Software Tenders
Software Tenders
U S SPECIAL OPERATIONS COMMAND USSOCOM USA Tender
Aerospace and Defence
United States
Details: 12/20/2024 Update: Added Aoi 5: Technical Experimentation, Updated Closing Date, And Added Technical Poc For Aoi 5. Entire Update Is Captured In Text Below The Two Bolded Update Banners.
12/16/2024 Update: Removed Reference To Attachment. All Available Information In Reference To This Posting Is Included In The Text Below.
ussocom Sofat&l Science And Technology Commercial Solutions Opening (cso) – Amendment 01
solution Briefs For Aois 1-4 Accepted Through 20 December 2024.
solution Briefs For Aoi 5 Accepted Through 10 January 2025
a Future Opportunity
there Are Currently Five (5) Areas Of Interest (aois):
1. Market Research And Creative Development
2. Design Development And Systems Engineering
3. Multi-domain Test And Evaluation, Including Rapid Remodel, Refit And Upgrade Of Wargaming And Experimentation Facilities
4. Rapid Prototyping/low Rate Production
5. Technical Experimentation
note: As New Aois Are Identified By Government Stakeholders, Additional Aois May Be Added To This Announcement. The Government May Call For Subsequent Proposals Under This Notification For A Period Of Six (6) Months Or Longer If Extended Via Amendment To This Posting.
ussocom Sof At&l Futures Cso Guidance
06 Dec 2024
1. Introduction:
1.1 The United States Special Operations Command (ussocom) Has Established A Novel Business Process Under The Science And Technology (s&t) Directorate Within The Special Operations Forces Acquisition, Technology, And Logistics (sof At&l) Center To Accelerate The Development, Procurement, And Integration Of Commercial And Dual-use‐derived Concepts, Capabilities And Research To Address Gaps In Future Domestic And International Sof Missions And Operating Environments.
1.2 The Ussocom Sof At&l Science And Technology Directorate Seeks To Award Primarily Non‐far Contracts And Agreements To Nontraditional And Traditional Defense Contractors To Carry Out Prototype Projects That Are Directly Relevant To Enhancing The Mission Effectiveness Of The Sof Operator And The Supporting Platforms, Systems, Components, Or Material To Be Acquired Or Developed By The Ussocom, Or The Improvement Of Platforms, Systems, Components, Or Materials In Use By Ussocom.
1.3 This Commercial Solutions Opening (cso) May Make Awards To Proposals For Innovative,
commercial And Dual‐use Capabilities Through A Multi‐phased, Competitive Process.
1.3.1 Phase I: Initially, Solutions Will Be Sought Under Certain Technology Areas, Or Industry Sectors,
characterized By Areas Of Interest (aoi) In Accordance With 803 Of The National Defense
authorization Act (ndaa) For Fiscal Year (fy) 2022 (pub. L. 117-81). Initial Submissions Against These Aois Will Be Requested As Solution Briefs (sb) Mainly In The Form Of A White Paper (wp). A Team Of Government Personnel Who Are Subject Matter Experts For The Given Aoi Will Evaluate Each Submission Independently For Potential To Address Capability Gaps Within The Aois For Advancement To Phase Ii. These Standard Evaluation Criteria Will Be Presented With Each Individual Aoi. The Government May Elect To Proceed Directly To Phase Iii After A Successful Phase I Evaluation.
1.3.2 Phase Ii: If A Phase Ii Evaluation Is Necessary, The Government Will Host Phase Ii Invitees At
one Of Its Facilities Wherein Each Offeror Will Have A Standard Amount Of Time To Pitch/demonstrate Its
proposed Solution To The Government Evaluation Panel And Hold Any Discussions Necessary For Evaluation.
discussions May Continue Outside Of The Pitch/demonstration Session. Participation In Phase Ii Will Be
entirely At The Offeror’s Expense. Favorably Evaluated Pitches Will Receive A Request For Prototype Proposal (rpp) That Marks The Beginning Of Phase Iii. Note, Phase Ii Is Optional For This Cso Process, And May Not Always Be Conducted, Or May Not Be Required For Every Successful Phase I Submission.
1.3.3 Phase Iii: The Government Will Only Advance Companies To Phase Iii If It Intends To Award A
contract Or Agreement For Its Proposed Solution. Companies Will Collaboratively Build Statements Of Objectives With The Government Team And Negotiate Contract/agreement Terms And Conditions For Award.
1.4 There Are Five (5) Aois:
1.4.1: Aoi I: Market Research/creative Development: As Ussocom S&t Addresses The Ussocom Future
operating Environments, Missions Sets And Capabilities And Planning Guidance, In Addition To Other Strategic Documents And Partner Collaboration Products, Obtaining Innovative Methods And New Capabilities For Market Research Is Critical To Understand The State Foreign And Domestic
commercial, Academic And Government Ability To Meet Sof Concept, Capability, And Technology Gaps.
additionally, Creative Products Are Required For More Quickly Facilitating Newcomer Onboarding,
storytelling, Leadership Engagement, And Better‐informed Decision‐making In The Dynamic Sof Environment. It Is Anticipated That These Will Come In The Form Of Videos, Computer Graphics, Storyboards, Visual Art And Other Media, Or Other New Innovative Commercial Methods, Technologies, Or Services.
1.4.2: Aoi Ii: Design Development/systems Engineering – As Ussocom S&t Agilely And Rapidly Investigates Capabilities To Address Sof‐peculiar Concepts And Missions, Disciplined And Rigorous Engineering And Design Must Be Utilized To Reduce Technical And Programmatic Risk, As Well As Improve Capacity For Eventual Transition To Programs Of Record. Submissions Should Address Either Innovative Commercial Items, Technologies, Or Services That Aid In Design Development Capabilities (including, But Not Limited To Software Development Best Practices, Experimentation, And User Experience Trials), Or Systems Engineering Rigor (interface Definition, Requirement Derivation, System Architecture), Or Both.
1.4.3: Aoi Iii: Multi‐domain Test And Evaluation, Including Rapid Remodel, Refit And Upgrade Of Wargaming And Experimentation Facilities
‐ As Ussocom S&t Investigates Capabilities And Technologies To Address Sof‐peculiar Concepts And Missions, Novel And Agile Methods Of Multi‐domain Test And Evaluation Will Be Required. Submissions Should Address Innovative Commercial Items, Technologies, Or Services That Aid In One Or Multiple Domains, Including Aviation Experimentation, Cyber/internet Of Things Evaluation (to Include Vulnerability Assessments And Penetration Testing), Maritime/undersea Evaluation, Communications Testing And Electromagnetic Warfare Analyses. Additionally, Real-world Events Have Shown A Need For The Ability To Rapidly Innovate And Incorporate Required Changes To Collaboration And Decision Support Spaces, Experimentation Ranges And Wargaming Cells Based On A Much More Compressed Feedback Cycle, Novel And Agile Method Incorporation And A Reduced Scope Than Normal Military Construction Processes. Submissions Are Requested For This Supporting Effort.
1.4.4: Aoi Iv: Rapid Prototyping/low Rate Production – Offerors Should Demonstrate Innovative Commercial Items, Technologies, Or Services That Aid In Rapidly Prototyping Or Manufacturing Small Lots (<100) Of Experimental Electronics, Chipsets, Batteries And Other Multi‐material Experimental Prototypes Based On Task Orders From S&t Futures And The Experimentation Force.
1.4.5: Aoi V: Technical Experimentation – Offerors Should Demonstrate Innovative Commercial Capabilities To Develop A Prototype Business Process To Enhance The Technology Experimentation Process, Expand Experimentation Opportunities For Sof At&l Stakeholders Across The Command, And Enhance International Collaboration, Experimentation Event After-actions, And Synchronization With Command And Component Operational Exercises.
2. Guidelines For Solution Briefs, Pitches, And Proposals:
2.1 The Purpose Of The Solution Brief Is To Identify Innovative Solutions And Narrow Focus Areas To Exclude Potential Lines Of Effort On The Part Of Offerors Whose Proposed Work May Not Be Of Interest To The Government. Offerors Are Encouraged To Follow The Instructions Detailed Below. Solution Briefs Should Specifically Identify The Aoi To Which It Is Responding. The Government Aims To Provide An Evaluation Response No Later Than 10 Days After Receipt Of A Solution Brief.
2.2 Submissions Will Not Be Returned. The Original Of Each Submission Received Will Be Retained By The Ussocom Sofat&l S&t Team And All Other Non‐required Copies Destroyed.
2.3 Guidelines For Solution Brief Submissions:
2.3.1 Costs Of Preparing And Submitting Solution Briefs Are At The Offerors’ Expense.
2.3.2 Unnecessarily Elaborate Brochures Or Proposals Are Not Desired.
2.3.3 Use Of A Diagram(s) Or Figure(s) To Depict The Proposed Solution Is Strongly Encouraged.
2.3.4 Multiple Solution Briefs Addressing Different Aois May Be Submitted By The Same
organization; However, Each Solution Brief May Only Address One Concept Based On The Stated Aois.
2.3.5 The Period Of Performance For Any Solution Brief Or Proposal Submitted Under This Cso
should Generally Be No Greater Than 60 Months.
2.3.6 Technical Data With Military Application May Require Appropriate Approval, Authorization, Or License For Lawful Exportation.
2.3.7 All Solution Briefs Shall Be Unclassified. Solution Briefs Containing Data That Is Not To Be Disclosed To The Public For Any Purpose Or Used By The Government Except For Evaluation Purposes Shall Include The Following Notice On The Cover Page:
“this Solution Brief Includes Data That Shall Not Be Disclosed Outside The Government, Except To Contractor Support Services Personnel For Evaluation Purposes, And Shall Not Be Duplicated, Used, Or Disclosed ‐‐ In Whole Or In Part ‐‐ For Any Purpose Other Than To Evaluate This Submission. If, However, An Agreement Is Awarded To This Offeror As A Result Of ‐‐ Or In Connection With ‐‐ The Submission Of This Data, The Government Shall Have The Right To Duplicate, Use, Or Disclose The Data To The Extent Agreed Upon By Both Parties In The Resulting Agreement. This Restriction Does Not Limit The Government's Right To Use Information Contained In This Data If It Is Obtained From Another Source Without Restriction. The Data Subject To This Restriction Are Contained In Sheets [insert Numbers Or Other Identification Of Sheets]”
and Each Restricted Data Sheet Should Be Marked As Follows:
“use Or Disclosure Of Data Contained On This Sheet Is Subject To The Restriction On The Title Page Of This
proposal.”
2.3.8 Foreign‐owned Businesses May Submit A Proposal Alone Or Through Some Form Of Teaming
arrangement With One Or More United States‐owned Businesses. However, The Ability To Obtain An
agreement Based Upon A Submission May Depend Upon The Ability Of The Foreign Owned Business To
obtain Necessary Export Clearances And Approvals To Obtain Aoi Or Soi Information.
2.3.9 Questions Regarding The Objectives Or Preparation Of The Solution Brief For Aois 1-4 Should Be Addressed To: Brian.sisco@socom.mil. Questions Regarding Objectives Or Preparation Of The Solution Brief For Aoi 5 Should Be Addressed To: David.j.saren.civ@socom.mil
2.3.10 Submissions Must Be Submitted Electronically To The Individuals Listed Below:
mr. Ron Reed – Ronald.e.reed.civ@socom.mil
mr. Brian Sisco (aois 1-4) – Brian.sisco@socom.mil
mr. Dave Saren (aoi 5 Only) David.j.saren.civ@socom.mil
mrs. Terry Ann Lewis – Terryann.j.lewis.ctr@socom.mil
2.4 Solution Brief Preparation And Evaluation: Submitter’s Solution Brief Should Not Exceed Five (5)
pages Using Twelve (12)‐point Font. Alternatively, Solution Briefs May Take The Form Of Slides, Which Should Not Exceed Ten (10) Slides. These Limits Are Not Requirements, But Strong Recommendations.
2.4.1 Solution Brief Content:
• Title Page (does Not Count Against Page Limit) – Offeror Name, Title, Date, Point Of Contact Name, Email Address, Phone, And Address
• Executive Summary (one Page) ‐ Provide An Executive Summary Of The Capability.
capability Concept: Describe The Unique Aspects Of Your Capability And The Proposed Work As It Relates
to The Aoi. Identify Whether The Effort Includes The Pilot Or Demonstration Of Existing Commercial
technology (identified As Commercially Ready And Viable Technology) Or The Development Of
technology For Potential Commercial Or Defense Application. If Development Or Adaptation Is
proposed, Identify A Suggested Path To Mature The Technology. Explain How The Technology, Process,
or Method, Including Research And Development, Or Application Is Innovative (i.e., New As Of The Date
of Proposal Submission.)
• Previous Work With Ussocom S&t, Specifically As Part Of Futures Or The S&t Innovation Cycle
• Offeror Viability: Provide A Brief Overview Of The Offeror. Provide A Summary Of Current Fundraising To
date Or A Summary Of The Top Line (gross Sales/revenues). Provide A Summary Of Product
commercialization And Go‐to‐market Strategy.
2.4.2 Solution Brief Basis Of Evaluation: Individual Solution Briefs Will Be Evaluated Through Peer
review Without Regard To Other Submissions Received Under This Announcement, With The Primary
evaluation Factors For Selecting Proposals For Award As Technical, Importance To Agency Programs, And
funding Availability. Subfactors For Relevant Factors Are Further Explained Below In The Following Criteria:
• Technical
o Merit – The Feasibility Of The Proposed Solution To Address The Aoi
o Agility And Rapidity– Documented Desire And Procedures In Place To Respond To Government Task Order Requests (rfps, Rfis, Etc) Within Five (5) Business Days Of Receipt, Or Demonstrated Ability To Rapidly Prototype, Experiment Or Successfully Complete Technical Design Sprints.
o Innovation – Degree To Which The Proposed Solution Provides An Innovative, Unique And/or Previously Under‐utilized Approach
• Importance To Agency Programs
o Relevance ‐ How The Proposed Solution Relates To The Aoi
o Past Performance
o Business Viability – Strength Of The Offeror And Commercial Viability Of The Proposed Solution. (the Government May Elect To Use External Market Research In The Evaluation Of An Offeror’s Viability.)
• Affordability
o Cost, Price, And Budgetary Considerations
2.4.3 After Evaluation Of A Solution Brief, The Government May Elect To Invite An Offeror To Pitch
and/or Demonstrate Their Technology In Person Or Request Additional Information From The Offerors . The Government Reserves The Right To Move To Award Without Prior Pitch And/or Demonstration.
2.5 Pitch And/or Demonstration Content: The Pitch And/or Demonstration Should Provide More
details On The Technical Merit And Business Viability Of The Proposed Solution Submitted In The Solution
brief. Regardless Of Format, The Pitch And/or Demonstration Must Also Address:
rough Order Of Magnitude Price And Notional Schedule.
ussocom Utility And How This Concept Could Be Tested Within A Sof Military Environment.
operational Impact. Detail Who The Operational Users Of The Technology Are Expected To Be.
prototype: State How This Effort Constitutes A Prototype
data Rights And Intellectual Property Assertions.
the Government May Request Additional Information Outside Of The Pitch/demonstration.
2.6 Pitch And/or Demonstration Basis Of Evaluation: Individual Pitch And/or Demonstration Will Be
evaluated Without Regard To Other Presentations Under This Announcement With The Primary Evaluation
factors For Selecting Proposals For Award As Technical, Importance To Agency Programs, And Funds
availability. On The Following Factors:
• Technical
o Technical Merit
o Innovation
o Data Rights/intellectual Property
o Schedule
• Importance To Agency Programs
o Past Performance
o Business Viability
o Relevancy To Aoi
• Funds Availability
o Cost And Price Drivers
2.7 The Government Will Aim To Complete Phase Ii Evaluations And Offeror Notification Within 10
calendar Days Of The Pitch/demonstration And/or Receipt Of Additional Requested Information. All
companies Will Receive Phase Ii Notification, However, Only Favorably Evaluated Solution Briefs Or
pitches/demonstrations Will Enter Phase Iii Of The Cso Process And Receive A Request For Prototype
proposal (rpp).
2.8 Proposal Preparation: Rpps Will Include Preparation Instructions For Prototype Proposals. During
this Phase, Companies Will Collaboratively Develop Statements Of Work (sow) With The Government Teams For Their Specific Projects And Negotiate Terms And Conditions Into Their Contracts Or Agreements.
3. Contract Award:
3.1 Only Warranted Contracting Officers And Agreements Officers May Obligate The Government And
issues Awards For Procurement Contracts Or Other Transaction Agreements (ota).
3.2 Awards Made Under This Cso Will Be Primarily Firm Fixed‐price Contracts Or Other Transaction
agreements (ota) Under 10 U.s.c 4022 For Prototypes Projects With Potential Follow‐on Noncompetitive Production Agreements Iaw 10 U.s.c 4022(f), 10 U.s.c. 4023 Ota For Experimental Purposes, 15 U.s.c. 3715 Partnership Intermediary Agreements, Or Traditional Far Contracts. Contract Type Will Be Determined During Phase Iii.
3.3 In The Event An Ota Is Awarded Under 10 U.s.c 4022 For A Prototype Project, A Follow‐on
production Agreement May Be Awarded To The Prototype Project Recipient In A Non‐competitive Manner Based On Completion Of Success Criteria Developed In The Prototype Project. The Resulting Ota May Include More Than One Prototype Project. Non‐completion Of One Or More Prototype Project(s) Does Not Limit The Possibility Of The Non‐competitive Follow‐on Production Ota For Successfully Completed Projects, And The Noncompetitive Production Ota May Also Be Awarded At The Completion Of An Individual Prototype Project, Before The Overall Completion Of All Prototype Projects Contemplated Under The Ota.
3.4 To Receive An Award, Companies Must Be A Registered Entity In The System For Award
management (sam). This System Verifies Identity And Ensures That Payment Is Sent To The Right Party. The Link Can Be Found Here: Https://sam.gov/sam/
3.5 In General, To Invoice And Receive Payment, Companies Must Register In Wide Area Work Flow
(wawf). The Contracting Officer/agreements Officer Will Provide Wawf Assistance During Phase Iii.
