Substation Tenders
Substation Tenders
Defence Construction Canada Western Region Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
Canada
Closing Date14 Jan 2025
Tender AmountRefer Documents
Details: Advance Procurement Notice 25kv High Voltage Lines Replacement 4 Wing Cold Lake, Alberta. (with Security Requirements) Purpose Of This Advance Procurement Notice This Is Not A Bid Solicitation Nor A Request For Proposals. This Is An Advance Notice For A Potential Contract With Anticipated Security Requirements To Provide Interested Contractors An Opportunity To Begin The Sponsorship Process For Obtaining (if Required) The Anticipated Security Clearance(s). Note That There Is No Guarantee That This Solicitation Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project And Services The Defence Of Canada Fighter Infrastructure (dcfi) Power Grid Modernization (pgm) Project Is To Construct A New 25kv Underground (in Concrete Encased Copper Conduit Except For A Small Section Of Direct Buried Copper Conduit) High Voltage Power Line From Dnd Owned Sub-stn B651 On The Base Side Of 4 Wing To Both The Tac Side And The Airfield Of 4 Wing Cold Lake. The Project Is Divided Into Two Phases. Phase 1 Is The Installation Of A 25kv Line For The Main High Voltage Electrical Distribution System From The Existing Atco East Substation To A New East Switching Station, Through The Existing Switching Station To The New West Switching Station & Installation Of Concrete Encased Duct Bank Throughout. Phase 2 Is The Installation Of A New High Voltage Distribution System To The Qra, Waterleap, Tac Ramp, Hangarettes, And Fsf Tying Into The Phase 1 Distribution System; And Upgrade Of All Distribution Equipment For Multiple Buildings (approx. 13) Throughout The Base; And Also Concrete Encased Duct Bank Throughout. These Two Phases Of The Work Will Be Tendered Together As A Single Project. The Scope Of Work Is Not Limited To Electrical Site Services, It Also Includes Demolition Of Existing Services (i.e. Fences, O/h Line, Riser Poles, Concrete Pad, Etc.), And Reinstatement Of Associated Civil Works. It Is Anticipated That This Solicitation Will Be Initiated In February 2025. This Is Conditional On The Contract Receiving Approval To Proceed By The Department Of National Defence (dnd). It Is Anticipated That The Following Solicitation Will Proceed As Noted In The Table Below. This Is Conditional On The Contract Receiving Approval To Proceed From Dnd.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical Works...+1Electrical and Electronics
Eprocure
India
Closing Date4 Jan 2025
Tender AmountRefer Documents
Details: Works contract for execution of providing 1)Improvement estimate for providing 2 nos 11KV ABSwitch in Various locations in Thickanamcode feeder under Thickanamcode Section. 2)Improvement estimate for 8nos 8mtr PSC pole in various DTs in various locations under Thuckalay Section. 3)Improvement estimate for newly proposed 1no double pole 11KV AB Switch at Mulavilai under Thiruvattar Section. 4)Improvement estimate for newly proposed 6nos single pole 11KV AB Switches in 11KV Arumanai Feeder under Thiruvattar Section. 5)Improvement estimate for 3mos 9.14 mtr RCC poles into 9mtr PSC poles in Muthalakurichy SS II FI/2,3,4 under Thuckalay Section. 6)Improvement estimate for strengthening of existing LT conductor ACSR 7/2.11 into ACSR 7/3.35 in FI/1 to FI/15 in Puliyanvilai SS 100KVA under Thiruvattar feeder. 7)Improvement estimate for newly proposed 1no single pole 11KV AB Switch at Thattanvilai under Thiruvattar Section. 8)Improvement estimate for improving tailend voltage to be changed with existing Panavilai SS III 25KVA tobe enhanced to 63 KVA DT by secreating GH SS in Thuckalay feeder under TKY Section. 9)Improvement estimate for improving tailend voltage by secreating in Puliyoorkurichy SS V into by providing 1no 63KVA DT in Thuckalay feeder under TKY Section. 10)Improvement estimate for newly proposed 100KVA DT for improving tail end voltage by segregating Puliyoorkurichy SS I in Thuckalay feeder under Thuckalay section. 11)Improvement estimate for replacement of deteriorated 4nos 9.14 mtr RCC pole into 9mtr PSC pole and 1no 9 mtr into 9m PSC pole in various locations under MCL Section. 12)Improvement estimate for newly proposed 1no 63KVA DT for Improving TailEnd Voltage in Kulasekharam Market area in Thiruvattar Feeder under U KLm Section. 13)Improvement estimate for newly proposed 1nos 25 KVA DT at Veeyanoor Substation Quarters in 11KV Chandam Feeder under Thiruvattar Section. 