Software Tenders
Software Tenders
Development Bank Of The Philippines Tender
Software and IT Solutions
Philippines
Closing Soon27 Nov 2024
Tender AmountPHP 90.8 Million (USD 1.5 Million)
Details: Description 1. The Development Bank Of The Philippines, Through The Corporate Budget, Intends To Apply The Sum Of Ninety Million Eight Hundred Fifty-four Thousand Four Hundred Pesos (php 90,854,400.00), Inclusive Of Taxes Being The Approved Budget For The Contract (abc) To Payments For The Contract For The Above-cited Project. 2. The Development Bank Of The Philippines Now Invites Bids For The Above-cited Procurement Project. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 3. Delivery And Installation Shall Commence From The Date Of Receipt Of Notice To Proceed And Shall Be Completed Within One Hundred Twenty (120) Calendar Days. The 4-year Subscription, Support, And Maintenance Shall Be Reckoned From The Date Of Activation Of Licenses. 4. Bidders Must Have Completed Within The Last Five (5) Years From The Date Of Submission And Receipt Of Bids, Either A Single Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Or At Least Two (2) Contracts Similar To The Project, The Sum Of Which Must At Least Be Equivalent To Fifty Percent (50%) Of The Abc, Provided, That The Largest Of The Similar Contracts Must At Least Be Twenty Five Percent (25%) Of The Abc. Similar Contract Refers To “supply/delivery/installation/services Of Oracle Database Hardware Or Software”. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 5. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 6. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 7. Prospective Bidders May Obtain Further Information From The Development Bank Of The Philippines And Inspect The Bidding Documents At The Address Given Below Mondays To Fridays From 9:00 Am To 4:30 Pm. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On 6 November 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos (php 50,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Via Physical Presentation Of Official Receipt (or) (original). Bidders Shall Also Be Given The Printed Format Of The Bidding Documents Provided That Bidders Shall Pay The Applicable Bidding Documents Fee At Least The Day Before The Deadline For Submission Of Their Bids. Bac Secretariat Unit - Procurement And Inventory Management Department (pimd), 6th Floor, Development Bank Of The Philippines (dbp)-head Office, Sen. Gil Puyat Ave., Cor. Makati Ave., Makati City 9. The Following Is The Schedule Of Bidding Activities: == Issuance And Availability Of Bidding Documents == Date/time: Starting 6 November 2024, 9:00 Am To 3:00 Pm Only (excluding Weekends And Holidays) Venue: 6/f Bac Secretariat, Dbp Head Office, Makati City == Pre-bid Conference* == Date/time: 13 November 2024 (wednesday), 10:15 Am Venue: 12/f Suite 5, Dbp Head Office, Makati City == Submission Of Eligibility Documents, Technical And Financial Proposals == Date/time: 27 November 2024 (wednesday), On Or Before 8:30 Am Venue: 6/f Bac Secretariat, Dbp Head Office, Makati City == Opening Of Eligibility Documents, Technical And Financial Proposals == Date/time: 27 November 2024 (wednesday), 9:00 Am Venue: 12/f Suite 5, Dbp Head Office, Makati City *note: The Pre-bid Conference Shall Be Open To All Interested Parties. Bidders May Attend The Pre-bid Conference And Bid Opening Through Videoconferencing Via Zoom Meeting App. Bidders Who Wish To Attend/participate Via Zoom Meeting Must Coordinate With The Bac Secretariat Through Email At Least One (1) Day Before The Scheduled Bid Activity And Provide Their Contact Information (name Of Company, Name Of Representative, Email Address, Contact Number). Bidders Are Advised To Send Their Authorized Technical And/or Administrative Representatives Who Will Prepare The Bid Documents To Ensure Completeness And Compliance Of Bids. Bidders Are Prohibited From Recording (audio, Video Or Picture Format) The Proceedings Of The Pre-bid Conference. 10. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Above Or Via (ii) Online Or Electronic Submission On Or Before Deadline As Specified On The Above Schedule. Late Bids Shall Not Be Accepted. 11. Electronic Bids Shall Only Be Submitted Through The Bac’s Microsoft Onedrive, As The Official Electronic/online Submission Facility. Bidders Shall Inform And Coordinate With The Bac Secretariat (bacsecretariat@dbp.ph) On Their Intent To Submit Their Bids Online At Least One (1) Day Before The Scheduled Deadline Of Submission. Bids Which Are Not Submitted Through Ms Onedrive And/or Not Password-protected Shall Be Disqualified. Please Refer To The Bid Data Sheet For The Detailed Guidelines And Procedure For Electronic/online Submission. 12. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 13. The Development Bank Of The Philippines Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Dbp Bids And Awards Committee Secretariat 6/f Procurement And Inventory Management Department Dbp Head Office, Sen. Gil J. Puyat Corner Makati Avenue, Makati City Trunkline: (+632) 8818-9511 Local 2610 Or 2606 Email: Bacsecretariat@dbp.ph Bid Reference No. G-2024-39 15. You May Visit The Following Websites: For Downloading Of Bidding Documents • Dbp Website: Https://www.dbp.ph/invitations-to-bid/ • Philgeps Website: Https://philgeps.gov.ph/ Reminder To Bidders: • Please Be Informed That Dbp Exercises Zero Tolerance For All Types Of Fraud Including Illegal Practices, Corruption And Malpractices. Dbp Officers And Employees Shall Act Ethically And Lawfully In All Transactions And Dealing With Stakeholders Avoiding Any Appearance Of Irregularity That Could Erode The Trust And Confidence In The Bank As An Institution And As The Government As A Whole. • Dbp Cautions The Public In Dealing With Individuals Claiming Association With The Bank, Especially Those Posing As Bac Members For Any Form Of Monetary Solicitation Or Support. Dbp Does Not Condone Illegal Acts And Disowns Any Responsibility For Transactions Made With Unauthorized Individuals.
George County Tender
Telecommunication Services
United States
Closing Date9 Dec 2024
Tender AmountRefer Documents
Details: Request For Proposals (rfp) For 911 Dispatch Radio System Notice Is Hereby Given That Board Of Supervisors Of George County, Mississippi, Will Receive Electronic And Sealed Proposals In The Board Room, George County Administrative Building, 329 Ratliff Street, Lucedale, Ms, 39452, Until 10:00 A.m. On Monday, The 9th Of December, 2024, For The Following: P25 Digital Trucked Radio System To Improve George County’s 911 Dispatch & Emergency Communication Center. Proposals Are Invited For All Materials, Labor, Tolls, And Services Necessary To Construct, Install, And Connect: P25 700/800 Mhz Digital Trucked Radio System 911 Dispatch Consoles For A P25 System With Video Displays, Furniture, And Cabling Radio Equipment For Portable, Mobiles, Control Stations The Entire 151 Pages Rfp, Including Contract Terms, Drawings And Specifications, Are On File At The George County Administrative Office At 329 Ratliff Street, Lucedale, Ms 39452, (601) 947-7506 During Regular Business Hours. The Official Request For Proposals (rfp) And Bid Documents Can Be Downloaded From Central Bidding At Www.centralbidding.com. All Electronic Rfp Responses, Including The Point-by-point Response And Associated Attachments, Should All Be Submitted Via The Responsive.io Website. All Printed And Sealed Rfp Proposals, Including Point-by-point Responses And Attachments, Should Be Mailed Or Delivered To The Chancery Clerk At 355 Cox Street, Lucedale, Ms 39452. All Bid Envelopes Should Contain The Bidder’s Name And Mailing Address On The Outside Of The Envelope And Reference To This Rfp. A Mandatory Pre-proposal Conference And Site Visit For All Interested Vendors Will Be Held Wednesday, Nov. 06, 2024 At 10 A.m. Starting In The County Administration Building (329 Ratliff Street, Lucedale, Ms). The Rfp Response Shall Be Divided Into Two Sections: 1) Technical And 2) Pricing. All Rfp Responses Including The Point-by-point Response And Associated Attachments Should All Be Submitted Via The Responsive.io/george County, Ms Radio System Rfp. To Keep The Technical Proposals And Pricing Proposals Separate, Vendors Must Submit These Section Responses Separately To The Corresponding Rfp. The Technical Portion Of The Rfp Is Available At Responsive.io/george County, Ms Radio System Rfp/technical. The Pricing Portion Of The Rfp Is Available At Responsive.io/george County, Ms Radio System Rfp/pricing. Do Not Put Your Price In The Technical Proposal Or The Entire Proposal Will Be Disqualified. Computer Aided Dispatch (cad) Software Will Not Be Included In This Rfp. To Access The Rfp Technical Section This Link Should Be Used. Http://app.rfpio.com/survey/public/651c47e1fde9cd7d7785f835_668c4c5c0c28c5215a41ba78/george-county-mississippi-technical-sectionhttp://app.rfpio.com/survey/public/651c47e1fde9cd7d7785f835_668c4c5c0c28c5215a41ba78/george-county-mississippi-technical-section To Access The Separate Pricing Section This Link Should Be Used. Http://app.rfpio.com/survey/public/651c47e1fde9cd7d7785f835_670d5ea4f0f5cd5c4ee215d6/george-county-mississippi-pricing The Rfp Opening Of The Pricing Proposal Will Be Public. The County Will Discuss And Accept Proposal Recommendations At The Next Regular Scheduled Board Meeting. All Submitting Vendors Will Be Notified Of The Results. All Rfp Responses Become Property Of The County. For Any Questions Relating To The Electronic Process, Please Email Bos@georgecountyms.us. The Project’s Anticipated Time Of Completion Of Procurement For Phase 1 Through 3 In No Greater Than Six (6) Months Following The County’s Written Order To Commence (notice To Proceed). The Maximum Time Allowable For Completion Of Phase 1 Through Phase 3 Is Three Hundred Sixty-five (365) Calendar Days Following The County's Written Order To Commence. The Project’s Anticipated Time For Completion Of Procurement For Phase 4 Is Not Greater Than Eighteen (18) Months From Notice To Proceed. The Project Will Not Be Deemed Completed Until All Radio Equipment Has Been Installed; All Training Has Been Completed; Receipt Of Configuration Documentation Has Occurred; And A Certificate Of Substantial Completion Has Been Issued By The Consultant For Any Remaining Punch List Items. Proposals Must Be Accompanied By A “proposal Guarantee” Consisting Of A Bid Bond, Cashier’s Check Or Certified Check In The Amount Of 5 Percent Of The Amount Of The Bid. The Successful Bidder Will Be Required To Furnish A “payment And Performance Bond” If The Bid Equals Or Exceeds $25,000. On Bids Which Equal Or Exceed $75,000; A “certificate Of Responsibility” Classification Issued By The Mississippi State Board Of Contractors Will Be Stated In The Electronic Response Under Vendor Info Or Vendor Certifications Or Written On The Outside Of The Sealed Envelope Containing The Responses. The Ability To Obtain Any Insurance Required By The Contract Documents Which Does Not Require Proof Of Coverage To Be Contained In The Submitted Bid (such As Bid Bonds), Must Be Demonstrated In The Bid By The Means Specified In The Contract Documents. Proof Of Actual Insurance Coverage Must Be Submitted Within Five (5) Business Days From The Bid Acceptance. In Compliance With The Laws Of The State Of Mississippi, In Choosing Materials For The Project, The Successful Bidder Will Be Given Preference To Materials Grown, Produced, Prepared, Made Or Manufactured Within The State Of Mississippi. The Foregoing Notwithstanding, No Preference Will Be Given To Materials Grown, Produced, Prepared, Made Or Manufactured In The State Of Mississippi When Other Materials Of Like Quality Produced Outside The State Of Mississippi May Be Purchased Or Secured At Less Cost, Or Any Other Materials Of Better Quality Produced Outside The State Of Mississippi Can Be Secured At A Reasonable Cost. Bids May Be Held By George County, Mississippi, For A Period Not To Exceed Sixty (60) Days From The Date Of The Opening Of Bids For The Purpose Of Reviewing The Bids And Investigating The Qualifications Of Bidders, Prior To Awarding Of The Contract. The County Reserves The Right To Reject Any And All Bids And To Waive Any Informality In The Proposal Accepted. All Persons Having A Contract With George County Must Adhere To The County's Policy Concerning Non?discrimination Without Regard To Race, Creed, Color, Age, Sex, National Origin, Or Handicap. The George County Board Of Supervisors Approved This Rfp For Public Publication And Posting On 7th Day Of October, 2024 During A Regularly Schedule Boarding Meeting. Publish Dates: Oct. 17, 2024 And Oct. 24, 2024
