Solid Waste Tenders

Solid Waste Tenders

AGRICULTURAL RESEARCH SERVICE USA Tender

Environmental Service
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Details: Background And Site Description the Agricultural Research Service (ars) Is The U.s. Department Of Agriculture’s Chief Scientific In-house Research Agency. Our Job Is Finding Solutions To Agricultural Problems That Affect Americans Every Day From Field To Table. the Performance Of These Activities Results In The Generation Of Diversified Chemical And Biological Wastes Of Varying Quantities And Toxicities. Wastes May Contain Pyrophoric, Explosive, Reactive, Or Toxic Substances And Compressed Gases. Some Of The Chemicals Are Dangerous Due To Their Sensitivity To Shock, Friction, Or Pressure; Other Are Reactive Or Unstable For A Variety Of Reasons. The Ars Recognizes Its Responsibilities To Ensure Facilities Are Following Existing Regulations Imposed Upon Entities Which Generate, Transport, Store, Treat, And Dispose Of Hazardous Chemical Wastes. The Agency Has A Need For Hazardous Waste Disposal Services, As Well As Non-hazardous Waste Disposal Services. With 47 Research Units At 21 Locations, And Several Additional Worksites, Where Ars Employees Are Located Throughout Eight States (hawaii, Washington, Oregon, California, Idaho, Nevada, Arzona And Utah), The Pacific West Area (pwa) Is The Largest And Most Diverse Of The Eight Areas In Ars. For More Information On The Pwa Go To Https://ars.usda.gov/pacific-west-area/. description Of Work this Requirement Would Be For An Area-wide Hazardous Waste Indefinite Delivery – Indefinite quality (idiq) Contract. Fixed-price Task Orders Would Be Issued Off This Contract For Hazardous Waste Disposal Throughout The Pwa Service Area. The Contractor Shall Provide Hazardous Waste Disposal Services. Following Is Only An Example Of What Types Of Waste Would Be Included Under Coverage Of The Idiqs: waste Flammable Liquids, Corrosive waste Corrosive Liquid, Acidic, Organic waste Corrosive Liquid, Basic, Inorganic environmentally Hazardous Substance, Liquid, N.o.s. (benzyl Benzoate, Dibutyl Phthalate) waste Toxic, Liquids, Organic waste Flammable Liquids, Toxic waste Toxic Solid, Inorganic waste Hydrogen Sulfide waste Organometallic Substance, Liquid, Pyrophoric, Water-reactive waste Phosphorus Oxychloride waste Sodium Borohydride waste Toxic By Inhalation Liquid, Flammable, Corrosive waste Toxic By Inhalation Liquid, Flammable waste Water-reactive Liquid, Corrosive air, Compressed (lecture Containers) batteries, Dry Containing Potassium Hydroxide Solid batteries, Wet, Filled With Acid batteries, Wet Non-spillable carbon Dioxide (lecture Containers) compressed Gas, N.o.s. (calibration Gas/lecture Containers) ethane (lecture Containers) nitrogen, Compressed (lecture Containers) non-hazardous Waste, Solid oxygen, Compressed (lecture Containers) propane (lecture Containers) universal Waste (electrical Waste) universal Waste (fluorescent Lamps) universal Waste (spent Light Bulbs) any Costs Associated With High Hazardous Waste (chemist, Research Classification, Opening, Testing, Reduction, Stabilization) the Resultant Contract Could Cover The Entire Area Or Be Divided Into Geographical Areas. Multiple Idiqs Could Be Awarded And Task Orders Competed Among Contract Holders. The Results Of This Sources Sought Will Help Determine The Best Geographical Acquisition Strategy And Small Business Set-aside, If Any. The Anticipated Ceiling Of The Entire Idiq Is $5,000,000.00 For Five One-year Ordering Periods. this Is A Sources Sought (ss) Notice Only. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. This Ss Is Issued For Information And Planning Purposes Only As Part Of Usda Ars Market Research And Does Not Itself Constitute A Request For Proposal (rfp). This Requirement Is Covered Under Naics Code 562112. The Purpose Of This Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources; Small Businesses; Hubzone Small Business; Service-disabled Veteran-owned Small Business; 8(a) Small Business; Veteran-owned Small Business; Woman-owned Small Business; Small Disadvantaged Businesses; Or Large Businesses. It Will Also Serve To Ascertain The Ability Of Hazardous Waste Removal Companies To Serve The Entire Pwa Or Parts Of It. Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Government Does Not Intend To Make An Award Based On Responses To This Inquiry. This Notice Does Not Constitute A Commitment By The Government. capability Statement all Information Submitted In Response To This Announcement Is Voluntary, And The Government Will Not Pay For Information Requested, Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. Business Concerns That Possess The Capabilities Necessary To Undertake This Work Should Submit Complete Documentation Of Their Capabilities To The Contracting Officer. Capability Statements Shall Include The Contractors Contact Point To Discuss Their Response. the Capability Statement Should Include: acknowledgement The Company Is Legally Licensed To Provide Hazardous Waste Removal Services. indication Of Their Size Standards In Accordance With The Small Business Administration. at Least Three Previous Requirements That Were Performed Within The Pwa That Are Within Thescope Of This Requirement; Include A Discussion Of The Contract Type, Delivery Method, Duration, Etc. indicate Which Of The Eight States, If Not All, That Encompass The Usda Ars Pwa That Thecompany’s Legally Able And Willing To Perform Services In. include The Firm’s Sam Unique Entity Id (uei) Number And Cage Code. any Other Information Considered Relevant To This Requirement. the Government Requests That No Proprietary, Classified, Confidential, Or Sensitive Informationshould Be Included In The Response. responses Are Limited To One Digital Pdf Submission Not To Exceed Ten (10) Pages. Please Use Theemail Subject Line “sources Sought Usda Ars Pwa Haz-waste Removal Services Idiq”. any Contractor Responding To This Notice Should Ensure Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine Their Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provided Feedback To Respondents With Respect To Any Information Submitted. After Review Of The Responses Received, A Solicitation May Be Published On Sam.gov Depending On The Responses Received. all Responses To This Ss Must Be Received By The Notice’s Poc By The Deadline In Order To Be Considered. Responses May Not Be Returned. Responders Are Solely Responsible For All Expenses Associated With Responding To This Inquiry. Do Not Submit Pricing Information In Response To This Ss. the Notice Poc Is Theodore Blume: Theodore.blume@usda.gov

Municipal Corporation Tender

Works
Civil And Construction...+1Electrical and Electronics
Eprocure
Corrigendum : Closing Date Modified
India
Closing Date3 Jan 2025
Tender AmountINR 103.7 Million (USD 1.1 Million)
Details: 1) Construction of Beautification, Elctrification, Main Entry Gate at Chhatrapati Shiwaji Park in P.No.06 2) Construction of Concret road from Gajanan Way Bridge to APMC Market Gate in p no. 06 3) Construction of Cement Concrete Road from Shri Ajay Vishnu Patil to Shri Nitin Patil House at Dabki Village P No 08 4) Construction of Sabhagruh at Gurudutta Nagar,Shri Namdev Maharaj Mandir Open Space P No 08 5) Construction of Cement Concrete Road from Shri Wankhade to Open Space at Gokarna Park P No 08 6) Construction of Cement Concrete Road from Shri Bulbule House to Shri Shingne Sir House at Gokarna Park P No 08 7) Construction of Drain at Gokarna Plot Shri Bhiwate to Raghav Tale House P No. 08 8) Construction of Chain Link Compound Wall to Open Space near Paraskar School at Gurudutta Nagar P No.08 9) Construction of Drain at Laxmi Nagar Shri Ingle to Shri Ujjainkar to Canal P No. 08 10) Construction of Chain Link Compound Wall to Open Space near Mahakali Mandir at Asara Nagar P No.08 11) Construction of Drain at Gajanan Nagar Shri Galli No. 2 from Shri Parkhi to Shri Khandare House P No. 08 12) Construction of Cement Concrete Road from Shri Hanuman Mandir to Shri Anil Wankhade at Gajanan Nagar P No 08 13) Construction of Cement Concrete Road from Jain Kirana to Shri Jagdish Mankar at Gajanan Nagar P No 08 14) Construction of Cement Concrete Road from Shri Bahekar ti Shri Bhud, Shri Zhaparde to Shri Ubhe Sir & Shri Shinde to Shri Ujjwal Bade at Manorath Nagar P No 08 15) Construction of Cement Concrete Road from Shri Bhise to Shri Ingle House to Open Space at Awade Colony P No 08 16) Construction of Cement Concrete Road from Ashray Residency to Dabki Road to Hari Om Cement Shop to Shri Chipade at Ashray Nagar P No 08 17) Construction of Cement Concrete Road from Shri Ramdas Pohare to Canal Road at Raghuvir Nagar P No 08 39) Beautification Of Shri. Chatrapati Shivaji Maharaj Chowk At Shivar in P.No.13 40) 1) Construction of Concrete Service Line Beside Shri Vinod Taywale. 2) Construction of Concrete Road From From Shri Pravin Kalane to Shri Gawande. 3) Construction of Concrete Drain & Service Line From Shri Unkadrav Sonone to Shri Pravin Kalane. 4) Construction of Concrete Drain, Service Line & Culvert From Shri Manoj Bharde to Bhattad in Ara Mashion. 5) Construction of Concrete Drain & Road From Shri Prashant Sable to Shri Santosh Agrawal in Dwarka Nagari 6) Construction of Concrete Drain & Service Line From Shri Rameshwar Gond to Asara Chakki in Indian Gym 7) Construction of Concrete Service Line From Shri Gajanan Maharaj Mandir to Shri Ghonge in Mukund Nagar in P.No. 13 42) Construction of Walking Track & Beautification In Ravi Nagar Open Space at P.No.13 43) Construction of Sabhagruh In Open Space Front of Shri Navkar House At Gokul Colony In P. No. 13 44) Construction of Concrete Road At Sudhir Colony In P.No. 13 45) Beautification of Open Space Infront of Shri Lokhande House At Sudhir Colony In P.No.13 46) Development & Beautification of Road From National Highway 06 to Azad Chauk to Datta Nagar to Hanuman Mandir to Azad Chauk and Auto Stand to Shri Dhore and Shri Jayprakash Sabale to Shri Subhash More to Bhima Gawai and Shri Gajanan Maharaj Mandir to Shri Deshmukh in Shiwar In P.No. 13 47) Providing and Fixing Information Sign Board in Shashtri nagar Road & Gokul Colony Road at P.No. 13 48) 1) Construction of Concrete Road From Shri Chande to Shri Shegokar 2) Construction of Concrete Road From Shri Rathod to Shri Ladakhedkar to Shri Fulase to Shri Vike. 3) Construction of Concrete Drain & Culvert From Siddheshwar Ganpati Mandir 4) Construction of Concrete Road From Shri Desai to Shri Pali in P.No. 13 49) 1) Construction of Concrete Road Infront Of Shri Umale House in Mukund Nagar in P.No. 13 50) Construction of Public Toilet Block in Jawahar Nagar Chhatrapati Sambhaji Maharaj Park Shastri Nagar Hanuman Mandir Open Space at P.No. 13 51) Construction of Paving Block in Open Space in Ganpati Mandir in Shastri Nagar at P.No.13 53) Construction of Tar Road With WBM From Kailas Bhadake To Ganeh Jakate House At Malkapur In P No 14 54) Construction of Tar Road With WBM From Hivarale Major To Ganesh Sarnaik & Sheje To Wagh House At Malkapur In P No 14 55) Construction of Tar Road With WBM From Dilip Vagare To Damodare House At Malkapur In P No 14 56) Construction of CC Drain From Kothikar Duplex To Athavale To Ajay Nagpure Appartment Near Ashram At Malkapur In P No 14 57) Construction of Chainlink fencing Compound To Sarnath Bauddha Vihar Near Bhande Collage At Malkapur In P No 14 58) Construction of Sabhamandap Near Hanuman Mandir At PKV Colony Malkapur In P. No. 14 59) Construction of CC Road From Shri Santosh Wankhade To Amol Kale House At Malkapur In P No 14 60) Construction of Tar Road From Shri Gawande To Deshmukh House At Malkapur In P No 14 61) Construction of Sabhagruh Near Tuljaai Appartment Smashan bhumi Road Juni Wasti Malkapur In P No 14 62) Providing And Fixing Paving Blocks At Pola Location Junegaon Malkapur In P. No. 14 63) Construction of CC Road From MIDC Road To Barbi House At Malkapur In P No 14 64) Construction of Tar Road From Shri Dhenge House Yogiraj welding Work Shop To State Bank Colony At Malkapur In P No 14 65) Construction of CC Drain From Umak house To Sitara Tower Malkapur Road At Malkapur In p No 14 66) Construction of CC Drain From Abhang Appartment To Mangesh Wankhade House At Malkapur In p No 14 67) Construction of Tinshed At Gajanan Maharaj Mandir Malkapur In P. No. 14 68) Construction of CC Drain From Khatade To Deshmukh House At Malkapur In P No 14 69) Construction of CC Road From Shri Jayale To Dandale House At Malkapur In P No 14 70) Construction of Tar Road From Ajay Wankhade House Anil Wasnik To Nasir To Anand Buddha Vihar At Shivani In P No 14 71) Construction of Tar Road From Jaybhay House To Pachpor Blue Lotus School At Buddha prakash Colony Shivani In P No 14 72) Construction of CC Drain From Gautam Pachpor House To Jamil Bhai Kirana Shop At Jetvan Nagar Shivani In P No 14 73) Construction of Sabhamandap Near Devi Mandir At Ram Nagar Shivani In P. No. 14 74) Construction of Sabhamandap Infront Of Rajesh Wagare House At Basera Colony In P. No. 14 75) Construction of Chainlink fencing Compound To Surekha nagar Open Space At Malkapur In P No 14 92) Construction of Tar Road Back Side Of Khatu Shyam Mandir Hindu Smashan Bhumi To Main Road , In P.No. 17 124) Construction of CC Drain from Bhojane house to Wayatkar house at Mauli Nagar in P.No. 20 125) Construction of CC Drain from Balu Vairale house to Bhoyar house at Khadki in P.No. 20 126) Construction of Culvert infront of Bochare house at Santosh Nagar in P.No. 20 127) Construction of CC Road from Dangte Square to Yogesh Kuchar house at Z. P. Colony, Khadki in P.No.20 128) Construction of CC Road Mangrulpir Road to Ashutosh Chavhan house at Surya Garden Khadki in P.No.20 129) Construction of Tar Road From Pritam Deshmukh to Khanduji Walse house at Balaji Nagar in P.no. 20 130) Construction of CC Drain from Jadhav to Deshmukh house, Sandip Kharad to Gurav house at Khadki Gaothan and Construction of CC Road from Swami Samarth Kendra to Punde house at Sitaram Nagar Date Layout, Khadki in P.No.20 131) Construction of CC Road from Kakad house to Bhagat house and remaining portion infront of Swami Samarth Kendra Main Gate at Sant Nagar, Khadki in P.No.20 132) Construction of CC Road Jadhav house to Dandage house behind More Market Khadki in P.No.20 133) Construction of CC Drain from Wankhade house to Bopte house at Sant Nagar in P.No. 20 134) Construction of WBM Road from Nandkishor Rajaram Ingle house to Sopinath Maharaj Mandir to Ganesh Khatode house at Mhada Colony, Khadki in P.No.20 135) Construction of CC Road from Solid waste Management center to Vitthal Mahalle house at Khadki in P.No.20 136) Construction of Chainlink fencing, providing and fixing Pavers and Beautification at Sant Gadge Baba Open Space, Shivapur in P.no.20 137) Construction of CC Drain from Sane Guruji School to Someshwar Mandir at Santosh Nagar in P.No. 20 138) Construction of Walking track, Chainlink fencing at Someshwar Mandir Open Space, Santosh Nagar in P.no.20 139) Construction of Sabhagruh infront of Ramesh Raut, Sadanand Kakad, Pallavitai Joshi Open Space at Mhada Colony In P. No. 20 140) Construction of CC Road from Dilip Deshmukh house to Shiva Bhade house to Sant Gajanan Maharaj Provision at Kothari Watika 04 in P.No.20 141) Concreting in Service line from Sahyog apartment to Jadhav Tailor house near Ganpati Mandir at Giri Nagar in P.No. 20 142) Construction of CC Road Maharaj Vihar to Gajanan Apartment at Madhav Nagar in P.No.20 143) Construction of CC Drain from Manskar house to Kedia house at Yashwant Layout in P.No. 20

