Structural Design Tenders
Structural Design Tenders
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date3 Jun 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.30| Wvdbb Wvqbb Wvdbb Wvcdd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/
a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (feb 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be"do" Rated Order Certified For National Defense Use Under The Defense Priorities Andallocations System (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;s3c10011 99517 K B
atp-s3c10011 99517 A B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;regulator Control Block Assembly Must Be In Accordance With Vacco Drawing S3c10011, Part Number S3c10011-01, Except As Amplifed Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;body, Item 1;
material - ;300 Series Per Sae Ams-qq-s-763 Or Astm-a582;
part - ;stem, Item 2;
material - ;sae Ams 5643, Condition H1025;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;acceptance Tests;
item - ;each Regulator Control Block Assembly;
performance - ;atp-s3c10011;
acceptance - ;atp-s3c10011;
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;body, Item 1;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.7 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.7.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.7.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.7.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.8 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.9 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.9.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.10 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.10.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.10.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.10.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.11 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.12 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.13 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.14 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.14.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.14.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.14.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.14.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.14.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.14.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.14.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.14.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.14.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.14.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.14.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.14.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.15 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.15.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.15.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.15.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.15.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.15.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.16 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.16.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.16.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.17 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.17.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.17.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.17.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.17.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.17.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.18 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.18.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.18.2 Inspection For Completeness And Proper Type.
3.18.3 Verification Of Material Quality Received.
3.18.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.18.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.18.6 Identification And Protection From Improper Use Or Disposition.
3.18.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.18.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.18.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.19 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.19.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.20 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.20.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.20.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.20.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.20.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.21 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.21.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.21.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.21.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.21.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.21.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.22 Material Handling - The Written Material Control Process Must Include The Following:
3.22.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.22.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.22.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.22.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.22.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.22.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.23 Receiving Inspection -
3.23.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.23.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.24 Discrepancy Reporting -
3.24.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.25 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.25.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.25.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.25.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.25.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.26 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
delivery Days Will Be Established For This Clin At Time Of Award. date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;s1e10070 99517 U B;
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Tailpiece Must Be In Accordance With Vacco Systems Drawing S1e10070, Part Number S2d10189-3ea, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;tailpiece;
material - ;sae-ams-qq-s-763, Class 304;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;tailpiece;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
3.4 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.6.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.7 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.7.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.7.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.7.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Gove
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Closing Date18 Mar 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.42|wwv|7176051883|vincent.e.molesky.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E |
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version (jun 2002)|8|x||x||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|tbd|n50286|tbd|n/a|n/a|n/a|n39040 Certification||n/a|see Dd 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year |365 Days After Last Delivery Under This Contract |||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|332613|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. Dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Schedule Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 250 Days
after Effective Date Of Resulting Contract.
3. Any Contract Awarded As A Result Of This Solicitation Will Be "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocation System (dpas).
4. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7384567 |53711| B| |d|0000.a | A|49998|0047915
drawing Data=7384567 |53711| B| |d|0000.b | A|49998|0012340
drawing Data=7384567 |53711| B| |d|0000.c1 | A|49998|0063360
drawing Data=7384567 |53711| B| |d|0000.c2 | A|49998|0067816
drawing Data=7384567 |53711| B| |d|0000.c3 | A|49998|0047261
drawing Data=7384567 |53711| B| |d|0001 | B|49998|0541091
drawing Data=7384567 |53711| B| |d|0002.1 | B|49998|0049340
drawing Data=7384567 |53711| B| |d|0002.2 | B|49998|0050116
drawing Data=7384567 |53711| B| |d|0002.3 | B|49998|0039027
drawing Data=7384567 |53711| B| |d|0003 | A|49998|0008195
drawing Data=7384567 |53711| B| |d|0004 | B|49998|0035857
drawing Data=7384567 |53711| B| |d|0005 | A|49998|0027924
drawing Data=7384567 |53711| B| |d|0006.1 | B|49998|0051344
drawing Data=7384567 |53711| B| |d|0006.10 | B|49998|0018590
drawing Data=7384567 |53711| B| |d|0006.2 | B|49998|0050621
drawing Data=7384567 |53711| B| |d|0006.3 | B|49998|0046742
drawing Data=7384567 |53711| B| |d|0006.4 | B|49998|0044834
drawing Data=7384567 |53711| B| |d|0006.5 | B|49998|0040241
drawing Data=7384567 |53711| B| |d|0006.6 | B|49998|0048952
drawing Data=7384567 |53711| B| |d|0006.7 | B|49998|0041918
drawing Data=7384567 |53711| B| |d|0006.8 | B|49998|0052570
drawing Data=7384567 |53711| B| |d|0006.9 | B|49998|0020773
drawing Data=7384567 |53711| B| |d|0007.1 | B|49998|0030970
drawing Data=7384567 |53711| B| |d|0007.10 | B|49998|0034322
drawing Data=7384567 |53711| B| |d|0007.11 | B|49998|0035957
drawing Data=7384567 |53711| B| |d|0007.12 | B|49998|0036745
drawing Data=7384567 |53711| B| |d|0007.13 | B|49998|0031068
drawing Data=7384567 |53711| B| |d|0007.14 | B|49998|0032727
drawing Data=7384567 |53711| B| |d|0007.15 | B|49998|0033853
drawing Data=7384567 |53711| B| |d|0007.16 | B|49998|0036960
drawing Data=7384567 |53711| B| |d|0007.17 | B|49998|0038132
drawing Data=7384567 |53711| B| |d|0007.18 | B|49998|0036627
drawing Data=7384567 |53711| B| |d|0007.19 | B|49998|0031460
drawing Data=7384567 |53711| B| |d|0007.2 | B|49998|0031768
drawing Data=7384567 |53711| B| |d|0007.20 | B|49998|0031227
drawing Data=7384567 |53711| B| |d|0007.21 | B|49998|0035590
