace Domestic Water Distribution System Phase 2 (a/e) At The James J. Peters Vamc, Bronx, New York. This Project Seeks The Expertise Of An Architectural Engineering Firm To Design A State-of-the-art Hot Water Heater System, Design For Construction To Install New Sections Of Water Main Pipes And Conduct A Comprehensive Survey Of The Existing Water Main System At The James J. Peters Va Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468. this Requirement Is Being Procured In Accordance With The Brooks Act As Implemented In Far Subpart 36.6. Applicable Naics Code Is 541330 And Small Business Size Standard Of $25.5m. Magnitude Of Construction Is Between $5,000,000.00 And $10,000,000.00. This Is A 100% Service-disabled Veteran Owned Small Business Set Aside. The Anticipated Award Date Of The Proposed A-e Contract Is On Or Before April 15, 2025. Potential Contractors Must Be Registered In Sam (www.sam.gov ) And Are Visible/verified/certified As Sdvosb In Veterans Small Business Certification (https://veterans.certify.sba.gov/ ) At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. in Order To Assure Compliance With Vaar Clauses, 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (nov 2022) And 852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022), All Firms Submitting A Sf 330 For This Notice Are Required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e., Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation. all A/e Firms Are Advised That In Accordance With Vaar 836.606-71 The Total Cost Of The Production And Delivery Of Designs, Plans, Drawings And Specifications Shall Not Exceed Six (6) Percent Of The Estimate Cost Of Construction. Other A-e Fees Are Not Included In The Six (6) Percent. Additionally, Far Clause 52.236-22 (c) - Design Within Funding Limitation, Will Be Applicable To This Procurement Action. scope Of Service Required 526-23-107. See The Attached Statement Of Work. x. Location bronx Va Medical Center. cost Range estimated Construction Cost Range: Between $5,000,000.00 And $10,000,000.00. type Of Contract Contemplated
the Department Of Veterans Affairs Is Contemplating Awarding A Firm Fixed Price Contract. design Completion Period: The Department Of Veterans Affairs Requires Design And Contract Support Services. The A/e Shall Deliver 100% Bid Documents In Accordance With The Ae Design Schedule From The Issuance Of The Notice To Proceed (ntp). selection Criteria Descriptions
the Selection Criteria Descriptions Are Provided Below. professional Qualifications Necessary For Satisfactory Performance Of Required Services. provide Brief Resumes Of Proposed Team Members Who Will Specifically Serve As The Project Managers And Designers Of Record Proposed For This Project Only. Include Specific Experience And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm). The Designers Of Record Shall Perform And Direct The Design Within Their Respective Discipline And Shall Sign And Seal The Drawings. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. specialized Experience And Technical Competence
specialized Experience And Technical Competence Required For This Specific Project, Including, Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. capacity
this Factor Evaluates The Ability Of The Firm, Given Their Current Projected Workload And The Availability Of Their Key Personnel, To Accomplish The Possible Myriad Of Design Projects In The Required Time. the General Workload And Staffing Capacity Of The Design Office Will Be Evaluated.
list Current Projects With A Design Fee Of Greater Than $20,000 Being Designed In The Firms Office. indicate The Firms Present Workload And The Availability of The Project Team (including Sub-consultants) For The Specified Contract Performance Period;
describe Experience In Successfully Delivering Projects Per performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates past Performance: Visn2 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm.
recent Is Defined As Performance Occurring Within Five (5) Years Of The Date Of This Sources Sought, Except Those Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Sources Sought.
relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope Within A Va Hospital Setting In Relation To The Type Of Projects Anticipated Under The Resultant Contracts.
respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Superior Performance Ratings On Relevant Projects May Be Considered More Favorably In The Evaluation. location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project; Provided, That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project
to Be Rated Acceptable For This Evaluation Factor, The A/e Firm Must Be Within 450 Miles From The Prime Contractor S Main Office Or Official Satellite Office To The James J. Peters Va Medical Center, Bronx, Ny 10468 this Distance Is Determined According To Http://maps.google.com/
this Factor Evaluates The Distance The Ae Firm's Design Office Or Official Satellite Office(s) From The Location Of Work (va Medical Center). Please Provide The Address (es) And Distance Of Your Closest Office To The Address Listed In Iv. Above. the Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services. please Note: The Ae Evaluation Board Must Be Provided With Complete And Accurate Information For All Seven (7) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The Ae Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The Ae Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications. limitations
852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022) (a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb : (1) Means A Small Business Concern - (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar802.101, Surviving Spouse Definition); (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran; (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document; (iv) The Business Has Been Verified For Ownership And Control Pursuant To 38 Cfr Part 74 And Is Listed In Va's Vendor Information Pages (vip) Database At Https://www.vetbiz.va.gov/vip/; And (v) The Business Will Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size And Government Contracting Programs At 13 Cfr Parts 121 And 125, Provided That Any Reference Therein To A Service-disabled Veteran-owned Small Business Concern Or Sdvo Sbc, Is To Be Construed To Apply To A Va Verified And Vip-listed Sdvosb, Unless Otherwise Stated In This Clause. (2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). (3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). (4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)), Except That For A Va Contract The Firm Must Be Listed In The Vip Database (see Paragraph (a)(1)(iv) Of This Clause). (b) General.
(1) Offers Are Solicited Only From Vip-listed Sdvosbs. Offers Received From Entities That Are Not Vip-listed Sdvosbs At The Time Of Offer Shall Not Be Considered. (2) Any Award Resulting From This Solicitation Shall Be Made To A Vip-listed Sdvosb Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. (3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. (c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Vip-listed Sdvosbs Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible Sdvosb As Defined In This Clause, 38 Cfr Part 74, And Vaar Subpart 819.70. (d) Agreement. When Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. Unless Otherwise Stated In This Clause, A Requirement In 13 Cfr Parts 121 And 125 That Applies To An Sdvo Sbc, Is To Be Construed To Also Apply To A Vip-listed Sdvosb. For The Purpose Of Limitations On Subcontracting, Only Vip-listed Sdvosbs (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Certification Requirements In This Solicitation (see 852.219-75 Or 852.219-76 As Applicable). These Requirements Are Summarized As Follows: (1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract. (2) Supplies/products.
(i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Crf 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. (4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Vip-listed Sdvosbs. (5) Subcontracting. An Sdvosb Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Listed In Vip To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. (e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: _x_by The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or __by The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Is Listed In Vip And Complies With The Requirements In 13 Cfr 125.18(b), Provided That Any Requirement Therein That Applies To An Sdvo Sbc Is To Be Construed To Apply To A Vip-listed Sdvosb. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. (g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Program For Sdvo Sbcs, And The Va Veterans First Contracting Program. (h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company's Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406-2 Causes For Debarment). submission Requirements: unless Paper Offers Are Specifically Authorized In An Individual Solicitation, All Responses To Solicitations Must Be Submitted Electronically As Described Below.â Responses Submitted In A Paper Form Are Unacceptable. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award Due To Noncompliance With The Submission Requirements. email Submission Requirements Interested Firms Having The Capabilities To Perform This Work Must Submit: One (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) To Akkil.kurian@va.gov And Patricia.cordero@va.gov No Later Than 10:00am, Eastern Standard Time (est) On January 31, 2025. Submittals Received After The Date And Time Identified Will Not Be Considered. The Submittal Will Be Date And Time Stamped By The Microsoft Email System And Will Be The Official Record Of Receipt For The Submission. All Sf 330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Solicitation Number And Project Number And Title (abbreviated And Shortened Is Okay). Submission Is To Be No More Than A Total Of Fifty (50) Pages; Size Of Emails Is Not To Exceed 10 Megabytes (mb). If More Than One Email Is Sent, Please Number Emails In Subject Line As 1 Of 2, 2 Of 2 Etc. all Sf 330 Submissions Must Include The Following Information Either On The Sf 330 Or By Accompanying Document: cover Page With Solicitation Number, Project Number And Title
table Of Contents copy Of Valid State Registration For Each Lead Designer copy Of Current Https://veterans.certify.sba.gov/ Sdvosb/vosb Certification
duns Number
cage Code tax Id Number
email Address And Phone Number (including The Area Code) Of The Primary Point Of Contact.