3.6 Proposals Will Be Accepted Through The Date Of 10 January, 2025.
4. Non‐government Advisors: Non‐government Advisors May Be Used In The Evaluation Of Solution
briefs And Proposals And Will Have Signed Non‐disclosure Agreements (ndas) With The Government. The
government Understands That Information Provided In Response To This Cso Is Presented In Confidence
and May Contain Trade Secret Or Commercial Or Financial Information, And It Agrees To Protect Such
information From Unauthorized Disclosure To The Maximum Extent Permitted And As Required By Law.
5. Contact Information: Be Advised, Only A Contracting Officer/agreements Officer Has The Authority To Enter Into A Binding Agreement On Behalf Of The Government And Has Exclusive Authority To Change The Terms Of A Contract Or Agreement. All Inquiries Need To Be Sent To Ronald.e.reed.civ@socom.mil.
6. Definitions:
innovative: “innovative” Is Defined As (1) Any Technology, Process, Or Method, Including Research And
development, That Is New As Of The Date Of Submission Of A Proposal; Or (2) Any Application That Is New As Of The Date Of Submission Of A Proposal Of A Technology, Process, Or Method Existing As Of Such Date.
non‐traditional Defense Contractor (ndc): An Entity That Is Not Currently Performing And Has Not
performed, For At Least The One‐year Period Preceding The Solicitation Of Sources By Dod For The
procurement Or Transaction, Any Contract Or Subcontract For The Dod That Is Subject To Full Coverage Under The Cost Accounting Standards Prescribed Pursuant To Section 1502 Of Title 41 And The Regulations
implementing Such Section (see 10 U.s.c. 2302(9)).
other Transaction Agreement (ota): Legally Binding Instruments Not Subject To The Requirements Of The
federal Acquisition Regulation (far) Obligating The Government For A Purpose Iaw 10 Usc 4021 And
4022.
procurement Contract. A Contract Awarded Pursuant To The Federal Acquisition Regulation.
prototype Project: Prototype Project Addresses A Proof Of Concept, Model, Reverse Engineering To Address Obsolescence, Pilot, Novel Application Of Commercial Technologies For Defense Purposes, Agile
development Activity, Creation, Design, Development, Demonstration Of Technical Or Operational Utility, Or Combinations Of The Foregoing. A Process, Including A Business Process, May Be The Subject Of A Prototype Project.
although Assistance Terms Are Generally Not Appropriate In Ot Agreements, Ancillary Work Efforts That Are Necessary For Completion Of The Prototype Project, Such As Test Site Training Or Limited Logistics Support, May Be Included In Prototype Projects. A Prototype May Be Physical, Virtual, Or Conceptual In Nature. A Prototype Project May Be Fully Funded By Dod, Jointly Funded By Multiple Federal Agencies, Cost‐shared, Funded In Whole Or Part By Third Parties, Or Involve A Mutual Commitment Of Resources Other Than An Exchange Of Funds.
Closing Soon10 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: Request For Sf 330
a/e Idiq At The Capt James A. Lovell Federal Health Care Center (fhcc)
3001 Green Bay Rd, North Chicago Il, 60064
36c25225q0122
introduction:
this Is A Request For Sf330s For A Single Award Firm-fixed Price, Indefinite Delivery/indefinite Quantity (id/iq) Contract For Mep-a/e Professional Services At The Fhcc Under Naics 541330 Necessary For The Design Of Various In-house And Nonrecurring Maintenance Construction Projects, (nrm), Scip (strategic Capital Investment Planning) And Station Level Construction Projects At This Medical Center That Are Multi-discipline Engineering In Nature And Primarily Focused On Mechanical, Electrical, And Plumbing Design And Fca (facility Condition Assessment), (i.e., Mechanical, Electrical, Architectural, Civil Structural, Computer Engineering Services, Etc.). Services To Include, But Are Not Limited To Conceptual Design, Design Programming, Preliminary Designs, Working Drawings And Specifications, Cost Estimating, Site Visits, Miscellaneous Reports, And Construction Period Services. All Work Will Be For The Capt James A Lovell Federal Health Care Center North Chicago, Illinois.
pursuant To Public Law 109-461, This Solicitation Is Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Firms. In Accordance With Vaar 819.7003(b), At The Time Of Submission Of Bid, The Bidder Must Represent That It Is A Sdvosb Concern, A Small Business Concern Under The Naics Code Assigned To The Acquisition, And Is Cve Verified For Eligibility In The Vip Database.
attention To Special Notice Of Vaar Clause 852.219-75 Va Notice Of Limitations On Subcontracting - Certificate Of Compliance For Services And Construction. Failure Of Offeror To Attest And Sign The Certificate Of Compliance Shall Render The Offeror's Sf330 Submission Technically Unacceptable Outright And The Offeror Shall Not Be Eligible For Award. (see Page 6 Below)
this Announcement Is Not A Request For Proposal. No Solicitation Package Will Be Issued Via Sam. A Request For Proposal Will Be Issued Directly To The Top-rated Firm For Which Negotiations Will Commence In Accordance With Far Part 36.606. The Anticipated A/e Design Services, To Be Awarded, Will Be Procured In Accordance With The Selection Of Architects And Engineers Act (public Law 92-582), Federal Acquisition Regulation Part 36.6.
mileage Restriction: This Procurement Is Restricted To Sdvosb Concerns Located Within A 400-mile Radius Of The Fhcc. The 400-mile Radius Restriction Will Be Verified By Using The Website Https://www.freemaptools.com/radius-around-point.htm And Verifying The Distance From The Firm S Primary Or Satellite Office Location.
period Of Performance: Five-year Ordering Period
contract Type: Firm-fixed-price Idiq
estimated Magnitude Of Construction: Individual Task Orders Will Be Established For A Minimum Of $2,000 And A Maximum Of $6,000,000.00.
contract Ceiling: $25,000,000.00
naics Code: 541330 - Engineering Services
size Standard: $26 Million
attention To Special Notice Proof Of Sam Registration. Offerors Are Required To Submit Proof Of Sam Registry With Their Sf330 Submission. Failure Of Offeror To Submit Proof Of Sam Registration Shall Render The Offeror's Sf330 Submission Technically Unacceptable Outright And The Offeror Shall Not Be Eligible For Award.
sam: In Accordance With Far 19.301-1, At The Time Of Sf330 Submission And Prior To Award Of Any Contract, The Offeror Must Represent To The Contracting Officer That It Is A Small Business Concern Under The North American Industry Classification System (naics) Code Assigned To The Acquisition. Additionally, All Eligible Firms Must Be Registered And Current In The System For Award Management (sam) Database To Be Evaluated And Eligible For Contract Award. If The Firm Is Not Registered In Sam, You May Register Online At Https://www.sam.gov.
the Following Factors Are Included In The Request For Sf 330s And Will Be Used To Evaluate Firms. The Factors Are Listed In Descending Order Of Importance, In Accordance With Far 36.602-1 And Vaam M836.602-1. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria.
primary Selection Criteria:
1. Specialized Experience And Technical Competence: Specialized Experience In Health Care Facility And Associated Grounds And Structures Design And Construction Period Services.
specialized Experience Includes Healthcare Facility Specific Code And Industry Standards Such As Nfpa 99, Ashrae 170, And Others Listed At Design & Construction Procedures (pg-18-3) Topic 01 Available At Cfm Til (https://www.cfm.va.gov/til/).
include Government And Private Experience Detailing Each Projects Size, Scope, And Complexity, And Experience With Project Phasing, And Infection Control Planning To Maintain Hospital Operations During Construction. Of Particular Importance Will Be Describing The Contributing Disciplines Of Your Firm, And Your Processes, And How Your Work Enabled Positive Outcomes For The Example Clients.
the Evaluation Will Consider The Management Approach, Coordination Of Disciplines And Consultants, Quality Control Procedures, Prior Experience Of The Prime Firm And Any Key Consultants Working Together On Relevant Projects, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards.
2. Professional Experience And Qualifications: Discipline Leads, And Senior Architects And Engineers Must Have Graduated From An Abet Accredited Program, Maintain Current Licensure, And Possess No Less Than Five Years Professional Experience In The Discipline Of Their Assigned Responsibility (i.e. Only Licensed Electrical Engineers Can Design Electrical Systems). Expect Resumes To Be Fact-checked. Submitting False Information Will Adversely Affect Scoring.
personnel Proposed For Assignment To This Contract Possess A Current Registered Architect Or Professional Engineer License By A Us State, The District Of Columbia, Or Us Territory. Provide Professional License Jurisdiction Of Issue And License Numbers And/or Proof Of Licensure.
include The Vertical Transportation Planning Expert Along With The Credentials Of His Or Her Employer As Described At Pg-18-3 Topic 18. All Studies And Designs Are To Be Provided By Independent, Experienced, And Qualified Consultant That Normally Performs Vertical Transportation Studies And Design As A Standard Part Of Their Services, As Prescribed At Pg-18-10 Elevator Design Manual. Clarification: There Is No Industry Certification Named Medical Transport Logistics Consultant. Provide The Prescribed Qualifications And Submission Of Same.
physical Security Consultant Lead Must Hold The Physical Security Professional (psp) Certification Page 3 Source Selection Sensitive Far 2.101 And 3.104 Issued By Asis International. Telecom Network Sme Responsible For Compliant Planning Must Hold A Current Bicsi Registered Communications Distribution Designer (rcdd) Certification. Review The Current Physical Security And Resiliency Design Manual For More Required Certifications And Their Applicability. Do Not Submit Alternative Certifications Or Other Documentation Other Than Those Prescribed, Issued By The Organizations Prescribed. There Is No Alternative Physical Security Specialist. Only Asis Psp. Absence Of Prescribed Certifications Is Nonresponsive.
cost Estimates Prepared By The (in-house) Design Professionals Developing The Work Are Preferred Over Contracted Estimating Services Who Only Add To The Cost And Duration Of Design Efforts.
evaluation Will Consider Truthful Information Regarding Education, Certifications, Training, Registration, Relevant Experience, And Longevity With The Firm.
offer Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement:
I [signatory Authority]______________________, [company] __________________ Certify That The Team Proposed To Perform Under This Requirement Demonstrates The Capability Of 50% Sdvosb Performance In Compliance Of 48 Cfr 852.219-10.
3. Capacity To Accomplish The Work In The Required Time, Including Maintaining Project Schedules, Budgets, And Quality Compliance. Firm(s) Will Be Required And Expected To Have The Capacity To Simultaneously Manage And Staff Multiple Assignments Of Various Size, Scope, And Complexity.
evaluation Will Consider The Firm S Plan And Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Personnel In Key Disciplines. Provide The Available Capacity Of Required Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. Note That Responses To This Factor Almost Always Present The Same Result, Therefore Ae Firms Will Do Well To Describe How They Will Ensure Schedule, Budget, And Quality Compliance. Don T Provide Marketing Statements Or Academic Descriptions Of The Terms. Provide Your Actual Process And How It (uniquely) Benefits Clients. Include Examples Of These Successes Along With Contact Information.
4. Past Performance On Contracts With Government Agencies In Terms Of Cost Control, Schedule Adherence, And Quality Of Work. Include Complete, Unedited Cpars Reports Or Past Performance Questionnaires (ppqs) If Cpars Data Is Not Available For Example Projects (similar Past Engagements).
it Is Optimal For Submissions To Align The Parts Of This Submission. Example Projects Should Be Supported By Cpars For That Project, Submitted Staff And Consultant Team History In That Project, And More To Affect A Package Of Sorts. Submitting Team Members Who Didn T Contribute To Example Projects Only Results In More Questions And Little Benefit.
government Past Performance Information Systems May Be Accessed. Evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars Or Ipps. Failure To Provide Requested Data, Accessible Points Of Contact With Valid Phone Numbers Will Result In Reduced Scores.
5. Knowledge Of The Locality, And Servicing Office Location: Specific Knowledge Of Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Local Construction Methods, Market Conditions, Medical Center Structures, And Key Stakeholders. Project Experiences At This Location Are The Target Response, Not Nws Or Usgs Data. We Recommend Against Presenting Projects That Went Badly, Or Were Cancelled, Or Required To Be Redesigned By Others As Examples.
6. Inclusion Of Sdvosb, Vosb, And Then Small/disadvantaged Businesses.
secondary Selection Criteria:
7. Servicing Office Location: Staffed Offices Of The Submitting Firm Are The Target. Do Not Submit Virtual Offices, Offices Of Other Firms, Residences, Or Properties Currently For Sale. Preference Is Available Design Professional Staff Within 400 Miles, Or Four Hours Of Fair-weather Travel. Local Firms Tend To Have More Location-specific Knowledge, Which Offers Benefit To The Effort. Submitted Staff Listed At Local Offices Cannot Later Charge Airfare, Or Other Travel Costs Including Wages Beyond Four Hours. Firms Lacking A Regional Presence Aren T Disqualified, Only Scored Lower In This Factor Unless Their Submitted Information If Found To Be Untruthful.
8. Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Conduct And Performance, General Management, And Cooperation With All Project Stakeholders. Factor Also Includes Consideration Of Past Improper Or Incomplete Architectural And Engineering Services. Submission Of Information About Office Locations, Staff, Past Experience, And Other Criteria Offers Evidence Against The Reputation Of The Firm.
please Note: The Ae Evaluation Board Must Be Provided With Complete And Accurate Information For All Evaluation Factors Above In Order To Rank Interested And Eligible Firms. Therefore, The Ae Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The Ae Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications.
additionally, Keep In Mind The Submission Requirement Restrictions Outlined Below When Addressing Evaluation Factors.
selection Process: In Accordance With Far 36.6, Sf330s Will Be Evaluated By The Evaluation Board Using The Evaluation Factors Identified In This Announcement. After Sf330s Have Been Evaluated, Discussions/interviews Will Be Held With At Least Three Of The Most Highly Qualified Firms. After Discussions Conclude, The Evaluation Board Will Evaluate The Qualifications Of The Firms Using The Same Evaluation Factors, Taking Into Consideration Both The Sf330 Submission And Subsequent Discussions, To Select The Most Preferred Firm From The Firms Considered To Be The Most Highly Qualified. Negotiations Will Then Begin With The Most Preferred Firm.
submission Requirements: Interested And Eligible Firms Should Submit Their Current Sf330 As Follows:
1) One (1) Electronic Pdf Copy To Ricky.bond@va.gov And Stacy.hoover2@va.gov
a. Size Limitation Is 10mb;
the Sf330s Are Due On February 3, 2025 At 4:30 Pm (cst).
acceptable Electronic Formats (software) For Submission Of Sf330 Packages:
(a) Files Readable Using The Current Adobe Portable Document Format (pdf);
(b) Files In Adobe Pdf Files: When Scanning Documents Scanner Resolution Should Be Set To 200 Dots Per Inch, Or Greater.
(c) Sf330s Shall Be Provided On Standard Letter Size 8-1/2 By 11-inch Paper, Limited To A Maximum Of Seventy-five (75), Single-sided, Single-spaced, And Numbered Pages. If More Than Seventy-five (75) Single-sided Pages Are Submitted, All Pages After Seventy-five (75) Pages May Not Be Evaluated. The Font For Text Shall Be Times New Roman 12-point Or Larger.
(d) Please Note That We Can No Longer Accept .zip Files Due To Increasing Security Concerns.
the Sf330 Can Be Downloaded Through The Gsa Forms Library At: Http://www.gsa.gov/portal/forms/type/top, Type In Sf330 In The Find A Form Block And Click On Search.
no Fax Responses Will Be Accepted: Personal Visits For Discussing This Announcement Will Not Be Entertained Or Scheduled. Questions May Be Directed Only By E-mail To Ricky.bond@va.gov And Stacy.hoover2@va.gov. Va Primary Points Of Contact: Stacy Hoover, Nco 12 Contracting Officer, Stach.hoover2@va.gov.
vaar 852.219-75 Requirement
****complete This Letter & Include With Sf330****
contractor Letterhead
certification:
va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation)
(a) Pursuant Toâ 38 U.s.c. 8127(l)(2), The Offeror Certifies That
(1) If Awarded A Contract (seeâ far 2.101â definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: [contracting Officer Check The Appropriate Box Below Based On The Predominant Naics Code Assigned To The Instant Acquisition As Set Forth Inâ far 19.102.]
(i) [x ]â services.â in The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdvosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6.
(ii) []â general Construction.â in The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdbosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted.
(iii) [ ] Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Notâ certifiedâ sdvosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-73â orâ certifiedâ vosbsâ listed In The Sba Certification Databaseâ as Set Forth Inâ 852.219-74. Any Work That A Similarly Situatedâ certified Sdbosb/vosbâ subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted.
(2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution.
(3) If Va Determines That An Sdvosb/vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following:
(i) Referral To The Va Suspension And Debarment Committee;
(ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And
(iii) Prosecution For Violatingâ 18 U.s.c. 1001.
(b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed.
(c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate.
(d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award.
certification:
i Hereby Certify That If Awarded The Contract, ____________________________________________ [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of _______________________________________________________________[insert Name Of Offeror].
printed Name Of Signee: __________________________________
printed Title Of Signee: __________________________________
signature: __________________________________
date: __________________________________
company Name: __________________________________
address: __________________________________
__________________________________
Closing Date3 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Scraps
United States
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
type Of Contract (apr 1984)|1|firm Fixed|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
evaluation Of First Article Testing|3|x|$42,000||
this Amendment Is Issued To Update Solicitation Clauses.
this Requirement Is Not A Small Business Set-aside And Is Full And Open.
\
---this Requirement Is Not A Small Business Set-aside.---
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. The Following Proposed Delivery Schedule Applies:
submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery.
weld Procedure And Qual Data 120 Days Adc Lt
approval Of Weld Procedures And Qual Data
60 Days After Receipt
fat Report 150 Days After Approval Of Pr Lt
approval Of Fat Report 30 Days After Receipt
Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract.
4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas).
5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation.
7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details.
8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080211|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.;
3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.;
3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;receptacle Body, Item 14;
material - ;qq-n-281, Class A;
part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Electrical Hull Fitting Assembly;
performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258;
acceptance - ;mil-dtl-24231;
test - ;dye Penetrant Inspection;
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Annealing And Age Hardening
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - Qq-n-286
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240.
(207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; .
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - See Clause 52.209-3 For Submittal Timeframes.
