Software Tenders

Software Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Civil Works Others
Corrigendum : Closing Date Modified
United States
Closing Date23 Jan 2025
Tender AmountRefer Documents 
Details: Questions And Answers: sheet Gi016 Icra Legend D States That The Dashed Line Is For: Wall Type D, Reference Gi002. sheet Gi002 Wall Type D Shows Metal Stud With Two Layers Of Drywall To Deck. please Confirm Which Type Of Barrier Is Required. the Barriers Shall Be Two Hours Fire Rated Unless The Cor Specify/agree To A Different Plan. bid Alternate 3 Reads; base Bid Except All D Wing Elevators. This Alternate Shall Only Include Work Required For The A Wing. i Assume This Should Read: Base Bid Except Delete All D Wing Elevators bid Alternate 3: Base Bid Delete All D Wing Elevators. This Alternate Shall Only Include Work Required For The A Wing. will The Owner Accept Procore Project Management Software As The Primary Submittal And Data Tracking Tool For This Project? procore Is Acceptable. is This Project Tax-exempt, And Will The Co/cor Provide The Necessary Tax-exempt Certificates? yes because Of Covid-19 Throughout The U.s. And The Resulting Federal, State, And Local Governments Responses/requirements, Are There Any New Work Requirements Or Mandates That Will Be Required By The Va On This Project? at This Point There Are No New Requirements, However If The Va Announced Any Requirement Regarding To This In The Future, The Contractor Shall Follow. will You Confirm Contractors Need To Follow The Tb Policy Stated In Spec 01 35 26 1.16? specifications Shall Be Followed Unless The Va Waive The Requirement. what Is The Approximate Duration Between Issuing The Award And Issuing The Ntp? typical Turnaround Time For An Ntp After Award Is Approximately 2-3 Weeks. for Planning The Preliminary Project Schedule, Please Provide An Anticipated Award Date. the Government Is Currently Anticipating An Award Date Sometime Around The End Of January Beginning Of February Pending Any Unforeseen Circumstances. how Many Calendar Days Should Be Included In The Critical-path Method Schedule For The Owner And A/e To Review And Respond To Rfis? response Times To Be Discussed At The Pre-construction Meeting, Post Contract Award. how Many Calendar Days Should Be Included In The Critical-path Method Schedule For Owner And A/e Submittal Review? response Time To Be Discussed After Award During The Pre-construction Meeting. will The Government Provide The 3-d Revit Design Model In Native File Format For The Creation Of Coordination Drawings And Use By Contractor? native Files May Be Requested Once Construction Is Underway. please Confirm That The Superintendent Cannot Dual Hat As Cqc Or Ssho. contractor Shall Follow The Specifications. Ssho Cannot Be The Superintendent. If The Superintendent Have The Necessary Qualifications Of The Cqc (proven Qualifications), He/she Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least One Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects. please Confirm That The Project Scope Will Be Completed During Normal Working Hours, Not Nights And Weekends. contractor Shall Review Drawings, Sow, And Specs To Have Full Understanding. There Are Work To Be Done Off Hours And Weekends. can You Confirm That The Owner Will Be Contracting Directly With A Third-party Commissioning Agent For Commissioning The Project And That The Contractor Is Only To Include Participation/coordination With The Commissioning Agent? the Va Will Hire A 3rd Party For Commissioning. Contractor Shall Follow All Requirements Of Commissioning That Indicated In The Specifications And All Project Documents. knowing That The Campus Is Limited On Space And Parking, It Is Critical That The Contractor Project Superintendent Have Freedom Of Access And Close Proximity To The Work. Can The Va/owner Provide A Designated Parking Spot For The Contractor Project Superintendent? there Will Be Two Permits For Parking Spots In Campus. has The Facility Operation & Maintenance Team Reviewed The Contract Documents For Operability To Avoid Change Orders? contractor Shall Follow All Drawings, Specs, Sow, And All Project Documents. can The Contractor Use An Existing Office Inside The Building For A Temporary Construction Office During Construction Instead Of Setting Up A Temporary Trailer? no can The Contractor Use The Existing Restroom Facilities In The Work Area Or Adjacent Ones Nearby? yes But If The Bathrooms Are Assigned For Certain People Or Category, Then No. Generally There Will Be