14)Improvement estimate for strengthening of existing aged LT conductor ACSR 7/2.50 into ACSR 7/3.35 at Mathiravilai Kurusady Area for improving tail end voltage under TKD Section. 15)Improvement estimate for 4nos 9.14 mtr RCC poles into 9mtr PSC poles in 11KV Charode and CWSS feeders and 1no 8mtr RCC pole into 8mtr PSC for detoriated in various locations under Thuckalay Section. 16)Improvement estimate for improving tailend voltage suply in single phase connected load in Kuttakarai SS 100 KVA by stringing addl 2phase wire for reulating normal voltage at Kuttakarai area under TKY section. 17)Improvement estimate is prepared for the erection of 11 KV HT feeder link line between 11KV Mulagumoodu Feeder and 11KV Eraniel Feeder under Moolachel Section. 18)Improvement estimate for strengthening of existing HT conductor ACSR 7/2.5 into ACSR 7/4.09 in TKY SS 1,4,5 to Perumal Kovil under Thuckalay Section. 19)Improvement estimate for strengthening of existing LT conductor ACSR 7/2.11 into ACSR 7/3.35 in F2/1 to F2/23 in Puliyoorkurichy 250 KVA under Thiruvattar feeder. 20)Improvement estimate for replacement of 1nos 9mtr PSC pole and 6no 8mtr PSC pole and 2nos RSJ pole insertion in various locations in various DT under VCI section. 21)Improvement estimate for strenthening of existing LT conductor ACSR 7/2.59 into 7/4.09 and insertion of 9mtr PSC pole in various DT in Kothanalloor Feeder under MCL section. 22)Improvement estimate for insertion of 1no 9mtr PSC pole and 1no existing 8mtr pole into 9mtr PSC pole and 1no 9mtr stud pole in 11KV Chandam feeder under Moolachel Section. 23)Improvement estimate for replacement of deteriorated 8nos 8 mtr RCC pole into 8mtr PSC pole and 1no 8 mtr insertion PSC pole in various loacation under MCL Section. 24)Improvement estimate for replacement of 3nos RSJ pole 5nos 9mtr PSC poles and 2nos 8mtr PSC deteriorated poles in various locations under VCI Section. 25)Improvement estimte for replacement of 2nos 9.14 mtr RCC pole into RSJ Fabricated and 2nos damaged RSJ pole in low ground clearance in various loacation under MCL section. 26)Improvement estimate for replacement of deteriorated 4nos 8mtr PSC pole into 8mtr PSC poles in Poonangaparambu SS III 25KVA in various locations under MCL Section. 27)Improvement estimate for providing linkline between two 11KV feeders(Thickanamcode & Kattuvilai) Near Railway Bridge under Thickanamcode Section. 28)Improvement estimate for replacement of 6nos deteriorated RSJ poles and 1nos Tubular in various locations under Thuckalay Section. 29)Improvement estimate for provision of 3 feeders nos additional 11KV rotating AB Switch in existing 11KV Aloor & Mulagumoodu and Kothanalloor Feeders 110/11 KV SS Campous Thuckalay under Substation Thuckalay. 30)Improvement estimate for 11KV AB Switch in to 11KV Center Rotating AB Switch in Thiruvattar-Arumanai Tie Switch in 110/11 KV Sub station Veeyanoor. 31)EOS to 1no IIIB INDL additional load toTmy.Jaya Paulcy Bai at Ottalivilai by providing 250KVA DT under Thiruvattar Section. 32)Estimate for 1no IIIB service to Thiru.Sreekutty Enterprices at Marunthukottai under Thuckalay Section. 33)Improvement estimate for replacement of 6 nos deteriorted 9mtr PSC poles in various DTs under MCL Section. 34)Natural Calamity estimate for the replacement of damaged 1no single pole structure in Aanayadi Cashew Industries SS 100KVA due to fallen of Rubber tree under Thiruvattar Section. 35)Eos for 1no III B INDL additional load service to Thiru.Renish at Sadayalputhoor Rod at Peyode by providing 100KVA in 11KV Kattimancode feeder under Vellichanthai Section. 36)Estimate for 1no industrial SC to Tmy.A.Nabisath Beevi at main road Tiruvithamcode under Moolachel Section. 37)Eos to 1no IIA OHT service to The President Kumarankudi Village Panchayat by providing 1no 63KVA DT at Poovancode under Thiruvattar Section. 38)DCW estimate for shifting of existing 1No 100 KVA distribution transformer in Tholichal SS I and 1no 9mtr PSC poles as per the request of Thiru.Vishnu Prasad at Pullanivilai under Thiruvattar Section. 39)Improvement estimate for providing 1No 63KVA DT improving tail end voltage in Thirunainarkurichy SS I in 11 KV Vellichanthai Feeder under VCI Section. 40)Improvement estimate for providing 1No 63KVA DT Improving Tail end voltage to avoid electical accident in Vellamodi Junction in 11KV Kattimancode Feeder under VCI Section.Kanyakumari Electricity Distribution Circle – Regarding.