Closing Soon9 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
desired And Required Time Of Delivery (june 1997)|29|0001aa|9 Ea|548|0001ab|10 Ea|548 Days||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/a
|n/a|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery |one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001aa |200|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270.4(207-438-5898) Kittery Maine, 03904|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|336612|1000||||||||||||
type Of Contract (apr 1984)|1|firm Fixed Price|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
provision 252.204-7024 Is Hereby Removed From This Solicitation. This Is Not An Evaluation Factor For Award.
\
this Solicitation Requires First Article Testing
see Far 52.209-4 For More Details.
dd1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be"do" Rated Order Certified For National Defense Use Under The Defense Priorities Andallocations System (dpas).
if Drawings Are Included In The Solicitation, Access Needs To Berequested On The Individual Solicitation Page On Contractsopportunities On The Government's Sam Website. Afterrequesting Access, Send An Email To The Primary Poc Listed Onthe Solicitation.
this Requirement Requires Access To Noforn And/or Navalnuclear Propulsion Information. See Local Text Wsstermhz12for Further Information. If You Wish To Obtain A Copy Of Thedrawings, Please Download The Security Agreement Form Fromsam.gov And Email The Completed,
signed Form To Scott.r.youngblood2.civ@us.navy.mil.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=eb-2937 |96169| B|sp |d|0001 | B|49998|0568465
drawing Data=eb-2937 |96169| B|sp |d|0002 | B|49998|0262311
drawing Data=eb-2937 |96169| B|sp |d|0003 | B|49998|0457001
drawing Data=eb-2937 |96169| B|sp |d|0004 | B|49998|0494479
drawing Data=eb-2937 |96169| B|sp |d|0005 | B|49998|0557624
drawing Data=eb-2937 |96169| B|sp |d|0006 | B|49998|0572669
drawing Data=eb-2937 |96169| B|sp |d|0007 | B|49998|0588302
drawing Data=eb-2937 |96169| B|sp |d|0008 | B|49998|0487356
drawing Data=eb-2937 |96169| B|sp |d|0009 | B|49998|0641401
drawing Data=eb-2937 |96169| B|sp |d|0010 | B|49998|0609048
drawing Data=eb-2937 |96169| B|sp |d|0011 | B|49998|0332061
drawing Data=h261-0102d74 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h621-0102a01 |53711| A|er |d|0001 | A|49998|0037852
drawing Data=h621-0102a01 |53711| A|er |d|0002 | A|49998|0022265
drawing Data=h621-0102a01 |53711| A|er |d|0003 | A|49998|0045427
drawing Data=h621-0102a01 |53711| A|er |d|0004 | A|49998|0032629
drawing Data=h621-0102a01 |53711| A|er |d|0005 | A|49998|0033163
drawing Data=h621-0102a01 |53711| A|er |d|0006 | A|49998|0041453
drawing Data=h621-0102a01 |53711| A|er |d|0007 | A|49998|0122787
drawing Data=h621-0102a01 |53711| A|er |d|0008 | A|49998|0075868
drawing Data=h621-0102a02 |53711| A|er |d|0001 | A|49998|0038259
drawing Data=h621-0102a02 |53711| A|er |d|0002 | A|49998|0014346
drawing Data=h621-0102a02 |53711| A|er |d|0003 | A|49998|0053725
drawing Data=h621-0102a02 |53711| A|er |d|0004 | A|49998|0063527
drawing Data=h621-0102a02 |53711| A|er |d|0005 | A|49998|0064236
drawing Data=h621-0102a02 |53711| A|er |d|0006 | A|49998|0037645
drawing Data=h621-0102a02 |53711| A|er |d|0007 | A|49998|0036363
drawing Data=h621-0102a02 |53711| A|er |d|0008 | A|49998|0037448
drawing Data=h621-0102a02 |53711| A|er |d|0009 | A|49998|0039414
drawing Data=h621-0102a02 |53711| A|er |d|0010 | A|49998|0160700
drawing Data=h621-0102a02 |53711| A|er |d|0011 | A|49998|0134109
drawing Data=h621-0102a03 |53711| A|er |d|0001 | A|49998|0021078
drawing Data=h621-0102a03 |53711| A|er |d|0001.1 | A|49998|0019129
drawing Data=h621-0102a03 |53711| A|er |d|0001.2 | A|49998|0025775
drawing Data=h621-0102a03 |53711| A|er |d|0001.3 | A|49998|0039912
drawing Data=h621-0102a03 |53711| A|er |d|0001.4 | A|49998|0026761
drawing Data=h621-0102a03 |53711| A|er |d|0002 | A|49998|0057736
drawing Data=h621-0102a03 |53711| A|er |d|0003 | A|49998|0069402
drawing Data=h621-0102a03 |53711| A|er |d|0004 | A|49998|0052923
drawing Data=h621-0102a03 |53711| A|er |d|0005 | A|49998|0044205
drawing Data=h621-0102a03 |53711| A|er |d|0006 | A|49998|0053927
drawing Data=h621-0102a03 |53711| A|er |d|0007 | A|49998|0039873
drawing Data=h621-0102a03 |53711| A|er |d|0008 | A|49998|0047671
drawing Data=h621-0102a03 |53711| A|er |d|0009 | A|49998|0042694
drawing Data=h621-0102a03 |53711| A|er |d|0010 | A|49998|0039885
drawing Data=h621-0102a03 |53711| A|er |d|0011 | A|49998|0044703
drawing Data=h621-0102a03 |53711| A|er |d|0012 | A|49998|0042919
drawing Data=h621-0102a03 |53711| A|er |d|0013 | A|49998|0037692
drawing Data=h621-0102a03 |53711| A|er |d|0014 | A|49998|0039760
drawing Data=h621-0102a03 |53711| A|er |d|0015 | A|49998|0041011
drawing Data=h621-0102a03 |53711| A|er |d|0016 | A|49998|0048557
drawing Data=h621-0102a03 |53711| A|er |d|0017 | A|49998|0014830
drawing Data=h621-0102a03 |53711| A|er |d|0018 | A|49998|0013294
drawing Data=h621-0102a03 |53711| A|er |d|0019 | A|49998|0166561
drawing Data=h621-0102a03 |53711| A|er |d|0020 | A|49998|0139744
drawing Data=h621-0102a03 |53711| A|er |d|0021 | A|49998|0189793
drawing Data=h621-0102a03 |53711| A|er |d|0022 | A|49998|0139891
drawing Data=h621-0102a03 |53711| A|er |d|0023 | A|49998|0121265
drawing Data=h621-0102a03 |53711| A|er |d|0024 | A|49998|0105221
drawing Data=h621-0102a03 |53711| A|er |d|0025 | A|49998|0114189
drawing Data=h621-0102a03 |53711| A|er |d|0026 | A|49998|0198610
drawing Data=h621-0102a03 |53711| A|er |d|0027 | A|49998|0115665
drawing Data=h621-0102a03 |53711| A|er |d|0028 | A|49998|0083415
drawing Data=h621-0102a05 |53711| A|er |d|0001 | A|49998|0034604
drawing Data=h621-0102a05 |53711| A|er |d|0001.1 | A|49998|0012203
drawing Data=h621-0102a05 |53711| A|er |d|0002 | A|49998|0064744
drawing Data=h621-0102a05 |53711| A|er |d|0003 | A|49998|0127671
drawing Data=h621-0102a108 |53711| A|er |d|0001 | A|49998|0918547
drawing Data=h621-0102a11 |53711| A|er |d|0001 | A|49998|0043094
drawing Data=h621-0102a11 |53711| A|er |d|0001.1 | A|49998|0018658
drawing Data=h621-0102a11 |53711| A|er |d|0002 | A|49998|0060012
drawing Data=h621-0102a11 |53711| A|er |d|0003 | A|49998|0035375
drawing Data=h621-0102a11 |53711| A|er |d|0004 | A|49998|0055587
drawing Data=h621-0102a11 |53711| A|er |d|0005 | A|49998|0037265
drawing Data=h621-0102a11 |53711| A|er |d|0006 | A|49998|0039785
drawing Data=h621-0102a11 |53711| A|er |d|0007 | A|49998|0041585
drawing Data=h621-0102a11 |53711| A|er |d|0008 | A|49998|0036148
drawing Data=h621-0102a11 |53711| A|er |d|0009 | A|49998|0208132
drawing Data=h621-0102a121 |53711| A|er |d|0001 | A|49998|0709114
drawing Data=h621-0102a125 |53711| A|er |d|0001 | A|49998|0435504
drawing Data=h621-0102a168 |53711| A|er |d|0001 | A|49998|1501235
drawing Data=h621-0102a17 |53711| A|er |d|0001 | A|49998|0037341
drawing Data=h621-0102a17 |53711| A|er |d|0001.1 | A|49998|0019205
drawing Data=h621-0102a17 |53711| A|er |d|0002 | A|49998|0066302
drawing Data=h621-0102a17 |53711| A|er |d|0003 | A|49998|0062923
drawing Data=h621-0102a17 |53711| A|er |d|0004 | A|49998|0126037
drawing Data=h621-0102a188 |53711| A|er |d|0001 | |49998|1432274
drawing Data=h621-0102a22 |53711| C|er |d|0001 | |49998|0855198
drawing Data=h621-0102a22 |53711| C|er |d|0001.1 | B|49998|0028535
drawing Data=h621-0102a22 |53711| C|er |d|0001.2 | B|49998|0033887
drawing Data=h621-0102a22 |53711| C|er |d|0001.3 | B|49998|0012002
drawing Data=h621-0102a22 |53711| C|er |d|0002 | B|49998|0077551
drawing Data=h621-0102a22 |53711| C|er |d|0003 | B|49998|0038816
drawing Data=h621-0102a22 |53711| C|er |d|0004 | B|49998|0120742
drawing Data=h621-0102a22 |53711| C|er |d|0005 | B|49998|0068506
drawing Data=h621-0102a22 |53711| C|er |d|0006 | B|49998|0120902
drawing Data=h621-0102a39 |53711| A|er |d|0001 | A|49998|0043492
drawing Data=h621-0102a39 |53711| A|er |d|0001.1 | A|49998|0033724
drawing Data=h621-0102a39 |53711| A|er |d|0002 | A|49998|0062801
drawing Data=h621-0102a39 |53711| A|er |d|0003 | A|49998|0071199
drawing Data=h621-0102a48 |53711| B|er |d|0001 | B|49998|0037377
drawing Data=h621-0102a48 |53711| B|er |d|0001.1 | B|49998|0024643
drawing Data=h621-0102a48 |53711| B|er |d|0001.2 | B|49998|0022539
drawing Data=h621-0102a48 |53711| B|er |d|0001.3 | B|49998|0027931
drawing Data=h621-0102a48 |53711| B|er |d|0001.4 | B|49998|0036544
drawing Data=h621-0102a48 |53711| B|er |d|0002 | B|49998|0071446
drawing Data=h621-0102a48 |53711| B|er |d|0003 | B|49998|0035428
drawing Data=h621-0102a48 |53711| B|er |d|0004 | B|49998|0039985
drawing Data=h621-0102a50 |53711| A|er |d|0001 | A|49998|0041731
drawing Data=h621-0102a50 |53711| A|er |d|0001.1 | A|49998|0029231
drawing Data=h621-0102a50 |53711| A|er |d|0001.2 | A|49998|0036383
drawing Data=h621-0102a50 |53711| A|er |d|0002 | A|49998|0054429
drawing Data=h621-0102a50 |53711| A|er |d|0003 | A|49998|0030654
drawing Data=h621-0102a50 |53711| A|er |d|0004 | A|49998|0061856
drawing Data=h621-0102a50 |53711| A|er |d|0005 | A|49998|0057108
drawing Data=h621-0102a50 |53711| A|er |d|0006 | A|49998|0056135
drawing Data=h621-0102a50 |53711| A|er |d|0007 | A|49998|0060035
drawing Data=h621-0102a50 |53711| A|er |d|0008 | A|49998|0059823
drawing Data=h621-0102a50 |53711| A|er |d|0009 | A|49998|0023352
drawing Data=h621-0102a50 |53711| A|er |d|0010 | A|49998|0040524
drawing Data=h621-0102a50 |53711| A|er |d|0011 | A|49998|0051452
drawing Data=h621-0102a50 |53711| A|er |d|0012 | A|49998|0057922
drawing Data=h621-0102a50 |53711| A|er |d|0013 | A|49998|0022848
drawing Data=h621-0102a50 |53711| A|er |d|0014 | A|49998|0035871
drawing Data=h621-0102a50 |53711| A|er |d|0015 | A|49998|0038701
drawing Data=h621-0102a50 |53711| A|er |d|0016 | A|49998|0028302
drawing Data=h621-0102a50 |53711| A|er |d|0017 | A|49998|0088297
drawing Data=h621-0102a50 |53711| A|er |d|0018 | A|49998|0155682
drawing Data=h621-0102a50 |53711| A|er |d|0019 | A|49998|0124972
drawing Data=h621-0102a50 |53711| A|er |d|0020 | A|49998|0118121
drawing Data=h621-0102a50 |53711| A|er |d|0021 | A|49998|0077344
drawing Data=h621-0102a50 |53711| A|er |d|0022 | A|49998|0128466
drawing Data=h621-0102a51 |53711| A|er |d|0001 | A|49998|0040110
drawing Data=h621-0102a51 |53711| A|er |d|0001.1 | A|49998|0027168
drawing Data=h621-0102a51 |53711| A|er |d|0002 | A|49998|0060056
drawing Data=h621-0102a51 |53711| A|er |d|0003 | A|49998|0061789
drawing Data=h621-0102a52 |53711| A|er |d|0001 | A|49998|0039953
drawing Data=h621-0102a52 |53711| A|er |d|0001.1 | A|49998|0032355
drawing Data=h621-0102a52 |53711| A|er |d|0002 | A|49998|0062662
drawing Data=h621-0102a52 |53711| A|er |d|0003 | A|49998|0037395
drawing Data=h621-0102a52 |53711| A|er |d|0004 | A|49998|0035793
drawing Data=h621-0102a57 |53711| A|er |d|0001 | A|49998|0168427
drawing Data=h621-0102a71 |53711| A|er |d|0001 | A|49998|0169469
drawing Data=h621-0102a99 |53711| B|er |d|0001 | B|49998|5824730
drawing Data=h775-1512a1 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a10 |53711| A|er |d|0001 | |49998|1565029
drawing Data=h775-1512a2 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a3 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a4 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a5 |53711| A|er |d|0001 | |49998|0228403
drawing Data=h775-1512a6 |53711| A|er |d|0001 | |49998|0063013
drawing Data=h775-1512a7 |53711| A|er |d|0001 | |49998|0176895
drawing Data=h775-1512a8 |53711| A|er |d|0001 | |49998|0271962
drawing Data=h775-1512a9 |53711| A|er |d|0001 | |49998|0335202
drawing Data=6984052 |53711| D| |d|0001 | D|00026|0000000
drawing Data=6985426 |53711| A| |d|0000.a | A|49998|0035751
drawing Data=6985426 |53711| A| |d|0001 | A|49998|0074079
drawing Data=6985426 |53711| A| |d|0002 | A|49998|0062500
drawing Data=6985426 |53711| A| |d|0003 | A|49998|0008982
drawing Data=6985426 |53711| A| |d|0004 | A|49998|0010717
drawing Data=6985426 |53711| A| |d|0005 | A|49998|0030344
drawing Data=6985426 |53711| A| |d|0006.1 | A|49998|0061541
drawing Data=6985426 |53711| A| |d|0006.10 | A|49998|0022748
drawing Data=6985426 |53711| A| |d|0006.2 | A|49998|0061465
drawing Data=6985426 |53711| A| |d|0006.3 | A|49998|0055809
drawing Data=6985426 |53711| A| |d|0006.4 | A|49998|0059727
drawing Data=6985426 |53711| A| |d|0006.5 | A|49998|0059513
drawing Data=6985426 |53711| A| |d|0006.6 | A|49998|0023040
drawing Data=6985426 |53711| A| |d|0006.7 | A|49998|0040218
drawing Data=6985426 |53711| A| |d|0006.8 | A|49998|0051132
drawing Data=6985426 |53711| A| |d|0006.9 | A|49998|0057425
drawing Data=6985426 |53711| A| |d|0007.1 | A|49998|0024885
drawing Data=6985426 |53711| A| |d|0007.10 | A|49998|0037342
drawing Data=6985426 |53711| A| |d|0007.11 | A|49998|0032807
drawing Data=6985426 |53711| A| |d|0007.12 | A|49998|0037061
drawing Data=6985426 |53711| A| |d|0007.13 | A|49998|0036308
drawing Data=6985426 |53711| A| |d|0007.14 | A|49998|0040683
drawing Data=6985426 |53711| A| |d|0007.15 | A|49998|0028030
drawing Data=6985426 |53711| A| |d|0007.2 | A|49998|0038133
drawing Data=6985426 |53711| A| |d|0007.3 | A|49998|0037181
drawing Data=6985426 |53711| A| |d|0007.4 | A|49998|0035304
drawing Data=6985426 |53711| A| |d|0007.5 | A|49998|0035595
drawing Data=6985426 |53711| A| |d|0007.6 | A|49998|0035487
drawing Data=6985426 |53711| A| |d|0007.7 | A|49998|0032536
drawing Data=6985426 |53711| A| |d|0007.8 | A|49998|0038400
drawing Data=6985426 |53711| A| |d|0007.9 | A|49998|0042559
drawing Data=6985426 |53711| A| |d|0008.1 | A|49998|0029133
drawing Data=6985426 |53711| A| |d|0008.2 | A|49998|0046621
drawing Data=6985426 |53711| A| |d|0008.3 | A|49998|0014013
drawing Data=6985426 |53711| A| |d|0008.4 | A|49998|0012670
drawing Data=6985426 |53711| A| |d|0009 | A|49998|0088388
drawing Data=6985426 |53711| A| |d|0010 | A|49998|0157697
drawing Data=6985426 |53711| A| |d|0011 | A|49998|0138726
drawing Data=6985426 |53711| A| |d|0012 | A|49998|0189061
drawing Data=6985426 |53711| A| |d|0013 | A|49998|0134718
drawing Data=6985426 |53711| A| |d|0014 | A|49998|0123397
drawing Data=6985426 |53711| A| |d|0015 | A|49998|0118040
drawing Data=6985426 |53711| A| |d|0016 | A|49998|0113699
drawing Data=6985426 |53711| A| |d|0017 | A|49998|0118200
drawing Data=6985426 |53711| A| |d|0018 | A|49998|0071113
drawing Data=6985426 |53711| A| |d|0019 | A|49998|0068598
drawing Data=6985426 |53711| A| |d|0020 | A|49998|0116804
drawing Data=6985426 |53711| A| |d|0021 | A|49998|0075838
drawing Data=6985426 |53711| A| |d|0022 | A|49998|0097724
drawing Data=6985426 |53711| A| |d|0023 | A|49998|0069126
drawing Data=6985426 |53711| A| |d|0024 | A|49998|0155576
drawing Data=6985426 |53711| A| |d|0025 | A|49998|0143738
drawing Data=6985426 |53711| A| |d|0026 | A|49998|0127085
drawing Data=6985426 |53711| A| |d|0027 | A|49998|0123826
drawing Data=6985426 |53711| A| |d|0028 | A|49998|0109249
drawing Data=6985426 |53711| A| |d|0029 | A|49998|0121330
drawing Data=6985426 |53711| A| |d|0030 | A|49998|0087896
drawing Data=6985426 |53711| A| |d|0031 | A|49998|0124616
drawing Data=6985426 |53711| A| |d|0032 | A|49998|0234515
drawing Data=6985426 |53711| A| |d|0033 | A|49998|0126707
drawing Data=6985426 |53711| A| |d|0034 | A|49998|0128215
drawing Data=6985426 |53711| A| |d|0035 | A|49998|0072619
drawing Data=6985426 |53711| A| |d|0036 | A|49998|0076247
drawing Data=7069152 |53711| A| |d|0001 | A|49998|2185285
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-b209 | | | |070801|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b564 | | | |191101|a| | |
document Ref Data=astm-a574 | | | |120401|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=asme-b18.3 | | | |120101|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-a-200 | | |a |980901|a| | |
document Ref Data=sae Ams-qq-a-200 |0008| |a |150501|a| | |
document Ref Data=sae Ams-qq-a-250 |0011| | |970801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=t9074-bd-gib-010/0300 | | |2 |121218|a| | |
3. Requirements
3.1 ;desurger Assembly Fwd To Be In Accordance With Naval Sea System Command Drawing 6985426 Part A3 And All Eb Ers Invoked In This Contract, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;head Desurger, Part 3-1;
material - ;t9074-bd-gib-010/0300, Grade Hy-80, Forged, Appendix E;
part - ;tailpiece Fwd Part 3-2;
material - ;sae Ams-qq-s-763, Cl 304, Cond A;
part - ;bushing Part 6-1;
material - ;astm-b150 Uns C63200, Tq50 Or Tq55;
part - ;barrel Part 22;
material - ;astm-b564 Forged, Uns N06625, Condition Annealed And Meeting The Mechanical Properties Of General Note 7006. Chrome Plated In Accordance With General Note 7021;
part - ;piston Part 23;
material - ;sae Ams-qq-a-250/11, Alloy 6061, Temper T651 Or Astm B209, Alloy 6061, Temper T651. Anodized In Accordance With General Note 2221;
part - ;rod Tie Part 24;
material - ;astm-a193 Grade B7;
part - ;rod Piston Part 25;
material - ;sae-ams- Qq-a-200/8 Alloy 6061, Temper T6 Anodized In Accordance With General Note 2221 And Plated In Accordance With General Note 7202;
part - ;nut, Self-locking Part 78;
material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. All Material Must Be From The Same Class.