Restrooms Available Close By The Work Location. They Shall Not Also Carry Dust And Leave Footprints On The Floor On/from Work Location To The Bathroom. If Occurred, Contractor Shall Immediately Clean That. If Contractor Misuse The Bathrooms, They May Lose The Privilege Of Using Them. can The Contractor Use The Existing On-sites Utilities For Temporary Electrical And Water Free Of Charge? yes, If They Are Available And Approved By The Cor. The Va Will Not Be Responsible For Labor Or Materials To Get Utilities To The Work Site. The Cor Will Have To Approve The Source Of Utility If Available. will The Owner Provide The Fire Watch During The Period That The Fire Suppression And/or Fire Alarm System Is Not In Service? fire Watch Shall Be The Contractor S Responsibility Not The Va. Permits Shall Be Submitted And Approved Prior To Starting The Work. please Provide Detailed Guidance For Noise And Vibration Operations, Including Acceptable Levels/duration, Hours Of Operations For Acceptable Levels, And Acceptable Noise Levels After Hours. contractors Shall Follow The Specifications. it Appears There Is Some Minor Masonry Work On This Project. Will There Be Specification For The Masonry Scope Of Work, Prior To Bidding? reference General Notes On Sheet Ss001 And Call Outs On Details. can You Confirm The Time Of Submission? Sam.gov Shows January 7, 10:00 Am Est. The Original Solicitation Shows 2:00 Pm Est. the Solicitation Due Date Is January 23, 2025, At 2:00 Pm Est please Confirm The Bid Bond Will Need To Be Mailed In Prior To Bid. the Va Can Accept A Scanned Copy Of The Original Document With Wet Signatures As Acceptable Bond Submission. Mailing In Physical Copies Is No Longer Required. refer To Drawing Pl100. Specifically, The Left-hand Side #2 Plumbing Sanitary Sub-basement Wing D. the 2 Ss Line Running From Os-d-1 Indicates That This Line Is To Be Demolished (because It Is A Dashed Line). The Note At The End Of That Line, #3, Makes It Seem Like We Are Supposed To Connect New Vent Here. Our Question Is, Do We Run New Vent Piping After Removing This And What Size? the Drawing Referenced In This Rfi Is Essentially A New Work Plan And There Is No Demolition Of The Piping In Question. The Dashed Linework Is Intended To Indicate Vent Piping, Whereas The Solid Linework Is Drainage Piping. The New 2 Vent Is To Connect To The Existing System As Indicated On The Drawing And To Meet Actual Site Conditions. refer To The Specifications. 22 13 00 | 2.1 B & C - Facility Sanitary And Vent Piping the Specs Call For Copper Dwv Or Pvc For This Type Of Piping. Section C Says The Following; "c. Polyvinyl Chloride (pvc) 1. Polyvinyl Chloride (pvc) Pipe And Fittings Are Permitted Where The waste Temperature Is Less Than 60 Degrees C (140 Degrees F). 2. Pvc Piping And Fittings Shall Not Be Used For The Following applications: a. Waste Collected From Steam Condensate Drains. b. Spaces Such As Mechanical Equipment Rooms, Kitchens, Sterile Processing Services, Sterilizer Areas, And Areas Designated For Sleep. c. Vertical Waste And Soil Stacks Serving More Than Two Floors. d. Exposed In Mechanical Equipment Rooms. e. Exposed Inside Of Ceiling Return Plenums." our Question Is, Does This Mean We Can't Use Pvc In This Area Based On This Verbiage? pvc Piping Is Not Allowed are We Able To Use Regrigerant Press Fittings On This Project? press Fittings Are Not Allowed please Confirm The Va S Intent For The Prime Contractor To Have A Full Time Superintendent For The Entirety Of The Project. yes please Confirm The Va S Intent For The Prime Contractor To Have A Full-time Ssho On Site For The Entirety Of The Project. contractor To Follow The Specs please Confirm Va S Intent For The Prime Contractor To Have A Full-time Qcm On Site For The Entirety Of The Project. contractor To Follow The Specs. can Any Of The Above Individuals Double Or Triple Hat? contractor Shall Follow The Specifications. Ssho Can Not Be The Superintendent. If The Superintendent Have The Necessary Qualifications Of The Cqc (proven Qualifications), He/she Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least One Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects can Any Of The Above Individuals Be An Employee Of A Subcontractor, Or Will The Va Require The Above Individuals To Be A Full-time Employee Of The Prime Contractor? contractor To Follow The Specs will Microsoft Project Be An Acceptable Scheduling Tool For The Project? the Va Can Accept That. what Software Will Be Utilized On The Project For Submittal