2023 Tenure of Mayor's Office of Urban Services, Beaches, Cemetery, Urban Solid Waste Management and Hunting of the Cullera City Council Tender

Automobiles and Auto Parts
Spain
Closing Date20 Jan 2025
Tender AmountEUR 317.7 K (USD 327.4 K)
Purchaser Name: 2023 Tenure of Mayor's Office of Urban Services, Beaches, Cemetery, Urban Solid Waste Management | Spain – Motor Vehicles – Suministro Mediante Renting De 6 Vehículos Con Destino A Servicios Urbanos, Deportes Y Agricultura

BARANGAY ALANIB,LANTAPAN, BUKIDNON Tender

Others
Philippines
Closing Date29 Jan 2025
Tender AmountPHP 200 K (USD 3.4 K)
Details: Description Philippine Bidding Documents (as Harmonized With Development Partners) Procurement Of Goods Government Of The Republic Of The Philippines Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..8 Section Ii. Instructions To Bidders…………………………………………...12 1. Scope Of Bid ………………………………………………………………………. 8 2. Funding Information………………………………………………………………. 13 3. Bidding Requirements ……………………………………………………………. 13 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 13 5. Eligible Bidders…………………………………………………………………… 13 6. Origin Of Goods ………………………………………………………………….. 15 7. Subcontracts ……………………………………………………………………… 15 8. Pre-bid Conference ………………………………………………………………. 15 9. Clarification And Amendment Of Bidding Documents …………………………… 15 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 15 11. Documents Comprising The Bid: Financial Component …………………………... 16 12. Bid Prices …………………………………………………………………………. 16 13. Bid And Payment Currencies ……………………………………………………… 17 14. Bid Security ………………………………………………………………………. 17 15. Sealing And Marking Of Bids ……………………………………………………… 17 16. Deadline For Submission Of Bids …………………………………………………. 18 17. Opening And Preliminary Examination Of Bids ………………………………….. 18 18. Domestic Preference ……………………………………………………………… 18 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 18 20. Post-qualification ………………………………………………………………… 19 21. Signing Of The Contract …………………………………………………………… 19 Section Iii. Bid Data Sheet …………………………………………………..20 Section Iv. General Conditions Of Contract ……………………...………..22 1. Scope Of Contract ………………………………………………………………… 23 2. Advance Payment And Terms Of Payment ……………………………………….. 23 3. Performance Security ……………………………………………………………. 23 4. Inspection And Tests ……………………………………………………………… 23 5. Warranty …………………………………………………………………………. 24 6. Liability Of The Supplier ………………………………………………………….. 24 Section V. Special Conditions Of Contract ………………………………….25 Section Vi. Schedule Of Requirements ……………………………………....30 Section Vii. Technical Specifications …………………………………………31 Section Viii. Checklist Of Technical And Financial Documents …………..34 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Province Of Bukidnon Municipality Of Lantapan Invitation To Bid For Purchase & Installation Of Office Aircondition (1st Bid) 1. The Local Government Unit Of Lantapan, Through The Capital Outlay Cy 2019 And Supplemental Budget 2024 Intends To Apply The Sum Of (php 200,000.00) Being The Abc To Payments Under The Contract Purchase And Installation Of Office Air-condition Itb # 2025-01-22-001 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit Of Lantapan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Required Is 15 Calendar Days. Bidders Should Have Completed, From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4. Prospective Bidders May Obtain Further Information From The Local Government Unit Of Lantapan And Inspect The Bidding Documents At The Address Given Below During Mondays To Fridays From 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 22, 2025 To January 29, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos (php 500.00). The Procuring Entity Shall Allow The Bidder To Present Personally Its Proof Of Payment For The Fees. [note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots.] 6. The Local Government Unit Of Lantapan Will Hold A Pre-bid Conference On _____ At _____which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office 1st Floor, Barangay Alanib, Lantapan, Bukidnon, On Or Before 9:45 A.m (philippine Standard Time) On January 29, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 29, 2025 At 10:00 O’clock A.m At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. [insert Such Other Necessary Information Deemed Relevant By The Procuring Entity Such As The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submissions] 11. The Local Government Unit Of Lantapan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Lani D. Arida Bac Secretariat Bac Office, 1/f Barangay Alanib Purok 3, Alanib, Lantapan Bukidnon, Philippines Email Add: Lanialbertodevibar45@gmailcom.ph 13. You May Visit The Following Website/s: Lantapan.gov.ph For Downloading Of Bidding Documents: Www.philgeps.gov.ph Date Of Issue: January 22, 2025 Celestino M. Alob Barangay Alanib/bac Chairperson Reference No.: Itb # 2025-01-22-001 Name Of Project: Purchase & Installation Of Office Air-condition Location Of Delivery: Bgu-alanib, Lantapan, Bukidnon Abc: Php 200,000.00 Item No. Item Description Unit Of Issue Quantity Unit Price Amount 1 2.5tr ( 3.0hp)floor Mounted Inverter Model: 28tcfs/ji Cooling Capacity: 28,000(18,000-30,000) Kjh Heating Capacity:29,000(20,000-31,000)kjh Eer For Cooling3.18 W Power Supply: 220-240 V, 1 Phse/60hz Voltage Range : 165-264 Current: 11 Refrigerants:r32 Self Diagnose: Anti Cold Wind Auto Retart Golden Fin Note: Free Installation Unit 2 Total Total Bid Price In Figure: Total Bid Price In Words: Prepared And Submitted By:

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Philippines
Closing Date25 Feb 2025
Tender AmountPHP 30.3 Million (USD 525 K)
Details: Description Philippine Bidding Documents Procurement Of Infrastructure Projects Government Of The Republic Of The Philippines 25ff0028 Organizational Outcome 1: Ensure Safe And Reliable National Road System – Widening Of Permanent Bridges – Himaao Br. (b00409lz) Along Pili-tigaon-albay Bdry. Rd. Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv)the Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 11 1. Scope Of Bid 13 2. Funding Information 13 3. Bidding Requirements 13 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 14 5. Eligible Bidders 14 6. Origin Of Associated Goods 14 7. Subcontracts 14 8. Pre-bid Conference 15 9. Clarification And Amendment Of Bidding Documents 15 10. Documents Comprising The Bid: Eligibility And Technical Components 15 11. Documents Comprising The Bid: Financial Component 16 12. Alternative Bids 16 13. Bid Prices 16 14. Bid And Payment Currencies 17 15. Bid Security 17 16. Sealing And Marking Of Bids 17 17. Deadline For Submission Of Bids 17 18. Opening And Preliminary Examination Of Bids 18 19. Detailed Evaluation And Comparison Of Bids 18 20. Post Qualification 18 21. Signing Of The Contract 18 Section Iii. Bid Data Sheet 19 Section Iv. General Conditions Of Contract 20 1. Scope Of Contract 24 2. Sectional Completion Of Works 24 3. Possession Of Site 24 4. The Contractor’s Obligations 24 5. Performance Security 24 6. Site Investigation Reports 25 7. Warranty 25 8. Liability Of The Contractor 25 9. Termination For Other Causes 25 10. Dayworks 25 11. Program Of Work 26 12. Instructions, Inspections And Audits 26 13. Advance Payment 26 14. Progress Payments 26 15. Operating And Maintenance Manuals 26 Section V. Special Conditions Of Contract 28 Section Vi. Specifications 30 Section Vii. Drawings 32 Section Viii. Bill Of Quantities 33 Section Ix. Checklist Of Technical And Financial Documents 35 Glossary Of Terms, Abbreviations, And Acronyms Abc –approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project –refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc –government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Department Of Public Works And Highways Camarines Sur 3rd District Engineering Office Regional Office V Baras, Canaman Invitation To Bid For 25ff0028 – Organizational Outcome 1: Ensure Safe And Reliable National Road System – Widening Of Permanent Bridges – Himaao Br. (b00409lz) Along Pili-tigaon-albay Bdry. Rd. The Dpwh Camarines Sur 3rd District Engineering Office, Through The Gaa Fy 2025 Intends To Apply The Sum Of Php 30,379,465.51 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 25ff0028- Organizational Outcome 1: Ensure Safe And Reliable National Road System – Widening Of Permanent Bridges – Himaao Br. (b00409lz) Along Pili-tigaon-albay Bdry. Rd. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Dpwh Camarines Sur 3rd District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Project. Completion Of The Works Is Required 181 Cd. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Procurement Id/contract Id: 25ff0028 Contract Name: Organizational Outcome 1: Ensure Safe And Reliable National Road System – Widening Of Permanent Bridges – Himaao Br. (b00409lz) Along Pili-tigaon-albay Bdry. Rd. Brief Description: Widening Of Bridge Approved Budget For The Contract (abc): Php. 30,379,465.51 Source Of Funds: Gaa Fy 2025 Contract Duration: 181 Calendar Days Cost Of Bidding Documents: P 25,000.00 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 3. Interested Bidders May Obtain Further Information From Dpwh Camarines Sur 3rd District Engineering Office And Inspect The Bidding Documents At Baras, Canaman, Camarines Sur During Weekdays From 8:00 Am To 5:00 Pm. 4. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 5, 2025 To February 25, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 25,000.00. Prospective Bidders Shall Present Their Original Official Receipt Of Payment For Bid Documents (project Specific) To The Bac Secretariat Of This Office Before The Deadline Stated Above For Inclusion In The List Of Contractors For Eligibility Processing. Only The Owner Or Authorized Representatives Included In The Crc Will Be Allowed To Transact Business Relative To Bidding Matters Per D.o. 64 Series Of 2012. All Participating Bidders Must Be In The Document Request List (drl) Of The Philgeps Website And Secure A Print-out Copy Showing That They Are Included In The List. 5. The Dpwh Camarines Sur 3rd District Engineering Office Will Hold A Pre-bid Conference On February 13, 2025 9:00am At Bac Room, Dpwh - Cam. Sur 3rd Deo, Baras, Canaman, Cam. Sur And/or Through Videoconferencing/webcasting Via Facebook Livestreaming, Which Shall Be Open To Prospective Bidders. 6. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address As Indicated Below, On Or Before February 25, 2025 At 10:00am Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 8. Bid Opening Shall Be On February 25, 2025 At 10:01am At The Given Address Below And/or Through Facebook Livestreaming. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. Moreover, As Per Department Order No. 127, Series Of 2018, “if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii)(c) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid”. If The Ground For Post-disqualification Is Based On Above Requirements, The Concerned Bac Shall Issue A Notice Of Post-disqualification To The Bidder With A Statement That “the Dpwh Shall Not Qualify Your Bid For Any Of Its Projects Until And/or Unless The Reason For Your Post-disqualification Was Already Cleared By The Concerned Implementing Office”. Upon Presentation Of Required Documentary Evidence, The Concerned Implementing Office Shall Issue A Certification If The Contractor Has Already Eliminated The Negative Slippages And Other Deficiencies. However, Nothing Herein Shall Delay The Procurement Process Of The Concerned Implementing Office In Accordance With Periods Provided Under 2016 Rirr Of Ra 9184. Implementing Office In Accordance With Periods Provided Under 2016 Irr Of Ra 9184. 10. The Dpwh Camarines Sur 3rd Engineering District Office Reserves The Right To Reject Any All Bids, Declare A Failure Of Bidding Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184 Without Thereby Incurring Any Liability To The Bidder Or Bidders. 11. For Further, Please Refer To: Bac Chairperson: Jose B. Gigantone, Jr. Bac-secretariat Head: Debbie H. Escuro Address: Dpwh Camarines Sur 3rd Deo Address: Dpwh Camarines Sur 3rd Deo Telephone Number: 8811-25-00 Loc. 54211 Telephone Number: 8811-25-00 Loc. 54217 Email Address: Dpwhbac_camsur3rddeo@yahoo.com Email Address: Dpwhbac_camsur3rddeo@yahoo.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://www.dpwh.gov.ph/dpwh/business/procurement/cw/advertisement Date Of Publication: February 5, 2025 To February 25, 2025 Newspaper: Not Applicable Jose B. Gigantone, Jr. Assistant District Engineer Bac- Chairman Approved By: Romeo D. Doloiras District Engineer