CITY OF CARCAR, CEBU Tender
Electronics Equipment...+2Publishing and Printing, Electrical and Electronics
Philippines
Closing Soon26 Nov 2024
Tender AmountPHP 298.5 K (USD 5 K)
Details: Description Item No. Item Description Qty. Unit Unit Price Total Price To Be Used At The Brgy. Affairs Office, City Traffic Management Office & Lydo Computer Set 3 Units Specifications: Processor: 3.7ghz, 6mb Smart Cache, Lga1200, 14nm, 4 Cores, 8 Threads Motherboard: Compatible To Processor, Nvme M.2, (db15,hdmi) Memory: 8gb, Ddr4-2666 Storage: 1tb M.2 2280 Nvme Ssd Power Supply: Atx 550w 1 X 120mm Fan, 7sata, 80plus-bronze Chassis: Mid Tower Case W/ Tempered Glass Side Panel, 1 Fan (black) Monitor: 21" Led Monitor Black (vga Hdmi) Keyboard And Mouse: Usb Type Bundle Keyboard & Mouse Ups: Input/output 220va, Capacity Va/wattage 650va/455watts, Black Avr: High Performancxe, 220v 50-60hz 3 X 220v Socket, Max Capacity: 50va, Fuse 5a, Solid State Electronic Device Printer 3 Units Specification: Print, Scan, Copy, Fax With Adf Printing Technology: Print Method: On-demand Inkjet (piezoelectric) Printer Language: Esc/p-r, Esc/p Raster Nozzle Configuration: 180 X 1 Nozzles Black, 59 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 5760 X 1440 Dpi Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 69 Sec Per Photo (border) / 90 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 33 Ppm / 15 Ppm*2 Iso 24734, A4 Simplex (black / Colour): Up To 10 Ipm / 5.0 Ipm*2 First Page Out Time From Ready Mode (black / Colour): Approx. 10 Sec / 16 Sec*2 Copying: Maximum Copies From Standalone: 99 Copies Reduction / Enlargement: 25 – 400 % Maximum Copy Resolution: 600 X 600 Dpi Maximum Copy Size: Legal Iso 29183, A4 Simplex Flatbed (black / Colour): Up To 7.7 Ipm / 3.8 Ipm Scanning: Scanner Type: Flatbed Colour Image Scanner Sensor Type: Cis Optical Resolution: 1200 X 2400 Dpi Maximum Scan Area: 216 X 297 Mm Scanner Bit Depth (colour): 48-bit Input, 24-bit Output Scanner Bit Depth (grayscale): 16-bit Input, 8-bit Output Scanner Bit Depth (black & White): 16-bit Input, 1-bit Output Scan Speed: Scan Speed (flatbed / Adf (simplex)): 200dpi, Black: 12 Sec / Up To 4.5 Ipm, 200dpi, Colour: 29 Sec / Up To 4.5 Ipm Adf Specifications: Support Paper Thickness: 64 – 95 G/m2 Paper Capacity: 30 Pages (a4), 10 Pages (legal) Lcd Screen: 1.44" Colour Lcd Printer Software: Scansmart Paper Handling: Number Of Paper Trays: 1 Photo Paper Output Capacity: Up To 30 Sheets Of Plain Paper (80 G/m2), Up To 20 Sheets Premium Glossy Photo Paper Maximum Paper Size: 215.9 X 1200 Mm A6, Hagaki (100 X 148 Mm), 5 X 7", 5 X 8", 4 X 6", Envelopes: #10, Dl, C6 Interface: Usb: Usb 2.0 Network: Ethernet, Wi-fi Ieee 802.11b/g/n, Wi-fi Direct Network Protocol: Tcp/ipv4, Tcp/ipv6 Network Management Protocols: Snmp, Http, Dhcp, Bootp, Apipa, Ping, Ddns, Mdns, Slp, Wsd, Lltd Electrical: Rated Voltage: Ac 220 – 240v, Rated Frequency: 50 – 60 Hz Operating: 12 W, Sleep: 0.7 W, Power Off: 0.2 W, Standby: 4.5 W Accessories: Ink Bottles Black 003, Cyan 003, Magenta 003, Yellow 003 1x Usb Printer Cable 1x Power Cable To Be Used By The Videographer / Photographer Computer Set 1 Unit Processor: 25mb Smart Cache, 12mb L2 Cache, 5.0ghz, Max. Turbo Frequency, 2.7 Ghz Base Frequency, Fclga 1700, 128 Gb Max Memory Motherboard: Supports The Above Processors; Dual Channel Non-ecc Unbuffered Ddr4; 2 Dimms; Gbe Lan With Bandwidth Management, High Quality Audio Capacitors And Audio Noise Guard Memory: 16gb, Ddr4-3200 Storage: 1tb M.2 2280 Nvme Ssd Power Supply: Atx 12v 700w, 24+4+4 Pin + 2 Molex, 2 Sata, Power Big Fan 80-plus Bronze Videocard: 2gb 64-bit Gddr5 Hdmi Dvi Graphics Card Monitor: 21" Led Monitor Black (vga Hdmi) Keyboard And Mouse: Usb Type Bundle Keyboard & Mouse With Mouse Pad Avr: High Performance, 220v 50-60hz 3 X 220v Socket, Max Capacity: 50va, Fuse 5a, Solid State Electronic Device To Be Used At The Mayor's Office Laptop 2 Units Specifications: Processor: 12mb Smart Cache, 10 Cores, 12 Threads, Up To 4.6ghz Performance-core Max Turbo Frequency, 15w Base Power, Deep Learning Boost: Yes, Fcbga1744 Socket Supported, Mobile Vertical Segment, Directx 12.1 Support Memory: 8gb, Ddr4, 2666mhz Storage: 512gb, M.2, Pcie Nvme Solid State Drive Graphics: Uhd Graphics Screen: 15.6 Inch Fhd (1920x1080), 120hz, 250nits, Anti-glare, Led Backlit, Narrow Border Display Wireless: Realtek Wi-fi6 Rtl8852be, 2x2, 802.11ax, Mu-mimo, Bluetooth Wireless Card Os And Office: Windows 11 Home / Single Language English + Office Home & Student 2021 Bundle Bag: Essential Backpack 15 Color: Carbon Black Total
Philippine Textile Research Institute Tender
Others
Philippines
Closing Date16 Dec 2024
Tender AmountPHP 4 Million (USD 67.8 K)
Details: Description Invitation To Bid 1. The Philippine Textile Research Institute (ptri), Through The Gaa And Gia Projects Intends To Apply The Sum Of Sixteen Million Seven Hundred Sixty Thousand Nine Hundred Sixty-one Pesos And Eighty Centavos (php 16,760,961.80) Being The Total Abc To Payments Under The Contract Of The Following Procurement: Item Particulars Solicitation Number Fund Source Abc 1 One (1) Lot Universal Testing Machine, 50 Kn 2409/0861 Dost-gia Smarter Onelab For Industry 4.0 Through Testing And Calibration, Education, And Discovery (onelab For Ted) Php 6,260,961.80 2 One (1) Lot Biosafety Cabinet 2409/0854 Dost-gia: Biomedtex 1 “biocompatible Electrospun Nanofiber-based Scaffolds For Drug Delivery And Wound Healing (bionanoscaffolds)” Php 1,500,000.00 3 One (1) Lot Medical Braiding Machine 2409/0865 Dost-gia: Biomedtex 2 “biofunctional And Sustainable Silk-based Sutures (biosilktures)” Php 3,500,000.00 4 One (1) Lot Automated Electrospinning Machine 2409/0867 Dost-gia: Biomedtex 1 “biocompatible Electrospun Nanofiber-based Scaffolds For Drug Delivery And Wound Healing (bionanoscaffolds)” Php 4,000,000.00 5 One (1) Lot Lca Analysis Software 2410/0966 Dost-gia “assessing The Environmental Footprint Of The Bamboo Textile Production: A Life Cycle Analysis (lca) Of The Bamboo Textile Fiber (btf) Innovation Hubs” Php 1,500,000.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Ptri Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 90 Calendar Days For Item Nos. 1,2,4 And 5 And 120 Calendar Days For Item No. 3 Both Upon Receipt Of The Approved Ntp. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Ptri And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On 19 November 2024 To 10 December 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 1,102.50 For Item No. 1, Php 1,500.00 For Item No. 2, Php 2,350.00 For Item No. 3, Php 2,255.00 For Item No. 4, And Php 1,785.60 For Item No. 5 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Ptri Will Hold A Pre-bid Conference On 27 November 2024, (wednesday) At 09:00 A.m. For Item No. 1; 10:00 A.m. For Item No. 2; 11:00 A.m. For Item No. 3; 1:00 P.m. For Item No. 4; And 2:00 P.m. For Item No. 5, Through Video Conferencing Or Webcasting Via Zoom, Which Shall Be Open To Prospective Bidders As Least One (1) Hour Before The Conduct Of Pre-bid Conference. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before 16 December 2024, (monday) From 8:00 A.m. To 9:00 A.m. For Item No. 1; 9:00 A.m. To 10:00 A.m. For Item No. 2; 10:00 A.m. To 11:00 A.m. For Item No. 3; 12:00 N.n To 1:00 P.m. For Item No. 4; And 1:00 P.m. To 2:00 P.m. For Item No. 5. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 16 December 2024 (monday) At 09:00 A.m. For Item No. 1; 10:00 A.m. For Item No. 2; 11:00 A.m. For Item No. 3; 1:00 P.m. For Item No. 4; And 2:00 P.m. For Item No. 5 At The Ptri Training Room, 3rd Floor Ptri Main Building, Gen. Santos Ave., Bicutan, Taguig City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bidders Shall Submit Two (2) Sets Of Documents. Original And Copy 1, Duly Sealed, Labeled And Countersigned. Each Set Contains Two (2) Envelopes, One (1) Technical, And One (1) Financial Proposal. The Two (2) Sets I.e. Original And Copy 1, Must Be Contained In An Outer Envelope/packaging Duly Sealed, Labeled And Countersigned. All Pages Must Be Signed By The Duly Authorized Staff/personnel. The Labels Must Contain The Accurate Philgeps Reference Number. 11. The Ptri Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Ms. Marilou G. Agustin / Mr. Carlo M. Bahil Bac Secretariat Philippine Textile Research Institute General Santos Avenue, Bicutan, Taguig City Bacsecretariat@ptri.dost.gov.ph Tel No. (02) 8837-2072 (loc. 2373) Or Tex./fax No. (02) 8837-074 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://www.ptri.dost.gov.ph/ 19 November 2024 ______________________________________ Evangeline Flor P. Manalang Bac Chairperson
Oriental Mindoro Tender
Software and IT Solutions
Philippines
Closing Date11 Dec 2024
Tender AmountPHP 2.8 Million (USD 47.4 K)
Information Technology For The Use Of Omsdh , Information Technology ,province Of Oriental Mindoro
Province Of South Cotabato Tender
Philippines
Closing Soon26 Nov 2024
Tender AmountPHP 100 K (USD 1.6 K)