Statutory City Of Brno, District Of Brno Bystrc Tender
Others
Czech Republic
Closing Date11 Feb 2025
Tender AmountRefer Documents
Details: The Subject of the Performance Is the Development of Project Documentation for the Reconstruction of the Atrium in the Hey-rovského 32 Elementary School Complex in Brno-bystrc. The Documentation Will Be Prepared Within the Scope According to the Building Act 283/2021 Coll., and Decree No. 131/2024 Coll. - Annex No. 8 - Scope of Documentation for the Implementation of Construction. The Basis for the Development of the PD Is the Study as Annex No. 4 of the Call. One-stage project documentation at the stage of selecting a contractor and carrying out the construction will include: • Survey of the existing state • Demolition of existing buildings • Architectural and construction solutions of the atrium - all according to the attached documents • Reconstruction and new management of technical networks (sewage and storm sewers, electricity, water supply, data networks) • Communication solutions • Pbř • Pov • Itemized budget and statement of measurements for pricing in the format *.xls or *.xlsx. • Submission of documentation in paper form - 4 pairs and electronically in the format Pdf and Dwg The order includes author's supervision, which will take place during the implementation of the construction, it is assumed as occasional supervision, with participation in inspection days and possibly on the basis of a call from the technical supervision of the construction Tds. The total expected time required for Ad is 20 hours.
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Civil Works Others, Building Construction
United States
Closing Date20 Jan 2025
Tender AmountRefer Documents
Details: (1) Action Code: Sources Sought this Is A Sources Sought Notice Only. This Is Not A Request For Proposal, But A Survey To Locate Potential Sources. This Sources Sought Does Not Constitute An Invitation For Bids, Request For Proposals, Or A Request For Quotations, And Is Not To Be Construed As A Commitment By The Government To Issue An Order Or Otherwise Pay For The Information Solicited, Nor Is It A Guarantee Of A Forthcoming Solicitation Or Contract. It Is For Market Research Purposes Only. Respondents Will Not Be Notified Of The Results Of The Evaluation. the Purpose Of This Sources Sought Notice Is To Gain Knowledge Of Interest, Capabilities, And Qualifications Of Various Members Of Industry, To Include The Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (hub-zone), Service-disabled Veteran-owned Small Business (sdvosb), Women-owned Small Business (wosb), And Economically Disadvantaged Women-owned Small Business (edwosb). The Government Must Ensure There Is Adequate Competition Among The Potential Pool Of Responsible Contractors. Small Business, Section 8(a), Hubzone, Sdvosb, Wosb, & Edwosb Businesses Are Highly Encouraged To Participate. (2) Date: 13 January 2025 (3) Classification Code: F0 (4) Naics Code: 813312 (5) Naics Size Standard: $19.5m (6) Contracting Office Address: 2800 Powder Mill Road
bldg. 601
adelphi, Maryland 20783 (7) Subject: Sources Sought For Canada Goose Management To Include Nest Management (8) Proposed Solicitation Number: W911qx25q0034 (9) Sources Sought Closing Response Date: 20 January 2025 (10) Contact Point: Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil (11) a. Objective: to Find Sources That Are Qualified To Meet The Supplies/services As Listed In Section 11b. Note That The Specific Requirements In Section C Are Subject To Change Prior To The Release Of Any Solicitation. b. Canada Goose Management - Usag Aberdeen Proving Ground Adelphi Laboratory Center performance Work Statement (pws) 1.0 Introduction. The Purpose Of This Effort Is To Provide Canada Goose Management At Alc. The Contractor Shall Provide All Personnel, Equipment, Supplies, Facilities, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Canada Goose Management As Defined In This Performance Work Statement (pws), Section 5, Except For Those Items Specified As Government Furnished Property And Services. The Contractor Shall Perform To The Standards In This Contract. 