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date7 Feb 2025
Tender AmountRefer Documents 
Details: This Sources Sought Notice Is For Planning Purposes Only And Shall Not Be Considered As An Invitation For Bid, Request For Quotation, Request For Proposal, Or As An Obligation On The Part Of The Government To Acquire Any Products Or Services. Your Response To This Sources Sought Notice Will Be Treated As Information Only. No Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise Because Of Contractor Submission Of Responses To This Announcement Or The Government Use Of Such Information. This Request Does Not Constitute A Solicitation For Proposals Or The Authority To Enter Negotiations To Award A Contract. No Funds Have Been Authorized, Appropriated, Or Received For This Effort. the Information Provided May Be Used By The Department Of Veterans Affairs In Developing Its Acquisition Approach, Statement Of Work/statement Of Objectives And Performance Specifications. Interested Parties Are Responsible For Adequately Marking Proprietary Or Competition Sensitive Information Contained In Their Response. The Government Does Not Intend To Award A Contract Based On This Sources Sought Notice Or To Otherwise Pay For The Information Submitted In Response To This Sources Sought Notice. the Purpose Of This Sources Sought Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), Hubzone And Other Small Businesses Interested And Capable Of Providing The Services Described Below. documentation Of Technical Expertise Must Be Presented In Sufficient Detail For The Government To Determine That Your Company Possesses The Necessary Functional Area Expertise And Experience To Compete For This Acquisition. responses To This Notice Shall Include The Following: (a) Company Name (b) Address (c) Point Of Contact (d) Phone, Fax, And Email (e) Uei Number (f) Cage Code (g) Tax Id Number (h) Please Indicate The Size Status And Representations Of Your Business, Such As But Not Limited To: Service-disabled Veteran Owned Small Business (sdvosb), Veteran Owned Small Business (vosb), Hubzone, Woman Owned Small Business (wosb), Large Business, Etc.)? (i) Is Your Company Considered Small Under The Naics Code Identified Under This Ssn/rfi? (j) Are You The Manufacturer, Distributor, Or An Equivalent Solution To The Items Being Referenced Above? (k) If You Are A Large Business, Do You Have Any Designated Distributors? If So, Please Provide Their Company Name, Telephone, Point Of Contact And Size Status (if Available). (l) If You Re A Small Business And You Are An Authorized Distributor/reseller For The Items Identified Above Or An Equivalent Solution, Do You Alter; Assemble; Modify; The Items Requested In Any Way? If You Do, State How And What Is Altered; Assembled; Modified? (m) If You Intend To Subcontract Any Work On This Contract, What Portion Of The Total Cost Will Be Self-performed/will Be Performed By Your Organization? Please Provide Estimated Detailed Percentage Breakdowns Related To Subcontracted Work. (n) Does Your Company Have An Fss Contract With Gsa Or The Nac Or Are You A Contract Holder With Nasa Sewp Or Any Other Federal Contract? If So, Please Provide The Contract Number. (o) If You Are An Fss Gsa/nac Or Nasa Sewp Contract Holder Or Other Federal Contract Holder, Are The Items/solution You Are Providing Information For Available On Your Schedule/contract? (p) Please Provide General Pricing Of Your Products/solution For Market Research Purposes (q) Does Your Company Have An Fss Contract With Gsa Or The Nac Or Are You A Contract Holder With Nasa Sewp Or Any Other Federal Contract? If So, Please Provide The Contract Number. (r) Please Provide General Pricing Of Your Products/solution For Market Research Purposes (s) Must Provide A Capability Statement That Clearly Addresses The Organizations Qualifications And Ability To Perform As A Contractor For The Work Described Below. statement Of Requirements tissue Processors kansas City Va Medical Center description/specification/statement Of Requirements intent: Kansas City Va Medical Center Is In Need Of Renting/leasing Two Tissue Processors To Use In The Preparation Of Tissue Samples Obtained From Veteran Patients. This Preparation Is Necessary To Produce Slides For Review By Pathologists For Diagnostic Purposes. requirement: The Instrumentation Shall Have The Capability To Diffuse Solutions Into Biological Specimens To Ensure That Proper Embedding Occur. new Equipment Shall Be Acquired For The Required Laboratory. Refurbished, Discontinued, Or Previously Owned Units Are Not Acceptable. The Equipment Models Being Offered Shall Be In Current Production As Of The Date This Offer Is Submitted. For Purposes Of This Solicitation, Current Production Shall Mean That The Clinical Laboratory Analyzer Model Is Being Offered As New Equipment. general Requirements: primary Analyzer(s) Base Equipment Offered That Shall Fully Support The Scope Of Operations (minimal Requirements). operational And Technical Features- The Instrumentation Offered Shall Be Approved By The Food And Drug Administration (fda) And Have The Following required Salient Characteristics vacuum Infiltration Tissue Processor. must Be A Floor Standing Model Not To Exceed The Following Dimensions: 32 X 28 X 61 Inch (width X Depth X Height). must Be Moveable To Allow Access To Serviceable Parts For Staff And Service. must Have Touchscreen Interface. must Have A Process Capacity Of Up To At Least 400 Cassettes (blocks) Per Run. must Have The Option Run Different Protocols Simultaneously On One Instrument. must Provide The Option For Specimen Tracking System That Can Record Cassette Id And Quantity, As Well As User Id, In Order To Track Tissues Samples Loaded. must Allow Use Of Commercially Available, Nonproprietary Brands Of Reagents And Reagent Substitutes. must Have Reagent Tracking System Available To Track Reagent Type And Lot. reagent Reservoirs Must Allow Easy Access For Changing Of Reagent Solutions. must Have A Reagent Management System To Allow Rotation Of Solution Groups For Optimum Processing. The Reagent System Should Involve As Little Hands On As Possible For Safety (both Employee Exposure And Specimen Safety) Reasons. For Safety To Include Built In Systems To Minimize Exposure To Chemical Fumes. instrument Must Track Reagent Quality And Concentration For Optimal Use. instrument Must Automatically Rotate Reagents Based On Quality And Concentration. hot Paraffin Is Exchanged Without Manual Handling. must Be Capable Of Holding Up To 10 Processing Programs. must Have A Battery Back-up System (ups) For Electrical Outages. must Have Audible And Visually Displayed Alarms For System Malfunction. must Allow For Delayed Start And End Times Of Processing With Auto-calculation. installation Requirements vendor Must Supply The Following Items In Sufficient Quantities For Initial Operation. all Reagent Bottles With Attachments And Labels. activated Carbon Filters. metal Cassette Basket (baskets) With Handles And Dividers To Complete Up To A 300 Cassette (block) Run. any Necessary Hoses. any Other Parts And Reagents Needed To Allow For Immediate Training And Use After Installation. The Contractor Is Responsible For Any Missing Parts And Components Not Included In The Order To Carry Out The Installation. method Performance/validation Requirements: method Performance/comparison Shall Be At The Expense Of The Contractor, Shall Include Reagents And Be Consistent With Current Clinical Laboratory Standard Institute (clsi) Guidelines, College Of American Pathologists (cap) Standards And Related Federal Regulations. support Features: start-up Reagents. The Contractor Shall Provide All Reagents, Calibrators, Controls, Consumable/disposable Items, Parts, Accessories And Any Other Required To Establish Instruments For Operation For Performance Of Acceptance Testing. This Applies To All Equipment As Well As Additional Or Replacement Equipment Placed Under The Terms And Conditions Of This Contract. The Contractor Shall Perform/assist, To The Satisfaction Of The Government, All Validation Studies. The Contractor Shall Perform All Of The Statistical Analysis Provide A Hardcopy Of Data In An Organized, Clearly Comprehensible Format. documentation: a Current Editable Standard Operating Procedure Shall Be Provided. a Printed, Electronic Copy Or Both, Of The Operator S Manual And Technical Manual Shall Be Provided. the Document(s) Shall Be Formatted In Accordance With Current, Approved Clsi Guidelines. Electronic (cd Format). at A Minimum, Electronic Copies Of Safety Data Sheets (sds) Shall Also Be Provided. updates To All Procedure Manuals In Microsoft Word Format And Sds Sheets In Electronic Format Shall Be Provided When Package Inserts Are Modified. training: the Contractor Shall Provide An Instrument Training Program That Is Coordinated With And Timely To The Equipment Installation, Sufficient To The Size And Scope Of The Facility S Services. This Shall Include Training On The Operation Of The System, Data Manipulation, And Basic Trouble Shooting And Repair. If Applicable, Off-site Travel Shall Include The Cost Of Airfare, Room, And Board For Each Participant, If Applicable. equipment Preventative Maintenance/repair Service. the Contractor Shall Be Able To Provide Emergency Equipment Repair And Preventative Maintenance On Instrumentation, And Any Incremental Support/ancillary Equipment, E.g., Ups, Line Conditioner, Etc. Offered According To The Following Terms: service Requirements preventative Maintenance Will Be Performed As Frequently As Published In Manufacturer S Operator S Manual And Within 2 Weeks Of The Scheduled Due Date. a Technical Assistance Center Shall Be Available By Telephone 24 Hours Per Day, 7 Days Per Week With A Maximum Call Back Response Time Of 1 Hour(s). equipment Repair Service Shall Be Provided During Core Business Hours. Core Business Hours Are 8:00 Am To 5:00 Pm. Certain Circumstances May Dictate The Need For Repair Service To Be Conducted Outside Routine Business Hours. All Such Arrangements Shall Be Coordinated Between The Contractor And Va Laboratory Personnel. equipment Repair Response Time Shall Be On The Same Day Or No More Than 24 Hours. service Must Be Provided By A Local Technician a Malfunction Incident Report Shall Be Furnished To The Laboratory Upon Completion Of Each Repair Call. The Report Shall Include, As A Minimum, The Following: date And Time Notified date And Time Of Arrival serial Number, Type, And Model Number Of Equipment time Spent For Repair And Proof Of Repair That Includes Documentation Of A Sample Run Of Quality Control Verifying Acceptable Performance. each Notification For An Emergency Repair Service Call Shall Be Treated As A Separate And New Service Call. vendor Will Supply Any Parts Necessary To Keep The Equipment Operational. if Upgrades Or Changes In Technology Render A Piece Of Equipment No Longer Necessary, Contractor Shall Remove Said Piece At Contractor S Expense. upgrades - The Contractor Shall Provide Upgrades To Both The Equipment Hardware And Software To Maintain The Integrity Of The System And The State-of The Art Technology, At No Additional Charge To The Government. These Shall Be Provided As They Become Commercially Available And At The Same Time As They Are Being Provided To Commercial Customers. This Requirement Only Applies To System Upgrades That Enhance The Model Of Equipment Being Offered, I.e. New Version Of Software, Correction Of Hardware Defect, Upgrade Offered To Commercial Customers At No Additional Charge, Upgrade To Replace Model Of Equipment No Longer Contractor Supported, Etc. This Does Not Refer To Replacing The Original Piece Of Equipment Provided Under The Contract; However, It Does Refer To Significant Changes In The Hardware Operational Capability. ancillary Support Equipment - The Contractor Shall Provide, Install, And Maintain Through The Life Of The Contract, As Indicated, Any And All Ancillary Support Equipment To Fully Operate The Analyzer As Defined In These Specifications, E.g. Cabinetry To Support/house The Analyzer (if Necessary), Filters, Preventative Maintenance, And Repair, Etc.), Printers And Universal Interface Equipment, Ups And Ups Batteries, Line Conditioners, Etc. In Addition, The Contractor Shall Include All Ancillary Components That Are Customarily Sold Or Provided With The Model Of Equipment Proposed, E.g. Starter Kits, Tables/stands, Etc. commercial Offerings - The Contractor Shall Provide Any Additional Support Material That Is Routinely Provided To Equivalent Commercial Customers And Assists In Regulatory Compliance, E.g., Computer Disc Containing Their Procedure Manual In Clsi Format Or An On-line Procedure Manual In The Instrument Software. characterization Of Waste The Contractor Shall Provide Documentation That It Has Characterized The Hazardous Nature Of All Wastes Produced By All Equipment, Devices, Reagents, And Discharges In Accordance With The Requirements Of The Code Of Federal Regulations Title 40 Protection Of The Environment Part 261 Et Seq. And Applicable State And Local Requirements. Documentation Shall Include A Description Of The Characteristics Of The Hazardous Waste Produced As A Byproduct Of The Instrument Operations, Safety Data Sheets (sds) Meeting The Requirements Of The Occupational Safety And Health Administration (osha) And Environmental Protection Agency (epa), The Analytical Process Used To Determine The Hazardous Nature And Characteristics Of The Waste, And The Analytical Test Results. Testing Of Hazardous Waste Is To Be Done In Accordance With Testing Protocol Specified For Each Individual Waste As Described In The Code Of Federal Regulations Title 40 To Make A Determination If The Waste Is A Hazardous Waste Or Otherwise Regulated. the Determination And Description Shall Address The Following: waste Toxicity (reference 40 Cfr §261.11 And 40 Cfr §261.24) waste Ignitability (reference 40 Cfr §261.21) waste Corrosivity (reference 40 Cfr §261.22) waste Reactivity (reference 40 Cfr §261.23) hazardous Waste From Non-specific Sources (f-listed) (reference 40 Cfr §261.31) discarded Commercial Products (acutely Toxic Or P-listed And Toxic Or U-listed) (reference 40 Cfr §261.33) solid Waste (reference 40 Cfr §261.2) exclusions (reference 40 Cfr §261.4) the Contractor Will Provide Written Instructions And Training Material To Ensure Vha Laboratory Staff Are Trained As Needed To Properly Operate Devices With Special Emphasis To Managing And Disposing Of Hazardous Waste In Accordance With Epa And State Requirements. Additionally, The Training Provided By The Contractor Must Fulfill Resource Conservation And Recovery Act (rcra) Requirements For Training As Applicable To Devices. contractor Shall Provide A Description Of All Wastes The Process Or Equipment May Discharge So That The Facility Can Determine Whether The Discharge Meets Local Publicly Owned Treatment Works (potw), State And Federal Discharge Requirements. At A Minimum The Characteristics Of Ignitability, Corrosivity, Reactivity And Toxicity As Defined In 40 Cfr §261 Must Be Determined And Documented. Any Mercury Containing Reagents Must Be Identified In Any Concentrations. All Test Results Shall Be Provided. All Listed Chemicals (f, U, K And P) Found In 40 Cfr §261 Shall Be Provided In Product Information And Their Concentrations Documented. For Those Materials With A Positive Hazardous Waste Determination, A Mechanism For The Laboratory To Meet Local Discharge Requirements (i.e. Mercury, Thimerosol And Formaldehyde) Must Be Developed And Sds Sheets Must Be Provided In Advance For Review. At A Minimum, Documentation Shall Include, But Not Be Limited To The Concentration/measures Of The Elements And Parameters Listed Below And Must Be Included With Vendor Response: barium (total) cadmium (total) chromium (total) copper (total) cyanide (total) lead (total) mercury (total) nickel (total) silver (total) zinc (total) arsenic (total) selenium (total) tin (total) ph flash Point (to Higher Than 200â°f) bod; Biochemical Oxygen Demand the Documentation The Contractor Provides Will Be Used To Work With The Vamc And The Public And/or Private Organization (e.g., Potw) To Determine Whether Or Not The Waste From Each Device Can Legally Be Disposed Of Via The Sewerage System. implementation/transition Timeframe - The Implementation Of The Services/requirements Described In This Solicitation Shall Be Completed No Later Than 120 Days After The Award Of The Contract. This Timeline Is Based On A Reasonable Attempt Of The Contractor To Complete All Of The Necessary Implementation Requirements Within The Stated Timeframe. Contractor Shall Not Be Penalized For Implementation Timelines That Extend Beyond The 120-day Timeframe If The Extension Is Through No Fault Of The Contractor And Is A Result Of Delays Due To The Government. upon Award Of A Contract, The Transition Period For The Awarded Contract To Have All Equipment And Peripherals Installed And Operational By April 30 Or Mutually Agreed Upon Date. During This Same Period All Initial Training Of Va Personnel In The Operation And Maintenance Of Said Award Shall Also Be Completed. contractor Shall Provide With Its Quotation An Implementation Plan For Installation Of New Equipment. The Plan Should Include Installation And Training Of Personnel, Transition Of All Testing Materials, Reagents, And Supplies, Etc., Performance Of All Correlations And Validations. Failure Of The Contractor To Conform To The Transition Period Shall Be Considered As Sufficient Cause To Terminate Contract For Cause Under The Termination For Cause Clause Of The Contract. at The End Of 120 Days From Award Of The Contract, The Awarded Contractor Shall Have Full And Sole Responsibility For Services Under The Awarded Contract. standard And Quality Of Performance- This Paragraph Establishes A Standard Of Quality Performance That Shall Be Met Before Any Equipment Listed On The Delivery Order [or Contract] Is Accepted By The Government. This Also Includes Replacement, Substitute Machines And Machines That Are Added Or Field Modified After A System Has Demonstrated Successful Performance. The Acceptance Period Shall Begin On The Installation Date. It Shall End When The Equipment Has Met The Standard Of Performance For A Period Of 30 Consecutive Calendar Days By Operating In Conformance With The Contractor S Technical Specification Of Effectiveness Of 90% Or More. if Equipment Does Not Meet The Standard Of Performance During The Initial 30 Consecutive Calendar Days, The Standard Of Performance Tests Shall Continue On A Day-by-day Basis Until The Standard Of Performance Is Met For A Total Of 30 Consecutive Days. if The Equipment Fails To Meet The Standard Of Performance After 90 Calendar Days From The Installation Date, The User May, At His/her Option, Request A Replacement Or Terminate The Order In Accordance With The Provisions Of Far 52.212-4 Entitled Termination For Cause. (the Contractor Shall Receive Revenue For Tests Reported During The 90-day Acceptance Period.) operational Use Time For Performance Testing For A System Is Defined As The Accumulated Time During Which The Machine Is In Actual Use. System Failure Downtime Is That Period Of Time When Any Machine In The System Is Inoperable Due To Equipment Failure. Downtime For Each Incident Shall Start From The Time The Government Makes A Bona Fide Attempt To Contact The Contractor S Designated Representative At The Prearranged Contact Point Until The System Or Machine(s) Is Returned To The Government In Proper Operating Condition. during The Performance Period For A System, A Minimum Of 100 Hours Of Operational Use Time With Productive Or Simulated Work Shall Be Required As A Basis For Computation Of The Effectiveness Level. However, In Computing The Effectiveness Level, The Actual Number Of Operational Use Hours Shall Be Used When More Than The Minimum Of 100 Hours. the Government Will Maintain Daily Records To Satisfy The Requirements Of The Standard And Quality Of Performance Section And Shall Notify The Contractor In Writing Of The Date Of The First Day Of The Successful Period Of Operation. Operations Use Time And Downtime Shall Be Measured In Hours And Whole Minutes. during The Term Of The Contract, Should The Repair Record Of Any Individual Piece Of Laboratory Equipment Reflect A Downtime Of 10% Or Greater Of The Normal Working Days In One Calendar Month, A Determination Shall Be Made By The Cor And/or Contracting Officer To Replace The Malfunctioning Equipment With New Equipment. The Responsibility For Maintaining The Equipment Furnished In Good Condition In Accordance With Manufacturer S Instructions, Shall Be Solely That Of The Contractor. The Same Terms And Conditions Apply To Ancillary/support Equipment Provided Under This Contract, I.e., Water System Ups, Etc. government S Responsibility- The User Will Perform Routine Maintenance And Cleaning As Required In The Manufacturer S Operation And Maintenance Instructions. The User Shall Maintain Appropriate Records To Satisfy The Requirements Of This Paragraph. ownership Of Equipment- Title To The Equipment Shall Remain With The Contractor. All Accessories (unused Consumables, Etc.) Furnished By The Contractor Shall Accompany The Equipment When Returned To The Contractor. The Contractor, Upon Expiration Of Order(s), At Termination And/or Replacement Of Equipment, Shall Remove The Equipment. The Contractor Shall Disconnect The Analyzer (gas, Water, Air, Etc.) And Shall Be Responsible For All Packing And Shipping Required To Remove The Analyzer. as Applicable, The Contractor Will Identify If Removable Media Is Required To Perform Their Duties. The Clinical Engineering Department Will Ensure The Removable Media Is Scanned With Anti-virus Software Running Current Virus Definitions Prior To Connection To Any Medical Device/system. Any Contractor With Patient Sensitive Information That Is Imported Into The Removable Media Device For Any Reason Must Purge All Patient Sensitive Information Prior To Departure From The Facility. contractor/subcontractor Must Not Destroy Information Received From Va, Or Gathered/created By The Contractor Without Prior Written Approval By The Va. Any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Or Completion Of The Contract as Applicable, All Electronic Storage Media Used On Non-va Leased Or Non-va Owned It Equipment That Is Used To Store, Process, Or Access Va Information Must Be Handled In Adherence With Va Handbook 6500.1, Electronic Media Sanitization Upon: (i) Completion Or Termination Of The Contract Or (ii) Disposal Or Return Of The It Equipment By The Contractor/subcontractor Or Any Person Acting On Behalf Of The Contractor/subcontractor, Whichever Is Earlier. Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used By The Contractors/subcontractors That Contain Va Information Must Be Retained By The Va For Sanitization Or Destruction Or The Contractor/subcontractor Must Self-certify That The Media Has Been Disposed Of Per 6500.1 Requirements. This Must Be Completed Within 30 Days Of Termination Or Completion Of The Contract Or Disposal Or Return Of The It Equipment, Whichever Is Earlier. as Applicable, Bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The Contractor At The End Of Lease, For Trade-in, Or Other Purposes. The Options Are: contractor Must Accept The System Without The Drive. va S Initial Medical Device Procurement Includes A Spare Drive Which Must Be Installed In Place Of The Original Drive At Time Of Turn-in; Or va Must Reimburse The Company For Media At A Reasonable Open Market Replacement Cost At Time Of Purchase. due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain The Hard Drive, Then; the Equipment Contractor Must Have An Existing Baa If The Device Being Traded In Has Protected Health Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact; And any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Pre-approved And Described In The Purchase Order Or Contract. a Statement Needs To Be Signed By The Director (system Owner) That States That The Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place And Completed. The Information Security Officer (iso) Needs To Maintain The Documentation. important Information: The Government Is Not Obligated To, Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Source Sought Synopsis Request. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To An Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Currently A Total Set-aside For Service-disabled Veteran Owned Small Business Firms Is Anticipated Based On The Veterans Administration Requirement With Public Law 109-461, Section 8127 Veterans Benefit Act. however, If Response By Service-disabled Veteran Owned Small Business Firms Proves Inadequate, An Alternate Set-aside Or Full And Open. any Response To This Source Selection From Interested Parties Must Be Received Nlt 02/07/2025, 1500 Pm Est. attention: Arlie Lindsey, Contracting Specialist. email: Arlie.lindsey@va.gov please Reference 36c25525q0141 Tissue Processors Lease/rent Kcvamc In The Subject Line. please Provide Your Unique Entity Id So That Your Organization Can Be Identified In Sam.gov And Vetbiz If Organization Is Claiming Sdvosb Preference. only Organizations With An Active Sam.gov Account Can Be Considered. utilize This Link To Either Start A New Registration Or To Renew The Organization S Registration. https://sam.gov/content/home