drawing Data=7384567 |53711| B| |d|0007.22 | B|49998|0032406
drawing Data=7384567 |53711| B| |d|0007.23 | B|49998|0032888
drawing Data=7384567 |53711| B| |d|0007.24 | B|49998|0033759
drawing Data=7384567 |53711| B| |d|0007.25 | B|49998|0032713
drawing Data=7384567 |53711| B| |d|0007.26 | B|49998|0030746
drawing Data=7384567 |53711| B| |d|0007.27 | B|49998|0029951
drawing Data=7384567 |53711| B| |d|0007.28 | B|49998|0030916
drawing Data=7384567 |53711| B| |d|0007.29 | B|49998|0036562
drawing Data=7384567 |53711| B| |d|0007.3 | B|49998|0029144
drawing Data=7384567 |53711| B| |d|0007.30 | B|49998|0035822
drawing Data=7384567 |53711| B| |d|0007.31 | B|49998|0035710
drawing Data=7384567 |53711| B| |d|0007.32 | B|49998|0035391
drawing Data=7384567 |53711| B| |d|0007.33 | B|49998|0038044
drawing Data=7384567 |53711| B| |d|0007.34 | B|49998|0035787
drawing Data=7384567 |53711| B| |d|0007.35 | B|49998|0032424
drawing Data=7384567 |53711| B| |d|0007.36 | B|49998|0032716
drawing Data=7384567 |53711| B| |d|0007.37 | B|49998|0034125
drawing Data=7384567 |53711| B| |d|0007.38 | B|49998|0034895
drawing Data=7384567 |53711| B| |d|0007.39 | B|49998|0036124
drawing Data=7384567 |53711| B| |d|0007.4 | B|49998|0030904
drawing Data=7384567 |53711| B| |d|0007.40 | B|49998|0037245
drawing Data=7384567 |53711| B| |d|0007.41 | B|49998|0035893
drawing Data=7384567 |53711| B| |d|0007.42 | B|49998|0030509
drawing Data=7384567 |53711| B| |d|0007.43 | B|49998|0031504
drawing Data=7384567 |53711| B| |d|0007.44 | B|49998|0034862
drawing Data=7384567 |53711| B| |d|0007.45 | B|49998|0019826
drawing Data=7384567 |53711| B| |d|0007.5 | B|49998|0032757
drawing Data=7384567 |53711| B| |d|0007.6 | B|49998|0030206
drawing Data=7384567 |53711| B| |d|0007.7 | B|49998|0035655
drawing Data=7384567 |53711| B| |d|0007.8 | B|49998|0034678
drawing Data=7384567 |53711| B| |d|0007.9 | B|49998|0034181
drawing Data=7384567 |53711| B| |d|0008.1 | B|49998|0047060
drawing Data=7384567 |53711| B| |d|0008.10 | B|49998|0046913
drawing Data=7384567 |53711| B| |d|0008.11 | B|49998|0045668
drawing Data=7384567 |53711| B| |d|0008.12 | B|49998|0044059
drawing Data=7384567 |53711| B| |d|0008.13 | B|49998|0046117
drawing Data=7384567 |53711| B| |d|0008.14 | B|49998|0050092
drawing Data=7384567 |53711| B| |d|0008.15 | B|49998|0048036
drawing Data=7384567 |53711| B| |d|0008.16 | B|49998|0042649
drawing Data=7384567 |53711| B| |d|0008.17 | B|49998|0041300
drawing Data=7384567 |53711| B| |d|0008.18 | B|49998|0021672
drawing Data=7384567 |53711| B| |d|0008.19 | B|49998|0018145
drawing Data=7384567 |53711| B| |d|0008.2 | B|49998|0051081
drawing Data=7384567 |53711| B| |d|0008.20 | B|49998|0008759
drawing Data=7384567 |53711| B| |d|0008.3 | B|49998|0045412
drawing Data=7384567 |53711| B| |d|0008.4 | B|49998|0045820
drawing Data=7384567 |53711| B| |d|0008.5 | B|49998|0047940
drawing Data=7384567 |53711| B| |d|0008.6 | B|49998|0047030
drawing Data=7384567 |53711| B| |d|0008.7 | B|49998|0044513
drawing Data=7384567 |53711| B| |d|0008.8 | B|49998|0047005
drawing Data=7384567 |53711| B| |d|0008.9 | B|49998|0049947
drawing Data=7384567 |53711| B| |d|0009 | A|49998|0042709
drawing Data=7384567 |53711| B| |d|0010 | A|49998|0381945
drawing Data=7384567 |53711| B| |d|0011 | A|49998|0377930
drawing Data=7384567 |53711| B| |d|0012 | B|49998|0438708
drawing Data=7384567 |53711| B| |d|0013 | B|49998|0425947
drawing Data=7384567 |53711| B| |d|0014 | B|49998|0024163
drawing Data=7384567 |53711| B| |d|0015 | B|49998|0028587
drawing Data=7384567 |53711| B| |d|0016 | A|49998|0030960
drawing Data=7384567 |53711| B| |d|0017 | B|49998|0345977
drawing Data=7384567 |53711| B| |d|0018 | B|49998|0488724
drawing Data=7384567 |53711| B| |d|0019 | B|49998|0037883
drawing Data=7384567 |53711| B| |d|0019.1 | B|49998|0019839
drawing Data=7384567 |53711| B| |d|0020 | A|49998|0024639
drawing Data=7384567 |53711| B| |d|0021 | A|49998|0033119
drawing Data=7384567 |53711| B| |d|0022 | B|49998|0042432
drawing Data=7384567 |53711| B| |d|0023 | B|49998|0028348
drawing Data=7384567 |53711| B| |d|0024 | A|49998|0028158
drawing Data=7384567 |53711| B| |d|0025 | A|49998|0030240
drawing Data=7384567 |53711| B| |d|0026 | B|49998|0031400
drawing Data=7384567 |53711| B| |d|0027 | A|49998|0039543
drawing Data=7384567 |53711| B| |d|0028 | A|49998|0031593
drawing Data=7384567 |53711| B| |d|0029 | A|49998|0034213
drawing Data=7384567 |53711| B| |d|0030 | B|49998|0036511
drawing Data=7384567 |53711| B| |d|0031 | A|49998|0014761
drawing Data=7384567 |53711| B| |d|0032 | A|49998|0023154
drawing Data=7384567 |53711| B| |d|0033 | A|49998|0018565
drawing Data=7384567 |53711| B| |d|0034 | B|49998|0025969
drawing Data=7384567 |53711| B| |d|0035 | A|49998|0031138
drawing Data=7384567 |53711| B| |d|0036 | A|49998|0033451
drawing Data=7384567 |53711| B| |d|0037 | A|49998|0032161
drawing Data=7384567 |53711| B| |d|0038 | A|49998|0025245
drawing Data=7384567 |53711| B| |d|0039 | A|49998|0033687
drawing Data=7384567 |53711| B| |d|0040 | A|49998|0025985
drawing Data=7384567 |53711| B| |d|0041 | A|49998|0034616
drawing Data=7384567 |53711| B| |d|0042 | B|49998|0039232
drawing Data=7384567 |53711| B| |d|0043 | A|49998|0020916
drawing Data=7384567 |53711| B| |d|0044 | A|49998|0023047
drawing Data=7384567 |53711| B| |d|0045 | A|49998|0016440
drawing Data=7384567 |53711| B| |d|0046 | A|49998|0027094
drawing Data=7384567 |53711| B| |d|0047 | A|49998|0025150
drawing Data=7384567 |53711| B| |d|0048 | A|49998|0040122
drawing Data=7384567 |53711| B| |d|0049 | A|49998|0041616
drawing Data=7384567 |53711| B| |d|0050 | A|49998|0029207
drawing Data=7384567 |53711| B| |d|0051 | B|49998|0032310
drawing Data=7384567 |53711| B| |d|0052 | A|49998|0026523
drawing Data=7384567 |53711| B| |d|0053 | A|49998|0025913
drawing Data=7384567 |53711| B| |d|0054 | A|49998|0026989
drawing Data=7384567 |53711| B| |d|0055 | A|49998|0021634
drawing Data=7384567 |53711| B| |d|0056 | A|49998|0025499
drawing Data=7384567 |53711| B| |d|0057 | A|49998|0021584
drawing Data=7384567 |53711| B| |d|0058 | A|49998|0019594
drawing Data=7384567 |53711| B| |d|0059 | B|49998|0025953
drawing Data=7384567 |53711| B| |d|0060 | A|49998|0021104
drawing Data=7384567 |53711| B| |d|0061 | A|49998|0029864
drawing Data=7384567 |53711| B| |d|0062 | A|49998|0030574
drawing Data=7384567 |53711| B| |d|0063 | A|49998|0031783
drawing Data=7384567 |53711| B| |d|0064 | B|49998|0030482
drawing Data=7384567 |53711| B| |d|0065 | B|49998|0026312
drawing Data=7384567 |53711| B| |d|0066 | A|49998|0027833
drawing Data=7384567 |53711| B| |d|0067 | A|49998|0031218
drawing Data=7384567 |53711| B| |d|0068 | B|49998|0027341
drawing Data=7384567 |53711| B| |d|0069 | A|49998|0027314
drawing Data=7384567 |53711| B| |d|0070 | B|49998|0026721
drawing Data=7384567 |53711| B| |d|0071 | A|49998|0019947
drawing Data=7384567 |53711| B| |d|0072 | A|49998|0023480
drawing Data=7384567 |53711| B| |d|0073 | A|49998|0023379
drawing Data=7384567 |53711| B| |d|0074 | A|49998|0018760
drawing Data=7384567 |53711| B| |d|0075 | A|49998|0018731
drawing Data=7384567 |53711| B| |d|0076 | A|49998|0033001
drawing Data=7384567 |53711| B| |d|0077 | B|49998|0025694
drawing Data=7384567 |53711| B| |d|0078 | B|49998|0015947
drawing Data=7384567 |53711| B| |d|0079 | B|49998|0025543
drawing Data=7384567 |53711| B| |d|0080 | A|49998|0022691
drawing Data=7384567 |53711| B| |d|0081 | B|49998|0026827
drawing Data=7384567 |53711| B| |d|0082 | A|49998|0024208
drawing Data=7384567 |53711| B| |d|0083 | A|49998|0025319
drawing Data=7384567 |53711| B| |d|0084 | B|49998|0021681
drawing Data=7384567 |53711| B| |d|0085 | A|49998|0027127
drawing Data=7384567 |53711| B| |d|0086 | B|49998|0026948
drawing Data=7384567 |53711| B| |d|0087 | B|49998|0021388
drawing Data=7384567 |53711| B| |d|0088 | B|49998|0020078
drawing Data=7384567 |53711| B| |d|0089 | B|49998|0020412
drawing Data=7384567 |53711| B| |d|0090 | B|49998|0021010
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 ;the Spring, Left-hand Must Be Manufactured In Accordance With Navsea Drawing 7384567 Part Number 97, Except As Amplified Or Modified Herein.;
3.2 ;the Technical Data Contained In Csd169 Supersedes The Data Shown On Navsea Drawing 7384567 Sheet 63.;
3.3 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd169; In Ecds At Https://register.nslc.navy.mil/
3.4 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.6 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.7 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.7.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.7.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.7.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.7.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.7.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.8 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.8.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.8.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.9 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.10 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.10.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.10.2 Inspection For Completeness And Proper Type.
3.10.3 Verification Of Material Quality Received.
3.10.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.10.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.10.6 Identification And Protection From Improper Use Or Disposition.
3.10.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.10.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.10.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.11 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe).
3.11.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order.
3.12 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability
number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All
process Operations Including Any Subcontracted Operations, To The Finished Component.
3.12.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical,
an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed.