Transfers? Will The Prime Contractor Be Responsible For Purchasing And Maintaining? the Va Will Not Purchase Or Maintain Any Software, Typically The Gc Provides (purchases) The Software And Issues User Licenses For The A/e And Va. will The Client Require Any Construction Management Software To Be Utilized On The Project? Will The Prime Contractor Be Responsible For Purchasing And Maintaining? contractor To Follow The Specs And Project Documents. The Va Will Not Purchase Or Maintain Any Software, Typically The Gc Provides (purchases) The Software And Issues User Licenses For The A/e And Va. do The Elevators Currently Receive A Pre-transfer Signal From The Ats (automatic Transfer Switch)? The New Controllers Will Require A Pre-transfer Signal From The Ats. existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Shall Provide All Appurtenance To Comply With Specification §14 21 10 2.9.c if No Pre-transfer Signal Currently Exists, Does The Ats Have The Capability To Time Delay And Send A Pretransfer Signal To The Elevators It Serves? Additionally, Where Is The Ats Located Within The Building For Each Elevator Identified In The Solicitation? Conductors Will Need To Be Run In Conduit And Programmed To Function. Contractor Needs To Know The Length Of Run, Quantity Or Runs, And Potential Routing. existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Verify In-field Capabilities Of Existing Ats With Pre-transfer Signaling. Final Connections Shall Comply With §14 21 10 - 2.9.c. Atss Are Located In Rooms As Indicated Below: 'aats-eq1' --> Room A-b140 'aats-eq4' --> Room A-b140 'ats1d1' --> Room D-b009 'ats1d2' --> Room D-b009. can The Va Please Identify A Lay Down Area On Site Where Contractors Can Stage Materials And Equipment? please Review The Sow And Project Documents. The Va Will Not Give A Space To Store Materials Onsite. Csr Will Be Available For Trailers. can The Va Please Identify The Location Of Placement For Project Dumpsters? f Lot. please Provide Contract Information For Existing Building Fire Alarm Vendor. at This Moment Aadco Does The Testing, And Korsen Does The Programming. We Are Currently Upgrading The Whole System, It Will Be Siemens, Project Will Be Awarded Soon. please Provide Contact Information For Existing Building Fire Protection Vendor. grunau Fire Protections. Granaufire.com. (317) 872-7360 6011 E Hanna Ave, Suite A, Indianapolis, In 46203 new 24 X24 Sump Pit 24 Deep. Would The Va Be Open To The Contractor Installing Surface Mounted Sump Pumps? surface Pumps Could Be Considered But Must Meet The Elevator Code, Capacity In Gpm And Head To Be Suitable, And Be Coordinated With The Site Conditions. this Is A Code Allowable Approach, However Any Contractor That Uses This Approach Would Have To Provide The Discharge Calculations Meet Requirements And Provide As Built For All Installation Parameters And Equipment Placement. All Roofing Work Shall Be Performed By Contractor Approved By Existing Roof Manufacturer To Patch And Repair Existing Roofing System. Contractor Shall Be Responsible For Checking Existing Roofing System Warranty Status And Furnishing A Complete Roof Rework, Repair And Patching System That Will Be In Compliance With Any Existing Remaining Roof Warranties. New Work Shall Provide Full New System Warranties. Can The Va Please Identify The Existing Roof Manufacturer? d Wing And A Wing Are Spf Roofs Manufactured By Progressive Materials. can The Va Please Verify That The Job Will Be Installed Under The 2022 Code For The Elevators? Are Any Parts Of That Being Deleted For This Project? amse A17.1-2022 will All The Hoisting Of Materials Need To Be Done On Sunday? Does This Include Crane Picks On D Wing And Interior Hoisting On A Wing? no. Crane Lift On The D-wing Shall Happen On Sunday. Interior Hoisting On A Wing Does Not Have To Happen On Sunday, You Can Do That During Normal Business Hours. can The Va Please Clarify The Icra Wall Types For Each Elevator? Due To The Shading Of The Cabs On The Phasing Plan It Is Difficult To Decipher What Icra Wall Types Are Required In What Areas. icra Forms Were Provided As Part Of Design Submission. Contractor Needs To Fill It Out For Every Area Needing Enclosed And Submit To Va For Approval. Icra Barriers Are Dependent On Type Of Work Being Done, Type Of Departments Surrounding Work Area, Etc. If Elevator Doors Are Being Remove From Elevator Shaft Then The Icra Barrier Needs To Meet The Same Fire Rating Requirements Of The Adjacent Walls/ Partitions. based On The Questions And Answers We