Structural Design Tenders

Structural Design Tenders

City Of Valenzuela Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Item No. Quantity Unit Of Issue Item Description/specification 1 2 Pcs "digital Electronics (hb) Kumar, V. 2024" 2 2 Pcs "introduction To Electrochemistry Ritu Tomar 2024" 3 2 Pcs "basic Electrical Engineering Mathew West & Sara Miles 2025" 4 2 Pcs "core Concepts In Engineering: Electronics Engineering 2nd Edition Weinert, E. 2024" 5 2 Pcs "electronics Engineering: Principles And Applications Clark, H. 2021" 6 2 Pcs Statics And Analytical Geometry (2nd Edition) 3g Editorial Board 2022 7 2 Pcs "electrical Installation And Maintenance Basic And Intermediate Laxman Singh 2024" 8 2 Pcs "theory Of Machines (hb) Clark, Z. 2024" 9 2 Pcs "optimization Techniques In Power Distribution System Donchin Parasuraman 2024" 10 2 Pcs "core Concepts In Physics: Electricity (2nd Edition) (with Access Code) Carlos Suarez 2024" 11 2 Pcs "environment, Urbanisation And Development (hb) Jain, A.k. 2021" 12 2 Pcs "question Bank In Electrical Engineering 5th Ed Gupta 2017" 13 2 Pcs "industrial Instrumentation Engineering Richard Brawn 2024" 14 2 Pcs "handbook Of Maintenance Management And Engineering Principles And Practices Tomar R.p. 2021" 15 2 Pcs "advances In Classical Mechanics (hb) Kumar, A. 2023" 16 2 Pcs "intelligent Control And Automation (hb) Pehcevski, J. 2023" 17 2 Pcs "vector Analysis Pal, M. 2021" 18 2 Pcs "control Engineering Handbook Modeling, Analysis And Applications (hb) Set Vol. 1&2 Singer, C. 2024" 19 2 Pcs "handbook Of Linear And Partial Differential Equations Haque, M.n. 2021" 20 2 Pcs "textbook Of Mechanics (hb) Yadav, B.s. 2024" 21 2 Pcs "geotechnical Engineering (hb) Kulkarni, R.s. 2023" 22 2 Pcs "structural Mechanics Kashyap, D. 2023" 23 2 Pcs "fluid Mechanics, Fluid Dynamics And Pipe Flow Turbulence, Simulation And Dynamics Brown, W." 24 2 Pcs "indeterminate Structural Analysis Sahoo, D.r. 2021" 25 2 Pcs "earthquake Engineering For Structural Design Mckenzie, L. 2023" 26 2 Pcs "foundation Course For Civil Drafter (book With Dvd) 3g Editorial 2021" 27 2 Pcs "discrete Mathematics Panwar, R. 2024" 28 2 Pcs "computer Organization Anju Gautam 2023" 29 2 Pcs "robotics And Artificial Intelligence (hb) Peeri, R. 2023" 30 2 Pcs "digital Logic Design Murray, L. 2024" 31 2 Pcs "high Performance Computer Architecture Prasad, V. 2022" 32 2 Pcs "engineering Physics Ayouch, N. 2020" 33 2 Pcs "theory, Practice And Techniques In Graphics And Multimedia 3g E-learning 2018" 34 2 Pcs "theory, Practice And Techniques In Object Oriented Programming 3g E-learning 2018" 35 2 Pcs "database Management System Uzair Bashair 2024" 36 2 Pcs "web Technologies Avadhesh Kumar Gupta 2023" 37 2 Pcs Fundamentals Of Software Engineering Mason, H. 2022 38 2 Pcs "methods Of Research And Statistics J. Vidya Sagar 2021" 39 2 Pcs "foundation Course For Computer Network Architect (book With Dvd) 3g Editorial 2021" 40 3 Pcs "events Management Second Edition Dela Cruz, M. Et. Al. 2024" 41 3 Pcs "professional Salesmanship Serrano 2023" 42 3 Pcs Strategic Business Analysis With Management Palma, N. Et.al. 2023 43 2 Pcs Financial Markets Bairan 2024 44 2 Pcs "personal Finance Cabrera, E.et. Al. 2022" 45 2 Pcs Financial Accounting And Reporting Fundamentals Cabrera, E. Et Al. 2022 46 3 Pcs Credit And Collection Flores 2023 47 3 Pcs "thesis And Dissertation Writing Made Easy Mendoza, E. C. Et. Al. 2023" 48 3 Pcs "risk Management As Applied To Safety, Security, & Sanitation Somoray 2023" 49 4 Pcs Practical Research 1 Maranan, M.h. Et. Al. 2023 50 3 Pcs Training And Development 2nd Edition Flores, M. Et. Al. 2023 51 3 Pcs Organization Development 2nd Edition Flores, M. 2023 52 2 Pcs Advance Management Information System Abante, M.v. 2023 53 2 Pcs Data Analytics & Business Intelligence Abante, Et, Al. 2023 54 2 Pcs "income Taxation 2024 Edition Tabag, E. & Garcia, E. 2024" 55 3 Pcs "labor Relations Management And Negotiations (second Edition) Camilar-serrano, A. & Ducut, R. 2023" 56 3 Pcs Advanced Human Resource Management For Private Abante, Et, Al. 2024 57 3 Pcs "strategic Marketing Management Serrano 2024" 58 2 Pcs "advanced Financial Accounting & Reporting Punzalan, Angelito 2022" 59 2 Pcs "government Accounting (ngas) Punzalan & Cardona 2022" 60 2 Pcs "auditing Practice, Cpa Reviewer Roque, Gerardo 2023" 61 2 Pcs "conceptual Framework And Accounting Standards Cabrera, E. Et Al. 2022" 62 2 Pcs Conceptual Framework And Accounting Standards Valix, C. 2024 63 2 Pcs Intermediate Accounting Volume 3 Valix & Peralta 2023 64 2 Pcs "practical Financial Accounting Volume 1 Valix, C. 2023" 65 2 Pcs "practical Financial Accounting Volume 2 Valix, C. 2023" 66 2 Pcs Theory Financial Accounting Valix, C. 2022 67 2 Pcs Notes In Business Law Soriano, F. 2023 68 3 Pcs "obligations And Contracts (law And Application) Soriano, F. 2022" 69 2 Pcs "cost Accounting And Control De Leon, N. 2022" 70 2 Pcs Managerial Accounting - An Integrated Approach Cabrera, E.et. Al. 2022 71 2 Pcs Cpa Reviewer In Taxation 2024 Edition Tabag, E. 2024 72 2 Pcs Income Taxation 2024 Edition Tabag, E. & Garcia, E. 2024 73 2 Pcs Income Taxation Laws, Principles And Application 2023-2024 Edition Banggawan, R. B. 2023 74 2 Pcs Philippine Income Tax Volume 1 -part 1 & 2 Set Llamado, C. & De Vera, J. 2023 75 2 Pcs Transfer And Business Taxation 2023 Edition Tabag, E. & Garcia, E. 2023 76 2 Pcs Nirc + Train + Create: National Internal Revenue Code Of The Philippines, As Amended Aguirre, U.m. 2022 77 2 Pcs Gender And Society With Peace Education Towards An Inclusive Higher Education Perspective Espinol, Et Al 2023 78 2 Pcs Statistics And Probability Revised Edition (shs) Carpio, J. 2023 79 3 Pcs Strategic Management Essentials (tools, Techniques And Best Practices) Pasahol Et Al 2024 80 3 Pcs Advanced Human Behavior Organization With Ethics Abante, Et, Al. 2024 81 3 Pcs "introduction To Qualitative Research Writing: Handbook-worktext For Practical Research 1 Casinto, C.d. 2023" 82 3 Pcs Understanding Society And Culture: A Sociological And Anthropological Approach Riodique Iii, F.c. Et Al. 2024 83 2 Pcs "current Issues: Child And Youth Safety Online (hb) Maria-dolores 2024" 84 3 Pcs Midnight Monologues: Poems And Short Stories Ong, C. 2016 85 3 Pcs Applied English For Academic And Professional Purposes For Senior Highschool (shs) Tandoc, S. 2016 86 2 Pcs Teaching And Assessment Of Grammar Atkinson, I. 2024 87 2 Pcs "social Linguistics And Literacies Basa, R. 2021" 88 3 Pcs "the Teaching And Assessment Of Literature Studies Bacus, Terogo, Bustos, Dapat 2022" 89 3 Pcs "teaching Beginning Literacy Pado, F. 2020" 90 2 Pcs "an Introduction To Linguistics Ortega, S. 2019" 91 2 Pcs Meaning In Language (hb) Wilson, E. 2021 92 3 Pcs Guidebook For Writers And Editiors Lantican, A. 2021 93 2 Pcs Stories From The Other Side And Other Narratives De Viana, A. 2022 94 3 Pcs "technical Writing Mananay, Sumalinog 2022" 95 2 Pcs Laut Stories The Philippine Writers Series 2022 Gayangos, S. 2022 96 3 Pcs Mathematics In The Modern World Reyes 2023 97 3 Pcs Mathematics Of Investment 4th Ed. Sirug 2023 98 3 Pcs Advance Mathematics Adao & Chavez 2023 99 3 Pcs Pre-calculus Senior High School (shs) Chavez, S. 2023 100 3 Pcs Arts: Beyond Borders (contemporary Arts From The Regions) (shs) Constantion Jr., & Marquez 2023 101 3 Pcs Purposive Communication Atkinson, I. 2024 102 3 Pcs Essentials Of Purposive Communication Caudilla 2023 103 2 Pcs Purposive Communication (revised Edition) Zoleta 2023 104 3 Pcs English For Purposive Communication (a Modular Approach) Gutierrez-ang, J. 2023 105 3 Pcs Understanding The Self Developing Life Skills (revised Edition) Magalona, E. 2023 106 3 Pcs The Art Of Self Discovery: An Understanding The Self Workbook-textbook Villanueva; Egargo 2023 107 3 Pcs Understanding The Self:new Normal Edition Palean Et Al 2024 108 3 Pcs Teaching Science In The Elementary Grades Vol. 2 Physics, Earth & Space Bilbao, Larroder, Liaugo 2024 109 3 Pcs "assessment In Learning 1 A Modular Approach 2nd Ed. Helen Boholano,joje Mar,sanchez 2023" 110 3 Unit "action Research For Beginners In Classroom-based Context (a Guide For Pre-service And In- Service Teachers) By De Leon, E.""" 111 3 Pcs Field Study 1 2nd Edition Observation Of Teaching-learning In Actual School Environment Marcela J. 2023 112 2 Pcs Learning Disabilities And Remediation Alice Mathew 2022 113 2 Pcs Childhood And Growing Up (hb) Bhalerao, T. / Damle, S.v. 2023 114 3 Pcs "inclusive Education In Early Childhood Settings Boholano,menorianavarro,jamon,corte S 2024" 115 3 Pcs Exploring