Details: Description Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 24 - 1479 November 19, 2024 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than November 26, 2024 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Item No. Item & Description Estimated Unit Of Abc Qty. Unit Of Total Cost Issue Unit Cost 1 Laptop Computer , Laptop Computer 100,000.0 Unit Core I5-13500hx 3.5ghz - 4.7ghz, 24mb Smart Cache, 14c/20t Or Higher Hm770 Chipset, 16 Gb Ddr5-4800 Mhz Ram (2 X 8 Gb) 512 Gb Pcie® Gen4 Nvme? Tlc M.2 Ssd Geforce Rtx? 4060 Laptop Gpu (8 Gb Gddr6 Dedicated) 16.1" Diagonal, Fhd (1920 X 1080), 144 Hz, Ips Display Wi-fi 6e Ax211 (2x2) And Bluetooth® 5.3 Wireless Card Integrated 10/100/1000 Gbe Lan, True Vision 1080p Fhd Camera Integrated Dual Array Digital Microphone, Audio By B&o; Dual Speakers Full-size, 1-zone Rgb Backlit, Grey Keyboard With Numeric Keypad Pointing Device Imagepad, Battery 6-cell, 83 Wh Li-ion Polymer Up To 6 Hours And 30 Minutes, 230 W Smart Ac Power Adapter Software Included: Window 11 Pro Os, Mcafee Livesafe 25 Gb Dropbox Storage For 12 Months, Free Microsoft Office Home And Student (pre-installed) With Carrying Backpack Conditions: 1. All Equipment Shall Have At Least (1) Year Warranty On Parts And Services/labor From The Date Of Purchase Unless Stated By The Manufacturers. Warranty Covers Any Defects In Material Or Workmanship Under Normal Use During The Warranty Period. 2. Equipment Under Warranty Shall Be Checked And Diagnose Within A Maximum Of 48hrs Upon Received Of The Equipment. In Case The Repair Will Took More Than 1 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-gelloyd; Pr.no.24 - 1736 Page 1 Of 2 Standard Form Number: Sf-good-60 Revised On: May 24, 2004 Standard Form Title: Request For Quotation Republic Of The Philippines Provincial Government Of South Cotabato Bids And Awards Committee Capitol Compound, Alunan Avenue, City Of Koronadal Tel. No. (083) 228-9951 1. All Entries Must Be Handwritten (legible)/ Typewritten 2. Delivery Period Within 30 Calendar Days Upon Receipt Of The Notice To Proceed Note: Date: Svp 24 - 1479 November 19, 2024 Quotation No. Please Quote Your Lowest Price On The Items Listed Below, Subject To The General Conditions Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than November 26, 2024 12:00 Noon Provincial Legal Officer Bac Chairman (sgd.) Atty. Marnito B. Cosep 3. Warranty Shall Be For Period Of Three (3) Months For Supplies And Materials, One (1) Year For Equipments, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of 120 Days 5. Interested Suppliers Are Required To Submit Their Eligibility Documents Such As Valid And Current Mayor’s Permit/business Permit, Philgeps Registration Number ________, And Income/business Tax Return (for Abcs Above 500k) During The Submission Of Price Quotation. 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered (if Applicable) 7. Omnibus Sworn Statement Must Be Submitted During Submission Of Offer/s Or Before Issuance Of Notice Of Award.(for Abcs Above P50k) Note: Suppliers With Updated Eligibility Documents On File At The Bids And Awards Committee, May No Longer Require Its Re-submission. Item No. Item & Description Estimated Unit Of Abc Qty. Unit Of Total Cost Issue Unit Cost 48hrs, The Suppliers/dealers Shall Provide A Service Unit With The Same Specification Or Higher. 3. Suppliers/dealers Shall Replace The Equipment Immediately At No Charge With The Same Specification Or Higher And Has Agreed By The End User, In Case The Unit Has A Factory Defect That Cannot Be Repaired. 4. Vendor Shall Have Local Office In Socsargen To Provide Immediate Onsite Support If The Need Arises. X-x-x Nothing Follows X-x-x Note: For Use Of Pemo. Please Attached Brochure Please Indicate Brand Source Of Fund: Pto-1091 - 1-07-05-030 - Ppe- 24 - 10 -23302 Approved Budget: P 100,000.00 Brand And Model Delivery Period Warranty Price Validity After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. Printed Name / Signature Tel. No. / Cellphone No. Email Address Date Powered By Ppdo - Itu Powered By Ppdo - Itu Prepared By: Bac-gelloyd; Pr.no.24 - 1736 Page 2 Of 2
National Irrigation Administration Tender
Others
Philippines
Closing Soon28 Nov 2024
Tender AmountPHP 339.4 K (USD 5.7 K)
Details: Description 1. The National Irrigation Administration - Cordillera Administrative Region (nia-car), Through The Gaa 2024 Intends To Apply The Sum Of Three Million Six Hundred Seventy Thousand Eight Hundred Fifty-nine And 26/100 (php 3,670,859.26) Pesos Being The Abc To Payments Under The Contract For Ncg-car-os-04-2024/ Supply And Delivery Of Various Supplies. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The National Irrigation Administration - Cordillera Administrative Region (nia-car) Now Invites Bids For The Above Procurement Project. Delivery Of The Goods And Services Is Required By 60 Calendar Days From Receipt Of The Notice To Proceed For Lot 1 And Lot 2; While The Delivery Of The Goods And Services Is Required By 30 Calendar Days From Receipt Of The Notice To Proceed For Lot 3 And Lot 4. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Lot No. Description Abc Lot 1 Supply And Delivery Of Office Supplies 3,212, 819.26 Lot 2 Supply And Delivery Of Janitorial Supplies 339,440.00 Lot 3 Supply And Delivery Of Drugs, Medicines, Medical, Dental, And Laboratory Supplies 63,600.00 Lot 4 Supply And Delivery Of Other Supplies 55,000.00 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From National Irrigation Administration - Cordillera Administrative Region (nia-car) And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm , Mondays To Fridays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 07, 2024 To 09:00 Am Of November 28, 2024, From The Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Presented Below; Lot Number Approved Budget For The Contract Applicable Fee For The Bidding Documents Lot 1 Php 3,212, 819.26 Php 5,000.00 Lot 2 Php 339,440.00 Php 500.00 Lot 3 Php 63,600.00 Php 500.00 Lot 4 Php 55,000.00 Php 500.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented In Person. 6. The National Irrigation Administration - Cordillera Administrative Region Bids And Awards Committee (nia-car Bac) Will Hold A Pre-bid Conference On November 15, 2024, 10:00 A.m. At The Nia-car Training Hall, 1st Floor Cordillera Farmer’s Training Center, Wangal, La Trinidad, Benguet And/or Through Video Conferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. Https://meet.google.com/enn-djng-kir 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Nia-car Bac Secretariat Office, 1st Floor Main Building, Wangal, La Trinidad, Benguet On Or Before November 28, 2024, 09:00 A.m.. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On November 28, 2024, 09:15 A.m. At Nia-car Training Hall, 1st Floor Cordillera Farmer’s Training Center, Wangal, La Trinidad, Benguet And/or Through Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend The Activity. Bid Opening For All Contracts Scheduled On November 28, 2024 Will Start At 09:15 Am, And Shall Be Conducted Successively One After The Other, In The Order That Follows: 1. Ncg-car-os-04-2024 Lot 1/ Supply And Delivery Of Office Supplies 2. Ncg-car-os-04-2024 Lot 2/ Supply And Delivery Of Janitorial Supplies 3. Ncg-car-os-04-2024 Lot 3/ Supply And Delivery Of Drugs, Medicines, Medical, Dental, And Laboratory Supplies 4. Ncg-car-os-04-2024 Lot 4/ Supply And Delivery Of Other Supplies 5. Ncg-car-oe-05-2024 Lot 1/supply, Delivery, And Installation Of It Equipment 6. Ncg-car-oe-05-2024 Lot 2/supply, Delivery, And Installation Of Office Equipment And Accessories 7. Ncg-car-oe-05-2024 Lot 3/supply And Delivery Of Drone 8. Ncg-car-oe-05-2024 Lot 4/supply And Delivery Of Survey And Technical Equipment 9. Ncg-car-oe-05-2024 Lot 5/supply And Delivery Of Steel Vertical Fire File Cabinet With Digital Lock 10. Ncg-car-oe-05-2024 Lot 6/supply, Delivery, And Installation/ Configuration Of Licensed Software 11. Cw-mp-32-2025/ Cadchatay Cis 12. Cw-mp-33-2025/ Mapanawil Cis (magwed Nabilig Bongyoan) 13. Cw-benguet-15-2025/ Mamuyod Cis 14. Cw-benguet-16-2025/ Yugo Gambang Cis 15. Cw-benguet-17-2025/ Akayad Pamaskan Cis 10. The National Irrigation Administration - Cordillera Administrative Region Bids And Awards Committee (nia-car Bac) Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Bac Secretariat Nia-car, Wangal, La Trinidad, Benguet Tel. (074)422-2435; (074)422-6060 Email: Niacarbac@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website: Www.philgeps.gov.ph And Nia-car Website: Https://car.nia.gov.ph/ November 06, 2024 Sgd. Leonardo A. Lamangen Chairperson Bids And Awards Committee
DEPT OF THE NAVY USA Tender
United States
Closing Date6 Feb 2028
Tender AmountRefer Documents
Details: (please See Latest Baa Announcement Within, Posted02april 2020) this Is A Modification To The Broad Agency Announcement (baa) N00024-19-r-4145 To Extend The Date For Receipt Of White Papers And Full Proposals To 6 February 2028 And Correct Some Administrative Information. Any White Papers That Have Already Been Submitted Do Not Need To Be Resubmitted. Included In This Modification To The Baa Is Revision To The Power Controls Section To Augment The Desired Technology Interests. Included In This Modification To The Baa Is The Identification Of An Electronic Mail Submission Address For White Papers. Included In This Modification To The Baa Is Also A Change To The Identified Procuring Contracting Officer And Contract Specialist. The Navsea 0241 Points Of Contact (poc) Are Changed As Follows: The Primary Point Of Contact Remains Ms. Sakeena Siddiqi, Procuring Contracting Officer, Sakeena.s.siddiqi.civ@us.navy.mil And Secondary Point Of Contact Shall Be Mr. Tyler Pacak, Tyler.pacak@navy.mil. all Other Information Contained In The Prior Announcements Through Apr 02, 2020 Remain Unchanged. (please See Latest Baa Announcement Within, Posted 04 June 2019) i. Administrative Information this Publication Constitutes A Broad Agency Announcement (baa), As Contemplated In Federal Acquisition Regulation (far) 6.102(d)(2). A Formal Request For Proposals (rfp), Solicitation, And/or Additional Information Regarding This Announcement Will Not Be Issued Or Further Announced. This Announcement Will Remain Open For Approximately One Year From The Date Of Publication Or Until Extended Or Replaced By A Successor Baa. Initial Responses To This Announcement Must Be In The Form Of White Papers. Proposals Shall Be Requested Only From Those Offerors Selected As A Result Of The Scientific Review Of The White Papers Made In Accordance With The Evaluation Criteria Specified Herein. White Papers May Be Submitted Any Time During This Period. Awards May Take The Form Of Contracts, Cooperative Agreements, Or Other Transactions Agreements. the Naval Sea Systems Command (navsea) Will Not Issue Paper Copies Of This Announcement. Navsea Reserves The Right To Select For Proposal Submission All, Some, Or None From Among The White Papers Submitted In Response To This Announcement. For Those Who Are Requested To Submit Proposals, Navsea Reserves The Right To Award All, Some, Or None Of The Proposals Received Under This Baa. Navsea Provides No Funding For Direct Reimbursement Of White Paper Or Proposal Development Costs. Technical And Cost Proposals (or Any Other Material) Submitted In Response To This Baa Will Not Be Returned. It Is The Policy Of Navsea To Treat All White Papers And Proposals As Competition Sensitive Information And To Disclose Their Contents Only For The Purposes Of Evaluation. white Papers Submitted Under N00024-10-r-4215 That Have Not Resulted In A Request For A Proposal Are Hereby Considered Closed-out And No Further Action Will Be Taken On Them. Unsuccessful Offerors Under N00024-10-r- 4215 Are Encouraged To Review This Baa For Relevance And Resubmit If The Technology Proposed Meets The Criteria Below. Contract Awards Made Under N00024-10-r-4215 And Under This Baa Will Be Announced Following The Announcement Criteria Set Forth In The Far. ii. General Information 1. Agency Name
naval Sea Systems Command (navsea)
1333 Isaac Hull Ave Se