1.1 Background. Alc Is Home To Anywhere From Five (5) To Ten (10) Pairs Of Canada Geese That Return Each Year To Nest On Alc’s Installation. Each Year, The Directorate Of Public Works (dpw) Environmental Division Obtains A U.s. Fish And Wildlife Service (usfws) Resident Canada Goose Nest And Egg Depredation Permit. This Permit Allows Dpw To Oil Goose Eggs To Prevent The Population From Increasing. This Strategy Can Effective If Nests Are Found In Time But It Does Not Prevent The Health Hazards Associated With Geese Droppings Left On The Sidewalks. Furthermore, The Egg Oiling Program Does Not Prevent The Safety Hazards That Are Created When Installation Personnel Come Into Contact With Aggressive Geese Guarding Their Nest. Generally, On The Alc Site Most Geese Nest In The Area Surrounding The Main Complex Of Buildings. alc Is Located In Adelphi, Maryland. The Site Straddles The Border Between Two (2) Maryland Jurisdictions, Prince George’s And Montgomery Counties. Of The Total 207 Acre Area, 84 Acres Are Within Montgomery County And 123 Acres Are Within Prince George’s County. Alc Is Approximately Six (6) Miles From Washington, District Of Columbia. The Installation Is Located Within One (1) Mile Of The Capital Beltway (interstate 495) And Interstate 95 (i-95). Alc Lies In The Anacostia River Drainage Basin Which Is A Tributary Of The Potomac River. It Is Bordered By Residential Areas On The East And South And By The General Service Administration’s Federal Center On The North And West. Alc Consists Of Four (4) Main Building Areas With Parking Lots, Forested Lands And Two Stream Corridors, Paint Branch And Hillandale Tributary. The Alc Is Home To The Headquarters For The Army Research Laboratory (arl). Arl Provides America's Soldiers A Technological Edge Through Scientific Research, Technology Development, And Analysis. The Mission Of Arl Is To Provide The Underpinning Science, Technology, And Analysis That Enable Full-spectrum Operations. 1.2 Objectives. During The Performance Of This Contract, The Contractor Shall Be Responsible For Providing All Personnel, Equipment, Supplies, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Provide Canada Goose Management At Alc. The Objectives Of This Project Are To Provide Canada Goose Management Support Activities On Alc. 2.0 Requirements. 2.1 Description Of Services. This Is A Non-personnel Services Contract To Provide Canada Goose Management Support At Alc. 2.2 Required Tasks. 2.2.1 Canada Goose Site Aversion. The Contractor Shall Provide A Trained Border Collie/collies And Dog Handling Professional/professionals To Deter The Canada Geese Away From Alc. The Contractor Will Be Responsible For The Improved Areas Of Alc. This Includes The Areas Around All Buildings, Roads, Stormwater Management Features, Maintenance Yards And Parking Lots. The Government Will Provide A Map Of The Installation And Historical Nest Data Prior To The Start Of The Project. the Contractor Shall Conduct Site Visits For A Minimum Of Five (5) Days A Week. Success Of The Project Will Be Measured By The Absence Of Geese On Alc For 7 Consecutive Days During And At The End Of The Period Of Performance. the Contractor Shall Use Techniques That Are Approved By The State Of Maryland Department Of Natural Resources (mdnr) And The Usfws And That Do Not Violate The Migratory Bird Treaty Act (mbta). The Contractor Shall Obtain Any Required Licenses And Permits By The Mdnr And The Usfws. the Contractor Shall Always Remain In Control Of The Border Collies. The Contractor Shall Remove Any Waste Left By The Border Collies. 2.2.2 Canada Goose Nest Management. The Contractor Shall Provide Egg Addling Services For Nests Found On Alc. The Contractor Shall Oil And Number The Eggs That Are Deemed To Be Less Than 14 Days Old. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number, And Location Description. Data Will Be Provided To The Cor Within One Week Of The Nest Treatment. 2.2.3 Deliverables. The Contractor Shall Provide Data For Nest Addling Services, When Conducted. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number And Location Description. 2.3 General Information. 2.3.1 Federal Observed Holidays. The Contractor Shall Provide Canada Goose Management During The Period Of Performance Except During The Following Federal Holidays: new Year’s Day martin Luther King Jr.’s Birthday president’s Day memorial Day juneteenth independence Day labor Day columbus Day veteran’s Day thanksgiving Day christmas Day 2.3.2 Hours Of Operation. The Contractor Is Responsible For Providing Services Five (5) Days A Week Which Can Occur Monday Through Sunday Except During Local Or National Emergencies, Administrative Closings, Or Similar Government Directed Facility Closings. 