Structural Design Tenders
Structural Design Tenders
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Closing Date23 Sep 2024
Tender AmountRefer Documents
Details: Contact Information|4|n742.10|wv4cc|n/a|madison.m.gray4.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection/acceptance Point|6|||||||
time Of Delivery (june 1997)|20|clin 0001|eighteen (18)|121||||||||||||||||||
stop-work Order (aug 1989)|1||
repair Delivery (firm Fixed Price)|1|121|
wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice And Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspect & Accept At Source|tbd|n00104|tbd|tbd|n50286|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd Form 1423|port_pt
nh_wawf_notification@navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
firm Fixed Price Repair Purchase Orders|1|tbd|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
progress Payments (nov 2021)|4|||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332911|750 (# Of Employees)||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. This Is A Submarine Corporate Component Repairs Program (ccrp) Sole Source Repair Requirement.
2. Please Provide A Firm-fixed Price (ffp) Qualifying Proposal For The Full Repair Effort Of The Requirement. Please Include The Cost Of New, Or Estimated Cost Of New, With The Submitted Proposal.
3. When Submitting A Proposal, Specify Any Exceptions (i.e., Mil-std Packaging, Mil-std Labeling, Inspection & Acceptance Locations, Packaging House, Surplus Material, Etc.). If No Exceptions Are Indicated Or Received, Award Shall Be Based Upon Solicitation
requirements. Changes Or Requests For Changes After Award Shall Be Subject To Consideration Costs Deducted From The Unit Price.
4. In Repair Price, Include All Costs Associated With Receipt And Complete Repair Of The Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, Wear Damage, And Cav Reporting. Also Provide The Following Information:
4.1. Teardown & Evaluation Rate:
4.2. Repair Turn Around Time (rtat):
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turn Around Time (rtat) - The Resultant Contractual Delivery Requirement Is Measured From The Asset Return To The Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receipt, And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Contract.
5.1. Requested Rtat: 121 Days
5.2. Proposals Shall Reference The Proposed Rtat And Any Capacity Constraints.
6. Price Reductions - Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Of (tbd Price) Per Unit. This Adjustment Will Be Implemented Via A Reduction Modification At The End Of Contract Performance. Price Reductions
made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
7. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Company Name, Street Address And Cage Of The Packaging Facility.
8. If The Offeror Is Not The Original End Manufacturer (oem) Of The Material Called Out In The Requirement, The Oem Must Be Stated (company Name And Cage), And The Offeror Must Be Able To Provide A Signed Letter Of Authorization To Perform Repairs From The Oem On
the Company's Letterhead.
9. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
10. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Resulting Contract.
11. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Will Be A Rated Order.
12. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;280912-0004 99657 B B
233985-0001 99657 M B
236001-0003 99657 F B
281015-0001 99657 G B
235445-0002 99657 C B
283538 99657 J B
284031-0001 99657 C B
236463 99657 A B
236461 99657 C B
233029 99657 L B
atp280912-0004 99657 L B
233985-0003 99657 A B;
drawing Data=5950-081-091 |53711| -|st |d|0001 | -|49998|1955052
document Ref Data=astm-b21 | | | |200401|a| | |
document Ref Data=astm-b21 | | |a |191001|a| | |
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b171 | | | |040501|a| | |
document Ref Data=astm-a276 | | | |170315|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=astm-b283 | | |a |191001|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=qq-b-639 | | |c |160219|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=sae Ams 5640 | | |v |160201|a| | |
document Ref Data=sae Ams-s-7720 | | | |970901|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;marotta Drawing 280912-0004, Part Number 280912-0004, Assembly Model Spv83 And Ms No. 5950-081-091 Rev - Chg 15; , Except As Amplified Or Modified
herein. This Applies To All "parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 ;for The Potting Compound, Item 93 On Marotta Drawing 284031-0001, The Use Of Dow Silastic Rtv-3110 In Lieu Of Rtv 751 Or 501 Is Acceptable.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;drawing 280912-0004 (firing Valve Assembly);
part - ;body, Item 13; Cover, Item 14; And Fitting, Item 15;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screws, Items 86 And 87;
material - ;cres 300 Series Per Ff-s-86 (mechanical Properties As Modified By General Note 13 Of Drawing 280912-0004);
;drawing 233985-0001, Part Number 233985-0001 Or Drawing 233985-0003, Part Number 233985-0003 (differential Pressure Indicator);
part - ;body, Part Number 233985-0001 On Drawing 233985-0001 Or Body, Part Number 233985-0003 On Drawing 233985-0003;
material - ;qq-n-281 Or Cres 300 Series Per Astm-a581 Or Astm-a582 Or Sae-ams-qq-s-763 Or Sae-ams-5640;
;drawing 236001-0003 (dome System Assembly);
part - ;retainer, Item 25; Body, Item 36; And Plug, Item 81;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;housing, Item 28;
material - ;astm-b21, Alloy C46400, Temper H02;
part - ;socket Head Cap Screw, Item 83;
material - ;cres Per Ff-s-86;
;drawing 281015-0001 (relief Valve Assembly);
part - ;retainer, Item 17 And Body, Item 18;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
;drawing 235445-0002 (compensator Assembly);
part - ;housing, Item 12 And Cover, Item 13;
material - ;qq-n-281;
part - ;socket Head Cap Screw, Item 60;
material - ;cres 300 Series Per Sae-ams-s-7720 Or Sae-ams-qq-s-763 Or Astm-a276 Or Ff-s-86;
;drawing 283538, Part Number 283538-1344 (hand Valve Assembly);
part - ;retainer Screw, Item 13;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;stem, Item 15;
material - ;sae-ams-qq-s-763, Class 316, Condition A;
;drawing 284031-0001 (pilot Valve Assembly);
part - ;nut, Item 25;
material - ;astm B21, Uns C46400, Temper H04 Or H02 With The Following Minimum Properties: Yield Strength: 30,000 Psi
tensile Strength: 58,000 Psi
elongation: Per Astm B21 For The Starting Material Size And Temper;
part - ;body, Item 32;
material - ;sae-ams-qq-s-763, Class 316;
;drawing 236463 (interlock Assembly);
part - ;adapters, Items 20 And 25;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;body, Item 22;
material - ;qq-b-639, Alloy 464 Or Astm-b171, Alloy C46400 Or Astm-b21, Alloy C46400, Temper H02;
;drawing 236461 (regulator Assembly);
part - ;guide, Item 15; Body, Item 26; Cover, Item 28; And Plug, Item 85;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screw, Item 82;
material - ;cres Per Ff-s-86 (mechanical Properties As Modified By Note 12 Of Drawing 236461);
;drawing 233029, Part Number 233029-0001 (screw Assembly);
part - ;screw, Item 12;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;body, Item 13, Cover, Item 14, And Fitting, Item 15 On Drawing 280912-0004; Body On Drawing 233985-0001 Or 233985-0003; Retainer, Item 25, Body, Item 36, And Plug, Item 81 On Drawing 236001-0003; Retainer, Item 17 And Body, Item 18 On Drawing
281015-0001; Socket Head Cap Screw , Item 60 On Drawing 235445-0002; Retainer Screw, Item 13 And Stem, Item 15 On Drawing 283538; Body, Item 32 On Drawing 284031-0001; Adapters, Items 20 And 25 On Drawing 236463; Guide, Item 15, Body, Item 26, Cover, Item 28,
and Plug, Item 85 On Drawing 236461; And Screw, Item 12 On Drawing 233029;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;items 86 And 87 Of Drawing 280912-0004, Item 83 Of Drawing 236001-0003, Item 82 Of Drawing 236461, And Item 60 Of Drawing 235445-0002;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;acceptance Test;
item - ;each Assembly;
performance - ;atp280912-0004;
acceptance - ;atp280912-0004;
3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.7 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.8 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.9 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.9.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.9.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.9.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.10 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply.
3.11 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.12 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245330; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.13 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.14 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.20.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.20.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.20.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.20.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.20.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.21 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.21.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.21.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.22 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.22.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.22.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.22.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.22.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.22.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.23 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.23.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.23.2 Inspection For Completeness And Proper Type.
3.23.3 Verification Of Material Quality Received.
3.23.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.23.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.23.6 Identification And Protection From Improper Use Or Disposition.
3.23.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.23.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.23.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.24 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.24.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.25 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.25.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.25.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.25.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.25.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking To Be As Shown On Drawings.;
3.26 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.26.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.26.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.26.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.26.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.26.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.27 Material Handling - The Written Material Control Process Must Include The Following:
3.27.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.27.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.27.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.27.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.27.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.27.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.28 Receiving Inspection -
3.28.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.28.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.29 Discrepancy Reporting -
3.29.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.30 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.30.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.30.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.30.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.30.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configu
DEPT OF THE NAVY USA Tender
Healthcare and Medicine
United States
Closing Date8 Jul 2024
Tender AmountUSD 749 K This is an estimated amount, exact amount may vary.