Municipal Corporation Tender
Civil And Construction...+1Road Construction
Eprocure
India
Closing Date3 Jan 2025
Tender AmountINR 105.7 Million (USD 1.2 Million)
Details: Development Of Hindu Smashan Bhumi Area At Guljarpura In P No 09 Akola 19) Construction Of Tar & Cc Road At Fadke Nagar From Shri Chopale Complex To Dr. Shri Anant Shravangi To Shri Rande Saheb To Shri Pavar Saheb To Shri Sarag Japulkar Cc Road & Tar Road At Fadke Nagar From Shri Maniram Bhau Tale To Shri Jadhao Kaka Hanuman Mandir Road, At Wankhade Nagar Shri Deshmukh Kirana To Shri Chintvar Saheb To Shri Santosh Chitode To Shri Kale Saheb,rk Chowk To Shri Nanudasji Bhirad Tar Road In P No 9 20) Construction Of Cc Road With Widening From Ashish Gawande To Shri Gajanan Watika And Sanjay Upshyam To Kiran Udgirkar At Godbole Plot , P.no. 10 21) Construction Of Nalla From Adv. Takavale To Kotarwar Beside Balapur Road At Shivnagar ,p.no. 10 22) Construction Of Cc Road From Chittalwar To Thakare At Indira Colony, Dr. Kothari Hosp To Thatange House At Shivaji Nagar, And Construction Of Pavers Infront Of Sai Mandir At Sai Peth , P.no. 10 Construction Of Compound Wall With Gate At Hanuman Mandir ,godbole Plot ,p.no. 10 23) Construction Of Compound Wall With Gate At Hanuman Mandir ,godbole Plot ,p.no. 10 24) Construction Of Cc Road With Pavers From Sawarkar To Joshi ,at Renuka Nagar , P.no. 10 25) Construction Of Cc Road With Widening From Shri Sudhir Deshpande To Lande Guruji At Godbole Plot , P.no. 10 26) Construction Of Cc Road Infront Of Passport Office Infront Of Savatram Mill Tajnapeth Post Office ,in P.no. 11 27) Construction Of Cc Road Adjoining Passport Office To Ramesh Puri Hotel To Aruna Tea House, Infront Of Savatram Mill Tajnapeth Post Office ,in P.no. 11 28) Construction Of Cc Road Infront Of Omkar Appa Dehankar's Shop To Advocate Pancholi's House At Malipura ,in P.no. 11 29) Construction Of Tar Road From Shrikrushna Printer To Old Cotton Market Main Road At Khetan Jin In P.no.11 30) Construction Of Cc Culvert At Malipura Chowk Telipura Road Near Chowrasiya Medical In P.no. 11 31) Construction Of Cc Road From Gandhi Chowpati Shah Medical To Mata Mandir Main Road In P.no. 11 32) Construction Of Cc Nalla From Santoshi Mata Chowk To P.n.enterprizes To India Motor Shop To Hanman Mandir To Public Toilet In P.no.11 33) Construction Of Cc Drain And Cover Of Ganpati Viserjan Marg From Oswal Bhavan Culvert Futanwala To Sadhuram Tolaram Jin And Fixing Steel Cover Near Dana Bazar Infront Of Jain Mandir In P.no.11 34) Construction Of Nallah (coming From Ambedkar Nagar) From 33 Kv Electric Substation Behind Iti College To Azhar Hussain College, Ratanlal Plot Road In P.no.12. 35) Construction Of Tar Road From Dr Dhawale Hospital To Khan Forte At Patrakar Colony, New Bus Stand Road In P.no. 12. 36) Construction Of Drain From Officers Club Lane (vishwakarma Bunglow) To Collector's Residence, Civil Line Road In P.no.12. 37) Construction Of Bridge & Protection Wall To Nala Near Balaji Mall With Road Widening At Kholeshwar Road In P.no.12. 38) Construction Of Nallah From Shri Lohakpure To River,at Anikat Square, Kholeshwar Road In P.no.12.76) Construction Of Cc Drain From Ramaai Appartment To Shivraj Appartment At Om Housing Society In P No 15 77) Construction Of Cc Road From Shri Sapkal House To Shri Kulkarni House At Vijay Housing Society In P No 15 78) Construction Of Tar Road From B T Deshmukh House To Kulsundar House At Vijay Housing Society In P No 15 79) Construction Of Tar Road From Divakar Gawande To Shri Chaube House In P No 15 80) Construction Of Tar Road From Ddr Office To Bobade Dairy In P No 15 81) Construction Of Cc Road From Shri Shah To Mundada To Sayani House At Vidya Nagar In P No 15 82) Construction Of Tar Road From Kedia House To Sindur Next Appartment In P No 15 83) Construction Of Cc Drain From Ratnaparkhi House To Aamale House At Nagar Parishad Colony In P No 15 84) Construction Of Cc Road Rammai Appartment (infront Of Jagdamba Mata Mandir) To Shivraj