2.3.3 Place Of Performance. The Work To Be Performed Under This Contract Shall Be Performed At Alc. 2.3.4 Period Of Performance. The Period Of Performance Of This Contract Overlaps Nesting Season And The Time Of Year When The Geese Are On Site Which Is From 1 February Through 31 October Each Year Of The Contract Award. There Are Four (4) Option Years If Funding Is Available. 2.3.5 Key Personnel. The Following Personnel Are Considered Key Personnel By The Government: Garrison Natural Resources Manager/conservation Specialist, Chief, Environmental Integration Branch And The U.s. Army Combat Capabilities Development Command (devcom) Army Research Laboratory (arl) Chief, Environmental Management Branch. the Contractor Shall Provide A Contract Manager Who Is Considered Key Personnel By The Government For The Performance Of The Contract. The Contract Manager Shall Be Responsible For The Performance Of The Work. The Name Of This Person And An Alternate, Who Shall Act For The Contractor When The Contract Manager Is Absent, Shall Be Designated In Writing To The Ko. The Contract Manager Or Alternate Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. The Contract Manager Or Alternate Shall Be Available Between 0700 And 1530 Monday Thru Friday Except Federal Holidays Or When The Government Facility Is Closed For Administrative Reasons. the Contractor Shall Have Fully Trained Working Border Collies And Personnel Trained To Handle Them. The Contractor Shall Have Personnel Trained In Goose Management Including Egg Oiling And Nest Removal. The Contractor Shall Be Listed On The Alc Usfws Resident Canada Goose Nest And Egg Depredation Permit. The Contractor Shall Hold Any Other Necessary State Or Federal Permits And Or Licenses To Conduct The Work Described In This Pws. 2.3.6 Organizational Conflict Of Interest. Contractor And Subcontractor Personnel Performing Work Under This Contract May Receive, Have Access To, Or Participate In The Development Of Proprietary Or Source Selection Information (e.g., Cost Or Pricing Information, Budget Information Or Analyses, Specifications, Or Work Statements, Etc.), Or Perform Evaluation Services Which May Create A Current Or Subsequent Organizational Conflict Of Interests (oci) As Defined In Far Subpart 9.5. The Contractor Shall Notify The Ko Immediately Whenever It Becomes Aware That Such Access Or Participation May Result In Any Actual Or Potential Oci And Shall Promptly Submit A Plan To The Ko To Avoid Or Mitigate Any Such Oci. The Contractor’s Mitigation Plan Will Be Determined To Be Acceptable Solely At The Discretion Of The Ko, And In The Event The Ko Unilaterally Determines That Any Such Oci Cannot Be Satisfactorily Avoided Or Mitigated, The Ko May Affect Other Remedies As Deemed Necessary, Including Prohibiting The Contractor From Participation In Subsequent Contracted Requirements Which May Be Affected By The Oci. 2.3.7 Contractor Furnished Items And Responsibilities. The Contractor Shall Furnish All Supplies, Equipment, Facilities, And Services Required To Perform Work Under This Contract. 2.3.8 Applicable Publications (current Editions). The Contractor Shall Abide By All Applicable Regulations, Publications, Manuals, And Local Policies And Procedures. Any Contractor Provided Publications Are To Be Procured And Maintained At Contractor’s Expense. 3.0 Anti-terrorism /operational Security (at/opsec) Requirements 3.1. General Security Requirements And Guidance. The Security Requirements Described Below Apply To All Contract Personnel (including Employees Of The Prime Contractor ("contractor") And All Subcontractor Employees) Supporting The Performance Requirements Of This Contract. The Contractor Is Responsible For Compliance With These Security Requirements. Questions Regarding Security Matters Shall Be Addressed To The Designated Government Representative (e.g., Contracting Officer Representative (cor), Requiring Activity (ra) Representative, Or Contracting Officer (if A Cor Or Other Ra Representative Is Not Appointed)). Contract Personnel Are Critical To The Overall Security And Safety Of Us Army Corps Of Engineers (usage) Installations, Facilities And Activities, And Security Awareness Training Contributes To Those