Children's Literature To Enhance Literacy In The Elementary Grade Conjusta, G. 2022 116 3 Pcs Children And Adolescent Literature Bacus, Terogo, Bustos, Dapat 2022 117 3 Pcs Field Study 2 Participation And Teaching Assistantship Brawner, D. Et. Al. 2019 118 3 Pcs The Teaching Profession Fernando, Et Al 2024 119 3 Pcs The Teaching Profession In The 21st Century Sarandi & Babao 2024 120 3 Pcs The Teacher And The School Curriculum Fernando, M. & Oamil, E. 2022 121 3 Pcs Teaching And Assessment Of The Macroskills Alda, R.c.et Al. 2022 122 3 Pcs The Teaching Profession Fernando, Et Al 2024 123 3 Pcs Assessment Learning 1 Boholano, H. 2023 124 3 Pcs Let Rev. Professional Education Corpuz Et. Al. 2023 125 3 Pcs Research Writing Made Easy Basilan 2022 126 3 Pcs "let Rev. Prof Ed Assessment In Learning Corpuz, B. And Cuartel, I. 2023" 127 3 Pcs Linya At Galaw (mga Dula Sa Filipino At Ingles) Torres, Jose Victor Z. 2023 128 2 Pcs Sinesosyedad (panunuri Ng Piling Pelikulang Panlipunan) Elmer B. De Leon 2023 129 3 Pcs Borador Isang Pagkilala Sa Layunin Ng Komunikasyon Sa Kolehiyo Alvin B Yapan 2022 130 3 Pcs Global Culture And Tourism Geography Donesa, L. 2020 131 3 Pcs Principles Of Total Quality Management Pasahol Et Al 2024 132 3 Pcs Strategic Management Austria Et Al 2024 133 3 Pcs Strategic Operations Management, 2e Serrano 2024 134 3 Pcs Information Management Cortez 2023 135 2 Pcs E-governance For Development Administration Abante, Et, Al. 2024 136 3 Pcs Philippine Politics And Governance With 1987 Philippine Constitution Sanchez, R. Et. Al. 2023 137 3 Pcs Advanced Public Fiscal Management, Finance And Accountability Abante, Et, Al. 2024 138 3 Pcs Advanced Local Government And Regional Administration Development Abante, Et, At. 2024 139 3 Pcs "transcendence Understanding Contemporary Global Dynamics Issues And Challenges Dc Coronacion; Fc Calilung 2024" 140 2 Pcs "introduction To Sociology (hb) Ralhan, S.s./ Lambat, S.r. 2023" 141 2 Pcs "political Social And Economic Sociology Chandrama Singh 2024" 142 2 Pcs Essentials Of Environmental Science (hb) Palani, V. 2024 143 2 Pcs Heat, Light And Optics (hb) Singh, A.p. 2023 144 2 Pcs Advances In Plant Cell Physiology (theory And Practice) (hb) Joshi, D. 2023 145 2 Pcs Basics Of Magnetism (pb) 3g Elearning 2024 146 2 Pcs Fundamentals Of Physics 3g Editorial Board 2022 147 2 Pcs The Life, Works, Writings And Travels Of Dr. Jose P. Rizal Ayson 2022 148 3 Pcs The Contemporary World Mananay,sanchez,sumalinog,argate,cadosales 2024 149 3 Pcs A History Of The Philippines Student Edition (reprint) Tan, Samuel K. 2023 150 2 Pcs Readings In Philippine History 2nd Edition Outcome-based Module Asuncion. N. 2022 151 2 Pcs The Life And Works Of Rizal Balili Et Al 2023 152 3 Pcs Unravelling The Absolute Moral Principle:ethics For College Students. Rev. Ed. L.e. Buenaflor, Et Al 2024 153 3 Pcs Guidebook For Writers And Editors Lantican, A. 2021 154 2 Pcs Introduction To Broadcasting James, B. 2024 155 3 Pcs Events Management (revised Edition) Rodolfa, B. 2022 156 2 Pcs Disaster Readiness And Risk Reduction For Senior High School (shs) Serapio, M. 2016 157 3 Pcs The Advertiser's Blueprint Sygaco, S.b. 2024 158 2 Pcs Introduction To Journalism Warner, A. 2024 159 2 Pcs Communication Research Methods Warner, A. 2024 160 3 Pcs Sinesosyedad (panunuri Ng Piling Pelikulang Panlipunan) Elmer B. De Leon 2023 161 3 Pcs Disaster And Risk Reduction Management With Covid19 Modules Mogol 2022 162 2 Pcs Understanding Media, Culture And Technology Stewart, F. 2021 163 2 Pcs "public Administration In The Developing World: Operating In A Poorly Funded Context (hb) Buama, C. A. 2021" 164 3 Pcs "promoting Community Change Through Civic Welfare Training Service 2 Briones, M. Et.al. 2024" 165 5 Pcs (path ? Fit 2) Physical Activity Towards Health And Fitness Combative Sports And Outdoor Recreational Activities Bulatao Et. Al. 2023 166 5 Pcs "physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program Punzalan, M.d, Et. Al. 2023" 167 5 Pcs Physical Activity Towards Health And Fitness (path-fit 4 Sports) Individual/dual And Team Sports Medina-bulatao, M. G. Et. Al. 2023 168 5 Pcs Physical Education 4 Path Fit 2 Sports College Textbook Punzalan, M.d. Et. Al. 2019 169 5 Pcs Physical Activity Towards Health & Fitness 3 (path-fit 3) Menu Of Dance Punzalan, M. D. Et. Al. 2023 170 5 Pcs Physical Education And Health: Aquatic (basic Swimming) And Mountaineering Revised Edition Latorre 2023 171 5 Pcs Physical Activities Towards Health And Fitness Pathfit 2: Exercise-based Fitness Activities Ballecer, M. 2023
Closing Date13 Jan 2025
Tender AmountPHP 858.9 K (USD 14.7 K)

City Of Danao Tender

Others
Philippines
Details: Description Description Republic Of The Philippines Danao City Bids And Awards Committee Invitation To Apply For Eligibility And To Bid Production Staff For Danao City Contingent For The Sinulog Festival 2025 Of The City Government Of Danao The Local Government Of Danao City, Through The Tourism Office Intends To Apply The Sum Of Php7,000,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Production Staff For Danao City Contingent For The Sinulog Festival 2025 Of The City Government Of Danao. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. The City Government Of Danao Now Invites Sealed Bids From Eligible Bidders To Participate In The Public Bidding Of Production Staff For Danao City Contingent For The Sinulog Festival 2025, As Follows; Seq. Qty. Item Description Estimated Unit Cost Estimated Cost A. Props Structural And Pros Design This Includes Structural Materials (angle Bar, Wheels, 1 Plywoods, Welding Rod, Welding Wires & Etc, Including The Andas Making Materials B. Artistic Team Artistic Choreographer 1 Pax Head Choreographer 1 Pax Head Dance Masters 2 Pax Dance Masters 4 Pax Consultants 2 Pax Music Director 1 Pax C. Visual Team/laborers/rentals Head Artist (including Assistants) 4 Pax Welders, Carpenters 6 Pax D. Instrumentalists/music Ensemble Drum & Bugle Corp 1 Orchestra 1 Choir And Soloist 1 E. Lighting Design Technicians And Assistants Labor 1 F. Video And Graphics Design Official Graphic Artist 1 Video Support 1 G. Lights For The Costumes And Props Costume 100 Props 100 H. Costume, Make Up And Official Shirt Dancers Costume 100 Shoes 200 Make Up 150 Official Tshirt 500 Dramatist 30 I. Festival Queen Costume 1 Hair And Make Up Artist And Handlers -all Exposures 1 Festival Queen Allowance – Meals & Transpo J. Confetti Confetti Showers Used The End Part Of Dance 1 Presentation Php7,000,000.00 Delivery Of The Goods Is Ten (10) Days Upon Request/after Receipt Of Notice To Proceed. The Description Of An Eligible Bidders Is One Who Have Submitted The Following Requirements: Eligibility Requirements With Letter Of Intent To Bid To Be Submitted On December 23, 2024 – January 03, 2025 At 2:00 P.m. (note: All These Documents Should Be In A Separate Envelope.) 1. Dti Business Name Registration Or Sec Registration 2. Tax Clearance 3. Business Permit 4. Certificate Of Registration – Bir Form 2303 5. Authority Of Signatory (duly Notarized) If (single Proprietorship) / Secretary Certificate –should Be Notarized 6. Omnibus Sworn Statement Duly Notarized 7. Valid Joint Venture Agreement (if Applicable) 8. Articles Of Partnership Of Incorporation (if Applicable) 9. On-going And Awarded Contracts 10. Single Largest Completed Similar Contracts 11. Copies Of End-users Acceptance Letter For Completed Contracts (if Any) 12. Specification Of Whether Or Not The Prospective Bidder Is A Manufacturer, Supplier Of Distributor 13. Audited Financial Statement And Income Tax Return 14. Nfcc Duly Notarized Or Credit Line At Least 10% Of The Abc 15. Philgeps Organization Number 16. Philgeps Certificate 17. Danao City Mayors Permit To Bid Pre-bid Conference On December 23, 2024 At 1:30 In The Afternoon At The Bids And Awards Committee Office. Submission And Receipts Of Bids On January 06, 2025 At 1:30 In The Afternoon At The Bids And Awards Committee Office. Technical Envelope: 1.) Bid Security - 2% Cash/cashier's Check/manger's Check/letter Of Credit/bank Draft/guarantee (based On Abc) 5% Gsis Bond (based On The Abc) / Bid Securing Declaration 2.) Authority Of The Signatory Duly Notarized If (single Proprietorship) / Secretary Certificate If Corp. 3.) Production / Delivery Schedule 4.) Manpower Requirements 5.) After-sales/parts, If Applicable. 6.) Technical Specification Of The Products. 7.) Commitment To Extend A Credit Line / Nfcc At Least 10% Of The Abc Duly Notarized. 