DEPT OF THE ARMY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: The Following Is A Sources Sought Notice. This Sources Sought Is Seeking To Identify Qualified Sources Under North American Industry Classification System (naics) 541330, Engineering Services(a-e) Services. This Sources Sought Announcement Is For Market Research Information Only And Is To Be Used For Preliminary Planning Purposes. No Sf330s Are Being Requested And None Will Be Accepted In Response To This Notice. This Is Not A Solicitation For Proposals, And No Contract Will Be Awarded From This Notice. This Sources Sought Announcement Will Not Restrict The Government As To The Ultimate Acquisition Approach. The Government Will Not Reimburse Respondents For Any Cost Incurred In Preparation Of A Response To This Notice. these Services Will Be Procured In Accordance With 40 U.s.c. Chap 11, Selection Of Architects And Engineers (formerly Known As The Brooks Architect Engineer Act) As Implemented In Far Subpart 36.6 And Dfars Subpart 236.6. the U.s. Army Corps Of Engineers (usace) Kansas City District (nwk) Seeks Qualified Ae Firms Interested And Capable Of Providing An Array Of Design Services For The Department Of Veteran's Affairs (dva) John Cochran Medical Center (jcmc) Located At 915 N Grand Blvd, St. Louis, Mo 63106. The Government Is Contemplating An Unrestricted (ur), A-e, Single Award Task Order Contract (satoc), Indefinite Delivery Contract Solicitation. The Estimated Ordering Limitation Of All Task Orders Issued Under The Satoc Will Have A Maximum Ordering Capacity Of One Hundred Million ($100,000,000.00) Dollars. The Base Ordering Period For This Contract Will Be Five (5) Years With One Option To Extend The Ordering Period For An Additional Five (5) Years. It Is Anticipated That A Solicitation Announcement Will Be Published In The Procurement Integrated Enterprise Environment In The 2nd Quarter Of Fy2026. firms Must Be Capable Of Performing Work To Support The Planning, Design, And Construction Phase Services For The Construction Of A New Health Care Facility And Supporting Facilities. Firms Must Be Capable Of Progressing The Current Conceptual Schematic Design Using The Collaborative Integrated Design And Construction (idac) Project Delivery Method. Idac Is A Usace Alternative Early Contractor Involvement (eci) Delivery Method That Requires Extensive Collaboration Between The Owner, Designer Of Record (dor), And Construction Manager / General Contractor. The A-e Collaboration Requirements Include Continuous Open Team Communication; Partnering; Willingness For The A-e To Incorporate Alternative Designs And Materials And Include Changes To Schedule; Phasing Plans; Specifications; Means And Methods Of Construction Throughout The Collaborative Design Progression Period That Takes Place During The Construction Contractor’s Preconstruction Phase Services. A Summary Of The Idac Delivery Method Is Attached To This Announcement. required Services May Include The Preparation Of Special Reports; Planning And Design Charrettes; Studies; Development Of Design Criteria For Performance Contracts; Design Of Construction; Documenting Basis Of Design; Developing, Updating, And Reconciling Construction Cost Estimates. The Task Orders May Include But Are Not Limited To Design Work Involving Site Investigation, Geotechnical Reports, Topographic Surveys, Preparation Of Contract Drawings, Technical Specifications, Design Analyses, Life Cycle Cost Analyses, And Continuous Real-time Computer Aided Cost Estimating And Cost Reconciliation With Third Party Estimates. Electronic Security System Design, Anti-terrorism/force Protection Design, Progressive Collapse, Seismic Design, Cyber Security, And Network Engineering May Be Required. Resiliency, Reliability, And Sustainability Will Be Important Considerations. total Building Commissioning, With A Perspective As Designer May Be Required. Construction Phase Services, Including Shop Drawing Review, Design During Construction, Site Visits, Etc., Could Be Included In Task Orders. Building Information Modeling (bim) Technologies, Cadd And Gis Deliverables May Be Required. Specific Requirements Will Be Determined Based Upon Project Requirements And Described In Each Task Order. Project Assignments Will Typically Require Performance In An Office Setting And On-site. the Kansas City District Is Soliciting Feedback From Industry As Part Of Our Market Research Efforts Associated With This Acquisition And Is Considering Various Acquisition Strategies To Deliver This Project And Requests Input From Industry. The Following Information Is Requested In This Sources Sought (ss) Announcement With A Limit Of Ten (10) Pages For Your Response: 1. Organization Name, Address, Email Address, Website Address, Telephone Number, Business Size (small Or Large), And Type Of Ownership For The Organization; Include Uei Number And Cage Code. 2. Firm's Interest In Providing An Sf330 On The Pending Solicitation Once Issued. 3. Experience: A. Evidence Of Capabilities To Perform Work Comparable To That Required For This Project (e.g. Design Of Medical Facilities And Ancillary Structures Providing A Wide Variety Of Patient Care Services, Design Of A Campus Requiring Phased Demolition And Phased Construction, Design Of Facilities Utilizing The Dva's Technical Information Library). B. Provide Three Recent Relevant/comparable Projects (not More Than Ten Years Old). Include The Project Name; Dollar Value Of The Project; Description Of The Key/salient Features Of The Project And Those That Demonstrate Similarity To The Work Required Under The Proposed Satoc; Identify The Contracting Office & The Customer/user (include Poc Information); And Identify/discuss The Acquisition Method (e.g., Sealed Bid, Best Value), Contract Type (e.g., Firm Fixed Price, Fixed Price Incentive Successive Targets [fpis], And Delivery Method (e.g., Integrated Design And Construction [idac],guaranteed Maximum Price [gmp], Design-bid-build, Design-build, Early Contractor Involvement [eci], Construction Manager As Constructor [cmc], Etc.). Responses Should Address The Firm's Capability To Construct A Hospital Or Medical Center Facility And The Challenges Associated With Large, Complex Medical Facilities. 4. Identify If, Based Upon The Scope Of This Project, You Would Form A Joint Venture To Execute This Work. Provide Joint Venture Information, If Applicable, Including Uei And Cage Code. 5. Provide The Firms Plan To Include Small Business Participation To The Maximum Extent Practicable. a Virtual Industry Day Is Planned For Thursday, December 19, 2024 At 1100 Cst. Webex Login Information Is Listed Below: 1. Join From The Meeting Link Below: https://usace1.webex.com/usace1/j.php?mtid=m5e4d4e7380c3b0f3d4796025d738aa1d 2. Join By Meeting Number Below: meeting Number (access Code): 2827 328 3747 meeting Password: N4ppp75cyc* 3. Join From A Mobile Device (attendees Only) +1-844-800-2712,,28273283747## Us Toll Free +1-669-234-1177,,28273283747## Us Toll 4. Join By Phone +1-669-234-1177 Us Toll +1-844-800-2712 Us Toll Free global Call-in Numbers | Toll-free Calling Restrictions 5. Join From A Video System Or Application dial 28273283747@usace1.webex.com you Can Also Dial 207.182.190.20 And Enter Your Meeting Number. please Send Your Sources Sought Responses Via Email To Ines.necker@usace.army.mil. Submissions Should Be Received By 11 A.m. Cst, January 6, 2025. this Synopsis Is For Market Research Purposes Only And Is Not A Request For An Sf330 Nor Does It Restrict The Government As To The Ultimate Acquisition Approach. The Government Will Not Reimburse Respondents For Any Costs Incurred In Preparation Of A Response To This Notice.
Jefferson Parish Government Tender
Civil And Construction...+1Drainage Work
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents
Details: Public Notice Soq #25-005 Sala Avenue Historic District Drainage Feasibility Analysis And Improvements The Parish Of Jefferson, Authorized By Resolution No 145576. Is Hereby Soliciting A Statement Of Qualifications ((tec) Professional Services Questionnaire) For Persons Or Firms Interested And Qualified To Provide Professional Engineering Services For The Sala Avenue Historic District Drainage Feasibility Analysis And Improvements Project (council District 2). Deadline For Submissions: 3:30 P.m., January 23, 2025 General The Scope Of Work Associated With This Project Consists Of Streetscape And Drainage Improvements To The Sala Avenue Corridor Between River Road And 4th Street In The City Of Westwego. The Intention For The Project Is To Beautify And Improve The Drainage Of The Corridor For A 10-year Design Storm Utilizing Alternative Drainage Methods, Such As Green Infrastructure (bioswales, Permeable Pavement, Rain Gardens, Etc.). Jefferson Parish Anticipates The Project Will Require The Following Supplemental Services: Hydraulic Analysis, Geotechnical Services, Surveying, Landscape Architecture, And Resident Inspection. Compensation Compensation For The Required Design Services Will Be Made On An Hourly Rate Basis Or A Fixed Fee Basis, Or A Combination Of Both, Depending On Scope And Complexity Of The Work. The Parish Reserves The Right To Determine The Method Of Payment (hourly Or Fixed) For Each Individual Assignment. For Hourly Rate Work, The Firm Shall Be Compensated By The Appropriate Jefferson Parish Department On The Basis Of Their Certified And Itemized Burdened Rate In Accordance With Guidelines Established In Attachment “a” To The Standard Professional Services Agreement For Jefferson Parish. A Copy Of Attachment “a” May Be Obtained By Calling The Jefferson Parish Department Of Capital Projects At (504) 736-6833. For Fixed Fee Work, The Fee Shall Be Negotiated With The Firm By The Jefferson Parish Department Of Capital Projects And Shall Be Mutually Agreeable To Both Parties. Compensation For Supplemental Services, If Required, Shall Be In The Form Of A “lump Sum” Or Hourly Rate For Each Supplemental Service, Which Shall Be Mutually Agreeable To The Parish And The Consultant. All Costs Associated With This Project Shall Be Subject To Jefferson Parish Review And Approval. Minimum Requirements For Selection The Persons Or Firms Under Consideration Shall Have At Least One (1) Principal Who Is A Licensed, Registered Professional Engineer In The State Of Louisiana. A Subcontractor May Not Be Used To Meet This Requirement. (section C. Of Tec Professional Services Questionnaire); The Persons Or Firms Under Consideration Shall Have A Professional In Charge Of The Project Who Is A Licensed, Registered Professional Engineer In The State Of Louisiana With A Minimum Of Five (5) Years’ Experience. A Subcontractor May Not Be Used To Meet This Requirement. (section K. “professional In Charge Of Project:”; Of Tec Professional Services Questionnaire); The Persons Or Firms Under Consideration Shall Have One (1) Employee Who Is A Licensed, Registered Professional Engineer In The State Of Louisiana In The Applicable Discipline Involved. A Subcontractor May Meet This Requirement Only If The Advertised Project Involves More Than One Discipline (section D. Of Tec Professional Services Questionnaire). With Regard To The Questionnaire, Principal Means The Sole Proprietor Of The Firm, Or One Who Shares An Ownership Interest With Other Persons In The Firm, Including But Not Limited To, A Partner In A Partnership, A Shareholder In A Corporation, Or A Member Of A Limited Liability Corporation. Evaluation Criteria The Following Criteria Will Be Used To Evaluate Each Firm Submitting A Statement Of Qualifications: 1) Professional Training And Experience In Relation To The Type And Magnitude Of Work Required For The Particular Project – (maximum Points Awarded Shall Be 35). 2) Size Of Firm, Considering The Number Of Professional And Support Personnel Required To Perform The Type Of Engineering Tasks, Including Project Evaluation, Project Design, Drafting Of Technical Plans, Development Of Technical Specifications And Construction Administration – (maximum Points Awarded Shall Be 10). 3) Capacity For Timely Completion Of Newly Assigned Work, Considering The Factors Of Type Of Engineering Task, Current Unfinished Workload, And Person Or Firm’s Available Professional And Support Personnel – (maximum Points Awarded Shall Be 20). 4) Past Performance On A Project In Which The Person Or Firm Assisted A Governmental Entity In Dealings With Disaster Recovery And Any Other Projects Relating To Cdbg – (respondent Should Provide A List Of Completed Disaster Recovery Projects And/or Similar Cdbg Projects For Which Firm Has Provided Verifiable References) (maximum Points Awarded Shall Be 10). 5) Location Of The Principal Office – Preference Shall Be Given To Persons Or Firms With A Principal Business Office As Follows: (a) Jefferson Parish, Including Municipalities Located Within Jefferson Parish (15 Points); (b) Neighboring Parishes Of The Greater New Orleans Metropolitan Region, Which Includes Orleans, Plaquemines, St. Bernard, St. Charles And St. Tammany Parishes (12 Points); (c) Parishes Other Than The Foregoing (10 Points); (d) Outside The State Of Louisiana (6 Points). Location Of The Principal Office Shall Only Factor Into The Evaluation Criteria If Adequate Competition (two Or More Firms That Are Responsive And Responsible) Are Located Within Jefferson Parish - (maximum Points Awarded Shall Be 15). 6) Adversarial Legal Proceedings Between The Parish And The Person Or Firm Performing Professional Services, In Which The Parish Prevailed Or Any Ongoing Adversarial Legal Proceedings Between The Parish And The Person Or Firm Performing Professional Services Excluding Those Instances Or Cases Where The Person Or Firm Was Added As An Indispensable Party, Or Where The Person Or Firm Participated In Or Assisted The Public Entity In Prosecution Of Its Claim. (in The Event That The Person Or Firm Fails To Provide Accurate And Detailed Information Regarding Legal Proceedings With The Parish, Including The Absence Of Legal Proceedings, The Person Or Firm Shall Be Deemed Unresponsive With Regard To This Category, And Zero (0) Points Shall Be Awarded) - (maximum Points Awarded Shall Be 15). 7) Prior Successful Completion Of Projects Of The Type And Nature Of Engineering Services, As Defined, For Which Firm Has Provided Verifiable References - (maximum Points Awarded Shall Be 5). Project Will Include Federal Disaster And Resiliency Funds And Therefore Will Include Associated Federal Requirements, Including Section 3, As Applicable. Statements Of Qualifications From Minority, Female-owned, And Local Firms / Individuals Are Invited. Each Firm’s Lowest And Highest Score Shall Be Dropped And Not Count Towards The Firm’s Score. Only Those Persons Or Firms Receiving An Overall Cumulative Score Of At Least Seventy (70) Percent Or Greater, Of The Total Possible Points For All Categories To Be Assigned By The Participating Technical Evaluation Committee Members, Shall Be Deemed Qualified To Perform These Professional Services. The Person Or Firm Submitting A Statement Of Qualification ((tec) Professional Services Questionnaire) Must Identify All Subcontractors Who Will Assist In Providing Professional Services For The Project, In The Professional Services Questionnaire. Each Subcontractor Shall Be Required To Submit A ((tec) Professional Services Questionnaire) And All Documents And Information Included In The Questionnaire. (refer To Jefferson Parish Code Ordinance, Section 2-928) All Persons Or Firms (including Subcontractors) Must Submit A Statement Of Qualifications ((tec) Professional Services Questionnaire) By The Deadline. The Latest Professional Services Questionnaire May Be Obtained By Contacting The Purchasing Department At (504) 364-2678 Or Via The Jefferson Parish Website At Https://www.jeffparish.gov/27/government. This Questionnaire Can Be Accessed By Clicking On The + Next To “doing Business In Jefferson Parish” On The Website And Clicking On “professional Services Questionnaires”. Submissions Will Only Be Accepted Electronically Via Jefferson Parish’s E-procurement Site, Central Bidding At Www.centralauctionhouse.com Or Www.jeffparishbids.net. Registration Is Required And Free For Jefferson Parish Vendors By Accessing The Following Link: Www.centralauctionhouse.com/registration.php. No Statements Will Be Accepted After The Deadline. Affidavits Are Not Required To Be Submitted With The Statement Of Qualifications, But Shall Be Submitted Prior To Contract Approval. Insurances Are Not Required To Be Submitted With The Statement Of Qualifications, But Shall Be Submitted Prior To Contract Approval. Disputes/protests Relating To The Decisions By The Evaluation Committee Or By The Jefferson Parish Council Shall Be Brought Before The 24th Judicial Court. Adv: The New Orleans Advocate: January 8, & 15, 2025