self-locking Element- Astm-d4066, Group 01, Class 1 Or 2, Grade 1
part - ;self Locking Cap Screw, Part 79;
material - ;mil-dtl-1222, Type Ii, Qq-n-286, Solution Annealed And Age Hardened And Marked .k. Self-locking Element To Be In Accordance With Mil-dtl-18240. Cross Drill 2 Holes Iaw Ansi-b18.3;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;ultrasonic Inspection;
item - ;bushing Part 6-1(with A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material);
performance - ;t9074-as-gib-010/271;
acceptance - ;general Note 125 Of Drawing 6985426;
test - ;ultrasonic Inspection;
item - ;barrel Part 22 (starting Material);
performance - ;eb-2937, Paragraph 4.5.4;
acceptance - ;eb-2937, Paragraph 4.5.4;
test - ;ultrasonic Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/300 Appendix E;
acceptance - ;t9074-bd-gib-010/300 Appendix E;
test - ;magnetic Particle Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/300 Appendix E;
acceptance - ;t9074-bd-gib-010/300 Appendix E;
test - Quality Conformance/compliance Inspection
item - ;hy-80 Starting Material;
performance - ;t9074-bd-gib-010/300, Appendix E;
acceptance - ;t9074-bd-gib-010/300, Appendix E;
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;tailpiece, Part 3-2;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;rod Tie Part 24;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;nut Self Locking Part 78;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm-d4066, Group 01, Class 1, Grade 1;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
test - ;liquid Penetrant Inspection;
item - ;screw Cap Self Locking Part 79;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
attribute - Annealing And Age Hardening
item - ;screw Cap Self Locking Part 79;
performance - Qq-n-286
test - ;hydrostatic Test;
item - ;each Assembly;
performance - ;note 7400 Of Drawing 6985426;
acceptance - ;note 7400 Of Drawing 6985426;
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.5 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.6 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.6.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.6.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.7 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.8 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must Be
performed On A Full Size Fastener.)
3.8.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.8.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.9 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.10 Certification Is Required For The Following As Identified Further Below:
- Process Control Plan
- Qualification Plan
- Qualification Testing (first Article)
all Manufacturing Facilities Which Have Been Approved To An Earlier Revision Of This Specification Are Required To Meet The Recertification Requirements Of T9074-bd-gib-010/0300 Revision 2. An Updated Process Control Plan Incorporating Any Changes Necessary To
meet The Requirements Of T9074-bd-gib-010/0300 Revision 2 Must Be Submitted.
re-certification Of The First Article Approval Of Vendor Facilities, Processes, And Manufacturing Methods Is Required Every 5 Years And Must Meet All The Requirements Of T9074-bd-gib-010/0300. The Certification Must Be Current At The Delivery Date Of Procured
products.
3.10.1 Qualification Testing (first Article Inspection) - See Di-ndti-80809 (first Article Test Report) - Certification Is Required For The Following Test On The Items Listed Below:
test - First Article Inspection
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
acceptance - T9074-bd-gib-010/0300
previous Fat Approvals That Were Based Upon Previous Specifications Are Not Valid For Meeting The Requirements Of T9074-bd-gib-010/0300 Revision 2, Unless Otherwise Approved By Navsea.
the Contractor May Request The Fat Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval, Provided It Meets The Requirements Of This Contract/purchase Order.
3.10.2 Process Control Plan - See Di-ndti-80809 (process Control Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Process Control Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Pcp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Pcp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.10.3 Qualification Plan - See Di-ndti-80809 (qualification Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Qualification Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Qp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Qp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.11 ;see Cdrl Di-forg-80412 (forging Manufacturing Sketches) Forging Sketches Are Required For The Head Desurger, Part 3-1, Per T9074-bd-gib-010-0300, Appendix E.;
3.12 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.12.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.12.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.12.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.13 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.13.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.13.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.13.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.14 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.15 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures
qualified Under S9074-aq-gib-010/248 For All Production And Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.16 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.17 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.17.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.17.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.17.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.18 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.19 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.19.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.20 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.21 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's
identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked
by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective
compounds.
3.21.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.22 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
3.23 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item Made To T9074-bd-gib-010/0300, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. The Revision Of The Process Control Plan Used And The Date Of Most Recent First Article Approval Or Recertification.
5. Actual Data Of Specified Chemical And Mechanical Tests And A Record Of The Final Heat Treatment (if Applicable).
6. Qualitative Results Of Nondestructive Tests And Other Inspections Or Tests.
7. The Melt Processes Used And The Melting Source Of The Material If The Contractor Is Not The Melter.
8. A Statement That Each Lot Has Been Sampled, Tested, And Inspected In Accordance With The Specification Requirements And That The Manufacturer Has Maintained Adequate Manufacturing Procedures Demonstrated In First Article Testing As Listed And Maintained As
specified In Paragraph 4.3.2 Of T9074-bd-gib-010/0300 And Quality Assurance Practices To Produce A Product That Meets The Chemical And Mechanical Property Requirements Specified Throughout The Product.
9. A Statement That Each Lot Meets All Specification Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.24 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.24.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.24.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.24.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.24.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.24.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.24.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.24.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.24.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.24.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.24.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.24.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.24.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.25 See Cdrls Di-misc-80875 (brazing Procedures) And Di-misc-80876 (braze Proc Qual Data) - Prior To Performing Any Brazing, The Applicable Brazing Procedure Qualification Data Must Be Submitted. Brazing Procedures Must Be Submitted For Information With
the Supporting Procedure Qualification Data. Brazing Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. If The Contractor's Qualification Data Has Previously Been Approved By The Navy
for This Or Other Contracts, A Copy Of The Original Approval Letter Must Besubmitted In Lieu Of The Qualification Data. (note: Letters Extendingapproval Of Qualification Data Based On Previous Approvals Are Not Acceptableto Fulfill This Requirement. The
approval Letter Must Reference The Applicable Brazing Procedure And/or Brazing Procedure Qualification Data Number.)
3.26 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.26.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.26.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.26.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.26.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.26.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.27 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.27.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.27.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.28 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactur
Closing Soon13 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Machinery and Tools
United States
Description: Contact Information|4|n744.10|er4|n/a|zachary.r.morrill.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1|186|
inspection And Acceptance - Short Version|8|x||x||||||
desired And Required Time Of Delivery (june 1997)|29|clin0001aa|17|186|clin0001ab|18|186||||||||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|tbd|w25g1u - 17; W62g2t - 18|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd1423||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|w25g1u|30 Days |tbd|zachary Morrill & Zachary.r.morrill.civ@us.navy.mil|tbd|w62g2t|tbd|||
option For Increased Quantity (mar 1989)|1|180|
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||x ||||||||||||
annual Representations And Certifications (may 2024)|13|332991|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3||||
1. This Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issued" Contractual Documents As Detailed Herein.
4. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
5. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
7. The Government Retains The Option To Order An Additional Quantity Up To 100% Of This Order For 180 Days Aro At The Same Price. The Government May Choose To Exercise This Option Or Not.
8. This Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
\
1. Scope
1.1 ;this Procurement Specification Contains The Requirements For Manufacture And The Contract Quality Requirements For ;bearing, Mast; For Use On Navy Submarines.;
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=4491147 |53711| J| |d|0001 | J|49998|0437522
document Ref Data=mil-std-973 | | | |000930|a| |04|
document Ref Data=mil-std-130n | | | |121116|a| |01|
document Ref Data=asme B46.1 | | | |090101|a| | |
document Ref Data=iso 10012 | | | |030415|a| | |
document Ref Data=ncsl Z540.3 | | | |060803|a| | |
document Ref Data=fed-std-28/20b | | | |940310|a| | |
document Ref Data=mil-i-45208a | | | |951103|a|2 | |
document Ref Data=astm B150/b150m-2019 | | | | |a| | |
document Ref Data=iso9001 | | | |150915|a| | |
document Change Data=mil-b-24059 |astm B150/b150m
3. Requirements
3.1 ;design And Manufacturing - The ;bearing, Mast; Furnished Under This Contract/purchase Order Shall Meet The Material, Physical And Mechanical Requirements As Specified On Drawing 4491147, Item No. 7 Including Associated Specifications Mentioned In This
procurement.;
3.1.1 ;the ;bearing, Mast; Shall Be Manufactured From Nickel-aluminum-bronze Material Per Specification Astm B150/150m In Lieu Of Mil-b-24059 Listed On Drawing 4491147, Item No. 7.;
3.2 ;marking Requirements - The Supplier Shall Permanently Identify And Mark Each Production Lot Unit ;bearing, Mast; In Accordance With Notes 5 And 12 (a) And (b) Of Drawing 4491147 Per Mil-std-130.;
3.2.1 ;the Supplier Shall Mark ;bag Or Tag; Each Part With Contract And Heat Number Per Mil-std-130.;
3.3 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division, (nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.ogilvie@navy.mil, Code 242mo After Award Of Contract.;
3.3.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.;
3.4 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.4.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 ;inspection System - The Supplier's Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012. The Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The
contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier's Written Quality Inspection And Test Plan Is Required By The Contract.
cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110;
4.5 ;surface Roughness - All Surface Finishes Are In Rms Measurements. Where The Degree Of Surface Roughness Is Indicated, The Surface Shall Free From All Visible Imperfections As Defined By Standard Asme B46.1.;
4.6 ;finished Edges - Finished Edges Shall Be In Accordance With The Applicable Drawing Requirements.;
4.7 ;threads - Threads Shall Be Inspected In Accordance With Fed-std-h28/20 System 21 Requirements. Thread Inspection Shall Include The Measurement And Recording Of The Major Diameter For External Threads And The Minor Diameter For Internal Threads.;
4.8 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For Certified Quantitative Mill Or Industrial Laboratory Reports Of Chemical And Physical Analysis By Heat, Lot Or Batch For Raw Material Ordered For
production Units. If The Material(s) Is Subsequently Heat-treated, A Certification Of Physical Analysis, After Heat Treatment, Is Also Required For Each Heat, Lot Or Batch. Also, Where The Applicable Material Specification Calls Out (e.g. Corrosion Resistance
test, Macro-etch Test, Etc.,) These Test Results Shall Also Be Reported On The Applicable Mill Or Industrial Laboratory Report. The Physical Analysis Shall Establish The Following Properties For Metallic Part: Ultimate Tensile Strength, Yield Strength And
elongation.;
4.9 ;production Lot.;
4.9.1 ;visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The Production Lot Units And Record The Actual Measurements Of Each Dimension And Thread (including The Minor Diameter For Internal Threads) Identified On The
applicable Drawing. Threads Shall Be Inspected 100% And Results Recorded.;
4.10 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection And Test Reports Identified In The Objective Quality Evidence Records Section Of This Document And As
indicated On The Contract Data Requirements List (dd Form 1423). Government Approval Is Required Prior To Shipment Of Production Units.;
4.11 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Production Lots Shall Be Made By The Cognizant Dcma-qar. Nswcpd Shall Either Issue Specific Government Inspection Instructions Or Inspection Hold Points Based On Whether Dcma Or
nswcpd Will Be Performing The Required Inspections/tests. In Addition To The Normal Dcma Surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.;
4.12 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts. Records Shall Be Traceable By Drawing/item, Heat And Contract Number. All Oqeds Shall Be Clearly Legible
including Name And Title. The Supplier May Provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of Originals.;
4.12.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The Drawing/item, Heat And Contract Number. Supplier
format Is Acceptable For The Below Listed Cdrls.
A. Certified Quantitative Mill Or Industrial Laboratory Certification (chemical And Physical Analysis).
cdrl: Certified Quantitative Mill Certification Per Di-misc-80678
B. Visual/dimensional Inspection Reports Shall Show All The Characteristics, The Actual Measurement Of Each Dimension Inspected Including Threads (also The Minor Diameter For Internal Threads) Contract Number, Name Of Supplier, Drawing/item Number, Drawing
revision Letter And Heat Number Of Finished Parts, Item Nomenclature And Inspector's Acceptance Signature And Date.
cdrl: Visual/dimensional Inspection Report Per Di-ndti-80809b
C. Mercury Exclusion Certification (representing The Contract Units Shipment)
cdrl: Mercury Exclusion Certification Per Di-misc-80678;
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
5.2 Special Marking Requirements - Carderock Division, Naval Surface Warfare Center, Code 9613, Will Furnish The Dcmc-qar With A Special Stamp And Instruction For Marking The Package Of Each Acceptable Production Unit. The Dcmc-qar Or The Contractor (as
directed) Shall Stamp The Package Of Each Accepted Production Unit Prior To Shipment.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Statement Of Prior Approval Data - If The Item(s) Being Offered Meet The Requirements Specified In The Contract/purchase Order And Is An Exact Duplicate Of Item(s) Previously Approved By The Government, Furnish The Nsn, Name Of Prime Manufacturer, Drawing
number, Technical Manual Number, And Previous Contract Number. Provide This Information On Company Letterhead Signed By A Responsible Company Official.
6.2 Special Assistance From Submarine Sail Systems Department (sssd) - Commander, Carderock Division, Naval Surface Warfare Center (cdnswc),code 961, U.s. Naval Base, Philadelphia, Pa 19112-5083, Will Make Available Trained And Experienced Personnel Who Are
qualified To Offer Assistance And Guidance To The Contractor By Pointing Out Areas Of Usual Difficulty. This Will Aid The Contractor In Producing A Higher Percentage Of Acceptable Material.
Contractors Who Have Not Previously Furnished This Material To The Government And Whose Plant Facilities Have Not Been Evaluated, Or Personnel Have Not Been Given Special Instruction By A Representative From Submarine Sail Systems Department (sssd), Are
requested To Contact Cdnswc Through The Cognizant Contract Administration Service Component Representative Office.
Sssd May Initially Contact The Contractor To Make Arrangements For These Services.
The Sssd Representative Will Coordinate His Work Closely With The Contract Administration Services Component Representative. However, Any Recommended Changes In Specifications Relative To Navicp Contract Shall Be Presented To Navicp For Approval And
confirmation Via The Contract Administration Service Component Representative.
The First Article And Production Units(s) Shall Be Under The Surveillance Of Cdnswc Quality Assurance Specialist As Required.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.4 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.5 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navicp Does Not Regularly Purchase Only Technical Manuals Without
Purchasing Hardware And Related Tdp Software. Therefore,
Most Navicp Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, F Or X Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Defense Logistics Service Center (dlsc) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Forign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Ar To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offerer Is To Enter The
Appropriate Price Group. The Price Group Are Defines As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered Inpricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Becoded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
date Of First Submission=asreq
;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To Production.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;supplier Format Is Acceptable.;
;approval Of The Certification By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;supplier Format Is Acceptable.;
;approval Of The Certification By Nswc Philadelphia Division Isrequired Prior To Shipment Of Production Lot Units.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A004. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
Closing Date21 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208 Or Iso 9001 Ansi/ncsl Z540.3 Or Iso 10012 |
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1|30 |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss-n00104|
warranty Of Data--basic (mar 2014)|2|||
first Article Approval--contractor Testing (sep 1989)|10| Fat Details Are Included In The Drawing||15|120|n64498|tbd|30||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13|x||||x|||||||||
annual Representations And Certifications (may 2024)|13|339991|600|x|x|x|||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3|||x|
any Order Resulting From This Solicitation Will Be Issued Bi-laterally Requiring The Contractor's Written Acceptance Prior To Execution.