8.) Omnibus Sworn Statement Duly Notarized Financial Envelope: 1.) Bid Prices In The Bill Of Quantities In The Prescribed Bid Form. 2.) The Recurring And The Maintenance Costs, If Applicable. Instructions To Bidders: 1.) For Winning Bidders, Performance Security Shall Be Required To Guarantee The Faithful Performance Upon Signing The Contracts It Maybe 5% Of The Contract Prices On A Form Of Cash/manager's Check Or 30% Gsis Bond. 2.) Retention In The Amount Equivalent To At Least 10% Of Every Progress Payment Made Or Special Bank Guarantee Equivalent To At Least 10% Of The Total Contract Price. The Said Amount Shall Be Released Only After The Lapse Of The Warranty Period, 3 Months In Case Of Supplies And 1 Year In The Case Of Purchase Of Equipment. 3.) All Particulars Relative To Pre-qualifications, Biddings, Evaluation Of Bids And Awards Of Contracts Shall Be Governed By The Provision Of Ra 9184 And Other Rules Regulation As Maybe Applicable. 4.) The City Government Reserves The Right To Reject Any/or All Bids, To Waive Any Defect, Informalities Therein And To Award To The Bidders Upon Evaluation By The Bids And Awards Committee (bac) The Bid That Are More Advantageous To The City. 5.) 5% Value Added Tax (vat) Withheld Of The Contract Price. 1% Creditable Income Tax Of Contract Price. 6.) Bidders Should Fill-up All Items; Otherwise In Case Their Quotation Is Incomplete They Are Automatically Disqualified. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using As Specified In The Implementing Rules And Regulations Part ! (irr-a) Of Republic Act No. 9184 (r.a. 9184), Otherwise Known As The Government Procurement Reform Act, And Is Restricted To Organization With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belongings To Citizen Of The Philippines, As Specified In Republic Act 5183 (r.a. 5183). Only Bids From Bidders Who Pass The Eligibility Check Will Be Opened. The Process For The Eligibility Check Is Described In Section Ii Of The Bidding Documents, Itb. The Bidder With The Lowest Calculated Bid (lcb) Shall Advance To The Post-qualification Stage In Order To Finally Determine Who’s Responsiveness To The Technical And Financial Requirements Of The Project. The Contract Shall Then Be Awarded To The Lowest Calculated And Responsive Bidder (lcrb) Who Was Determined As Such During The Post-qualification Procedure. Very Truly Yours, Catherine M. Enriquez Bac Secretariat Approved: Rosette B. Villaflor Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 7 Million (USD 120.6 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Real Estate Service
Corrigendum : Closing Date Modified
United States
Details: ***a0001 Is Attached*** A-e Services Are Being Procured In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) 36.6. All Submissions Will Be Evaluated In Accordance With The Evaluation Criteria Listed Herein. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. The Naics Code For This Acquisition Is 541330 And The Applicable Small Business Size Standard Is $25.5m. The Area Of Consideration Is Restricted To A 500-mile Radius Of The Alexandria Va Health Care System (avahcs), 2495 Shreveport Hwy, 71n, Pineville, La 71360, In Which Either The A/e Firm S Primary Or Already Established Auxiliary/satellite Office Must Be Located. Note: The 500-mile Radius Will Be Measured By One Or More Of The Nationally Recognized Commercial Free On-line Mapping Services From The Primary Or Already Established Auxiliary/satellite Office Address To The Above Va Address (shortest Driving Distance Option). In-order To Use The Address Of An Already Established Auxiliary/satellite Office, The A/e Firm Must Have Employees Of Their Firm Who Are Currently (before And At The Time Of Sf330 Submission) Physically Located At The Auxiliary/satellite Office (a Home Of An Employee Does Not Meet The Requirement Of An Auxiliary/satellite Office) And Are On The A/e S Payroll Not Employees Of An Actual Or Proposed Subcontractor Or On The Payroll Of An Actual Or Proposed Subcontractor. Contract Award Procedure: The Proposed A/e Services Will Be Obtained By A Negotiated Firm-fixed Price Contract. Interested Parties Shall Ensure Current Licensing And Have A Current Registration In The System For Award Management (sam) Database At Https://www.sam.gov And The Sba Veteran S Small Business Database At Veteran Small Business Certification (sba.gov) As Well As Have Submitted The Current Cycle Vets-4212 (formerly Called Vets-100) Report Per The Requirements Located At Https://www.dol.gov/agencies/vets/programs/vets4212. Failure Of A Proposed Sdvosb To Be Certified By The Sba At The Time The Sf330 S Are Submitted Shall Result In Elimination From Consideration As A Proposed Contractor. Sdvosb Requirements: In Accordance With Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside, A Service-disabled Veteran-owned Small Business Concern Agrees That, In The Performance Of The Contract, It Will Not Pay More Than 50 Percent Of The Amount Paid By The Government To It To Firms That Are Not Vip Listed Sdvosbs. Design Costs: All Offerors Are Advised That In Accordance With Vaar 836.606-71(a) The Total Cost Of The Architect Or Engineer Services Contracted For Shall Not Exceed 6 Percent Of The Estimated Cost Of The Construction Project Not Including Any Fees For Investigative Services, Special Consultant Services That Are Not Normally Available In Organizations Or Architects Or Engineers That Are Not Specifically Applied To The Actual Preparation Of Working Drawings Or Specifications Of The Project For Which The Services Are Required, Costs Of Reproducing Drawings And Specifications, Travel And Per Diem Allowances, Etc. Additionally, Far 52.236-22 Design Within Funding Limitations, Will Be Applicable To This Procurement Action. Design Limitation Costs Will Be Provided To The Most Highly Qualified Ae Firm Selected To Complete The Design. The Magnitude Of Construction (not Design) Of This Project Is Between $2,000,000 And $5,000,000. Selection Criteria: The Selection Criteria For This Acquisition Are Listed Below. Note: Each Evaluation Factor Below Is To Be Specifically Addressed Not Only Through The Submission Of The Sf330s But Also In Narrative Format To Clearly Show How Each Evaluation Factor Is Formally Addressed. Evaluation Factors Are Listed In Descending Order Of Importance: Professional Qualifications Necessary For The Satisfactory Performance Of Required Services; (far 36.602-1 (a)(1)) Provide Key Personnel, It Is Expected That The Individuals Identified As Key Personnel Will Be Performing Tasks Under The Resulting Contract. Include Resumes For Key Personnel Of Proposed Sub-consultants For All Engineering Disciplines: Electrical, Data Communication, Mechanical, Civil, Structural, Environmental, Interior Design, Leed, Commissioning And Cost Estimating. Specialized Experience And Technical Competence In The Type Of Work Required, Including, Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. Provide A Minimum Of Five (5) Similar Projects To Include Technical Capabilities In Design Quality Management Procedures, Computer-aided Design And Drafting/building Information Modeling, Equipment Resources, And Laboratory Requirements For The Firm And Any Proposed Subcontractors. In Addition, Provide Information Concerning The Effectiveness Of The Proposed Project Team (including Management Structure, Coordination Of Disciplines, Subcontractors, And Prior Working Relationships). (far 36.602-1 (a)(2)) Past Performance On Contracts With Government Agencies, State & Local Agencies, And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Provide Information Concerning Superior Performance Ratings On Recently (last 5 Years From Date Of Qualification Submission For This Project) Completed Va Projects. (equivalent Medical/hospital Facility) As Well As The Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. Provide Information Concerning Any Claims Against The Firm Because Of Any Issues To Include Improper Or Incomplete Architectural And Engineering Services. Identify Post-award Construction Services Previously Performed To Include: (a) Experience In Professional Field Inspections During The Construction Period, (b) Reviews Of Construction Submittals, (c) Support In Answering Requests For Information During The Construction Period, And (d) Support Of Construction Contract Changes To Include Drafting Statements Of Work And Reviewing/providing Cost Estimates. Capacity To Accomplish The Work In The Required Time To Include The Available Capacity Of Key Disciplines To Perform The Work (in The Required Time). Include Current Workload, Projected Workload For The Next 12 Months, And Key Personnel S Availability Over The Next 12 Months. Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project (to Include Knowledge Of Geological Features, Climate Conditions, And Local Construction Methods That Are Unusual Or Unique).â Explain How Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project Was Obtained. Identification Of, And Commit To, The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. List Percentage Of Work To Be Performed By Sdvosbs And Other Size Businesses To Be Utilized Subcontractors. List Percentage Of Work To Be Performed By Sdvosbs And Other Size Businesses To Be Utilized. Submittal Requirement: This Project Is A 100% Set-aside For Service-disabled Veteran Owned Small Business (sdvosb) Concerns Under Vaar 852.219-73, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside (dec 2009). All Original Standard Form (sf) 330 Packages And Narrative Information Shall Be Submitted By Email Only To Jb Herbst At The Following Email Address: Jennings.herbst@va.gov All Sf 330 Submissions Shall Be Clearly Marked With The Subject Line Displaying The Solicitation Number 36c25623r0084. The Sf330 May Be Downloaded From Www.gsa.gov/forms. Completed Sf330 S Shall Include The Primary Firms, Subcontractor Firms, And Any Consultants Expected To Be Used On The Project. All Submissions Shall Be In Black And White No Color Submissions Please. Firms That Meet The Requirements Listed In This Announcement Are Invited To Submit An Email Copy Of The Completed Sf330 Including Parts I And Ii As Described Herein To The Above Email Address No Later Than 2:00pm Local (ct) On Thursday, 07/14/2023. Late Submission/proposal Rules Found In Far 15.208 Will Be Followed For Submittals/proposals Not Received By The Exact Date And Time Listed Above So Please Do Not Wait Until The Last Minute To Submit Your Sf330s Qualification Packages In The Event Of A Firm S Email Or Internet Connectivity Issues Which Are Not Considered To Be Excusable Delays. Interested Firms Shall Address Each Of The Seven (7) Selection Criteria In Their Sf330 S And Additional Documents/submittals. Interested Firms Shall Limit The Narrative Information To Support All Seven (7) Evaluation Factors To Ten (10) Pages Total (beyond The Sf330s). Any Additional Narrative Information Past Ten (10) Pages Total Will Not Be Considered. Failure To Provide Narrative Information To Support Each Of The Seven (7) Evaluation Factors May Negatively Affect The Interested Firms Factor(s) Rating And Subsequently Their Overall Rating And Standing. This Is Not A Request For Proposal. There Are No Solicitation Documents Available. This Is A Request For Sf330 S Architect/engineer Qualifications Packages Only. Any Requests For A Solicitation Will Not Receive A Response. This Requirement Is Subject To Availability Of Funds.
Closing Date8 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.43|wwv|717-605-3992|noelle.m.smith10.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C & Section E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version (jun 2002)|8|x||x|||||| general Information-fob-destination|1|a| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|n50286|tbd|||n/a|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contract||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2023)|13|334513|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Small Business Set Aside Is Dissolved. the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 8 January 2025. the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 06 March 2024 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited Inthe Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In. 3.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (186 Days) \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-std-1330 | | |e |220516|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-p-24212 | | |c |980421|a| 2| | document Ref Data=qpl 24212 | | |32 |060308|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | 3. Requirements 3.1 ;the Transducer, Motional Must Be Manufactured In Accordance With Specification Mil-p-24212, Type Designation Pgt-gp-4500-g-4, Except As Amplified Or Modified Herein.; 3.1.1 ;each Transducer Must Be Furnished With A Receptacle Having Type Normal Keying In Accordance With Ms3102r14s-5p Vice Ms3102r14s-5px Specified By Mil-p-24212c Section 3.5.14.2.; 3.1.2 ;each Transducer Must Be Furnished With A Protective Plug In Lieu Of Mating Plug Specified By Mil-p-24212c Sections 3.5.14 And 3.5.14.2.; 3.2 Oxygen Cleaning - This Material Must Be Cleaned, Tested, Packaged & Labeled By Trained Personnel And Procedures In Accordance With Mil-std-1330, General. 3.3 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.4 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.4.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.4.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.4.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.4.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s). 3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.6 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.6.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.6.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.6.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement. 3.6.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.6.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.7 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved and Rejected And The Nature Of Corrective Action Taken As Appropriate. 3.7.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.7.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions provided By The Government Representative. 3.8 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.9 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.9.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.9.2 Inspection For Completeness And Proper Type. 3.9.3 Verification Of Material Quality Received. 3.9.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.9.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.9.6 Identification And Protection From Improper Use Or Disposition. 3.9.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.9.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.9.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.10 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe). 3.10.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order. 3.11 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All process Operations Including Any Subcontracted Operations, To The Finished Component. 3.11.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.11.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.12 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.12.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.12.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.12.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.13 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" are Not Acceptable. 3.13.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.14 See Cdrl Di-ndti-80603a - Cleaning - Prior To Performing Any Cleaning, The Applicable Cleaning Procedure Must Be Submitted For Review And Approval. If The Contractor's Cleaning Procedure Has Previously Been Approved By Navsea For This Or Other contracts, A Copy Of The Original Approval Letter Must Be Submitted In Lieu Of The Actual Procedure. 3.14.1 When Cleaning Is Performed By A Subcontractor, The Requirements For Submission Of All Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address, Phone Number And Date. 2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12). 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable). 5. Cure Date ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing n/a." 9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements. 10. Contractor's Or Authorized Personnel's Signature. 3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below: 11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections. 12. Direct Reading Of O-ring Surface Diameters With Specified Standard. 3.15.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below: 13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 14 2008 - Mil-std-1330 Cleaning Procedures Required - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - Within 60 Days After Contract Award And Prior To Performing Any Cleaning, Submit One Copy To The Pco. note: If This Procedure Has Been Previously Approved By Navsea, Submittal Of The Original Approval Letter In Lieu Of The Procedure Is Acceptable. the Review (approval/disapproval) Must Be Within 60 Days From Date Of Receipt.