University Of Ottawa Tender

Others
Canada
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Details: Deliverables: The High-resolution Gamma Spectrometer And Ln2 Recycler System (later To Be Known As The System) Will Be Used For The Verification And Determination Of Gamma Emitting Radionuclides In Different Sources And Materials. The System Is Going To Be Used In The Analysis Of Environmental (soil, Water, Air Filter, Etc.) And Radioactive Waste Characterization (solid Or Liquid) Samples In Different Geometries Such As 10 Ml Rounded Plastic Tube, Disk And Cylindrically Shaped Sources And In Variable (low To High) Count-rate. The Equipment Must Include A Ln2 Recycler System. Mandatory Requirements: Gamma Counter With Ln2 Recycler Cryostat 1. The System Must Include All Hardware, Software And Services Listed In This Proposal (turn-key Solution). A Single Contract Will Be Awarded To The Top Ranked Proponent For All Equipment, Software And Services Listed Within The Tender Documentation. 2. Technical Requirements 2.1 The System Must Include A High Purity Detector For High Absolute Counting Efficiency And Low-level Gamma Ray Spectroscopy With An Energy Range Of 40 Kev-10 Mev, Or Better. The Detector Must Also Be In A Near 4π Geometry For Maximum Absolute Counting Efficiency. 2.2 The System Must Include A Low Background Detector Accompanied By Oxygen-free High Conductivity (ofhc) Copper Endcaps With Low-background, And High Purity Aluminum Well Tubes. Low Background Means Minimal Contribution To The Background From The Detector Materials. Average Background Count Of 3.3 Counts/1000 Sec/kev At 100 Kev For Ieee Efficiency Of 100 %. 2.3 The System Must Include Advanced Efficiency Calibration Software To Reduce Data Processing Time; Include Spectral Analysis Software With Test Results Such As V&v (verification And Validation) To Produce Certificates Of Validation; 2.4 System Detector Shielding Is To Be Graded Lead, With A Thickness Of 10 Cm Or Greater, With Sn (or Cd) And Cu Sheets To Prevent Interference By Lead X-rays, Or Other Accepted Equivalent By The University. 2.5 The System Software Must Provide Accurate Identification And Quantification Of Radioactive Material Through Accurate System Calibration And Sample Analysis Settings, Robust Peak Search And Fit Algorithms, And A Variety Of Corrections For Background, Peak Interferences, Attenuation, And Reporting Units. 2.6 The System Must Include Calibration Software That Provides Advanced Efficiency Calculation For The Detector By Combining The Measured Efficiency Of A Known Reference Configuration And Solid Angle Models To Derive The Efficiency For Different Containers, Sample Materials, And Sample Positions. 2.7 Must Include A Desktop Pc, Including All Necessary Peripherals (mouse, Keyboard, Monitor, Etc) And Windows 11. The Pc Must Be Capable Of Running The System Software And Hardware. 2.8 The System Must Include A Liquid Nitrogen (ln2) Recycling System Including A Compatible Detector And Vertical Dipstick Cryostat. The System Must Also Feature An Automatic Shutdown Of The Detector`s High Voltage In Case Of Detector Warm-up. 2.9 The Ln2 Recycling System Must Include A Level Monitor/controller; Including A Remote Display, A Storage Vessel, All Necessary Tubes And Fittings As Well As Any Other Accessories/components Required. 3. Functional And Performance Requirements 3.1 The Proposed System Must Achieve An Energy Range Of 40 Kev-10mev, Or Better. 3.2 The Proposed System Must Be Capable Of Achieving The Following Energy Resolutions: At Full Width Half Maximum: 2.1 Kev @ 122 Kev Or Better. At Full Width Half Maximum (fwhm): 2.3 Kev @1333 Kev Or Better. 3.3 The Relative Efficiency Must Be 40 % Or Better At 1333 Kev 3.4 Peak-to-compton Ratio Must Be A Minimum Of 62:1. 4. Ln2 Recycler System 4.1 The System Must Be Capable Of Maintaining A Steady Uninterrupted State For A Minimum Of 2 Years Without Requiring Refills. 4.2 In The Case Of Power Loss, The Counter Must Remain Operational For A Minimum Of 72 Hours. An External Ups Must Be Included To Meet This Requirement. 4.3 The Ln2 Loss Rate While The Cryocooler Is Off Must Not Exceed 3l/day. 4.4 The Power Consumption Of The Ln2 Recycler Must Be 350 W Maximum 5. Other Requirements 5.1 Installation And A Training Session For 2 Users Must Be Included. 5.2 Must Include A Minimum Of One (1) Year Of Warranty On Parts And Labor.