the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.12.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A
method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.13 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.13.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.13.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.13.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.14 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True"
are Not Acceptable.
3.14.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, Or S-5343934-3, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7384567 |53711| B| |d|0000.a | A|49998|0047915
drawing Data=7384567 |53711| B| |d|0000.b | A|49998|0012340
drawing Data=7384567 |53711| B| |d|0000.c1 | A|49998|0063360
drawing Data=7384567 |53711| B| |d|0000.c2 | A|49998|0067816
drawing Data=7384567 |53711| B| |d|0000.c3 | A|49998|0047261
drawing Data=7384567 |53711| B| |d|0001 | B|49998|0541091
drawing Data=7384567 |53711| B| |d|0002.1 | B|49998|0049340
drawing Data=7384567 |53711| B| |d|0002.2 | B|49998|0050116
drawing Data=7384567 |53711| B| |d|0002.3 | B|49998|0039027
drawing Data=7384567 |53711| B| |d|0003 | A|49998|0008195
drawing Data=7384567 |53711| B| |d|0004 | B|49998|0035857
drawing Data=7384567 |53711| B| |d|0005 | A|49998|0027924
drawing Data=7384567 |53711| B| |d|0006.1 | B|49998|0051344
drawing Data=7384567 |53711| B| |d|0006.10 | B|49998|0018590
drawing Data=7384567 |53711| B| |d|0006.2 | B|49998|0050621
drawing Data=7384567 |53711| B| |d|0006.3 | B|49998|0046742
drawing Data=7384567 |53711| B| |d|0006.4 | B|49998|0044834
drawing Data=7384567 |53711| B| |d|0006.5 | B|49998|0040241
drawing Data=7384567 |53711| B| |d|0006.6 | B|49998|0048952
drawing Data=7384567 |53711| B| |d|0006.7 | B|49998|0041918
drawing Data=7384567 |53711| B| |d|0006.8 | B|49998|0052570
drawing Data=7384567 |53711| B| |d|0006.9 | B|49998|0020773
drawing Data=7384567 |53711| B| |d|0007.1 | B|49998|0030970
drawing Data=7384567 |53711| B| |d|0007.10 | B|49998|0034322
drawing Data=7384567 |53711| B| |d|0007.11 | B|49998|0035957
drawing Data=7384567 |53711| B| |d|0007.12 | B|49998|0036745
drawing Data=7384567 |53711| B| |d|0007.13 | B|49998|0031068
drawing Data=7384567 |53711| B| |d|0007.14 | B|49998|0032727
drawing Data=7384567 |53711| B| |d|0007.15 | B|49998|0033853
drawing Data=7384567 |53711| B| |d|0007.16 | B|49998|0036960
drawing Data=7384567 |53711| B| |d|0007.17 | B|49998|0038132
drawing Data=7384567 |53711| B| |d|0007.18 | B|49998|0036627
drawing Data=7384567 |53711| B| |d|0007.19 | B|49998|0031460
drawing Data=7384567 |53711| B| |d|0007.2 | B|49998|0031768
drawing Data=7384567 |53711| B| |d|0007.20 | B|49998|0031227
drawing Data=7384567 |53711| B| |d|0007.21 | B|49998|0035590
drawing Data=7384567 |53711| B| |d|0007.22 | B|49998|0032406
drawing Data=7384567 |53711| B| |d|0007.23 | B|49998|0032888
drawing Data=7384567 |53711| B| |d|0007.24 | B|49998|0033759
drawing Data=7384567 |53711| B| |d|0007.25 | B|49998|0032713
drawing Data=7384567 |53711| B| |d|0007.26 | B|49998|0030746
drawing Data=7384567 |53711| B| |d|0007.27 | B|49998|0029951
drawing Data=7384567 |53711| B| |d|0007.28 | B|49998|0030916
drawing Data=7384567 |53711| B| |d|0007.29 | B|49998|0036562
drawing Data=7384567 |53711| B| |d|0007.3 | B|49998|0029144
drawing Data=7384567 |53711| B| |d|0007.30 | B|49998|0035822
drawing Data=7384567 |53711| B| |d|0007.31 | B|49998|0035710
drawing Data=7384567 |53711| B| |d|0007.32 | B|49998|0035391
drawing Data=7384567 |53711| B| |d|0007.33 | B|49998|0038044
drawing Data=7384567 |53711| B| |d|0007.34 | B|49998|0035787
drawing Data=7384567 |53711| B| |d|0007.35 | B|49998|0032424
drawing Data=7384567 |53711| B| |d|0007.36 | B|49998|0032716
drawing Data=7384567 |53711| B| |d|0007.37 | B|49998|0034125
drawing Data=7384567 |53711| B| |d|0007.38 | B|49998|0034895
drawing Data=7384567 |53711| B| |d|0007.39 | B|49998|0036124
drawing Data=7384567 |53711| B| |d|0007.4 | B|49998|0030904
drawing Data=7384567 |53711| B| |d|0007.40 | B|49998|0037245
drawing Data=7384567 |53711| B| |d|0007.41 | B|49998|0035893
drawing Data=7384567 |53711| B| |d|0007.42 | B|49998|0030509
drawing Data=7384567 |53711| B| |d|0007.43 | B|49998|0031504
drawing Data=7384567 |53711| B| |d|0007.44 | B|49998|0034862
drawing Data=7384567 |53711| B| |d|0007.45 | B|49998|0019826
drawing Data=7384567 |53711| B| |d|0007.5 | B|49998|0032757
drawing Data=7384567 |53711| B| |d|0007.6 | B|49998|0030206
drawing Data=7384567 |53711| B| |d|0007.7 | B|49998|0035655
drawing Data=7384567 |53711| B| |d|0007.8 | B|49998|0034678
drawing Data=7384567 |53711| B| |d|0007.9 | B|49998|0034181
drawing Data=7384567 |53711| B| |d|0008.1 | B|49998|0047060
drawing Data=7384567 |53711| B| |d|0008.10 | B|49998|0046913
drawing Data=7384567 |53711| B| |d|0008.11 | B|49998|0045668
drawing Data=7384567 |53711| B| |d|0008.12 | B|49998|0044059
drawing Data=7384567 |53711| B| |d|0008.13 | B|49998|0046117
drawing Data=7384567 |53711| B| |d|0008.14 | B|49998|0050092
drawing Data=7384567 |53711| B| |d|0008.15 | B|49998|0048036
drawing Data=7384567 |53711| B| |d|0008.16 | B|49998|0042649
drawing Data=7384567 |53711| B| |d|0008.17 | B|49998|0041300
drawing Data=7384567 |53711| B| |d|0008.18 | B|49998|0021672
drawing Data=7384567 |53711| B| |d|0008.19 | B|49998|0018145
drawing Data=7384567 |53711| B| |d|0008.2 | B|49998|0051081
drawing Data=7384567 |53711| B| |d|0008.20 | B|49998|0008759
drawing Data=7384567 |53711| B| |d|0008.3 | B|49998|0045412
drawing Data=7384567 |53711| B| |d|0008.4 | B|49998|0045820
drawing Data=7384567 |53711| B| |d|0008.5 | B|49998|0047940
drawing Data=7384567 |53711| B| |d|0008.6 | B|49998|0047030
drawing Data=7384567 |53711| B| |d|0008.7 | B|49998|0044513
drawing Data=7384567 |53711| B| |d|0008.8 | B|49998|0047005
drawing Data=7384567 |53711| B| |d|0008.9 | B|49998|0049947
drawing Data=7384567 |53711| B| |d|0009 | A|49998|0042709
drawing Data=7384567 |53711| B| |d|0010 | A|49998|0381945
drawing Data=7384567 |53711| B| |d|0011 | A|49998|0377930
drawing Data=7384567 |53711| B| |d|0012 | B|49998|0438708
drawing Data=7384567 |53711| B| |d|0013 | B|49998|0425947
drawing Data=7384567 |53711| B| |d|0014 | B|49998|0024163
drawing Data=7384567 |53711| B| |d|0015 | B|49998|0028587
drawing Data=7384567 |53711| B| |d|0016 | A|49998|0030960
drawing Data=7384567 |53711| B| |d|0017 | B|49998|0345977
drawing Data=7384567 |53711| B| |d|0018 | B|49998|0488724
drawing Data=7384567 |53711| B| |d|0019 | B|49998|0037883
drawing Data=7384567 |53711| B| |d|0019.1 | B|49998|0019839
drawing Data=7384567 |53711| B| |d|0020 | A|49998|0024639
drawing Data=7384567 |53711| B| |d|0021 | A|49998|0033119
drawing Data=7384567 |53711| B| |d|0022 | B|49998|0042432
drawing Data=7384567 |53711| B| |d|0023 | B|49998|0028348
drawing Data=7384567 |53711| B| |d|0024 | A|49998|0028158
drawing Data=7384567 |53711| B| |d|0025 | A|49998|0030240
drawing Data=7384567 |53711| B| |d|0026 | B|49998|0031400
drawing Data=7384567 |53711| B| |d|0027 | A|49998|0039543
drawing Data=7384567 |53711| B| |d|0028 | A|49998|0031593
drawing Data=7384567 |53711| B| |d|0029 | A|49998|0034213
drawing Data=7384567 |53711| B| |d|0030 | B|49998|0036511
drawing Data=7384567 |53711| B| |d|0031 | A|49998|0014761
drawing Data=7384567 |53711| B| |d|0032 | A|49998|0023154
drawing Data=7384567 |53711| B| |d|0033 | A|49998|0018565
drawing Data=7384567 |53711| B| |d|0034 | B|49998|0025969
drawing Data=7384567 |53711| B| |d|0035 | A|49998|0031138
drawing Data=7384567 |53711| B| |d|0036 | A|49998|0033451
drawing Data=7384567 |53711| B| |d|0037 | A|49998|0032161
drawing Data=7384567 |53711| B| |d|0038 | A|49998|0025245
drawing Data=7384567 |53711| B| |d|0039 | A|49998|0033687
drawing Data=7384567
DEPT OF THE NAVY USA Tender
United States
Closing Date1 Jul 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.45|n/a|717-605-2227|sylvia.sentz@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001 - 0006|12 Total (2 Units Per Niin)|558 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd
1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Drawings Associated With This Solicitation Will Be Made Available On The Sam.gov Website But Will Be Restricted Access, Which Needs To Be Approved. Once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform
them Of The Request.
3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
4. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (558 Days)
early And Incremental Delivery Is Acceptable At No Additional Cost To The Government.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Li-soc Item - It Has Been Determined That This Item Falls Within Both The Level I Boundary And The Scope Of Certification (soc) Boundary.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7384912 |53711| B| |d|0001 | B|49998|9999999
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-130 | | |n |121116|a| |01|
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 ;splined Shaft Must Be Made In Accordance With Navsea Drawing 7384912, Part Number 90, Except As Amplified Or Modified Herein.;
3.2 ;no Weld Repair Allowed On Qq-n-286 Material.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;splined Shaft;
material - ;qq-n-286; Form 2, Annealed, Hot Finished, And Age Hardened;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
attribute - Annealing And Age Hardening
item - ;splined Shaft;
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
3.5 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.9 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.10 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.10.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-4
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.15.2 Inspection For Completeness And Proper Type.
3.15.3 Verification Of Material Quality Received.
3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.15.6 Identification And Protection From Improper Use Or Disposition.