Appartment At Om Housing Society In P No 15 85) Construction Of Chainlink Fencing Compound To Open Space At Vijay Housing Society In P No 15 86) Construction Of Cc Approach Road Gaurakshan To Vidya Nagar From Shri Varhade Sir To Shreeji Heights At In P No 15 87) Construction Of Compound Wall And Providing And Fixing Open Gym Equipments Near Kunbi Samaj Mandal Open Space In P.no.15 88) Providing And Fixing Open Gym Equipments At Harish Ashwini Colony Open Space In P.no.15 89) Construction Of Cc Drain From Shrimati Kiran Praful Kale House To Kulswamini Mangal Karyalay To Rahul Sawaji Appartment To Chakradhar Appartment In P No 15 90) Construction Of Cc Drain Behind Greenland Hotel Goldenpam Appartment To Kothari To Navalseth Jain House At Vidya Nagar In P No 15 91) Construction Of Cc Compound And Fixing Paving Block At Kailash Tekdi Babaji Math In P No 16. 93) Construction Of Tar Road From Shri. Shashikant Tiwari House To Khandelwal Duplex To Shri. Sharma House Near Nisarga Park Main Road , In P.no. 18 94) Construction Of Tar Road From Shri. Sidhara House Tulshan House To Shri. Ravi Patel House And Shri. Nareshkumar Ganatra House To Shri. Bilala House At Geeta Nagar , In P.no. 18 95) Construction Of Sabhagruh In Front Of Kisanpuri Maharaj Mandir At Old Hingna In P.no 18 96) Construction Of Chain Link Compound Wall At Ch. Shivaji Maharaj Statue At Somthana In P.no. 18 97) Construction Cc Road From Shri. Sharma House To Shri. Shetre Sir House At Emrald Colony In P.no 18 98) Construction Cc Road With Culvert Near Maharana Pratap Chowk At Shivsena Vasahat In P.no 18 99) Construction W.b.m Road With Drain From Auto Stop To Shri. Dubey H. To Main Nalla At Shivsena Vasahat In P.no 18 100) Construction Cc Road From Shri. Kacholiya House To Shri. Gwalani House At Geeta Nagar In P.no 18 101) Providing & Fixing Pavers From Biyani Foods To Shani Maharj Mandir And Jalaram Socity To App. At Geeta Nagar, In P.no. 18 102) Construction Cc Drain From Gurushrichand App. To Shri. Gandhi House To Shri. Balu Asware House At Geeta Nagar In P.no 18 103) Providing & Fixing Pavers From Shri. Joshi House To Shri. Pancholi House At Geeta Nagar, In P.no. 18 104) Construction Cc Road With Drain 1) Shri. Dilip Shinde House To Shri. Sagar Jamode H. 2) Neeta Gomase H. To Shri. Santosh Kharate House 3) Shri. Pawan Thakre H. To Shri. Ranjeet Bendre H. 4) Kailash Kirana To Shri. Dinkar Leknar H. 5) Shri. Sanjiv Navthale To Pooja Mapari 6) Bhatkar Kirana To Shri. Sanjay Ketkar House At Shivsena Vasahat In P.no 18 105) Construction Cc Road From Shri. Lakshman Farkade House To Shri. Vasudev Sarode House At Somthana In P.no 18 145) Construction Cc Nalla From Pkv To Shri. Kanojiya House To Nisarga Park App. At Geeta Nagar In P.no 18 106) Construction Of Cc Nalla From Shri Patil House To Shri Kishor Kale House At (lahariya Nagar) In P.no.19 109) Construction Of Cc Road From Dahake House To Shrinath House At Dreamcity In P.no. 19 110) Construction Of Cc Road From Dhore House To Bambatkar House At Sandhya Colony In P.no. 19 111) Construction Of Tar Road From Shri Tembhe To Sapkal And Shri Dahale To Jogi House At Dreamland City In P.no.19 112) Construction Of Cc Drain From Shri Dhote House To Shri Hanumate House At Rajeshwar Nagar In P.no.19 113) Construction Of Tar Road From Shri Chikte House To Shri Sharma House At Gayatri Nagar In P.no.19 114) Construction Of Tar Road From Shri Gyaral To Ingale House At Gayatri Nagar In P.no.19 115) Construction Of Cc Drain From Shri Damodar Ade To Shri Chavhan House At Banjara Nagar In P.no.19 116) Construction Of Cc Drain From Shri Subhash Chavhan To Shri Ramdhan Ade House At Banjara Nagar In P.no.19 117) Construction Of Cc Drain From Shri Rathod To Shri Waman Rathod House At Banjara Nagar In P.no.19 118) Construction Of Cc Drain From Shri Mankar House To Shri Kashiram Daberav House Near School Of Scholar In P.no.19 119) Construction Of Bridge And Railing At Balode Layout Near Ram Mahalle House In P.no.19 120) Construction Of Chainlink Fencing At Kaulkhed Smashanbhumi In P.no. 19 121) Construction Of Cc Drain From Shri Sakhar Pohe House To Shri Pappu Chavhan House (gayatri Nagar) In P.no.19