Anticipate Receiving From The Government Along With The Upcoming Holiday, We Are Requesting Additional Time To Work With Our Vendors And Ensure Our Pricing Is Accurate. Will The Va Please Issue A Bid Extension? the Bid Due Date Has Been Extended To January 23, 2025 At 14:00 can The Va Please Clarify The Bas/bms Scope Of Work For The Project? will Any Of The New Equipment Require Bas/bms Connections? if So, Please Clarify Which Equipment Will Require These Connections. does This Equipment Currently Have Bas/bms Connections Fed To Them? if There Are Not Existing Connections, And The Va Is Requesting Them, Can The Va Identify The Source Panels For The New Connections? who Is The Current Bas/bms Service Provider At The Facility? existing Are Not Connected To Our Building Automation System. Contractor Shall Review Drawing And Specs For New Installations. please Clarify If We Are To Submit 2 Or 3 Alternate Bid Deducts. As Per Solicitation Page 5 Or Bid Alternate In Dwg Gi000. there Are Three Alternates And Base Bid As Noted On The Invitation To Bid. Also Please Review The Sow For Clarifications. please Clarify The Locations Of The Abatement. environmental Drawings Detail Locations Of Known Or Suspected Hazardous Materials Related To Scope Of Work Areas. please Confirm If Superintendent Can Satisfy The Role Of Qc? if The Superintendent Has The Necessary Qualifications Of The Cqc (proven Qualifications), Proposed Superintendents Can Be However, They Must Also Have To Prove/show That The Personnel Ran Two Elevators Project That Are 100% Completed At The Same Capacity Or At Least On Completed Project At The Same Capacity And 5 Years Of Experience Of Similar Mep Projects. solicitation States All Submittals Must Be Sent Within 15 Days Of Award. Please Clarify? (solicitations Page 8) this Could Be Discussed After Award. The Va Is Willing To Agree On A Reasonable Time Frame. will Prime Contractor Be Required To Be In Attendance During Fire Watch? (solicitation Page 10) contractor Shall Have A Personnel To Be The Fire Watch While Conducting Any Work That May Require Fire Watch. drawing Gi015, Detail 3. Note 10.43 Category C. What Is The Risk Group For This Containment? risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. note 10.45 For Different Landings State Category B. What Is Risk Group For The Different Landings? Notes State To Verify With Cor/hospital Staff? risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. drawing Gi016, For Vestibule In Blood Draw Areas, Where Can Exhaust Be Routed From Negative Air Machine? exhaust To Closest Adjacent Window Systems Plan North Of A2127 drawing Gi017 What Is Risk Group For Basement? risk Category Varies At All Locations Depending On Surrounding Departments. Patient Risk Group High Risk Designated For All Containment Enclosures. Deviations Where Possible To Be Coordinated With Va. please Confirm Only Elevator S7 Will Be Required To Have An Oil Water Separator? only Elevator S7 Requires An Oil Water Separator. which Code Year Shall Be Utilized For The Elevators Asme Code A17.1? discussion: Statement Of Work References Most Recent Code But Refers The Asme A17.1-2010, Specifications Reference Asme A17.1-2019 In 14 21 10, Sention 2.7, D, N. the Most Recent Code Year Is 2022. Please Confirm The Correct Code Year For The Project. Additionally, The Design Drawings Do Not Comply With The Requirements For 2022 And Have Several Lacking Items. It Is Suspected The Design Was Done For Code Year 2019. Please Advise. asme A17.1-2022 Is The Governing Code. do The Elevators Currently Operate On Emergency Power? Do The Elevators Currently Have Pretransfer Signal Wire Which Initiates The Countdown As Indicated In Items C? discussion: It Is Important To Know If The Current Functionality Exists For The Time Delay Transfer To Emergency Power Under Loss Of Normal Power To Appropriately Estimate Cost. Should New Signal Wire Be Needed For The Ats And Emergency Power Functionality The Length Of Run Will Be Critical In Estimating The Project. Please Confirm If The Pre-transfer Signal Wire Is Currently In Place For The Elevators And If The Conduit And Conductor May Be Re-used. existing Elevators Operate On Emergency Power. Pre-transfer Signal Wiring May Be Required. Contractor Shall Provide All Appurtenances To Comply With Specification §14 21 10 2.9.c do All Elevators Have Existing Shunt Trip Devices And Functional Shunt Trip Circuitry Tied To The Fire Alarm System? discussion: Note 24 On Drawing Sheet E-201 Acknowledges The Requirement