BARANGAY MAGRAFIL GONZAGA, CAGAYAN Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 326.2 K (USD 5.6 K)
Details: Description Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The Continuation Of Peri- Meter Fence And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Note In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreignassisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 7 Section Ii. Instructions To Bidders 10 1. Scope Of Bid 10 2. Funding Information 10 3. Bidding Requirements 11 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 11 5. Eligible Bidders 11 6. Origin Of Associated Goods 12 7. Subcontracts 12 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 13 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 14 14. Bid And Payment Currencies 14 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 15 18. Opening And Preliminary Examination Of Bids 15 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 18 1. Scope Of Contract 19 2. Sectional Completion Of Works 19 3. Possession Of Site 19 4. The Contractor’s Obligations 19 5. Performance Security 20 6. Site Investigation Reports 20 7. Warranty 20 8. Liability Of The Contractor 20 9. Termination For Other Causes 20 10. Dayworks 21 11. Program Of Work 21 12. Instructions, Inspections And Audits 21 13. Advance Payment 21 14. Progress Payments 21 15. Operating And Maintenance Manuals 22 Section V. Special Conditions Of Contract 23 Section Vi. Specifications 26 Section Vii. Drawings 28 Section Viii. Bill Of Quantities 29 Section Ix. Checklist Of Technical And Financial Documents 33   Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Province Of Cagayan Municipality Of Gonzaga Barangay Magrafil Invitation To Bid For The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan 1. The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan, Through The Funding Intends To Apply The Sum Of Three Hundred Twenty Six Thousand Two Hundred Pesos (326,200.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Magrafil -infra-001-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan. Completion Of The Works Is Required 30 Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information On The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20, 2025 From Given Address And Website/s Below {insert If Necessary: And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or Via Email. 6. The Bac Will Hold A Pre-bid Conference On [january 28, 2025] At [lnb Hall Municipal Compound Barangay Magrafil, Gonzaga, Cagayan] {[insert If Applicable] And/or Through Videoconferencing/webcasting Via [insert Website, Application Or Technology To Be Used].}, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 28, 2025 At 9:14 Am At The Given Address At {lnb Hall, Municipal Compound Barangay Smart Gonzaga, Cagayan] And/or Through [insert Website, Application, Or Technology To Be Used].} Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. [insert Such Other Necessary Information Deemed Relevant By The Procuring Entity Such As The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submissions] 11. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Flordelisa I. Javier Secretariat Bids And Awards Committee Barangay Hall Barangay Magrafil, Gonzaga, Cagayan Email: Lisaidmilao32@gmail.com 09999779655-09065742240 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [indicate Websites] [if Applicable] For Online Bid Submission: [indicate Website] January 16, 2025 ________________________________ Wilfrey Loy S. Idmilao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, [barangay Magrafil, Gonzaga, Cagayan] Invites Bids For The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan, With Project Identification Number Magrafil-infra-001-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Twenty Six Thousand Two Hundred Pesos. 2.2. The Source Of Funding Is: [if An Early Procurement Activity, Select One And Delete Others:] A. Nga, The National Expenditure Program. B. Gocc And Gfis, The Proposed Corporate Operating Budget. C. Lgus, The Proposed Local Expenditure Program. [if Not An Early Procurement Activity, Select One And Delete Others:] A. Nga, The General Appropriations Act Or Special Appropriations. B. Gocc And Gfis, The Corporate Operating Budget. C. Lgus, The Annual Or Supplemental Budget, As Approved By The Sangguniang. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: [select One, Delete Other/s] A. Subcontracting Is Allowed. The Portions Of Project And The Maximum Percentage Allowed To Be Subcontracted Are Indicated In The Bds, Which Shall Not Exceed Fifty Percent (50%) Of The Contracted Works. B. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding , State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criterial Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: [select One, Delete Other/s] A. Philippine Pesos. B. [indicate Currency If Procurement Involves A Foreign-denominated Bid As Allowed By The Procuring Entity, Which Shall Be Tradeable Or Acceptable By The Bsp.] 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: [provide Description/clarification Of What Are Major Categories Of Work]. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 [specify If Another Contractor License Or Permit Is Required. ] 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 12 [insert Value Engineering Clause If Allowed.] 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than __________ [insert Two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than __________ [insert Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Allowed, As Follows: [insert Grouping Of Lots By Specifying The Items And The Quantity For Every Identified Lot.] 20 [list Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It, E.g. Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone, Etc.] 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And Scurve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract.   1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor.   Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 [if Different Dates Are Specified For Completion Of The Works By Section, I.e. “sectional Completion,” These Dates Should Be Listed Here.] 4.1 [specify The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part.] 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] 7.2 [select One, Delete The Other.] [in Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. [in Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures:] Five (5) Years. [in Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures:] Two (2) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. B. No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within [insert Number] Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Three Hundred Six Thousand Pesos. 13 The Amount Of The Advance Payment Is [insert Amount As Percentage Of The Contract Price That Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment]. 14 [if Allowed By The Procuring Entity, State:] Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is [date]. The Date By Which “as Built” Drawings Are Required Is [date]. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is [amount In Local Currency]. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.