DEPT OF THE NAVY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents
Details: Amendment 0004: amendment 0004 Is Issued To Extend The Sf 330 Submission Date Regarding N0016425r1025. amendment 0003: amendment 0003 Is Issued To Provide Answers To Industry Questions Received Thus Far Regarding N0016425r1025. amendment 0002: amendment 0002 Is Issued To Provide Answers To Industry Questions Received Thus Far Regarding N0016425r1025. amendment 0001: amendment 0001 Is Issued To Provide Answers To Industry Questions Received Thus Far Regarding N0016425r1025. original Posting: n0016425r1025 Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi‐ Discipline Architect‐engineer (a‐e) Services In Support Of Naval Surface Warfare Center Crane Division (nswc Crane) Facilities Projects At Naval Support Activitys Crane (nsa Crane), Crane, Indiana And Lake Glendora Test Facility (lgtf), Sullivan In. description: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download. related Notices: N0016422snb83, N0016424snb55, N0016424r1025, N0016424snc12, N0016425snb08 background: the Naval Surface Warfare Center Crane Division (nswc Crane) Requires A-e Services In Support Of Various Projects At Nsa Crane And Lgtf. This Procurement Will Result In One Single-award Idiq Contract For Multi‐discipline A‐e Services For Planning, Design, Construction, Evaluation Of New Construction, And Renovation Projects. These Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Idiq Contract Will Be For A Five-year Ordering Period. This Is A Five-year Contract, With No Option Years. The Maximum Value For The Contract Term, Including All Awards, Shall Not Exceed $12,000,000. There Will Be No Minimum Dollar Limit Per Order And The Maximum Dollar Limit Per Order Will Be $5m In Compliance With The $9m Fy24 Ndaa Prescription. The Guaranteed Minimum For The Contract Ordering Period Is $5,000 And Will Be Satisfied By Simultaneous Award Of The Initial Task Order With The Basic Contract. Firm‐fixed Price Task Orders Will Be Negotiated At The Task Order Level. In Accordance With Dfars Subpart 236.6, The Contract Price Or The Estimated Cost And Fee For Production And Delivery Of Designs, Plans, Drawings, And Specifications Shall Not Exceed Ten (10) Percent Of The Estimated Construction Cost Of The Public Work Or Construction, Excluding Fees. there Will Be No Minimum Dollar Limits Per Task Order. The Estimated Award Date Is October 2025. this Proposed Contract Is Anticipated To Be A Full And Open Procurement. The North American Industry Classification System (naics) Code Is 541330, Engineering Services, And The Small Business Size Standard Is $25,500,000. The Product And Services Code (psc) Is C219 Architect And Engineering- General: Structural Engineering. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications, In Accordance With The Selection Criteria Included Herein. comprehensive A‐e Services Are Required For The New Construction, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facility Projects. Projects May Include Single Or Multiple Disciplines, Such As: Structural, Civil, Mechanical, Electrical, Architectural, Planning, Environmental, Fire Protection, Cost Estimating, And/or Geotechnical. The Types Of Projects May Include: Building Renovations; Building Additions; Site Work Required To Support New Work; New Construction; Parking Areas; Foundations; Retaining Walls; Failure Investigation Including Destructive And Non‐destructive Testing; Seismic Evaluation And Design; Progressive Collapse Analysis; Blast Resistant Design; Structural Engineering Investigations; Utility Systems Including sanitary And Storm; Water Systems; Electrical Power Systems, Storm Water Management; Surveying; Pavement Design; And Civil Engineering Studies. the Selected Offeror Will Be Solely Responsible For The Designs Produced On The Resulting Task Order Contracts And Will Be Recorded As The Designer Of Record. The Successful Offeror Shall Also Be Accountable And Responsible For Contributions To Design-build Rfp Preparation And All Other Requirement Submittals To The Government. in Accordance With Far 36.604 And The Supplements Thereto, And Upon Final Acceptance Or Termination, All Task Orders Above $35,000 Will Receive A Performance Evaluation. A Performance Evaluation May Be Prepared For Lesser Task Orders And Interim Performance Evaluations May Be Prepared At Any Time. Performance Evaluations Will Be Maintained For Use In Future Source Selections For Architect-engineer Services. performance Location(s): crane, Indiana sullivan, Indiana requirements: for Complete Details On This Requirement See Attachment 1, “statement Of Work (sow).” Specific Types Of A‐e Services That May Be Required Under This Contract Include: facility Planning And Project Development: Services May Include Work Such As The Following: Prepare Master Plans, Project/site Plans For Proposed Facility/infrastructure Projects. Facility Planning May Be Requested For Renovation, Addition, Repair And New Construction Projects. development Of Design‐bid‐build (dbb) Packages: Services May Include Preparation Of Drawings And Specifications For Renovation, Addition, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design Solution(s) That Meet The Government’s Project Requirements. Electronic Document Delivery Details Will Be Specified At The Order Level. Electronic Delivery Shall Include Both .pdf And .dwg Formats. development Of Design‐build (db) Request For Proposal (rfp) Packages: Services May Include Working With A Construction Manager As Part Of A Design-build Team To Prepare Drawings And Specifications For Renovation, Additions, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design-build Solution(s) That Meet The Government’s Project Requirements. Electronic Document Delivery Details Will Be Specified At The Order Level. Electronic Delivery Shall Be Include Both .pdf And .dwg Formats. preparation Of Cost Estimates Using Unit Guidance, Parametric Methodologies, And Detailed Cost Estimating: Services May Include Preparing Cost Estimates To Include Rough Order Of Magnitude Through Construction Working Estimates For Renovation, Addition, Repair And/or New Construction Projects Based On Prepared Design Documents, As Called Out In The Task Order. development Of Alternatives And Economic Analysis: Service May Include Providing Alternate Design Solutions And Associated Economic Impacts For Renovation, Addition, Repair Or New Construction Projects. condition Assessment: Services May Include Performing Studies Of Existing Buildings And/or Components Of Buildings To Validate Existing Conditions That May Then Be Used To Inform Future Proposed Design Solutions. Site Visits May Be Required To Document Existing Facility/infrastructure Conditions. field Investigations (including Utility And Geotechnical): Services May Include Conducting Field Surveys/investigations Of Existing Sites, Buildings Or Specific Components Of A Building (i.e., Hvac Or Electrical Systems) In Order To Document Current Status Of A Facility’s Infrastructure. The Results Of Any Field Investigations May Then Be Used To Assist With The Preparation Of Design Documents For A Particular Project. surveying And Mapping: Services May Include Surveying And/or Mapping Of Existing Or Proposed Sites For A New Construction Project Or Building Addition. Survey Work May Be Required In Order To Document Existing Site Conditions To Support Site/civil Design Solutions. preparation Of Engineering Evaluations: Services May Include Performing Engineering Calculations To Support Civil, Mechanical, Electrical, Plumbing Or Fire Protection Design Solutions. incorporation Of Sustainable Engineering Design Practices: Services May Include Incorporation Of Design Principles For Renovation, Addition, Repair And/or New Construction Projects To Support Sustainable Design Solutions And/or Leadership In Energy And Environmental Design (leed) Certification. consultations: Services May Include Collaborating With Other Specialty Design Professionals To Offer And Propose Design Solutions Required To Respond To Unique Project Requirements. energy Computations: Services May Include Preparation Of Energy Calculations To Verify Proposed Design Solutions Comply With Required Building Codes, Federal, State And/or Local Energy Requirements. geotechnical Investigations: Services May Include Conducting Soil Boring Testing In Order To Identify Minimum Design Requirements For New Construction Projects Or Building Additions. obtaining Permits And Regulatory Approvals: Services May Include Submitting Design Documents To Local, State And/or Federal Jurisdictions For Review And Approval Prior To Proceeding With Renovation/construction Work. environmental Investigation And Consultation: Services May Include Providing Design Services Required To Meet Environmental/epa Regulations On Facility/infrastructure Projects And Providing Consultation(s)/collaboration With The Government To Discuss Acceptable Environmental Design Alternatives And Solutions. review Of Construction Contractor Submittals: Services May Include Review Of Project Submittals (such As Product Data Or Product Samples) In Order To Validate Proposed Materials/products Comply With Design Drawings And/or Specifications. field Consultation And Inspection During Construction: Services May Include Responding To Contractor Requests For Information (rfis) During Construction In Order To Address Design Questions That May Arise During Construction/renovation Projects. commissioning: Services May Include Supporting The Commissioning Process By Attending Commissioning Meetings In Order To Validate Engineered Design Solutions Are Incorporated Into The Project In Accordance With Design Specifications. operation And Maintenance Support Information (omsi): Services May Include Providing The Government With O&m Documentation And Training, Where Applicable, Based On The Final Design Solution And Construction. Electronic Document Delivery Details Shall Be Included With Each Order. Electronic Delivery Shall Include Both .pdf And .dwg Formats. as‐built Drawing Preparation: Services May Include Updating Design Documents Including Drawings And Specifications To Accurately Reflect Construction Field Changes And Document Final As-built Construction/renovation Projects. Electronic Document Delivery Details Shall Be Included With Each Order. Electronic Delivery Shall Include Both .pdf And .dwg Formats functional Analysis Concept Development (facd)/design Charrette/other Design And Construction Related Workshops And Meetings: Contractor Shall Attend Design Meetings To Collaborate With Government Representatives To Consider Design Options And Build Consensus Regarding Preferred Design Solution(s). Contractor Shall Provide Meeting Minutes (cdrl A005). document Deliverable Requirements: cdrl did Number did Title did Description/scope deliverable Schedule a001 di-misc-80508b technical Report - Study/services studies And Specifications at Milestone/ Asreq a002 di-fncl-81116 Not 2 manhour Estimate, Technical Cost Proposals manpower And Cost Estimate To Implement The Statement Of Work (sow) at Milestone a003 di-mgmt-80061a Not 2 engineering And Technical Services Accomplishment Report production Report weekly a004 di-misc-81274 Not 2 environmental Permits outlines Submittal Procedures To Be Applied To All Permits asreq a005 di-admn-81250c meeting Minutes meeting Minutes 2 Days After Meeting a006 di-mgmt-81597 personnel Resumes contractor’s Personnel Roster With Relevant Qualifications And Certifications post Award Kickoff a007 di-mgmt-80507 project Planning Chart schedule post Award Kick Off a008 di-admn-81249c meeting Agenda meeting Agenda 1 Day Before Meeting a009 di-facr-82278 installation Design Package designs And Drawings asreq other Special Considerations: as Defined By Paragraph 1‐5 Of United Facilities Criteria (ufc) 3‐ 600‐01, Fire Protection Engineering For Facilities, This Contract Requires The Services Of A Licensed Fire Protection Engineer Or Consultant. asbestos And/or Lead‐based Paint Assessments May Be Required On This Contract To Determine The Presence Of Hazardous Material During Removals/demolition Or At Utility Points Of Connections. Work On And Around Waterfront Structures, Including Under Deck And Underwater, And Work In Confined Spaces May Be Required On This Contract. A‐e Firms Must Be Able To Accept Work That Involves Asbestos, Lead Paint, Poly‐chlorinated Biphenyls (pcbs), And Other Hazardous Materials, Work On And Under Waterfront Structures, And In Confined Spaces. all Engineering And Design Services Shall Comply With The Most Current Edition Of Facilities Criteria (fc) 1‐300‐09n Design Procedures, And Other Requirements As Indicated On The Whole Building Design Guide (wbdg) Web Site (www.wbdg.org). The Selected A-e Contractor Shall Have Online Access To Web‐based Support Programs Capable Of Creating Auto-cad Documents For Government Review, And Email Via The Internet For Routine Exchange Of Correspondence. The Selected A-e Contractor Shall Submit And Maintain An A‐e Accident Prevention Plan (app) In Accordance With U.s. Army Corp Of Engineers (usace) Em 385‐1‐1 For Each Project On This Contract And Activity Hazard Analysis (aha) For Each In‐field Action. Key Personnel, Including Consultants, Must Be U.s. Citizens. a‐e Firms Are Advised That The Selected Firm, Its Subsidiaries Or Affiliates, And Its Consultants Which Design, Prepare, Or Provide Engineering Services In Support Of Construction Contract Documents Cannot Provide Construction Services For The Same Contract. This Includes Concept Design, Preparation Of Project Programming Documents (dd Form 1391), Facility Siting Studies, Environmental Assessments, Geotechnical Services, Engineering Studies And Services, Design‐build Request For Proposals (rfps), Or Other Activities That Result In Identification Of Project Scope And Cost. The Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest, Including H-209-h003, Required Disclosure Of Organizational Conflict Of Interest (navsea) (nov 2022). The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term. in Accordance With Far 19.702, Each Solicitation Of Offers To Perform A Contract That Is Expected To Exceed $750,000 ($1.5 Million For Construction) And That Has Subcontracting Possibilities, Shall Require The Apparently Successful Offeror To Submit An Acceptable Small Business Subcontracting Plan. If The Apparently Successful Offeror Fails To Negotiate A Subcontracting Plan Acceptable To The Contracting Officer Within The Time Limit Prescribed By The Contracting Officer, The Offeror Will Be Ineligible For Award. submission Requirements: submission Requirements - Sf 330 Part I typed, 12 Point Times New Roman, Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages criterion criterion Title criterion Requirements criterion 1 specialized Experience sf 330, Part I, Section F - Minimum Of Three (3) And Maximum Of Five (5) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years criterion 2 professional Qualifications And Technical Competence sf 330, Part I, Section E – Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. criterion 3 past Performance submit A Completed Cpars/acass/ppq Evaluation For Each Project Under Criterion 1 criterion 4 quality Control describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. criterion 5 program Management And Capacity 1. Provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Include Small Business Participation Specifics. 2. Describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. 3. Describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. criterion 6 knowledge Of General Geographic Area 1. Indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. 2. Provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. 3. Provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. criterion 7 volume Of Work firms Shall Not Submit Data For This Factor. a‐e Firms Desiring To Be Considered For This Contract Shall Submit A Completed Sf 330 Package By Dod Safe To The Contracting Officer And The Contract Specialist. The Sf 330 Shall Be Typed, 12 Point Times New Roman. Part I Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages (the 100 Page Limit Does Not Include The First Eight (8) Instructional Pages Of The Sf 330, Individual Subcontracting Reports (isrs), The Small Business Subcontracting Plan Or Certificates/licenses, Nor Does The Page Limit Include Cover Sheets Or Dividers, Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. Introductions Shall Be Included In Sections E And F. A-e Firm Submissions Shall Include Its Unique Entity Identifier (uei), Commercial And Government Entity (cage), And Taxpayer Identification Number (tin) Numbers In Block 30 Of The Sf 330. submissions To This Proposal Announcement Must Be Submitted Electronically Through Dod Safe. No Paper Copies, Email, Cd-roms Or Facsimile Submissions Will Be Accepted. Electronic Proposal Submission Is Required Through The Army’s Electronic File Sharing Service, Dod Safe (https://safe.apps.mil). The Dod Safe Application Is Used To Send Large Files To Individuals That Would Normally Be Too Large To Send Via Email. There Are No User Accounts For Dod Safe. Authentication Is Handled Via Email. anyone Has Access To Dod Safe And The Application Is Available For Use By Anyone. The Dod Safe “getting Started Guide” Has Information On How To Utilize The System (https://safe.apps.mil/about.php). Instructions For Uploading Are As Follows: send An Email To The Contracting Officer And Contract Specialist To Receive The Link To Drop Off Your Proposal. This Will Need To Be Completed Five (5) Business Days Prior To The Proposal Due Date. contract Specialist, Aaron Hohl, Aaron.m.hohl.civ@us.navy.mil contracting Officer, Jared Myers, Jared.s.myers3.civ@us.navy.mil . you Will Receive An Email With The Link To Submit Your Drop Off. The Link Will Be Provided No Later Than Two (2) Business Days Prior To The Proposal Due Date. short Note To The Recipients: Click The Add Files Or Drag And Drop Your Files. For File Description, Enter N0016425r1025-firmname. click Upload Button To Send Documents. guest Users Will Need To Check Their Email To Verify Their Email Address Before The Recipients Will Be Notified. (government-issued Common Access Cards (cacs) Are Not Required). file Size Limitations: Offerors Are Advised To Follow The Dod Safe Instruction For Uploading Files. Dod Safe Supports Delivery Up To 8gb. If Needed, Offerors Are Advised To Break The Files Down To Smaller Sections In Order To Upload It To The System. In Such Cases, Please Divide The Sections As Logically As Possible And Be Sure To Clearly Name The Files As Specified Below. file Naming Convention: To Ensure Your Submission Is Received And Processed Appropriately, It Is Important That Interested Parties Carefully Ensure Their Electronic Files Adhere To The Following Naming Convention: xxx- Firmname- Volume I xxx- Firmname- Volume Ii each File Name Shall Begin With The Solicitation Number Followed By The Firm’s Name And A Brief File Description. Please See Examples Above. file Organization: Although Hard Copies Are Not Accepted, Each File Shall Be Clearly Indexed, And Logically Assembled. Font Size Shall Be 12 Or Larger. Pages Shall Be Letter Sized (larger Page Sizes (such As 11x17 Foldouts, Etc.) Will Be Counted As One Page. Proposals Shall Be In Narrative Format, Organized, And Titled So That Each Section Of The Proposal Follows The Order And Format Of The Criterion. Information Presented Should Be Organized So As To Pertain To Only The Evaluation Factor In The Section That The Information Is Presented. Information Pertaining To More Than One Evaluation Factor Should Be Repeated In Each Section For Each Factor. upload Completion And Deadline: Interested Offerors Shall Submit Proposals No Later Than The Date And Time Specified In This Synopsis. The Time And Date Of The Proposal Receipt Will Be Upload Completion/delivery Time And Date Recorded Within Dod Safe Site. Do Not Assume That Electronic Submission Will Occur Instantaneously. Large Files (e.g. 10mb Or More) Will Take Some Time To Upload. Offerors Should Time Their Upload Effort With Prudence By Not Waiting Until The Last Few Minutes- This Will Allow For Unexpected Delays In The Transmittal Process. Offerors Are Encouraged To Keep A Copy Of The Upload Confirmation For Their Record. Submissions After The Deadline Will Be Considered Late And Will Be Processed In Accordance With Far 15.208. electronic Files: Files Shall Be In Their Native Format (i.e .,.docx, .xlsx, .ppt, Etc.), Or If In .pdf Format, Shall Be In Searchable Text. Text And Graphics Portfolios Of The Electronic Copies Shall Be In A Format Readable By Microsoft Office Or Adobe Applications. Data Submitted In A Spreadsheet Format Shall Be Readable By Ms Excel (all Cells And Formulars Shall Be Unlocked). all Contractors Are Advised That Registration In System For Award Management (sam) Database Is Required Prior To Award Of A Contract. Failure To Register In The Sam Database May Render Your Firm Ineligible For Award. For More Information, Check The Sam Web Site: Https://www.sam.gov. the Technical Data Package May Contain Information That Is Export Controlled. Only Those Companies That Have Completed Dd Form 2345 And Are Certified Under The Joint Certification Program (jcp) In An Active Status Are Authorized To Receive Export Controlled Information. Only Jcp Certified Firms Will Be Eligible For Any Future Award Made Related To This Effort. Additional Information About Jcp Is Available At Https://www.dla.mil/hq/logisticsoperations/services/jcp/. offerors Shall Restrict The Disclosure Or Use Of Its Proposal, (and) A Proper Legend Must Be Included On Materials Provided. Individual Subcontractor/vendor Proprietary Information May Be Submitted Separately. In Addition, If Proposal Volumes Include Technical Requirements That Have Been Identified As Cui, The Markings Shall Apply To The Technical Information Included In The Technical Volume. offeror Shall Mark Proposal Documents As Cui In Accordance With Nist Sp 800-171. Possible Categories For Use Include But Are Not Limited To The Following: cui Category: General Proprietary Business Information https://www.archives.gov/cui/registry/category-detail/proprietary-business-info.html#authority-list banner Marking For Specified Authorities: Cui//sp-propin banner Marking For Basic Authorities: Cui category Description: material And Information Relating To, Or Associated With, A Company's Products, Business, Or Activities, Including But Not Limited To Financial Information; Data Or Statements; Trade Secrets; Product Research And Development; Existing And Future Product Designs And Performance Specifications. *at A Minimum Technical Proposals Shall Safeguard In Accordance With Markings And Distributions Statements On All Technical Documents Within The Solicitation (sow, Specification, Drawings, Etc.). cui Category: Controlled Technical Information* https://www.archives.gov/cui/registry/category-detail/controlled-technical-info.html#authority-list banner Marking: Cui//sp-cti category Description: controlled Technical Information Means Technical Information With Military Or Space Application That Is Subject To Controls On The Access, Use, Reproduction, Modification, Performance, Display, Release, Disclosure, Or Dissemination. Controlled Technical Information Is To Be Marked With One Of The Distribution Statements B Through F, In Accordance With Department Of Defense Instruction 5230.24, "distribution Statements Of Technical Documents." The Term Does Not Include Information That Is Lawfully Publicly Available Without Restrictions. "technical Information" Means Technical Data Or Computer Software, As Those Terms Are Defined In Defense Federal Acquisition Regulation Supplement Clause 252.227-7013, "rights In Technical Data - Noncommercial Items" (48 Cfr 252.227-7013). Examples Of Technical Information Include Research And Engineering Data, Engineering Drawings, And Associated Lists, Specifications, Standards, Process Sheets, Manuals, Technical Reports, Technical Orders, Catalog-item Identifications, Data Sets, Studies And Analyses And Related Information, And Computer Software Executable Code And Source Code. category Marking: cti *at A Minimum Technical Proposals Shall Safeguard In Accordance With Markings And Distributions Statements On All Technical Documents Within The Solicitation (sow, Specification, Drawings, Etc.). cui Category: General Procurement And Acquisition https://www.archives.gov/cui/registry/category-detail/procurement-acquisition.html#authority-list banner Marking: Cui//sp-procure category Description: material And Information Relating To, Or Associated With, The Acquisition And Procurement Of Goods And Services, Including But Not Limited To, Cost Or Pricing Data, Contract Information, Indirect Costs And Direct Labor Rates. category Marking: procure cui Category: Source Selection https://www.archives.gov/cui/registry/category-detail/source-selection banner Marking For Specified Authorities: Cui//sp-ssel banner Marking For Basic Authorities: Cui category Description: per Far 2.101: Any Of The Following Information That Is Prepared For Use By An Agency For The Purpose Of Evaluating A Bid Or Proposal To Enter Into An Agency Procurement Contract, If That Information Has Not Been Previously Made Available To The Public Or Disclosed Publicly: (items 1-10). category Marking: ssel each Volume Submitted Shall Be Properly Marked With At A Minimum Ssel As Follows: a Cover Page Including The “cui” Marking In The Header And Footer As Required, As Well As The Requiredcui Designator Block If The Volume Contains Cui. This Designator Block Shall Be Included At The Bottom Right Portion Of The Cover Page And Read As Follows: controlled By: Department Of The Navy controlled By: Nswc Crane Code 02 cui Category: Propin/cti/procure/ssel distribution/dissemination Control: Fedcon poc: Nswccr 0253 Branch Head all Subsequent Pages Of The Document Shall Include The “cui” Marking In The Header And Footer. If Other Information Is Included In The Header Or Footer, The "cui" Marking Shall Be Centered On Its Own Line Within The Header And Footer. in Accordance With The Federal Acquisition Regulations (far) 36.601-4(b), The A-e Firm Must Be A Professional A-e Firm Permitted By Law To Practice The Professions Of Architecture Or Engineering In The State Of Indiana. This Requirement Can Be Achieved By Providing The Firm’s Indiana Secretary Of State Registration, And Currently Employing At Least Two (2) State Of Indiana Registered A-e Professionals. A-e Firms Shall Provide Proof That The Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering In Indiana (e.g., Indiana Secretary Of State Registration And Employee’s State Of Indiana Professional Engineering License With Stamp Or State Of Indiana Registered Architect License With Stamp). Failure To Submit The Required Proof Will Result In A Firm’s Elimination From Consideration. all Businesses Intending To Conduct Business In Indiana, Except Sole Proprietors And General Partnerships, Must Register With The Indiana Secretary Of State. If A Business Needs To Be Registered, Please Do So At Www.inbiz.in.gov. jv Offerors Must Ensure That Both Entities Are Either State Registered Individually In Accordance With The Information Above, Or State Registered As A Jv In Accordance With The Information Above. only Those Companies That Have Completed Dd Form 2345 And Are Certified Under The Joint Certification Program (jcp) In An Active Status Are Authorized To Receive Export-controlled Information. Only Jcp Certified Firms Will Be Eligible For Any Future Award Made Related To This Effort. please Provide A-e Professional Licensure Proof Within Sf 330, Part I, Section E. Please Provide Secretary Of State Registration Information Within Sf 330, Part I, Section H. please Provide Jcp Registration Specifics Within Sf 330, Part I, Section E. Include Jcp Certification Number, Jcp Status, And Jcp Expiration Date. If Currently Working To Acquire Jcp Certification, You May Provide A Brief Explanation Of Your Firm’s Progress Towards Certification. However, Only Actively Jcp Certified Firms Will Be Eligible For Award. Jcp Active Status Will Be Confirmed Via Https://www.public.dacs.dla.mil/jcp/ext/ On The Day Of Proposal Submission. firms Must Also Acknowledge All Amendments To The Solicitation Within Their Proposal. A Statement Of Amendment Acknowledgement Within Sf 330, Part I, Section H Will Suffice. Please Address Individual Amendments Along With Corresponding Date Of Issuance On Sam.gov With Your Proposal. A Signed Copy Of The Amendments Is Not Required. if An Sf 254/sf 255 Is Submitted For This Request, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number). interested Firms Shall Submit Proposals To Both The Contract Specialist