Stadt Rheinsberg Tender
Civil And Construction...+1Civil Works Others
Germany
Closing Date14 Jan 2025
Tender AmountRefer Documents
Details: The primary school of the Rheinsberg educational campus is located at Kiefernweg 5 in 16381 Rheinsberg. The primary school's sports hall is still located on the site, but is not the subject of this renovation measure. The property is of the Erfurt Ts 66/69 building type with a gross floor area of approx. 3,834 m². The school building consists of two wings that are connected to one another by a crossbar. The maximum dimensions of the school building are approx. 58.78m in the crossbar at its greatest extent and approx. 31.76m in depth. The property can be divided into 3 building sections: Part A: Large crossbar Part B: Connector Part C: Small crossbar The school building has four above-ground floors in part A (ground floor to 3rd floor). The connector (part B) and part C consist of 3 above-ground floors (ground floor - 2nd floor). Only part C of the school building has a full basement. This is where the heat supply handover point is located as a substation. The main connection for the district heating is in the sports hall. From there, the school is supplied via a heat route. The basement area can be reached via one of the stairwells. In part C of the building, the previous main drinking water connection for supplying the building is located under the stairs. Parts B and C of the building only have one crawl space. This is where the supply lines for the drinking water and heat media for these sections of the building are brought in, as well as the disposal lines for the waste water. The waste water is led out of the building via a short route. The school has a total of 5 connection points to the drainage network (3 in part C and 2 in part A). The following measures are to be implemented using the materials advertised: - Complete renewal of the heat transfer incl. Control - Maintaining the pressure of the secondary network - Renewing the heat distribution network - Replacing the radiators and control - Decentralized hot water supply - Reinstalling the cold water network - Reinstalling the wastewater system - Installing a grease separator/lifting system - Installing a lifting system for new toilet areas - Building new toilet rooms for students and teachers - Ventilating windowless areas - Kitchen ventilation - Dismantling and demolition work for old supply technology in the HLS trade (including distribution networks, risers and connecting lines, as well as objects), including partition walls/toilet partitions - Disposal of rubble materials or objects The conversion of the school will take place while operations are ongoing. For the most part, the holidays are to be used for the essential measures. However, it is essential to use the opportunity (outside of class times) to carry out preparatory work during the school year before the holidays. All system components are to be installed and functional when school starts in September 2025. Corresponding impairments during construction must be planned for and do not entitle the customer to make additional demands. Freedom to build is ensured by clearing the respective construction phase. The preliminary acceptance takes place after the project has been completed. The client is expected to cooperate appropriately in the coordination by the contractor. Constant attendance at construction meetings is required for all trades. A pollutant report is not yet available. Insulation materials containing pollutants (insulation containing KMF) are suspected to be in the crawl space. Personal protective equipment should be used for short-term work or when staying in the crawl space. A health check to determine suitability for work in the black area must be presented from the beginning.
1101-1110 of 1105 archived Tenders