Structural Design Tenders

Structural Design Tenders

Central Public Works Department - CPWD Tender

Services
Building Construction...+2Consultancy Services, Civil And Architectural Services
India
Details: Construction Of Western Regional Center Of Indian Institute Of Mass Communication Iimc Including Consultancy Services For Preparation Of Master Plan Lop, Architectural Drawings, Submission Drawings For Local Body Submittals And Other Approvals, Working Drawings, Structural Design Or Drawings, Landscape Design Or Drawings, Obtaining Of Occupancy Certificate Or Clearance Of Fire Noc Or All Necessary Permissions Or Approvals Whichever Is Applicable For : Administrative And Academic Bloc, Residential Building 01 No.- Ty-v, 04 Nos. - Ty-iv, 04 Nos. - Ty-iii And 04 Nos. - Ty-ii, Male And Female Hostel Building, Auditorium Building 200 Capacity, Parking 75 Nos. Cars And 559 Nos. Scooters, Outdoor Sports Area 02 Nos. Badminton Court Doubles And 01 No. Basket Ball Court With Complete Development And Bulk Services On Engineering Procurement And Construction Epc Basis.
Closing Soon6 Nov 2024
Tender AmountINR 816.2 Million (USD 9.7 Million)

Public Works Department - PWD Tender

Services
Consultancy Services...+1Civil And Architectural Services
India
Details: Providing Consultancy Services For Preparation Of Dpr And Construction Drawings For All Services Including Preparation Of Structural Designs And Drawings Along With All Allied Works Of Proposed Construction Of Ring/bypass Road To Raibag Town In Raibag Taluka. Including Soil Investigation Document Printing, Surveys Alingment & Preparation Of Land Aquistion Proposal And Getting Approval Land Aquistion Proposal Etc., Complete As Per Directions Of Engineer In Charge (inclusive Of Consultancy Service Taxes, Local Taxes, Duties, Fees, Levies And Other Impositions Imposed Under The Applicable Law On The Consultants But Excluding Gst Charges)
Closing Soon4 Nov 2024
Tender AmountINR 2 Million (USD 24.5 K)

Public Works Department - PWD Tender

Services
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
India
Details: Providing Consultancy Services For Preparation Of Dpr And Construction Drawings For All Services Including Preparation Of Structural Designs And Drawings Along With All Allied Works Of Proposed Construction Of Ring/bypass Road To Hukkeri Town Sankeshwar Sangam Sh-44 Yellimunnoli Cross To Shettihalli Inchalkaranji Sh-78 To Join Near Seed Farm In Hukkeri Taluka. Including Soil Investigation Document Printing Surveys & Preparatation Of Land Acquatation Praposals And Approval Of Land Acquatation Praposals Etc., Complete As Per Directions Of Engineer In Charge (inclusive Of Consultancy Service Taxes, Local Taxes, Duties, Fees, Levies And Other Impositions Imposed Under The Applicable Law On The Consultants But Excluding Gst Charges)
Closing Soon4 Nov 2024
Tender AmountINR 2 Million (USD 24.5 K)

South Eastern Railway - SER Tender

Works
Civil And Architectural Services
Ireps
India
Details: Soil Exploration For The Work Of Proposed Lhs/nhs/rhs And Bridges And Other Location Under Den/east For The Development Of Structural Drawing By Designing As Per Relevant Design Code.
Closing Date25 Nov 2024
Tender AmountINR 2.2 Million (USD 26.3 K)