And The Contracting Officer Via Dod Safe. sf 330 Submissions Are Due No Later Than 9 January 2025 At 12:00 Pm (est). Late Responses Will Be Handled In Accordance With Federal Acquisition Regulations (far) 52.215‐1. The Points Of Contact For This Acquisition Are Contract Specialist, Aaron Hohl, At Aaron.m.hohl.civ@us.navy.mil And Jared Myers, Contracting Officer, At Jared.s.myers3.civ@us.navy.mil. inquiries Concerning This Procurement Should Reference The Solicitation Number (n0016425r1025) And Title And Be Forwarded Via Email To The Points Of Contact Identified Above. Questions Pertaining To This Requirement Are Due No Later Than Fourteen (14) Days After Posting Of This Requirement In Sam.gov. list Of Attachments: statement Of Work (sow) cdrls past Performance Questionnaire (ppq) key Personnel Criteria dd 254 selection Criteria: firms Responding To This Special Notice Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria. failure To Comply With Instructions Or Provide Complete Information May Affect The Firm’s Evaluation Or Disqualify The Firm From Further Consideration. Evaluation Criteria (1) Through (4) Are Considered Most Important And Are Equal Among Themselves; Criteria (5) Through (6) Are Less Important And Are Equal Among Themselves; Criteria (7) Will Only Be Used As A Tie‐breaker Among Technically Equal Firms. Specific Selection Criteria Include: specialized Experience professional Qualifications And Technical Competence past Performance quality Control program Management And Capacity knowledge Of General Geographic Area volume Of Work (no Data Submission Required) criterion 1 —specialized Experience (sf 330, Part I, Section F): firms Will Be Evaluated On Specialized Experience In Performance Of Services Similar To Those Anticipated Under This Contract Through Evaluation Of Experience In: infrastructure/facility Design Utilizing The Following Criteria, Including, But Not Limited To, Unified Facilities Criteria (ufcs) And Military Standard (milstd); conducting On‐site Design Development Workshops, Charrettes, Functional Analysis, Schematic Design, Or Space Programming, Including Supporting Budgetary Or Parametric Cost Estimating; demonstrated Ability To Design To Project Budget And Schedule; experience Preparing Design‐bid‐build; experience Preparing Design‐build Rfp Packages; And designing Projects In Accordance With Dod, Navy, Or Other Government Agencies’ Criteria. use Of Specsintact For Package Generation And Submittal To The Government specialized Design Experience To Include Antiterrorism Force Protection (atfp), Seismic Design And Analysis, And Design Of Secure Spaces firms May Be Considered More Favorably Under Criterion 1 By Demonstrating The Following: demonstrated Experience On Military Bases Within The Primary Geographic Area Of The Contract. experience In The Delivery Of Multiple Types Of A‐e Services Identified In The Requirements Above. experience On Multiple Facility Types, Such As Business, Educational, Industrial, Assembly, Health Care, Residential, Storage, Laboratory, And Mixed-use Occupancies, Identified In The Requirements Above. demonstrated Experience Using Rsmeans-based (or Equal) Electronic Cost Estimating Software. demonstrated Experience Designing Modifications To Existing Structures And Developing Construction Phasing While Associated Facilities Are Required To Remain In Service. demonstrated Experience Specific To Navy Facility Projects, Illustrating The Capability Of The A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Consultants) To Work Within The Navy Project Planning Process Including: dd Form 1391 Development In The Navy’s Electronic Procurement Generator (epg), dd Form 1391 Validation Procedures Including Cost Validation. demonstrated Understanding Of Procedures And Timely Submission Of Base Access Documents In Adherence With Security, Safety, Environmental, And Accident Prevention Regulations In Order To Support A‐e Activities And Maintain Project Schedules. experience Of A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Sub‐ Consultants) With Facilities Located In Historic Areas That Will Require Consultation With State Historic Preservation Officer (shpo) Throughout The Design Process. criterion 1 Submission Requirements: provide Up To A Minimum Of Three (3) And Maximum Of Five (5) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Is Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted. all Projects Provided In The Sf 330 Must Be Completed By The Actual Office/branch/regional Office/ Individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include The Uei And Cage Along With Each Firm Name In The Sf 330 Part I, Section F, Block 25, “firm Name.” Include A Contract Number Or Project Identification Number In Block 21. Include An E‐mail Address And Phone Number For The Point Of Contact In Block 23(c). In Block 24, Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. For Projects Performed As A Sub-contractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Sub-contractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Firm Will Be Eliminated From Award Consideration. note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Must Be Submitted For Each Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For Both Partners Combined. Each Partner Within A Jv May Not Be Responsible For More Than Three (3) Projects Within The Past Performance Submission. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion. projects Shall Be Submitted On The Sf 330 At Part I, Section F And Shall Be Completed Projects. Projects Not Completed Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand‐alone Contract Award. Do Not Submit An Idiq Base Contract As An Example Project. Instead, List Relevant Task Orders Or Stand‐ Alone Contract Awards That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. all Information For Criterion 1 Shall Be Submitted In The Sf 330, Part I, Section F. The Government Will Not Consider Information Submitted In Addition To Part I, Section F In The Evaluation Of Criterion 1. criterion 2—professional Qualifications And Technical Competence (sf 330, Part I, Sections E & G): films Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf 330, Part I, Section G. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Specific Disciplines That Must Be Included In Key Personnel Are: project Manager, Registered Architect Or Professional Engineer, 10 Years quality Control Specialist, Architect Or Professional Engineer, 15 Years architect, Senior, Registered Architect, 15 Years architect, Junior, Registered Architect, 10 Years civil Engineer, Senior, Registered Professional Engineer, 15 Years civil Engineer, Junior, Registered Professional Engineer, 10 Years structural Engineer, Senior, Registered Professional Engineer, 15 Years structural Engineer, Junior, Registered Professional Engineer, 10 Years mechanical Engineer, Senior, Registered Professional Engineer, 15 Years mechanical Engineer, Junior, Registered Professional Engineer, 10 Years electrical Engineer, Senior, Registered Professional Engineer, 15 Years electrical Engineer, Junior, Registered Professional Engineer, 10 Years registered Communication Distribution Design (rcdd), 15 Years fire Protection Engineer, Registered Professional Engineer, 15 Years cost Estimator, Certified Cost Professional Or Equivalent, 15 Years key Personnel, Including Consultants, Shall Be U.s. Citizens. submissions Must Demonstrate Key Personnel Relevant Experience, Formal Education (e.g. Bachelor’s Or Master’s Degrees), And Relevant Professional Development Or Professional Certifications. See Key Personnel Attachment For Specific Qualification Criteria. If An Offeror Is Unable To Meet Key Personnel Requirement List In Its Entirety, The Government Still Urges A Response For Consideration Which Illustrates The Firm’s Maximum Personnel Capabilities. If Certain Key Personnel Roles Cannot Be Fulfilled, Please Indicate Those Role Vacancies Individually With A Course Of Action For Fulfillment. criteria 2 Submission Requirements: sf 330, Part I, Section E – Provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three (3) Single-sided Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines To Include Document/licensure Numbers; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. The Firm Must Hold A Current And Active License In The State Of Indiana As Well As Currently Employ At Least Two (2) State Of Indiana Registered A-e Professionals. offeror Will Not Be Permitted To Simultaneously Fulfill Multiple Roles With An Individual On The Same Project. The Individuals Identified As Key Personnel On The Sf330 May Not Have Multiple Duties Or Be “dual-hatted.” Offerors Shall Provide Individual Resumes In Sf330 Section E For Each Of The Individuals Listed Above. criterion 3—past Performance (sf 330, Part I, Section H): firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. evaluating Past Performance And Experience Will Include Information Provided In The Contract performance Assessment Reporting System (cpars) / Architect-engineer Contract Administration Support System (acass) Or A Completed Past Performance Questionnaire (ppq) For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. criteria 3 Submission Requirements: submit A Completed Cpars/acass/ppq Evaluation For Each Project Under Criterion 1. firms May Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1—specialized Experience. Firms May Also Address Any Adverse Past Performance Issues. Information For Each Past Performance Submission Shall Not Exceed Five Single‐sided Pages In Total. offeror Shall Submit One (1) Past Performance Questionnaire Provided As An Attachment To This Synopsis To Each Of Its Customer Pocs Identified In Criterion 1 For Referenced Projects With No Cpars/acass Available. In Order To Expedite The Assessment Process, The Offeror May Complete The “contract Information” Portion Of The Past Performance Questionnaire For The Convenience Of The Customer Poc. A Ppq Submission Is Not Required For Criterion 1 Projects Accompanied By A Cpars/acass. However, A Ppq Submission For Every Criterion 1 Project, Including Those With A Cpars/acass Evaluation On Record, Would Assist The Government In Evaluation Accuracy And Is Encouraged. the Offeror Shall Not, However, Complete Any Other Section Of The Past Performance Questionnaire. The Questionnaire Shall Be Provided To The Customer Poc With Instructions To Complete And Submit It Directly To The Contracting Officer And/or The Point Of Contact Identified In This Announcement On Or Before The Proposal Due Date. Electronic Submission Via Encrypted E-mail By The Customer Is Required. under No Circumstances Shall The Questionnaires Be Returned To The Offerors After Completion. Any Information Provided By The Offeror’s References Is Subject To Verification/validation By The Government During The Evaluation Process. The Government May Make Contact And Follow Up With The Listed References Identified On The Contractor Past Performance Data Documents/data. The Offeror May Provide Information On Problems Encountered On The Identified Contracts As Well As The Offeror’s Corrective Actions. The Government Reserves The Right To Solicit Feedback Beyond What Is Identified In The Questionnaire. awards, Letters Of Commendation, Certificates Of Appreciation, Etc., Shall Not Be Submitted And Will Not Be Considered In The Evaluation. criterion 4—quality Control Program (sf 330, Part I, Section H): firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract And Means Of Ensuring Quality Services From Their Consultants/subcontractors. criteria 4 Submission Requirements: describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall: describe Specific Quality Control Processes And Procedures Proposed For This Contract To Achieve Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, And Engineering And Design Services. provide A Quality Control Process Chart Showing The Inter‐relationship Of The Management And Team Components. identify The Key Personnel (submitted Under Criterion 2—professional Qualifications And Technical Competence) Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities. describe How The Firm’s Quality Control Program Extends To Management Of Sub-contractors. explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf 330, Section F Or How The Plan Will Work If It Has Not Been Used Previously. criterion 5—program Management And Capacity (sf 330, Part I, Section H): firms Will Be Evaluated On The Firm’s Ability To Plan For And Manage Work Under The Contract And The Capacity To Accomplish The Work In The Required Time. criteria 5 Submission Requirements: provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff, Sub- Contractors And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably. describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. include Small Business Subcontracting Plan Specifics Which Detail Level Of Participation Of Small Business, Small Disadvantaged Business, Woman-owned Small Business, Hubzone Small Business, Service-disabled Veteran-owned Small Business And Veteran Owned Small Business Team Members. attach A Small Business Subcontracting Plan Which Estimates The Proposed Extent Of Participation Of Small Business, Small Disadvantaged Business, Woman-owned Small Business, Hubzone Small Business, Service-disabled Veteran-owned Small Business And Veteran Owned Small Business Team Members In The Contract Team. Clearly Specify Each Small Business Firm That Is A Team Member, Their Small Business Category, And Their Proposed Level Of Participation Measured As A Percentage Of The Overall Estimated Effort. The Small Business Subcontracting Plan Draft Will Not Count Against The Total Page Count Limitation For The Firm’s Response. The Small Business Subcontracting Plan Should Be Included As An Attachment To The Sf 330 Response. Small Business Subcontracting Plan Specifics May Be Referenced Within The Sf 330 Response, But The Subcontracting Plan Should Also Be Attached In Its Entirety. criterion 6— Knowledge Of General Geographic Area (sf 330, Part I, Section H) firms Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract And Demonstrated Knowledge Of The General Geographic Areas In Which Projects Could Be Located. Evaluation Of Firms Will Include Consideration Of Their Location Within The General Geographic Area Of The Anticipated Projects (primarily At Naval Surface Warfare Center Crane Division, Crane, In). criteria 6 Submission Requirements: indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. Provide Timelines And Examples Of The Team’s Success In Providing This Response. Include Both Primary And Sub‐contractor Support As Required. Teams With A Demonstrated History Of Providing Timely Support May Be Considered More Favorably. criterion 7—volume Of Work (sf 330, Part 1, Section H) (tie-breaker) in The Event Of A Tie Among Equally Rated Firms, Those Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602‐1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve (12) Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A‐e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A‐e Contracts. criterion 7 Submission Requirements: firms Shall Not Submit Data For This Factor.
