Solid Waste Tenders
Solid Waste Tenders
Municipality Of Barcelona, Sorsogon Tender
Solid Waste Management
Philippines
Closing Soon7 Feb 2025
Tender AmountPHP 156.5 K (USD 2.6 K)
Description: Solid Waste Management, Including 3ps Program, Waste Segregation Training, Origon And The Like (supply & Delivery Of Commercial Rice) , Food Stuff ,municipality Of Barcelona, Sorsogon
010440001698 Republican state institution Department of the Border Service of the National Security Committee of the Republic of Kazakhstan for Pavlodar region Tender
Others
Kazakhstan
Closing Soon6 Feb 2025
Tender AmountRefer Documents
Description: Purchase of Services for Removal of Solid and Liquid Waste for the Needs of the Department
Municipality Of San Miguel, Bulacan Tender
Transportation and Logistics
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 10 Million (USD 171 K)
Description: Procurement Of Hauling Services For The Disposal Of Solid Waste , Waste Management And Recycling ,municipality Of San Miguel, Bulacan
U S COAST GUARD USA Tender
Machinery and Tools
United States
Closing Soon7 Feb 2025
Tender AmountRefer Documents
Description: The Coast Guard Requires The Supply Of Two (2) Solid Waste Submersible Pumps And One
(1) Control Panel. No Labor Will Be Required From The Vendor. scope Of Work: Contractor Shall Furnish Two (2) Barnes Sh Model Number 3shvc50n4
submersible Pumps And (1) Cox Research & Design Control Panel Model Number Cp-5071 With Four
(4) Level Control Floats. No Alterations Outside Of The Statement Of Work Criteria Are Authorized
without Permission From The Contracting Officer (ko) Or Contracting Officers Representative (cor) 1. Performance Requirements: Contractor Shall Furnish Equipment As Outline Below. All
associated Equipment Shall Be Approved And Designed To Work With Stated Model Number.
a) Two (2) Barnes Sh Model 3shvc50n4 Electric Submersible Pumps
3” Ansi Flange Discharge
5 Hp
3-phase, 480v Electrical Service
gorman Rupp Guide Shoe Retrofit b) Cox Research & Design Duplex Alternating Control Panel, Model Cp-5071
nema 4x Ss Enclosure
four (4) Level Control Floats
3-phase/480v Electrical Service 2. Contract Timeline: The Contractor Shall Provide All Required Information And Complete
this Contract Within This Time Schedule, Unless Approved By The Contracting Officerrepresentative. Any Delays On Materials Or Labor Issues That Will Impede The Completion Of Thecontract Shall Be Documented With The Contracting Officer Or Their Representative.
a) Provide All Required Submittals To The Contracting Officer Or Contracting Officers
representative Within 14 Calendar Days After Contract Award.
b) The U.s. Coast Guard Will Have 7 Calendar Days To Review The Submittals And Respond To
contractor.
c) Contractor Shall Provide Projected Delivery Schedule During Proposal And Provide A Firm
delivery Date Within 14 Calendar Days After The Contract Has Been Awarded.
d) The Contractor, Upon Receiving Notification That The U.s. Coast Guard Has Approved The
submittals And Having Received The Contractors Firm Delivery Date Schedule, Will Have 14
calendar Days To Begin Work On The Project & 30 Calendar Days To Complete. The
contractor Shall Notify The Contracting Officer Of Any Long Lead Time Delivery Of
equipment, So That The Contracting Officer Can Modify The Delivery Date Of The Contract. submittals: Once Awarded, The Following List Of Submittals Required At Time Of Delivery And
defines The Specific Minimum Requirements For This Contract.
c) Manufactures Technical Publications And Guides
d) Warranty Information warranty: Contractor Shall Provide A One-year Warranty For All Materials. All Warranty Claims
by The Coast Guard Shall Be Honored By The Vendor At No Additional Cost To The Coast Guard. yes, Equivalent Brands Are Acceptable As Long As They Match The Standard. The Issue You May Run Into Is The Physical Layout Of The Pump In Order To Mount In Our Lift Station. I Have Attached Pictures Of The Current Pump.
221-230 of 573 active Tenders