washington, Dc 20376 2. Research Opportunity Title research And Development Of Naval Power And Energy Systems 3. Response Date this Announcement Will Remain Open Through The Response Date Indicated Or Until Extended Or Replaced By A Successor Baa. White Papers May Be Submitted Any Time During This Period. 4. Research Opportunity Description 4.1 Summary navsea, On Behalf Of The Electric Ships Office (pms 460, Organizationally A Part Of The Program Executive Office Ships) Is Interested In White Papers For Long And Short Term Research And Development (r&d) Projects That Offer Potential For Advancement And Improvements In Current And Future Shipboard Electric Power And Energy Systems At The Major Component, Subsystem And System Level. The Mission Of Pms 460 Is To Develop And Provide Smaller, Simpler, More Affordable, And More Capable Ship Power Systems To The Navy By Defining Open Architectures, Developing Common Components, And Focusing Navy, Industry, And Academia Investments. Pms 460 Will Provide Leadership Of The Developments Identified As Part Of This Baa, Will Direct The Transition Of Associated Technologies Developed By The Office Of Naval Research (onr), And Will Manage The Technology Portfolio Represented By Program Element (pe) 0603573n (advanced Surface Machinery Systems) For Transition Into Existing And Future Navy Ships. 4.2 Naval Power And Energy Systems Technology Development Roadmap naval Power And Energy Systems Are Described In Detail In The 2019 Naval Power And Energy Systems Technology Development Roadmap (npes Tdr). The Npes Tdr Focuses And Aligns The Power System Investments For The Navy, Defense Department, Industry And Academia To Guide Future Research And Development Investments To Enable The Navy To Leverage These Investments To Meet Its Future Needs More Affordably. Included In The Npes Tdr Are Specific Recommendations And Opportunities For Near, Mid And Long Term Investments, With A Renewed Focus On Energy Management. These Opportunities Range From An Energy Magazine To Support Advanced Weapons And Sensors To The Development Of An Integrated Power And Energy System (ipes). The Npes Tdr Aligns Electric Power System Developments With War Fighter Needs And Enables Capability-based Budgeting. The Npes Tdr Is Responding To The Emerging Needs Of The Navy, And While The Plan Is Specific In Its Recommendations, It Is Inherently Flexible Enough To Adapt To The Changing Requirements And Threats That May Influence The 30-year Ship Acquisition Plan. The First Section Of The Roadmap Establishes Why Npes Are A Critical Part Of The Kill Chain Based On The Capabilities Desired By The Navy In The Near Term, As Well As Supporting Future Platforms In The Navys 30-year Shipbuilding Plan. The Second Section Of The Roadmap Presents Power And Energy Requirements That Are Derived From Mission Systems Necessary To Support Future Warfighting Needs. The Third Section Describes Required Initiatives Based On Capabilities And The Projected Electrical Requirements Of The Future Ships. 4.3 Focus Areas the Areas Of Focus For This Baa Include, But Are Not Limited To, The "fydp/near-term" Activities As Described Throughout The Npes Tdr; The Analysis, Development, Risk Reduction And Demonstration Of Future Shipboard (both Manned And Unmanned) Electric Power Systems And Components, Emphasizing Shipboard Power Generation, Electric Propulsion, Power Conversion, Energy Storage, Distribution And Control; Power Quality, Continuity, And System Stability; Electric Power System And Component Level Modeling And Simulation; Energy Storage Technologies; Electrical System Survivability; And Power System Simplicity, Upgradeability, Flexibility, And Ruggedness. The Integrated Power And Energy System (ipes) Architecture Provides The Framework For Partitioning The Equipment And Software Into Modules And Defines Functional Elements And The Power/control And Information Relationships Between Them. For Power Generation, High Power Distribution, Propulsion, And Large Loads, The Architecture Includes Medium Voltage Ac Power (with Emphasis On Affordability), And Medium Voltage Dc Power (with Emphasis On Power Density And Fault Management). For Ship Service Electrical Loads, The Architecture Includes Zonal Electrical Distribution Which May Be Either Ac Or Dc, Depending Upon The Specific Application. Also Of Particular Interest Are Technologies That Result In Significant Energy Efficiency, Power Density Improvements And/or Carbon Footprint Improvements Over Existing Propulsion And Power System Technologies. The Npes Tdr Partitions The Power System In To Functional Areas That Include The Following. 4.3.1 Energy Storage energy Storage Modules May Support Short Duration To Long Duration Energy Storage Applications, Which Utilize A Combination Of Technologies To Minimize Power Quality And Continuity Impacts Across The System. For The Short Duration Energy Storage Applications, The Module Should Provide Hold-up Power To Uninterruptible Loads For Fault Clearing And Transient Isolation, As Well As Load Leveling For Pulse Power Loads. For The Mid Duration, The Module Should Provide Up To Approximately 3mw (100 - 150 Kw-hr) Of Standby Power For Pulse Power Loads While Also Providing Continuity Of Operations For A Subset Of Equipment Between Uninterruptible And Full Ships Load (including Emergency Power Generation Starting In A Dark Ship Condition). For Long Duration Applications, Energy Storage Modules Should Provide The Required Power As An Emergency Backup System Or To Provide Increased Stealth For Specialty Equipment. The Required Duration For This Type Of Application May Extend Up To Days Or Longer, And May Be Intermittent Or Continuous. A Number Of Energy Storage Technologies For Future Ship Applications Are Of Interest To The Navy, Including Various Electrochemical, Capacitor-based, Or Rotating Discussed Below: a. Capacitor: Electrochemical Capacitor Improvements Continue To Focus On Improving Energy Density While Maintaining Inherently High-power Density. Design Improvements Include Development And Integration Of Higher Temperature Films, Advanced Electrolytes, Advanced Electrode Materials, And Minimizing Equivalent Series Resistance (esr). b. Rotating: The Navy Has Interest In The Investment From The Transportation Industry In Flywheel Systems That Can Handle Gyroscopic Forces Continues To Support Flywheel Usage In Commercial Rail And Ground Transportation. Additional Factors Of Interest To The Navy Include Safety, Recharge/discharge Rates, Ship Motion Impacts, Environmental Impacts And Control. c. Electrochemical: Factors Of Interest To The Navy With Respect To Electrochemical Energy Storage Include The Ability To Maintain State Of Charge When Not In Use; Change In Voltage Versus State Of Charge; Charge And Discharge Capability; The Temporary Or Permanent Loss Of Capacity Due To Repeated Shallow Discharges; The Ability To Shallow Charge And Discharge Or Partially Charge Intermittently During A Discharge; Battery Life Considerations Such As Service-life, Cycle Life, And Shelf-life; Off-gas Properties That Affect The Level Of Ventilation And Associated Auxiliary Systems; And Safety Enhancements To Support Qualification For Use Onboard Us Navy Ships. near Term Navy Interests Are In The Area Of Common And Scalable Hardware And Software Elements Which Enable Advanced Weapons And Sensors And In Understanding The Sizing Algorithms For How To Optimize Energy Storage Sizing Against Various Competing System Requirements (short Duration/high Power Vs. Long Duration/low Power, For Example. The Specific Design Issues To Be Considered Include Reliability, Volumetric And Gravimetric Power And Energy Densities, Differentiating Between High Levels Of Stored Energy And High Energy Density. The Relevant Information Required For Characterizing Technology Performance Include: Technology Readiness Level (trl) Of Components And Systems; Production Capability; Safety Evaluation And Qualifications Performed On Relevant Subsystems Or Components (any Hazard Analyses Of Systems Designs As Relevant To Notional Applications); Other Military Application Of The Devices; Energy Storage Management System Approach; Thermal Characteristics, Constraints, And Cooling Requirements; Auxiliary Requirements (load); Device Impedance (heat Generation Characteristics); And Device Efficiency (discharge/recharge). 4.3.2 Power Conversion industry Continues To Drive Towards Increased Power Density, Increased Efficiency, Higher Switching Frequencies, And Refined Topologies With Associated Control Schemes. Innovation In Power Conversion From The Development And Implementation Of Wide-bandgap Devices, Such As Silicon Carbide (sic), Promise Reduction In Losses Many Times Over Silicon. The Use Of High Frequency Transformers Can Provide Galvanic Isolation With Reduced Size And Weight Compared To Traditional Transformers. Advances In Cooling Methods Will Be Required To Handle Larger Heat Loads Associated With Higher Power Operation. a Typical Navy Power Conversion Module Might Consist Of A Solid State Power Converter And/or A Transformer. Advanced Topologies And Technologies, Such As The Application Of Wide Band Gap Devices, Are Of Particular Interest. Navy Interests Are In The Area Of Innovative Approaches To Address Converting High Voltage Ac/dc To 1000 Vdc With Power Levels On The Order Of 3mw Or Larger. The Specific Design Issues To Be Considered Include Modularity, Open Architecture (focusing On Future Power System Flexibility And The Ability Of A Conversion Module Within A Ships Power System To Be Replaced/ Upgraded In Support Of Lifecycle Mission System Upgrades), Reliability, Cost, And Conversion Efficiency. Areas Of Interest Include More Power-dense Converters Supporting Advanced Mission Systems And Prototyping Of Full Scale Conversion Based On Second Generation Wide-bandgap Devices. 4.3.3 Power Distribution power Distribution Typically Consists Of Bus Duct/ Bus Pipe, Cables, Connections, Switchgear And Fault Protection Equipment, Load Centers, And Other Hardware Necessary To Deliver Power From Generators To Loads. Industry Has Used Medium Voltage Dc (mvdc) Transmission As A Method To Reduce Losses Across Long Distances. Complementarily, Industry Is Developing Mvdc Circuit Protection For Use In Mvdc Transmission Variants Of Approximately 50, 100, And 150 Megawatts (mw) At Transmission Voltages Of 20 To 50 Kvdc. Analysis Includes Modeling And Simulation To Determine Methods For Assessing The Benefits Of Dc Vs Ac Undersea Transmission And Distribution Systems For Offshore Oil And Gas. Industry And Academia Continue To Invest Resources In Advanced Conductors That Have Applications In Power Distribution, Power Generation, And Propulsion. Research Is Focused On Using Carbon Nanotubes. The Development Of A Room Temperature, Lightweight, Low Resistance Conductor Is Of Great Interest To The Navy. areas Of Interest Include Development Of An Mvdc Distribution System Up To 12 Kvdc To Meet Maximum Load Demands; Design Of An Appropriate In-zone Distribution System Architecture; Development Of High Speed 1 Kvdc And 12 Kvdc Solid State Circuit Protection Devices That Are Ship Ready, And Advanced Conductors Capable Of Supporting Power Distribution. 