Efforts. The Department Of Defense (dod) And Army Security Training Requirements Specified Below, If Applicable, Are Performance Requirements; All Applicable Contract Personnel Shall Complete Initial Training Within 30 Days Of Contract Award Or The Date New Contract Personnel Begin Performance On The Contract. Within Five Business Days From The Completion Of Training, The Contractor Shall Provide Written Documentation (e.g., Email Or Memorandum) To The Government Representative. The Documentation Shall Include The Names Of Contract Personnel Trained And Which Training They Completed; The Contractor Shall Maintain Training Records As Part Of Their Contract Files And Be Prepared To Provide Copies Of Training Certificates To The Government Representative. Contractor Personnel And Vehicles Are Subject To Search When Entering Federal Installations. Additionally, All Contract Personnel Shall Comply With Force Protection Condition (fpcon) Measures, Random Antiterrorism Measures (commonly Referred To As "rams"), And Health Protection Condition (hpcon) Measures. The Contractor Is Responsible For Meeting Performance Requirements During Elevated Fpcon And/or Hpcon Levels In Accordance With Applicable Ra Plans And Procedures --this Includes Identifying Mission Essential And Non-mission Essential Personnel. In Addition To The Changes Otherwise Authorized By The Changes Clause Of This Contract, Should The Fpcon Or Hpcon Levels At Any Individual Facility Or Installation Change, The Government May Implement Security Changes That Affect Contract Personnel. The Contractor Shall Ensure All Contract Personnel Are Aware Of Their Security Responsibilities, Including Any Site-specific Requirements Identified In Local Policies Or Procedures. 3.2. Physical Security And Access Control Requirement. All Contract Personnel Requiring Physical Access To A Federal Installation Or Facility Shall Comply With The Access Control Procedures Of That Location. Contract Personnel Requiring Unescorted Access To Meet Contract Performance Requirements On A Dod Installation In The Us Shall Be Vetted By The Installation/facility Provost Marshal/directorate Of Emergency Services/security Office Using The National Crime Information Center-interstate Identification Index (commonly Referred To As "ncic-iii") And Terrorist Screening Database (commonly Referred To As "tsdb"). Contract Personnel Shall Comply With All Personal Identity Verification Requirements Specified In Installation/facility Policies And Procedures. Contract Personnel Who Do Not Meet Requirements For Unescorted Access To Usage Facilities Shall Coordinate Escorted Access With The Government Representative, As Needed. Contract Personnel Who Receive Keys, Access Cards, Or Lock Combinations That Provide Access To Government-owned Property Shall Comply With Key And Lock Control Procedures Of The Ra. 3.3. Pre-screen Candidates Using E-verify Program. Contractors Shall Comply With The Requirements Set Forth In Far Clause 52.222-54 Employment Eligibility Verification And Far Subpart 22.18 In Using The E-verify Program At (https://www.e-verify.gov/) (website Subject To Change) To Meet The Contract Employment Eligibility Requirements. Contractors Are Encouraged To Cooperate With Federal And State Agencies Responsible For Enforcing Labor Requirements To Include Eligibility For Employment Under United States Immigration Laws In Accordance With Far 22.102-1 (i). An Initial List Of Verified/ Eligible Candidates Shall Be Provided To The Cor No Later Than Three Business Days After The Initial Contract Award. When Contracts Are With Individuals, The Individuals Will Be Required To Complete A Form 1-9, Employment Eligibility Verification, And Submit Ii To The Contracting Officer To Become Part Of The Official Contract File. 4.0 Non-personal Services. arl/alc/garrison Non-personal Services (jul 2012) the Contractor, As An Independent Contractor And Not As An Agent Of The Government, Shall Provide The Necessary Resources (except Those Furnished By The Government) To Accomplish Tasks Of The Type Set Forth In The Performance Work Statement. contractor Employees Performing Services Under This Contract Shall Be Controlled, Directed And Supervised At All Times By Management Personnel Of The Contractor. The Contractor's Management Shall Ensure That Employees Properly Comply With The Performance Standards Outlined