Details: Contact Information|4|n743.30|wvd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|tbd|n00104|tbd|n50286|tbd|133.2|n/a|n/a|n/a|n/a|n/a|n/a|port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
this Solicitation Is For Repair.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;s1e10033 99517 V B
v3e10041 99517 G B
v3d10055 99517 J B
v3d10054 99517 H B
v1d10711 99517 C B
f3c10089 99517 N B
wi-s1e10033 99517 B B
atp-s1e10033 99517 E B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;vacco Drawing S1e10033, Assembly Part Number S1e10033-01a1, With Vacco Document Wi-s1e10033 (less Operational Plate, S2d10180-2ad; Tail Piece,
s2d10202-6ha; Union Nut, S2d10166-8ca; Tail Piece, S2d10384-3ma; Union Nut, S2d10383-8da; Tail Piece, S2d10170-6ha; Union Nut, S2d10171- 8ca; And Associated O-rings); , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring Certification"
as Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;vacco Drawing S1e10033, Assembly Part Number S1e10033-01a1 (manifold Assembly);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, Class 304;
part - ;filter Cap, Item 2; Port Adapter (inlet), Item 3; Port Adapter (outlet), Item 7; Inlet Port, Item 12 (thread Piece Only); And Outlet Port, Item 13 (thread Piece Only);
material - ;astm-a581 Or Astm-a582, Type 303;
part - ;bleed Poppet, Item 4; Gage Connection Poppet, Item 5; And Socket Head Cap Screws, Items 28, 29, 30, And 32;
material - ;sae-ams-5643, Condition H-1025;
part - ;socket Head Cap Screw, Item 27;
material - ;sae Ams-qq-s-763, 300 Series;
part - ;socket Head Cap Screw, Item 31;
material - ;300 Series Stainless Steel Per Ff-s-86;
;vacco Drawing V3e10041, Assembly Part Number V3e10041-01a (regulator Assembly);
part - ;guide, Item 3; Seat Retainer, Item 4; Poppet, Item 13; And Bleed Poppet, Item 15;
material - ;sae-ams-5643, Condition H-1025;
part - ;dome Cap, Item 17 And Plugs (welded In Dome Cap);
material - ;sae Ams-qq-s-763, Class 304;
part - ;seat Plate, Item 21;
material - ;sae-ams-5643, Condition H-1150;
part - ;plug, Item 29;
material - ;sae Ams-qq-s-763, Class 304;
;vacco Drawing V3d10055, Assembly Part Numbers V3d10055-01 And V3d10055-02 (inlet/bypass Valves);
part - ;poppet, Item 3;
material - ;sae-ams-5643, Condition H-1025;
part - ;bonnet, Item 4;
material - ;astm-a582, Type 303, Condition A;
;drawing V3d10054, Assembly Part Number V3d10054-01 (outlet Valve);
part - ;bonnet, Item 1;
material - ;astm-a582, Type 303, Condition A;
part - ;orifice Block, Item 2 And Poppet, Item 3;
material - ;sae-ams-5643, Condition H-1025;
;vacco Drawing V1d10711, Assembly Part Number V1d10711-01 (relief Valve);
part - ;body, Item 1;
material - ;sae Ams-qq-s-763, Class 304l;
;vacco Drawing F3c10089, Assembly Part Number F3c10089-070 (differential Pressure Indicator);
part - ;body, Item 1; Bonnet, Item 4; And Adjusting Screw, Item 9;
material - ;astm-a582, Type 303;
part - ;piston, Item 2;
material - ;sae-ams-5643, Condition H-1025;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;items 1 And 27 Of Drawing S1e10033; Items 17, 29 And Plugs Welded To Dome Cap Of Drawing V3e10041; And Item 1 Of Drawing V1d10711;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;items 27, 28, 29, 30, 31, And 32 Of Drawing S1e10033;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;5x Visual Magnification Or Dye Penetrant Inspection (root Layer);
item - ;class P-1 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual And Dye Penetrant Inspection (final Layer);
item - ;class P-1 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual Inspection (root And Final Layer);
item - ;class M-2 Weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - ;acceptance Tests;
item - ;each Manifold Assembly;
performance - ;atp-s1e10033;
acceptance - ;atp-s1e10033;
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.6 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887355407; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.9 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.15 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.17 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.17.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.17.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.17.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.17.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.17.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.17.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.17.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.17.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.17.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.17.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.17.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.17.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.18 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.18.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.18.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.18.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.18.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.18.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.19 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.19.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.19.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.20 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.20.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.20.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.20.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.20.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.20.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.21 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.21.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.21.2 Inspection For Completeness And Proper Type.
3.21.3 Verification Of Material Quality Received.
3.21.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.21.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.21.6 Identification And Protection From Improper Use Or Disposition.
3.21.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.21.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.21.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.22 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.22.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.23 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.23.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.23.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.23.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.23.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.24 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.24.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.24.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.24.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.24.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.24.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.25 Material Handling - The Written Material Control Process Must Include The Following:
3.25.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.25.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.25.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.25.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.25.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.25.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.26 Receiving Inspection -
3.26.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.26.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.27 Discrepancy Reporting -
3.27.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.28 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.28.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.28.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.28.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.28.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.29 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Sae-ams-5643, Condition H-1025 Material Is Material Designator Smm; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For
grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A
minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.29.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.30 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Feb 03 2011 - Clarified Intergranular Corrosion Test On Raw Stock
- Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Oct 05 2006 - Added Configuration Control Definitions; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of M
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date8 Jul 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.30|wvd|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/a
|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
dd1423 Data Item A001 May Be Waived If Already On File Atnavsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be"do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;22957n 35795 J B
35254n 35795 - B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-a216 | | | |180701|a| | |
document Ref Data=astm-a322 | | | |130501|a| | |
document Ref Data=astm-a515 | | | |101001|a| | |
document Ref Data=astm-a516 | | | |171101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-v-18030 | | |e |900824|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Control Valve To Be In Accordance With Leslie Drawings 22957n, Certification Data Sheet 35254n And Part Number Ddb0ns Less Piece 31, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;bonnet, Piece 12 And Valve Body, Piece 19;
material - ;astm-a216, Grade Wcb;
part - ;bottom Flange, Piece 25;
material - ;astm-a515 Or Astm-a516, Grade 65 Or 70;
part - ;valve Stem;
material - ;aisi 316, Nitrided Surfaces Or Nitronic 60:
mechanical Property Requirements For Aisi 316, 300 Series
tensile - 70,000 Psi Minimum
yield - 25,000 Psi Minimum
elongation - 30% Minimum
mechanical Property Requirements For Nitronic 60
tensile - 95,000 Psi Minimum
yield - 50,000 Psi Minimum
elongation - 35% Minimum;
part - ;studs, Piece 15 And Piece 26;
material - ;astm-a193, Grade B16;
part - ;nuts, Piece 16 And Piece 23;
material - ;astm-a322, Grade 4140, Finished Nut Must Have A Brinell Hardness Of 250-350;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;dye Penetrant Inspection;
item - ;all Hard Faced Surfaces;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable);
item - ;studs, Piece 15 And Piece 26 And Nuts Piece 16 And Piece 23;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;magnetic Particle Inspection;
item - ;bonnet, Piece 12 And Valve Body, Piece 19;
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010a/278
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Pressure Tests
item - Each Assembly
performance - ;in Accordance With Mil-v-18030 Paragraphs 3.4.3, 3.4.4 And 4.5.2;
acceptance - ;in Accordance With Mil-v-18030 Paragraphs 3.4.3, 3.4.4 And 4.5.2;
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.4 Radiography Is Required On ;bonnet Piece 12 And Valve Body, Piece 19; .
3.5 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be
submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.7 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.7.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.7.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.7.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.8 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;88a050773x; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.9 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.10 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.10.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.11 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.12 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.12.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.12.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.12.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.13 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.14 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.15 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.15.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.15.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.15.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.15.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.15.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.15.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.15.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.15.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.15.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.15.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.15.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.15.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.16 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.16.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For
radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend
only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been
previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.16.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.)
3.16.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To
shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs (reader Sheets)
(d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet)
3.17 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.17.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.17.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.17.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.17.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.17.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.18 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.18.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.18.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.19 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.19.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.19.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.19.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.19.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.19.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.20 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.20.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.20.2 Inspection For Completeness And Proper Type.
3.20.3 Verification Of Material Quality Received.
3.20.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.20.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.20.6 Identification And Protection From Improper Use Or Disposition.