4.3.4 Prime Movers (including Power Generation) power Generation Converts Fuel Into Electrical Power. A Typical Power Generation Module Might Consist Of A Gas Turbine Or Diesel Engine (prime Mover), A Generator (see Rotating Machine Discussion Below), A Rectifier (either Active Or Passive), Auxiliary Support Sub-modules And Module Controls. Other Possible Power Generation Technologies Include Propulsion Derived Ship Service (pdss), Fuel Cells, Or Other Direct Energy Conversion Concepts. Power Generation Concepts Include 60 Hz Wound Rotor Synchronous Generator Driven Directly By A Marine Gas Turbine (up To 30 Mva Rating); Commercially Derived Or Militarized Design Variants Of The Above; And Higher Speed, Higher Frequency, High Power Density Variants Of The Above With High Speed Or Geared Turbine Drive. Npes Dc Technologies Permit Prime Movers And Other Electrical Sources (such As Energy Storage) To Operate At Different, Non-60hz Electrical Frequency Speeds, Improving Survivability, Resiliency, And Operational Availability. Energy Storage That Is Fully Integrated With The Power Generation Can Enable Uninterrupted Power To High Priority Loads, Mission Systems That Reduce Susceptibility, And Damage Control Systems To Enable Enhanced Recoverability. the Specific Design Issues To Be Considered Include Fuel Efficiency, Module Level Power Density, Machine Insulation System Characteristics, Size, Weight, Cost, Maintainability, Availability, Harmonic Loading, Voltage, Power, System Grounding Approaches, Fault Protection, Response To Large Dynamic (step) Or Pulse Type Loading Originated From Ship Propulsion Or Directed Energy/electromagnetic Weapons, Interface To Main Or Ship Service Bus, Autonomy, Limited Maintenance, And Commercial Availability. Navy Interests Are In The Area Of Innovative Approaches To Power Generation In The 5 To 30 Mw Range, Utilizing Gas Turbines, Diesel Engines And Other Emerging Power Technologies That Address Challenges Associated With Achieving Reduced Fuel Consumption, Decreased Life Cycle And Acquisition Cost, Support Of Ship Integration, Enable Flexibility, Enable Power Upgrades, And Improved Environmental Compliance. Near Term Navy Interest Includes 10-30 Mw (nominally 25 Mw) Output Power Rating And The Power Generation Source Able To Supply Two Independent Electrical Buses (where Abnormal Conditions, Including Pulsed/stochastic Loads, On One Bus Do Not Impact The Other Bus) At 12 Kvdc (while Also Considering 6kvdc, 18kvdc, And 1 Kvdc). Enhanced Fuel Injection, Higher Operating Temperatures And Pressures, And Optimized Thermal Management Are Critical For Future Prime Movers. Advanced Controls For Increased Efficiency, Reduced Maintenance, And Increased Reliability Include Implementation Of Digital Controls; Autonomous And Unmanned Power Control; Enhanced Engine Monitoring, Diagnostics, And Prognostics; And Distributed Controls. Advanced Designs For Increased Efficiency Include New Applications Of Thermodynamic Cycles Such As Humphrey/atkinson Cycle For Gas Turbines And Diesels And Miller Cycle For Diesel. the Navy Is Interested In Developing A Knowledge Bank Of Information On Potential Generator Sets, Generator Electrical Interface Requirements, And The Impacts Of Those Requirements On Generator Set Performance And Size, As A Logical Next Step From The Request For Information Released Under Announcement N00024-16-r-4205. A Long-term Goal For This Effort Is To Maximize Military Effectiveness Through Design Choice And Configuration Option Flexibility When Developing Next-generation Distribution Plants. The Power Generation Source Should Fit Within The Length Of A Typical Engine Room (46 Feet, Including Allowances For Any Needed Maintenance And Component Removal). The Power Generation Source Is Expected To Have The Ability To: Control Steady-state Voltage-current Characteristic For Its Interface; To Maintain Stability; And To Adjust Control Set-points From System Level Controllers. For Any Proposed Design Approach, Initial Efforts Would Include Conceptual Design Trade Studies That Inform The Performance Level That Can Be Achieved. Trade Studies May Address Pulsed Load Capability (generator/rectifier Design To Increase Pulse Load Capability, Engine Speed Variation Limits, And Impact Of Cyclic Pulse Load On Component Life); Power Density (cost Vs. Benefits Of High Speed Or High Frequency, Mounting On Common Skid, And Advanced Cooling Concepts); Single Vs. Dual Outputs (continuous Vs. Pulse Rating For Each Output, Voltage Regulation With Shared Field, And Control Of Load Sharing); Efficiency (part Load Vs. Full Load Optimization, Flexible Speed Regulation, Impact Of Intake And Exhaust Duct Size/pressure Drop On Engine Efficiency); Power Quality (voltage Transient, Voltage Modulation For Step, Pulse Loads, Impact Of Voltage And Current Ripple Requirements, And Common Mode Current); Pgm Controls (prime Mover Speed Vs. Generator Field Vs. Rectifier Active Phase Angle Control, And Pulse Anticipation); Stability When Operating In Parallel With Other Sources; Short Circuit Requirements; And Dark Ship Start Capability (self-contained Support Auxiliaries). Trade Studies May Also Address How Rotational Energy Storage Can Be Built Into The Design Of The Generator Or Added To The Generator And What Parameters Need To Be Defined In Order To Exploit This Capability. Development Of Advanced Coatings And Materials That Support High Temperature Operations Of A Gas Turbine Is Also Of Interest. Energy Harvesting To Convert Heat Energy And Specifically Low Quality Heat Energy To Electricity Using Solid State Components Is Also Of Interest To The Navy. 4.3.5 Rotating Machines (including Generators And Propulsion Motors) recent Trends In Electrical Machines Include Neural Networks; Artificial Intelligence; Expert System; Fiber Communications And Integrated Electronics; New Ceramic Conducting And Dielectric Materials; And Magnetic Levitation. High Temperature Superconducting Rotors Have Higher Power Density Than Their Induction And Synchronous Rotor Counterparts. Wind Power Generators Eliminate Excitation Losses Which Can Account For 30% Of Total Generator Losses. The Offshore Wind Power Industry Is Moving To Larger Power Wind Tower Generators In The 10mw Class. Advanced Low Resistance Room Temperature Wire And Hts Shows Promise For These Higher Power Levels Because Of Low Excitation Losses And Low Weight Due To Reduction In Stator And Rotor Iron. Hts Motors May Be Up To 50% Smaller And Lighter Than Traditional Iron-core And Copper Machines. They Have Reduced Harmonic Vibrations Due To Minimization Of Flux Path Iron And Have Mitigated Thermal Cycling Failures Due To Precision Control Of Temperature. propulsion Motor Concepts Of Interest To The Navy Include Permanent Magnet Motors (radial Air Gap, Axial Air Gap, Or Transverse Flux), Induction Motors (wound Rotor Or Squirrel Cage), Superconducting Field Type (homopolar Dc Or Synchronous Ac). The Drivers And Issues Associated With These Designs Include Acoustic Signature, Noise (requirements, Limitations, Modeling, Sources, And Mitigation Methods), Shock, Vibration, Thermal Management, Manufacturing Infrastructure, Machine Insulation System Characteristics, Commercial Commonality, Platform Commonality, Cost, Torque, Power, Weight, Diameter, Length, Voltage, Motor Configuration, And Ship Arrangements Constraints. Motor Drives That May Be Explored Include Cyclo-converter (with Variations In Control And Power Device Types), Pulse Width Modulated Converter/inverter (with Many Variations In Topology), Switching (hard Switched, Soft Switched), And Matrix Converter (with Variations In Control, Topology, Cooling, Power Device Type). Technologies For Drives And Rotating Machines Which Allow The Ability To Operate As A Motor And A Generator To Facilitate A Pdss Installation Or On A Fully Integrated Power System To Leverage The Inherent Energy Storage In The Ship's Motion May Be Explored. Integrated Motor/propulsor Concepts May Be Considered Either As Aft-mounted Main Propulsion Or As A Forward Propulsor Capable Of Propelling A Ship At A Tactically Useful Speed. Areas Of Interest For Future Rotating Machines Include Increased Magnetic Material Flux Carrying Or Flux Generation Capacity; Improved Electrical Insulation Material And Insulation System Dielectric Strength; Increased Mechanical Strength, Increased Thermal Conductivity, And Reduced Sensitivity To Temperature; Improved Structural Materials And Design Concepts That Accept Higher Torsional And Electromagnetically Induced Stress; Innovative And Aggressive Cooling To Allow Improved Thermal Management And Increased Current Loading; Increased Electrical Conductor Current Carrying Capacity And Loss Reduction. 4.3.6 Cooling And Thermal Management as The Demand And Complexity Of High Energy Loads Increases, So Does The Demand And Complexity Of Thermal Management Solutions. Assessing And Optimizing The Effectiveness Of A Thermal Management System Requires The Analysis Of Thermal Energy Acquisition, Thermal Energy Transport, And Thermal Energy Rejection, Storage, And Conversion. The Design Of The Thermal Management System Aims To Transfer The Thermal Energy Loads At The Sources To The Sinks In The Most Efficient Manner. areas Of Interest To The Navy With Respect To Cooling And Thermal Management Include The Application Of Two Phased Cooling And Other Advanced Cooling Techniques To Power Electronics And Other Npes Components And Innovative Approaches To Manage Overall Ship Thermal Management Issues Including Advanced Thermal Architectures, Thermal Energy Storage Systems, Increases In Efficiency, And Advanced Control Philosophies. 4.3.7 Power Controls controls Manage Power And Energy Flow Within The Ship To Ensure Delivery To The Right Load In The Right Form At The Right Time. Supervisory Power System Control Typically Resides On An External Distributed Computer System And Therefore Does Not Include Hardware Elements Unless Specialized Hardware Is Required. The Challenge To Implement Tactical Energy Management (tem) Is To Integrate Energy Storage, Power Generation, And Interfaces With Advanced Warfighting Systems And Controls. Tem Is Critical To Enabling Full Utilization Of The Capabilities Possible From Technologies Under Development. The State Complexity And Combat Engagement Timelines For Notional Future Warfighting Scenarios Are Expected To Exceed The Cognitive Capacity And Response Times Of Human Operators To Effectively Manage The Electric Plant Via Existing Control System Schema In Support Of Executing Ship Missions. The Survivability Requirements For Military Ships Combined With The Higher Dynamic Power Characterisitics (pulse Load) Characteristics Of Some Mission Systems Will Require More Sophisticated Control Interfaces, Power Management Approaches, And Algorithms Than Are Commercially Available. The Navy Is Pursuing A Long Term Strategy To Create A Unified, Cyber Secure Architecture For Machinery Control Systems That Feature A Common, Reusable, Cyber Hardened Machinery Control Domain Specific Infrastructure Elements; A Mechanism For Transitioning New Technology From A Variety Of Sources In An Efficient And Consistent Manner; And A Mechanism To Provide Life Cycle Updates And Support In A Cost Effective And Timely Manner.tem Controls Will Be Expected To Maintain Awareness Of The Electric Plant Operating State (real Time Modeling); Interface With Ship Mission Planning (external To The Electric Plant Control Systems) For Energy Resource Prioritization, Planning, And Coordination Towards The Identification Of Resource Allocation States That Dynamically Optimize Mission Effectiveness; Identify And Select Optimal Trajectories To Achieving Those Optimal Resource Allocation States; And Actuate The Relevant Electric Plant Components To Move The Electric Plant State Along Those Optimized Trajectories Towards The Optimal Resource Allocation State. Tem Controls Would Enable Reduced Power And Energy System Resource Requirements For A Given Capability (or Improved Capability For A Given Set Of Resources); Increased Adaptability Of The Navy’s Power And Energy System Design To Keep Pace With An Evolving Threat Environment; And Maximized Abilities To Execute The Ship’s Mission. the Navy Is Interested In Potential Applications Of Distributed Control Architectures That Have Led To The Development Of Intelligent Agents That Have Some Autonomous Ability To Reason About System State And Enact Appropriate Control Policies. A Simple Example Of These Agents In A Control System Is The Use Of Autonomous Software Coupled With Smart Meters In A Smart Grid Implementation. The Agents, Smart Meters In This Example, Can Temporarily Shut Off Air Conditioning But Not The Refrigerator In Residences During Grid Peak Power Usage Times When The Cost Per Watt Is Highest On Hot Days. The Agent Software Acts Autonomously Within Its Authority To Comply With Programmed Customer Desires. The Navy Is Interested In Tem Controls Within A Modular Open Systems Architecture Framework Such That They Are Agnostic Of, But Affordably Customizable To, Specific Ship Platforms And Power System Architectures. Tem Controls May Reside Between (i.e. Interface With) Embedded Layers Within Individual Power System Components, Ships’ Supervisory Machinery Control Systems, And Ships’ Mission Planning Systems. Initial Or Further Development Or Modification Of These Interfaces May Be Required To Achieve Desired Performance Behaviors And Characteristics. Tem Controls Are Expected To Develop Within A Model-based System Engineering And Digital Engineering Environment And Will Be Initially Evaluated In A Purely Computational Environment, Representing Navy-developed Shipboard-representative Power And Energy System Architecture(s), But Will Be Progressively Evaluated On Systems With Increasing Levels Of Physical Instantiation (i.e., Controller-hardware-in-loop And Power-hardware-in-loop With Progressive Levels Of Representative Power System Components Physically Instantiated). When Implementing A Tem Based Control Scheme, The Overall Power System Should Increase Installed Power Generation Available To Mission And Auxiliary Loads; Reduce Power System Design Margins; Hone The Installed Stored Energy Required For Mission Critical Capability; And Allow Higher Power Transients (ramp Rates And Step Loads). Other Areas Of Interest To The Navy With Respect To Controls Include Improvements To Traditional Machinery Control And Automation, Advanced Power Management, Cyber Security, And Advanced Controls For Distributed Shared Energy Storage And Maintaining Electrical System Stability. The Navy Is Also Interested In Non-intrusive Load Monitoring, Power System Data Analytics, Real Time System Monitoring And Onboard Analysis And Diagnostics Capabilities. 