In This Performance Work Statement And As Required By The Contracting Officer Or The Contracting Officer's Representative (cor). Contractor Employees Shall Perform Independent Of And Without The Supervision Of Any Government Official. Actions Of Contractor Employees May Not Be Interpreted Or Implemented In Any Manner That Results In Any Contractor Employee Creating Or Modifying Federal Policy, Obligating The Appropriated Funds Of The U.s. Government, Overseeing The Work Of Federal Employees, Providing Direct Personal Services To Any Federal Employee Or Otherwise Violating The Prohibitions Set Forth In Parts 7.5 And 37.1 Of The Federal Acquisition Regulation (far). The Government Shall Control Access To The Facility And Shall Perform The Inspection And Acceptance Of Completed Work And Tasks. 5.0. Distribution Statement. 5.1. Determination Of Contract Submission Documents Are: distribution Statement A: Approved For Public Release, Distribution Is Unlimited. 5.2. Determination For Information Generated From The Performance Of The Contract: distribution Statement A: Approved For Public Release, Distribution Is Unlimited c. Responses: all Interested Parties Should Notify This Office In Writing, Mail, Fax, Or E-mail Within The Posted Date. Responses Shall Include: to What Extent Each Of The Specifications Can Be Met. include Your Type Of Business (i.e. Commercial, Academia), Whether Your Organization Is Classified As A Large Or Small Business Based On The $19.5m Employees Standard That Accompanies Naics Code 813312. If A Small Business, You Must Also List Any Small Disadvantaged Status You Hold [hubzone, 8(a), Service Disabled Veteran Owned Small Business (sdvosb), Women Owned Small Business (wosb), Economically Disadvantaged Women-owned Small Business (edwosb), Etc.]. past Experience/ Performance Through The Description Of Completed Projects. (12) Responses To This Sources Sought Are Due No Later Than 11:59 Am Eastern Standard Time 20 January 2025. Submissions Should Be Emailed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil questions Concerning This Sources Sought May Be Directed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil. Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil. Please Be Advised That .zip And .exe Files Cannot Be Accepted. (13) Place Of Contract Performance: Garrison-adelphi Laboratory Center 2800 Powder Mill Road adelphi Md 20783 (14) Estimated Delivery Timeframe Or Period Of Performance: period Of Performance (pop): 01 February 2025 – 31 October 2029
City Of Koronadal Water District Tender
Others...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Municipality Headquarter Tender
Others...+2Civil And Construction, Civil Works Others
Czech Republic
Closing Date14 Feb 2025
Tender AmountCZK 631.6 K (USD 26.1 K)
Details: The Subject of the Contract is the Completion of the Construction Currently Under Construction, Consisting of the Reconstruction of Sidewalks in the Municipality of Hlavnice. The Original Contractor Did Not Complete the Construction and the Client (Municipality of Hlavnice) Withdrawn from the Contract. A Detailed Description of the Construction Works Within the Entire Construction Is Set Out in the Project Documentation "Repair of Sidewalks in Malé Strana", Prepared by Ing. Zbyněk Novák, Čajkovského 1595/49, 746 01 Opava, Date 12/2023 (hereinafter referred to as the "Project Documentation"). The Project Documentation Forms Annex No. 3 to the Call. Annex No. 3 Also Includes Lists of Construction Works, Which Serve to Determine the Bid Price Within the Framework of This Contract. These are therefore items of construction work, supplies and services that are not in accordance with the project documentation, as they only contain work that needs to be carried out to complete the construction and which are the subject of this contract. In general, the performance (in addition to other work) includes, in particular, the completion of the non-existent part of the sidewalk and also the area within the bus stop. Items highlighted in yellow in the list of works are work that will be carried out on sections that have already been completed - for example, the completion of paving, ironing, etc. The client also requires a geodetic survey of the actual construction based on a cadastral map as part of the performance of the contract.
6921-6930 of 6983 archived Tenders