_______________ - Place Of Material Inspection
_______________ - Place Of Packaging Inspection & Final Acceptance
requested Delivery Is 210 Days After Date Of Contract.
quoted Delivery Is____ Days Adc.
dfars 252.232-7006, Wide Area Workflow Payment Instructions, Is Incorporated By Reference Into This Request For Quotation(rfq). Any Resulting Order Will Require Electronic Submittal Of Invoices And Receiving Reports Through Piee-wawf, And Will Include The Clause
In Full Text, Complete With Submittal Instructions.
far Clause 52.213-4, Terms And Conditions-simplified Acquisitions (other Than Commercial Products And Commercial Services), Is Incorporated By Reference Into This Rfq. This Clause Is A Compilation Of The Most Commonly Used Clauses That Apply To Simplified
acquisitions And Incorporates Them By Reference As Well.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
drawing Requests Shall Be Submitted At Sam.gov Using The Link In The Solicitation Posting. Vendors Must Have An Approved Dd2345 Of File In Order To Be Granted Access To Controlled Drawings.
this Procurement Requires Contractor First Article Testing And Production Lot Testing.
\
1. Scope
1.1 ;this Procurement Specification Contains The Requirements For Manufacture And Contract Quality Requirements For ;seal Plain, Encased (dash 2); For Use On Navy Submarines.;
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=6878818 |53711| B| |d|0001 | B|49998|0043129
document Ref Data=mil-std-130 | | |n |121116|a| 1| |
document Ref Data=mil-std-973 | | | |950113|a|3 | |
document Ref Data=iso 9001 | | | |150915|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=ncsl Z540.3 | | | |060803|a| | |
document Ref Data=eia-649-2/19 | | |c | |a| | |
document Ref Data=adiprene L-100 (50-60a) Com'l | | | | |a| | |
3. Requirements
3.1 ;design And Manufacturing - The ;seal Plain, Encased (dash 2); Furnished Under This Contract/purchase Order Shall Meet The Material, Physical And Mechanical Requirements As Specified On Drawing 6878818, Dash 2 Including Associated Specifications
mentioned In This Procurement. ;
3.1.1 ;the,;seal Plain, Encased (dash 2); Shall Be Supplied With No Fillers, Color Additives, Coatings Or Finishes As Specified On Drawing 6878818, Note 4.;
3.2 ;marking Requirements - The Supplier Shall Mark Bag Each First Article And Production Lot Unit Seal Plain, Encased In Accordance With Drawing 6878818, Note 7 Including With Contract, Lot Or Batch And Serial Number Per Mil-std-130.;
3.3 ;first Article Testing/inspection - (supplier Testing/inspection). The Article Testing/inspection Procedure And Approval Are Required For The ;seal Plain, Encased.(dash 2);government Approval Is Required Prior To Commencement Of Firstarticle Unit.;
3.4 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division,(nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.j.ogilvie.civ@us.navy.mil, Code 242mo After Award Of Contract.;
3.4.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.;
3.5 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.5.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.6 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 ;inspection System - The Supplier?s Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012. The Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The
contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier?s Written Quality Inspection And Test Plan Is Required By The Contract.
cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110 ;
4.5 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For Certified Industrial Laboratory Analysis By Lot Or Batch For Raw Material Ordered For First Article And Production Lot Units.the Analysis Shall Establish
the Properties For The Non-metallic Material As Specified On Drawing 6878818, Note 4.;
4.6 ;first Article Testing/inspection. (supplier Testing/inspection).the Supplier Shall Perform First Article Testing/inspection On The ;seal Plain,encased(dash 2); In Accordance With The Applicable Drawing And Their Approved First Article Procedure.;
4.6.1 ;the First Article Inspection Shall Be Made By The Cognizant Dcma-qar At The Supplier's And/or Subcontractor Facility. The Supplier Shall Notify Nswcpd, Code 242mo Two Weeks In Advance Prior To The Scheduled First Article Testing/ Inspection, So An
nswcpd Representative Has The Option Of Being Present During During The First Article Testing/inspection.;
4.6.2 ;first Article Approval For Testing/inspection Procedure And Acceptance- (supplier Testing/inspection).the Supplier Shall Prepare And Submit Their First Article Testing/inspection Procedure ;seal Plain, Encased (dash 2); In Accordance With The
requirements Of Di-ndti-80603 And Applicable Drawing As Indicated On The Contract Data Requirements List (dd Form 1423).government Approval Of The Procedure Is Required Prior To Commencement Of First Article Unit.
cdrl: First Article Testing/inspection Procedure Per Di-ndti-80603a;
4.6.3 ;first Article Visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The First Article Unit And Record The Actual Measurement Of Each Dimension Including Hardness Identified On The Applicable Drawing.;
4.6.4 ;first Article Testing/inspection Report And Acceptance-(supplier Testing/ Inspection).the Supplier Shall Submit For The First Article Unit ;seal Plain, Encased (dash 2); Testing/inspection Reports In Compliance With The Requirementof Di-ndti-80603 And
applicable Drawing.the Report Shall Also Include A Copy Of;certified Industrial Laboratory Analysis For Adiprene L-100 Material And Visual/dimensional Inspection Report; Identified In The Objective Quality Evidence Records Section Of This Document, And As
indicated On The Contract Data Requirements List (dd Form 1423).government Approval Of The First Article Testing/inspection Report Is Required Prior To Commencement Of Production Units.
cdrl: First Article Testing/inspection Report Per Di-ndti-80809b;
4.7 ;production Lot.;
4.7.1 ;visual/dimensional Inspection - The Supplier Shall Visually And Physically Inspect 100% The Production Lot Units And Record The Actual Measurements And Results Of Each Dimension Including Hardness Identified On The Applicable Drawing. ;
4.7.2 ;production Lot Testing/inspection Report And Acceptance- (supplier Testing/ Inspection).the Supplier Shall Submit For The Completed Production Units ;seal Plain, Encased (dash 2); Testing/inspection Reports In Compliance With The Applicable Data Item
descriptions (dids) And Drawing. The Production Lot Testing/inspection Report Shall Consist Of ;certified Industrial Laboratory Analysis For Adiprene L-100 Material; Visual/dimensional Inspection Report And Mercury Exclusion Certification; Identified In The
objective Quality Evidence Records Section Of This Document, And As Indicated On The Production Lot Test/ Inspection (plt) Contract Data Requirements List (dd Form 1423).government Government Approval Of The Production Lot Testing/inspection Report Is
requiredprior To Shipment Of Production Lot Units.
cdrl: Production Lot Testing/inspection Report Per Di-ndti-80809b;
4.8 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection Andtest Reports Identified In The Objective Quality Evidence Records Section Of This Document And As Indicated
on The Production Lot Testing/inspection (plt) Contract Data Requirements List (dd Form 1423).government Approval Is Required Prior To Shipment Of Production Units. ;
4.9 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Productionlots Shall Be Made By The Cognizant Dcma-qar In Conjunction With The Specific Government Inspection Instructions (sgiis) Furnished By Nswcpd.in Addition To The Normal Dcma
surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.;
4.10 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts Of ;seal Plain, Encased (dash 2);. Records Shall Be Clearly Legible Including Nameand Title. The Supplier May
provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of Originals.;
4.10.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The D Drawing/part, Lot Or Batch, Serial And Contract
number. Supplier Format Is Acceptable For The Below Listed Cdrls.
a. Certified Industrial Laboratory Analysis For Adiprene L-100 (50-60a) Material (the Analysis Shall Establish The Properties For Material As Specified On Drawing 6878818, Note4.).
cdrl: Certified Industrial Lab Analysis Per Di-misc-82386
b.visual/dimensional Inspection Reports Shall Show All The Characteristics, The Actual Measurement Results Of Each Dimension Inspected Including Hardness, Contract Number, Name Of Supplier, Drawing/part Number, Drawing Revision Letter, Lot Or Batch And Serial
number Of Finished Parts, Item Nomenclature, Inspector's Acceptance Signature And Date.
cdrl: Visual/dimensional Inspection Report Per Di-ndti-80809b
c.mercury Exclusion Certification (representing The Contract Units Shipment)
cdrl: Mercury Exclusion Certification Per Di-misc-82386;
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navicp Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navicp Does Not Regularly Purchase Only Technical Manuals Without
Purchasing Hardware And Related Tdp Software. Therefore,
Most Navicp Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, F Or X Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Defense Logistics Service Center (dlsc) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Forign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcmc Or Nspcc The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Ar To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offerer Is To Enter The
Appropriate Price Group. The Price Group Are Defines As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered Inpricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Becoded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
date Of First Submission=asreq
;;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To First Article.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
date Of First Submission=asreq
;approval Of The Procedure By Nswc Philadelphia Division Is Required Prior To Commencement Of First Article Unit.;
;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;
date Of First Submission=asreq
;;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Commencement Of Production Lot Units.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
date Of First Submission=asreq
;;supplier Format Is Acceptable.; ;
;;plt Report Shall Consist Of Oqed Records Listed In Contract Section E: Certified Industrial Laboratory Analysis Material; Visual/dimensional Inspection Report And Mercury Exclusion Certification.;;
;;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Shipment Of Production Lot Units.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A004. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
Closing Date27 Jan 2025
Tender AmountRefer Documents
The City Government Of Baguio Tender
Others...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Materials For Smart City Command Center 15,500,000.00 22 Unit 16 Port Poe Switch - 16 Port Poe Switch - Cpu Core Count 1 Cpu Nominal Frequency 800 Mhz Size Of Ram 256 Mb Storage Size 16 Mb Storage Type Flash Mtbf Approximately 200'000 Hours At 25c Cooling Type Passive Poe-out Ports Ether1-ether16 Poe Out 802.3af/at Max Out Per Port Output (input 18-30 V) 1.1 A Max Out Per Port Output (input 30-57 V) 0.6 A Max Total Out (a) 2.8a (18v-30v) & 1.4a (48v-57v) X2 10/100/1000 Ethernet Ports 16 Number Of 1g Ethernet Ports With Poe-out 16 Sfp+ Ports 2 Certification Ce, Eac, Rohs Ip Ip54 Warranty :1 Year 88 Unit Adjustable Stainless Steel Strapping Band - Adjustable Stainless Steel Strapping Band - Material: Stainless Steel 304 Width: 1/2 Inch Thickness: 0.5 Mm Length: 30 Meters 44 Unit Cable Loop Holder - Cable Loop Holder - Galvanized Steel Pole Mountable 4 Branches At Least 400mmx400mm 1 Box Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable 40 Unit Cctv Channel License - Cctv Channel License - Single Anpr Camera Connection For Use With Central Software Warranty :perpetual Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Unit Cctv Lpr Camera - Cctv Lpr Camera - Camera Image Sensor 1/1.8″ Progressive Scan Cmos Max. Resolution 2688 × 1520 Min. Illumination Color: 0.001 Lux @ (f1.2, Agc On) Shutter Time 1/25 S To 1/100,000 S Day & Night Ir Cut Filter Lens Focal Length & Fov 2.8-12 Mm: Horizontal: 113.5° To 39°, Vertical: 58.4° To 22.7°, Diagonal: 141.3° To 44.3° Aperture 2.8-12 Mm: F1.38, 8-32 Mm: F1.7, 10-50 Mm: F1.7 Illuminator Built-in Supplement Light Type Ir Light Built-in Supplement Light Range Up To 40 M Ir Wavelength 850 Nm Video Main Stream 50 Hz: 25 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Sub-stream 50 Hz: 25 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Video Compression H.264 And H.265 Encoding Main Stream: H.265/h.264/mjpeg Sub-stream: H.265/h.264/mjpeg Video Bit Rate 32 Kbps To 16 Mbps Protocols Tcp/ip,icmp,http,https,ftp,sftp,dhcp,dns,ddns,rtp,rtsp,rtcp,ntp,smtp,snmp,igmp,qos,ipv4/ipv6,udp,ssl/tls,isup,arp,802.1x Simultaneous Live View Up To 6 Channels Road Traffic And Vehicle Detection Coverage Up To 3 Lane(s) Smart Function Traffic Flow Detection:average Speed, Traffic Flow, Queuing Length, And Traffic Status Incident Detection: Congestion, Stopped Vehicle, Lane Change, Wrong-way Driving, Speeding, Low-speed Driving Capture Speed Range 5 To 120 Km/h Blocklist And Allowlist Max. 50000 Records Warranty :2 Years Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 5 Unit Cctv Nvr - Cctv Nvr - Supports Redundant Power Supply To Improve The System Stability Supports Hdd Hot Swap With Raid0, Raid1, Raid5, Raid 6, And Raid10 Storage Scheme Configurable. Either Normal Or Hot Spare Working Mode Is Configurable To Constitute An N+1 Hot Spare System. Supports Some Specialist Cameras, Including People Counting Camera/anpr (automatic Number Plate Recognition) Camera/fisheye Camera Supports Video Analytic Functions Such As Vehicle Detection, License Plate Recognition --video & Audio Input -ip Video Input 128-ch -incoming/outgoing Bandwidth 576 Mbps/512 Mbps -incoming/outgoing Bandwidth (raid Mode) 576 Mbps/512 Mbps -tls Outgoing Bandwidth 128 Mbps, Or 64 Mbps (when Raid Is Enabled) --video & Audio Output -protocol Hikvision, Acti, Arecont, Axis, Bosch, Brickcom, Canon, Hunt, Onvif (version 2.5), Panasonic, Pelco, Rtsp, Samsung, Sony, Vivotek, Zavio --video & Audio Output -hdmi Output Two Independent Hdmi Outputs Of 4k Resolution. Resolution: 4k (4096 × 2160), 4k (3840 × 2160)/30hz, 2k (2560 × 1440)/60hz, 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz -vga Output 1-ch. Resolution: 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz --video & Audio Decoding -decoding Format H.265, H.265+, H.264, H.264+, Mpeg4, Mjpeg (for Hikvision Ip Camera Only) -video Resolution 32 Mp/24 Mp/12 Mp/8 Mp/7 Mp/6 Mp/5 Mp/4 Mp/3 Mp/1080p/uxga/720p/vga/4cif/dcif/2cif/cif/qcif *: 32 Mp And 24 Mp Is Only Available For Channel 1 To 4 When Ultra Hd Resolution Mode Is Enabled -synchronous Playback Up To 16 Channels -capability 1-ch@32 Mp (8160 × 3616, 30 Fps)/5-ch@8 Mp(30 Fps)/10-ch@4 Mp(30fps)/20-ch@1080p(30 Fps)/40-ch@720p(30 Fps) *: The Length Or Width Of Camera Resolution (each Track) Cannot Exceed 4096 Pixels --hdd -interface 16 Sata Interfaces Supporting Hot-plug -capacity Up To 10 Tb For Each Hdd -storage Extension 1 × Esata Interface, 2 × Mini Sas Interface (optional) --raid Raid Type Raid0, Raid1, Raid5, Raid 6, And Raid10 --network Management -protocol Ipv6, Https, Upnp, Snmp, Ntp, Sadp, Smtp, Nfs, Iscsi, Pppoe, Ddns Network Interface 4, Rj45 10m/100m/1000m Self-adaptive Ethernet Interface --external Interface -usb Interface Front Panel: 2 × Usb 2.0; Rear Panel: 2 × Usb 3.0 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) -alarm Input/output 16/8 --general -power Supply 100 To 240 Vac, 50 To 60hz, 5 A -fan Redundant Dual Ball Bearing Fan; Speed Adjustable -consumption (without Hdd) ≤ 140w -warranty :2 Years 1. Responsibility Of The Supplier 1.1 Supply And Delivery Of Ict Equipment 1.2 Inventory Of The Items Deliverd With The Following Details 1.2.1 Brand 1.2.2 Model 1.2.3 Serial Number 1.2.4 Quantity 1.3 The Bidder Must Ensure That All Components Delivered Will Be Brand New 1.4 All Equipment Provided Must Be Compatible And Working With The Cctv System As A Whole 1.5 Materials And Equipment Delivery Within 90 Days 1.6 Cctv Contractor Should Have Manufacture Authorization And Certification. 1.7 Contractor Must Have A Valid Iso 9001:2015 Certificate 1.8 All Equipment Provided Must Be Capable/compatible To Interconnect With The Existing Systems Located At The Smart City Command Center (sc3) To Be Viewable And Configurable In The Sc3. 