Closing Date8 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n742.10|wv1|(717) 605-4056|madison.m.gray4.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection/acceptance Point|6||dcma Nseo S4306a||||dcma Nseo S4306a| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|n/a|tbd|n00104|tbd|material - S4306a; Certifications - N39040|n50286|tbd|136|n/a|n/a|certifications - N39040|n/a|n/a|s ee Dd Form 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (feb 2024)|13|332911|750 (# Of Employees)|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x|| this Amendment Shall Be Issued To Provide A Response To The Bidder's Notes Submitted With Moog's Quote Q13082. moog Email Dated 20 May 2024 From Mhairi Metzel Submitted Moog Quotation Q13082for The Subject Solicitation. Moog Quotation Q13082 Included The Following Statements, And Navsup Wss Requested That Navsealogcen Address The Exceptions: "moog Requests Flow Down Of Ndt Requirements Per Navsea Directive In Letter 9556 Ser 05z/478." in Response, Navsealogcen Stated That Non-destructive Testing (ndt) Conducted In Accordance With Navsea Letter 9556 Ser 05z/478 Dated 13 August 2020 Is Acceptable For The Subject Contract. "moog Will Provide Item No. 3 - Rack On Drawing Number 15097-37100 Using Material In Accordance With Aisi 4340 Steel As Opposed To Aisi 4140 Steel. Due To The Heat Treating Strength Requirements, It Is Very Difficult To Procure 4140 Material With The Required material Strengths; Therefore, Moog Will Be Using 4340 Material, Which Is Readily Available From Suppliers." in Response, Navsealogcen Stated That, Provided The Mechanical Properties Are Equivalent To Aisi 4140, Rack, Item 3 Of Flo-tork Drawing 15097-37100 Revision C Supplied As Material Specification Aisi 4340 In Lieu Of Aisi 4140 Is Acceptable For The Subject solicitation. "moog Will Provide Item 35, Set Screw, In Accordance With Class 303 Instead Of Class 304. Material Spec Qq-s-764 Does Not Have Class 304 As An Option." in Response, Navsealogcen Stated That Supplying The Set Screw, Item 35 Of Flo-tork Drawing 15097-37100 Revision C, With Material In Accordance With Class 303, Condition A Per Qq-s-764, In Lieu Of Class 304 As Required By The Drawing, Is Acceptable For The Subject solicitation, Subsequent Contract, And Future Procurements. "reference Previously Approved For Navsup Contract N00104-21-p-fb32. Moog Is Requesting To Use Acoustic Test Criteria To The Virginia Class Equivalent Model 15094a (drawing 15094-41655), As The Seawolf Criteria Is Difficult Or Impossible To Meet Given The Energy absorbers Have Been Removed From This Actuator Design Due To Break Down Of The Polyurethane Material On Board The Submarines. The Removal Was Done In 2011 As Part Of Revision C Of Drawing 15097-37100. Moog Manufactured This Same Actuator Model Back In 2013 For E electric Boat (eb), And The Same Request Was Made. The Following Waiver Approval Was Given By Eb. "electric Boat Finds Acoustic Testing Virginia Class Acceptance Criteria Technically Acceptable. Flo-tork Actuator 15097-37100 Is Used As Td-785, Eav Flood & Drain hull Valve For The Brizo Program." This Was On Electric Boat Po # Ppx171 Issued To Moog Flo-tork." in Response, Navsealogcen Stated That The Request To Test The Subject Hydraulic Actuator To Virginia Class Vibration Requirements For The Subject Solicitation Is Approved For The Subject Solicitation And Subsequent Contract. Structure Borne Vibration Testing Is To Be Performed To Virginia Class Acceptance Criteria In Accordance With Flo-tork Drawing 15094-41655 Revision B. \ 1. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Methods, Such As Email. The Government's Acceptance Of The Contract Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 2. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. final Delivery Of Material Shall Be On Or Before 300 Days After The Effective Date Of The Contract. 3. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See Far Clause 52.211-14, Notice Of Priority Rating For National Defense, emergency Preparedness, And Energy Program Use. 4. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 5. Dd 1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Subsafe/non-level I Material And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Test/inspection Certifications - To Allow Contractors To Use Existing Stock Of Material Previously Tested With Ndt Specification Revisions That Are Technically Acceptable While Minimizing The Submittal Of Waivers/deviations, The Following test/inspection Specification Revisions Are Acceptable In Lieu Of Their Preferred Current Revisions (where Applicable) Listed Under "document References" Below When They Were The Current Revision As Of The Date Of Ndt Certification. mil-std-1949 Original, Revision A, A Chg Not 2 mil-i-6868 Rev. E, Revision E Amendment 1, Revision E Amendment 2 astm-e1417 1999, 2011 sae-ams-std-2154 2005, 2010 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;15097-37100 07270 C D 2.2.4 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-i-6868 | | |e |800606|a|3 | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=sae Ams-std-2154 | | |d |200401|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 Design, Manufacture, And Performance - Except As Modified Herein, The Item Furnished Under This Contract/purchase Order Must Meet The Design, Manufacture, And Performance Requirements Specified On Cage ;07270; drawing ;15097-37100; . 3.2 A Certificate Of Tests Is Required For Non-destructive, Hydrostatic, And Operational Testing As Required By The Assembly Drawing And The Maintenance Standard, When Invoked. Non-destructive Testing Must Be In Accordance With T9074-as-gib-010/271. 3.3 Certificate Of Compliance - (special Emphasis Subsafe/non-level I Material) - The Contractor Must Prepare And Submit A Certificate Of Compliance Traceable To Each Serialized Component, Certifying That The Components Furnished Under This Contract Comply with The Requirements Of The Procurement Document, Including Any/all Invoked Specifications And Drawings. 3.4 Each Component Must Be Assigned A Unique Serial Number. The Component Must Be Marked With This Serial Number On The Major Piece Part Of The Assembly. (e.g. Body, Casing) Serial Number Marking Must Be Permanently Applied In Accordance With Mil-std-792. this Serial Number Must Also Be Annotated On The C Of C To Provide Positive Traceability. 3.4.1 In The Event Of Refurbishment, If An Existing Readable Serial Number Is Found On The Component, A Suffix Must Be Applied To Ensure The Final Serial Number Is Unique. 3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications, or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.6.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Subsafe/non-level (q5) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. 3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.10 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements To Apply To The Supplies Being Purchased. when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.12 Final Inspection - The Following Inspection Must Be Performed Prior To Shipping Material. 3.12.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.12.2 Material Must Be Inspected For Form, Fit, And Function In Accordance With The Sampling Plan(s) In The Applicable Military Specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. The Absence Of such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), Table Iia (for Sample Size) With Lot Acceptance Based On Zero Defects And Lot Rejection Based On One Defect. Due To The High consumer Risk Associated With Small Sample Sizes, The Minimum Sample Size Must Be Eight Units (for Lot Sizes Of Fifty Or Less) Or One Hundred Percent (for Lot Sizes Of Eight Or Less). 3.12.3 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.13 See Cdrl Di-misc-80678 (special Emphasis Subsafe/non-level I Material C Of C) - The Certificate Of Compliance Must Contain: 1. Contractor's Name, Address, Phone Number And Date 2. The Contract Issuing Agency's Contract/purchase Order Number 3. The National Stock Number (nsn) 4. Government Nomenclature (noun Name) Of The Item Purchased 5. Contractor's Nomenclature (noun Name) Of Item Purchased 6. Component Serial Number 7. Contractor's Or Authorized Personnel's Signature 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements. Submission Must Be In Accordance With The Contract Data Requirements List (dd Form 1423). 3.14 See Cdrl Di-misc-80678 (special Emphasis Ss-non-li Hydrostatic, Ndt Per T9074-as-gib-010/271, And Operational Testing) - The Certificate Of Tests (c Of T) Shall Contain: 1. Contractor's Name, Address, Phone Number And Date 2. The Contract Issuing Agency's Contract/purchase Order Number 3. The National Stock Number (nsn) 4. Government Nomenclature (noun Name) Of The Item Purchased 5. Contractor's Nomenclature (noun Name) Of Item Purchased 6. Component Serial Number 7. Contractor's Or Authorized Personnel's Signature 8. A Statement Of Tests Performed Listing The Pieces Tested. A. The Standard/specification To Which Testing Was Performed. B. The Revision Of The Standard/specification. C. The Acceptance Criteria Used. 9. Test Procedure Numbers May Also Be Referenced On Test Reports. 10. Test Reports On Welds Shall Be Identified To Weld Joint And Layer. 11. When Hydrostatic Tests, Operational Testing, Or Ndt Is Not Required Per The Applicable Drawing, The C Of T Shall So State. (i.e. "no Ndt Is Required Per The Applicable Drawing.") 3.15 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Or Brazing Is Required, The Applicable Welding/brazing Procedure(s) And Qualification Data Must Be Submitted For review And Approval. note: These Requirements Do Not Apply To Tack/spot Welds. 3.15.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). Welding/brazing Qualification Must Be In Accordance With S9047-aq-gib-010/248. Applications For Which Commercial Welding Is allowed Must Have Procedures And Qualification Data Which Meet All Applicable Requirements Of The Specification (aws, Asme, Etc.). The Procedure And Qualification Data Must State The Specification And Its Revision That Is Being Used. Suppliers That Are unsure If Commercial Welding Is Allowed For A Particular Application Must Contact The Procurement Contracting Officer. 3.15.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Welding procedure And Qualification Data Report Identification/number And Revision. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be Submitted At The Same Time. Welding procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, Citing The Drawing Number And pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") Authority For The Repair Of Special Repairs In Castings And authority For The Repair Of Wrought Or Forged Material Must Be Obtained From The Procurement Contracting Officer. This Request Must Describe The Defect; Including Size, Depth, Location, And A Description Of The Proposed Repair. This Request For Navsup-wss contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.15.3 Any New Procedure Qualification Performed To S9047-aq-gib-010/248 Under This Contract Will Require The Vendor To Provide A Minimum 48 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 48 Hour Time Limit May Be modified Upon Mutual Agreement Between The Vendor And Dcma. 3.15.4 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278 Or As Specified In Applicable Commercial Welding Specifications. 3.15.5 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.1.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.2 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.3 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.3.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.3.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.3.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.3.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.3.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.3.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied conforms To The Specified Requirements. 6.3.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.3.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.3.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.3.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.3.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.3.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.3.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.3.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.3.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.3.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.3.