3.20.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.20.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.20.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.21 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.21.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.22 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.22.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.22.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.22.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.22.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.23 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.23.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.23.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.23.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.23.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.23.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.24 Material Handling - The Written Material Control Process Must Include The Following:
3.24.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.24.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.24.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.24.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.24.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.24.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.25 Receiving Inspection -
3.25.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.25.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.26 Discrepancy Reporting -
3.26.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.27 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.27.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.27.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.27.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.27.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.28 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.28.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
blocks 12 And 14 - Within 135 Days After Approval Of Radiographic Shooting Sketches, Forward One Copy For Review To:
commander, Portsmouth Naval Shipyard
attn: Code 135.3
portsmouth, Nh 03804-5000
a Receiving Report Must Be Entered Into Wawf And Should Reference The Date Of Shipment And The Shipment Tracking Number.
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
the Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
blocks 12 And 14 - Within 45 Days After Contract Award Prior To Performing Radiography, Radiographic Shooting Sketches Must Be Submitted To Portsmouth Naval Shipyard Via Wawf (wide Area Work Flow) For Review. If The Rss Was Previously Approved By Pns, The Rss
can Be Submitted With The Rt Film.
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
the Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;24573n 35795 G B
34655n 35795 B B;
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a105 | | | |210101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;top Cap For Pressure Reducing Valve Must Be In Accordance With Leslie Controls Inc. Drawing 24573n And Leslie Control Cd Sheet 34655n, Piece 2c, (p/n N819025301pl), Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
par
DEPT OF THE NAVY USA Tender
United States
Closing Date3 Sep 2024
Tender AmountRefer Documents
Details: Contact Information|4|n743.7|wve|717-605-3875|jill.sabol@navy.mil|
item Unique Identification And Valuation (mar 2022)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
repair Delivery (firm Fixed Price)|1|125|
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n
00104|tbd|material-s4306a; Certifications-n39040|n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
firm Fixed Price Repair Purchase Orders|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
annual Representations And Certifications (jan 2022)|13|333914|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Criteria And Basis For Award-|1||
this Amendment Is Issued To Extend The Closing Date To 03sep2024.
poc Updated To Benjamin.t.spangler.civ@us.navy.mil.
\
technical Data Updated.
closing Date Extended To 6/22/22.
\
this Requirement Has A Confidential Drawing Associated With It. A Facility Clearance And Dd254 Are Required.
offerors Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfp (announcement), Because The Rfp (announcement) Includes An Annex Classified At The Confidential Level Which Will Be Released Only To Offerors Possessing
the Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nispom) (dod 5220-22-m) And Industrial Security Regulation (dod 5220.22-r).
\
1. This Solicitation Is Being Issued Under Special Emergency Procurement Authority.
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation
to Notify Them Of Your Access Request.
6. This Requirement Requires Access To Noforn And/or Naval Nuclear Propulsion Information. See Local Text Wsstermhz12 For Further Information.
7. Please Quote A Firm Fixed Price For The Full Repair Of The Item. This Includes The Teardown, Evaluation, Inspection And Full Repair Of The Item To "like New" Or "a" Condition.
8. A Cost Of New Price Shall Also Be Provided In Addition To The Repair Price.
9. Do Not Include The Cost For Shipping Material As The Government Implemented Shipping System Or Atac Will Be Shipping/delivering Material.
10. The Vendor Is Required To Comply With The Commercial Asset Visibility (cav) Of The Asset(s) In This Purchase Order In Accordance With Navsupwssfa24.
11. The Following Delivery Schedule Will Apply:
radiographic Shooting Sketches (rss) 45 Days Adc
approval Of Rss 30 Days Afterreceipt
production Radiography (pr) 135 Days After Approval Of Rss
approval Of Pr 30 Days After Receipt
weld Procedure And Qual Data 120 Days Adc
approval Of Weld Procedures And Qual Data 90 Days After Receipt
submission Of All Other Form 1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To Delivery. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final Delivery Of Material Will Be On Or Before 125 Days After The
effective Date Of The Contract.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3 Specification Revisions - The Specification Revisions Listed Under "docu Ments References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.3.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;12532f18 88032 C B
pl12532f18 88032 B D
12457d18 88032 G D
12461f18 88032 C D
12504f18 88032 J D
12444d18 88032 B D
12445c18 88032 - D
dkc10150 65456 E D
12449f18 88032 B D
12577f18 88032 C D
3505-21 95402 F D
12459d18 0ubg9 E D
12451f18 88032 C D;
2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.4 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;eb-3356 Rev K - Confidential;
drawing Data=eb-3356 |96169| K| |d|0001 | K|00026|0000000
drawing Data=2550-081-037 |53711| D|ms |d|0001 | D|00026|0000000
drawing Data=3505-21 |95402| F| |d|0001 | F|00026|0000000
document Ref Data=fed-std-h28 | | |a |941228|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a182 | | | |190315|a| | |
document Ref Data=astm-a193 | | | |171115|a| | |
document Ref Data=astm-a194 | | | |181101|a| | |
document Ref Data=astm-a217 | | | |140501|a| | |
document Ref Data=astm-a240 | | | |181101|a| | |
document Ref Data=astm-a336 | | |a |180901|a| | |
document Ref Data=astm-a494 | | |a |141001|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |130601|a| | |
document Ref Data=astm-e1444 | | | |160616|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-c-24707 |0006| | |890127|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17829 | | | |991101|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Shall Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Shall Maintain Traceability Of These Markingsto Each Unit Throughout
refurbishment.
3.1.2 Re-useable Parts - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), May Be Utilized As Initially Supplied.
3.1.3 Non-useable Parts - Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Shall Be In Accordance With This Tdp (technical Data Package).
3.1.4 Refurbishment - Upon Completion Of Inspection, This Item Shall Be Refurbished To Be In Accordance With ;ingersoll Rand Drawing 12532f18 And Motor Drawing 3505-21; , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring
certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.5 Additional Sow Requirements -
;n/a;
3.2 ;no-forn Maintenance Standard 2550-081-037 For Motor Tests And Examinations Will Be Supplied When Requested.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;discharge Head Assembly Finish Machine Item No. 474a On Drawing 12461f18;
material - ;mil-c-24707/6 And Astm-a217 Grade Ca-15 Or Astm A-240 Grade S4100;
part - ;stud; Item No.178b On Drawing 12445c18;
material - ;mil-dtl-1222, Grade B7 Type Iv (astm-a193);
part - ;main Stud; Item 178a And 178d Of Drawing Pl-12532f18;
material - ;mil-dtl-1222, Grade B7 (astm-a193) And A Hardness Of 25 Rc Minimum;
part - ;shaft; Item 10 Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, Hot Finished And Stress Relieved In Accordance With Note 6 Of Drawing 12504f18;
part - ;end Cover; Item No. 368a Of Drawing Pl-12532f18 And Shell; Item 359 Of Drawing 12451f18;
material - ;astm A336 Grade F6;
part - ;casing Item No. 183 Of Drawing Pl-12532f18;
material - ;mil-c-24707/6 And Astm A217 Grade Ca-15 Or Astm A-336 Grade F6;
part - ;cap Nut; Item No 179b Of Drawing Pl-12532f18;
material - ;astm A194 Grade B7;
part - ;nut Hex Self Locking; Item No.240a On Drawing Pl-12532f18;
material - ;astm-a194 Grade 2h Or 4 Or 7 Ms17829-10c;
part - ;tee; Item 175 And Elbow; Item 295 Of Drawing 12451f18;
material - ;astm-a182 Grade F6a, Class 2;
part - ;sleeve, Throttle; Item 440 Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, And Hardness Of 250 To 285 Bnh;
part - ;nipples; Items 415a, 415b, 415c And 415d Of Drawing 12451f18;;
material - ;sae-ams-qq-s-763, Uns S41000 Condition T, Hot Finished;
part - ;bushing, Throttle; Item 441 Of Drawing Pl-12532f18;
material - ;astm-a494, Grade Cy5snbim;
part - ;plug, Test Conn; Item 417b Of Drawing Pl-12532f18;
material - ;sae-ams-qq-s-763 Class 304;
part - ;nozzle Head; Item 360 Of Drawing 12451f18;
material - ;mil-c-24707/6 And Astm-a217 Grade Ca-15;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;magnetic Particle Inspection (wet Method);
item - ;cap Nut, Item No 179b;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;proof Load Test;
item - ;cap Nut, Item No 179b;
performance - ;astm-f606 And Note 5 Of Drawing 12459d18;
acceptance - ;no Evidence Of Stripping;
test - ;liquid Penetrant Inspection Or Magnetic Particle Inspection (wet Method) (either Inspection Is Acceptable);
item - ;main Stud Item 178a And 178d And Stud Item No.178b;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades Or Magnetic Particle Inspection (wet Method) For Ferro-magnetic Grades;
item - ;nut Hex Self Locking; Item No. 240a;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Shall Not Be Used On Thread)
acceptance - ;nasm25027;
test - ;magnetic Particle Inspection;
item - ;casing Item No. 183 On Drawing Pl-12532f18 And Discharge Head Assembly Item No. 361a On Drawing 12461f18;
performance - T9074-as-gib-010/271
acceptance - S9074-ar-gib-010a/278
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;plug Test Conn Item No 417b;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual Or Magnetic Particle Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Magnetic Particle Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;pressure, Performance And Noise Tests;
item - ;each Pump Assembly;
performance - ;eb Specification 3356;
acceptance - ;eb Specification 3356;
test - ;hydrostatic Test;
item - ;each Discharge Head Finish Machine;
performance - ;general Note 6 Of Drawing 12461f18;
acceptance - ;general Note 6 Of Drawing 12461f18;
test - ;motor Tests And Examination;
item - ;each Motor;
performance - ;all Measurements Required By Maintenance Standard 2550-081-037
acceptance - ;all Measurements Required By Maintenance Standard 2550-081-037
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - Astm-d4066, Group 01, Class 1 Or 2, Grade 1
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Shall State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. 30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.6 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;eb-3356 Rev K; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The Working
pressure On The Item Does Not Apply And Is Strictly Prohibited.