Stadt Frankfurt Oder , Bereich Des Oberb Rgermeisters, Rechtsamt, Zentrale Vergabestelle Tender
Other Consultancy Services...+1Consultancy Services
Germany
Closing Date16 Jan 2025
Tender AmountRefer Documents
Details: Creation of a concept for the provision of needs-based housing for people in need of care and their relatives in the city of Frankfurt (or) As part of the Care Pact and the Local Care Funding Program of the State of Brandenburg, a report on the provision of needs-based housing for people in need of care and their relatives in the city of Frankfurt (or) is to be prepared by June 30, 2025. The basis is a well-founded assessment of the current situation and future trends to be expected in the city of Frankfurt (or) with regard to the housing situation of people in need of care and senior citizens. It should be noted that extensive data is already available in the form of the population forecast, a senior citizen survey, care structure planning and the plan for senior citizens. Particular attention should be paid to - the housing wishes of senior citizens, - generational change, - the different developments in the districts and the city center, - information on age-appropriate housing stock and - the affordability of housing. Building on this, goals and strategies for age-appropriate housing provision in Frankfurt (Oder) are to be developed.
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender
Housekeeping Services
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Details: Amendment 0003 (01/01/2025): Solicitation Q&asee Attachment "solicitation Q&a" For All Responses To Inquiries Submitted By The Due Date/time.end Of Amendment 0003.amendment 0002 (12/19/2024): Solicitation Extendedthe Solicitation Due Date And Time Is Hereby Extended To Friday, January 17, 2024 At 12:00pm Mst/mdt Due To Limited Availability For Site Visits During The End Of The Calendar Year.end Of Amendment 0002amendment 0001 (12/19/2024): Incumbent Informationthe Incumbent Contract Was Awarded To Superior Janitorial Group Llc For An Aggregate Of $70,620.00.end Of Amendment 0001combined Synopsis/solicitationnon-personal Janitorial Services For National Weather Service (nws), Weather Forecast Office (wfo) Located In Tallahassee, Fl(i) this Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice And In Accordance With The Simplified Acquisition Procedures Authorized In Far Part 13. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.(ii) this Solicitation Is Issued As A Request For Quotation (rfq). Submit Written Quotes On Rfq Number 1305m325q0035.(iii) the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-01 (nov 2024).(iv) this Solicitation Is Being Issued As A Total Small Business Set-aside. The Associated Naics Code Is 561720. The Small Business Size Standard Is $22.0 Million. (v) this Combined Solicitation/synopsis Is For Purchase Of The Following Commercial Services:clin 0001 – Base Yearservices, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2025 Through 02/28/2026.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 1001 – Option Year 1services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2026 Through 02/28/2027.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 2001 – Option Year 2services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2027 Through 02/29/2028.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 3001 – Option Year 3services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2028 Through 02/28/2029.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________clin 4001 – Option Year 4services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Janitorial Services At The National Weather Service (nws), Weather Forecast Office (wfo) In Tallahassee, Fl, In Accordance With The Statement Of Work. Period Of Performance 03/01/2029 Through 02/28/2030.quantity: 12 Months unit Price (per Month): ___________ annual Total: ______________aggregate Total For All Years: ________________________(vi) description Of Requirements Is As Follows:see Attached Statement Of Work Which Applies To Base Year And All Option Years 1 – 4, And Department Of Labor Wage Rates: Wd 2015-4569, Revision No. 24, Dated 07/22/2024, Which Can Be Found On: Https://sam.gov/content/wage-determinationsinvoices To Be Billed Monthly In Arrears. Provide Monthly And Annual Pricing For Each Base And Option Year. Quote Pricing May Be Provided On Attached Sf18 Form Or On Company Letterhead.(vii) date(s) And Place(s) Of Delivery And Acceptance:period Of Performance Shall Be:base Year For A Twelve Month Period 03/01/2025 Through 02/28/2026.option Period 1 For A Twelve Month Period 03/01/2026 Through 02/28/2027.option Period 2 For A Twelve Month Period 03/01/2027 Through 02/29/2028. Option Period 3 For A Twelve Month Period 03/01/2028 Through 02/28/2029. Option Period 4 For A Twelve Month Period 03/01/2029 Through 02/28/2030. Place Of Performance Is 1017 Academic Way, Tallahassee, Fl 32306.(viii) Far Provision 52.212-1, Instructions To Offerors-commercial Products And Commercial Services (sept 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(ix) Far Provision 52.212-2, Evaluation-commercial Products And Commercial Services (nov 2021), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment.(x) Far Provision 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. Offerors Are Advised To Include A Completed Copy Of The Provision With Its Offer.(xi) Far Clause At 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services (nov 2023), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. (xii) Far Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (nov 2024), Applies To This Acquisition And Can Be Found In Full Text On The Request For Quote Form Sf18 Attachment. (xiii) Any Additional Contract Requirement(s) Or Terms And Conditions That Apply Can Be Found On The Request For Quote Form Sf18 Attachment. (xiv) Defense Priorities And Allocations System (dpas) And Assigned Rating Does Not Apply.(xv) Quotes Are Required To Be Received In The Contracting Office No Later Than 12:00pm Mst/mdt On Friday, January 3, 2025. All Quotes Must Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.(xvi) Any Questions Regarding This Solicitation Should Be Submitted Electronically Via Email To Stephanie.mas@noaa.gov.utilization Of Fedconnect® For Contract Administrationthe Department Of Commerce Will Utilize The Fedconnect® Web Portal In Administering This Award. The Contractor Must Be Registered In Fedconnect® And Have Access To The Fedconnect® Website Located At Https://www.fedconnect.net/fedconnect/. For Assistance In Registering Or For Other Fedconnect® Questions Please Call The Fedconnect® Help Desk At (800) 899-6665 Or Email At Support@fedconnect.net. There Is No Charge For Registration In Or Use Of Fedconnect®.(end)1352.215-72 Inquiries (apr 2010)offerors Must Submit All Questions Concerning This Solicitation In Writing Via Email To Stephanie.mas@noaa.gov. Questions Should Be Received No Later Than 12:00pm Mst/mdt On Friday, December 27, 2024. Any Responses To Questions Will Be Made In Writing, Without Identification Of The Questioner, And Will Be Included In An Amendment To The Solicitation. Even If Provided In Other Form, Only The Question Responses Included In The Amendment To The Solicitation Will Govern Performance Of The Contract.(end Of Clause)52.237-1 Site Visit (apr 1984)offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award.(end Of Provision)a Site Visit Is Highly Recommended But Not Required. Offerors Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. Please Contact Jennifer Nichols At 850-942-8833 Ext. 222 Or Jennifer.nichols@noaa.gov To Set Up A Time To Visit The Site. All Questions During The Site Visit Should Be Submitted Electronically To Stephanie.mas@noaa.gov.far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services (sep 2023)notice To Offerors: Instructions For Submitting Quotations Under This Request For Quote Must Be Followed. Failure To Provide All Information To Aid In The Evaluation May Be Considered Non-responsive. Offers That Are Non-responsive May Be Excluded From Further Evaluation And Rejected Without Further Notification To The Offeror.1. Submit Pdf Or Microsoft Word Format Quotations To The Office Specified In This Solicitation At Or Before The Time Specified In The Solicitation. Quote Documents Shall Include Signed Copies Of The Sf 18 And Sf 30(s) To Acknowledge The Solicitation And Any Applicable Amendments. Email Quotes Are Required And Can Be Sent To Stephanie.mas@noaa.gov. 2. Offeror Shall Have An Active Registration In The System For Award Management (sam Found At Https://sam.gov/content/home) In Order To Provide A Quote And Be Eligible For Award. Must Provide Their Ueid/cage Code With Their Quote. 3. Offerors Shall Assume That The Government Has No Prior Knowledge Of Them Or Their Capability.4. Offerors Must Provide All Evaluation Criteria In Accordance With Far 52.212-2. Offerors Who Do Not Provide All Evaluation Criteria May Not Be Considered.1. technical Approach And Capability2. past Performance, Including Submission Of Completed Past Performance Questionnaires3. pricethe Government Does Not Accept Responsibility For Non-receipt Of Quotes. It Is The Contractor’s Responsibility To Request And Receive A Confirmation Of The Quote Receipt.far 52.212-2 Evaluation- Commercial Products And Commercial Services (nov 2021) Offers Will Be Evaluated Based On Price And The Factors Set Forth In Paragraph (a). The Evaluation Will Consider The Non-price Technical Solution (technical Approach And Past Performance) To Be Significantly More Important Than Price. However, As Quotes Are Determined To Be More Equal In The Non-price Evaluation Factor, Price Becomes More Important And May Become The Determining Factor For Award. If, At Any Stage Of The Evaluation, All Vendors Are Determined To Have Submitted Equal, Or Virtually Equal, Non-price Technical Solutions, Price Could Become The Factor In Determining Which Vendor Will Receive The Award.the Government Intends To Evaluate The Quotes And Award A Purchase Order Based On The Offeror’s Initial Quote; Therefore, The Offeror’s Initial Quote Should Contain The Offeror’s Best Terms From A Non-price Technical Solution And Price Standpoint. The Government Reserves The Right Not To Award A Purchase Order Depending On The Quality Of The Quote(s) Submitted And The Availability Of Funds. Furthermore, The Government May Waive Informalities And Minor Irregularities Or Omissions In Quotes Received.the Government May Make Award To Other Than The Lowest-priced Offeror Or The Offeror With The Highest Technical Rating If The Contracting Officer Determines That To Do So Would Result In The Best Value To The Government. The Government Will Not Make An Award At A Significantly Higher Overall Price To Achieve Only Slightly Superior Performance Capability. (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. Paragraph (a) Is Hereby Completed As Follows: Evaluation Will Be Based On The Following: 1. technical Approach And Capability. The Offeror’s Overall Technical Approach Will Be Evaluated To Assess The Government's Level Of Confidence In The Offeror’s Understanding Of, Approach To, And Ability To Successfully Perform The Requirements As Described In The Statement Of Work. Provide A Detailed Description Of The Company’s Experience Performing Similar Services. A Detailed Technical Approach Write-up Describing How The Offeror Will Perform This Service Is Required To Be Submitted With The Quote Regardless Of Whether A Site Visit Was Made Or Not. The Technical Approach Write-up Must Not Be A Reiteration Of The Statement Of Work, But How Your Company Plans On Performing The Tasks Listed In The Attached Statement Of Work. (i.e. Performance Checklists, Anticipated Number Of Employees, Anticipated Hours At The Facility And/or Confirmation Of Supplies Being Provided, Etc.)2. past Performance. Quote Shall Include At Least Two References From At Least Two Separate Contracts For Similar And Relevant Services Including The Name, Phone Number, Full Address, And E-mail Address Of The Reference To Demonstrate The Offeror’s Capability To Successfully Perform The Services Listed In The Statement Of Work. The Offeror Is Required To Fill Out Blocks 1-4 And Send The Attached Past Performance Questionnaire To Those References Provided By The Offeror In Their Submission, And Email The Completed Survey Form Directly To Stephanie.mas@noaa.gov By The Closing Date And Time Of This Solicitation. The Government Reserves The Right To Consider Past Performance Report Forms Received After The Due Date And Time Of The Solicitation And To Contact References For Verification Or Additional Information.the Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications Between Contracting Parties, Proactive Management And Customer Satisfaction. The Government Will Use Its Discretion To Determine The Sources Of Past Performance Information Used In The Evaluation, And The Information May Be Obtained From References Provided By The Offeror, The Agency’s Knowledge Of Offeror Performance, Other Government Agencies Or Commercial Entities, Or Past Performance Databases, And Will Be Based On Responsiveness, Quality, And Customer Services. Offerors Lacking Relevant Past Performance History, Or For Whom Past Performance Information Is Either Not Available Or Has Not Been Submitted To The Government, Will Receive A Neutral Rating For Past Performance.3. price. The Government Will Evaluate The Price Quote For Completeness And Reasonableness In Relation To The Rfq Requirements. Quoted Prices Must Be Entirely Compatible With The Non-price Technical Solution.the Government Intends To Award A Trade-off, Single Firm Fixed-price Purchase Order On An All Or None Basis With Payment Terms Of Net 30. (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s).(c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.(end Of Provision)
EllisDon Construction Services Inc Tender
Aerospace and Defence
Canada
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project. Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number: 71947 Title: Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu), including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division Scope Of Work 01 45 00 Surveying 01 45 00 Material Testing 01 45 00 Third Party Inspection (roof, Structural, Geotechnical) 01 52 00 Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19 Tower Cranes 01 54 23 Scaffolding 02 41 19 Selective Demolition 03 11 00 Concrete Formwork 03 15 00 Concrete Accessories 03 20 00 Reinforcing Steel 03 30 00 Concrete Supply 03 35 00 Concrete Placing & Finishing 03 45 00 Precast Specialties 04 00 00 Masonry 05 10 00 Structural Steel 05 30 00 Metal Decking 05 50 00 Miscellaneous Steel 05 70 00 Ornamental (specialized) Metals 06 20 00 Millwork / Architectural Woodwork 07 10 00 Damp Proofing & Waterproofing 07 40 00 Metal Roofing, Cladding & Siding 07 50 00 Membrane Roofing 07 80 00 Firestopping & Fireproofing 07 90 00 Caulking 08 10 00 Openings – Doors, Frames & Hardware 08 33 00 Coiling Doors & Grilles 08 34 16 Hanger Doors 08 35 00 Folding Doors & Grilles 08 36 00 Overhead Doors 08 40 00 Aluminum Entrances, Storefronts & Curtain Wall 08 80 00 Glazing 08 87 00 Window Film 09 21 16 Gypsum Board Assemblies 09 51 14 Acoustic Panels 09 60 00 Flooring 09 66 00 Tiling 09 67 00 Fluid Applied Flooring 09 69 00 Access Flooring 09 90 00 Painting 10 11 00 Visual Display Boards 10 14 00 Signage 10 22 19 Demountable Partitions 10 26 00 Wall, Corner, Door Protection 10 28 00 Bathroom Accessories & Toilet Partitions 10 51 00 Lockers 10 75 00 Flagpoles 11 30 00 Appliances 11 61 00 Theater And Stage Equipment 11 66 00 Athletic Equipment 11 81 29 Fall Arrest Systems 11 98 00 Detention Equipment 12 00 00 Furnishings 12 20 00 Window Coverings 14 20 00 Elevator & Lifts 21 00 00 Fire Suppression 22 00 00 Mechanical – Plumbing 23 00 00 Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00 Integrated Automation 26 00 00 Electrical 28 10 00 Access Control 31 00 00 Earthworks 31 60 00 Piling 32 10 00 Paving 32 16 00 Sidewalk Curb & Gutter 32 31 00 Fencing 32 90 00 Landscaping 33 00 00 Utilities & Underground 34 73 00 Airfield Construction - Apron 41 22 00 Overhead Cranes 48 16 00 Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.