National Dairy Authority Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Project Title Construction Of 35-head Dairy Cow Shed With Calf Pen I. Background The Project Is A Dairy Cattle Establishment To Be Implemented In The Municipality Of San Miguel, Province Of Surigao Del Sur, To Promote And Increase The Milk Production And Support Dairy Farming In The Area. The Attached Architectural And Structural Design Shall Serve As The Construction Drawings, And Will Serve As The Contractor’s Reference On The Electrical And Plumbing/sanitary Design. The Plans Shall Consist Of Architectural Design (from The Twg), Structural Design (from The Twg), Electrical Design And Sanitary/plumbing Design. The Shed Shall Be Designed For Different Earthquake Zones, Wind Loads, And Soil-bearing Capacities. This Should Also Be In Accordance With All The Applicable Codes Of The Philippines. Ii. Objective The Objective Of This Project Is To Hire An Engineering And Construction Firm To Construct The Shed In Accordance With The Design And Plans Including The Program Of Works, Detailed Estimates For The Bill Of Quantities, And Other Documents Needed In Construction And Securing Permits, If Applicable. Iii. Scope Of Work 1. Contract Documents 1.1 The Contractor Is Responsible For Producing Comprehensive Construction Drawings And Specifications Based On The Approved Design Documents, Outlining In Detail The Necessary Work For Both The Electrical And Sanitary/plumbing Systems. 1.2 The Contractor Shall Furnish The End-user Complete Sets Of Signed And Sealed Program Of Works, Construction Drawings, Material Specifications, And General Conditions. 1.3 The Contractor Shall Be Responsible For Securing Permits And Other Clearances, If Applicable. Our Quality Management System Is Certified According To Iso 9001 2. Construction Phase 2.1 The Contractor Shall Be Fully Responsible For The Mobilization And Demobilization, Supervision, Labor, Materials, Tools And Equipment Including Utilities Needed To Complete All The Works. These Shall Include The Preparations, Accessories And Consumables Necessary To Complete The Project. The Scope Includes, But Not Limited To, The Following: I. Civil Works • Site Preparation; Clearing And Grubbing Of The Area • Site Excavation And Backfilling To Attain Proposed Elevation. Proper Compaction Of The Area Shall Be Observed. • Structural Excavation And Backfilling Ii. Structural Works • Supply, Delivery, Fabrication And Installation Of Formworks Including Accessories • Supply, Delivery, Fabrication And Installation Of Reinforcing Steel Bars • Supply, Delivery And Pouring Of All Concrete Works Including Clearing And Disposal Of Waste Concrete Mix • Supply, Delivery, Fabrication And Installation Of Structural Steel. Full Welding Shall Be Observed For All The Welded Connections. • Supply, Delivery, Fabrication And Installation Of All Metal Works And Railings. Full Welding Shall Be Observed For All The Welded Connections. Iii.roofing Works • Supply, Delivery And Installation Of Roofing Including All The Accessories As Per Required By The Plans. Iv.electrical Works • Supply, Delivery And Installation Including Commissioning And Testing V. Plumbing And Sanitary Works • Supply, Delivery And Installation Of Clean Water System, Waste Water System And Drainage System Of The Facility Vi. Miscellaneous Works • Supply, Delivery And Fabrication/installation Of Miscellaneous Items Included In The Drawing And Documents 2.2 The Contractor Shall Ensure The Implementation And Compliance Of All Works Indicated In The Approved Construction Drawings And Documents. All Revisions And Deviations From The Approved Plans, Especially If It Shall Impact The Overall Cost Of The Project, Shall Be Subject To The Approval Of The Technical Working Group (twg) And The End-user. 2.3 The Contractor Shall Provide Necessary Soil Filling, Soil Grading, And Other Soil Preparation And Protection Measures For The Construction. 2.4 Coordinates With The Twg And The End-user Regarding The Scheduling Of Delivery And Installation Of All Materials And Equipment During Construction. 2.5 Rectifies Punch-listing Works To Be Inspected By The Twg Iv. Expected Outputs 1. Design Plans (electrical, Plumbing And Sanitary) 2. Final Design Drawings In A Standard Size Tracing Paper Signed And Sealed By Professionals And Other Qualified Approving Authorities. 3. Provide Five (5) Sets Of Blueprint Signed And Sealed. 4. Cad Files 5. Technical Specifications Signed And Sealed By Design Professionals 6. Design Analysis 7. Program Of Works And Detailed Cost Estimates 8. Construction Schedule, S – Curve And Pert – Cpm Standard Requirements: 1. Technical Outputs And/or Project Documentation Shall Conform To The Standards, Content, And/or Requirements Of The National Building Code, National Structural Code Of The Philippines, Philippine Electrical Code, National Plumbing Code Of The Philippines, Philippines Mechanical Engineering Code And Fire Code Of The Philippines And Other Related Codes Applicable In The Execution Of The Project. 2. Progress Reports Are Reportorial Requirements For Monitoring The Project. 3. The Technical Working Group (twg) Assigned To The Project Shall Issue A Certificate Of Acceptance For The Required Deliverables Per Scope Of Work. V. Project Duration All Works Shall Be Completed Within A Period Of 60 Calendar Days From The Date Of Issuance Of The Notice To Proceed (ntp). Vi. Project Site Municipality Of San Miguel, Surigao Del Sur Vii. Implementing Agency National Dairy Authority – Northern Mindanao Department Viii. Layout Attached Architectural And Structural Plans For Contractor’s Reference For The Electrical And Plumbing/sanitary Design. Note: Any Vague Details To The Architectural Design, Structural Design And Terms Of Reference Shall Be Consulted To The Designer Prior To Construction. Any Errors Identified During Progress Inspection Shall Be Rectified Without Additional Contract Cost.
Closing Soon4 Nov 2024
Tender AmountPHP 3 Million (USD 51.7 K)