3.7 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.7.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.7.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.7.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.8 Radiography Is Required On ;nozzle Head; Item 360 And Casing Weldment On Drawing 12451f18 And Discharge Head Assembly Item No. 361a On Drawing 12461f18; .
3.9 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified Under S9074-aq-gib-010/248 For All Production
and Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.12 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.12.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.13 Certificate Of Compliance - (special Emphasis Material) The Contractor Shall Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.14 Mercury Free - Mercury And Mercury Containing Compounds Shall Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^
3.15 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Shall Be Furnished Along With A Copy Of The Test Results. Certification Shall Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Shall Be Identified To Weld Joint And Layer.
3.16 Radiography (rt) - Radiography Shall Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level Iper The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.16.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing Theradiography Shall Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketches Are Not Required For Radiography
of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend Only On
the Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Datahas Been Previously
approved By A Navy Activity, The Original Approval Letter Shall Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.16.2 All Pieces Radiographed Shall Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable Tothe Rt Film.)
3.16.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiographyrequires Final Acceptance By The Navy. The Items Listed Below Shall Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior
to Shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs
(d) Dd250 (with Unique Rt Serial Numbers Traceable To The Rt Film)
3.17 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Shall Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.17.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.17.2 The Contractor's Quality System Shall Be Documented And Shall Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Shall, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.17.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.17.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.17.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.18 Contractor Inspection Requirements - The Contractor Shall Maintain Adequate Records Of All Inspections And Tests. The Records Shall Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Shall Be Traceable To The Material Inspected.
3.18.1 The Supplier's Gages, Measuring And Test Equipment Shall Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Shall Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.18.2 All Documents And Reference Data Applicable To This Contract Shall Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Shall Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.19 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Shall Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.19.1 The Prime Contractor's Program Shall Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.19.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Shall Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or
services Specified In The Purchase Order Or Contract.
3.19.3 The Prime Contractor Shall Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Shall Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.19.4 The Prime Contractor Shall Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Shall
be Established. Records Of This Effort Shall Be Available For Review By The Government.
3.19.5 The Prime Contractor's Supplier Quality Assurance Program Shall Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.20 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Shall Develop Documented Control Procedures That Require At Least The Following:
3.20.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.20.2 Inspection For Completeness And Proper Type.
3.20.3 Verification Of Material Quality Received.
3.20.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.20.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.20.6 Identification And Protection From Improper Use Or Disposition.
3.20.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Shall Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.20.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Shall Be Maintained.
3.20.9 Material Returned To The Contractor Shall Be Handled As Gfm.
3.21 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.21.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Shall Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.22 Material Traceability - The Certification Data Report Shall Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Shall Also Be Marked On The Material. This Traceability Marking On The Material
shall Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Shall Be Taken No Less Than Once In Every Eight Hours
of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Shall Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.22.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Shall Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.22.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Shall Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.22.3 Traceability Markings Shall Be Maintained Through Assembly, And Whenever Possible Shall Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Shall Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.22.4 Marking Shall Be Legible And Shall Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.23 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.23.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Shall Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.23.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
shall Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Shall Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Shall Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.23.3 Material Certification Data Forwarded By The Manufacturer Shall Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.23.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.23.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.24 Material Handling - The Written Material Control Process Shall Include The Following:
3.24.1 All Raw Materials Shall Have Traceability Markings (except As Specified Below).
3.24.2 Stored Raw Materials Requiring Traceability Shall Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.24.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Shall Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Shall Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.24.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Shall Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Shall Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Shall Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.24.5 Purchase Orders For Raw Material Shall Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Shall Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.24.6 The Material Control Process Shall Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Shall Specify A Method And
marking Location For Remarking. The Contractor Shall Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.25 Receiving Inspection -
3.25.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Shall Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.25.2 Receiving Inspection Shall Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.26 Discrepancy Reporting -
3.26.1 Nonconforming Products From Sub-tier Suppliers Shall Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Shall Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Shall Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.27 Final Inspection - The Following Inspections Shall Be Performed Prior To Government Inspection And Acceptance.
3.27.1 Material Sampling - Material Shall Be Inspected For Form, Fit, And Function. Lot Acceptance Shall Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Shall Be In Accordance With The Sampling Plan(s) In The Applicable
military Specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Shall Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size
selection Code), Table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Shallbe Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Shall Be One Hundred Percent Of The Lot.
3.27.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.27.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Shall Be 100% Inspected. The Certification
test Reports Shall Also Be 100% Inspected For Completeness And Legibility.
3.27.4 All Material Requiring Traceability Shall Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.28 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Shall Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Shall Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.28.1 Approval Of The Contractor's Qualification Data Shall Be Obtained Prior To Performing Any Welding (production Or Repair).
3.28.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Shall Be
submitted At The Same Time. Welding Procedures And Qualification Data Shall Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Shall State The Applicability Of Each Weld Procedure And Qualification Data
submitted, Citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." "wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz."). Authority For The
repair Of Special Repairs In Castings And Authority For The Repair Of Wrought Or Forged Material Shall Be Obtained From The Procurement Contracting Officer. This Request Shall Describe The Defect; Including Size, Depth, Location, And A Description Of The
proposed Repair. This Request For Navsup-wss Contracts Shall Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.28.3 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 48 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 48 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.28.4 When Drawings Require Hard Facing Surface Iron Content (nickel For Monel Valves) Not To Exceed 5%, The Contractor Shall Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test
results Shall Be Submitted As Part Of The Qualification Data.
3.28.5 Qualification Requirements For Production Hardfacing: The Maximum Qualified Thickness For Hardfacing Shall Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt (non-destructive Testing) And Any
additional Drawing Requirements. The Minimum Qualified Thickness Is The Final Machined Thickness At Which Hardness Testing, Ndt, Macro-etch, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.28.6 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs) Shall Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential Elements And Any Elements Not
listed In S9074-aq-gib-010/248 That Influence Dilution Shall Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.28.7 Qualification Requirements For Production Cladding: The Maximum Qualified Thickness For Cladding Shall Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt And Any Additional Drawing Requirements.
the Minimum Qualified Thickness Is The Final Machined Thickness At Which Ndt, Side Bends, Macro-etch Testing, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.28.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.28.9 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Shall Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.28.10 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Shall Be Passed Down To The Subcontractor.
3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Shall Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1)
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
6.3.1 If You Have A Problem Connecting To The Dodssp Website, Please Contact Either The Subscription Service Desk (215)697-2569, Or The Special Assistance Desk (215)697-2667. The Dodssp Customer Service Staff Is Available Every Business Day Between The Hours
of 7:30 Am And 4:00 Pm Eastern Time To Answer Your Questions Or Assist In Solving Any Problems You Might Encounter When Ordering From The Dodssp Collection Of Defense Specifications And Standards, Federal Specifications And Standards Used By Dod, And Other Dod
standardization Documents. Mail Requests Should Be Submitted To: Navy Publishing And Printing Service (subscriptions) Building 4d 700 Robbins Ave. Philadelphia, Pa. 19111 Attn: Dodssp
requests Can Be Transmitted To Dodssp Via Fax Number (215)697-1462.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035
d. Ordnance Documents (od) - Ordnance Documents May Be Obtained By Submitting A Request To: Commanding Officer Naval Surface Warfare Center Port Hueneme Div Code 5a00 Port Hueneme, California 93043
e. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
f. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Education And Training Services
United States
Closing Date19 Mar 2024
Tender AmountUSD 147.5 K This is an estimated amount, exact amount may vary.