PUBLIC BUILDINGS SERVICE USA Tender
Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents.
if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10
cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report
houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal
(1) Contents
· Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror.
· A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement.
· Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010)
(a) Submission Of Certified Cost Or Pricing Data Is Not Required.
(b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested.
77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90
exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision
of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects
that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance,
evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes
standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp
services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions
asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In
pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Civil Works Others, Building Construction
United States
Closing Date20 Jan 2025
Tender AmountRefer Documents
Details: (1) Action Code: Sources Sought this Is A Sources Sought Notice Only. This Is Not A Request For Proposal, But A Survey To Locate Potential Sources. This Sources Sought Does Not Constitute An Invitation For Bids, Request For Proposals, Or A Request For Quotations, And Is Not To Be Construed As A Commitment By The Government To Issue An Order Or Otherwise Pay For The Information Solicited, Nor Is It A Guarantee Of A Forthcoming Solicitation Or Contract. It Is For Market Research Purposes Only. Respondents Will Not Be Notified Of The Results Of The Evaluation. the Purpose Of This Sources Sought Notice Is To Gain Knowledge Of Interest, Capabilities, And Qualifications Of Various Members Of Industry, To Include The Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (hub-zone), Service-disabled Veteran-owned Small Business (sdvosb), Women-owned Small Business (wosb), And Economically Disadvantaged Women-owned Small Business (edwosb). The Government Must Ensure There Is Adequate Competition Among The Potential Pool Of Responsible Contractors. Small Business, Section 8(a), Hubzone, Sdvosb, Wosb, & Edwosb Businesses Are Highly Encouraged To Participate. (2) Date: 13 January 2025 (3) Classification Code: F0 (4) Naics Code: 813312 (5) Naics Size Standard: $19.5m (6) Contracting Office Address: 2800 Powder Mill Road
bldg. 601
adelphi, Maryland 20783 (7) Subject: Sources Sought For Canada Goose Management To Include Nest Management (8) Proposed Solicitation Number: W911qx25q0034 (9) Sources Sought Closing Response Date: 20 January 2025 (10) Contact Point: Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil (11) a. Objective: to Find Sources That Are Qualified To Meet The Supplies/services As Listed In Section 11b. Note That The Specific Requirements In Section C Are Subject To Change Prior To The Release Of Any Solicitation. b. Canada Goose Management - Usag Aberdeen Proving Ground Adelphi Laboratory Center performance Work Statement (pws) 1.0 Introduction. The Purpose Of This Effort Is To Provide Canada Goose Management At Alc. The Contractor Shall Provide All Personnel, Equipment, Supplies, Facilities, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Canada Goose Management As Defined In This Performance Work Statement (pws), Section 5, Except For Those Items Specified As Government Furnished Property And Services. The Contractor Shall Perform To The Standards In This Contract. 1.1 Background. Alc Is Home To Anywhere From Five (5) To Ten (10) Pairs Of Canada Geese That Return Each Year To Nest On Alc’s Installation. Each Year, The Directorate Of Public Works (dpw) Environmental Division Obtains A U.s. Fish And Wildlife Service (usfws) Resident Canada Goose Nest And Egg Depredation Permit. This Permit Allows Dpw To Oil Goose Eggs To Prevent The Population From Increasing. This Strategy Can Effective If Nests Are Found In Time But It Does Not Prevent The Health Hazards Associated With Geese Droppings Left On The Sidewalks. Furthermore, The Egg Oiling Program Does Not Prevent The Safety Hazards That Are Created When Installation Personnel Come Into Contact With Aggressive Geese Guarding Their Nest. Generally, On The Alc Site Most Geese Nest In The Area Surrounding The Main Complex Of Buildings. alc Is Located In Adelphi, Maryland. The Site Straddles The Border Between Two (2) Maryland Jurisdictions, Prince George’s And Montgomery Counties. Of The Total 207 Acre Area, 84 Acres Are Within Montgomery County And 123 Acres Are Within Prince George’s County. Alc Is Approximately Six (6) Miles From Washington, District Of Columbia. The Installation Is Located Within One (1) Mile Of The Capital Beltway (interstate 495) And Interstate 95 (i-95). Alc Lies In The Anacostia River Drainage Basin Which Is A Tributary Of The Potomac River. It Is Bordered By Residential Areas On The East And South And By The General Service Administration’s Federal Center On The North And West. Alc Consists Of Four (4) Main Building Areas With Parking Lots, Forested Lands And Two Stream Corridors, Paint Branch And Hillandale Tributary. The Alc Is Home To The Headquarters For The Army Research Laboratory (arl). Arl Provides America's Soldiers A Technological Edge Through Scientific Research, Technology Development, And Analysis. The Mission Of Arl Is To Provide The Underpinning Science, Technology, And Analysis That Enable Full-spectrum Operations. 1.2 Objectives. During The Performance Of This Contract, The Contractor Shall Be Responsible For Providing All Personnel, Equipment, Supplies, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Provide Canada Goose Management At Alc. The Objectives Of This Project Are To Provide Canada Goose Management Support Activities On Alc. 2.0 Requirements. 2.1 Description Of Services. This Is A Non-personnel Services Contract To Provide Canada Goose Management Support At Alc. 2.2 Required Tasks. 2.2.1 Canada Goose Site Aversion. The Contractor Shall Provide A Trained Border Collie/collies And Dog Handling Professional/professionals To Deter The Canada Geese Away From Alc. The Contractor Will Be Responsible For The Improved Areas Of Alc. This Includes The Areas Around All Buildings, Roads, Stormwater Management Features, Maintenance Yards And Parking Lots. The Government Will Provide A Map Of The Installation And Historical Nest Data Prior To The Start Of The Project. the Contractor Shall Conduct Site Visits For A Minimum Of Five (5) Days A Week. Success Of The Project Will Be Measured By The Absence Of Geese On Alc For 7 Consecutive Days During And At The End Of The Period Of Performance. the Contractor Shall Use Techniques That Are Approved By The State Of Maryland Department Of Natural Resources (mdnr) And The Usfws And That Do Not Violate The Migratory Bird Treaty Act (mbta). The Contractor Shall Obtain Any Required Licenses And Permits By The Mdnr And The Usfws. the Contractor Shall Always Remain In Control Of The Border Collies. The Contractor Shall Remove Any Waste Left By The Border Collies. 2.2.2 Canada Goose Nest Management. The Contractor Shall Provide Egg Addling Services For Nests Found On Alc. The Contractor Shall Oil And Number The Eggs That Are Deemed To Be Less Than 14 Days Old. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number, And Location Description. Data Will Be Provided To The Cor Within One Week Of The Nest Treatment. 2.2.3 Deliverables. The Contractor Shall Provide Data For Nest Addling Services, When Conducted. The Contractor Shall Provide The Nest Treatment Data To The Cor Which Will Include: The Date, Nest Number And Location Description. 2.3 General Information. 2.3.1 Federal Observed Holidays. The Contractor Shall Provide Canada Goose Management During The Period Of Performance Except During The Following Federal Holidays: new Year’s Day martin Luther King Jr.’s Birthday president’s Day memorial Day juneteenth independence Day labor Day columbus Day veteran’s Day thanksgiving Day christmas Day 2.3.2 Hours Of Operation. The Contractor Is Responsible For Providing Services Five (5) Days A Week Which Can Occur Monday Through Sunday Except During Local Or National Emergencies, Administrative Closings, Or Similar Government Directed Facility Closings. 2.3.3 Place Of Performance. The Work To Be Performed Under This Contract Shall Be Performed At Alc. 2.3.4 Period Of Performance. The Period Of Performance Of This Contract Overlaps Nesting Season And The Time Of Year When The Geese Are On Site Which Is From 1 February Through 31 October Each Year Of The Contract Award. There Are Four (4) Option Years If Funding Is Available. 2.3.5 Key Personnel. The Following Personnel Are Considered Key Personnel By The Government: Garrison Natural Resources Manager/conservation Specialist, Chief, Environmental Integration Branch And The U.s. Army Combat Capabilities Development Command (devcom) Army Research Laboratory (arl) Chief, Environmental Management Branch. the Contractor Shall Provide A Contract Manager Who Is Considered Key Personnel By The Government For The Performance Of The Contract. The Contract Manager Shall Be Responsible For The Performance Of The Work. The Name Of This Person And An Alternate, Who Shall Act For The Contractor When The Contract Manager Is Absent, Shall Be Designated In Writing To The Ko. The Contract Manager Or Alternate Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. The Contract Manager Or Alternate Shall Be Available Between 0700 And 1530 Monday Thru Friday Except Federal Holidays Or When The Government Facility Is Closed For Administrative Reasons. the Contractor Shall Have Fully Trained Working Border Collies And Personnel Trained To Handle Them. The Contractor Shall Have Personnel Trained In Goose Management Including Egg Oiling And Nest Removal. The Contractor Shall Be Listed On The Alc Usfws Resident Canada Goose Nest And Egg Depredation Permit. The Contractor Shall Hold Any Other Necessary State Or Federal Permits And Or Licenses To Conduct The Work Described In This Pws. 2.3.6 Organizational Conflict Of Interest. Contractor And Subcontractor Personnel Performing Work Under This Contract May Receive, Have Access To, Or Participate In The Development Of Proprietary Or Source Selection Information (e.g., Cost Or Pricing Information, Budget Information Or Analyses, Specifications, Or Work Statements, Etc.), Or Perform Evaluation Services Which May Create A Current Or Subsequent Organizational Conflict Of Interests (oci) As Defined In Far Subpart 9.5. The Contractor Shall Notify The Ko Immediately Whenever It Becomes Aware That Such Access Or Participation May Result In Any Actual Or Potential Oci And Shall Promptly Submit A Plan To The Ko To Avoid Or Mitigate Any Such Oci. The Contractor’s Mitigation Plan Will Be Determined To Be Acceptable Solely At The Discretion Of The Ko, And In The Event The Ko Unilaterally Determines That Any Such Oci Cannot Be Satisfactorily Avoided Or Mitigated, The Ko May Affect Other Remedies As Deemed Necessary, Including Prohibiting The Contractor From Participation In Subsequent Contracted Requirements Which May Be Affected By The Oci. 2.3.7 Contractor Furnished Items And Responsibilities. The Contractor Shall Furnish All Supplies, Equipment, Facilities, And Services Required To Perform Work Under This Contract. 2.3.8 Applicable Publications (current Editions). The Contractor Shall Abide By All Applicable Regulations, Publications, Manuals, And Local Policies And Procedures. Any Contractor Provided Publications Are To Be Procured And Maintained At Contractor’s Expense. 3.0 Anti-terrorism /operational Security (at/opsec) Requirements 3.1. General Security Requirements And Guidance. The Security Requirements Described Below Apply To All Contract Personnel (including Employees Of The Prime Contractor ("contractor") And All Subcontractor Employees) Supporting The Performance Requirements Of This Contract. The Contractor Is Responsible For Compliance With These Security Requirements. Questions Regarding Security Matters Shall Be Addressed To The Designated Government Representative (e.g., Contracting Officer Representative (cor), Requiring Activity (ra) Representative, Or Contracting Officer (if A Cor Or Other Ra Representative Is Not Appointed)). Contract Personnel Are Critical To The Overall Security And Safety Of Us Army Corps Of Engineers (usage) Installations, Facilities And Activities, And Security Awareness Training Contributes To Those Efforts. The Department Of Defense (dod) And Army Security Training Requirements Specified Below, If Applicable, Are Performance Requirements; All Applicable Contract Personnel Shall Complete Initial Training Within 30 Days Of Contract Award Or The Date New Contract Personnel Begin Performance On The Contract. Within Five Business Days From The Completion Of Training, The Contractor Shall Provide Written Documentation (e.g., Email Or Memorandum) To The Government Representative. The Documentation Shall Include The Names Of Contract Personnel Trained And Which Training They Completed; The Contractor Shall Maintain Training Records As Part Of Their Contract Files And Be Prepared To Provide Copies Of Training Certificates To The Government Representative. Contractor Personnel And Vehicles Are Subject To Search When Entering Federal Installations. Additionally, All Contract Personnel Shall Comply With Force Protection Condition (fpcon) Measures, Random Antiterrorism Measures (commonly Referred To As "rams"), And Health Protection Condition (hpcon) Measures. The Contractor Is Responsible For Meeting Performance Requirements During Elevated Fpcon And/or Hpcon Levels In Accordance With Applicable Ra Plans And Procedures --this Includes Identifying Mission Essential And Non-mission Essential Personnel. In Addition To The Changes Otherwise Authorized By The Changes Clause Of This Contract, Should The Fpcon Or Hpcon Levels At Any Individual Facility Or Installation Change, The Government May Implement Security Changes That Affect Contract Personnel. The Contractor Shall Ensure All Contract Personnel Are Aware Of Their Security Responsibilities, Including Any Site-specific Requirements Identified In Local Policies Or Procedures. 