Bureau Of Corrections leyte Regional Prison Abuyog Leyte Tender

Others
Philippines
Closing Date24 Jan 2025
Tender AmountPHP 310 K (USD 5.2 K)
Details: Description Philippine Bidding Documents (as Harmonized With Development Partners) Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Government Of The Republic Of The Philippines Sixth Edition January 2025 Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….2 Section I. Invitation To Bid……………………………………………………..5 Section Ii. Instructions To Bidders…………………………………………...8 1. Scope Of Bid ………………………………………………………………………. 9 2. Funding Information………………………………………………………………. 9 3. Bidding Requirements ……………………………………………………………. 9 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 9 5. Eligible Bidders…………………………………………………………………… 9 6. Origin Of Goods ………………………………………………………………….. 10 7. Subcontracts ……………………………………………………………………… 10 8. Pre-bid Conference ………………………………………………………………. 10 9. Clarification And Amendment Of Bidding Documents …………………………… 10 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 10 11. Documents Comprising The Bid: Financial Component …………………………... 11 12. Bid Prices …………………………………………………………………………. 11 13. Bid And Payment Currencies ……………………………………………………… 12 14. Bid Security ………………………………………………………………………. 12 15. Sealing And Marking Of Bids ……………………………………………………… 12 16. Deadline For Submission Of Bids …………………………………………………. 13 17. Opening And Preliminary Examination Of Bids ………………………………….. 13 18. Domestic Preference ……………………………………………………………… 13 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 13 20. Post-qualification ………………………………………………………………… 14 21. Signing Of The Contract …………………………………………………………… 14 Section Iii. Bid Data Sheet …………………………………………………..15 Section Iv. General Conditions Of Contract ……………………...………..17 1. Scope Of Contract ………………………………………………………………… 18 2. Advance Payment And Terms Of Payment ……………………………………….. 18 3. Performance Security ……………………………………………………………. 18 4. Inspection And Tests ……………………………………………………………… 18 5. Warranty …………………………………………………………………………. 18 6. Liability Of The Supplier ………………………………………………………….. 19 Section V. Special Conditions Of Contract ………………………………….20 Section Vi. Schedule Of Requirements ……………………………………....24 Section Vii. Technical Specifications …………………………………………25 Section Viii. Checklist Of Technical And Financial Documents …………..29 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Invitation To Bid For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) 1. The Leyte Regional Prison, Through The General Appropriations Act (gaa) Of 2025 Intends To Apply The Sum Of Three Hundred Ten Thousand Pesos Only (₱310,000.00) Being The Abc To Payments Under The Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Leyte Regional Prison, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Until December 31, 2025 From The Receipt Of Notice To Proceed (ntp) And Contract Agreement. Bidders Should Have Completed, Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Twenty-five Percent (25%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Leyte Regional Prison Bac Secretariat Using The Contact Below And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 8:00am - 5:00pm To January 24, 2025 8:00am – 8:55pm From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos Only (₱500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 24, 2025 @ 9:00am. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be On January 24, 2025 @ 9:00am At The Lrp – Conference Room, Administration Building, Leyte Regional Prison. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. Schedule Of The Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents January 17, 2025 8:00am To 5:00pm To January 24, 2025 8:00am To 8:55am Office Of The Bac/bac Secretariat, Leyte Regional Prison, Abuyog, Leyte 2. Submission And Opening Of Bid Documents January 24, 2025 @ 9:00am Conference Room, Admin Building, Lrp, Abuyog, Leyte 10. The Lrp Bac Shall Use Non-discretionary And Non-discriminatory Measure Based On Sheer Luck As A Tie-breaking Tool (draw Lots) In The Event That Two Or More Bidders Were Declared As Lcrb In-order To Determine The Final Lcrb Based On The Following: I. In Alphabetical Order, The Bidder Shall Pick One Rolled Paper Ii. The Lucky Bidder Who Would Pick A Paper With “congratulations” Remark Shall Be Declared As The Final Lcrb And Recommended For The Award Of The Contract. 11. The Leyte Regional Prison Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Jeruel Go Office Of The Bac Secretariat Leyte Regional Prison, Abuyog, Leyte Cp # 09455311532, Email: Leurejz@yahoo.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.bucor.gov.ph/ Www.philgeps.gov.ph Date Of Issue: January 16, 2025 Mr. Tracy B. Soriano Bac Chairperson Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Leyte Regional Prison Wishes To Receive Bids For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) With Identification Number Bid 2024-05rb. The Procurement Project For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Ten Thousand Pesos Only (₱310,000.00). A. The Source Of Funding Is National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. A. Payment Of The Contract Price Shall Be Made In Philippine Pesos 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until May 24, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 24, 2025 @ 9:00 Am At Lrp Administrative Building Conference Room As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Any Food Catering Services. B. Completed Within The Last Two (2) Years Equivalent To At Least Twenty-five Percent (25%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 No Further Instruction. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱6,200.00, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱15,500.00 If Bid Security Is In Surety Bond. 15 Electronic Copy/electronic Submission Is Not Allowed Each Bidder Shall Submit One (1) Original Copy And Three (3) Photocopies Of The First And Second Components Of Its Bid. 19.4 One Project Having Several Items That Shall Be Awarded As One Contract. 20.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Certificate Of Compliance Occupational Safety And Health Standards Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause Delivery And Documents – Delivery Of The Catering Services Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi. Schedule Of Requirements. Delivery Time Of The Food To Be Served As Follows: Am Snacks – Not Later Than 9:30 Am Lunch – Not Later Than 11:30 Am Pm Snacks – Not Later Than 2:30 Pm Upon Delivery Of The Catering Services To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Procuring Entity’s Representative At The Project Site; (iii)certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; For Purposes Of This Clause, The Procuring Entity’s Representative At The Project Site Is The End-user, Or His Duly Authorized Representative. When A Seminar Has Been Rescheduled Or Cancelled, Leyte Regional Prison, Reserves The Right To Cancel The Catering Service Upon Formal Notice To The Caterer Two (2) Days Prior To The Start Of The Occassions. In Such Case, Leyte Regional Prison, Has No Obligation To Pay The Supplier The Amount Corresponding To The Cancelled Catering Service. Where There Is An Increase Or Decrease Of Participants, The End-user Shall Inform The Supplier Of The Same Three (3) Days Prior The Occasion Date. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Transportation – The Transport Of The Food To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage/spoilage Of Food During Transit. The Contract Price For The Catering Service Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Amount Stipulated In The Purchase Request (pr). After Each Occasion, The Supplier Is Responsible For Sending To The Leyte Regional Prison, A Billing Or Final Invoice For The Costs Of The Catering Service For Every Occasion Completed. It Shall Also Turn Over To The Bureau Any Remains/left Over Of The Catering Services Every End Of The Day For Its Use. 2.2 Partial Payment Is Not Allowed Cost For E-vat And Other Governmental Costs Which Fall Equally On All Prospective Suppliers Are Presumed To Be Included In The Computation Of The Bid Price 4 The Inspections And Tests That Will Be Conducted Are: The Evaluation Activities That Will Be Conducted At The Leyte Regional Prison, Upon Delivery Are As Follows: (1) Food Tasting On A Sampling Basis To Determine The Quality Of Food Served. (2) Ocular Inspection To Determine The Quantity And Completeness Of The Food Delivered In Accordance To The Menu Set In The Schedule Of Requirements. (3) Observation Before, During And After The Training Schedule To Determine The Quality Of Service Given By The Supplier. (4) Surveys Among The Participants To Determine The Level Of Satisfaction Of The Participants To The Service Rendered By The Supplier 6 Liability Of The Supplier: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru Df Of Pr Signed By The End-user Or Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. State “comply” Or “not Comply” To The Statement Of Compliance. Item No. Description Quantity Delivery Schedule 1 Meals: Breakfast 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Lunch 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Dinner 620 Pax From The Receipt Of Ntp Up To December 31, 2025 2 Snacks: Am Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Pm Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 The Quantity/units Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity/units That May Be Required May Increase/decrease As The Need Arises. I/we Hereby Commit To Comply And Deliver All The Above Requirements In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Section Vii. Technical Specifications Item Specification Statement Of Compliance I The Catering Service Provider Shall Comply With The Government Regulations As Provided In Presidential Decree No. 856 Otherwise Known As “the Code On Sanitation Of The Philippines”. A. Sanitary Permit B. Health Certificate Of Food Handlers C. Quality And Protection Of Food Ii The Catering Service Provider Agrees: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru A Notice Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/ Snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison. F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Additional Requirements 1 The Lrp Shall Inform The Concessionaire Of The Total Number Of Actual Participants At Least Three (3) Days Before The Conduct Of The Training. 2 The Service Provider Shall Assure The Quality Of Food To Be Served Maintaining High Standards Of Sanitation. In The Event That That The Food Served Has Indication Of Spoilage, The Caterer Shall Be Allowed To Make Substitution Upon The Approval Of The Course Administrator. 3 The Service Provider Shall Submit Or Provide Menu Including Healthy Foods Such As Rice, Beef, Chicken, Pork, Seafoods, Vegetables, Dessert/fruits, Fruit Juice 4 The End User Can Request Specific Meals Or Snacks And Services They Prefer As Long As Requests Remain Within The Allocated Budget Per Meal, Snacks And Services 5 Subject To Increase/decrease Of Participants. 6 The Caterer Shall Serve Consumables Of One (1) Lunch And Two (2) Snacks Per Day Which Shall Be Ready For Inspection By 11:15am, Snacks By 8:45am And 2:30pm, Respectively. 7 The Service Provider Shall Not Require Advance Payment And Deposit To Guarantee Reservation. 8 The Concessionaire Shall Assign At Least Four (4) Waiters/waitresses In Clean Working Garments In Trainings With 50 Or More Participants And At Least 2-3 Waiters/waitresses For Trainings With Less Than Or Equal To 50 Participants. 9 The Lrp Reserves The Right To Cancel/reschedule The Delivery Of Catering Services In Case Of Major Institutional Mandates/changes, Calamities, Etc. Upon Formal Notice To The Caterer At Least Three (3) Days Prior To The Event. 10 The Lrp Shall Pay The Concessionaire At Least Five (5) Days After The Billing Statements Have Been Received By The Office. 11 The Lrp Reserves The Right To Substitute/reschedule Trainings. 12 The Service Provider Shall Provide At Least Two (2) Buffet Tables With Centerpiece For Trainings With Less Than Or Equal To Fifty (50) Participants And At Least Four (4) Buffet Tables Inside The Function Hall For Trainings With More Than Fifty (50) Participants. 13 The Lrp Reserves The Right To Substitute/reschedule Trainings. Rice: A Serving Must Be Provided With Each Meal Viand: Each Meal Should Include One Main Viand Vegetables: A Side Of Vegetables Should Accompany The Meal To Ensure Balanced Nutrition. Desserts Or Sweets: Each Meal Should Include A Dessert Or Any Sweet Treat. Beverage: Participants Should Be Offered Bottled Water/canned Juice/softdrinks. I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Ix. Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery End User’s Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, (attached Copy) Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Certificate Of Net Financial Contracting Capacity ((please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _________________________(p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _______day Of __________2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Leyte Regional Prison I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Bid Form Date: Invitation To Bid No: Bid 2024-05rb To: Mr. Tracy B. Soriano, Msca Bac Chairperson Leyte Regional Prison Abuyog, Leyte Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) In Conformity With The Said Bidding Documents For The Sum Of __________________________________________₱ ________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Of The Bidding Documents. I/we Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert]: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Schedule Of Prices Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat Meals 620 Pax Breakfast ₱62,000.00 620 Pax Lunch ₱93,000.00 620 Pax Dinner ₱93,000.00 Snacks 620 Pax Am Snacks ₱31,000.00 620 Pax Pm Snacks ₱31,000.00 Total Bid Price Inclusive Of Vat In Words The Quantity And Unit Of Issue Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity That May Be Required May Increase/decrease As The Need Arises. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date13 Feb 2025
Tender AmountRefer Documents 
Details: Combined Synopsis/solicitation Notice combined Synopsis/solicitation Notice page 3 Of 3 combined Synopsis/solicitation Notice *= Required Field combined Synopsis/solicitation Notice page 1 Of 3 (i) This Is A Combined Synopsis/solicitation For Commercial Services Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued. (ii) Solicitation 36c24725q0296 Is Issued As A Request For Quotation (rfq). (iii) The Solicitation Incorporates Provisions And Clauses In Effect Through Federal Acquisition Circular 2025-02, Dated 01-03-2025. (iv) This Solicitation Is Set-aside Exclusively For Service-disabled Veteran-owned Small Business Concerns. To Be Considered For Award Prospective Offerors Must Be Registered And Active In The System For Award Management (www.sam.gov) And Sba Verified Sdvosb Veteran Small Business Certification Veteran Small Business Certification (vetcert) (https://veterans.certify.sba.gov/) Concern Verified At The Date And Time Set For Receipt Of Offers. An Offeror, Who Is Not Sam Registered Or Sba Vet Cert Verified Sdvosb Concern At The Date And Time Set For Receipt Of Offers Will Have Their Offer Rejected As Non-responsive And Will Not Be Considered For Award. The Applicable Naics Code For This Solicitation Is 562211, Small Business Size Standard $47.0 Million. Applicable Wage Determination Wd # 2015-4609, Revision 24, Dated 12/23/2024 Is Incorporated. (v) Contractor Shall Provide Quote For Services A Base Plus (4) Four Option Years. (vi) Price/cost Schedule item Information item Number description Of Supplies/services quantity unit unit Price amount 0001 12.00 mo __________________ __________________ contractor Shall Perform Regulated Medical Waste (rmw) Pick Up/disposal Services In Accordance With The Statement Of Work (sow). This Service Includes But Is Not Limited To Items Contaminated With Blood And Body Fluids/waste, Chemotherapy Wastes, Sharps, Pathological And Microbiological Waste Or Other Potentially Infectious Materials And The Collection, Packaging, Transport, And Incineration Or Otherwise Disposal Of Medical Waste Materials In Accordance With All Applicable Environmental Protection Agency (epa), Food And Drug Administration (fda), Department Of Transportation (dot), Occupational Safety And Health Administration (osha) And Any Other State And Federal Requirements Or Guidelines. contract Period: Base pop Begin: 04-01-2025 pop End: 03-31-2026 1001 12.00 mo __________________ __________________ contractor Shall Perform Regulated Medical Waste (rmw) Pick Up/disposal Services In Accordance With The Statement Of Work (sow). This Service Includes But Is Not Limited To Items Contaminated With Blood And Body Fluids/waste, Chemotherapy Wastes, Sharps, Pathological And Microbiological Waste Or Other Potentially Infectious Materials And The Collection, Packaging, Transport, And Incineration Or Otherwise Disposal Of Medical Waste Materials In Accordance With All Applicable Environmental Protection Agency (epa), Food And Drug Administration (fda), Department Of Transportation (dot), Occupational Safety And Health Administration (osha) And Any Other State And Federal Requirements Or Guidelines. contract Period: Option 1 pop Begin: 04-01-2026 pop End: 03-31-2027 2001 12.00 mo __________________ __________________ contractor Shall Perform Regulated Medical Waste (rmw) Pick Up/disposal Services In Accordance With The Statement Of Work (sow). This Service Includes But Is Not Limited To Items Contaminated With Blood And Body Fluids/waste, Chemotherapy Wastes, Sharps, Pathological And Microbiological Waste Or Other Potentially Infectious Materials And The Collection, Packaging, Transport, And Incineration Or Otherwise Disposal Of Medical Waste Materials In Accordance With All Applicable Environmental Protection Agency (epa), Food And Drug Administration (fda), Department Of Transportation (dot), Occupational Safety And Health Administration (osha) And Any Other State And Federal Requirements Or Guidelines. contract Period: Option 2 pop Begin: 04-01-2027 pop End: 03-31-2028 3001 12.00 mo __________________ __________________ contractor Shall Perform Regulated Medical Waste (rmw) Pick Up/disposal Services In Accordance With The Statement Of Work (sow). This Service Includes But Is Not Limited To Items Contaminated With Blood And Body Fluids/waste, Chemotherapy Wastes, Sharps, Pathological And Microbiological Waste Or Other Potentially Infectious Materials And The Collection, Packaging, Transport, And Incineration Or Otherwise Disposal Of Medical Waste Materials In Accordance With All Applicable Environmental Protection Agency (epa), Food And Drug Administration (fda), Department Of Transportation (dot), Occupational Safety And Health Administration (osha) And Any Other State And Federal Requirements Or Guidelines. contract Period: Option 3 pop Begin: 04-01-2028 pop End: 03-31-2029 4001 12.00 mo __________________ __________________ contractor Shall Perform Regulated Medical Waste (rmw) Pick Up/disposal Services In Accordance With The Statement Of Work (sow). This Service Includes But Is Not Limited To Items Contaminated With Blood And Body Fluids/waste, Chemotherapy Wastes, Sharps, Pathological And Microbiological Waste Or Other Potentially Infectious Materials And The Collection, Packaging, Transport, And Incineration Or Otherwise Disposal Of Medical Waste Materials In Accordance With All Applicable Environmental Protection Agency (epa), Food And Drug Administration (fda), Department Of Transportation (dot), Occupational Safety And Health Administration (osha) And Any Other State And Federal Requirements Or Guidelines. contract Period: Option 4 pop Begin: 04-01-2029 pop End: 03-31-2030 grand Total __________________ (vii) Description Of Requirement: statement Of Work regulated Medical Waste And Sharps Removal Services tuscaloosa Va Medical Center a. General Information: 1. Title Of Project: Regulated Medical Waste And Sharps Removal Services 2. Location Of Services: Tuscaloosa Va Medical Center, 3701 Loop Road East, Tuscaloosa, Al 35404 3. Location Of Sharps/bio-hazard Containers: building room Number quantity 137 4-117 1 137 14-117 1 137 14-106 1 137 3117 1 137 3104 1 137 d3-101 1 137 e3-107 2 137 e3-117 1 137 g3-101 1 137 g3-116 2 137 h3-113 1 137 13-100 1 137 12-117 2 135 g-15 1 135 g-17 1 135 g18 1 135 g19 1 135 g21 1 135 g23 1 135 g23 1 135 g26 1 135 g25 1 135 g27 1 135 g31 1 135 g32 1 135 g33 1 135 g34 1 135 g42 1 38 210 1 38 211 1 38 212 1 38 213 1 38 214 1 38 206 1 38 207 1 38 240 1 38 242 1 38 243 1 38 244 1 38 243 1 38 243a 1 38 227 1 38 241 1 38 241a 1 38 243 1 38 251 1 38 252 1 38 254 1 38 111 1 38 112 1 38 113 1 38 114 1 38 115 1 38 110 1 38 109 1 38 106 1 38 104 1 38 143 1 38 133 1 38 133b 1 38 141 1 38 142 1 38 142a 1 38 143 1 38 144 1 38 144a 1 38 145 1 38 152 1 38 152a 1 38 153 1 38 155 1 1 314 2 1 308 1 1 323 1 1 420 1 phar-135 g12, G58 2 phar-145 tbd 2 eye 20a 1 dental 41b, 41e, 41h, 41j, 41m, 41n, 41p, 41q 1 lab-135 123, 128, 128a, 128c, 133, 133b, 133d 25 18 108 1 146 19, 30 2 147 19 2 149 23, 33, 45, 69, 79 9 61 a37 1 61 b-20 3 61 b23 2 61 d20 1 61 d-22 3 cage-3 n/a (storage) 69 (estimated) 3. Period Of Performance: Base Plus Four (4) Option Years As Follows: base Year: April 1, 2025 March 31, 2026 option Year #1: April 1, 2026 March 31, 2027 option Year #2: April 1, 2027 March 31, 2028 option Year #3: April 1, 2028 March 31, 2029 option Year #4: April 1, 2029 March 31, 2030 4. Type Of Contract: Firm Fixed Price 5. Days And Hours Of Operation: The Tuscaloosa Vamc Business Days And Hours Are Monday Through Friday 8:00 Am- 4:30 Pm, Central Standard Time, Excluding Federal Holidays. Federal Holidays Are New Year S Day, Martin Luther King Birthday, President S Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran S Day, Thanksgiving Day, And Christmas Day. B. General Requirments: 1. The Contractor Shall Provide All Labor, Supervision, Transportation, Supplies, Equipment Necessary To Pick Up And Transport Regulated Medical Waste (rmw) To Include The Pickup Of Sharps And Bio-hazard Waste. 