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date10 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.40|wvl|717-605-1842|desiree.d.meyers.civ@us.navy.mil| item Unique Identification And Valuation (mar 2016)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|inspection: D Acceptance: D| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x|||x||||| variation In Quantity (apr 1984)|3|+10%|-10%|| time Of Delivery (june 1997)|20|50 Lbs|||||||||||||||||||| general Information-fob-destination|1|a| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|n39040 Certification; S4306a Material|n50286 Portsmouth|tbd|133.2||n/a|certification N39040|||ss Dd1423 Or Specified By Block 14a|| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year From Date Of Delivery|365 Days After Acceptance Of Material||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (sep 2021)|13|333992|1,250|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| evaluation Criteria And Basis For Award-|1|| 1. The Offer Due Date Is Updated To 14 January 2025. \ 1. The Offer Due Date Is Updated To 2 December 2024. \ 1. The Offer Due Date Is Updated To 14 November 2024. \ 1. The Offer Due Date Is Updated To 21 October 2024. 2. The Poc Is Updated To Amanda Bailey Amanda.l.bailey50.civ@us.navy.mil. 3. The Small Business Set-aside Is Hereby Dissolved. 4. The Quantity Is Updated To 500. 5. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. \ this Amendment Is Issued To Extend Closing To 28jul23. this Amendment Is Issued To Extend Closing Date To 05may23. \ this Amendment Is To Extend The Closing Date To 16dec22. \ this Amendment Is Issued To Extend The Closing Date To 09 Sep 2022. \ the Purpose Of This Amendment Is To Extend The Closing Date To 10aug22. \ amendment Issued To Extend Closing Date To 17jun22. this Amendment Is Issued To Extend The Closing Date To 13 May 22. \ this Amendment Is Issued To Extend The Closing Date To 15 Apr 22. this Amendment Is To Extend The Closing Date To 15 Mar 2022. this Amendment Is To Extend The Closing Date To 14 Feb 2022. poc Changed To Benjamin.t.spangler.civ@us.navy.mil all Prior Offers Shall Be Resubmitted To Above Poc Or Neco. \ 1. Dd1423 Data Item Aoo1 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286. 3.all Contractual Documents (i.e. Contracts,purchase Orders,task Order,delivery Order,& Modifications) Related To The Instant Procurement Considered To Be "issues" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 4. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offfers. See Clause 252.213-7000. 5. The Following Proposes Delivery Schedule Applies: submission Odf All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Workig Days After Receipt. 180 Actual Days To Manufacture Part final Delivery Of Material 365 Days delivery Days And Past Performance Will Be Evaluation Factors In Determining Awardee. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=aws A5.01 | | | |930101|a| | | document Ref Data=aws A5.28 | | | |200630|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Aws-a5.28, Except As Amplified Or Modified Herein. Aws-a5.28 Ordering Data Information Is Provided Below: a. American Welding Society Specification Aws-a5.28; Low Alloy Steel Filler Metals For Gas Shielded Arc Welding. aws Classification - ;er70s-b2l; size, Diameter - ;1/16 Inch; spool Size, Weight - ;n/a; cut Length - ;36 Inches; b. American Welding Society Specification Aws-a5.01; Filler Metal Procurement Guidelines. lot Classification - Class S2 intensity Of Testing - Schedule J 3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - ;quality Conformance/compliance Inspection (includes Chemicals And Mechanicals); item - ;rod, Welding; performance - ;aws A5.01 And Aws A5.28; acceptance - ;aws A5.01 And Aws A5.28; 3.3 Container Size - Welding Electrodes Must Be Supplied In ;10; Pound Containers. 3.4 Welding Electrode Strip Heaters - Electrical Resistance Rod-type Or Pad-type Heaters (i.e. Strip Heaters) That Are Controlled Automatically By Thermocouples Or Manually By An On-off Switch Must Be Used To Maintain Preheat/interpass Temperatures Within The required Range Before And During Welding Of The Usability (i.e. Soundness) Test Plate And The Mechanical Property (when Required) Test Plate. The Test Plate Must Be Insulated Or Separated From The Work Bench. Oxy-fuel Heating Of Any Test Plate Is Not permitted. 3.5 Radiography - Radiography Is Required For Test Weldments And Must Be Performed In Accordance With T9074-as-gib-010/271 As Modified By Aws-a5.28. Acceptance Criteria Must Be Aws-a5.28. 3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The information Listed Below. a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product. d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. b. A Complete Description Of The Change To Be Made And The Need For That Change. c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. d. Proposed Changes To Documents Controlled By The Government. e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. f. Recommendations About The Way A Retrofit Should Be Accomplished. g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct. h. Impacts To The Operational Use Of The Product. i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. j. Milestones Relating To The Processing And Implementation Of The Engineeringchange. 3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements established In The Contract/purchase Order. 3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities available For Audit By The Contracting Officer Or His Authorized Representative. 3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. 3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco. 3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The government. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate planning For Government Inspection Can Be Accomplished. 3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.12.2 Inspection For Completeness And Proper Type. 3.12.3 Verification Of Material Quality Received. 3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.12.6 Identification And Protection From Improper Use Or Disposition. 3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.12.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Unit Containers. This Traceability Marking Must Provide direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14.1 Permanent Markings Are Not Required For Consumable Material (weld Filler Material, Etc.). Traceability Must Be By A Label Attached To Each Unit Container. The Unit Container Identification Label Must Include, In Addition To The Contract Number And The national Stock Number (nsn), All Markings Required For Identity And Traceability. Each Container In The Lot Must Contain Material From The Same Traceability Number Or Heat/lot, As Defined In The Applicable Specification. Identification Marking Must Be The Type designation In Accordance With The Applicable Detail Specification. 3.14.2 For Covered Welding Electrodes, The Type Designation Or Classification Number Must Also Be Applied To The Electrode Covering Within The Space 2 1/2 Inches From The Grip End Of The Electrode. The Marking Must Consist Of At Least One Complete Type designation Or Two Or More Partial Type Designations That Can Be Read Or Positively Interpreted As The Intended Designation. The Two Partial Type Designations Must Consist Of At Least The Top Portion And The Bottom Portion Of The Designation. 3.14.3 Individual Cut Length Bare Welding Rods Must Be Identified In Accordance With The Applicable Commodity Specification. In The Absence Of Specific Specification Marking Requirements, At Least One Legible Type Designation/classification Number Must Be applied To Each Rod, Either By Stamping Or By Tagging (i.e. Flag Tagging). 3.14.4 Spool And Coil Weld Filler Material Must Be Identified In Accordance With The Applicable Commodity Specification. 3.15 Material Certification - In Addition To The Certification Data Requirements Specified In The Detailed Specification Invoked In This Contract, The Following Material Certification Requirements Apply: 3.15.1 See Cdrl Di-misc-81020 (quality Conformance/required Tests) - Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications). 3.15.2 In Addition To Quantitative Chemical And Mechanical Properties, (as Required By The Applicable Specification), The Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type And Finish, As Applicable, Of The Material supplied. 3.15.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.15.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.15.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.16 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance: 3.16.1 All Welding Electrodes/inserts Must Be Sample Inspected In Accordance With The Applicable Welding Electrode/insert Specification, Except The Unit Containers Must Be 100% Inspected For Traceability Marking And That The Markings Are Legible. 3.16.2 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material/unit Container Marking) And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The certification Test Reports Must Be 100% Inspected For Completeness And Legibility, And That There Is A Test Report For Each Heat Or Lot Of Material Being Shipped. 3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To The Contractor - 4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And contract Number Must Be Submitted To The Pco. 4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied conforms To The Specified Requirements. 6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;10/20/2016 - Updated Ecds Url - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - May 16 2013 - Removed Gsi From This Material. - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq the Following Paragraphs Of Di-misc-81020 Must Be Modified As Shown Below: 10.1.1 - Add: Material Marking For Spooled Wire Must Be As Identified Within The Applicable Commodity Specification. 10.1.2 - Add: For Weld Materials, The Weld Material Manufacturer Is Considered The Original Mill. 10.2 - Replace The Entire Paragraph With: For Weld Materials, Certification Is Required For Each Test Performed Under Quality Conformance Listed In The Applicable Paragraph Of The Military Specification. (or Table 5 Of Aws Specifications) block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date14 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n743.6|wvx|564-230-3066|francine.a.pommells.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| variation In Quantity (apr 1984)|3|5%|0%|total Contract Quantity| time Of Delivery (june 1997)|20|0001|450|365 Days|||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1 423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332722|600|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Solicitation Is Amended To Extend The Closing Date To 10jan2025. 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech. 2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000. 3. The Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls After Receipt final Delivery Of Material (365 Livery Days ) please Quote Actual Delivery Days early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment. 4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. 5. A Variation In Quantity Of +5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | | document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Nasm25027, Except As Amplified Or Modified Herein. Nasm25027 Ordering Data Information Is Provided Below. (a) Nuts, Self Locking, 250 F, 450 F, And 800 F; Nasm25027 (b) Part Number - ;ms17828-22c; (c) Preservation, Packaging, And Marking Requirements Must Be As Specified Elsewhere In The Contract/purchase Order. 3.2 The Unit Of Issue Is Each. the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener. 