3.2. Physical Security And Access Control Requirement. All Contract Personnel Requiring Physical Access To A Federal Installation Or Facility Shall Comply With The Access Control Procedures Of That Location. Contract Personnel Requiring Unescorted Access To Meet Contract Performance Requirements On A Dod Installation In The Us Shall Be Vetted By The Installation/facility Provost Marshal/directorate Of Emergency Services/security Office Using The National Crime Information Center-interstate Identification Index (commonly Referred To As "ncic-iii") And Terrorist Screening Database (commonly Referred To As "tsdb"). Contract Personnel Shall Comply With All Personal Identity Verification Requirements Specified In Installation/facility Policies And Procedures. Contract Personnel Who Do Not Meet Requirements For Unescorted Access To Usage Facilities Shall Coordinate Escorted Access With The Government Representative, As Needed. Contract Personnel Who Receive Keys, Access Cards, Or Lock Combinations That Provide Access To Government-owned Property Shall Comply With Key And Lock Control Procedures Of The Ra. 3.3. Pre-screen Candidates Using E-verify Program. Contractors Shall Comply With The Requirements Set Forth In Far Clause 52.222-54 Employment Eligibility Verification And Far Subpart 22.18 In Using The E-verify Program At (https://www.e-verify.gov/) (website Subject To Change) To Meet The Contract Employment Eligibility Requirements. Contractors Are Encouraged To Cooperate With Federal And State Agencies Responsible For Enforcing Labor Requirements To Include Eligibility For Employment Under United States Immigration Laws In Accordance With Far 22.102-1 (i). An Initial List Of Verified/ Eligible Candidates Shall Be Provided To The Cor No Later Than Three Business Days After The Initial Contract Award. When Contracts Are With Individuals, The Individuals Will Be Required To Complete A Form 1-9, Employment Eligibility Verification, And Submit Ii To The Contracting Officer To Become Part Of The Official Contract File. 4.0 Non-personal Services. arl/alc/garrison Non-personal Services (jul 2012) the Contractor, As An Independent Contractor And Not As An Agent Of The Government, Shall Provide The Necessary Resources (except Those Furnished By The Government) To Accomplish Tasks Of The Type Set Forth In The Performance Work Statement. contractor Employees Performing Services Under This Contract Shall Be Controlled, Directed And Supervised At All Times By Management Personnel Of The Contractor. The Contractor's Management Shall Ensure That Employees Properly Comply With The Performance Standards Outlined In This Performance Work Statement And As Required By The Contracting Officer Or The Contracting Officer's Representative (cor). Contractor Employees Shall Perform Independent Of And Without The Supervision Of Any Government Official. Actions Of Contractor Employees May Not Be Interpreted Or Implemented In Any Manner That Results In Any Contractor Employee Creating Or Modifying Federal Policy, Obligating The Appropriated Funds Of The U.s. Government, Overseeing The Work Of Federal Employees, Providing Direct Personal Services To Any Federal Employee Or Otherwise Violating The Prohibitions Set Forth In Parts 7.5 And 37.1 Of The Federal Acquisition Regulation (far). The Government Shall Control Access To The Facility And Shall Perform The Inspection And Acceptance Of Completed Work And Tasks. 5.0. Distribution Statement. 5.1. Determination Of Contract Submission Documents Are: distribution Statement A: Approved For Public Release, Distribution Is Unlimited. 5.2. Determination For Information Generated From The Performance Of The Contract: distribution Statement A: Approved For Public Release, Distribution Is Unlimited c. Responses: all Interested Parties Should Notify This Office In Writing, Mail, Fax, Or E-mail Within The Posted Date. Responses Shall Include: to What Extent Each Of The Specifications Can Be Met. include Your Type Of Business (i.e. Commercial, Academia), Whether Your Organization Is Classified As A Large Or Small Business Based On The $19.5m Employees Standard That Accompanies Naics Code 813312. If A Small Business, You Must Also List Any Small Disadvantaged Status You Hold [hubzone, 8(a), Service Disabled Veteran Owned Small Business (sdvosb), Women Owned Small Business (wosb), Economically Disadvantaged Women-owned Small Business (edwosb), Etc.]. past Experience/ Performance Through The Description Of Completed Projects. (12) Responses To This Sources Sought Are Due No Later Than 11:59 Am Eastern Standard Time 20 January 2025. Submissions Should Be Emailed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil questions Concerning This Sources Sought May Be Directed To Swati Jain, Contract Specialist, Swati.jain2.civ@army.mil. Or Acquisition Specialist, Alex Gilliam, Alex.p.gilliam.ctr@army.mil. Please Be Advised That .zip And .exe Files Cannot Be Accepted. (13) Place Of Contract Performance: Garrison-adelphi Laboratory Center 2800 Powder Mill Road adelphi Md 20783 (14) Estimated Delivery Timeframe Or Period Of Performance: period Of Performance (pop): 01 February 2025 – 31 October 2029
City Of Koronadal Water District Tender
Others...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents
Details: Sources Sought Notice sources Sought Notice page 12 Of 12
sources Sought Notice
*= Required Field
sources Sought Notice page 1 Of 12
this Announcement Is Not A Request For Proposal. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. the Department Of Veterans Affairs Is Seeking A Qualified Architect-engineering (ae) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project 528a5-24-504, Project Upgrade Buildings 7&8 Electric Room At The Canandaigua Vamc At 400 Fort Hill Ave, Canandaigua Ny 14424. This Project Will Expand The Existing Electrical Rooms On The Ground Floor Of Building 7 And 8, Into Adjacent Spaces And Replace Electrical Components. this Requirement Is Being Procured In Accordance With The Brooks Act As Implemented In Far Subpart 36.6. Applicable Naics Code Is 541330 And Small Business Size Standard Of $25.5 Million. Magnitude Of Construction Is Between $5,000,000.00 And $10,000,000.00. This Is A 100% Service-disabled Veteran Owned Small Business Set Aside. The Anticipated Award Date Of The Proposed A-e Contract Is On Or Before May 20th, 2025 . Potential Contractors Must Be Registered In Sam (www.sam.gov ) And Are Visible/verified/certified As Sdvosb (or Vosb) In Veterans Small Business Certification (https://veterans.certify.sba.gov/ ) At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. in Order To Assure Compliance With Vaar Clauses, 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (nov 2022) And 852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022), All Firms Submitting A Sf 330 For This Notice Are Required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e., Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation all A/e Firms Are Advised That In Accordance With Vaar 836.606-71 The Total Cost Of The Production And Delivery Of Designs, Plans, Drawings And Specifications Shall Not Exceed Six (6) Percent Of The Estimate Cost Of Construction. Other A-e Fees Are Not Included In The Six (6) Percent. Additionally, Far Clause 52.236-22 (c) - Design Within Funding Limitation, Will Be Applicable To This Procurement Action. exsisting Conditions:
the Canandaigua Vamc Is Located At 400 Fort Hill Avenue, Canandaigua, Ny 14424. Building 7 And 8 Are Two Of The Main Campus Structures And Contains Sensitive Programming Including Clc S With In-patient Care. The Existing Electrical Rooms Are Insufficient In Size And Does Not Meet Current Codes/standards As Set By The Va. The Adjacent Spaces To These Electrical Rooms Consist Of Available Space For Expansion. All Electrical Equipment Shall Be Replaced Unless Otherwise Directed By The Va And All Building Services Shall Placed On Emergency Power. All Proposed Equipment Shall Meet Current Va Standards And Codes. scope Of Service Required 1. Provide Investigative, Schematic, And Design Development Services, Production Of Construction Documents, Working Drawings, Specifications, And Cost Estimates, And Perform Construction Administration Including Shop Drawing And Submittal Review As Required To Complete The Work And As Per The Architect/engineer (a/e) Required Deliverables. The A/e Firm Shall Analyze The Existing Conditions And Working With The Medical Center Staff Develop Various Proposals To Meet The Project Intent. Develop Accepted Proposal Into A Final Design And Cost Estimate To Best Suit The Needs And Constraints Of The Government, While Incorporating Vamc Canandaigua Engineering Services, Va Network 2, Or Any Other Government Comments. 2. Provide For Necessary Design For Utility Connections, Alternative Power, Phasing, And Support For Building Operations Through Construction With Minimal Interruptions. 3. Perform Load Test On Existing Generator And Emergency Power System To Confirm Existing Supply Will Support Additional Loads. 4. Provide An Independent Analysis To Locate Any Underground Or Hidden Utilities For Inclusion In The Design If Applicable, To Confirm Viability Of Planned Excavations Or Demolitions Of To Support Design Objectives. Such Analysis May Include Ground Penetrating Radar, Review Of Existing Va Documentation Or Other Viable Options To Verify These Utilities. 5. Attend All Design Review Meetings And Make All Necessary Site Visits During Design Phases To Gather Information Necessary From The Existing Site Conditions, Building Plans, Utility Plans, Etc. To Provide A Complete Assessment Of The Proposed Work. The Proposal Shall Include An Identified Number Of Visits. The Va Shall Provide Access To Hardcopy/electronic Files. The A/e Firm Shall Perform All Searches Of The Files For Any Required Reference Materials To Support Design Efforts. Limited Digital Drawings Are Available. 6. Attend Pre-bid Job Walk And Provide All Engineering Responses To Questions Asked By Potential Bidders And Issue Addendum When Necessary. 7. All Work Shall Be In Accordance With All Applicable Codes In The Department Of Veteran Affairs (va) Design Manuals And Va Publications (master Construction Specifications, Construction Standards, National Fire Protection Association (nfpa), Underwriters Laboratory, International Building Code Ibc, National Electric Code (nec), Building Codes And Standards, And Va Information Security Handbook 6500.6, Etc.) 8. All Work Containing Hazardous Materials Shall Be In Accordance With New York State Code Rule 56 Regarding Asbestos And Other Hazardous Materials, Ahera Regulations 40 Cfr Part 763.86, 763,87, And Osha 1926.1101(k)(1). 9. All Submissions Shall Include Physical And Digital Submissions Of Drawings And Specifications. 10. All Drawings Shall Be Submitted At Architectural E1 (30 X 42 ) For Full Sized Sets And Architectural C (18 X 24 ) For Half Sized Sets. All Sets Shall Be Bound. 11. All Cad Submissions Shall Be Provided In Autocad 2017 Unless Discussed Otherwise. Revit Models Shall Also Be Submitted In Addition To Cad Documents If Created. 12. The Autodesk Build Construction Management Platform (autodesk Construction Cloud Acc) Will Be Used For Information Sharing And Project Management Through The Design And Construction Phases. This Software Is Provided By The Va At No Additional Cost To The A/e. a. Platform Training Will Be Provided By The Va And Is Required By All Parties To Access. b. The A/e Shall, Upon Award, Provide A Comprehensive List Of Project Staff Who Will Need Access To Acc Including:
i. Full Name
ii. Company Name
iii. Email Address
iv. Role/position On The Project
c. Completion Certificates Of Training By All Members Of The Team Shall Be Provided To The Cor Within 12 Calendar Days.
d. Additional Members Can Be Added At Any Time Upon Written Request To The Cor.
e. Acc Shall Be Used For All Digital Submissions, Official Project Correspondence, Submittals, Rfis, Schedules, Actionable Tasks, Photos, Surveys, Reports, Inspections, Etc. 13. Provide Design, Construction, And Post-construction Services As Listed Below. a Full Scope Of Services Including The Deliverables Will Be Included In The Formal Solicitation After A Review Of The Sf330s. Location canandaigua Vamc. 400 Fort Hill Avenue Canandaigua, Ny 14424 cost Range estimated Construction Cost Range: Between $5,000,000 And $10,000,000. type Of Contract Contemplated
the Department Of Veterans Affairs Is Contemplating Awarding A Firm Fixed Price Contract. design Completion Period: The Department Of Veterans Affairs Requires Design And Contract Support Services. The A/e Shall Deliver 100% Bid Documents In 220 Calendar Days From The Notice To Proceed (ntp). selection Criteria Descriptions
the Selection Criteria Descriptions Are Provided Below. professional Qualifications Necessary For Satisfactory Performance Of Required Services. offerors Will Be Evaluated In Terms Of The Qualifications, Competence And Experience Of The Key Personnel And Technical Team Proposed To Accomplish This Work. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Provide A Balanced Licensed And Or Certified Workforce In The Following Disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental Services And Fire Protection Engineering As Needed. The Designers Of Record Shall Perform And Direct The Design Within Their Respective Discipline And Shall Sign And Seal The Drawings. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. submission Requirements: Provide Resumes For All Proposed Key Personnel. Resumes Are Limited To One Page Each And Should Cite Project Specific Experience And Indicate Proposed Role In This Contract. Provide Professional Registration, Certification, Licensure And/or Accreditation. Indicate Participation Of Key Personnel In Example Projects In The Sf-330 Part 1 Section G. (2) Specialized Experience And Technical Competence
specialized Experience And Technical Competence Required For This Specific Project, Including, Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. offerors Will Be Evaluated On Specialized Experience And Technical Competence In The Performance Of Services Similar To Those Anticipated Under This Contract With Regard To:
experience With Design Of Inpatient Medical Care Facilities. experience With Design Of Multifunctional Offices.