3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.15.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.17.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.17.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.17.3 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The
original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number ____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And
contract Requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.19 Material Handling - The Written Material Control Process Must Include The Following:
3.19.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.19.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.19.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.19.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.19.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.19.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.20 Receiving Inspection -
3.20.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.20.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.21 Discrepancy Reporting -
3.21.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.22 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.22.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.22.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.22.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.22.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.23 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Li-soc Item - It Has Been Determined That This Item Falls Within Both The Level I Boundary And The Scope Of Certification (soc) Boundary.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=7384912 |53711| B| |d|0001 | B|49998|9999999
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-130 | | |n |121116|a| |01|
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 ;splined Shaft Must Be Made In Accordance With Navsea Drawing 7384912, Part Number 91, Except As Amplified Or Modified Herein.;
3.2 ;no Weld Repair Allowed On Qq-n-286 Material.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;splined Shaft;
material - ;qq-n-286; Form 2, Annealed, Hot Finished, And Age Hardened;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
attribute - Annealing And Age Hardening
item - ;splined Shaft;
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
3.5 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.9 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.10 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.10.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-4
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agenc
DEPT OF THE NAVY USA Tender
Telecommunication Services
United States
Closing Date30 Apr 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.42|wwu/wwv|7176051883|vincent.e.molesky.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And E |
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version (jun 2002)|8|x||x||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receceiving Report Combo|n/a|tbd|n00104|tbd|tbd|n50286|n/a|n/a|n/a|n/a|n39040 Certifications|n/a|n/a|n/a|n/a|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|1 Year |365 Days After Last Delivery Under This Contract |||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|332991|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
3.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (365 Days)
4.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
1.1.2 This ;bearing Sleeve; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May Require
testing.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;kjb909200b-94 50632 Nc B;
2.2.3 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.4 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=h547-0292a1 |53711| A|er |d|0001 | A|49998|8752667
drawing Data=7106771 |53711| A| |d|0000.a | A|49998|0035412
drawing Data=7106771 |53711| A| |d|0001 | A|49998|0082597
drawing Data=7106771 |53711| A| |d|0002 | A|49998|0057512
drawing Data=7106771 |53711| A| |d|0003 | A|49998|0010060
drawing Data=7106771 |53711| A| |d|0004 | A|49998|0012281
drawing Data=7106771 |53711| A| |d|0005 | A|49998|0032228
drawing Data=7106771 |53711| A| |d|0006.1 | A|49998|0065628
drawing Data=7106771 |53711| A| |d|0006.2 | A|49998|0055983
drawing Data=7106771 |53711| A| |d|0006.3 | A|49998|0051850
drawing Data=7106771 |53711| A| |d|0006.4 | A|49998|0033335
drawing Data=7106771 |53711| A| |d|0007.1 | A|49998|0025301
drawing Data=7106771 |53711| A| |d|0007.10 | A|49998|0051258
drawing Data=7106771 |53711| A| |d|0007.11 | A|49998|0042871
drawing Data=7106771 |53711| A| |d|0007.12 | A|49998|0050275
drawing Data=7106771 |53711| A| |d|0007.13 | A|49998|0054998
drawing Data=7106771 |53711| A| |d|0007.14 | A|49998|0037963
drawing Data=7106771 |53711| A| |d|0007.2 | A|49998|0043945
drawing Data=7106771 |53711| A| |d|0007.3 | A|49998|0048239
drawing Data=7106771 |53711| A| |d|0007.4 | A|49998|0045053
drawing Data=7106771 |53711| A| |d|0007.5 | A|49998|0047468
drawing Data=7106771 |53711| A| |d|0007.6 | A|49998|0046727
drawing Data=7106771 |53711| A| |d|0007.7 | A|49998|0046574
drawing Data=7106771 |53711| A| |d|0007.8 | A|49998|0049816
drawing Data=7106771 |53711| A| |d|0007.9 | A|49998|0049941
drawing Data=7106771 |53711| A| |d|0008.1 | A|49998|0030287
drawing Data=7106771 |53711| A| |d|0008.2 | A|49998|0054270
drawing Data=7106771 |53711| A| |d|0008.3 | A|49998|0057515
drawing Data=7106771 |53711| A| |d|0008.4 | A|49998|0013368
drawing Data=7106771 |53711| A| |d|0008.5 | A|49998|0009152
drawing Data=7106771 |53711| A| |d|0009 | A|49998|0053269
drawing Data=7106771 |53711| A| |d|0010 | A|49998|0122282
drawing Data=7106771 |53711| A| |d|0011 | A|49998|0127755
drawing Data=7106771 |53711| A| |d|0012 | A|49998|0144956
drawing Data=7106771 |53711| A| |d|0013 | A|49998|0175151
drawing Data=7106771 |53711| A| |d|0014 | A|49998|0089875
drawing Data=7106771 |53711| A| |d|0015 | A|49998|0112836
drawing Data=7106771 |53711| A| |d|0016 | A|49998|0132821
drawing Data=7106771 |53711| A| |d|0017 | A|49998|0139888
drawing Data=7106771 |53711| A| |d|0018 | A|49998|0064914
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a564 | | |a |190901|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=ss800-ag-man-010/p-9290 | | |a |200324|a| |42|
3. Requirements
3.1 ;the Sleeve Bearing Must Be Manufactured In Accordance With Navsea Drawing 7106771, Part Number 94 And Erh547-0292a1, Except As Amplified Or Modified Herein.;
3.2 ;per Note 7001 Of Navsea Drawing 7106771, Kamatics Is The Approved Source Of Supply For This Item. Kamatics Drawing Number Kjb909200b-94 Is Invoked Herein For Reference Only.;
3.3 ;tensile And Hardness Tests Are Required After Heat Treating In Accordance With Astm-a564 Paragraph 8. Only A Certificate Of Compliance Is Required.;
3.4 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.6 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.7 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.7.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.7.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.7.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.7.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.7.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.8 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.8.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.8.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.9 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.10 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.10.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.10.2 Inspection For Completeness And Proper Type.
3.10.3 Verification Of Material Quality Received.
3.10.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.10.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.10.6 Identification And Protection From Improper Use Or Disposition.
3.10.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.10.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.10.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.11 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe).
3.11.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order.
3.12 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability
number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All
process Operations Including Any Subcontracted Operations, To The Finished Component.
3.12.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical,
an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed.
the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.12.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A
method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.13 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.13.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.13.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.13.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.14 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True"
are Not Acceptable.
3.14.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
3.15.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below:
13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
1.1.2 This ;bearing,sleeve; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May Require
testing.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;kjb909200b-95 50632 Nc B;
2.2.3 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.4 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=h547-0292a1 |53711| A|er |d|0001 | A|49998|8752667
drawing Data=7106771 |53711| A| |d|0000.a | A|49998|0035412
drawing Data=7106771 |53711| A| |d|0001 | A|49998|0082597
drawing Data=7106771 |53711| A| |d|0002 | A|49998|0057512
drawing Data=7106771 |53711| A| |d|0003 | A|49998|0010060
drawing Data=7106771 |53711| A| |d|0004 | A|49998|0012281
drawing Data=7106771 |53711| A| |d|0005 | A|49998|0032228
drawing Data=7106771 |53711| A| |d|0006.1 | A|49998|0065628
drawing Data=7106771 |53711| A| |d|0006.2 | A|49998|0055983
drawing Data=7106771 |53711| A| |d|0006.3 | A|49998|0051850
drawing Data=7106771 |53711| A| |d|0006.4 | A|49998|0033335
drawing Data=7106771 |53711| A| |d|0007.1 | A|49998|0025301
drawing Data=7106771 |53711| A| |d|0007.10 | A|49998|0051258
drawing Data=7106771 |53711| A| |d|0007.11 | A|49998|0042871
drawing Data=7106771 |53711| A| |d|0007.12 | A|49998|0050275
drawing Data=7106771 |53711| A| |d|0007.13 | A|49998|0054998
drawing Data=7106771 |53711| A| |d|0007.14 | A|49998|0037963
drawing Data=7106771 |53711| A| |d|0007.2 | A|49998|0043945
drawing Data=7106771 |53711| A| |d|0007.3 | A|49998|0048239
drawing Data=7106771 |53711| A| |d|0007.4 | A|49998|0045053
drawing Data=7106771 |53711| A| |d|0007.5 | A|49998|0047468
drawing Data=7106771 |53711| A| |d|0007.6 | A|49998|0046727
drawing Data=7106771 |53711| A| |d|0007.7 | A|49998|0046574
drawing Data=7106771 |53711| A| |d|0007.8 | A|49998|0049816
drawing Data=7106771 |53711| A| |d|0007.9 | A|49998|0049941
drawing Data=7106771 |53711| A| |d|0008.1 | A|49998|0030287
drawing Data=7106771 |53711| A| |d|0008.2 | A|49998|0054270
drawing Data=7106771 |53711| A| |d|0008.3 | A|49998|0057515
drawing Data=7106771 |53711| A| |d|0008.4 | A|49998|0013368
drawing Data=7106771 |53711| A| |d|0008.5 | A|49998|0009152
drawing Data=7106771 |53711| A| |d|0009 | A|49998|0053269
drawing Data=7106771 |53711| A| |d|0010 | A|49998|0122282
drawing Data=7106771 |53711| A| |d|0011 | A|49998|0127755
drawing Data=7106771 |53711| A| |d|0012 | A|49998|0144956
drawing Data=7106771 |53711| A| |d|0013 | A|49998|0175151
drawing Data=7106771 |53711| A| |d|0014 | A|49998|0089875
drawing Data=7106771 |53711| A| |d|0015 | A|49998|0112836
drawing Data=7106771 |53711| A| |d|0016 | A|49998|0132821
drawing Data=7106771 |53711| A| |d|0017 | A|49998|0139888
drawing Data=7106771 |53711| A| |d|0018 | A|49998|0064914
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a564 | | |a |190901|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=ss800-ag-man-010/p-9290 | | |a |200324|a| |42|
3. Requirements
3.1 ;the Sleeve Bearing Must Be Manufactured In Accordance With Navsea Drawing 7106771, Part Number 95 And Erh547-0292a1, Except As Amplified Or Modified Herein.;
3.2 ;per Note 7001 Of Navsea Drawing 7106771, Kamatics Is The Approved Source Of Supply For This Item. Kamatics Drawing Number Kjb909200b-95 Is Invoked Herein For Reference Only.;
3.3 ;tensile And Hardness Tests Are Required After Heat Treating In Accordance With Astm-a564 Paragraph 8. Only A Certificate Of Compliance Is Required.;
3.4 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.6 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.7 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.7.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.7.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.7.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.7.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.7.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.8 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.8.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.8.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.9 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.10 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.10.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.10.2 Inspection For Completeness And Proper Type.
3.10.3 Verification Of Material Quality Received.
3.10.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.10.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.10.6 Identification And Protection From Improper Use Or Disposition.
3.10.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.10.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.10.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.11 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe).
3.11.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order.
3.12 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability
number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All
process Operations Including Any Subcontracted Operations, To The Finished Component.
3.12.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical,
an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed.
the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.12.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A
method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.13 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.13.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.13.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.13.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.14 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True"
are Not Acceptable.
3.14.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
3.15.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below:
13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms M
DEPT OF THE NAVY USA Tender
Electrical Goods and Equipments...+3Electrical Generators And Transformers, Machinery and Tools, Electrical and Electronics
United States
Closing Date1 Apr 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.30|wvd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/
a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
this Solicitation Is For A Repair.
the Contractor Will Provide The Cost Of A New Unit. An Agreed Upon Nte Price Will Be Established Prior To Award. Once Awarded, The Contract Price Will Be Definitized To A Firm Fixed Price Contract.
a001 May Be Waived At Time Of Award.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;22821n 35795 G B
cd27827n 35795 G B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a105 | | | |210101|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-a194 | | | |200501|a| | |
document Ref Data=astm-a216 | | | |180701|a| | |
document Ref Data=astm-a276 | | | |170315|a| | |
document Ref Data=astm-a516 | | | |171101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-v-18030 | | |e |900824|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;leslie Controls Inc. Drawing 22821n And Certification Data Sheet Cd 27827n, Class Donsx; , Except As Amplified Or Modified Herein. This Applies To All
"parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;valve Body, Piece 19 And Body Insert/plug (insert/plug May Be Cast Solid Or Welded To The Body;
material - ;astm-a216, Grade Wcb;
part - ;bonnet, Piece 12 (flange Piece Only);
material - ;astm-a516, Grade 70;
part - ;bonnet, Piece 12 (head Piece Only);
material - ;astm-a105;
part - ;bolt, Stud, Piece 15;
material - ;astm-a193, Grade B16 In Accordance With Mil-dtl-1222;
part - ;nuts, Piece 16;
material - ;astm-a194, Grade 4 Or 7 In Accordance With Mil-dtl-1222;
part - ;valve Plug Complete, Piece 14;
material - ;astm-a276 Type 316 Condition A;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;dye Penetrant Inspection;
item - ;all Hard Faced Surfaces;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable);
item - ;bolts, Piece 15 And Nuts, Piece 16;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - Quality Conformance/compliance Inspection
item - ;each Assembly;
performance - ;mil-v-18030 Paragraph 4.5 As Modified By Leslie Drawing 22821n And Cd 27827n;
acceptance - ;mil-v-18030 Paragraph 4.5 As Modified By Leslie Drawing 22821n And Cd 27827n;
3.4 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 88a050774x; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified
under S9074-aq-gib-010/248 For All Production And Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. 30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.7 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.8 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.9 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.9.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.9.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.9.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.10 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.11 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.11.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.12 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.13 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.13.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.13.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.13.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.14 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.15 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.16 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.16.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.16.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.16.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.16.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.16.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.17 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.17.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.17.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.18 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.18.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.18.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.18.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.18.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.18.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.19 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.19.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.19.2 Inspection For Completeness And Proper Type.