Details: This Request For A-e Firm Qualifications Packages Is 100% Set-aside For Service-disabled Veteran Owned Small Business (sdvosb) Concerns Under Vaar 852.219-73, Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation)
this Is Not A Request For Proposal. This Is A Request For Sf 330's Architect- Engineer Qualification Packages Only. public Announcement For Procurement Of Architect-engineering (a-e) Services: This Is A Request For Standard Form 330, Architect-engineer Qualifications Only. A-e Services Are Being Procured In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) Subpart 36.6. All Submissions Will Be Evaluated In Accordance With The Below Selection Criteria. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. Any Resulting Award For The Proposed A-e Services Will Be Procured Under A Negotiated Firm-fixed Price Contract. general Information: the Department Of Veterans Affairs, Durham Veterans Administration Health Care System, Is Seeking Sources And Intends To Award A Firm Fixed-price Contract For Architect-engineering (a-e) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project #558-23-155, Generator Exhaust Modification Located At 508 Fulton Street, Durham, North Carolina 27705. the A-e Services Listed Herein Is Being Procured In Accordance With The Federal Acquisition Regulation (far) 36.6 And Vaar 836.6. Potential Contractors Must Be Registered In Sam (www.sam.gov) And Visible/certified In The Sba Certification Database At Https://veterans.certify.sba.gov/ At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. As A Prospective Offeror For This Service-disabled Veteran-owned Small Business (sdvosb) Set Aside, You Are Verifying Your Company Meets The Status Requirements Of A Sdvosb Concern As Established By Vaar 852.219-73. pursuant To 38 U.s.c. 8127(l)(2), All Interested Firms Are Required To Submit The Certification At Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation) With Their Qualification Package. The Government Will Not Consider Submissions From Firms That Do Not Provide The Signed Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award.
the Durham Va Health Care System Is A Working Facility And Phasing Plans For Minimizing Downtime, And Provisions For Continuation Of Service During Outages Is Critical To This Project. point Of Contact: Elaine Belber, Contract Specialist Email: Elaine.belber@va.gov
project Information:
project No. 558-23-155
project Title: A-e: Generator Exhaust Modification
durham Va Health Care System
508 Fulton Street
durham, Nc 27705
the Naics Code For This Procurement Is 541330, Engineering Services, And The Applicable Small Business Size Standard Is $25.5 Million Annual Revenue. The Projected Award Date For The Anticipated A-e Contract Is On Or Before June 28, 2024. the Naics Code For The Anticipated Construction Project Is Projected To Be 236220 And Magnitude Of Construction Is Predicted To Be Between $500,000 And $1,000,000. The Anticipated Award Date Of The Construction Phase Of The Project Is To Be Determined (tbd). an Architect & Engineer (a-e) Contract Will Be Negotiated For The Development Of Complete Construction Documents Which Include Working Drawings, Specifications, Reports, And Construction Period Services. The A-e Will Be Given Written Information; Participate In Project Planning Meetings, Pre-proposal Meeting, And Pre-construction Meeting As Required; Communicate With Va Personnel Via Telephone Or E-mail; And Is Expected To Coordinate So That The Final Documents Include All Requirements In Accordance With Industry Standard Practices, Va Standards, Va Design Manuals, And Review Comments. statement Of Task/scope Of Work:
provide Professional Engineering Services To Include Phasing Recommendations, Investigative Surveys And Reports, Planning, Consultation And Visits, Design Work, Preparation Of Contract Drawings And Specifications, Preparation Of Cost Estimates And Provision Of Construction Period Services As Necessary For All Demolition, Construction, Inspection, Testing And Certification For All Mechanical, Electrical, And Plumbing Components For Project 558-23-155 The Modification Of Generator Exhaust At Durham Va Health Care System, Durham, Nc.
the Intent Of This Project Is To Modify The Generator Exhaust To Prevent Exhaust Smell From Entering The Patient Treatment Areas. After Options Are Developed, The A/e Shall Work In Conjunction With Vamc Staff And Interested Agencies To Determine The Best Options, Then Design And Prepare Construction Documents For The Mechanical, Electrical, Instrument & Control, Structural And Other Applicable Components Of This Project. The Design Shall Include The Desired Future Condition And Allow For Future Construction Of Components Without Significant Effect To The Constructed Components. The Design Process Shall Also Provide A Prioritization Of The Individual Components. location Of Work: This Project Location Is Building #1. This Building Stands Alone And Is Across From The Station Chiller Plant In Building #9. Durham Vamc Building #1 Located At 508 Fulton Street Durham, Nc 27705. codes And Standards: This Project Will Meet But Is Not Limited To The Following Most Recent Codes And Standards.
all Federal And Local Codes Including:
national Fire Protection Association 101, 92b, 92, 96, 72, 37, 13, 241, And 90a
national Electric Code (nec)
life Safety Codes
other Applicable Codes
va Numbered Standards For Construction:
pg-18-1 Master Construction Specifications
pg-18-3 Design And Construction Procedures
pg-18-4 Standard Details And Cad Standards
pg-18-5 Equipment Guide List
h-18-8 Seismic Design Handbook
pg-18-9 Space Planning Criteria, And Va-space & Equipment Planning System (va-seps)
pg-18-10 Design Manuals (by Discipline)
architectural
asbestos Abatement
electrical
fire Protection
hvac Systems
steam, Heating Hot Water, And Outside Distribution Systems Design Manual Volumes 1, 2 And 3
structural
pg-18-12 Design Guides (graphical, By Function)
pg-18-13 Barrier Free Design Standard
pg-18-14 Room Finishes, Door, And Hardware Schedule Change Summary
pg-18-15 Minimum Requirements For A/e Submissions
pg-18-17 Environmental Planning Guidance
d-7545 Cultural Resource Management
h-7545 Cultural Resource Management Procedures
office Of Construction & Facilities Management - Architect/engineer Information:
national Cad Standard, Vha Application Guide
va Bim Standard V2.2
drawing Deliverable Requirements (ddr) architect-engineering Services:
the Project Design Shall Be Completed In Accordance With This A/e Scope And All Appropriate Department Of Veterans Affairs (va) Standards, Specifications, And Other Criteria Otherwise Required By The Va. The A/e Shall Retrieve All Va Design Information And Standards From The Va Facilities Web Site (til Catalog - Office Of Construction & Facilities Management (va.gov)). These Documents And All National, State And Local Codes Adopted And Used By The Va Shall Be Incorporated In The Design Of This Project And Reflected In The Construction Cost Estimate. The A/e Shall Use As Applicable, For Planning And Design Purposes, The Va Numbered Standards For Construction Listed Under Scope Of Work Codes And Standards Above.
analysis - As Part Of The Design The A/e Will Provide A Detailed Analysis (per Applicable Code) And Comprehensive Review Of Existing Conditions For The Exhaust For Three Generators In Building 1.
design Scope A Full Design Will Be Created By The A/e Based, In Part, Of The Va Approved Option After Analysis. The A/e Will Provide A Design Of A Code Compliant Exhaust Which Will Include But Is Not Limited To:
determination Of Proper Material Or Materials.
full Consideration Of The Existing Exhaust Systems.
a Nfpa 37 Designed Exhaust System With Calculations And Test Procedures. Ensure Coordination With Existing Building Exhausts Are Provided Per Nfpa 37 And Discussed With Va Personnel.
neshap And Abatement Plans For The Affected Locations For The Exhaust.
design: Provide Design Documents With Working Drawings, Specifications, And Cost Estimate At 30%, 65%, 95%, And 100% Design And Final Stages. design Deliverables:
design Report (included In Part I Submission): Prior To The Initiation Of Any Detailed Design, The A/e Shall, In Conjunction With Representatives Of The Engineering Department, Review Documentation, Conduct Department Interviews And Tour Project Areas. Next The A/e Will Develop Various Alternatives, Which Will Be Presented To The Engineering Department For Selection With Rough Order Of Magnitude (rom) Construction Estimates.
part I - 30% Submission: The Requirements Are Working Drawings At The 30% Stage, Marked-up Specifications, And A Detailed Construction Cost Estimate Showing A Quantitative Survey Of All Labor And Material. Submit 3 Full Size Set Of Drawings (22 X 34 ) On Bond Paper, 4 Half Size Set Of Drawings (11 X 17 ) On Bond Paper, 2 Copies Of The Marked-up Specifications, 1 Copy Of The Preliminary Construction Cost Estimate, And An Electronic Copy Of The Drawings (.pdf And Autocad) And Specifications (.docx And .pdf) On A Cd Rom.
part Ii - 65% Submission: The Requirements Are Working Drawings At The 65% Stage, Marked-up Specifications, And A Detailed Construction Cost Estimate Showing A Quantitative Survey Of All Labor And Material. Submit 2 Full Size Set Of Drawings (22 X 34 ) On Bond Paper, 4 Half Size Set Of Drawings (11 X 17 ) On Bond Paper, 4 Copy Of The Marked-up Specifications, 2 Copy Of The Preliminary Construction Cost Estimate, And An Electronic Copy Of The Drawings (.pdf And Autocad) And Specifications On A Cd-rom.