experience With Specialized Hvac And Electrical Distribution Systems Design For Healthcare Facilities;
experience In Providing Post Construction Award Services (shop Drawing Review, As-built Drawing And Quality Assurance Plan (qap) Preparation, Construction Inspection Services, And Operating And Maintenance Manuals).
experience With Government Designs And Construction.
experience With Extensive Site Survey Skills submission Requirements: Provide Up To Five (5) Projects Completed Or Substantially Completed Within The Past Five (5) Years That Best Illustrate Specialized Experience Of The Proposed Team In The Areas Outlined Above And The Scope Of Work Of The Project. Example Projects Shall Note Project S Square Footage. All Projects Provided In The Sf-330 Must Be Completed By The Office/branch/regional Office/individual Team Member Actually Proposed To Manage And/or Perform Work Under This Contract. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf-330 Part 1, Section F Item 25 Firms From Section C Involved In This Project, Block (1). Include A Contract Number Or Project Identification Number In Block 21. Include An E-mail Address, And Phone Number For The Point Of Contact In Block 23(c). Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. If The Contractor Served As A Subcontractor On A Project, Indicate The Value Of The Work They Provided Towards The Performance Of The Overall Project. If A Project Was Performed By A Joint Venture, And Not All Joint Venture Partners Are On The Team Proposed For This Contract, The Offeror/team Should Specifically Address The Work Performed By The Joint Venture Partner Offering/teaming On This Contract. Likewise, If The Offeror/team Member Worked As A Subcontractor On A Project, The Description Should Clearly Describe The Work Actually Performed By The Offeror/team Member And The Roles And Responsibilities Of Each On The Project, Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Project Could Be Eliminated From Consideration. note: If The Offeror Is A Joint Venture, Information Should Be Submitted As A Joint Venture; However, If There Is No Information For The Joint Venture, Information Should Be Submitted For Either Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For This Criterion. Projects Shall Be Submitted On The Sf-330. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand-alone Contract Award. Do Not List An Idiq Contract As An Example Of A Completed Project. Instead, List Relevant Completed Task Orders Or Stand-alone Contract Awards That Fit Within The Definition Above. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated.
failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Rated Lower. all Information For Criterion 1 Should Be Submitted In Part 1, Section F Of The Sf-330. The Government Will Not Consider Information Submitted In Addition To Part 1, Section F In Evaluating Criterion 1. (3) Capacity
this Factor Evaluates The Ability Of The Firm, Given Their Current Projected Workload And The Availability Of Their Key Personnel, To Accomplish The Possible Myriad Of Design Projects In The Required Time. submission Requirements: Describe The Firm S Ability To Concurrently Perform And Manage Multiple Projects In Different Locations To Meet Aggressive Schedules, Multiple Disciplines, And Control Costs And The Firm S Capacity To Accomplish Multiple Projects Simultaneously.
the General Workload And Staffing Capacity Of The Design Office Will Be Evaluated.
list Current Projects With A Design Fee Of Greater Than $20,000 Being Designed In The Firms Office. ii. Indicate The Firms Present Workload And The Availability Of The Project Team (including Sub-consultants) For The Specified Contract Performance Period;
iii. Describe Experience In Successfully Delivering Projects Per Performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates (4) Past Performance: Visn2 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm.
i. Recent Is Defined As Performance Occurring Within Five (5) Years Of The Date Of This Sources Sought, Except Those Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Sources Sought.
ii. Relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope Within A Va Hospital Setting In Relation To The Type Of Projects Anticipated Under The Resultant Contracts.
respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Superior Performance Ratings On Relevant Projects May Be Considered More Favorably In The Evaluation. submission Requirements: Submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If There Is Not A Completed Cpars/acass Evaluation, The Past Performance Questionnaire (ppq) Included In This Notice Is Provided For The Offeror Or Its Team Members To Submit To The Client For Each Project The Offeror Includes Under Criterion 1. An Offeror Shall Not Submit A Ppq When A Completed Cpars/acass Is Available. If A Cpars/acass Evaluation Is Not Available, Ensure Correct Phone Numbers And Email Addresses Are Provided For The Client Point Of Contact. Completed Ppqs Should Be Submitted With Your Sf-330. If The Offeror Is Unable To Obtain A Completed Ppq From A Client For A Project(s) Before The Response Date Set Forth In This Notice, Offerors Should Complete And Submit With Their Responses The First Page Of The Ppq (attachment), Which Will Provide Contract And Client Information For The Respective Project(s). Offerors May Submit A Ppq Previously Submitted Under A Different Notice/rfp (legible Copies Are Acceptable) As Long As It Is On The Same Form As Posted With This Synopsis. Offerors Should Follow Up With Clients/references To Ensure Timely Submittal Of Questionnaires. If Requested By The Client, Questionnaires May Be Submitted Directly To The Government's Point Of Contact, Network Contracting Office 2 Attn: Amanda Baumler Via Email At Amanda.baumler@va.gov Prior To The Response Date. Offerors Shall Not Incorporate By Reference Into Their Response Ppqs Or Cpars Previously Submitted In Response To Other A/e Services Procurements. However, This Does Not Preclude The Government From Utilizing Previously Submitted Ppq Information In The Past Performance Evaluation. (5) Location: Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project; Provided, That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project
iv. To Be Rated Acceptable For This Evaluation Factor, The A/e Firm Must Be Within 450 Miles From The Prime Contractor S Main Office Or Official Satellite Office To The Canandaigua Vamc At 400 Fort Hills Avenue. Canandaigua, Ny 14424.
v. This Distance Is Determined According To Http://maps.google.com/
vi. This Factor Evaluates The Distance The Ae Firm's Design Office Or Official Satellite Office(s) From The Location Of Work (va Medical Center). Please Provide The Address (es) And Distance Of Your Closest Office To The Address Listed In Iv. Above. submission Requirements: Indicate Firms/teams Location, Including Main Offices, Branch Offices And Any Subconsultants Offices And Demonstrate How This Will Be Advantageous To The Government. (6) Veteran Owned: The Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. (7) Construction Period Services: Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services. (8) Experience Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team. submission Requirements: Offerors Shall Submit Evidence Of Individuals Experience And Qualifications In Their Respective Fields. Additionally, Documentation Must Be Provided To Show These Individuals Have Worked Together As A Team On Previous Projects And Their Role. (completing Sections E, F, And G, On The Sf-330 Meets The Documentation Requirement). Furthermore, Offerors Shall Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. (9) Reputation Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. submission Requirements: Offerors Shall Provide Documentation (awards, Certificates, Publications, Commendations From Within The Community) As Evidence Of Reputation And Standing Of Its Firm. (10) - Claims - Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services. Offerors With Substantiated Claims Against The Firm As A Result Of Improper Architectural And Engineering Services Provided In The Last Three (3) Years. submission Requirements: Records And Any Other Documentation Of Substantiated Claims Highlighting Improper Or Incomplete Architectural Engineering Services Against The Firm Within The Last Three (3) Years. The Sf-330 Shall Contain A Statement Affirming That There Are No Records Of Significant Claims Because Of Improper Or Incomplete Architectural And Engineering Services. please Note: The Ae Evaluation Board Must Be Provided With Complete And Accurate Information For All Ten (10) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The Ae Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The Ae Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications. evaluation Scoring evaluation Factors 1, 2, 3, 5, 8, 9 And 10 Will Be Evaluated Using The Following Adjectival Ratings As Follows: outstanding: Proposal Meets Requirements And Indicates An Exceptional Approach And Understanding Of The Requirements. Strengths Far Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Very Low. good: Proposal Meets Requirements And Indicates A Thorough Approach And Understanding Of The Requirements. Proposal Contains Strengths Which Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Low. acceptable: Proposal Meets Requirements And Indicates An Adequate Approach And Understanding Of The Requirements. Strengths And Weaknesses Are Offsetting Or Will Have Little Or No Impact On Contract Performance. Risk Of Unsuccessful Performance Is Moderate. marginal: Proposal Does Not Clearly Meet Requirements And Has Not Demonstrated An Adequate Approach And Understanding Of The Requirements. The Proposal Has One Or More Weaknesses Which Are Not Offset By Strengths. Risk Of Unsuccessful Performance Is High. unacceptable: Proposal Does Not Meet Requirements And Contains One Or More Deficiencies. Proposal Is Not Awardable. The Firm S Proposal Demonstrates A Misunderstanding Of The Requirement And The Approach Fails To Meet Performance Standards. The Firm S Proposal Has Major Omissions And Inadequate Details To Assure Evaluators That The Offeror Has An Understanding Of Requirement. the Ratings Identified Below Were Used In The Evaluation Of Past Performance (criterion 4): substantial Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A High Expectation That The Offeror Will Successfully Perform The Required Effort. No Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract. satisfactory Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A Reasonable Expectation That The Offeror Will Successfully Perform The Required Effort. Little Doubt Exists Based On The Offeror S Past Performance That They Could Satisfy The Requirements Of The Contract. unknown Confidence (neutral): No Recent/relevant Performance Record Is Available Or The Offeror S Performance Record Is So Sparse That No Meaningful Confidence Assessment Rating Can Be Reasonably Assigned. limited Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectation That The Offeror Will Be Able To Successfully Perform The Required Effort. Some Doubt Exists Based On Past Performance That They Could Satisfy The Terms And Conditions Of The Contract. no Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectations That The Offeror Will Be Able To Successfully Perform The Required Effort. Significant Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract. limitations
852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022) (a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb : (1) Means A Small Business Concern - (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar802.101, Surviving Spouse Definition); (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran; (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document; (iv) The Business Has Been Verified For Ownership And Control Pursuant To 38 Cfr Part 74 And Is Listed In Va's Vendor Information Pages (vip) Database At Https://www.vetbiz.va.gov/vip/; And (v) The Business Will Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size And Government Contracting Programs At 13 Cfr Parts 121 And 125, Provided That Any Reference Therein To A Service-disabled Veteran-owned Small Business Concern Or Sdvo Sbc, Is To Be Construed To Apply To A Va Verified And Vip-listed Sdvosb, Unless Otherwise Stated In This Clause. (2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). (3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). (4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)), Except That For A Va Contract The Firm Must Be Listed In The Vip Database (see Paragraph (a)(1)(iv) Of This Clause). (b) General.
(1) Offers Are Solicited Only From Vip-listed Sdvosbs. Offers Received From Entities That Are Not Vip-listed Sdvosbs At The Time Of Offer Shall Not Be Considered. (2) Any Award Resulting From This Solicitation Shall Be Made To A Vip-listed Sdvosb Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. (3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. (c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Vip-listed Sdvosbs Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible Sdvosb As Defined In This Clause, 38 Cfr Part 74, And Vaar Subpart 819.70. (d) Agreement. When Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. Unless Otherwise Stated In This Clause, A Requirement In 13 Cfr Parts 121 And 125 That Applies To An Sdvo Sbc, Is To Be Construed To Also Apply To A Vip-listed Sdvosb. For The Purpose Of Limitations On Subcontracting, Only Vip-listed Sdvosbs (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Certification Requirements In This Solicitation (see 852.219-75 Or 852.219-76 As Applicable). These Requirements Are Summarized As Follows: (1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract (2) Supplies/products.
(i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Crf 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. (4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Vip-listed Sdvosbs. (5) Subcontracting. An Sdvosb Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Listed In Vip To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. (e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: _x_by The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or __by The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Is Listed In Vip And Complies With The Requirements In 13 Cfr 125.18(b), Provided That Any Requirement Therein That Applies To An Sdvo Sbc Is To Be Construed To Apply To A Vip-listed Sdvosb. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. (g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Program For Sdvo Sbcs, And The Va Veterans First Contracting Program. (h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company's Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406-2 Causes For Debarment). submission Requirements: unless Paper Offers Are Specifically Authorized In An Individual Solicitation, All Responses To Solicitations Must Be Submitted Electronically As Described Below. Responses Submitted In A Paper Form Are Unacceptable. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award Due To Noncompliance With The Submission Requirements. email Submission Requirements Interested Firms Having The Capabilities To Perform This Work Must Submit: One (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) To Amanda.baumler@va.gov No Later Than 10am, Eastern Standard Time (est) On Tuesday, January 21st 2025 Submittals Received After The Date And Time Identified Will Not Be Considered. The Submittal Will Be Date And Time Stamped By The Microsoft Email System And Will Be The Official Record Of Receipt For The Submission. All Sf 330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Solicitation Number And Project Number And Title (abbreviated And Shortened Is Okay). Submission Is To Be No More Than A Total Of Fifty (50) Pages; Size Of Emails Is Not To Exceed 10 Megabytes (mb). If More Than One Email Is Sent, Please Number Emails In Subject Line As 1 Of 2, 2 Of 2 Etc. all Sf 330 Submissions Must Include The Following Information Either On The Sf 330 Or By Accompanying Document: 1. Cover Page With Solicitation Number, Project Number And Title
2. Table Of Contents 3. Copy Of Valid State Registration For Each Lead Designer
4. Copy Of Current Https://veterans.certify.sba.gov/ Sdvosb/vosb Certification
5. Duns Number
6. Cage Code 7. Tax Id Number
8. Email Address And Phone Number (including The Area Code) Of The Primary Point Of Contact.