FEDERAL HIGHWAY ADMINISTRATION USA Tender

Civil And Construction...+4Bridge Construction, Others, Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
United States
Details: The Federal Highway Administration (fhwa) Office Of Infrastructure Research And Development (hrdi) Bridge Engineering Research Team Is Announcing Its Intent To Solicit White Papers And Proposals Under This Broad Agency Announcement (baa). This Baa Is Developed In Accordance With Far 6.102(d)(2) And Far 35.016. This Baa Involves The Use Of A 5-year Open Baa To Quickly And Efficiently Execute Research And Development To Deliver Practical Solutions To High Priority Problems. This Strategy Will Provide Fhwa An Acquisition Tool With The Flexibility To Solicit White Papers And Proposals And Make Awards That Meet Present And Compelling Needs. white Papers And Proposals Will Only Be Solicited And Accepted During Individual Calls. Calls For White Papers And Proposals Will Occur Periodically Throughout The Life Of The Baa. Each Call Will Identify: (1) Specific Topic Areas; (2) Any Changes To The Standard Evaluation Criteria Or White Paper And/or Proposal Preparation Instructions, And; (3) Cutoff Dates For Submissions. the Fhwa Hrdi Bridge Engineering Research Team Conducts And Directs Research Efforts In Support Of The Development Of Testing Standards, Structural Design And Construction Specifications, And Acceptance Criteria. The Fhwa Hrdi Bridge Engineering Research Team Leads The Development And Advancement Of Next Generation Structural Materials And Systems, And Provides Leadership In The Development Of Standards, Specifications, And Acceptance Criteria To Enable Their Deployment. The Work Conducted Generally Enables The Advancement Of State-of-the-art Solutions And Positions Hrdi As A Leader In The Deployment Of Such Technologies To Maintain Or Improve The Safety, Durability, Sustainability, And Resilience Of The Nation’s Bridges And Highway Structures. the Primary Purpose Of This Baa Is To Solicit A Variety Of Solutions That Will Support The Strategic Objectives Of The Fhwa Bridge Engineering Research Team Program Areas: Structural Steel, Structural Concrete, Geotechnical Structures, And Bridge Hydraulics. Projects Shall Develop Next Generation Technologies And Solutions That Address Fhwa’s Current Strategic Goals And Objectives Of Safety, Economic Strength And Global Competitiveness, Equity, Climate And Sustainability, Transformation, And Organizational Excellence.
Closing Date1 Apr 2029
Tender AmountRefer Documents 

Municipal Affairs Department - MAD Tender

Services
Consultancy Services...+1Civil And Architectural Services
Eprocure
India
Details: Engagement of Architectural- Engineering consultancy firms for Preparation of DPR (including Vetting) including Architectural, Structural and Electrical Design & Preparation of BOQ and Estimate of Amusement Park of Kalyani Lake Park at Kalyani, Nadia. (including other ancillary work as per requirement of Project) (3rd Call)
Closing Date11 Nov 2024
Tender AmountRefer Documents 

The Kingdom Of Sardinia Tender

Civil And Construction...+4Others, Construction Material, Consultancy Services, Civil And Architectural Services
Italy
Description: Engineering and Architecture Services Such as Architectural, Structural and Plant Design, Construction Management, Operational Management and Safety Coordination During the Execution Phase Ex Legislative Decree 81/2008 For Extraordinary Maintenance and Recovery Interventions "of Properties Located in the Municipalities Under the Jurisdiction of the Technical Territorial Service of Carbonia and the Technical Territorial Service of Cagliari for the Year 2024-2026".
Closing Date18 Nov 2024
Tender AmountRefer Documents 

Department Of Fisheries Tender

Services
Consultancy Services...+1Civil And Architectural Services
Eprocure
India
Details: Request for Proposal for 'Consultancy service for Preparation of Detailed Project Report for Development of Amranga Fish Farm, Kamrup under RIDF XXVIII including sub soil investigation, designing, architectural & structural planning, detail estimation and BOQ preparation etc.'
Closing Date11 Nov 2024
Tender AmountRefer Documents 