2. The Contractor Shall Collect, Transport, And Dispose Of Rmw And Sharps. Should Be Treated By Autoclaving Or By Means As Regulated By The Alabama Department Of Environmental Management, And In Accordance With Federal, State And Local Laws And Regulations. 3. Pickup Of Full Sharps And Rmw Shall Be Twice Every Week On Wednesdays From The Locked Cage Located In Building 3. Twice Per Week The Contractor Should Pick Up From All Units As Listed In The Above Table. Contractor Is To Check In With The Cor Or Chief Ems. 4. This Medical Facility Has As Estimate 19,102 Pounds Of Rmw That Is Disposed Of Per Year And 13,000 Pounds Of Sharps And Bio-hazardous Waste Per Year. 5. Types Of Rmw Include, But Are Limited To The Following: a. Pathological Waste B. Cultures, Stocks And Vaccines C. All Used And Unused Sharps D. Blood, Blood Products, Other Potentially Infectious Body Fluids And Contaminated Items E. Pharmaceuticals (controlled, Outdated And Vaccines) **will Not Be Separated note: Please Be Advised That All Personnel Of The Awarded Contractor Must Have A Completed Tuberculosis Skin (tb) Test In Order To Work In Patient Areas. The Tb Skin Test Will Be At The Expenses Of The Contractor And Proof Of The Test Must Be Submitted To The Contracting Officer Representative (cor) Prior To Any On-site Services Conducted At The Tvamc. c. Specific Services: 1. Provide And Service Reusable Sharps Containment System: a. Contractor Shall Provide Labor, Transportation, Collection, Removal, Treatment And Destruction Services Including A Reusable Sharps Containment System Compliant With Centers For Disease Control (cdc) And National Institute For Occupational Safety And Health (niosh) Guidelines For The Storage, Transport And Shipment Of Regulated Medical Waste. b. A Minimum Of 90 Containers Are Needed Bi-weekly At The Tvamc. For Start Up Purposes, A Total Of 196 Containers Are Needed As Follows: 2 Gallon 64 4 Gallon 36 7 Gallon 96 c. Contractor Shall Provide Rigid Puncture Resistant Sharps Containers That Meet The American Society For Testing Materials (astm) Standard F2131-01 "standard Specification For Puncture Resistance Of Materials Used In Containers For Discarded Medical Needles And Other Sharps" d. Contractor Shall Provide Sharps Containers That Include Appropriate Sizes And Shapes, Opening Types (vertical Drop) And Closures (locking Mechanism), Mounting Brackets, Carts With Casters (to Hold And Transport), Training, And Replacement For Sharps Collection And Containment Of Sharps Waste (defined Below). e. Sharps Containers Shall Be Of The Type That Lends Itself To Privacy Of Patient Information (example- Be Of Solid Red In Color). Each Container Shall Meet All Requirements Of The Occupational Safety And Health Administration (osha) Regulation 29 Cfr 1910.1030 'bloodborne Pathogens" And Be Registered As A Sharp Waste Container With The Food And Drug Administration (fda). f. Contractor Shall Provide Labor, Tools, Materials, Supplies, Appropriate Equipment, Transportation, And Supervision Necessary To Pick Up, Store, Transport, Decant, And Clean/sterilize Containers As Well As Destroy, Dispose Of, Document, And Invoice For Waste Removed From The Containers. Special Function Items Such As, But Not Limited To, Funnel Tops, Traps, Wall Cabinets And Related Hardware, Shall Be Supplied By The Contractor At No Additional Cost To The Va. g. "sharps Infectious Waste" Shall Be Considered For The Purpose Of This Contract To Include Hypodermic Needles, Syringes And Scalpel Blades. The Term Does Not Include Any Hazardous Waste, Radioactive Waste, Or Pharmaceuticals. The Medical Center Will Be Responsible For The Segregating Of All Waste In Accordance With Federal, State, And Local Requirements. h. The Contractor Shall Provide A Supply Of Clean/sterilized, Dry And Free Of Odors, Reusable Sharps Containers To Be Kept On Site To Be Used In The Event That A Container Does Become Full Prior To The Contractor's Scheduled Exchange Visit And An Environmental Management Service (ems) Staff Member Will Then Replace Full Container With A New Empty One. Exact Storage Location To Be Determined By Ems. i. Contents Of Containers Shall Be Transported Off Station And Disposed Of As Rmw. The Contaminated Reusable Sharps Containers Shall Be Cleaned, Disinfected, And Sterilized For Reuse. Reusable Sharps Containers Shall Not Be Cycled Through More Than 500 Times Or As Stated And Allowed By Applicable And Current Regulations. The Cost Of Any Replacement Sharps Containers Shall Be At The Contractor's Expense. j. All Containers Shall Be Clearly Labeled With Biohazard Symbol And The Word "biohazard' Displayed On Them Along With Barcode. k. The Contractor Will Provide Red Bags/liners For The Re-useable Plastic Containers As Needed, Or Upon Request. We Will Require 8- And 15-gallon Bags, Using An Estimated 1,200 Bags Per Year For Each Size. l. In Additional To Re-useable Containers, Contractor Will Provide Red Bags For Use In Emergencies. 2. Provide Regulated Medical Waste (rmw) Collection And Disposal Services a. Contractor Shall Provide Services Including The Provision Of Containers And Labels For Regulated Medical Waste; Pickup Of All Regulated Medical Waste Streams To Include Sharps; Storage And Transport; Decanting, Examination, Appropriate Treatment, Disposal, And Documentation Of Quantities And Weights Of Waste; Cleaning Of Containers; And Provision Of Legal Manifest Which Accurately Documents The Chain Of Custody From Point Of Pickup To Final Disposition. b. The Estimated Quantity Of Waste Pickup Is Established In Section B2 Price/cost Schedule. c. Contractor Will Pick Up Medical Waste And Sharps From The Units As Listed In Section A3 And Take To Building 3, Locked Cage. The Contractor Will Pick Up And Dispose Of Rmw And Sharps From The Containers Behind Building 3 In The Locked Cage. d. Regulated Medical Waste Containers: Containers Shall Be Made Of Rigid Plastic Construction Designed To Prevent Puncture By Needles And Other Sharps, Capacity Not To Exceed 96-gallons, (minimum Of 26 Wheeled Totes Are Needed In The Catchment Area) And Shall Include Locking Safety Handles Along With Appropriate Bio-hazard Warning Symbols Approved By The State And Federal Regulatory Agencies. Contractor Shall Maintain The Re-used Containers And Equipment In A State Of Satisfactory Repair (no Broken Wheels Or Lids, Sharp Points) And Appearance (free Of Dirt/old Paper Stickers) As Determined By The Cor. Contractor Shall Have Containers Disinfected Inside And Out And Free Of Moisture Using The Centers For Disease Control (cdc) Approved Disinfectant Before Returning Them To The Medical Center Or Clinics For Use. Safety Data Sheet (sds) Information Shall Be Provided By The Contractor To The Cor Prior To Use. e. Medical Waste And Sharps Should Be Disposed Of By Autoclaving. d. Safety Requirements And Training: a. Contractor Vehicles, Carts, Materials, Or Supplies Shall Not Be Left Unattended. Vehicles Shall Be Parked Only In Designated Area As Provided By Ems Staff. b. Contractor Shall Ensure That Its Staff Who Drive On Va Property Are Professional, Comply With All Facility Policies Such As Zero Tolerance For Sexual Harassment And Violence In The Workplace, Drug-free Workplace, Safety, And Be Appropriately Dressed. c. Contractor Shall Ensure That Facility Standards Are Followed Along With The Joint Commission Standards. Contractor Is Solely Responsible For Any And All Spills Or Leaks During The Performance Of The Contract. d. The Contractor Agrees To Clean Up Such Spills And/or Leaks To The Satisfaction Of The Government In A Manner Which Satisfies The Applicable Regulations, At No Cost To The Government e. The Contractor Shall Report To The Va Safety Officer Via The Cor All Spills, Regardless Of Quantity And All Personnel Exposures. Such Reports Shall First Be Reported By Telephone Within 30 Minutes Following The Incident And Shall Have A Follow Up In Writing No Later Than Seven (7) Days After The Initial Report. When Reporting A Spill, The Following Information Shall Be Furnished (1) Quantity Spilled; (2) Exact Location Of Spill; (3) Containment Procedures Initiated; (4) Clean-up And Disposal Procedures; (5) Personal Injury Involved; (6) Assistance Required; And (7) A Narrative Summarizing All On-scene Visits Made By Local, State, And Federal Officials. f. Contractor Shall Not Dispose Of Any Chemical Containers Contaminated By Cleaning Chemicals In Any Location In The Facility Except As Specified By The Cor. g. Contractor Shall Comply With All Applicable Federal, State, County Regulations On Workers' Safety Standards And Related Training. h. All Contractor Personnel Involved In The Performance Of This Contract Shall Have Received Training Regarding The Handling Of Infectious Materials, And Emergency Procedures To Be Followed In Case Of A Spill Before Starting Work Under This Contract. i. Certification Of Such Training Shall Be Provided Within (fifteen) 15 Days Of Receiving Notice Of Award Of The Contract. Certification For Any New Contract Employees Shall Be Provided To The Contracting Officer Within Thirty (30) Days Of Receipt Of The Training. e. Contractor Submittals: a. Prior To Commencement Of Any Work, The Contractor And Employees Working On This Contract Shall Submit To The Cor And/or Contracting Officer: contractor Shall Be Properly Licensed By Federal, State And Local Authorities To Provide Pickup, Removal And Disposal Of Bio-hazardous Waste And Insured. contractor Shall Attach Copies Of Licenses, Permits, And Proof Of Insurance Indicated Above With Their Quote At Time Of Offer Due Date And Shall Maintain All Required Licensing, Permitting, And Insurance Throughout The Life Of The Contract. contractor Shall Provide Name, Address, Contact Name And Telephone Number Of All Disposal Facilities To Be Used Under This Contract, With Their Offer At Time Of Offer Due Date. contractor Shall Make Complete Distribution Of The Waste To A Reliable Licensed Facility Approved By All Federal, State, And Local Regulatory Bodies For Disposal. the Contractor Shall Identify A Person Who Shall Be Responsible For The Performance Of Work. The Name And Phone Number Shall Be Provided To The Contracting Officer At The Time Of Offer. the Contractor Shall Establish And Maintain A Complete Quality Control Program To Assure The Requirements Of The Contract Are Provided As Specified. The Contractor Shall Provide A Copy Of Their Quality Control Program To The Contracting Officer At The Time Of Offer. the Contractor Shall Develop And Submit To The Contracting Officer, A Copy Of Their Contingency Plan In The Event Of Vehicle Breakdown, Disposal Facility Breakdown, Natural Disaster, Or Employee Strike At The Time Of Offer. The Contingency Plan Will Include Notification Procedures For Informing The Contractor Officer Representative (cor)/generator Of Any Actuation Of The Contingency Plan To Prevent Possible Violation Of Interstate Laws. f. Contractor Qualifications: all Personnel Of The Awarded Contractor Must Have A Completed Tuberculosis Skin (tb) Test In Order To Work In Patient Areas. The Tb Skin Test Will Be At The Expense Of The Contractor And Proof Of The Test Must Be Submitted To The Contracting Officer Representative (cor) Prior To Any On-site Services Conducted At The Tvamc. contractor Must Provide A Copy Of The State Department Of Environmental Management, notification Of Permit By Rule Operations Solid Waste Collection Operation Permit, Transporter Permit. g. Manifest Documentation/report a. Contractor Will Make Pickups At The Designated Pick Up Points Between The Hours Of 8 Am And 2:30 P.m. (weekdays). b. The Contractor Shall Provide Tracking Of Medical Waste From The Point Of Pickup, Through Use Of An Epa, Deq For Applicable State, And Dot Approved Manifest System. c. The Contractor Shall Provide Hard Copy Documentation (manifest Sheets) To The Cor, Indicating Time And Date Of Pickup, Time And Date Of Autoclaving, And Weight Of Each Container Received At The Time Of Pick Up. d. Contractor Staff Shall Engage Only Authorized Ems Staff (cor Or Designee) To Sign Manifests Of Waste In Accordance With Dot And State Requirements. Contractor Shall Provide Final Copy Of Manifests Within Two (2) Weeks After The End Of The Month Of Service. e. Contractor Shall Provide The Weights Of Medical Waste Processed For Each Facility Site At The End Of Each Month. These Weights May Be Included On The Monthly Invoice But Must Be Provided Monthly. f. Contractor Will Provide All The Necessary Labels To Designate The Type Of Medical Waste Contained In Each Container (medical Waste) h. Quality Control/assurance (contractor): a. The Contractor Shall Establish And Maintain A Complete Quality Control/assurance Program To Assure The Requirements Of The Contract Are Provided As Specified. b. The Contractor Shall Provide A Copy Of Their Quality Control/assurance Plan To The Contracting Officer With Their Quote At Time Of Offer Due Date. i. Quality/performance Requirements Summary a. As Stated Above, The Contractor Shall Be Responsible For Their Own Internal Quality Control Program. The Government Will Perform Surveillance Of The Contractor's Performance Using The Performance Work Statement And The Performance Requirements Summary (see Technical Exhibit 1) On The Next Page To Determine If The Contractor Exceeds, Meets, Or Does Not Meet These Standards. The Fact That The Government Is Performing Surveillance Of The Contractor's Performance Does Not In Any Way Relieve The Contractor From Performing Their Own Surveillance And Maintaining Acceptable Quality Levels. b. Performance Requirements Summary Matrix: 1. The Government Shall Use These Standards To Determine Contractor Performance And Shall Compare Contractor Performance To The Acceptable Quality Level (aql). technical Exhibit 1 performance / Requirement Indicator performance Standard performance Measure (aql) monitoring Method / Method For Surveillance incentive waste Collection/pickup Form Both Rmw And Sharps Containers (sections 3a And 3b) within Time Specified 100% (no Deviation) direct Observation, Random Sampling By Cor And Customer Complaints positive Past Performance & Exercise Of Option Year Periods treat And Disposal Of Waste (section 3) dispose Of In Accordance With Osha, Epa, And Local, Stated, And Federal Regulations 100% (no Deviation) direct Observation, Random Sampling By Cor positive Past Performance & Exercise Of Option Year Periods provide Copies/access To Documentation (manifest Sheets) To The Cor, Indicating Time And Date Of Pickup, Time And Date Of Autoclaving, And Weight Of Each Container Received At The Time Of Pick-up (section 6) provide At The Time Of Pickup 100% (no Deviation) direct Observation, Random Sampling By Cor positive Past Performance & Exercise Of Option Year Periods pick-up, Disposal Documents The Contractor Shall Provide Copy Of Monthly Record Of The Weights For Medical Waste (manifests) Picked Up And Disposed Of. (section 6) final Documents Received Within 2 Weeks, Following The End Of The Month 100% (no Deviation) direct Observation, Random Sampling By Cor positive Past Performance & Exercise Of Option Year Periods (viii) Far 52.212-1, Instructions To Offerors Commercial Items (sep 2023), Applies To This Solicitation. The Following Provisions And Clauses Are Added As Addenda: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/index.asp far Number title date 52.204-7 system For Award Management oct 2018 52.204-16 commercial And Government Entity Code Reporting aug 2020 52.229-11 tax On Certain Foreign Procurements--- Notice And Representation jun 2020 852.233-70 protest Content/alternative Dispute Resolution oct 2018 852.239-75 information And Communication Technology Accessibility Notice feb 2023 addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Provisions Are Incorporated Into 52.212-1 As An Addendum To This Solicitation: the Offeror Shall Submit Their Quote On Company Letterhead. The Offeror S Quote Shall Include The Name, Address, And Telephone Number Of The Offeror, The Offeror S Uei# And Orca Document, In Sam At (https://sam.gov) , And A Completed Copy Of 52.212-3 Offeror Representations And Certifications- Commercial Items. All Fillable Documents Are Required For Submission. Submission Of Vaar 852.219-75 Certification Completely Filled Out Is Required. acknowledgement Or Signed Copy Of All Amendments Posted To The Solicitation And Signed 1449. all Offerors Must Meet The Small Business Size Standard Of $47m For Naics Code 562211 Hazardous Waste Treatment And Disposal At The Time Of Submission Of Quote And At The Time Of Award. All Offerors Must Be Registered In Veterans Small Business Certification () And Sam At The Time Of Quote Submittal. an Offeror Must Be Sdvosb Verified (reference Vaar 852.219-73) At Time Of Quote Submission And At Time Of Award. Vaar 852.219-75 Certification Are A Submission Requirement And Shall Be Submitted Electronically. an Offeror Shall Indicate In Its Quote Whether It Will (1) Self-perform 100% Of The Requirement, Or (2) Subcontract Any Portion Of The Requirement. If The Offeror Intends To Subcontract Any Portion Of The Requirement, The Offeror Shall Provide A Subcontracting Plan That Includes A Percentage Breakdown Evidencing How The Offeror Will Comply With The Limitations On Subcontracting In 13 Cfr 125.6(a)(1). Failure To Provide The Required Information May Result In An Offeror S Quote Being Rejected Without Further Consideration. If The Offeror Plans On Using Subcontractors, You Must Provide A Subcontracting Plan To Include: a. Business Name b. Business Size c. Work They Will Be Performing, To Include % Of Work On Contract d. % Of Payment To Be Receive Of Total Contract Amount 7. Price: The Offeror Shall Fill-in All Unit Prices And Totals For Each Clin As Well As The Total Amount Of The Price Quote In The Solicitation S Price Schedule. 