80 Unit Cctv Nvr Surveillance Hard Drive - Designed And Built To Handle Heavy Surveillance Workloads Advanced Vibration Management Capacity 10tb Interface Sata 6 Gb/s Max. Sustained Transfer Rate Od (mb/s) 250mb/s Cache (mb) 256 Tarnish Resistant Yes Mtbf 1,500,000 Hr Warranty :2 Years 15 Set Command Center Desktop Computer - Minimum Specifications: Operating System: Microsoft Windows 11 Pro 64bit Processor: Intel Core I5 14600k Turbo Frequency 5.3ghz 14 Cores/20 Threads, 24mb Cache, Socket Lga1700 Cpu Air Cooler: Twin Tower Cpu Air Cooler, With 6x6mm Sintered Copper Heatpipes, With 2x140mm Fans Motherboard: B760 Chipset, Lga1700 Socket, Ddr5 4xdimm Matx Form Factor Ram: Ddr5 5600mhz, 32gb (dual 2x16gb) Memory Modules Gpu: Rtx 4070, 12gb Gddr6/gddr6x Ssd: 512gb Capacity R/w 560/520 Mb/s 3d Tlc Ssd 2.5 Inch Form Factor Hdd: Capacity 2tb, 7200 Rpm, 256mb Cache, 3.5 Inch Form Factor Power Supply: 1000 Watts, 80 Plus Gold Certified, Fully Modular, With 120mm Smart Hydraulic Bearing (hyb) Fan, With Active Pfc, Mtbf: >100,000 Hours Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Case: Tempered Glass Mid Tower Atx Case With At Least 3 Fans Monitor: 2 Units, 24 Inches, Resolution: Fhd 1920 X1080, Aspect Ratio:16:9, Brightness: 250cd, Color Gamut Ntsc 72%, Refresh Rate: 100hz, Response Time: 5ms(gtg), Connectivity: 1x Hdmi 1x Displayport Keyboard: Usb Connectivity, With Backlight, Rubber Dome, Usb Connectivity, Multi-key Anti-ghosting, Polling Rate: 1000hz, Cable Type: Attached, Braided, Cable Length: 5.9ft Mouse: Usb Connectivity, Optical Sensor, Mouse Button Durability: 30m L/r Click, Cable: 1.8m Tangle Free Rubber, Dpi: 12,400 Dpi Ups: Max Configurable Power (watts) 650 Watts / 1.2kva, At Least 3 Universal Socket Warranty :2 Years 2 Unit Command Center Field Laptop - Command Center Field Laptop - Intel Core I7-13700hx Processor (30 Mb Smart Cache, 2.1 Ghz Performance-core With Turbo Boost Max Technology 3.0 Up To 5.0 Ghz, Overclock Capable) 1x 16gb Of Ddr5 4800mhz System Memory, Upgradable To 32 Gb Using Two Sodimm Modules 2x 512gb Nvme Ssd; Total Of 1tb 16 Display With Ips (in-plane Switching) Technology, Wqxga 2560 X 1600, High-brightness (500 Nits) Nvidia® Geforce Rtx 4060 With 8 Gb Of Dedicated Vram Warranty :2 Years 2 Unit Command Center Printer - Command Center Printer - A3 Wi-fi Duplex All-in-one Ink Tank Printer Print Speed Of Up To 25.0 Ipm Prints Up To A3+ (for Simplex) Automatic Duplex Printing Ultra-high Page Yield Of 7,500 Pages (black) And 6,000 Pages (colour) Wi-fi, Wi-fi Direct, Ethernet Printer Type: Print, Scan, Copy, Fax With Adf Minimum Ink Droplet Volume: 3.8 Pl Print Direction: Bi-directional Printing Nozzle Configuration:800 X 1 Nozzles Black, 256 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 2400 Dpi Automatic 2-sided Printing: Yes (up To A3) Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 43 Sec Per Photo (border) / 52 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 32.0 Ppm / 22.0 Ppm *2 Iso 24734, A4 Simplex (black / Colour): Up To 25.0 Ipm / 12.0 Ipm *2 Iso 24734, A4 Duplex (black / Colour): Up To 16.0 Ipm / 9.0 Ipm *2 Iso 24734, A3 Simplex (black / Colour): Up To 13.5 Ipm / 6.0 Ipm *2 Iso 24734, A3 Duplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm *2 Warranty :1 Year Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 5 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Unit Command Center Video Wall Controller - Command Center Video Wall Controller - Interface Alarm In Alarm Out 8-ch Alarm Out 8-ch Alarm In Serial Interface Rs-232 (rj45) × 1, Rs-485 × 1 Usb Interface Usb 2.0 × 2 Network Interface Rj45 × 2, 10 M/100 M/1000 Mbps Self-adaptive Ethernet Interface Optic Interface × 2 100 Base-fx/1000 Base-x Supports Optoelectronic Self-adaptation Video Walls 1 Video Wall Size <= 8 Layers Per Screen 1080p × 3 Or 4k × 1.5 Layers Layers Per Screen × Output Interface(s) Split Window Yes Scene Auto-switch Delay 3s Auto-switching Plans Support 256 Auto-switching Plans Max. Input Resolution 4k Audio Encoding Format G722.1, G711u, G711a, Aac-lc Video Output Interface Type Hdmi 1.4 Video Output Interface(s) 8 Video Decoding Resolution Up To 32 Mp Warranty:2 Years 8 Unit Command Center Video Wall Display - Command Center Video Wall Display - Display Panel Diagonal Size Class 55 Measured 54.6 Resolution 3,840 X 2,160 (16:9) Brightness (typ.) 700 Nit Orientation Landscape/portrait Haze 25% Contrast Ratio (typ.) 4,000:1 Type Va Active Display Area 1,209.6 (h) X 680.4 (v) Pixel Pitch (mm) 0.315 X 0.315 Color Gamut Ntsc 72% Operation Hour 24/7 Connectivity / Sound Input Video Dp 1.2 (1), Hdmi 2.0 (3) Audio N/a Usb Usb 2.0 X 2 Tuner N/a Output Audio Stereo Mini Jack Wifi / Bt O/o External Control Rs232c (in/out), Rj45 Speaker 10w 2ch Mechanical Spec Dimension (mm / In.) With Heavy Duty Full Motion Tv Wall Mount Warranty :3 Year 44 Unit Din Rail Mount - Din Rail Mount - 35mm At Least 7.5mm Depth Aluminum 22 Unit Electrical Box Enclosure - Electrical Box Enclosure - Electricalbox Panel Box Metal Enclosure(ip66, Nema 4 & 12) 300x250x150 Mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Molded Case Circuit Breaker Mccb30a 220v 2 Pole Din Rail Mount Type X1 Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Rail Mount Type X1 Grounding Bus Bar With Insulator X1 Din Rail Mount Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 6 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Roll Fiber Optic Connectivity - Fiber Optic Connectivity - Fiber Optic Connectivity 2.0 Kms 4 Core Fiber Optic Cable Maintenance Of Outside And Inside Plant Equipment To Smart City Command Center For 1 Year 1 Unit Fiber Optic Fusion Equipment - Fiber Optic Fusion Equipment - Fiber Alignment Core/cladding Motor Number 6 Motors Splicing Time 5s Heating Mode 15s, Can Be Customized According To The External Environment Fiber Type Single-mode Fiber (smf/g.652), Bif/g.657); Suitable For Single Mode, Multi-mode, Bare Fiber, Tail Fiber, Drop Cable, Jumper, Invisible Fiber Fusion; The Cladding Diameter 80-150μm Splicing Loss 0.02db(sm)、0.01db(mm)0.04db(ds/nzds) Splicing Mode Automatic Focusing Core Alignment, Conventional/high Precision Welding Splicing Way Automatic, Semi-automatic Opm Wavelength: 850nm、1300nm、1310nm、1490nm、1550nm、1625nm、980nm、1270nm、1577nm、1650nm/measurement Range: -50+26dbm Absolute Error: <0.3db (-50dbm ~+3dbm Range) Battery Capacity 7800mah Large Capacity Lithium Battery Charging Time ≤3.5; It Can Continuously Weld And Heat About 260 Cores Magnification 320x (x Or Y Axis Single Display) 200x (x And Y Axis Dual Display) Fiber Diameter Coating Diameter: 80-150μm/coating Diameter: 100-1000μm Cutting Length Coating Layer 250μm Below: 8-16mm/coating Layer 250-1000μm: 16mm Heat Shrink Tube 60mm、50mm、40mm、25mm Tensile Testing Standard 2n Display 5 Inch Tft Color Display Screen Return Loss Better Than 60 Db Product Protection Waterproof, Dustproof And Fall Proof Warranty :1 Year 44 Unit Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upcto Lc/upc3 Meter 44 Unit Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upcto Sc/upc3 Meter 45 Unit Gigabit Rj-45 Surge Protector Arrester - Gigabit Rj-45 Surge Protector Arrester - Protects Your Ethernet Device From The Damage Of Lightning & Surge Gigabit 10/100/1000 Specification: Connectors: Rj-45 Material: Shielded Aluminum Alloy 44 Unit Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulatorat Least 8 Way At Least 8x12mm² 2 Roll Grounding Cable Pure Copper Wire - Grounding Cable 4mm Pure Copper Wire Round Solid 100m Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 7 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Grounding Rod And Clamp Copper Plated - Grounding Rod And Clamp Copper Plated - "grounding Rod Full Set - (1pc Grounding Rod + 1 Pc Grounding Clamp) Size: Approximately 50cm Length X 0.9cm Diameter" 22 Unit Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang 15 Amperes Capacity/ Maximum 3,750watts 1 Lot Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of All Outside Plant Project Equipment In Outside Project Sites Outside Of The Smart City Command Center 1 Lot Installation, System Integrations And Configuration Of All Inside Plant Project Equipment - Installation, System Integrations And Configuration Of All Inside Plant Project Equipment In The Smart City Command Center Such As The Hikcentral Camera License, Integration To Existing Hikcentral Software And Integration Of Existing Cctv Cameras Into New Nvr 22 Unit Iot Box Panelbox Metal Enclosure (ip66,nema4 & 12) 500x300x200mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Heavy Duty Surface Type Extension Outlet 4 Gang Terminal Block Distribution 2 Input 4 Output Push-in Type 40 Unit Lpr Camera Arm Mount - Gi Pipe Extension Arm 1.5-3 Meters 40 Unit Lpr Camera Memory Card - Product Capacity Covering 128g The Storage Mediumis Tlc Particles Long Reading And Writing Times, Which Can Meet More Than 1000 Cycles Optimized For Long Time On-board Video Recording, Offering More Stable Reading And Writing Experience Operating Voltage 2.7v~3.6v Compatibility Sd 6.1 Working Life 1,000 Cycles Storage Medium Tlc Speed Class Write/read Speed 64gb:up To 35/100mb/s 128gb:up To 70/100mb/s256gb:up To 90/100mb/s Durability 10,000 Insertion/removal Cycles Uhs-i Sdr104 Type Sdxc 40 Unit Lpr Camera Vertical Pole Mount - Vertical Pole Mounting Bracket Installed On The Cross Bar Galvanized Steel Sheet And Steel Material With Surface Spray Treatment Can Be Used For New Bullet Camera Outdoor Greycolo Must Be Compatible With Cctv Camera 22 Roll Metal Flexible Conduit 1 Inch - Metal Flexible Conduit 1 Inch 30 Meters Per Roll 44 Unit Molded Case Circuit Breaker Mccb 30a - Molded Case Circuit Breaker Mccb 30a 220v 2 Pole Din Rail Mount Type 22 Unit Molded Case Circuit Breaker Mccb 63a - Molded Case Circuit Breaker Mccb 63a 220v 2 Pole Din Rail Mount Type 22 Unit Poe Switch Power Supply - Power Supply 48v 2a 96w With Us Plug Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 8 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Residual Current Circuit Breaker 63a 220v - Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Railmount Type 44 Unit Sfp+ Module Lc Connector Type - Gigabit Single-mode Wdm Bi-directional Sfp Module Spec: Lc Connector, Tx:1550nm/rx:1310nm, Single-mode, 20 Km 7 Roll Solidwire Awg#12 - Solidwire Awg#12 75m Per Roll Use For Termination Inside Iot Box 7 Roll Solidwire Awg#16 - Solid Wire Awg#16 75m Per Roll Use For Termination Inside Iot Box 66 Unit Terminal Block Distribution 2 Input 4 Output - Terminal Block Distribution 2 Input 4 Output Push-in Type This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Brands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business For Use Of Cmo Mitd Under Pr No. 1 Please Refer To Attached Terms Of Reference In The Associated Components Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature
Closing Soon10 Jan 2025
Tender AmountPHP 15.5 Million (USD 267 K)
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Others, Civil Works Others
United States
Details: As Of 08 January 2025, Amendment 0002 Has Been Made To:provide Responses To Contractor Inquiries (see Attachment).
as Of 30 December 2024, The Following Amendments Have Been Made:1) The Size Standard Statement Has Been Removed And 2) The Project Manager (pm) Has Been Updated To Include R.a. Required.
1. Contract Information:
these Contracts Are Procured As A Small Business Set-aside. The Naics Code’s Are 541330 And 541310.
the Number One, Two And Three Ranked Small Business Firms Will Be Selected For Negotiations Based On Demonstrated Competence And Qualifications For The Required Work. The Length Of Each Indefinite Delivery Contract (idc) Is A Maximum Of 60 Months And Will Not Include Optional Time Periods. Three (3) Idc’s Will Share $49.9m Total Capacity Of The Matoc. Task Orders Will Be Issued By Negotiated Firm-fixed-price Task Orders To The Most Technically Qualified Offeror In Response To The Task Order Requirement Notification (torn) And Will Be Issued Under The Terms And Conditions Of This Matoc. The Government Guarantees A Minimum Value Of $4,000 Seed Task Order For Each Individual Idc. Labor Rates For Each Discipline, Overhead Rates, And Escalation Factors For Each 1 Year Time Period Will Be Negotiated For Each Basic Idc And Profit Will Be Negotiated For Each Task Order Not For Each Basic Idc.
work Distribution Between Idcs: Task Orders (to) Will Be Distributed According To The Experience And Qualifications Of The A-e Firms. The Specific Contractor Chosen For A To Will Be Selected Based On Factors Such As Technical Expertise, Demonstrated Performance, Specific Ability, To Size And Complexity, And Contractor Availability To Complete The To In The Time Required. We Are Going To Have The A-e Firms To Compete Amongst The Highly Qualified Selectees For This Contract. Above All, It Is The Intent Of The New York District To Not Have A “hollow” Contract.
three (3) Indefinite Delivery Contracts Will Be Negotiated That Includes Level Of Efforts, Labor Rates For Each Discipline And Overhead Rates For The Contract Period. Profit Will Be Negotiated In Each Task Order Not In The Basic Contract.
the Selected Small Business A-e Firms Will Need To Demonstrate Capability To Perform At Least 51% Of The Contract Work Listed Below In Accordance With Ep 715-1, Chapter 3-8 C Which Can Be Found At Http//www.usace.army.mil/publications/eng.pamphlets/ep715-1-7
in Particular, In Order To Be Awarded A Small Business Contract The Concern Will Perform At Least 51 Percent Of The Cost Of The Contract Incurred From Personnel With Its Own Employees.
“any Subcontractor And Outside Associates Or Consultants Required By The Contractor (prime A-e Firm) In Connection With The Services Covered By The Contract Will Limit To Individuals Or Firms That Were Specifically Identified And Agreed To During Negotiations The Contractor Shall Obtain The Contracting Officer’s Written Consent Before Making Substitutions For These Subcontractors, Associates Or Consultants”.
if A Substitution Is Necessitated By Illness, Death, Or Termination Of Employment For Whatever Reason, The Selected A-e Firm Shall Notify The Contracting Officer In Writing Within 15 Calendar Days After The Concurrences Of Any Of These Events And Provide The Following Information To The Contracting Officer:
required Information For Substitution Necessitated By Illness, Death, Or Termination Of Employment For Whatever Reason: The Contractor Shall Provide A Detailed Explanation Of The Circumstances Necessitating The Proposed Substitution, Complete Resumes For The New Proposed Substitutes, And Any Additional Information Requested By The Contracting Officer. Proposed Substitutes Should Have Comparable Qualifications Or Better Qualifications To Those Of The Persons Being Replaced. The Contracting Officer Will Notify The Contractor Within 15 Calendar Days After Receipt Of All Required Information Of The Decision On Substitutions.
approximate Award Date: June 2025
the Wages And Benefits Of Services Employees (see Far 22.10) Performing Under This Contract Must Be At Least Equal To Those Determined By The Department Of Labor Under The Service Contract Act, As Determined Relative To The Employee’s Office Location (not Of The Location Of The Work). To Be Eligible For A Contract Award, The Firm Must Be Registered In The Dod Central Contractor Registration (ccr). Registered Via The Ccr Internet Site At Http://www.ccr.gov Or By Contacting The Dod Electronic Commerce Information Center At 1-800-334-3414.
2. Project Information:
a-e Services May Include But Not Be Limited To The Following:
general Architect Engineering Services To Include Support Of The Milcon Programs, Sustainment, Restoration And Modernization (srm) Program, Iis Program And Other Non-military Construction Programs Within Nan/nad Boundaries.
architect Engineering (a-e) Services For Smaller Scale Projects Typically With A Construction Cost Of Approximately $10m Or Less To Include The Following:
construction Of New And Renovation/upgrade Of Multiple Hangar/buildings, Maintenance, Training Facilities (hands-on/simulators), Aviation Facilities, Runways And Taxiways, Aircraft Fueling Facilities/distribution, Industrial Facilities, Vehicle Maintenance Facilities, Research & Design Facilities (armament, Munitions And Communications), Munitions And Storage Facilities, Dining Facilities, Academic Labs, Barracks/dormitories, Academic Facilities, Administrative Office Buildings
antarctic/cold Region Construction.
whole And/or Partial Building Renovations Which Address Interior Re-configuration, Life/safety, Energy Conservation, And Utility Systems.
architectural Alterations Which Address New Space Requirements, Programmed Functions Such As: Maintenance, Training Facilities, Storage, Administrative Spaces, And Squad/ops.
new Building Exterior And Envelope (cold Region) Shall Follow The Architectural Compatibility Plan Defined At The Base Inclusive Of, Structural Roof Systems, Insulation And Waterproofing, Windows, And Atfp.
mechanical/electrical/plumbing (mep): Fire Suppression And Water Supply Systems, Fire Alarm And Mass Notification System, Cybersecurity, Fire Detection/protection/monitoring And Controls, Heating And Ventilation Systems, Plumbing Systems, Electrical Systems, Telecommunication And Cabling Systems, Closed Circuit Television (cctv), Alarm And Card Access Systems, And Public Address Systems.
topographic Surveys, Geological Surveys, Geotechnical Investigations, Environmental Investigations, Master Planning Studies, Value Engineering Studies, Field Investigation Studies, Construction Support Services.
asbestos And Lead Abatement Services Related To Building Renovation Or Demolition.
perform/conduct Design Charrettes Including Eco-charrettes
prepare Studies (to Include Building, Energy, Life-cycle Studies)
prepare Parametric Designs, To Include Development Of Dd Form 1391 Preparation.
site & Infrastructure/seismic Design In Accordance With The Ufc’s
development Of Design Criteria And Basis Of Design
design Work Analysis And Technical Specifications
nepa Documentation And Coordination
historic Architecture And Section 106 Consultation
preparation Of Permit Applications.
preparation Of Design/build Documents
preparation Of Arctic Foundation Designs, Building Air Tightness And Hvac Performance For Cold/arctic Regions.
preparation Of Designs Including Hemp And Scif Areas.
preparation Final Design Construction Documents
antiterrorism/force Protection Design In Accordance With Applicable Ufc’s
sustainable Design/gbi/net Zero Strategy Development
cost Estimating Using The Latest Version Mii [m2] Software.
value Engineering Studies And Cost Schedule Risk Analysis (csra).
preparation Of Deliverables In Building Information Modeling (bim) Format.
drawings In Accordance With The Architectural/engineering/construction (a/e/c) Computer-aided Standard Version (cadd)
demonstrated Construction Phase Services:
design During Construction
preparation Of Operation And Maintenance Manuals
providing Technical Assistance – Responding To Requests For Information (rfis)
design Build Conformance Reviews
shop Drawing Review – Review Of Shop Drawings And Submittals
conduct Site Visits
commissioning/enhanced Commissioning; Fit-up Design Support
project Start-up – Coordinate With Contractors To Start Up And Conduct Performance Tests Of The Constructed Project.
projects Designed Under These Contracts May Require Designers To Obtain Security Clearances As Well As Having Physical Security Measures In Place Before A Firm Can Do The Work. Security Clearances Are Not Required At The Time Of Selection Or Award Of A Contract.