City Of Trece Martires Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Request For Expression Of Interest For Procurement Of Consulting Services For Design And Land Development For New City Hall Compound (6 Lots) The City Government Of Trece Martires, Through The Gop 2024 – Supplemental Budget No. 1 Intends To Apply The Sum: Approved Budget For The Contract Lot 1: General Requirement ₱ 32,326.00 Lot 2: Land Development ₱ 4,326,664.00 Lot 3. Architectural Design ₱ 11,340,000.00 Lot 4. Structural Design And Analysis ₱ 7,560,000.00 Lot 5. Mechanical, Electrical, Plumbing, Fire Protection And Sanitary Design ₱ 4,851,000.00 Lot 6. I.t. And Security Design ₱ 1,890,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Itb-counsulting-2024-001. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of The Financial Proposals. The City Government Of Trece Martires Now Calls For The Submission Of Eligibility Documents For Procurement Of Consulting Services For Design And Land Development For New City Hall Compound (6 Lots). Eligibility Documents Of Interested Consultants Must Be Duly Received By The Bac Secretariat On Or Before November 11, 2024; 9:00 Am At Bac Office, 3rd Floor Multi-purpose Building City Hall Compound, Brgy. San Agustin, Trece Martires City, Cavite. Applications For Eligibility Will Be Evaluated Based On A Non-discretionary “pass/fail” Criterion. Interested Bidders May Obtain Further Information From The City Government Of Trece Martires And Inspect The Bidding Documents At The Address Given Below During Mondays To Fridays; 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 21, 2024 To November 11, 2024 From The Address Below {insert If Necessary: And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Approved Budget For The Contract Bidding Documents Fee Lot 1: General Requirement ₱ 32,326.00 ₱ 500.00 Lot 2: Land Development ₱ 4,326,664.00 ₱ 5,000.00 Lot 3. Architectural Design ₱ 11,340,000.00 ₱ 25,000.00 Lot 4. Structural Design And Analysis ₱ 7,560,000.00 ₱ 10,000.00 Lot 5. Mechanical, Electrical, Plumbing, Fire Protection And Sanitary Design ₱ 4,851,000.00 ₱ 5,000.00 Lot 6. I.t. And Security Design ₱ 1,890,000.00 ₱ 5,000.00 Bidders Shall Submit A Letter Of Intent Upon Purchase Of Bid Document. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented In Person. All Bidding Documents Fee Is Non-refundable If The There Is A Failure Of Bidding, And That Failure Of Bidding Is At Fault Of The Bidders In Accordance To Section Sec. 17.5 And Sec. 41 (b) Of This Irr. The Bac Shall Draw Up The Short List Of Consultants From Those Who Have Submitted Expression Of Interest, Including The Eligibility Documents, And Have Been Determined As Eligible In Accordance With The Provisions Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”, And Its Implementing Rules And Regulations (irr). The Short List Shall Consist Of Three (3) To Seven (7) Consultants Who Will Be Entitled To Submit Proposals. Should Only One (1) Or Less Than The Required Number Apply For Eligibility And Short Listing Pass The Eligibility Check, And/or Pass The Minimum Score Required In The Short Listing, The Bac Shall Consider The Same. The Criteria And Rating System For Short Listing Are: Criteria Weight (%) Applicable Experience Of The Consulting Firm 60 Qualification Of Personnel Who May Be Assigned To The Job 20 Current Workload Relative To Capacity 20 Total 100 A Consultant Must Get A Total Score Of At Least Seventy Percent (70%) To Be Included In The Short List. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Irr Of Ra 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. The Procuring Entity Shall Evaluate Bids Using The Quality Based Evaluation/selection (qbe/qbs), Procedure. The Criteria And Rating System For The Evaluation Of Bids Shall Be Provided In The Instructions To Bidders. The Contract Shall Be Completed Within 90 Calendar Days. The City Government Of Trece Martires Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Christian S. Asas Bac Secretariat Head Bids And Awards Committee Office 3rd Floor, Multi-purpose Building, City Hall Compound., Brgy. San Agustin, Trece Martires City, Cavite And/or Through Email Address: Tmcbacsecretariat@yahoo.com October 20, 2024 Atty. Kim M. Moral Bac Chairperson
Closing Date11 Nov 2024
Tender AmountPHP 29.9 Million (USD 517.9 K)
71-80 of 101 active Tenders