4.3.8 System Interplay, Interfacing, And Integration increasingly, The Navy Is Recognizing The Need For Incorporating Flexibility And Adaptability Into Initial Ship Designs And Recognizing That The Integration Of New Systems And The Ability To Rapidly Reconfigure Them Will Be An Ongoing Challenge Throughout A Platform's Life Cycle In Order To Maintain Warfighting Relevancy. The Ability To Support Advanced Electrical Payload Warfighting Technologies Requires Not Only Power And Energy Systems Delivered With The Flexibility And Adaptability To Accommodate Them, But A Npes Engineering Enterprise With The Capability And Capacity (knowledge, Labor, And Capital) For Continuous Systems Integration. The Navy Can More Affordably Meet This Challenge By Shifting As Much Effort As Possible Into The Computational Modeling And Simulation Regime. an Integrated Power System (ips) Provides Total Ship Electric Power Including Electric Propulsion, Power Conversion And Distribution, Energy Storage, Combat System Support And Ship Mission Load Interfaces To The Electric Power System. Adding Energy Storage And Advanced Controls To Ips Results In An Integrated Power And Energy System (ipes) In Order To Accommodate Future High Energy Weapons And Sensors. The Ipes Energy Magazine Is Available To Multiple Users, And Provides Enhanced Power Continuity To The Power Distribution System. The Flexibility Of Electric Power Transmission Allows Power Generating Modules With Various Power Ratings To Be Connected To Propulsion Loads And Ship Service In Any Arrangement That Supports The Ships Mission At The Lowest Total Ownership Cost (toc). systems Engineering In Ips/ipes Is Focused On Increasing The Commonality Of Components Used Across Ship Types (both Manned And Unmanned) And In Developing Modules That Will Be Integral To Standardization, Zonal System Architectures, And Generic Shipbuilding Strategies With Standard Interfaces That Are Navy-controlled. Ipes Offers The Potential To Reduce Signatures By Changing The Frequency And Amplitude Of Acoustic And Electromagnetic Emissions. Integrated Energy Storage Can Reduce Observability By Enabling The Reduction And Elimination Of Prime Movers, Thereby Reducing Thermal And Acoustic Signatures. The Modules Or Components Developed Will Be Assessed For Applicability Both To New Construction And To Back-fit Opportunities That Improve The Energy Efficiency And Mission Effectiveness. areas Of Navy Interest Are To Continuously Improve Ips/ipes By Performing Analysis, Modeling And Simulation, Life Cycle Cost Analysis, Producibility Studies, Module Development, Ship Integration Studies, Architecture Design, Ship Electric Architectures And Support For High Power Weapons Systems Requirements, And Related Efforts. High Level Power System Architectures Are Based On Mvac And Mvdc Power With Attributes Of Power Density, Fault Management, Capability And Affordability. For Ship Service Electrical Loads, The Architecture Includes Zonal Electrical Distribution Which May Be Either Ac Or Dc, Depending Upon The Specific Application. In Addition To A Full Ipes Or Ips Implementation, Hybrid Electric Drive (hed) Where Mechanical Propulsion Is Augmented By Rotating Electric Machinery, Or Additional Power Generation Or Energy Storage May Be Of Interest. The Navy Desires To Understand The Performance And Cost Trade Space That Is Available For The Various Options Of Architecture; Component, System And Controls Technologies; Functional Allocations; And Interfaces. Also Of Interest Are Technologies That Result In Significant Energy Efficiency, Thermal Improvements, Power Density Improvements And/or Carbon Footprint Improvements Over Existing Propulsion And Power System Technologies. Another Area Of Interest For The Navy Is The Interface Definition Between Unique Electrical Loads And The Power System, And The Provision Of Specialty Power To Optimize That Load Interface. Among The Special Load Interfaces That Might Require Development Are Support For Pulsed Power Weapons And Sensors Such As Radar Power Supplies, Electromagnetic Launchers (for Example Electromagnetic Railgun), And Advanced Laser Systems, All Of Which Would Benefit From Optimized Integration With The Shipboard Power System. the Approach To Prototype Hardware Developed Under This Baa Is That It Fosters Modularity And Scalability (so That Families Of Products May Be Leveraged To Multiple Potential Applications) And Shall Accommodate An Open System Architecture Where Interfaces Are Well Defined And Mutually Accepted. The Navy Is Interested In Both Near Term Solutions That Have The Potential For Rapid Transition To A High Technology Readiness Level (trl) As Well As Longer Term Technology Pushes That Advance The Science And Would Enable A Future Compact Shipboard System. Risk Reducing Technology Prototype Demonstrations In The Near Term Are Encouraged. An Evaluation Of Emerging Technologies For Ship Applications (such As Energy Storage, Support For High Energy Weapons, Support For High Power Radars, High-speed Generators, And Advanced Power Electronics) To Determine Future Feasibility And Development Requirements Is Also Of Great Interest. Development Of Advanced Design Tools And Power System Specifications And Standards Is Also Key To Ensuring New Power Systems Will Integrate Aboard Ship. The Navy Is Interested In A Model-based Approach To Power System Engineering, From Early Concept System Architecture Trade Studies And Trade-space Exploration, To Production-ready Performance Specifications For Component And Systems Acquisitions. Particular Technologies And System Concepts Will Need To Be Evaluated In A Common Set Of Modeling Contexts And Environments Standardized Across The Navy Power System Engineering Enterprise. Modeling-enabled Evaluation Of Technology Alternatives And Performance Of System-level Trade Studies Requires That Models Be Delivered With A Sufficient Pedigree Supported By Analysis, Verification, And Validation (e.g., By Subscale Hardware Demonstrations) To Prove The Applicability Of The Models For The Standardized Modeling Contexts And Environments (model Based System Engineering). 5. Point(s) Of Contact all White Papers Shall Be Submitted To All Parties Identified Below: pms 460 Technical Poc: Josh Cushenette
joshua.j.cushenette.civ@us.navy.mil navsea 0241 Poc: ms. Sakeena Siddiqi, Procuring Contracting Officer sakeena.s.siddiqi@us.navy.mil mr. Tyler Pacak, Contracting Specialist tyler.pacak@navy.mil iii. Award Information the Amount And Period Of Performance Of Each Selected Proposal Will Vary Depending On The Research Area And The Technical Approach To Be Pursued By The Selected Offeror. iv. Eligibility Information all Responsible Sources From Academia And Industry May Submit White Papers Under This Baa. Awards Under This Baa Will Likely Be Cost Plus Fixed Fee (cpff) And Thus Offerors Are Required To Have A Defense Contract Management Agency (dcma) / Defense Contract Audit Agency (dcaa) Approved Accounting System To Be Eligible For Award Or Evidence That A Pre-award Survey Has Been Initiated With Dcma/dcaa. v. Application And Submission Information 1. Application And Submission Process "white Papers" Are Desired By Navsea In Response To This Solicitation.all White Papers Shall Be Submitted Tonavseavia Email To The Following Address: Joshua.j.cushenette.civ@us.navy.mil. Hard Copy Submissions Are Not Accepted. Those Offerors With White Papers Considered To Have Merit Will Be Requested To Prepare Full Proposals For The Planned Effort As Specified Below. Receipt Of All White Papers Will Be Acknowledged By The Technical Point Of Contact Listed Above. White Papers Will Be Retained By The Navy And, Should An Application And Associated Funding Be Identified For The Concept Proposed, Additional Responses Will Be Requested Of The Offeror. 2. General Information For White Papers/full Proposals the White Papers And Proposals Submitted Under This Baa Are Expected To Be Unclassified. White Paper And Proposal Submissions Will Be Protected From Unauthorized Disclosure In Accordance With Far 15.207, Applicable Law, And Department Of Defense (dod)/department Of Navy (don) Regulations. Offerors Are Expected To Appropriately Mark Each Page Of Their Submission That Contains Proprietary Information. 2.1. White Papers 2.1.1 White Paper Format paper Size Shall Be No Larger Than 8.5" X 11" Paper With No Less Than 1" Margins On All Sides. The Font Shall Not Be Less Than 12 Point. The Format Of The Submission Shall Be One Electronic Copy In Microsoftword Or Excel Compatible Or .pdf Format. The Page Limit For White Papers Shall Be No Longer Than Twenty-five (25) Pages And Only Contain Information Necessary To Describe The Proposed Technical Concept And Comply With Content Requirements For The White Papers Stated Herein. 2.1.2 White Paper Content 2.1.2.1 Cover Page the Cover Page Shall Be Labeled "white Paper," And Shall Include The Baa Number, Proposed Title, Thecompany Technical/administrative Points Of Contact With Telephone Numbers And E-mail Addresses, The Company Commercial And Government Entity (cage) Code, Which Module Or Modules The White Paper Is Relevant To From The Research Opportunity Section Above (section Ii Paragraph 4), And The Names And Contact Information (if Known) Of The Assigned Dcma Administrative Contracting Officer (aco). 2.1.2.2 Technical Concept/naval Relevance the Technical Concept Shall Include A Description Of The Technology Innovation And Associated Technical Risk Areas. This Section Also Includes A Description Of The Potential Naval Relevance And Contributions Of The Proposed Effort To Improvement In The Performance Of Npes As Defined In The Npes Tdr. This Section May Include A Plan For Demonstrating And Evaluating The Operational Effectiveness Of The Offeror's Proposed Products Or Processes In Field Experiments And/or Tests In A Simulated Environment. 