3.19.3 Verification Of Material Quality Received.
3.19.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.19.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.19.6 Identification And Protection From Improper Use Or Disposition.
3.19.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.19.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.19.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.20 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.20.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.21 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.21.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.21.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.21.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.21.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.22 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.22.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.22.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.22.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.22.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.22.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.23 Material Handling - The Written Material Control Process Must Include The Following:
3.23.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.23.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.23.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.23.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.23.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.23.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.24 Receiving Inspection -
3.24.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.24.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.25 Discrepancy Reporting -
3.25.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.26 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.26.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.26.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.26.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.26.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.27 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.27.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.27.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.27.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.27.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.27.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.27.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.27.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.27.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.27.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.27.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.27.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.27.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.28 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.28.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1)
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Closing Date23 Sep 2024
Tender AmountRefer Documents
Details: Contact Information|4|n742.10|wv4cc|n/a|madison.m.gray4.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection/acceptance Point|6|||||||
time Of Delivery (june 1997)|20|clin 0001|eighteen (18)|121||||||||||||||||||
stop-work Order (aug 1989)|1||
repair Delivery (firm Fixed Price)|1|121|
wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice And Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspect & Accept At Source|tbd|n00104|tbd|tbd|n50286|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd Form 1423|port_pt
nh_wawf_notification@navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
firm Fixed Price Repair Purchase Orders|1|tbd|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
progress Payments (nov 2021)|4|||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332911|750 (# Of Employees)||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. This Is A Submarine Corporate Component Repairs Program (ccrp) Sole Source Repair Requirement.
2. Please Provide A Firm-fixed Price (ffp) Qualifying Proposal For The Full Repair Effort Of The Requirement. Please Include The Cost Of New, Or Estimated Cost Of New, With The Submitted Proposal.
3. When Submitting A Proposal, Specify Any Exceptions (i.e., Mil-std Packaging, Mil-std Labeling, Inspection & Acceptance Locations, Packaging House, Surplus Material, Etc.). If No Exceptions Are Indicated Or Received, Award Shall Be Based Upon Solicitation
requirements. Changes Or Requests For Changes After Award Shall Be Subject To Consideration Costs Deducted From The Unit Price.
4. In Repair Price, Include All Costs Associated With Receipt And Complete Repair Of The Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, Wear Damage, And Cav Reporting. Also Provide The Following Information:
4.1. Teardown & Evaluation Rate:
4.2. Repair Turn Around Time (rtat):
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turn Around Time (rtat) - The Resultant Contractual Delivery Requirement Is Measured From The Asset Return To The Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receipt, And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Contract.
5.1. Requested Rtat: 121 Days
5.2. Proposals Shall Reference The Proposed Rtat And Any Capacity Constraints.
6. Price Reductions - Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Of (tbd Price) Per Unit. This Adjustment Will Be Implemented Via A Reduction Modification At The End Of Contract Performance. Price Reductions
made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
7. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Company Name, Street Address And Cage Of The Packaging Facility.
8. If The Offeror Is Not The Original End Manufacturer (oem) Of The Material Called Out In The Requirement, The Oem Must Be Stated (company Name And Cage), And The Offeror Must Be Able To Provide A Signed Letter Of Authorization To Perform Repairs From The Oem On
the Company's Letterhead.
9. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
10. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Resulting Contract.
11. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Will Be A Rated Order.
12. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;280912-0004 99657 B B
233985-0001 99657 M B
236001-0003 99657 F B
281015-0001 99657 G B
235445-0002 99657 C B
283538 99657 J B
284031-0001 99657 C B
236463 99657 A B
236461 99657 C B
233029 99657 L B
atp280912-0004 99657 L B
233985-0003 99657 A B;
drawing Data=5950-081-091 |53711| -|st |d|0001 | -|49998|1955052
document Ref Data=astm-b21 | | | |200401|a| | |
document Ref Data=astm-b21 | | |a |191001|a| | |
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b171 | | | |040501|a| | |
document Ref Data=astm-a276 | | | |170315|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=astm-b283 | | |a |191001|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=qq-b-639 | | |c |160219|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=sae Ams 5640 | | |v |160201|a| | |
document Ref Data=sae Ams-s-7720 | | | |970901|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;marotta Drawing 280912-0004, Part Number 280912-0004, Assembly Model Spv83 And Ms No. 5950-081-091 Rev - Chg 15; , Except As Amplified Or Modified
herein. This Applies To All "parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 ;for The Potting Compound, Item 93 On Marotta Drawing 284031-0001, The Use Of Dow Silastic Rtv-3110 In Lieu Of Rtv 751 Or 501 Is Acceptable.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;drawing 280912-0004 (firing Valve Assembly);
part - ;body, Item 13; Cover, Item 14; And Fitting, Item 15;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screws, Items 86 And 87;
material - ;cres 300 Series Per Ff-s-86 (mechanical Properties As Modified By General Note 13 Of Drawing 280912-0004);
;drawing 233985-0001, Part Number 233985-0001 Or Drawing 233985-0003, Part Number 233985-0003 (differential Pressure Indicator);
part - ;body, Part Number 233985-0001 On Drawing 233985-0001 Or Body, Part Number 233985-0003 On Drawing 233985-0003;
material - ;qq-n-281 Or Cres 300 Series Per Astm-a581 Or Astm-a582 Or Sae-ams-qq-s-763 Or Sae-ams-5640;
;drawing 236001-0003 (dome System Assembly);
part - ;retainer, Item 25; Body, Item 36; And Plug, Item 81;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;housing, Item 28;
material - ;astm-b21, Alloy C46400, Temper H02;
part - ;socket Head Cap Screw, Item 83;
material - ;cres Per Ff-s-86;
;drawing 281015-0001 (relief Valve Assembly);
part - ;retainer, Item 17 And Body, Item 18;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
;drawing 235445-0002 (compensator Assembly);
part - ;housing, Item 12 And Cover, Item 13;
material - ;qq-n-281;
part - ;socket Head Cap Screw, Item 60;
material - ;cres 300 Series Per Sae-ams-s-7720 Or Sae-ams-qq-s-763 Or Astm-a276 Or Ff-s-86;
;drawing 283538, Part Number 283538-1344 (hand Valve Assembly);
part - ;retainer Screw, Item 13;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;stem, Item 15;
material - ;sae-ams-qq-s-763, Class 316, Condition A;
;drawing 284031-0001 (pilot Valve Assembly);
part - ;nut, Item 25;
material - ;astm B21, Uns C46400, Temper H04 Or H02 With The Following Minimum Properties: Yield Strength: 30,000 Psi
tensile Strength: 58,000 Psi
elongation: Per Astm B21 For The Starting Material Size And Temper;
part - ;body, Item 32;
material - ;sae-ams-qq-s-763, Class 316;
;drawing 236463 (interlock Assembly);
part - ;adapters, Items 20 And 25;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;body, Item 22;
material - ;qq-b-639, Alloy 464 Or Astm-b171, Alloy C46400 Or Astm-b21, Alloy C46400, Temper H02;
;drawing 236461 (regulator Assembly);
part - ;guide, Item 15; Body, Item 26; Cover, Item 28; And Plug, Item 85;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screw, Item 82;
material - ;cres Per Ff-s-86 (mechanical Properties As Modified By Note 12 Of Drawing 236461);
;drawing 233029, Part Number 233029-0001 (screw Assembly);
part - ;screw, Item 12;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;body, Item 13, Cover, Item 14, And Fitting, Item 15 On Drawing 280912-0004; Body On Drawing 233985-0001 Or 233985-0003; Retainer, Item 25, Body, Item 36, And Plug, Item 81 On Drawing 236001-0003; Retainer, Item 17 And Body, Item 18 On Drawing
281015-0001; Socket Head Cap Screw , Item 60 On Drawing 235445-0002; Retainer Screw, Item 13 And Stem, Item 15 On Drawing 283538; Body, Item 32 On Drawing 284031-0001; Adapters, Items 20 And 25 On Drawing 236463; Guide, Item 15, Body, Item 26, Cover, Item 28,
and Plug, Item 85 On Drawing 236461; And Screw, Item 12 On Drawing 233029;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;items 86 And 87 Of Drawing 280912-0004, Item 83 Of Drawing 236001-0003, Item 82 Of Drawing 236461, And Item 60 Of Drawing 235445-0002;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;acceptance Test;
item - ;each Assembly;
performance - ;atp280912-0004;
acceptance - ;atp280912-0004;
3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.7 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.8 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.9 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.9.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.9.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.9.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.10 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply.
3.11 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.12 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245330; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.13 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.14 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.20.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.20.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.20.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.20.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.20.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.21 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.21.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.21.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.22 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.22.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.22.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.22.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.22.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.22.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.23 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.23.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.23.2 Inspection For Completeness And Proper Type.
3.23.3 Verification Of Material Quality Received.
3.23.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.23.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.23.6 Identification And Protection From Improper Use Or Disposition.
3.23.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.23.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.23.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.24 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.24.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.25 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.25.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.25.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.25.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.25.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking To Be As Shown On Drawings.;
3.26 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.26.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.26.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.26.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.26.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.26.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.27 Material Handling - The Written Material Control Process Must Include The Following:
3.27.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.27.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.27.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.27.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.27.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.27.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.28 Receiving Inspection -
3.28.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.28.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.29 Discrepancy Reporting -
3.29.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.30 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.30.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.30.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.30.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.30.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configu
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Closing Date6 Feb 2024
Tender AmountUSD 4.2 Million This is an estimated amount, exact amount may vary.