part Iii - 95% Submission: The Requirements Are Complete Construction Drawings Showing All Details And Views, Updated Detailed Cost Estimate, And Finalized Specifications. Submit 3 Full Size Set Of Drawings (22 X 34 ) On Bond Paper, 4 Half Size Set Of Drawings (11 X 17 ) On Bond Paper, 4 Copies Of The Marked-up Specifications The Updated Construction Cost Estimate, The Submittal Register, Narrative For The Solicitation (provide The Brief Description Of Work For Inclusion In The Solicitation, And An Electronic Copy Of The Drawings (.pdf And Autocad) And Specifications On A Cd-rom.
part Iv - 100% Submission: Provide 3 Full Size Set Of Drawings (22 X 34 ) On Bond Paper, 4 Sets Of Half Size Drawings (11 X 17 ) On Bond Paper, 2 Bound Sets Of Specifications, And An Electronic Copy Of The Drawings (.pdf And Autocad) And Specifications On A Cd-rom.
part V - Final Submission: Provide 2 Set Of Drawings (30 X42 ) On Bond Paper, 4 Sets Of Half Size Drawings On Bond Paper, A Bound Set Of Specifications, A Set Of Unbound Specifications, And An Electronic Copy Of The Drawings (.pdf And Autocad) And Specifications On A Cd-rom. Additionally Provide:
narrative For The Solicitation: Provide The Brief Description Of Work For Inclusion In The Solicitation. Provide 2 Copies.
engineering Calculations: Provide Analysis Including Engineering Calculations. Provide 2 Copies.
justifications: Provide Justification Statements For Any Sole Source Items And Any Or-equal Items Included In The Design. Provide 2 Copies.
the Design Deliverables Must Adhere To The Following Requirements:
specifications: The Project Specifications Shall Be Prepared In Microsoft Word By The A/e From The Va Master Specifications. The General Format Shall Include; Part 1-general, Part 2-products, And Part 3-execution. Part 1 Verbiage Shall Include The General Requirements, Identify Applicable Standards, And Identify Submittals Required For A Particular Specification. This Information Should Be Directly Related And Correspond To A Specific Submittal Number Enumerated In The Submittal Register As Identified Below. Part 2 Shall Include Description Of The Salient Characteristics Of The Products. Part 3 Shall Include A Description Of The Methods Used To Install Items Of Construction. The A/e Shall Identify All Va Master Specification Sections Applicable To The Project And Edit Them Accordingly To Fit The Scope Of Work. If Additional Specification Sections Are Needed That Are Not Listed In The Va Master Specs, The A/e Is Responsible To Write And Edit An Appropriate Csi Format Specification Section. Specifications Shall Be Printed On 8 ½ X 11 Bond Paper Using 12pt Times-new-roman Fonts. The A/e Shall Incorporate Into The Specifications And Its Construction Site Inspection Procedures The Applicable Infection Control And Dust Control Provisions.
construction Cost Estimates: The A/e Shall Prepare Construction Cost Estimates In Microsoft Excel Using The Csi 34-division Format. The Cost Estimates Shall Include A Copy Of The Quantity Take-offs, Breakdown Of Individual Line Items That Accurately Reflect The Quantity Take-off Of The Various Categories Of Work Involved, Unit Of Measure, Quantities, Unit Cost, Overhead, And Profit. All Cost Data Shall Be Taken From The Most Current Version Of A Recognized Industry Standard, E.g. Means Estimating Guides. For Items That Are Not In The Industry Standards, Vendor Quotes And Justification For Labor Hours Shall Be Provided. Construction Cost Estimates Shall Be Submitted With 65%, 95% And 100% Design Reviews And For The Final Submission. Provide 2 Copies With Each Submission. As Part Of The Cost Estimating Effort, The A/e Shall Provide A Schedule Of Values Such That Discrete Elements Of The Specifications Are Identified And May Be Used In Negotiations With A Proposal Solicitation.
submittal Register: The A/e Shall Develop A List Of All Uniquely Identified Submittals Required By The Specifications In Section 1 Of Each Individual Specification. This Submittal Register Should Be Submitted To The Cor For Approval In Microsoft Excel Using The Csi 34-division Format. The Register Should Include Specification Reference, And Item To Be Reviewed/approved And Correspond To The Submittal Requirements As Identified In The Specification Section Addressed In Paragraph Above. Submittal Register Shall Be Submitted With 95% And 100% Design Reviews And For The Final Submission. Provide 2 Copies With Each Submission.
narratives: Written Narratives Shall Be Included As Part Of Each Design Submission. The Narrative Should Be Used To Elaborate On And Provide An Explanation Of Key Design Decisions By A/e And/or The Va, Objectives, Obstacles, Alternatives And Resolutions, Design Issues Or Decisions Relating To Constructability, And In General To Communicate All Information Relevant To The Design Submission. Provide 2 Copies With Each Submission.
reproduction: The A/e Shall Be Responsible For All Reproduction During Design; However, Only Materials Which Are Submitted To The Va For Design Reviews Shall Be Reimbursable. All Other Reproduction For In-house Reviews, Consultants, Etc. Shall Not Be Reimbursed. Note That All Solicitation Administration Activities Will Be Performed By The Va Contracting Office. submission Due Dates:
part I 30% Submission Due: 30 Days From Ntp
va Review 50 Days From Ntp
part Ii 65% Submission Due: 70 Days From Ntp
va Review 90 Days From Ntp
part Iii 95% Submission Due : 110 Days From Ntp
va Review 130 Days From Ntp
part Iv 100% Documents Due: 150 Days From Ntp
va Review 170 Days From Ntp
part V Final Documents Due: 190 Days From Ntp note: The Va Will Have 20 Days To Review Each Submission 30%, 65%, 95%, 100% And Final. construction - Provide Construction Period Services Which Shall Include Submittal Review And As-built Preparation.
potential Contractors Site Visit: Participate And Facilitate This Site Visit In Conjunction With The Contracting Officer And Cor, Contractors, And Representatives Of The Building Committee As Needed. At This Meeting, Potential Contractors Will Walk The Site Limits To Discuss The Scope Of Work. The Ae Shall Also Be Required To Evaluate Rfis Resulting From The Potential Contractor Site Visit, To Clarify Project Requirements.
pre-construction Meeting: Participate And Facilitate This Meeting In Conjunction With The Contracting Officer And Cor, Contractor, And Representatives Of The Building Committee As Needed. At This Meeting The Staging Area And Work Site Rules Shall Be Discussed Again With The Contractor (these Should Already Be Included In The Specifications). Contract Specifications Should Require A Construction Schedule Submitted Within 14 Calendar Days From The Notice To Proceed.
submittal Review And Logs: Designer Shall Prepare And Maintain A Log Of Key Submittals And Of Rfis And Provide The Same To The Contracting Officer And Cor. Reviewed Submittals Are To Be Returned Within 5 Working Days To The Cor. Designer Is Fully Responsible For Review Of All Submittals, Retaining A Record Copy Of Submittals For Turn Over To The Owner Upon Project Completion, And Communication With The Contractor Regarding Any Deficiencies Or Changes Required To The Submittals.
response To Rfis: The A/e Shall Be Responsible For Evaluating Rfis To Determine If A Change Will Be Required. The A/e Shall Then Provide Recommendations To The Contracting Officer. Within 48 Hours, The A/e Shall Provide In Writing The Information, Clarification Or Revision Material Needed To Properly Answer The Rfi And To Resolve The Issue. The A/e Shall Include A Cost/credit Estimate For Rfis Which Result In A Change To Contract Cost.
construction Change Orders: Designer Shall Prepare The Statement Of Work And Cost Estimates (returned Within 10 Calendar Days) And Track The Total Cost And Changes To The Project.
monthly Site Inspections: Designer Shall Meet Monthly With The Contractor, Cor And Others Needed To Inspect The Progress Of The Construction And Report Any Deficiencies To The Same.
monthly Progress Meetings: In Conjunction With The Monthly Site Inspection, The Designer Shall Hold Formal Progress Meetings With Contractor, Contracting Officer, And Cor. At These Meetings The Agenda Shall Contain A Narrative Of Work Completed The Previous Month, Work Upcoming, Submittals Or Rfis Outstanding, Schedule Update, Any Special Coordination Items Requiring Actions, And Discussion Of Change Orders Or Time Extension Requests. Minutes Of This Meeting Shall Be Issued Within 3 Working Days Of The Meeting.
final Acceptance Testing: The Design Team Shall Provide An Engineer That Will Conduct Final Acceptance Testing Of The Ventilation And Cooling Systems That Were Designed And Installed During This Project. The Engineer Will Provide A Detailed Acceptance Test Report Upon Project Completion. The Engineer Will Coordinate All Testing With The Durham Vamc And The Ahj.
project Close Out: Designer Shall Receive Notice Of Intent For Final Inspection From The Cor, And Contractor Shall Propose A Time And Place For This To Occur In Conjunction With The Contracting Officer And The Cor. Following The Final Inspection, The Designer Shall Issue A Punch List. Contract Documents Shall Specify That The Contractor Has 15 Calendar Days To Complete The Punch List And Notify The Designer For Re-inspection. Following Re- Inspection And Project Acceptance The Closeout Phase Will Occur.