2.1.2.3 Capabilities; Related Experience And Past Performance, And Facilities the Capabilities Section Shall Describe Past Experience And Facilities That Demonstrate Yourcompany Ability To Complete The Scope Identified In The White Paper. This Section Shall Include Evidence Of The Company's Capabilities To Demonstrate The Technology Innovation Proposed. Offerors Shall Provide All Relevant Past Performance For Similar Or Related Work Under Contracts Currently Being Performed Or Completed During The Last Three (3) Years. The Offeror May Include Federal, State And Local Government And Private Sector Contracts. Offerors That Represent Newly Formed Entities, Without Prior Contract Experience, Should Identify Previous Contract And Subcontract Experience For All Principal Investigators Identified In The Proposal. This Section Will Not Be Counted Against The Page Limits Noted In Paragraph 2.1.1 Above. The Following Information For Each Such Contract Shall Be Provided: a. Contract Number b. Customer/agency c. Contracting Officer And Technical Point Of Contact (names And Phone Numbers) d. Brief Description Of Scope Of Work And Deliverables e. Contract Type f. Award Price/final Price g. Period Of Performance 2.1.2.4 Cost And Development Schedule the White Paper Should Identify The Total Estimated Cost And The Notional Development Timeline Of The Effort Proposed In The White Paper And A Brief Rational For How You Established This Rough Order Of Magnitude (rom) Cost Estimate. The Page Limit For The Estimated Cost And Schedule Information Shall Not Exceed One (1) Page; No Larger Than 8.5" X 11" When Printed On Paper With No Less Than 1" Margins On All Sides; And The Font Shall Not Be Less Than 12 Point. The Estimated Cost And Schedule Section Will Not Be Counted Against The Page Limits Noted In Paragraph 2.1.1 Above. For Planning Purposes, Depending Upon The Nature Of The Technology Being Proposed, A Contract That May Result From The White Paper Could Be Staged Using Multiple Phases, Starting With Concept Exploration And Technology Characterization. Should The Concept Prove Meritorious, Options May Be Included To Take The Technology/approach Through A Design And Prototype/software Build. The Total Potential Contract Period Of Performance Cannot Exceed Five (5) Years. 2.1.2.5 Assertion Of Data Rights include Here A Summary Of Any Proprietary Rights (limited/restricted) To Pre-existing Results, Prototypes, Or Systems Supporting And/or Necessary For The Use Of The Research, Results, And/or Prototype. If There Are Proprietary Rights, The Offeror Must Explain How These Affect Its Ability To Deliver Subsystems For Integration. Additionally, Offerors Must Explain How The Program Goals Are Achievable In Light Of These Proprietary And/or Restrictive Limitations. If There Are No Claims Of Proprietary Rights In Pre-existing Data, This Section Shall Consist Of A Statement To That Effect. In Order For A Data Rights Assertions List To Be Accepted By The Government And Included As An Attachment To A Contract, The Dfars (252.227-7013 And 252.227-7014) Requires That The Information Be Listed In A Table Having Four Columns. In The First Column, Technical Data To Be Furnished With Restrictions, For Non-commercial Technical Data Items, Both The Item And The Technical Data Pertaining To That Item Must Be Listed. Also, The Assertion Must Be Made At The Lowest Component Level. And Since Technical Data Is Defined As "recorded Information Of A Scientific Or Technical Nature", A Document Where The Technical Data Is Recorded Must Also Be Listed. This Is Usually, But Not Always, A Drawing Number. Non-commercial Computer Software Items Should Similarly Be Listed At The Lowest Practicable Subroutine Level And Should Also List A Version Number. 2.1.2.6 Accounting System Documentation the White Paper Shall Include Evidence Of An Approved Accounting System Or Evidence That A Pre-award Survey Has Been Initiated With Dcma/dcaa For An Approved Accounting System. 2.2 Full Proposals Format And Content once A White Paper Topic Has Been Selected To Proceed To The Next Step, The Contracting Officer Will Issue A Request For Proposal (rfp) Letter With Additional Detail On The Required Content Of The Proposal, Page Limitations, And Due Dates. The Rfp Letter Will Also Provide Details Of The Notional Statement Of Work For The Effort, Including A Level Of Effort For Related Engineering Services As Described Above; Any Optional Phases; A Description Of The Required Deliverable Data; And The Required Contents And Details Of The Cost Volume. 2.2.1 Associated Engineering Services the Potential Contract, At The Option Of The Government, May Also Include The Services Of Qualified Engineers/technicians And Management Functions To Perform Engineering Support For Follow-on Investigations, Additional Trade Studies, Participation In Navy Directed Interface Working Groups (iwg) To Assess The Technology Implementation In Shipboard Applications, And Hardware Evaluations To Determine The Effectiveness Of The New Technologies Developed Under The Basic Effort. This Level Of Effort Shall Not Be Included In The White Paper Submission, But May, At The Option Of The Government, Be Included In Any Resultant Contract. The Nature Of The Services To Be Performed Shall Be Integrally Related To The Core Scope Of The Contract, Shall Form A Logical Extension Of The Work Otherwise Performed (such As Completion Of Testing Of Articles Developed Or Extending The Performance Capability Of The Articles Developed), Or Shall Provide Amplifying Details Of The Articles Or Technologies Beyond That Otherwise Required And Shall Result In A Specific End-product, Such As A Report. Funding For Engineering Services May Be From R&d, Ship Construction, Operation & Maintenance; Or Other Procurement Sources As May Be Appropriate For The Follow-on Activity Required, But Shall Not Be Used For Production Of Any Technology Proposed. vi. Evaluation Information 1. Evaluation Criteria 1.1 White Papers evaluation Of The "white Papers" Will Be Based On A Competitive Selection Resulting From A Scientific Review Using The Following Evaluation Criteria: criteria 1: Overall Scientific And Technical Merits Of The Concept Proposed And The Potential Naval Relevance And Contributions Of The Effort To The Improved Performance Of Npes Modules And Architectures Within A Reasonable Development Schedule. criteria 2: Potential Risks To The Development And Future Acquisition Associated With The Assertion Of Data Rights. criteria 3: Capabilities; Related Experience And Past Performance; And Facilities criteria 4: Potential Risks To The Development Associated With The Length Of The Development Schedule And The Availability Of Funds To Complete All Proposed Tasks. selection Of The Offeror(s) From Which Rfps Will Be Issued Will Be Based Upon Thegovernments Assessment Of The Criteria Above And The Availability Of Funds To Accomplish The Proposed Effort. White Papers Submitted Under This Baa Will Be Protected From Unauthorized Disclosure In Accordance With Far 3.104-5 And 15.207. The Cognizant Government Experts Will Perform The Evaluation Of Technical Proposals. 1.2 Ratings Used For Scientific Review 1.2.1 Criteria 1 overall Scientific And Technical Merits And Potential Naval Relevance Of The Concept. rating = Excellent: Research Proposal Demonstrates High Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Developmental Risk. Research Proposal Demonstrates High Potential For Direct Application To A Future Npes Ship And/or Will Significantly Improve The Performance Of Npes Modules And/or Architectures. rating = Good: Research Proposal Demonstrates Moderate Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Development Risk. Research Proposal Demonstrates Moderate Potential For Direct Application To A Future Npes Ship And/or Will Probably Improve The Performance Of Npes Modules And/or Architectures. rating = Poor: Research Proposal Demonstrates Low Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Development Risk And/or Have An Unreasonable Amount Of Development Risk. Research Proposal Demonstrates Low Potential For Direct Application Of A Future Npes Ship And/or Will Not Significantly Improve The Performance Of Npes Modules And/or Architectures. 1.2.2. Criteria 2 potential Risks To The Development And Future Acquisition Associated With The Assertion Of Data Rights. rating = Excellent: There Is Low Or No Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. rating = Good: There Is Moderate Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. rating = Poor: There Is High Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. 1.2.3 Criteria 3 capabilities; Related Experience And Past Performance; Facilities; Techniques; And Qualifications, Capabilities And Experience Of The Proposed Principal Investigator / Team Leader. rating = Acceptable: Based On The Offerors Performance Record, The Government Has A Reasonable Expectation That The Offeror Will Successfully Perform The Required Effort, Or The Offeror's Performance Record Is Unknown. In The Case Of An Offeror Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Or So Sparse That No Meaningful Past Performance Rating Can Be Reasonably Assigned, The Offeror May Not Be Evaluated Favorably Or Unfavorably On Past Performance (see Far 15.305 (a)(2)(iv)). Therefore, The Offeror Shall Be Determined To Have Unknown (or "neutral") Past Performance. In The Context Of Acceptability/unacceptability, A Neutral Rating Shall Be Considered "acceptable." rating = Unacceptable: Based On The Offerors Performance Record, The Government Does Not Have A Reasonable Expectation That The Offeror Will Be Able To Successfully Perform The Required Effort. 1.2.4. Criteria 4 potential Risks To The Development Associated With The Length Of The Development Schedule And The Availability Of Funds To Complete All Proposed Tasks. rating = Excellent: There Is Low Or No Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. rating = Good: There Is Moderate Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. rating = Poor: There Is High Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. vii. Security Classification in Order To Facilitate Intra-program Collaboration And Technology Transfer, The Government Will Attempt To Enable Technology Developers To Work At The Unclassified Level To The Maximum Extent Possible. If Access To Classified Material Will Be Required At Any Point During Performance, The Offeror Must Clearly Identify Such Need Prominently In Their Proposal. If Offerors Use Unclassified Data In Their Deliveries And Demonstrations Regarding A Potential Classified Project, They Should Use Methods And Conventions Consistent With Those Used In Classified Environments. Such Conventions Will Permit The Various Subsystems And The Final System To Be More Adaptable In Accommodating Classified Data In The Transition System. contracting Office Address: n00024 Naval Sea Systems Command, Dc 1333 Isaac Hull Avenue S.e. Washington Navy Yard, Dc contracting Office Address:
sea 02
1333 Isaac Hull Avenue Se
washington Navy Yard, District Of Columbia 20376 United States place Of Performance:
tbd
united States primary Point Of Contact: ms. Sakeena Siddiqi, Procuring Contracting Officer sakeena.s.siddiqi.civ@us.navy.mil secondary Point Of Contact: mr. Tyler Pacak, Contract Specialist tyler.pacak@navy.mil
Vset N Elementary School, Luh 1544 Tender
Czech Republic
Closing Date5 Jun 2025
Tender AmountRefer Documents
Details: The subject of the Supplied is the General Teaching School. Delivery Product, Implementing Installation of Software and Interconnection, Including Testion will be Included in the Offer Ceně. A complete technical specification of supplied products is also included.