Details: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001aa|12|150||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material ||tbd|n00104|tbd|tbd|tbd|tbd|||n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3||||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|332911|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Amendment Is Being Issued To Combine Two Requirements Into One And Add Required Clauses.
\
this Is A Repair Requirement For The Ccrp Program.
1. Offers Shall Be Submitted As Firm Fixed Price For The Full Repair Effort Based On The Repair Instruction Or Sow. If The Contractor Is Unable To Provide A Firm Fixed Price, An Estimated Not-to-exceed Price For The Full Repair Effort Will Be Acceptable. The
contractor Shall Have 90 Days To Complete Ateardown And Evaluation Of The Carcass(es) And Submit A Repair Report And Firm Fixed Price Offer For The Repair.
2. A Cost Of New Price Shall Also Be Provided In Addition To The Repair Price.
3. Include In Estimated/not-to-exceed Repair Price All Costs Associated With Receipt And Complete Repair Of Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, Wear Damage, And Cav Reporting. Also, Please Provide
the Following:
a. Teardown And Evaluation Rate:
b. Rtat:
c. Throughput Constraint:
d. Induction Expiration Date:
4. This Requirement Utilizes Government Furnished Property (gfp). Any Gfp Located At The Contractors Facility In Storage That Can Be Used For Repair Of The Requirement Must Be Utilized And Called Out Within The Final Quote.
5. The Contractor Shall Comply With The Commercial Asset Visibility (cav) Of The Asset(s) In This Order In Accordance With Navsupwssfa24.
6. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail,transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
7. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). (see Far Clause 52.211-14, Notice Of Priority Rating For National Defense,
emergency Preparedness, And Energy Program Use).
8. This Requirement Falls Under The Special Emergency Procurement Authority (sepa)in Accordance With 41 U.s.c. 1903 And Class Deviation 2018-o0013 Now Referred To As Emergency Acquisition Flexibilities (eaf).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;v3e10041 99517 G B
v3d10055 99517 J B
f3c10089 99517 N B
atp-s1e10033 99517 E B
s1e10033 99517 V B
wi-s1e10033 99517 B B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | | |950910|a| | |
document Ref Data=astm-a582 | | | |170315|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191115|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;vacco Drawing Number S1e10033 Assembly Part Number S1e10033-02a1, With Vacco Welding Information Document Wi-s1e10033 (less Operational Plate,
s2d10180-2ad; Tail Piece, S2d10202-6ha; Union Nut, S2d10166-8ca; Tail Piece, S2d10384-3ma; Union Nut, S2d10383-8da; Tail Piece, S2d10170-6ha; Union Nut, S2d10171- 8ca, And Associated O-rings); , Except As Amplified Or Modified Herein. This Applies To All
"parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;drawing S1e10033, Part Number S1e10033-02a1 (manifold Assembly);
part - ;body, Item 1;
material - ;sae-ams-qq-s-763, Class 304;
part - ;filter Cap, Item 2; Port Adapter (inlet), Item 3 And Inlet Port, (thread Piece Only), Item 12;
material - ;astm-a581 Or Astm-a582, Type 303;
part - ;bleed Poppet, Item 4 And Socket Head Cap Screws, Items 29, 30 And 32;
material - ;sae-ams 5643, Condition H-1025;
part - ;socket Head Cap Screw, Item 31;
material - ;corrosion Resistant Steel Per Ff-s-86;
part - ;socket Head Cap Screw, Item 27;
material - ;sae-ams-qq-s-763, 300 Series;
;drawing V3e10041, Part Number V3e10041-02a (regulator Assembly);
part - ;guide, Item 3; Seat Retainer, Item 4; Poppet, Item 6; Poppet, Item 13 And Bleed Poppet, Item 15;
material - ;sae-ams 5643, Condition H-1025;
part - ;plate, Seat, Item 21;
material - ;sae-ams 5643, Condition H-1150;
part - ;dome Cap, Item 17 And Plug, Item 29;
material - ;sae-ams-qq-s-763, Class 304;
;drawing V3d10055, Part Number V3d10055-01 And V3d1055-02 (inlet/bypass Valves);
part - ;poppet, Item 3;
material - ;sae-ams 5643, Condition H-1025;
part - ;bonnet, Item 4;
material - ;astm-a581 Or Astm-a582, Type 303, Condition A;
;drawing F3c10089, Part Number F3c10089-070 (differential Pressure Indicator Assembly);
part - ;body, Item 1; Bonnet, Item 4 And Adjusting Screw, Item 9;
material - ;astm-a582, Type 303;
part - ;piston, Item 2;
material - ;sae-ams 5643, Condition H-1025;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;drawing S1e10033: Body, Item 1 And Socket Head Cap Screw, Item 27 Drawing V3e10041: Dome Cap, Item 17 And Plug, Item 29;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;socket Head Cap Screws, Items 27, 29, 30, 31 And 32 Of Drawing S1e10033;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection;
item - ;dome Cap, Item 17 (plug Weldments) Of Drawing V3e10041;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;production Tests;
item - ;each Assembly;
performance - ;in Accordance With Vacco Acceptance Test Procedure Atp-s1e10033;
acceptance - ;in Accordance With Vacco Acceptance Test Procedure Atp-s1e10033;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.5 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.6 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887355428; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.7 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.8 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.8.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.8.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.8.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.9 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.9.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.9.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.9.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.10 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.11 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.15 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.17 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.17.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.17.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.17.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.17.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.17.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.17.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.17.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.17.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.17.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.17.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.17.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.17.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.21.2 Inspection For Completeness And Proper Type.
3.21.3 Verification Of Material Quality Received.
3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.21.6 Identification And Protection From Improper Use Or Disposition.
3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.21.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.25 Material Handling - The Written Material Control Process Must Include The Following:
3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.26 Receiving Inspection -
3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.26.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.27 Discrepancy Reporting -
3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.29 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Material Symbol Marking For Sae-ams-5643, Condition H-1025 Material Must Be "smm"; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of
mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To
coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.29.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.30 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Ccrp Serial Number
5. Restoration Maintenance Standard (including Revision And Change Notice Levels).
6. Drawing Or Specification (including Revision And Change Notice Levels) To Which The Component Is Certified.
7. Existing Traceability Number(s). The Existing Traceability Number(s) Listed Must Include A Valid Mic Number.
8. Uro Mrcs Accomplished During Refurbishment.
9. Uro Mrc Report Serial Number (note That For Ssn688 Class Components, Submepp No Longer Requires Reporting Of Uro Mrc 008 Results Per Navsea 0924-lp-064-8010, Ssn688 Class Uro Mrc Program).
8. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
9. Cure Date ("n/a" When Not Applicable).
10. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
11. Manufacturer's Compound Number ("n/a" When Not Applicable).
12. Known Applicable Departures To Include Those Processed During Restoration ("n/a" When Not Applicable).
13. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
14. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed Satisfactorily.
15. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date8 Jul 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.30|wvd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/a
|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be"do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;22957n 35795 J B
35254n 35795 - B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-a216 | | | |180701|a| | |
document Ref Data=astm-a322 | | | |130501|a| | |
document Ref Data=astm-a515 | | | |101001|a| | |
document Ref Data=astm-a516 | | | |171101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-v-18030 | | |e |900824|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Control Valve To Be In Accordance With Leslie Drawings 22957n, Certification Data Sheet 35254n And Part Number Ddb0ns Less Piece 31, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;bonnet, Piece 12 And Valve Body, Piece 19;
material - ;astm-a216, Grade Wcb;
part - ;bottom Flange, Piece 25;
material - ;astm-a515 Or Astm-a516, Grade 65 Or 70;
part - ;valve Stem;
material - ;aisi 316, Nitrided Surfaces Or Nitronic 60:
mechanical Property Requirements For Aisi 316, 300 Series
tensile - 70,000 Psi Minimum
yield - 25,000 Psi Minimum
elongation - 30% Minimum
mechanical Property Requirements For Nitronic 60
tensile - 95,000 Psi Minimum
yield - 50,000 Psi Minimum
elongation - 35% Minimum;
part - ;studs, Piece 15 And Piece 26;
material - ;astm-a193, Grade B16;
part - ;nuts, Piece 16 And Piece 23;
material - ;astm-a322, Grade 4140, Finished Nut Must Have A Brinell Hardness Of 250-350;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;dye Penetrant Inspection;
item - ;all Hard Faced Surfaces;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable);
item - ;studs, Piece 15 And Piece 26 And Nuts Piece 16 And Piece 23;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;magnetic Particle Inspection;
item - ;bonnet, Piece 12 And Valve Body, Piece 19;
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010a/278
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Pressure Tests
item - Each Assembly
performance - ;in Accordance With Mil-v-18030 Paragraphs 3.4.3, 3.4.4 And 4.5.2;
acceptance - ;in Accordance With Mil-v-18030 Paragraphs 3.4.3, 3.4.4 And 4.5.2;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 Radiography Is Required On ;bonnet Piece 12 And Valve Body, Piece 19; .
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.7 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.7.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.7.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.7.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;88a050773x; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.9 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.10 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.10.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.11 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.12 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.12.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.12.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.12.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.13 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.14 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.15 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.15.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.15.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.15.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.15.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.15.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.15.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.15.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.15.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.15.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.15.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.15.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.15.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.16 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.16.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For
radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend
only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been
previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.16.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.)
3.16.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To
shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs (reader Sheets)
(d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet)
3.17 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.17.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.17.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.17.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.17.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.17.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.18 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.18.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.18.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.19 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.19.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.19.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.19.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.19.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.19.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.20 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.20.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.20.2 Inspection For Completeness And Proper Type.
3.20.3 Verification Of Material Quality Received.
3.20.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.20.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.20.6 Identification And Protection From Improper Use Or Disposition.
3.20.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.20.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.20.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.21 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.21.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.22 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.22.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.22.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.22.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.22.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.23 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.23.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.23.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.23.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.23.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.23.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.24 Material Handling - The Written Material Control Process Must Include The Following:
3.24.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.24.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.24.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.24.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.24.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.24.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.25 Receiving Inspection -
3.25.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.25.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.26 Discrepancy Reporting -
3.26.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.27 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.27.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.27.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.27.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.27.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.28 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.28.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
blocks 12 And 14 - Within 135 Days After Approval Of Radiographic Shooting Sketches, Forward One Copy For Review To:
commander, Portsmouth Naval Shipyard
attn: Code 135.3
portsmouth, Nh 03804-5000
a Receiving Report Must Be Entered Into Wawf And Should Reference The Date Of Shipment And The Shipment Tracking Number.