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;nut, Self Locking Hexagon; material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. all Material Must Be From The Same Class. self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;nut, Self Locking Hexagon; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027; test - Quality Conformance Tests item - Self-locking Nuts performance - ;nasm25027; acceptance - ;nasm25027; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm-d4066, Group 01, Class 1, Grade 1; 3.5 See Cdrl Di-ndti-80809 (fat Self Locking Nuts) - First Article Testing - Certifications Are Required For The Following Tests On The Items Listed Below: test - Fat (consisting Of Qualification Inspections In Table Xiii Of Nasm25027) item - Self-locking Nuts performance - ;paragraph 3.2 And Table Xiii Of Nasm25027; acceptance - ;paragraph 3.2 And Table Xiii Of Nasm25027; this Requirement May Be Satisfied By The Submission Of The Approval Letter Of Previously Performed Qualification Testing As Fat. this Requirement May Also Be Satisfied By The Submission Of A Letter From Previously Qualified Manufacturers Stating That They Were Previously Qualified And That Their Production Methods Represented By The Qualification Tests Have Not Changed. distributors May Also Satisfy This Requirement By Submitting Proof (certificate Of Compliance, Invoice, Etc.) That The Material Was Obtained From A Qualified Source. for Heavy Hex Nuts, The Above Documentation For The Same Size And Material Standard Hex Nut Is Acceptable, Except When Specific Performance Characteristics, Such As Mechanical Properties, Are Called Out Elsewhere Within This Contract. These Specific Performance characteristics Must Be Satisfied For Fat. for Heavy Hex Nuts Manufactured In Accordance With Mil-dtl-32258, The Fat Must Be Performed In Accordance With Nasm25027 And Mil-n-25027/1. 3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.7 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.9 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.9.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.9.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.9.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.11 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.11.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.12 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.16.2 Inspection For Completeness And Proper Type. 3.16.3 Verification Of Material Quality Received. 3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.16.6 Identification And Protection From Improper Use Or Disposition. 3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.16.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Qq-n-281; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.20 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.20.1 Fasteners Must Be Marked In Accordance With ;nasm 17828. Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's Identification Symbol, Material Symbol, And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.20.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.21 Material Handling - The Written Material Control Process Must Include The Following: 3.21.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.21.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.21.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.21.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.21.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.22 Receiving Inspection - 3.22.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.22.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.23 Discrepancy Reporting - 3.23.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.24 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.24.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.24.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.24.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.24.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.25 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ; - 10/20/2016 - Updated Ecds Url - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 14 - Within 120 Days After Contract Award, Forward One Copy To The Pco. the Review (approval/disapproval) Must Be Within 120 Days From The Date Of Of Receipt. this Requirement May Be Satisfied By The Submission Of One Of The Following: - A Copy Of The First Article Test Report - A Copy Of The Approval Letter For Previously Performed First Article Testing - The Letter Of Qualification Acceptance. distributors May Also Satisfy This Requirement By Submitting Proof (certificate Of Compliance, Invoice, Etc.) That The Material Was Obtained From A Qualified Source. for Heavy Hex Nuts, The Above Documentation For The Same Size Standard Hex Is Acceptable.
Closing Date10 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.49|wvb|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| variation In Quantity (apr 1984)|3|0|5|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040|n50286|tbd|133.2|n/a|n/a|n39040|n/a|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy. mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|365 Days After Acceptance Of Material|365 Days After Acceptance Of Material||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2023)|13|332312|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Is Issued To Increase The Qty From 110 Ft To 500 Ft. \ this Amendment Is Issued To Extend The Closing Date To 02dec2024. \ 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 4.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (365 Days) 5.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000. 6. Drawings Can Be Accessed Thru: Sam.gov 7. This Award Does Not Contain Government Source Inspection (gsi) 8. Far Clause 52.232-25(a)(5), Entitled Prompt Payment, Constructive Acceptanceis Changed From 7 Days To 45 Days After Delivery Of The Supplies In Accordance With The Terms And Conditions Of The Contract. 9. Note To Dcma Aco: Clause Navsupwssga02 Is Amended To Include Post Award Pcoretaining The Following Functions: Far 42.302(3), (32), (37), (38), (40),(41),(43), (45 Through 51), (60) And (62). 10. This Order Is Issued Pursuant To Emergency Acquisition Flexibilities (eaf). 11. Viq 0+/5- Applies To This Order. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b666 | | | |201101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-std-2132 | | |d |080310|a| |01| document Ref Data=sae Ams 2806 | | |c |080301|a| | | document Ref Data=sae Ams 2807 | | |a |000901|a| | | document Ref Data=sae Ams 2809 | | |a |070801|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=sae Ams-std-185 | | | |000901|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Qq-n-286 Except As Amplified Of Modified Herein. Qq-n-286 Ordering Data Information Is Provided Below: a. Nickel-copper-aluminum Alloy, Wrought (uns N05500); Qq-n-286. b. Form - ;2; Condition - ;annealed (hot Finished Or Cold Drawn) And Age Hardened; Surface Finish - As Specified In Paragraph 4.3.3.1.3 Of Qq-n-286. c. Specification Revision Levels Must Be As Specified Elsewhere In The Contract/purchase Order. d. Forging Sketches Are Not Applicable. e. Size - ;2 Inches (round); f. Product Check Analysis Is Not Required. g. Forging Rings And Discs Are Not Applicable. h. Tolerances Must Be As Specified In Qq-n-286. i. Optional Ultrasonic Inspection Is Required. Certification Is Required. j. Optional Liquid Penetrant Inspection Is Required On Cold Worked Material Only. k. Length - Under 5" Dia. = 8 Feet Min / 12 Feet Max (plus Or Minus 10%) 5" Dia & Over = 5 Feet Min / 12 Feet Max (plus Or Minus 10%) Or As Specified Elsewhere In The Contract/purchase Order. l. Paragraph 3.9.1.3.1 Of Qq-n-286 Applies Unless Otherwise Specified. m. Edges Must Be As Specified In Paragraph 3.9.1.4 Of Qq-n-286. n. Forging Dimensions Are Not Applicable. o. Marking Must Be As Specified Elsewhere In The Contract/purchase Order. p. All Unaged Barstock Must Be Supplied In The Annealed Condition And Be Subjected To A Capability Test. q. Age Hardening Must Be Performed In Accordance With Paragraph 4.3.2.2.1, Unless Otherwise Specified. r. The Final Heat Treatment Procedure Must Be In Accordance With Qq-n-286, Unless Otherwise Specified. s. The Slow Strain Rate Tensile Test Must Be Conducted By One Of The Laboratories Identified Below. t. Level Of Preservation, Packaging, And Packing Must Be As Specified Elsewhere In The Contract/purchase Order. 3.2 Bar, Pipe, And Tube Quantities - When This Order Results In Supplying Fewer Than 5 Pieces As Defined In The "length" Paragraph Above, All Material Must Be From A Single Heat Of Material. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - Ultrasonic Inspection On Starting Material item - ;each Bar; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - ;macroetch Test (duplex Grain Structure); item - ;bar, Metal; performance - ;qq-n-286; acceptance - ;qq-n-286; test - Dye Penetrant Inspection (100% Coverage) item - Each Metal Bar (cold Worked/cold Finished) performance - T9074-as-gib-010/271 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;bar, Metal; performance - Qq-n-286 3.4 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.6 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government Inelectronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.6.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. Requests Must Include The information Listed Below. a. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. b. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. c. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To Theoperational Use Of The Product. d. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.6.2 Requests For Waivers/deviations For Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.6.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: a. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. b. A Complete Description Of The Change To Be Made And The Need For That Change. c. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. d. Proposed Changes To Documents Controlled By The Government. e. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. f. Recommendations About The Way A Retrofit Should Be Accomplished. g. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of Theproduct. h. Impacts To The Operational Use Of The Product. i. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. j. Milestones Relating To The Processing And Implementation Of The Engineeringchange. 3.7 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.8 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government To Determine The System's Effectiveness In Meeting The Quality Requirements established In The Contract/purchase Order. 3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, Make His Facilities available For Audit By The Contracting Officer Or His Authorized Representative. 3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Destination. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. 3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco. 3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made Available For operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By The government. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Any Purchasing Documents To A Subcontractor Must Cite The applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of This Order, Promptly Notify The Prime Contractor Who Will Notify The Pco So That Appropriate planning For Government Inspection Can Be Accomplished. 3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.12.2 Inspection For Completeness And Proper Type. 3.12.3 Verification Of Material Quality Received. 3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.12.6 Identification And Protection From Improper Use Or Disposition. 3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.12.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other required Objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within paragraph 3, Section C Of This Contract/purchase Order. 3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In The Contract/purchase Order. 3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.15 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. In Addition To The Marking Requirements On Applicable Specifications, Marking For Traceability Is Required. Pipe, Tube, And Metal Bar Must Have both Permanent Marking And Temporary Marking Applied As Specified Below. 3.15.1 Permanent Marking - Permanent Traceability Marking Must Be Marked On Each End Of Each Pipe, Tube, And Metal Bar. (monel And K-monel Bar: 3/4 Inch To 1 Inch Rods, And 7/8 Inch Hex Bar May Be Marked On The Surface Near The End Of Bar/rod, And Rod Less than 3/4 Inch And Hex Bar Less Than 7/8 Inch May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Tag Or Box.) All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792. An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order, And Differs From That Specified In The Specification. Electric Arc Marking Or Impression marking Is Strictly Prohibited On Thin Wall Tubing. (wall Thickness Of Less Than 0.125 Inch). 