The City Government Of Baguio Tender
Machinery and Tools
Philippines
Closing Date13 Dec 2024
Tender AmountPHP 1.2 Million (USD 20.9 K)
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-151 Re-bidding November 18, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Twenty (20) Calendar Days Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Equipment 1,235,000.00 1 Set 3d Printer - 3d Printer - | Build Volume: 256 × 256 × 256 Mm³ | Nozzle: Stainless Steel | Hotend: All-metal | Max Hot End Temperature: 300 ℃ | Filament Diameter: 1.75mm | Chamber Monitoring Camera: Low Rate Camera 1280 X 720 / 0.5fps; Time Lapse Supported | Supported Filament: (ideal) Pla, Petg, Tpu, Pva, Pet; Capable (enclosure Required): Pa, Pc, Abs, Asa; Not Recommend: Carbon/glass Fiber Reinforced Polymer | Build Plate Surface Compatibility: Bambu Cool Plate, Bambu Engineering Plate, Bambu High Temperature Plate | Max Build Plate Temperature: 100℃ | Max Speed Of Tool Head: 500 Mm/s | Max Acceleration Of Tool Head: 20 M/s² | Physical Dimensions: 386 × 389 × 458 Mm³, Package Size 485 × 480 × 528 Mm³ | Net Weight: 9.65 Kg, Gross Weight 14.3 Kg | Electrical Requirements: 100-240 Vac, 50/60 Hz, 1000w@220v, 350w@110v | Certifications - Must Include Authorized Distributorship Certificate Signed By Manufacturer - Requires A Certificate That Instructor During Training Is A Certified Trainer By The Manufacturer - Must Have A Certificate Signed By Manufacturer That The Machine Is Brand New And Unused 1 Piece 3d Scanner - 3d Scanner - Mode Of Alignment Fixed Scan: Feature; Manual Auto Scan: Turntable; Manual Single Shot Accuracy Fixed Scan: ≤0.1 Mm Auto Scan: ≤0.05 Mm Minimum Scan Volume Fixed Scan: 30 × 30 × 30 Mm Auto Scan: 200×200×200mm Range Of Single Capture: 200×150 Mm Scan Speed Fixed Scan: <8> 1g; Auto Scan: Nvidia Series (gtx 660 Or Higher) Graphic Memory > 2g; Interface: 1 ×usb 2.0 Or 3.0 Windows: Win7, Win8, Win10 (64 Bit) Cpu: Dual-core I5 Or Higher Ram Fixed Scan: >8 G Auto Scan: >16 G Weight (unpacked) Fixed Scan: 2.5 Kg Auto Scan: 4.2 Kg Weight (packed) Fixed Scan: 4.9 Kg Auto Scan: 7.0 Kg Dimension: 570×210×210 Mm Power Supply: 50 W Input Voltage: Dc:12 V, 3.33 A Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry Brgy., Baguio City, December 13 , 2024 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 4 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-151 Re-bidding November 18, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Twenty (20) Calendar Days Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Calibration Board Fixed Scan: Standard Auto Scan: Hd Turntable Fixed Scan: Standard Auto Scan: Turntable With Markers Load Capacity Of Turntable: 5 Kg Certifications Must Have Certificate Of Authorize Distributorship Issued And Signed By The Manufacturer To Ensure Product Authenticity And Warranty Will Be Honored. Must Have Certificate Issued And Signed By The Manufacturer That The Machine Is Brand New And Unused Trainers Must Be Certified By The Equipment Manufacturer To Ensure That Trainors Is Properly Trained To Operate And Handle Technical Issues Thereby End Users Will Be Will Supported And Enjoy A Reliable After Sales Support. 2 Piece 43in - Interactive Kiosk - 43in - Interactive Kiosk - Lcd Size: 43in Class A Led Display Ration: (16:9) Display: Led Display Area: 941.2 X 529.4mm Resolution: 1920x1080 Light Source: Led Backlight Brightness: 300-700 Cm/m2 Touch Screen: 10 Points Contrast Ratio: 1200:1 Response Time: 8ms Viewing Angle: 88/88/88/88(l/r/u/d) Color: 8bit,16.7m Processor: Intel Core I5 Operating System (os): Genuine Windows 10 - 64 Bit Edition (or Latest) Memory (ram): 16gb 3200mhz Ddr4 Storage: M.2 Ssd 256gb Warranty: 1 Year 1 Piece 75in Interactive/touchscreen Tv - 75in Interactive/touchscreen Tv - 75" Led Panel With 20 Touch Points System Cpu: Octa-core With A73 X 4 & A53 X 4 (each Core 2.28ghz) Ram: 4gb Storage: 32gb * Metal Structure With 4mm Toughened Glass Surface Protection * Anti-glare & Anti-break Glass Resolution: 4k (3840 X 2160) Embedded Software Solutions:smart Present, Wireless Display Up To 9 Screens & Reverse Screen Broadcasting Up To 100 Devices (supporting Miracast, Airplay, Widi, Dlna) Collab Online Whiteboard: (1 Year Subscription) Cloud Storage: 10gb Built-in Camera: (8 Megapixel, 104 Degree Wide Angle) Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry Brgy., Baguio City, December 13 , 2024 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 4 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-151 Re-bidding November 18, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Twenty (20) Calendar Days Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Built-in Microphones: 6 X Omni-directional With Beamforming & To Be Able To Cover Up To 10 Meters. Embedded With 3a Algorithm For Audio: Aec (acoustic Echo Cancellation), Anc (anti-noise Resistance), Agc (automatic Gain Control). Built-in 2x 20 Watt Speakers, 1x 20 Watt Subwoofer Total Io: Hdmi Input 2.0 X 2, Hdmi Output 2.0 X 1, Dp X 1, Usb2.0 X 1, Usb3.0 X 4, Type-c Usb X 2, Touch Usb X 3, Rs232 X 1, Rj45 X 1, Audio In X 1, Audio Out X 1 Warranty: 3 Years Warranty Against Manufacturing Defects On Parts 1 Set Embroidery Machine - Embroidery Machine - Built-in Designs: 200 Designs And 11 Built-in Fonts Embroidery Area: 160mm X 260mm Display Screen: Color Lcd Stitch Selection: Touchscreen Needle Threader: Advanced Design Transfer Options: Ethernet, Wlan, Usb Embroidery Sewing Speed: 850 Spm Thread Cutter: Yes 1 Set Resin Printer - Resin Printer - System: Phrozen Os Operation: 3.5" Touch Panel Slicer Software: Chitubox V1.9.6 And Above (or Others) Connectivity: Usb Design: Technology Resin 3d Printer - Lcd Type Light Source: 405nm Paraled® Matrix 3.0 Release Film: Acf Film Xy Resolution: 43 Μm Layer Thickness: 0.01-0.30 Mm Average Printing Speed: 600 Layers/hr Power Requirement: Ac100-240v;50-60hz System Power: Max 240 W Printer Size: L47.2 X W38 X H56.6 Cm Print Volume: L33 X W18.5 X H30 Cm Printer Weight: 26 Kg Free Resin: 2 Bottles Equipped With Resin Drip Hanger Lift Up Lid Design –occupies Less Space In Area Optional Pump & Fill Accessory Upgradable (sold Separately) Certifications: Must Have Certificate Of Authorized Distributorship Signed By The Manufacturer To Ensure Product Authenticity And Warranty Will Be Honored Must Have Certificate Signed By Manufacturer That The Machine Is Brand New And Unused. Trainers Must Be Certified By The Equipment Manufacturer To Ensure That Trainor’s Is Properly Trained To Operate And Handle Technical Issues Thereby End Users Will Be Well Supported And Enjoy A Reliable After Sales Support Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry Brgy., Baguio City, December 13 , 2024 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 4 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-151 Re-bidding November 18, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Twenty (20) Calendar Days Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Piece Vacuum Forming Machine - Vacuum Forming Machine - Machine Heater: Ceramic Type, Mid-ir Band Vacuum System: Built-in, Dual-stage Hybrid User Controls: Lcd Interface Maximum Temperature: 250°c Overall Dimensions: L400 X W335 X H405 Mm Weight: 10kg Input Voltage: 100-240 Vac, 50/60hz Power Consumption: 1.32kw, Peak Noise Level: 65db, Peak Certifications: Ce, Pse, Saa, As-nzs Material Specifications Sheet Size: L330 X W250 Mm Thickness Range: 0.2 - 3.0 Mm Supported Materials: Hips, Abs, Petg, Pvc, Pmma, Pe, Pp, Pc, Eva, Kydex® Forming Envelope Area: L280 X W200 Mm Depth Of Draw: 200 Mm, Max Certifications - Must Have Certificate Of Authorized Distributorship Signed By The Manufacturer To Ensure Product Authenticity And Warranty Will Be Honored. - Must Have Certificate Signed By Manufacturer That The Machine Is Brand New And Unused. - Trainers Must Be Certified By The Equipment Manufacturer To Ensure That Trainor’s Is Properly Trained To Operate And Handle Technical Issues Thereby End Users Will Be Well Supported And Enjoy A Reliable After Sales Support. This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Bands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business On The Sale Of The Items Being Procured Or Similar Equipment For Use Of Cpdo Under Pr No.52 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry Brgy., Baguio City, December 13 , 2024 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 4
5181-5190 of 5256 active Tenders