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
the Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
blocks 12 And 14 - Within 45 Days After Contract Award Prior To Performing Radiography, Radiographic Shooting Sketches Must Be Submitted To Portsmouth Naval Shipyard Via Wawf (wide Area Work Flow) For Review. If The Rss Was Previously Approved By Pns, The Rss
can Be Submitted With The Rt Film.
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
the Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;24573n 35795 G B
34655n 35795 B B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a105 | | | |210101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;top Cap For Pressure Reducing Valve Must Be In Accordance With Leslie Controls Inc. Drawing 24573n And Leslie Control Cd Sheet 34655n, Piece 2c, (p/n N819025301pl), Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
par
DEPT OF THE NAVY USA Tender
United States
Closing Date3 Sep 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.7|wve|717-605-3875|jill.sabol@navy.mil|
item Unique Identification And Valuation (mar 2022)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
repair Delivery (firm Fixed Price)|1|125|
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n
00104|tbd|material-s4306a; Certifications-n39040|n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
firm Fixed Price Repair Purchase Orders|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
annual Representations And Certifications (jan 2022)|13|333914|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Criteria And Basis For Award-|1||
this Amendment Is Issued To Extend The Closing Date To 03sep2024.
poc Updated To Benjamin.t.spangler.civ@us.navy.mil.
\
technical Data Updated.
closing Date Extended To 6/22/22.
\
this Requirement Has A Confidential Drawing Associated With It. A Facility Clearance And Dd254 Are Required.
offerors Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfp (announcement), Because The Rfp (announcement) Includes An Annex Classified At The Confidential Level Which Will Be Released Only To Offerors Possessing
the Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nispom) (dod 5220-22-m) And Industrial Security Regulation (dod 5220.22-r).
\
1. This Solicitation Is Being Issued Under Special Emergency Procurement Authority.
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation
to Notify Them Of Your Access Request.
6. This Requirement Requires Access To Noforn And/or Naval Nuclear Propulsion Information. See Local Text Wsstermhz12 For Further Information.
7. Please Quote A Firm Fixed Price For The Full Repair Of The Item. This Includes The Teardown, Evaluation, Inspection And Full Repair Of The Item To "like New" Or "a" Condition.
8. A Cost Of New Price Shall Also Be Provided In Addition To The Repair Price.
9. Do Not Include The Cost For Shipping Material As The Government Implemented Shipping System Or Atac Will Be Shipping/delivering Material.
10. The Vendor Is Required To Comply With The Commercial Asset Visibility (cav) Of The Asset(s) In This Purchase Order In Accordance With Navsupwssfa24.
11. The Following Delivery Schedule Will Apply:
radiographic Shooting Sketches (rss) 45 Days Adc
approval Of Rss 30 Days Afterreceipt
production Radiography (pr) 135 Days After Approval Of Rss
approval Of Pr 30 Days After Receipt
weld Procedure And Qual Data 120 Days Adc
approval Of Weld Procedures And Qual Data 90 Days After Receipt
submission Of All Other Form 1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To Delivery. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final Delivery Of Material Will Be On Or Before 125 Days After The
effective Date Of The Contract.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3 Specification Revisions - The Specification Revisions Listed Under "docu Ments References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.3.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;12532f18 88032 C B
pl12532f18 88032 B D
12457d18 88032 G D
12461f18 88032 C D
12504f18 88032 J D
12444d18 88032 B D
12445c18 88032 - D
dkc10150 65456 E D
12449f18 88032 B D
12577f18 88032 C D
3505-21 95402 F D
12459d18 0ubg9 E D
12451f18 88032 C D;
2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.4 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;eb-3356 Rev K - Confidential;
drawing Data=eb-3356 |96169| K| |d|0001 | K|00026|0000000
drawing Data=2550-081-037 |53711| D|ms |d|0001 | D|00026|0000000
drawing Data=3505-21 |95402| F| |d|0001 | F|00026|0000000
document Ref Data=fed-std-h28 | | |a |941228|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a182 | | | |190315|a| | |
document Ref Data=astm-a193 | | | |171115|a| | |
document Ref Data=astm-a194 | | | |181101|a| | |
document Ref Data=astm-a217 | | | |140501|a| | |
document Ref Data=astm-a240 | | | |181101|a| | |
document Ref Data=astm-a336 | | |a |180901|a| | |
document Ref Data=astm-a494 | | |a |141001|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |130601|a| | |
document Ref Data=astm-e1444 | | | |160616|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-c-24707 |0006| | |890127|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17829 | | | |991101|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Shall Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Shall Maintain Traceability Of These Markingsto Each Unit Throughout
refurbishment.
3.1.2 Re-useable Parts - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), May Be Utilized As Initially Supplied.
3.1.3 Non-useable Parts - Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Shall Be In Accordance With This Tdp (technical Data Package).
3.1.4 Refurbishment - Upon Completion Of Inspection, This Item Shall Be Refurbished To Be In Accordance With ;ingersoll Rand Drawing 12532f18 And Motor Drawing 3505-21; , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring
certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.5 Additional Sow Requirements -
;n/a;
3.2 ;no-forn Maintenance Standard 2550-081-037 For Motor Tests And Examinations Will Be Supplied When Requested.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;discharge Head Assembly Finish Machine Item No. 474a On Drawing 12461f18;
material - ;mil-c-24707/6 And Astm-a217 Grade Ca-15 Or Astm A-240 Grade S4100;
part - ;stud; Item No.178b On Drawing 12445c18;
material - ;mil-dtl-1222, Grade B7 Type Iv (astm-a193);
part - ;main Stud; Item 178a And 178d Of Drawing Pl-12532f18;
material - ;mil-dtl-1222, Grade B7 (astm-a193) And A Hardness Of 25 Rc Minimum;
part - ;shaft; Item 10 Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, Hot Finished And Stress Relieved In Accordance With Note 6 Of Drawing 12504f18;
part - ;end Cover; Item No. 368a Of Drawing Pl-12532f18 And Shell; Item 359 Of Drawing 12451f18;
material - ;astm A336 Grade F6;
part - ;casing Item No. 183 Of Drawing Pl-12532f18;
material - ;mil-c-24707/6 And Astm A217 Grade Ca-15 Or Astm A-336 Grade F6;
part - ;cap Nut; Item No 179b Of Drawing Pl-12532f18;
material - ;astm A194 Grade B7;
part - ;nut Hex Self Locking; Item No.240a On Drawing Pl-12532f18;
material - ;astm-a194 Grade 2h Or 4 Or 7 Ms17829-10c;
part - ;tee; Item 175 And Elbow; Item 295 Of Drawing 12451f18;
material - ;astm-a182 Grade F6a, Class 2;
part - ;sleeve, Throttle; Item 440 Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, And Hardness Of 250 To 285 Bnh;
part - ;nipples; Items 415a, 415b, 415c And 415d Of Drawing 12451f18;;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, Hot Finished;
part - ;bushing, Throttle; Item 441 Of Drawing Pl-12532f18;
material - ;astm-a494, Grade Cy5snbim;
part - ;plug, Test Conn; Item 417b Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763 Class 304;
part - ;nozzle Head; Item 360 Of Drawing 12451f18;
material - ;mil-c-24707/6 And Astm-a217 Grade Ca-15;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;magnetic Particle Inspection (wet Method);
item - ;cap Nut, Item No 179b;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;proof Load Test;
item - ;cap Nut, Item No 179b;
performance - ;astm-f606 And Note 5 Of Drawing 12459d18;
acceptance - ;no Evidence Of Stripping;
test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable);
item - ;main Stud Item 178a And 178d And Stud Item No.178b;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades Or Magnetic Particle Inspection (wet Method) For Ferro-magnetic Grades;
item - ;nut Hex Self Locking; Item No. 240a;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Shall Not Be Used On Thread)
acceptance - ;nasm25027;
test - ;magnetic Particle Inspection;
item - ;casing Item No. 183 On Drawing Pl-12532f18 And Discharge Head Assembly Item No. 361a On Drawing 12461f18;
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010a/278
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;plug Test Conn Item No 417b;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual Or Magnetic Particle Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Magnetic Particle Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;pressure, Performance And Noise Tests;
item - ;each Pump Assembly;
performance - ;eb Specification 3356;
acceptance - ;eb Specification 3356;
test - ;hydrostatic Test;
item - ;each Discharge Head Finish Machine;
performance - ;general Note 6 Of Drawing 12461f18;
acceptance - ;general Note 6 Of Drawing 12461f18;
test - ;motor Tests And Examination;
item - ;each Motor;
performance - ;all Measurements Required By Maintenance Standard 2550-081-037
acceptance - ;all Measurements Required By Maintenance Standard 2550-081-037
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - Astm-d4066, Group 01, Class 1 Or 2, Grade 1
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Shall State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. 30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.6 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;eb-3356 Rev K; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The Working
pressure On The Item Does Not Apply And Is Strictly Prohibited.
3.7 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.7.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.7.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.7.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.8 Radiography Is Required On ;nozzle Head; Item 360 And Casing Weldment On Drawing 12451f18 And Discharge Head Assembly Item No. 361a On Drawing 12461f18; .
3.9 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified Under S9074-aq-gib-010/248 For All Production
and Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Shall Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.14 Mercury Free - Mercury And Mercury Containing Compounds Shall Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.15 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Shall Be Furnished Along With A Copy Of The Test Results. Certification Shall Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Shall Be Identified To Weld Joint And Layer.
3.16 Radiography (rt) - Radiography Shall Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level Iper The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.16.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing Theradiography Shall Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketches Are Not Required For Radiography
of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend Only On
the Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Datahas Been Previously
approved By A Navy Activity, The Original Approval Letter Shall Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.16.2 All Pieces Radiographed Shall Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable Tothe Rt Film.)
3.16.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Shall Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior
to Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs
(d) Dd250 (with Unique Rt Serial Numbers Traceable To The Rt Film)
3.17 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Shall Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.17.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.17.2 The Contractor's Quality System Shall Be Documented And Shall Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Shall, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.17.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.17.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.17.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.18 Contractor Inspection Requirements - The Contractor Shall Maintain Adequate Records Of All Inspections And Tests. The Records Shall Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Shall Be Traceable To The Material Inspected.
3.18.1 The Supplier's Gages, Measuring And Test Equipment Shall Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Shall Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.18.2 All Documents And Reference Data Applicable To This Contract Shall Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Shall Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.19 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Shall Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.19.1 The Prime Contractor's Program Shall Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.19.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Shall Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or
services Specified In The Purchase Order Or Contract.