8. Technical: The Offeror Shall Demonstrate In Its Quote In As Much Detail As Possible How It Will Meet The Tusacaloosa Va Medical Center, Tuscaloosa, Al- Regulated Medical Waste And Sharps Removal Services Requirement As Described In The Solicitation S Statement Of Work. 9. Past Performance: The Offeror Is Required To Provide A Minimum Of Two (2) Past Performance Reference For Similar Services Within The Last Four (4) Years, Either Governmental Or Commercial Entity, In Response To This Solicitation, To Include Place, Size, And Years Of Service Performed. If No Past Performance Is Available, You Must Address This In Your Offer. Past Performance Will Be Reviewed As Part Of The Responsibility Determination Only. 10. All Questions Should Be Emailed To Laterrica.sewell@va.gov By Thursday, January 30, 2025, At 10:00am Est.. No Late Submissions Will Be Accepted. All Responses To Questions Shall Be Incorporated Into A Written Amendment Posted To The Government Point Of Entry (gpe). The Offeror Is Encouraged To Monitor The Gpe, Sam Website With Respect To This Solicitation Because Any Amendments To This Solicitation Will Be Posted On The Website (https://.sam.gov). there Will Be No Automated Email Notification Of Amendments. 11. Quotes Must Be Received By Thursday, February 13, 2025, At 10:00am Est. Email Your Quote To Laterrica.sewell@va.gov. The Subject Line Must Have The Solicitation The Offeror Is Responding To Listed. There Will Be No Automated Email Notification Of Receipt Of Quotes. All Quotes Received Without Requested Documentation Will Not Be Considered. a. The Offeror Will Submit All Documents In Pdf Form, Preferably One Document, With No More Than Ten (10) Pages. Not Providing All The Required Documents Above Along With Not Following The Instructions For Submission Will Result In An Unacceptable Quote. (end Of Provision) ix. Far 52.212-2, Evaluation Commercial Items (nov 2021), Applies To This Solicitation. basis For Award: This Request For Quote (rfq) Is Issued In Accordance With Far 12 And In Conjunction With Simplified Acquisition Procedures Far 13.5. Evaluation Of Price And Other Factors Will Be Performed In Accordance With Procedures Outlined In Far 13.106-3. A Single Award Will Be Made To The Offeror Who Represents The Best Value Utilizing Comparative Analysis, Considering, Technical, Past Performance, And Price. the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: technical: The Technical Evaluator Will Evaluate The Offerors Quote To Fulfill This Requirement. The Offeror Will Show Its Understanding Of The Requirement And The Viability Of Its Quote By Demonstrating Its Plan Of Action To Provide This Service, Demonstration Of Knowledge Of The Service And Ability To Perform By Providing A Detailed Plan Of Equipment And Personnel Required To Fulfill The Need And The Procedures You Will Use While Executing The Requirement. this Description Shall Include: offer Must Be In Business For Two Or More Years. offeror Must Provide Capabilities Statement Specifying The Ability To Provide Service Directly Related To Regulated Medical Waste And Sharps Removal Services Outlined In The Statement Of Work (sow). details Of The Vendor S Internal Quality Assurance Plan. past Performance: The Offeror Is Required To Provide A Minimum Of Two (2) Past Performance References For Similar Services Within The Last Two (2) Years, Either Governmental Or Commercial Entity, In Response To This Solicitation, To Include Place, Size, And Years Of Service Performed. If No Past Performance Is Available, You Must Address This In Your Offer. Past Performance Will Be Reviewed As Part Of The Responsibility Determination Only. price. The Vendor Is Required To Quote A Fully Burdened Fixed Price For The Clin Structure As Shown In Section Vi. Insert The Quoted Unit And Extended Prices In Contract Line-item Number (clin) 0001 Through 4001. All Unit Prices Shall Be Represented In Two Decimal Positions Only. Example: $0.27, Not $0.27458. The Government Shall Evaluate Price To Determine If It Is Considered Fair And Reasonable In Accordance With Far Part 13.106-3. (b) Options. The Government Will Consider Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). This Includes Options Under Far 52.217-8, Option To Extend Services, Which Applies To This Solicitation. Evaluation Of Options Under Far 52.217-8 Will Be Accomplished By Adding Six Months Of The Quoter's Price For The Last Potential Period Of Performance Under This Contract To The Quoter's Total Price. For Example, If The Contract Includes Option Periods That Are Exercisable Under Far 52.217-9, The Quoter's Total Price For The Purpose Of Evaluation Will Include The Base Period, All Option Periods, And An Additional Six Months Of The Last Option Period. Quoters Must Price Only The Base And Option Periods Specified In The Contract Line-item Numbers (clins) And Shall Not Submit A Price For The Potential Six-month Extension Of Services Under Far 52.217-8. The Government Reserves The Right To Exercise The Option Under Far 52.217-8 Before The End Of Any Of The Contractor's Performance Periods And Will Be Exercised At The Price And/or Rates In Effect At The Time The Clause Is Exercised. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). a Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) The Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument In Paragraph (c)(1) In The Provision At 52.204 26, Covered Telecommunications Equipment Or Services Representation, Or In Paragraph (v)(2)(i) Of The Provision At 52.212 3, Offeror Representations And Certifications Commercial Products And Commercial Services. The Offeror Shall Not Complete The Representation In Paragraph (d)(2) Of This Provision If The Offeror Has Represented That It Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services In Paragraph (c)(2) Of The Provision At 52.204 26, Or In Paragraph (v)(2)(ii) Of The Provision At 52.212 3. (a) Definitions. As Used In This Provision Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (d) Representations. The Offeror Represents That (1) It [ ] Will, [ ] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds Will In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds Does In Paragraph (d)(2) Of This Section. (e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded Will In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded Does In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (end Of Provision) 52.204-29 Federal Acquisition Supply Chain Security Act Orders Representation And Disclosures (dec 2023) (a) Definitions. As Used In This Provision, Covered Article, Fascsa Order, Intelligence Community, National Security System, Reasonable Inquiry, Sensitive Compartmented Information, Sensitive Compartmented Information System, And Source Have The Meaning Provided In The Clause 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (b) Prohibition. Contractors Are Prohibited From Providing Or Using As Part Of The Performance Of The Contract Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Prohibition Is Set Out In An Applicable Federal Acquisition Supply Chain Security Act (fascsa) Order, As Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (c) Procedures. (1) The Offeror Shall Search For The Phrase Fascsa Order In The System For Award Management (sam)(https://www.sam.gov) For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If There Is An Applicable Fascsa Order Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (2) The Offeror Shall Review The Solicitation For Any Fascsa Orders That Are Not In Sam, But Are Effective And Do Apply To The Solicitation And Resultant Contract (see Far 4.2303(c)(2)). (3) Fascsa Orders Issued After The Date Of Solicitation Do Not Apply Unless Added By An Amendment To The Solicitation. (d) Representation. By Submission Of This Offer, The Offeror Represents That It Has Conducted A Reasonable Inquiry, And That The Offeror Does Not Propose To Provide Or Use In Response To This Solicitation Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Prohibited By An Applicable Fascsa Order In Effect On The Date The Solicitation Was Issued, Except As Waived By The Solicitation, Or As Disclosed In Paragraph (e). (e) Disclosures. The Purpose For This Disclosure Is So The Government May Decide Whether To Issue A Waiver. For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Subject To An Applicable Fascsa Order, And The Offeror Is Unable To Represent Compliance, Then The Offeror Shall Provide The Following Information As Part Of The Offer: (1) Name Of The Product Or Service Provided To The Government; (2) Name Of The Covered Article Or Source Subject To A Fascsa Order; (3) If Applicable, Name Of The Vendor, Including The Commercial And Government Entity Code And Unique Entity Identifier (if Known), That Supplied The Covered Article Or The Product Or Service To The Offeror; (4) Brand; (5) Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); (6) Item Description; (7) Reason Why The Applicable Covered Article Or The Product Or Service Is Being Provided Or Used; (f) Executive Agency Review Of Disclosures. The Contracting Officer Will Review Disclosures Provided In Paragraph (e) To Determine If Any Waiver May Be Sought. A Contracting Officer May Choose Not To Pursue A Waiver For Covered Articles Or Sources Otherwise Subject To A Fascsa Order And May Instead Make An Award To An Offeror That Does Not Require A Waiver. (end Of Provision) 52.233-2 Service Of Protest (sep 2006) Protests, As Defined In Section 33.101 Of The Federal Acquisition Regulation, That Are Filed Directly With An Agency, And Copies Of Any Protests That Are Filed With The Government Accountability Office (gao), Shall Be Served On The Contracting Officer (addressed As Follows) By Obtaining Written And Dated Acknowledgment Of Receipt From: vaar 852.233-71 Alternate Protest Procedure (oct 2018) (a) As An Alternative To Filing A Protest With The Contracting Officer, An Interested Party May File A Protest By Mail Or Electronically With: Executive Director, Office Of Acquisition And Logistics, Risk Management And Compliance Service (003a2c), Department Of Veterans Affairs, 810 Vermont Avenue Nw, Washington, Dc 20420 Or Email: Edprotests@va.gov. (b) The Protest Will Not Be Considered If The Interested Party Has A Protest On The Same Or Similar Issue(s) Pending With The Contracting Officer. (end Of Provision) (x) Far 52.212-3 Offeror Representations And Certifications Commercial Items (nov 2023) Applies To This Solicitation. Offerors Shall Submit A Completed Copy Of Far 52.212-3 With Its Offer. (xi) Far 52.212-4, Contract Terms And Conditions Commercial Items (nov 2023) Applies To This Solicitation. The Following Provisions And Clauses Are Added As Addenda: far 52.252-2, Clauses Incorporated By Reference (feb 1998) this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): http://www.acquisition.gov/far/index.html (far) http://www.va.gov/oal/library/vaar/index.asp (vaar) (end Of Clause) far Number title date 52.203-17 contractor Employee Whistleblower Rights nov 2023 52.204-4 printed Or Copied Double-sided On Postconsumer Fiber Content Paper may 2011 52.204-13 system For Award Management Maintenance jun 2020 52.204-18 commercial And Government Entity Code Maintenance aug 2020 52.228-5 insurance Work On A Government Installation jan 1997 852.201-70 contracting Officer's Representative dec 2022 852.203-70 commercial Advertising may 2018 52.217-8 Option To Extend Services (nov 1999) The Government May Require Continued Performance Of Any Services Within The Limits And At The Rates Specified In The Contract. These Rates May Be Adjusted Only As A Result Of Revisions To Prevailing Labor Rates Provided By The Secretary Of Labor. The Option Provision May Be Exercised More Than Once, But The Total Extension Of Performance Hereunder Shall Not Exceed (6) Six Months. The Contracting Officer May Exercise The Option By Written Notice To The Contractor Within (30) Thirty Days Of Contract Expiration. (end Of Clause) 52.217-9 Option To Extend The Term Of The Contract (mar 2000) (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within (30) Thirty Days Of Contract Expiration; Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least (60) Sixty Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause. (c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed (5) Five Years. (end Of Clause) â supplemental Insurance Requirements â  In Accordance With Far 28.307-2 And Far 52.228-5, The Following Minimum Coverage Shall Apply To This Contract: â  (a)â  Workers' Compensation Andâ employersâ liability:â  Contractors Are Required To Comply With Applicable Federal And State Workers' Compensation And Occupational Disease Statutes.â  If Occupational Diseases Are Not Compensable Under Those Statutes, They Shall Be Covered Under The Employer's Liability Section Of The Insurance Policy, Except When Contract Operations Are So Commingled With A Contractor's Commercial Operations That It Would Not Be Practical To Require This Coverage.â  Employer's Liability Coverage Of At Least $100,000 Is Required, Except In States With Exclusive Or Monopolistic Funds That Do Not Permit Workers' Compensation To Be Written By Private Carriers. â  (b)â  General Liability:â $500,000.00â per Occurrences. â  (c)â  Automobile Liability:â $200,000.00â per Person;â $500,000.00â per Occurrence Andâ $20,000.00 Property Damage. â  (d)â  The Successful Bidder Must Present To The Contracting Officer, Prior To Award, Evidence Of General Liability Insurance Without Any Exclusionary Clauses For Asbestos That Would Void The General Liability Coverage. (end Of Clause) vaarâ 852.219-73â â va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businessesâ (jan 2023)â (deviation) â  (a)â definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb : â â â  (1) Means A Small Business Concern â â â â â  (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar 802.201, Surviving Spouse Definition); â â â â â  (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Suchâ veteran; â â â â â  (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitationâ document; â â â â â  (iv) The Business Has Beenâ certifiedâ for Ownership And Control Pursuant To 38â u.s.c. 8127, 13 Cfr 128, Andâ is Listedâ as Certifiedâ inâ the Sba Certification Database Atâ https://veterans.certify.sba.gov/; And â â â â â  (v) The Businessâ agrees Toâ comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size,â governmentâ contracting,â and The Veteran Small Business Certification Programâ at 13 Cfr Parts 121,â 125,â and 128. â â â  (2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). â â â  (3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). â â â  (4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)). â â â  (5) The Termâ  Sdvosb Participant  orâ certified Sdvosbâ means A Small Business That Has Been Certified In The Sba Veteran Small Business Certification Program And Listed In The Sba Certification Database (see 13 Cfr 128.102). â  (b)â general.â in Order Forâ a Concern To Submit An Offer And Be Eligible For The Award Of An Sdvosb Set-aside Or Sole Source Contract, The Concern Must Qualify As A Small Business Concern Under The Size Standard Corresponding To The Naics Code Assigned To The Contract And Be Listed As An Sdvosb Participant In The Sba Certification Database As Set Forth In 13 Cfr 128. â â â  (1) Offers Received From Entities That Are Notâ certifiedâ sdvosbsâ and Listed In The Sba Certification Databaseâ at The Time Of Offer Shall Not Be Considered. â â â  (2) Any Award Resulting From This Solicitation Shall Be Made To Aâ certifiedâ sdvosbâ listed In The Sba Certification Databaseâ who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. â â â  (3) The Requirements In This Clause Apply To Any Contract,â orderâ or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. â  (c)â representation. Pursuant To 38 U.s.c. 8127(e), Onlyâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligibleâ and Certifiedâ sdvosb As Defined In This Clause,â 13 Cfr 121, 125, And 128, And Vaar Subpart 819.70. â  (d)â agreement/los Certification.â when Awarded A Contract Action, Including Orders Under Multipleaward Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size,â and Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontractingâ (los)â requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6.â for The Purpose Ofâ limitations On Subcontracting, Onlyâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Requiredâ losâ certification Requirements In This Solicitation (see 852.219 75 Or 852.219 76 As Applicable). These Requirements Are Summarized As Follows: â â â  (1)â services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/ Vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract. â â â  (2)â supplies/products. â â â â â  (i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. â â â â â  (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13â cfrâ 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. â â â  (3)â general Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database. â â â  (4)â special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Database. â â â  (5)â subcontracting. An Sdvosbâ subcontractorâ must Meet The Naics Size Standard Assigned By The Prime Contractor And Beâ certified Andâ listed Inâ the Sba Certification Databaseâ to Count As Similarly Situated. Any Work That A First Tier Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. â â (e)â required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: [â ]â by The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or [â ]â by The End Of The Performance Period For Each Order Issued Under The Contract. â  (f)â joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Complies With The Requirements In 13 Cfrâ 128.402 And The Managing Joint Venture Partner Makes The Representations Under Paragraph (c) Of This Clause.â a Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. â  (g)â precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sbaâ veteran Small Business Certificationâ program And The Va Veterans First Contracting Program. â  (h)â misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company S Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406 2 Causes For Debarment). vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation) (a) Pursuant To 38 U.s.c. 8127(l)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: (i) X Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (ii) General Construction. In The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (iii) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/ Vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating 18 U.s.c. 1001. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. certification i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror]. printed Name Of Signee: ___________ printed Title Of Signee: _____________ signature: ____________ date: ______________ company Name And Address: _______________ (end Of Clause) (xii) Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (feb 2024), Applies To This Solicitation. (xiii) N/a (xiv) N/a (xv) Offers Are Due Not Later Thursday, February 13, 2025, At 10:00 Am Est. Offers Must Be Submitted Electronically Via Email To Laterrica.sewell@va.gov . Questions Must Be Submitted Via Email To Laterrica.sewell@va.gov By Thursday, January 30, 2025, At 10:00 Am Est. No Late Submissions Will Be Accepted. (xvi) For Additional Information, Please Contact The Contracting Officer, Laterrica Sewell Via E-mail To Laterrica.sewell@va.gov .
2021-2030 of 2032 archived Tenders