3. Selection Criteria:
primary Selection Criteria:
the Selection Criteria Are Listed Below In Descending Order Of Importance (first By Major Criterion And Then By Each Sub-criterion).
criteria A Through E Are Primary Selection Criteria.
criteria F Through H Are Secondary Selection Criteria And Will Only Be Used As Tiebreakers Among Technically Equal Firms.
the Firm Is Required To Have The Following Specific Design Capabilities:
a. Specialized Experience And Technical Competence In:
submit At Least Five (5) Example Projects In Sf-330 Section F That Demonstrates Experience With The Following: Building (whole And/or Partial) Renovation Design That Includes At Least Five (5) Of The Following Design Elements As A Substantial Part Of The Design (replacement Of Architectural Elements, Interior Re-configuration, Building Seismic Upgrade, Anti-terrorism/force Protection Upgrades, Mechanical Systems, Hvac Systems, Electrical Upgrades, Fire Protection/detection Systems, Exterior Envelope Upgrades Including Roof, Windows And Walls, Asbestos And Lead Abatement.). The Projects Shall Demonstrate The A/e’s Ability To Execute Design Charrettes, Concept Designs, Final Designs And Prepare Final Construction Bid Documents. Projects May Include The Following Facility Types: Academic Facilities, Administrative Facilities, Barracks, Research And Development Facilities, Manufacturing Facilities, Hangers, Maintenance Facilities And Training Facilities. The Ae Shall Identify The Month And Year The 100% Final Design Was Completed. The Ae Shall Identify The Month And Year The Construction Was Completed. Projects Shall Have A Construction Cost Of Approximately $10m. Construction Of The Projects Must Be Completed After January 2017. Projects Completed Before January 2017 Will Not Be Considered.
submit At Least Three (3) Example Projects In Sf-330 Section F That Demonstrates Experience With The Following: Infrastructure Type Design That Includes At Least Three (3) Of The Following Design Elements As A Substantial Part Of The Design. The Ae Shall Demonstrate Experience In Planning, Designing And Preparing 100% Construction Bid Documents. Projects May Include The Following Project Types (each Example Project Shall Represent A Different Project Type): Road/parking Replacement/repairs, Utility Infrastructure Replacement/repairs, Utility Central Plant Upgrades/repairs, And Retaining Wall Upgrades/repairs. The Ae Shall Identify The Month And Year The 100% Final Design Was Completed. The Ae Shall Identify The Month And Year The Construction Was Completed. Projects Shall Have A Construction Cost Of At Least $5m. Construction Of The Projects Must Be Completed After January 2017. Projects Completed Before January 2017 Will Not Be Considered.
submit At Least Two (2) Example Projects In Sf-330 Section F That Demonstrates Experience With The Following: Design Of New Facilities. The Ae Shall Demonstrate Experience In Sustainable Design Using An Integrated Design Approach And Emphasizing Environmental Stewardship, With Experience In Energy And Water Conservation And Efficiency; And Employing The Leed Evaluation And Certification Methods. The Projects Shall Demonstrate The A/e’s Ability To Execute Design Charrettes, Concept Designs, Final Designs And Prepare Final Construction Bid Documents. Projects May Include The Following Facility Types: Academic Facilities, Administrative Facilities, Barracks, Research And Development Facilities, Manufacturing Facilities, Hangers, Maintenance Facilities And Training Facilities And Training Facilities. The Ae Shall Identify The Month And Year The 100% Final Design Was Completed. The Ae Shall Identify The Month And Year The Construction Was Completed. Projects Shall Have A Construction Cost Of Approximately $10m. Construction Of The Projects Must Be Completed After January 2017. Projects Completed Before January 2017 Will Not Be Considered.
the Above Requested Projects Shall Also Demonstrate The A/e’s Abilities With All Of The Following:
- Planning And Scheduling Management Of Fast Track Designs,
- Working On Military Installation Projects,
- Prepare Cost Estimates Using Mii And Paces, (the Cost Estimator And/or The Subcontractor Should Demonstrate Familiarity With The Changing Dynamics Of The Current Construction Market In The Tri-state New York Area With Particular Emphasis On The Southern New Jersey),
- Preparing Drawings In Autocad And Autocad Revit,
- Experience In The Ability To Provide A Qa/qc Plan Indicating How The Prime Plans To Manage Their Team To Ensure That Quality Products Are Prepared. Demonstrate Ability To Produce Quality Designs. Evaluation Will Be Based On The Firm's Design Quality Management Plan (dqmp) And Will Consider The Management Approach, Coordination Of Disciplines, Management Of Subcontractors And Quality Control Procedures.
on All Ten (10) Example Projects, The Government May Consider The Following Strengths For Evaluation Purposes:
projects Demonstrating Experience Working At Military Installations Within Nan Boundaries.
projects Demonstrating Experience Working With Nydec And Njdep In Obtaining Environmental Permits.
projects Demonstrating Experience With Sustainable Design And Achieving Leed Silver Or Better.
projects Demonstrating Experience Working Mcaces Paces And Pax/dd1391.
projects Demonstrating Experience With Fast-tracked Designs.
projects Demonstrating Experience Utilizing A Design Quality Control Plan
projects Demonstrating Experience In Permitting, Real Estate Actions, Nepa Documentation, And Other Agency Coordination Tasks.
b. Qualified Registered Professional Personnel In The Following Key Disciplines:
project Manager (p.e. Or R.a. Required)
quality Assurance Manager (p.e. Or R.a. Required)
architecture (r.a. Required)
structural Engineering (p.e. Required)
civil Engineering (p.e. Required)
mechanical Engineering (p.e. Required)
electrical Engineering (p.e. Required)
fire Protection Engineering (p.e. Required)
landscape Architect (r.la. Required)
cost Engineering (p.e. Required. Those With Ccp/cpe Certification Will Be Considered A Strength)
geotechnical Engineering (p.e. Required)
certified Industrial Hygienist (cih Required)
licensed Interior Designer (ncid Required)
land Surveyor (p.l.s. Required)
anti-terrorism/force Protection Specialist (p.e. Required)
blast/explosives Safety Engineering (p.e. Required)
industrial Engineering (p.e. Required)
industrial/process Engineer (p.e. Required)
lean-six Sigma Professional
historic Preservationist
environmental Engineering (p.e. Required)
lead Commissioning Specialist (p.e And At Least One Of The Following: A Nebb Qualified Systems Commissioning Administrator (sca); Acg Certified Commissioning Authority (cxa); Icb/tabb Certified Commissioning Supervisor; Bca Certified Commissioning Professional (ccp); Aee Certified Building Commissioning Professional (cbcp); University Of Wisconsin-madison Qualified Commissioning Process Provider (qcxp); Ashrae Commissioning Process Management Professional (cpmp))
certified Value Specialist (cvs Required)
telecommunications Engineering (rccd Required)
master Planner (p.e. Or R.a. Required)
the Evaluations Will Consider Education, Training, Registration, Voluntary Certificates, Overall And Relevant Experience, And Longevity With The Firm Using Information From Section E Of The Sf 330. The Sf 330 Includes A Matrix In Section G Showing Experience Of The Proposed Lead Designers On The Projects Listed In Section F Of The Sf 330.
senior Project Personnel For Each Discipline Are Required To Be Licensed And/or Registered.
additional Disciplines May Be Submitted As Required By The Ae For This Type/size Project And Will Be Evaluated As The Above.
fire Protection Engineering: The Services And Qualifications Of Fire Protection Engineers Are Shown In Section 1.6 Of Ufc 3-600-01, And Are Reiterated Here: A Qualified Fire Protection Engineer Shall Be An Integral Part Of The Design As It Relates To Fire Protection. This Includes, But Is Not Limited To, Building Code Analysis, Life Safety Code Analysis, Design Of Automatic Detection And Suppression Systems, Water Supply Analysis, And A Multi-discipline Review Of The Entire Project. For The Purposes Of Meeting This Requirement A Qualified Fire Protection Engineer Is Defined As An Individual Meeting One Of The Following Conditions:
i.) A Registered Professional Engineer (p.e.) Having A Bachelor Of Science Or Master Of Science Degree In Fire Protection Engineering, From An Accredited University Engineering Program, Plus A Minimum Of 5 Years’ Work Experience In Fire Protection Engineering.
ii.) A Registered Professional Engineer (p.e.) Who Has Passed The National Council Of Examiners For Engineering And Surveys (ncees) Fire Protection Engineering Written
examination.
iii.) A Registered Professional Engineer (p.e.) In A Related Engineering Discipline With A Minimum Of 5 Years’ Experience, Dedicated To Fire Protection Engineering That Can Be Verified With Documentation.
the Ae And Their Subconsultants Must Be A U.s. Company(ies). The Ae’s Team Must Use Only U.s. Citizens Or U.s. Persons (an Individual Who Has Been Lawfully Admitted For Permanent Residence As Defined In 8 U.s.c. § 1101(a)(20) Or Who Is A Protected Individual As Defined By Title 8 U.s.c. § 1324b (a)(3)). The A-e’s Team Must Be Able To Obtain Visitor Registration Documents/passes To Access Any Military Base And/or Federal Facility Under This Contract.
c. Past Performance On Dod And Other Contracts With Respect To Cost Control, Quality Of Work And Compliance With Performance Schedules, As Determined From References, Other Sources And Cpars. Letters Of Recommendation From Customers Addressing Your Firm’s Cost Control, Quality Of Work And Schedule Compliance Capabilities May Be Included In Section H Of The Sf 330. Letters Should Be For Projects Of A Similar Nature And Shall Be No Older Than Three Years To Be Considered.
d. Capacity To Initiate Work And Complete Within The Time Parameters Of The Project. The Evaluation Will Consider The Availability Of An Adequate Number Of Personnel In All Key Disciplines. The Evaluation Will Review Part Ii Of The Sf330 To Evaluate The Overall Capacity Of The Team. Include A Part Ii Form Of The Sf 330 For Each Firm And Each Office Of Each Firm That Is Part Of The Proposed Team.
e. Knowledge Of The Locality In The General Geographical Area Of Ny District Boundaries. The Evaluators Will Review Projects Identified In Section F, The Specific Experience Of The Listed Key Discipline In Section E And Additional Information In Section H In Order Of Preference.
secondary Selection Criteria:
f. Geographic Proximity In Relation To Ny District Boundaries.
g. Volume Of Work Previously Awarded To The Firm By The Department Of Defense, With The Object Of Effecting An Equitable Distribution Among Qualified A/e Firms, Including Small Business, Veteran-owned Small Business, Service-disabled Small Business, Hubzone Small Business, Small Disadvantaged Small Business And Woman-owned Small Business And Minority Institutions And Firms That Have Not Had Prior Dod Contracts.
4. Submission Requirements:
interested Prime Firms Having The Capabilities To Perform These Services Must Submit Their Sf330 To Stephen Dibari By Email Stephen.dibari@usace.army.mil Maximum File Size Is 25 Mb If Overall Sf330 Is Larger Than 25 Mb, Please Break Up The File Into Smaller Separate Files.
no Hard Copies Of Sf-330’s Will Be Required. Do Not Mail Sf-330’s (cd Or Hard Copies) To The Contract Specialist Nor To Stephen Dibari At 26 Federal Plaza. Doing So, Will Delay The Ae Selection/award Process.
the Sf 330 Can Be Found By Searching For Sf330 On The Following Gsa Website: Https://www.gsa.gov/forms
the Forms Can Be Downloaded In A .pdf File Type. Total Submittal Page Limitation Is 85 Pages. Section E Is Limited To 50 Pages. Section F Is Limited To 10 Pages (1 Page Per Project). Each Page Shall Be Numbered. Section Dividers, Front And Back Covers, Cover Letter And Part Ii Of The Sf 330 Don’t Count Towards Overall Page Limit. Tabloid Size Paper 11” X 17” Pages For Organizational Chart Or Other Graphics Will Count As One Page. Submittals Not Following These Instructions, May Not Be Evaluated By The Board.
supplemental Information On The Sf 330 Is Posted On The Ny District Usace Website: Https://www.nan.usace.army.mil/business-with-us/engineering-division/
submittals Will Not Be Accepted After 2:00 Pm On The Response Date Shown In The Advertisement In The Https://sam.gov/. If The Response Date Falls On A Saturday, Sunday, Or A Federal Holiday, The Response Date Will Move To The Next Business Day.
for Questions Regarding This Contract, Contact Stephen.dibari@usace.army.mil
if A Pre-selection Meeting Is Required, Notifications Will Not Be Sent After Approval Of The Pre-selection. Notification Of All Firms Will Be Made Within Ten (10) Calendar Days After Selection Approval. In Addition To The Two (2) Items Listed Above, The Remaining Info On Release Of Information On Firm Selection Shall Be In Accordance With Uai Subpart 5.4 (usace Acquisition Instructions).
interviews (discussions) Will Be Held With All The Most Highly Qualified Firms As Required By Far 36.602-3(c). All Firms Will Be Interviewed By The Same Method (telephone, Video Teleconference Or In Person). Firms Will Be Given Sufficient Advance Notice To Allow Representatives To Participate In The Interviews Or Presentations. All Firms Will Be Asked Similar Questions. The Questions Will Be Related To The Announced Selection Criteria Including But Not Limited To, Their Experience, Capabilities, Capacity, Organization, Management, Quality Control Procedures And Approach For This Project.
firms Must Be Registered In The Following: Https://www.sam.gov/
naics Code’s Are 541330 And 541310.
interviews (discussions) Will Be Held With All The Most Highly Qualified Firms As Required By Far 36.602-3(c). All Firms Will Be Interviewed By The Same Method (telephone, Video Teleconference Or In Person). Firms Will Be Given Sufficient Advance Notice To Allow Representatives To Participate In The Interviews Or Presentations. All Firms Will Be Asked Similar Questions. The Questions Will Be Related To The Announced Selection Criteria Including But Not Limited To, Their Experience, Capabilities, Capacity, Organization, Management, Quality Control Procedures And Approach For This Project.