record Drawing Submission: Provide 2 Updated Sets Of Drawings (22 X34 ) On Bond Marked As As-built Drawings That Include The Contractor S Mark-ups And An Electronic Copy Of The Drawings (.pdf And Autocad) On A Cd-rom. construction Amount: The Project Is To Be Designed With An Estimated Magnitude Of Construction Cost Between $500,000 And $1,000,000. If The Base Solicitation Cost Exceeds Budget, The A/e Shall Redesign Or Take Steps Necessary To Reduce Cost, So The Budget Limitations Are Not Exceeded. period Of Performance: Vendor Shall Complete This Project Nlt Than 385 Days After Issue Of Notice To Proceed (ntp). required Training
all Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete The Following Before Being Granted Access To Va Information And Its Systems:
sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix D Relating To Va Information And Information Systems.
successfully Complete The Appropriate Va Privacy Training And Annually Complete Required Privacy Training.
the Contractor Shall Provide To The Contracting Officer And/or The Cor A Copy Of The Training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required.
failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete. release Of Claims: Prior To The Final Payment Under Each Delivery Order Issued Under This Contract Or Prior To Settlement Upon Termination Of The Delivery Order, And As A Condition Precedent Thereto, The A/e Shall Execute And Deliver To The Contracting Officer A Release Of All Claims Against The Government Arising Under Or By Virtue Of This Contract, Other Than Such Claims, If Any, As May Be Specifically Excepted By The A/e From The Operation Of The Release In Stated Amounts To Be Set Forth Therein. project Area
end Of Scope Of Work a-e Selection Process:
the Agency Has Convened An Evaluation Board For The Evaluation Of Responses To This Notice. Responses Will Be Evaluated In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) 36.6. Specifically, Sf 330 Submissions Will Be Evaluated To Identify The Most Highly Qualified Firms, Using The Selection Criteria Identified Below. Discussions Will Be Held With At Least Three (3) Of The Most Highly Qualified Firms, In Accordance With Far 36.602-3(c). The Processes At Far 36.602-4 And Far 36.606 Will Then Be Followed. Selected Firms Will Be Notified By Telephone Or Email Of Selection And Provided Further Instructions. evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Publicly Available Sources. Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. selection Criteria: Evaluation And Selection Of Firms Will Be Based On Submissions And Direct Responses To The Following Criteria Which Are Numbered In Descending Order Of Importance:
professional Qualifications Necessary For Satisfactory Performance Of Required Services Showing Recent Experience Of The Project Team With Comparable Hospital Projects Within The Past Five Years In Which The Construction Has Been Completed.
do The Qualifications Indicate That The Project Team Has Recent Direct Experience On Hospital Projects Designing Similar Improvements To Those Proposed At The Durham Vamc? Is The Architect/engineer Providing A Team Where Each Member Has More Than 5 Years Of Experience In The Project S Key Engineering Disciplines?
specialized Experience And Technical Competence In The Type Of Work Required, Specifically Hvac Systems, Infection Control And Life Safety Requirements.
does The Architect/engineer Provide Evidence Of Understanding Of The Project; And Any Unique Architectural/engineering Aspects Associated With The Proposed Project And How To Address Them?
capacity To Accomplish The Work In The Required Time.
does The Proposed Design Team Have Sufficient Capacity To Work On This Project? Has The Firm Demonstrated An Ability To Meet Design Schedules In The Past And Their Record Of Working Together As A Team?
past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules In A Hospital Setting.
does The Proposed Architect/engineer Have Past Performance With Ratings Satisfactory And Above While Working On Hospital Projects?
does The Architect/engineer Have A Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness.
experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates.
what Evidence Do The Qualifications Provide As To The Architect/engineer S Commitment To Proactive And Consistent Representation During Construction Specifically Answering Rfis, Reviewing Submittals And Conducting Periodic Site Visits?
no Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services.
the Extent To Which Potential Firms Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. location
in The Event That Evaluations Of Sf330s Result In The Same Rating, Proximity To The Facility Will Be Used As A Tiebreaker. This Distance Will Be Determined According To Http://maps.google.com/. For Firms Which Have Multiple/regional Offices, The Location Of The Primary Project Team Will Be Used To Calculate The Distance And Should Be Provided In The Sf330. the Department Of Veterans Affairs Shall Evaluate Each Potential Contractor In Terms Of The Following As M Firm Meeting The Synopsized Selection Criterion And "nm" Means That The Firm Did Not Meet The Synopsized Selection Criterion.:
selection Criteria
professional Qualifications Necessary For Satisfactory Performance Of Required Services Showing Recent Experience Of The Project Team With Comparable Hospital Projects Within The Past Five Years In Which The Construction Has Been Completed.
specialized Experience And Technical Competence In The Type Of Work Required, Specifically Hvac Systems, Infection Control And Life Safety Requirements.
capacity To Accomplish The Work In The Required Time.
past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules In A Hospital Setting. experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates.
no Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services.
the Extent To Which Potential Firms Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors.
location
please Note: The A-e Evaluation Board Must Be Provided With Complete And Accurate Information For All Eight (8) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The A-e Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The A-e Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications.
limitations:
852.219-73 Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses.
852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction.
submission Criteria/requirements:
interested Firms Having The Capabilities To Perform This Work Must Submit:
one (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) Electronically To Elaine.belber@va.gov No Later Than 3:00 P.m. Eastern Daylight Time On March 19, 2024.
interested Firms Are Responsible For Ensuring Electronic Delivery Of Submission By The Time And The Date Specified. It Is Highly Recommended Interested Firms Confirm Electronic Submissions Have Been Received By The Contract Specialist.
size Limits Of E-mails Are Restricted To 10mb. If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of N . (example: Sf330 Submission, #36c24624r0046 Generator Exhaust Modification, Project #558-23-155 (1 Of N, 2 Of N, Etc.).
all Sf330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Procurement Number And Project Title (abbreviated Or Shortened Is Acceptable). interested Firms Are Responsible For Ensuring Delivery Of Submission.
all Sf 330 Submissions Must Include The Following Information, Either On The Sf 330 Or By Accompanying Document:
1) Cage Code 2) Unique Entity Identifier (uei) Number
3) Tax Id Number 4) The E-mail Address And Phone Number Of The Primary Point Of Contact
5) Sf 330 Must Indicate The Percentage Of The Contract Performance Cost That Will Be Expended By The Prime Firm S Employees And In Which Discipline(s) And Subcontracted Percentage Of Contract Performance Cost To Be Expended (and In What Disciplines). Any Subcontracted Or Otherwise Business Entity Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, Large, Etc.).
6) A Copy Of The Completed Vaar Clause 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. (note: The Government Will Not Consider Submissions From Firms That Do Not Provide The Signed Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award.) the Firm And Or A-e On Staff Representing The Project Must Follow State Of North Carolina Guidelines Under State Law For All Licensing Requirements To Sign And Seal Drawings. each Respondent Must Be Able To Demonstrate The Ability To Comply With The Limitations On Subcontracting, In Accordance With Far Clause 52.219-14 And Vaar Clauses 852.219-73 And 852.219-75.
electronic Submittals Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Considered. All Information Must Be Included In The Sf330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At: Www.sam.gov For Any Revisions To This Announcement Prior To Submission Of Sf330s. vendor Questions:
all Questions Shall Be Submitted To Elaine.belber@va.gov No Later Than 3:00 P.m. Eastern Standard Time On March 8, 2024. 52.219-14â limitations On Subcontracting.
as Prescribed Inâ 19.507(e), Insert The Following Clause:
limitations On Subcontracting (oct 2022)
(a)â this Clause Does Not Apply To The Unrestricted Portion Of A Partial Set-aside.
(b)â definition.â similarly Situated Entity, As Used In This Clause, Means A First-tier Subcontractor, Including An Independent Contractor, That (1)â has The Same Small Business Program Status As That Which Qualified The Prime Contractor For The Award (e.g., For A Small Business Set-aside Contract, Any Small Business Concern, Without Regard To Its Socioeconomic Status); And
(2)â is Considered Small For The Size Standard Under The North American Industry Classification System (naics) Code The Prime Contractor Assigned To The Subcontract.