3.19.3 The Prime Contractor Shall Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Shall Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.19.4 The Prime Contractor Shall Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Shall
be Established. Records Of This Effort Shall Be Available For Review By The Government.
3.19.5 The Prime Contractor's Supplier Quality Assurance Program Shall Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.20 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Shall Develop Documented Control Procedures That Require At Least The Following:
3.20.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.20.2 Inspection For Completeness And Proper Type.
3.20.3 Verification Of Material Quality Received.
3.20.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.20.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.20.6 Identification And Protection From Improper Use Or Disposition.
3.20.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Shall Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.20.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Shall Be Maintained.
3.20.9 Material Returned To The Contractor Shall Be Handled As Gfm.
3.21 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.21.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Shall Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.22 Material Traceability - The Certification Data Report Shall Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Shall Also Be Marked On The Material. This Traceability Marking On The Material
shall Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Shall Be Taken No Less Than Once In Every Eight Hours
of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Shall Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.22.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Shall Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.22.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Shall Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.22.3 Traceability Markings Shall Be Maintained Through Assembly, And Whenever Possible Shall Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Shall Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.22.4 Marking Shall Be Legible And Shall Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.23 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.23.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Shall Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.23.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
shall Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Shall Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Shall Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.23.3 Material Certification Data Forwarded By The Manufacturer Shall Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.23.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.23.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.24 Material Handling - The Written Material Control Process Shall Include The Following:
3.24.1 All Raw Materials Shall Have Traceability Markings (except As Specified Below).
3.24.2 Stored Raw Materials Requiring Traceability Shall Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.24.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Shall Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Shall Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.24.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Shall Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Shall Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Shall Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.24.5 Purchase Orders For Raw Material Shall Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Shall Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.24.6 The Material Control Process Shall Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Shall Specify A Method And
marking Location For Remarking. The Contractor Shall Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.25 Receiving Inspection -
3.25.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Shall Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.25.2 Receiving Inspection Shall Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.26 Discrepancy Reporting -
3.26.1 Nonconforming Products From Sub-tier Suppliers Shall Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Shall Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Shall Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.27 Final Inspection - The Following Inspections Shall Be Performed Prior To Government Inspection And Acceptance.
3.27.1 Material Sampling - Material Shall Be Inspected For Form, Fit, And Function. Lot Acceptance Shall Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Shall Be In Accordance With The Sampling Plan(s) In The Applicable
military Specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Shall Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size
selection Code), Table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Shallbe Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Shall Be One Hundred Percent Of The Lot.
3.27.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.27.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Shall Be 100% Inspected. The Certification
test Reports Shall Also Be 100% Inspected For Completeness And Legibility.
3.27.4 All Material Requiring Traceability Shall Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.28 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Shall Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Shall Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.28.1 Approval Of The Contractor's Qualification Data Shall Be Obtained Prior To Performing Any Welding (production Or Repair).
3.28.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Shall Be
submitted At The Same Time. Welding Procedures And Qualification Data Shall Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Shall State The Applicability Of Each Weld Procedure And Qualification Data
submitted, Citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." "wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz."). Authority For The
repair Of Special Repairs In Castings And Authority For The Repair Of Wrought Or Forged Material Shall Be Obtained From The Procurement Contracting Officer. This Request Shall Describe The Defect; Including Size, Depth, Location, And A Description Of The
proposed Repair. This Request For Navsup-wss Contracts Shall Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.28.3 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 48 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 48 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.28.4 When Drawings Require Hard Facing Surface Iron Content (nickel For Monel Valves) Not To Exceed 5%, The Contractor Shall Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test
results Shall Be Submitted As Part Of The Qualification Data.
3.28.5 Qualification Requirements For Production Hardfacing: The Maximum Qualified Thickness For Hardfacing Shall Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt (non-destructive Testing) And Any
additional Drawing Requirements. The Minimum Qualified Thickness Is The Final Machined Thickness At Which Hardness Testing, Ndt, Macro-etch, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.28.6 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs) Shall Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential Elements And Any Elements Not
listed In S9074-aq-gib-010/248 That Influence Dilution Shall Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.28.7 Qualification Requirements For Production Cladding: The Maximum Qualified Thickness For Cladding Shall Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt And Any Additional Drawing Requirements.
the Minimum Qualified Thickness Is The Final Machined Thickness At Which Ndt, Side Bends, Macro-etch Testing, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.28.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.28.9 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Shall Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.28.10 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Shall Be Passed Down To The Subcontractor.
3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Shall Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1)
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
6.3.1 If You Have A Problem Connecting To The Dodssp Website, Please Contact Either The Subscription Service Desk (215)697-2569, Or The Special Assistance Desk (215)697-2667. The Dodssp Customer Service Staff Is Available Every Business Day Between The Hours
of 7:30 Am And 4:00 Pm Eastern Time To Answer Your Questions Or Assist In Solving Any Problems You Might Encounter When Ordering From The Dodssp Collection Of Defense Specifications And Standards, Federal Specifications And Standards Used By Dod, And Other Dod
standardization Documents. Mail Requests Should Be Submitted To: Navy Publishing And Printing Service (subscriptions) Building 4d 700 Robbins Ave. Philadelphia, Pa. 19111 Attn: Dodssp
requests Can Be Transmitted To Dodssp Via Fax Number (215)697-1462.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. Ordnance Documents (od) - Ordnance Documents May Be Obtained By Submitting A Request To: Commanding Officer Naval Surface Warfare Center Port Hueneme Div Code 5a00 Port Hueneme, California 93043
e. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
f. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be
DEPT OF THE NAVY USA Tender
Healthcare and Medicine
United States
Closing Date8 Jul 2024
Tender AmountUSD 749 K This is an estimated amount, exact amount may vary.
Details: Contact Information|4|n743.30|wvd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|tbd|n00104|tbd|n50286|tbd|133.2|n/a|n/a|n/a|n/a|n/a|n/a|port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
this Solicitation Is For Repair.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;s1e10033 99517 V B
v3e10041 99517 G B
v3d10055 99517 J B
v3d10054 99517 H B
v1d10711 99517 C B
f3c10089 99517 N B
wi-s1e10033 99517 B B
atp-s1e10033 99517 E B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;vacco Drawing S1e10033, Assembly Part Number S1e10033-01a1, With Vacco Document Wi-s1e10033 (less Operational Plate, S2d10180-2ad; Tail Piece,
s2d10202-6ha; Union Nut, S2d10166-8ca; Tail Piece, S2d10384-3ma; Union Nut, S2d10383-8da; Tail Piece, S2d10170-6ha; Union Nut, S2d10171- 8ca; And Associated O-rings); , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring Certification"
as Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;vacco Drawing S1e10033, Assembly Part Number S1e10033-01a1 (manifold Assembly);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, Class 304;
part - ;filter Cap, Item 2; Port Adapter (inlet), Item 3; Port Adapter (outlet), Item 7; Inlet Port, Item 12 (thread Piece Only); And Outlet Port, Item 13 (thread Piece Only);
material - ;astm-a581 Or Astm-a582, Type 303;
part - ;bleed Poppet, Item 4; Gage Connection Poppet, Item 5; And Socket Head Cap Screws, Items 28, 29, 30, And 32;
material - ;sae-ams-5643, Condition H-1025;
part - ;socket Head Cap Screw, Item 27;
material - ;sae Ams-qq-s-763, 300 Series;
part - ;socket Head Cap Screw, Item 31;
material - ;300 Series Stainless Steel Per Ff-s-86;
;vacco Drawing V3e10041, Assembly Part Number V3e10041-01a (regulator Assembly);
part - ;guide, Item 3; Seat Retainer, Item 4; Poppet, Item 13; And Bleed Poppet, Item 15;
material - ;sae-ams-5643, Condition H-1025;
part - ;dome Cap, Item 17 And Plugs (welded In Dome Cap);
material - ;sae Ams-qq-s-763, Class 304;
part - ;seat Plate, Item 21;
material - ;sae-ams-5643, Condition H-1150;
part - ;plug, Item 29;
material - ;sae Ams-qq-s-763, Class 304;
;vacco Drawing V3d10055, Assembly Part Numbers V3d10055-01 And V3d10055-02 (inlet/bypass Valves);
part - ;poppet, Item 3;
material - ;sae-ams-5643, Condition H-1025;
part - ;bonnet, Item 4;
material - ;astm-a582, Type 303, Condition A;
;drawing V3d10054, Assembly Part Number V3d10054-01 (outlet Valve);
part - ;bonnet, Item 1;
material - ;astm-a582, Type 303, Condition A;
part - ;orifice Block, Item 2 And Poppet, Item 3;
material - ;sae-ams-5643, Condition H-1025;
;vacco Drawing V1d10711, Assembly Part Number V1d10711-01 (relief Valve);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, Class 304l;
;vacco Drawing F3c10089, Assembly Part Number F3c10089-070 (differential Pressure Indicator);
part - ;body, Item 1; Bonnet, Item 4; And Adjusting Screw, Item 9;
material - ;astm-a582, Type 303;
part - ;piston, Item 2;
material - ;sae-ams-5643, Condition H-1025;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;items 1 And 27 Of Drawing S1e10033; Items 17, 29 And Plugs Welded To Dome Cap Of Drawing V3e10041; And Item 1 Of Drawing V1d10711;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;items 27, 28, 29, 30, 31, And 32 Of Drawing S1e10033;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;5x Visual Magnification Or Dye Penetrant Inspection (root Layer);
item - ;class P-1 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual And Dye Penetrant Inspection (final Layer);
item - ;class P-1 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual Inspection (root And Final Layer);
item - ;class M-2 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - ;acceptance Tests;
item - ;each Manifold Assembly;
performance - ;atp-s1e10033;
acceptance - ;atp-s1e10033;
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.6 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887355407; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.9 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.15 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.17 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.17.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.17.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.17.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.17.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.17.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.17.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.17.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.17.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.17.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.17.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.17.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.17.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.21.2 Inspection For Completeness And Proper Type.
3.21.3 Verification Of Material Quality Received.
3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.21.6 Identification And Protection From Improper Use Or Disposition.
3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.21.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.25 Material Handling - The Written Material Control Process Must Include The Following:
3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.26 Receiving Inspection -
3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.26.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.27 Discrepancy Reporting -
3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.29 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Sae-ams-5643, Condition H-1025 Material Is Material Designator Smm; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For
grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A
minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.29.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.30 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Oct 05 2006 - Added Configuration Control Definitions; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of M
1771-1780 of 1781 archived Tenders