Closing Date27 Jan 2025
Tender AmountRefer Documents
City Of Winnipeg Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Canada
Details: D4. Scope Of Services D4.1 This Scope Of Services Identifies The Services Required And Is To Provide A General Guideline Only. The Consultant Will Draw Upon Their Expertise And Knowledge In Sewer Condition Assessment As Well As Their Knowledge Of The City’s Sewer Inspection Program And Sewer Infrastructure To Make The Appropriate Recommendations In Their Proposal. D4.2 The Services Required Under D4.9, D4.10, D4.11, D4.12, And D4.13 Shall Be In Accordance With The City’s Project Management Manual Http://winnipeg.ca/infrastructure/asset-managementprogram/ Templates-manuals.stm#2 And Templates Http://winnipeg.ca/infrastructure/assetmanagement- Program/templates-manuals.stm#4 . Notwithstanding The Foregoing, The Consultant Is Being Engaged By The City For Its Professional Expertise; The Consultant Shall Bring To The Consulting Contract Administrator’s Attention Any Aspect Of The City’s Project Management Manual Or Templates Which The Consultant Is Of The Opinion Is Not Consistent With Good Industry Practice. D4.3 The Following Shall Apply To The Services If Applicable: (a) City Of Winnipeg Green Building Policy: New City-owned Buildings And Major Additions Http://clkapps.winnipeg.ca/dmis/docext/viewdoc.asp?documenttypeid=2&docid=5989 (b) Universal Design Policy Http://clkapps.winnipeg.ca/dmis/docext/viewdoc.asp?documenttypeid=2&docid=3604 (c) Should This Project Include A Public Engagement Aspect, It Will Be Required To Meet: Public Engagement Guidelines Https://winnipeg.ca/publicengagement/pdfs/publicengagementrequirements.pdf D4.4 The Funds Available For This Contract (2025) Are $475,000.00. D4.5 The Work Of This Contract Consists Of Consulting Services To Provide Project Management, Program Development, Procurement, Contract Administration, And Analytical Services For The Sewer And Manhole Cleaning And Inspection Project (sewer Inspections). The Sewer Inspections, Performed By A Contractor, Will Be Tendered And Administered By The Consultant Under A Separate Tender. The Consultant Will Perform Condition Assessment On Sewers And Manholes Inspected By The Contractor. D4.6 The 2025 Work Includes Inspections Of All Sewers That Have Previously Been Inspected In The Despins, Marion, Mission, Mission Separate, And Woodhaven Sewer Districts Regardless Of Structural Performance Grade To Monitor Their Deterioration, As The Original Inspections Were Completed Nearly 20 Years Ago. Finally, Aging Wastewater, Storm Relief And Land Drainage Sewers With No Previous Inspections Now Require Inspection To Establish Their Structural Condition. D4.7 The Required Condition Assessments In 2025 Are: (a) 76.4 Km Of Previously Inspected Combined Sewers And Manholes Which Are Being Inspected As Part Of The District-wide Re-inspections And Will Be In Various States Of Deterioration; (b) 36.4 Km Of Wastewater Sewers And Manholes Which Now Require Inspection Due To Their Age (c) 24.3 Km Of Storm Relief Sewers And Manholes Which Now Require Inspection Due To Their Age; And (d) 20.4 Km Of Land Drainage Sewers And Manholes Which Now Require Inspection Due To Their Age These Sewers Are Listed In Appendix A And Shown On The Location Map In Appendix B. D4.8 There Will Be The Option Of Two (2) Mutually Agreed Upon One (1) Year Extensions. D4.8.1 The City May Negotiate The Extension Option With The Consultant Within One Hundred Twenty (120) Calendar Days Of December 31st Of The Current Year. The City Shall Incur No Liability To The Consultant As A Result Of Such Negotiations. D4.8.2 Changes Resulting From Such Negotiations Shall Become Effective Upon Initiation Of The Next Year’s Program; Changes Will Not Be Applied To Any Year’s Program Currently Underway. Changes To The Contract Shall Not Be Implemented By The Consultant Without Written Approval By The Consulting Contract Administrator. D4.8.3 The Two Potential One-year Extensions For 2026 And 2027 Will Be For Condition Assessment Programs That Are Expected To Be Of Similar Size And Scope To The 2025 Contract, But May Be Adjusted To Reflect The Lessons Learned From Previous Years. Future Programs Will Depend On Available Approved Capital Funds. Specific Locations Will Be Determined Prior To Negotiations. D4.8.4 Sewer Inspection Guidelines For Consultant Contract Administration Fee Basis (a) Pre-cleaning Shall Be Done On All Combined, Storm Relief And Land Drainage Sewers Less Than 900mm In Diameter And All Wastewater Sewers Smaller Than 450mm. (b) Large Diameter Sewers, Equal To Or Greater Than 900mm For Combined, Storm Relief Or Land Drainage And Equal To Or Greater Than 450mm For Wastewater, Will Be Inspected Without Pre-cleaning Except As Required. (c) The City Requires The Successful Cleaning And Inspection Contractor To Provide Sewer Coding For All Inspected Assets In Nassco Pacp And Macp Format. (d) An Average Contractor Inspection Rate Of 1100m/day Should Be Assumed For Estimating Purposes. This Amount Can Vary Depending On The Successful Contractor Or Type Of Inspection And Size Of Pipe Inspected. D4.8.5 The Annual Preliminary Budget Estimate For The Sewer Cleaning And Inspections Tender Including Applicable Taxes Is $4,260,000.00. D4.9 Program Management D4.9.1 The Successful Consultant Will Be Responsible For Project Reporting And Support To The City’s Consulting Contract Administrator In Accordance With The City Of Winnipeg’s Project Management Manual And Templates. D4.9.2 Develop, Host, And Maintain A Microsoft Sharepoint Site (sharepoint) That Is Updated On A Daily Basis At The Start And End Of Each Workday, And Additionally As Required. The Consultant Is Responsible For Providing Key Project Staff (consultant, Contractor, And City) Access To Sharepoint. Coordinate And Conduct A Pre-construction Meeting With All Relevant Parties And Provide Minutes Within Seven (7) Calendar Days Of The Meeting. D4.9.3 Arrange For Regular Bi-weekly Job Meetings At An Agreed Location Throughout The Duration Of The Project. The Meetings Are To Be Attended By The Contract Administrator, Or Their Designate, As Well As The Resident Inspector, The Contractor, And The Department’s Consulting Contract Administrator. Provide Minutes Of All Site Meetings Within Seven (7) Calendar Days Of The Meeting. D4.9.4 A Maximum Of 80% Of The Total Fee For The “project Management” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.10 Program Development D4.10.1 Meet With Stakeholders And Identify The General Strategy For Completing The Project. D4.10.2 Review The Assets (sewers, Manholes, And Chambers) To Be Inspected (appendix A) And Create An Inspection Work Program In Infoasset Manager And The Corresponding Inspection Work Orders. D4.10.3 Identify Errors And Omissions In The Work Listed In Appendix A And Review With The Consulting Contract Administrator. D4.10.4 Perform A General Site Investigation And Identify Any Locations With Access Issues Or Areas Of Cleaning And Inspection That May Interfere Or Require Additional Clearances Due To Proximity Of Other Utilities, For Example Water Feeder Main Or Aqueduct Crossings. D4.10.5 Refine The Project Schedule. D4.10.6 A Maximum Of 80% Of The Total Fee For The “program Development” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.11 Drawing And Tender Document Preparation D4.11.1 Tender Documents Shall Be Consistent With Past Sewer Inspection Contracts Which Can Be Found On The City’s Bid Opportunity Web Site Under “closed Bid Opportunity Information”. D4.11.2 Review The Past Inspection Contracts With Stakeholders And Refine The Contract Specifications. Where Required, Write Specifications Modifying The City Of Winnipeg Standard Construction Specifications Cw 2140 And Cw 2145 To Suit The Nature Of The Work And To Apply Lessons Learned From Past Contracts. Known Specification Additions Will Include, But Not Be Limited To: (a) An Amount Of Miscellaneous Hourly ‘as-required’ Cleaning For Sewers And Manholes; (b) An Amount Of Miscellaneous Hourly ‘as-required’ Cleaning For Other Structures. Other Structures Include: Lift Stations, Control Structures, Overflow Structures, Etc.; (c) Where Possible The Inspections Shall Be Carried Out From A Wheeled Or Track-driven Inspection Platform But In Areas With High Flow Or Soft Debris A Floating Platform Or Skid Will Be Required; (d) For Some Sewers, Inspections May Need To Be Carried Out At Night During Low Flow Conditions Or For Safety Or Traffic Considerations. D4.11.3 Prepare Maps (drawings) Showing All Assets To Be Inspected Labelled With Asset Numbers And Flow Direction Arrows. (a) Show All Lift Stations, Flow Monitor Installations, And Gate Chambers/control Structures That May Affect Or Be Affected By The Work; (b) Show The Locations Of All “white-cap Hydrants” In The General Areas Of The Sewers To Be Inspected. The City Will Provide All Gis Data For White-cap Hydrants. Water Required For The Work Will Only Be Taken From These Hydrants Or Any Other Hydrant As Approved By Water Services Division. (c) Show All Locations Identified In D.10.4 And Note Clearances May Be Required Prior To Attempting Inspections. D4.11.4 Include A Table Of Assets To Be Inspected (work Program) In Ms Excel Format. D4.11.5 Prepare A Pre-tender Estimate And Provide To The Consulting Contract Administrator. The Consulting Contract Administrator Must Approve The Pre-tender Estimate Prior To Posting The Tender. D4.11.6 Provide An Accurate Defendable Estimate Of Costs For Liquidated Damages Including City Costs As Well (provided By The Consulting Contract Administrator). The Consulting Contract Administrator Must Approve The Estimate Of Costs For Liquidated Damages Prior To Posting The Tender. D4.11.7 A Maximum Of 80% Of The Total Fee For The “drawing And Bid Document Preparation” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.12 Procurement Process D4.12.1 Review Bid Submissions For Completeness And Prepare Bid Tabulation. D4.12.2 Review Low Bidder Qualifications. (a) Perform A Complete Review Of The Low Bidders Qualifications To Determine If They Are Capable Of Performing The Work Under The Terms Of The Contract. (b) Conduct A Pre-award Meeting If Required. D4.12.3 Make A Recommendation Of Award To The Consulting Contract Administrator. D4.12.4 A Maximum Of 80% Of The Total Fee For The “procurement Process” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.13 Contract Administration Services D4.13.1 Non-resident (a) Process Monthly Contract Progress Estimates Within Ten (10) Business Days In Accordance With The General Conditions Of The City Of Winnipeg Standard Construction Specifications. (b) Provide A Detailed Monthly Consultant Progress Report Using The City Of Winnipeg Pmm Template. This Report Is To Include The Actual Costs To Date, Plus Projected Costs To Complete The Contract Including Allowances For Any Unforeseen Costs. The Report Will Identify Any Expected Budget Overruns Or Surpluses. (c) Monitor Project Progress And Ensure All Items Of Work Are Completed Within The Terms Of The Contract. (d) Ensure The Contractor Submits The Inspections And Data Files To The Consultant On A Weekly Basis For The Previous Week’s Work. (e) Determine The Dates Of Any Required Critical Stages Along With Substantial And Total Performance And Complete The Corresponding Certificates. (f) Look For And Document Locations Of Dry Weather Overflows In All Srs Pipes. The Consultant Will Notify The Consulting Contract Administrator Immediately Upon Encountering Such Locations. (g) Look For And Document Locations Of Infiltration And Inflow (i & I) In All Sewers. The Consultant Will Notify The Consulting Contract Administrator Immediately Upon Encountering Locations Of I & I. (h) Information Provided By The Consultant On Sharepoint Will Include, But Not Be Limited To: Project Records, Sewer And Manhole Inspections, Notices To Residents, Resident Complaints, Emergency Repair Details, White-cap Hydrant Locations, And Project Progress Details. (i) Prepare Operational Shutdown Summary (oss) Documents And Hydraulic Analysis For Cleaning Lift Station Locations Identified Within The Districts Listed In The Contract. Oss Documents To Be Reviewed And Authorized By Waste Water Service Division Personnel Prior To Commencement Of Lift Station Cleaning Activities. (j) Ensure That Infoasset Manager Is Updated On A Regular Basis Daily Throughout The Duration Of The Project. (i) Where Inspections Could Not Be Completed In Full, Ensure The Comments Field In The Inspection Window Shows Details Of The Survey Abandoned (sa) Along With The Percent Of Obstruction – I.e. Sa, Debris 40%. (ii) Where Inspections Could Not Be Obtained, Update The Asset Comments Field In Infoasset Manager With The Reasons Why. If Maintenance Is Required To Obtain The Inspections, Create The Corresponding Work Orders In Infoasset Manager. (k) A Maximum Of 80% Of The Total Fee For The “non-resident Contract Administration Services” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.13.2 Resident (a) Personnel Experienced In Sewer Inspection Are To Be Provided For Continuous On-site Inspection Of The Work. (b) Monitor The Activities Of The Contractor To Ensure: (i) Project Schedules Are Being Realized; (ii) Traffic Control Is In Accordance With City Specifications; (iii) Damage To Private Property Is Addressed; (iv) Contract Requirements And Specifications Are Being Met; (v) Residential Notices Are Being Delivered On Time; (vi) Site Safety Is In Accordance With Provincial Regulations. (c) Review Video Inspections On-site For Adherence To The Specifications. (i) Perform Quality Assurance / Quality Control (qa/qc) In The Field And Perform Random Resolution Tests Of Captured Video; (ii) Ensure That Video Is Submitted To The Department For Consideration Of Emergency Repairs In A Timely Manner. (d) Update The Water And Waste Department’s Asset Management Branch Of The Addresses Where Notices Have Been Delivered At The Beginning Of Each Working Day And Provide Daily Updates Of Completed Locations. (e) Coordinate With The Wastewater Services Division When Working At Or Near Lift Stations, Flow Meters And Overflow Structures Including The Drafting, And Achieving Final Approval, Of Operational Shutdown Summary Documents For The Purpose Of Cleaning Specific Lift Stations Within The Related Sewer Districts. (f) Consultant To Provide Air Monitor And Supply Air For Their Personnel Should The Need To Enter Confined Space Arise. (g) Coordinate With The Water Services Division For Hydrant Approval And Monitor Hydrant Operation By The Contractor To Ensure Conformance With City Requirements. Ensure That Only Personnel Trained By Water Services Operate Hydrants. (h) Provide Weekly Project Reports To The Department's Consulting Contract Administrator Identifying, But Not Limited To The Following: Days Worked, Progress, Days Lost Due To Weather Conditions, Project Concerns, Material, Personnel, Equipment Employed By The Contractor, And Work Completed. Provide Weekly Reports No Later Than The Following Wednesday. (i) Monitor All Damage To Private Property, Including Basement Flooding, Caused By The Contractor And: (i) Ensure That Acceptable Repairs Are Made To The Satisfaction Of The Homeowner And The Department; (ii) Ensure That The Contractor Submits A Report For Every Incidence Of Property Damage Describing All Actions Taken And Copies Of Agreements Made; (iii) Take Before And After Photographs (digital) Of All Damage. (j) Make And Submit Gis Error Reports To The City For Any Gross Errors Between Records And Actual Field Measurements. (i) On The Day The Error Is Discovered, Update Sharepoint With The Details; (ii) Prepare A Gis Error Report And Submit With The Weekly Report. (k) Track All Pay-item Quantities And Obtain Confirmation And Signature From The Contractor On A Daily Basis. (l) For Asset Inspections That Could Not Be Attempted Or Completed; (i) Record The Reasons Why They Could Not Be Attempted Or Completed For The Purpose Of Updating Sharepoint. Common Reasons Include, But Are Not Limited To, Excessive Debris, Access Issues, Flow Conditions, Etc. (m) A Maximum Of 80% Of The Total Fee For The “resident Contract Administration Services” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.14 Analytical Services (a) The City Uses Software By Innovyze, Specifically Infoasset Manager, To Manage Its Sewer Assets. This Is A Purpose-built Infrastructure Management System For Wastewater Collection And Land Drainage Networks To Aid In Day-to-day Operational Management As Well As Long-term Network Planning. Infoasset Manager Will Be Used By The Consultant For Performing Condition Assessment. The Consultant Is Responsible For Obtaining The Necessary Licenses For The Product; Associated Costs Will Not Be Covered Under This Contract. (water & Waste Department’s Media Management Program Will Be Implemented At A Point Within The Term Of The Contract.) (b) The Water And Waste Department Is Working In Conjunction With Our It Department On Implementing A Web-based Application For The Submittal And Initial Review Of Nassco Pacp And Macp Inspections. The Exact Timeline This Application Will Be Completed Is Unknown, But It Is Anticipated To Be Ready For Use At Some Point In The Duration Of This Contract. This May Cause Changes In The Processes Used By The Contractor And The Consultant In The Submittal Of Sewer And Manholes Inspections. If Extra Work Is Expected Due To This Application Implementation, Discussions With The City Consulting Contract Administrator Will Be Required To Determine If A Change In Scope Of Services Is Warranted. (c) Only Personnel With Extensive Experience And Knowledge In Sewer Construction Techniques, Identification Of Failure Modes Of Various Pipe Materials, And Rehabilitation Methods Currently Used By The Department, Will Assign Spg Ratings And Work Orders Under This Contract. (d) Only Personnel With Current And Valid Nassco Pacp And Macp Certification Can Perform This Work. Copies Of The Certificates Must Be Submitted To The City’s Consulting Contract Administrator Before Working On This Project. (e) Only Personnel Listed In The Proposal Can Perform This Work. Any Additional Staff Must Be Proposed To, And Approved By The City’s Consulting Contract Administrator Before Working On This Project. (f) Perform Quality Assurance / Quality Control (qa/qc) To Industry And Departmental Standards On 10% Of The Submitted Nassco Pacp And Macp Raw Coded Data. (g) Input Inspection Data Received From The Contractor Into Infoasset Manager For Evaluation. (h) Ensure That Inspections With Temporary Id’s Are Assigned To The Proper Asset Number Once Gis Corrections Are Made. (i) Perform Quality Assurance / Quality Control (qa/qc) To Industry And Departmental Standards For Spg Evaluations And Work Order Assignments. (j) Perform A Cursory Review Of All Sewer And Manhole Inspections Provided By The Contractor For Conformance To The Specifications. (i) Cursory Review To Be Completed Within Five (5) Working Days Of Any Video Inspection Being Submitted By The Contractor. (k) Review The Internal Condition Grade (icg) And Assign/update The Actual Structural Performance Grade (spg) In Infoasset Manager For All Assets. (l) Perform A Complete Review Of All Sewer And Manhole Inspections With An Spg Value Of 3, 4, Or 5, And Enter Work Orders In Infoasset Manager Identifying The Appropriate Rehabilitation Strategy. (i) Spg Assignments Must Be Assigned To The Entire Asset Based On The Likelihood Of Failure At Any One Location Or On The Entire Asset (sewers And Manholes), Whichever Is Greater. (ii) Spg Assignments Must Be Based On Structural Defects That Exist Within The Asset. (iii) For Assets That Have Previously Been Inspected And Assigned Spg Values, Reevaluate The Spg. Assign/update The Spg Based On Structural Defects That Exist Within The Asset In The Most Current Inspection. All Corresponding Work Orders Should Be Reviewed And Updated Where Required In Relation To Current Rehabilitation Methods And Trends. Notify The Consulting Contract Administrator Of All Assets With ‘pending’ Work Orders. (m) A Maximum Of 80% Of The Total Fee For The “analytical Services” Task Will Be Paid Prior To The Acceptance Of The Draft Summary Report. The Remaining 20% Of The Payment Will Be Made Upon Acceptance Of The Final Summary Report. D4.15 Summary Report D4.15.1 Provide A Draft Summary Report, In Ms Word Format, Discussing The Overall Condition Of The Sewers And Manholes Inspected And Identify Any Areas Of Concern. Provide Two (2) Hard Copies And One (1) Digital Copy Of The Draft Report To The Consulting Contract Administrator In Accordance With The Critical Stages Listed In D9. Draft Report Will, At A Minimum Include: (a) In Graph And Tabular Form, Summarize The Overall Condition Of Spg Values By Length And Segment Count For All Inspection Types (i.e. Inspections, Re-inspections, Trunk Sewers, And Interceptors) Included In This Program. (b) Report On Changes In Spg Values Between The Current Inspections And The Previous Inspections, Where Applicable, Including Factors Affecting The Changes. (c) Provide A Summary Of Assets Where Inspections Were Not Possible And Reasons Why Inspections Were Not Completed. (d) Provide A Summary Of Assets That Required Gis Error Reports. (e) Provide A Summary Of Manhole Assets With Weirs, Including Depths And Other Relevant Details. (f) Provide A Summary Of Rehabilitation Work Type For Each Inspection Type (i.e. Inspections, Re-inspections, Trunk Sewers, And Interceptors) Included In This Program. (g) Include A Discussion Of Lessons Learned And Recommendations For Future Sewer Inspection And Condition Assessment Contracts. D4.15.2 Incorporate City Review Comments Into A Final Report. Final Report Should Be Submitted 1 Month After Consultant Receives City Comments On Draft Report. Provide Four (4) Hard Copies And One (1) Digital Copy Of The Final Report To The Consulting Contract Administrator In Accordance With The Critical Stages Listed In D10. D4.15.3 Hand Deliver (in Person) Two (2) Hard Drive Inspection Media To The Consulting Contract Administrator. D4.15.4 The Consultant Shall Provide A Final Presentation Of The Results, Along With Lessons Learned, Following The Completion Of The Summary Report. D4.15.5 Payment For The Summary Report Document Will Be As Follows: (a) 50% Upon Acceptance Of The Draft Report; (b) 50% Upon Acceptance Of The Final Report And Final Presentation.
Closing Soon15 Jan 2025
Tender AmountRefer Documents
5181-5190 of 5204 active Tenders