(c)â applicability.â this Clause Applies Only To (1)â contracts That Have Been Set Aside For Any Of The Small Business Concerns Identified Inâ 19.000(a)(3);
(2)â part Or Parts Of Aâ multiple-award Contractâ that Have Been Set Aside For Any Of The Small Business Concerns Identified Inâ 19.000(a)(3);
(3)â contracts That Have Been Awarded On A Sole-source Basis In Accordance With Subpartsâ 19.8,â 19.13,â 19.14, Andâ 19.15;
(4)â orders Expected To Exceed Theâ simplified Acquisition Thresholdâ and That Are (i)â set Aside For Small Business Concerns Underâ multiple-award Contracts, As Described Inâ 8.405-5â andâ 16.505(b)(2)(i)(f); Or
(ii)â issued Directly To Small Business Concerns Underâ multiple-award Contractsâ as Described Inâ 19.504(c)(1)(ii);
(5)â orders, Regardless Of Dollar Value, That Are (i)â set Aside In Accordance With Subpartsâ 19.8,â 19.13,â 19.14, Orâ 19.15â underâ multiple-award Contracts, As Described Inâ 8.405-5â andâ 16.505(b)(2)(i)(f); Or
(ii)â issued Directly To Concerns That Qualify For The Programs Described In Subpartsâ 19.8,â 19.13,â 19.14, Orâ 19.15â underâ multiple-award Contracts, As Described Inâ 19.504(c)(1)(ii); And
(6)â contracts Using Theâ hubzoneâ price Evaluation Preference To Award To Aâ hubzoneâ small Business Concern Unless The Concern Waived The Evaluation Preference.
(d)â independent Contractors.â an Independent Contractorâ shallâ be Considered A Subcontractor.
(e)â limitations On Subcontracting.â by Submission Of Anâ offerâ and Execution Of A Contract, The Contractor Agrees That In Performance Of A Contract Assigned A North American Industry Classification System (naics) Code For (1)â services (exceptâ construction), It Will Not Pay More Than 50 Percent Of The Amount Paid By The Government For Contract Performance To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor's 50 Percent Subcontract Amount That Cannot Be Exceeded. When A Contract Includes Both Services Andâ supplies, The 50 Percent Limitationâ shallâ apply Only To The Service Portion Of The Contract;
(2)â suppliesâ (other Thanâ procurementâ from A Nonmanufacturer Of Suchâ supplies), It Will Not Pay More Than 50 Percent Of The Amount Paid By The Government For Contract Performance, Excluding The Cost Of Materials, To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor's 50 Percent Subcontract Amount That Cannot Be Exceeded. When A Contract Includes Bothâ suppliesâ and Services, The 50 Percent Limitationâ shallâ apply Only To The Supply Portion Of The Contract;
(3)â generalâ construction, It Will Not Pay More Than 85 Percent Of The Amount Paid By The Government For Contract Performance, Excluding The Cost Of Materials, To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor's 85 Percent Subcontract Amount That Cannot Be Exceeded; Or
(4)â constructionâ by Special Trade Contractors, It Will Not Pay More Than 75 Percent Of The Amount Paid By The Government For Contract Performance, Excluding The Cost Of Materials, To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor's 75 Percent Subcontract Amount That Cannot Be Exceeded.
(f)â the Contractorâ shallâ comply With The Limitations On Subcontracting As Follows:
(1)â for Contracts, In Accordance With Paragraphs (c)(1), (2), (3) And (6) Of This Clause [contracting Officerâ check As Appropriate.]â  by The End Of The Base Term Of The Contract And Then By The End Of Each Subsequentâ optionâ period; Or  by The End Of The Performance Period For Each Order Issued Under The Contract.
(2)â for Orders, In Accordance With Paragraphs (c)(4) And (5) Of This Clause, By The End Of The Performance Period For The Order.
(g)â a Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (e) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants.
(1)â in A Joint Venture Comprised Of A Small Business Protã©gã© And Its Mentor Approved By The Small Business Administration, The Small Business Protã©gã©â shallâ perform At Least 40 Percent Of The Work Performed By The Joint Venture. Work Performed By The Small Business Protã©gã© In The Joint Ventureâ mustâ be More Than Administrative Functions.
(2)â in An 8(a) Joint Venture, The 8(a) Participant(s)â shallâ perform At Least 40 Percent Of The Work Performed By The Joint Venture. Work Performed By The 8(a) Participants In The Joint Ventureâ mustâ be More Than Administrative Functions.
(end Of Clause)
852.219-73â Va Notice Of Total Set-aside Forâ certifiedâ service-disabled Veteran-owned Small Businesses.
as Prescribed Inâ 819.7011, Insert The Following Clause:
va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation)
(a)â definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb :
(1) Means A Small Business Concern (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (seeâ vaar 802.101, Surviving Spouse Definition);
(ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran;
(iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document;
(iv) The Business Has Beenâ certifiedâ for Ownership And Control Pursuant Toâ 38 U.s.c. 8127, 13 Cfr 128,â and Is Listedâ as Certifiedâ inâ the Sba Certification Database Atâ https://veterans.certify.sba.gov/; And
(v) The Businessâ agrees Toâ comply Withâ vaar Subpart 819.70â and Small Business Administration (sba) Regulations Regarding Small Business Size, Government Contracting, And The Veteran Small Business Certification Program At 13 Cfr Parts 121, 125, And 128.
(2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16).
(3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632).
(4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)).
(5) The Term "sdvosb Participant Or Certified Sdvosb Means A Small Business That Has Been Certified In The Sba Veteran Small Business Certification Program And Listed In The Sba Certification Database (see 13 Cfr 128.102).
(b)â general.â in Order For A Concern To Submit An Offer And Be Eligible For The Award Of An Sdvosb Set-aside Or Sole Source Contract, The Concern Must Qualify As A Small Business Concern Under The Size Standard Corresponding To The Naics Code Assigned To The Contract And Be Listed As An Sdvosb Participant In The Sba Certification Database As Set Forth In 13 Cfr 128.
(1) Offers Received From Entities That Are Notâ certifiedâ sdvosbsâ and Listed In The Sba Certification Databaseâ at The Time Of Offer Shall Not Be Considered.
(2) Any Award Resulting From This Solicitation Shall Be Made To Aâ certifiedâ sdvosbâ listed In The Sba Certification Databaseâ who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award.
(3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences.
(c)â representation.â pursuant To 38 U.s.c. 8127(e), Onlyâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligibleâ and Certifiedâ sdvosb As Defined In This Clause,â 13 Cfr 121, 125, And 128, Andâ vaar Subpart 819.70.
(d)â agreement/los Certification.â when Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements Inâ vaar Subpart 819.70â and Sba Regulations Onâ small Business Size,â and Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontractingâ (los)â requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. For The Purpose Of Limitations On Subcontracting, Onlyâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Requiredâ (los)â certification Requirements In This Solicitation (seeâ 852.219-75â orâ 852.219-76â as Applicable). These Requirements Are Summarized As Follows:
(1)â services.â in The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract.
(2)â supplies/products.â (i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract.
(ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13â cfrâ 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements.
(3)â general Construction.â in The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database.
(4)â special Trade Construction Contractors.â in The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database.
(5)â subcontracting.â an Sdvosbâ subcontractorâ must Meet The Naics Size Standard Assigned By The Prime Contractor And Beâ certified Andâ listed Inâ the Sba Certification Databaseâ to Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6.
(e)â required Limitations On Subcontracting Compliance Measurement Period.â an Sdvosb Shall Comply With The Limitations On Subcontracting As Follows:
[contracting Officer Check As Appropriate.]
____ By The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or
____ By The End Of The Performance Period For Each Order Issued Under The Contract.
(f)â joint Ventures.â a Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Complies With The Requirements Inâ 13 Cfr 128.402 And The Managing Joint Venture Partner Makes The Representations Under Paragraph (c) Of This Clause. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants.
(g)â precedence.â the Va Veterans First Contracting Program, As Defined Inâ vaar 802.101,â subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sbaâ veteran Small Business Certificationâ program, And The Va Veterans First Contracting Program.
(h)â misrepresentation.â pursuant To 38 Usc 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company S Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (seeâ vaar 809.406-2â causes For Debarment).
(end Of Clause)
852.219-75â Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction.
as Prescribed Inâ 819.7011(b), Insert The Following Clause:
va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation)
(a) Pursuant Toâ 38 U.s.c. 8127(l)(2), The Offeror Certifies That (1) If Awarded A Contract (seeâ far 2.101â definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: [contracting Officer Check The Appropriate Box Below Based On The Predominant Naics Code Assigned To The Instant Acquisition As Set Forth Inâ far 19.102.]
(i) [ ]â services.â in The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdvosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6.
(ii) [ ]â general Construction.â in The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdbosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted.
(iii) [ ] Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdbosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted.
(2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution.
(3) If Va Determines That An Sdvosb/vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following:
(i) Referral To The Va Suspension And Debarment Committee;
(ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And
(iii) Prosecution For Violatingâ 18 U.s.c. 1001.
(b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed.
(c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate.
(d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award.
certification:
i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror].
printed Name Of Signee:â ________________________________________
printed Title Of Signee:â _________________________________________
signature:â ___________________________________________________
date:â _____________________
company Name And Address:â ______________________________________
________________________________________________________________
(end Of Clause)
1761-1770 of 1765 archived Tenders