3.15.2 Temporary Marking - Temporary Marking Must Consist Of: name Or Trademark Of Manufacturer, Specification And Grade (as Applicable), Size, Contract Number, And The Traceability Marking. Pipe And Tube Marking Must Also Include Sml (for Seamless). Marking Must Be In Accordance With The Material Specification And sae-ams-2806, Sae-ams-2807, Sae-ams-2809, Table I Of Sae-ams-std-185, Or Astm-b666 As Applicable. Application Must Be In Accordance With Mil-std-792, Type A (temporary Ink Stenciling). An Alternate Method Is Permissible For Monel And K-monel Bar Provided It is An Available Option (temporary Marking Only) In The Applicable Material Specification, Except That Hot Finished Rod With Rough Ground Surface 3/4 Inch And Under May Be Bundled And Tagged Or Boxed With The Traceability Marking On The Bag Or Box. contamination Levels For Ink Stenciling Must Be As Outlined In Paragraph 5.2 Of Mil-std-792. 3.16 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.16.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.16.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.16.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.16.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.16.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.17 Material Handling - The Written Material Control Process Must Include The Following: 3.17.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.17.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.17.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.17.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.17.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.18 Receiving Inspection - 3.18.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.18.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.19 Discrepancy Reporting - 3.19.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government. 3.20 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.20.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.20.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.20.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.20.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.21 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To The Contractor - 4.1.1 The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. The Departure Must Be considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Record Of These Departures, Traceable To The Applicable Part Number And contract Number Must Be Submitted To The Pco. 4.1.3 The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions, And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That He Material Supplied conforms To The Specified Requirements. 6.1.7 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks). Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.8 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.9 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.10 A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.11 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.12 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.13 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.14 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.15 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.16 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.17 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;10/20/2016 - Updated Ecds Url - Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - May 16 2013 - Removed Gsi From This Material. - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date7 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n743.6|wvf|564-230-3066|francine.a.pommells.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| variation In Quantity (apr 1984)|3|0%|-5%|total Contract Quantity| time Of Delivery (june 1997)|20|0001|500|365 Days|||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1 423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332722|600|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| solicitation Is Amended To Extend The Closing Date To 08jan2025. 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech. 2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000. 3. The Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls After Receipt final Delivery Of Material (365 Days) please Quote Actual Delivery Days early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment. 4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. 5. A Variation In Quantity Of -5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;284593-0001 99657 F B; 2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 ;socket Head Cap Screw, To Be In Accordance With Marotta Drawing 284593-0001, Item 67, Except As Amplified Or Modified Herein.; 3.2 The Unit Of Issue Is Each. the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener. 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;socket Head Cap Screw; material - ;cres 431, Cond.ht/mil-dtl-1222; 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.15.2 Inspection For Completeness And Proper Type. 3.15.3 Verification Of Material Quality Received. 3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.15.6 Identification And Protection From Improper Use Or Disposition. 3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.15.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Mil-dtl-1222; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.19 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.19.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.19.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.20 Material Handling - The Written Material Control Process Must Include The Following: 3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.20.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.20.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.21 Receiving Inspection - 3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.21.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.22 Discrepancy Reporting - 3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.23.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.23.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date8 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.18|wvf|7176054066|karen.a.palm.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2||| variation In Quantity (apr 1984)|3|10|0|total Quantity Of Item 0001| general Information-fob-destination|1|b/a| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo)certifications - Stand-alone Receiving Report|n/a|tbd|n00104|tbd|material-s4306a; Certifications-n39040;|n50286|tbd|133.2|n/a|n/a|material-s4306a|n/a|n/a|see Dd1423| port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332722|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Quantity Has Increased From 100 Ea To 150 Ea. Please Provide Pricing For The New Quantity. \ 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mechanicsburg. 2. Final Delivery Of Material Will Be On Or Before 200 Days After Effective Dateof The Resulting Contract. 3. Any Contract Awarded As A Result Of This Solicitation Will Be Do Rated order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 4. This Item Requires Production Lot Testing (plt) Which Refers To The "additional" Fastener Required By The Tdp. The Ship To And Delivery Date Is The Same As Line Item 0001aa. 5. A Variation In Quantity Of +10%/-0% Of The Total Contract Quantity Is Allowed. See Far 52.211-16 For Further Details. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| | document Ref Data=qpl 18240 | | |qpd|140611|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Mil-dtl-1222, Except As Amplified Or Modified Herein. Mil-dtl-1222 Ordering Data Information Is Provided Below. (a) Studs, Bolts, Hex Cap Screws, Socket Head Cap Screws, And Nuts; Mil-dtl-1222. (b) Part Number - ;n/a; Configuration - ;screw; Type - ;ii; Style - ;n/a; Grade - ;500 (qq-n-286); Condition - ;solution Annealed And Age Hardened; Size - ;3/4 Inch; Length - ;1 3/4 Inches; Thread Series - ;10 Unrc; Class Of Fit - ;3a; End Configuration - ;chamfered; (c) Issue Of Dodiss Is Specified Elsewhere In The Contract/purchase Order. (d) Heat Treatment Must Be Performed In Accordance With Applicable Specifications. (e) Type Of Coating - ;n/a; (f) Aluminum Alloy Fasteners Must Be Coated In Accordance With Mil-dtl-1222, Unless Otherwise Specified In Paragraph (e) Above. (g) Externally Threaded Titanium Alloy Fasteners Must Be Anodized In Accordance With Mil-dtl-1222, Unless Otherwise Specified In Paragraph (e) Above. (h) Cut Or Ground Threads ;are Permitted; . (i) See Ordering Data Item (b) Above As Applicable. (j) Bearing Surfaces - ;n/a; (k) Self-locking Element - ;is Required And Must Be In Accordance With Mil-dtl-18240.; (l) Marking Must Be As Specified In Paragraph 3.13 Of Mil-dtl-1222. (m) Chemical, Mechanical, And Non-destructive Test Results Must Be As Specified Elsewhere In This Contract/purchase Order. (n) Resubmittal Of Fastener Lots That Failed An Examination Is Not Allowed Unless Specifically Approved By The Pco. (o) Retesting Of Mechanical Properties Is Not Allowed Unless Specifically Approved By The Pco. (p) Rework And Resubmittal Of Lots Must Be In Accordance With Mil-dtl-1222. (q) Inspection Of Defects Must Be In Accordance With Mil-dtl-1222, Unless Otherwise Specified Elsewhere In This Contract/purchase Order. (r) Acceptance Criteria For Inspection Of Defects Must Be In Accordance With Mil-dtl-1222, Unless Otherwise Specified In This Contract/purchase Order. (s) Non-destructive Testing Must Be In Accordance With Mil-dtl-1222, Unless Otherwise Specified Elsewhere In This Contract/purchase Order. (t) Mechanical Testing Must Be Performed After Final Heat Treatment, Unless Otherwise Specified Elsewhere In This Contract/purchase Order. (u) Preservation, Packaging, And Packing Requirements Must Be As Specified Elsewhere In The Contract/purchase Order. (v) - (bb) Substituting Material Grades Is Not Allowed Unless Specifically Approved By The Pco. 3.2 The Unit Of Issue Is Each. the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below. test - ;liquid Penetrant Inspection; item - ;screw, Cap, Socket Head, Self-locking; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 attribute - Annealing And Age Hardening item - ;screw, Cap, Socket Head, Self-locking; performance - Qq-n-286 3.4 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.4.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.4.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.4.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.5 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.5.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.5.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.6 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must Be performed On A Full Size Fastener.) 3.6.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.6.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.7 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.11 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.11.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.11.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.11.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. ^ Quality Assurance Requirements ^ 3.12 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.16.2 Inspection For Completeness And Proper Type. 3.16.3 Verification Of Material Quality Received. 3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.16.6 Identification And Protection From Improper Use Or Disposition. 3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.16.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Mil-dtl-1222; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.20 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.20.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.20.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.21 Material Handling - The Written Material Control Process Must Include The Following: 3.21.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.21.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.21.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.21.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.21.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.22 Receiving Inspection - 3.22.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.22.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.23 Discrepancy Reporting - 3.23.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.24 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.24.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.24.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.24.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.24.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.25 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Dec 17 2011 - Expanded Thread Cutting Requirements - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date13 Jan 2025
Tender AmountRefer Documents 
41-50 of 59 archived Tenders