For All Elevators To Be Shunted. All Elevators Have Sprinkled Machine Rooms And Therefore Require Shunting. However, During The Site Visit No Shunt Trip Devices Were Observed And Their Location / Existence Was Unclear. Please Confirm All Elevators In The Scope Of Work Are Currently Serviced By Shunt Trip Breakers And The Shunt Trip Functionality Is Active And Connected To The Heat Detectors In The Respective Machine Spaces. Shunt Trip Breakers Are Costly And Expected To Be Retained. Should Any Device Lack Shunt Trips Or Require Shunt Trip Breaker Replacement It Is Critical To Know Prior To Bidding. existing Shunt Trip Devices Are Present At Distribution Equipment Feeding All Elevator Controls. what Digital Monitor Is Required On The Icra Enclosure? discussion: Note 8 Is Mentioned Throughout On Icra Barrier Pages. Shall Digital Monitors Be Required To Show Negative Pressure Locally? Is There A Remote Monitoring Requirement? Is There A Particular Required Device Brand / Model That Is Required? Please Expand On The Requirement Guidelines. (note: Magnehelic Is Noted In The Scope Of Work, But No Model Number Is Given. Google Search Returns Mechanical Gauges Which Conflict With The Digital Guidance Given In The Drawings.) for Purposes Of Fair Bidding Utilize Digital Monitors With Local Display. Remote Monitoring Is Not Required. No Specific Brand Is Required, But Reference Spec Section 02 82 11 For Negative Air Monitoring Requirements. shall Remote Monitoring Be Provided For All Elevator On 1 Monitoring Station In The Electric Shop? discussion: Shall All Contract Elevators Be Monitored From The Same Machine In The Electric Shop? not Required For This Project. shall The Car Have Security Override Features Like Lockdown Or Any Special Security Features? discussion: Standard Features Will Be Provided However If Security Or Lockdown Features Are Required For Active Shooter Type Scenarios A Detailed Description Of The Desired Functionality Must Be Provided So The Additional Programming And Hardware May Be Quoted With The Control System. these Additional Features Are Not Required. which Seismic Zone Does The Facility Lie Within? discussion: Specification 14 21 10, Section 1.5, C, 1, C. Indicates Rail Bracket Requirements For Seismic Zone 2. It Is My Understanding That The Indianapolis Facility Falls Within The Seismic Zone 1 Which Encompasses The Majority Of The State. Please Confirm The Seismic Zone Requirement For This Project Is Zone 1 And The Zone 2 Note Is An Error. per Us Dept. Of Va Seismic Zone Map, Indianapolis Is In An Area Of Moderate Low Seismicity. This Facility Is Risk Category Iv And Falls Under Ibc Seismic Design Category D Per Rp 10-22 Referenced In H-18-8 Seismic Design Requirements. is The Contractor Exempt From Indiana Sales Tax As A Passthrough For This Project? discussion: States Such As New Mexico And South Dakota Require Contractors To Pay Local Sales Tax On Projects Although The Federal Entity Is Exempt. This Exemption Does Not Pass Through To The Contractor. Please Confirm Whether Or Not The Sales Tax Exemption For The Richard L . Roudebush Vamc Allows Passthrough To The Contractor. project Is Tax-exempt And Contracting Will Provide Any Necessary Certificates. is The Contractor To Make The Cleared Pit Space Between P8/p9 And P10 Pits Compliant? discussion: The Drawings Lack Guidance For Electrical Or Fire Installations In The Void Crawlspace Between The P8/p9 And P10 Elevator Pits. This Space Being Accessible By The Elevator Pits And Open To The Other Side Should Be Barricaded, Switched, Lighted And Smoke Device Controlled. Please Advise If Any Modifications To The Crawl Space Shall Be Required. reference Keynote 1.02 On Ae Sheets. request Bid Date Be Extended To 1/31/2025 At Minimum To Allow Contractors To Price The Job After Rfi Responses Have Been Answered And To Adequately Communicate With Vendors As The Holiday Impact To Vendor Operations Is Substantial? discussion: Please Provide, At Minimum, 2 Weeks After Rfi S Have Been Returned Before Bid Due Date. This Will Allow The Contractors Fair Time To Appropriately Price The Project. Additionally, The Holiday S Make Vendor Pricing For Materials Near Impossible. the Bid Due Date Has Been Extended To 1/23/2025. shall A Second Iteration Of Rfi S Be Allowed To Follow Up On Responses To The First Set? discussion: It Is Generally Helpful To Allow A Follow Up Round Of Rfi S To Provide Further Clarification To The Answers Provided To Round 1. It Often Become Necessary To Ask A Different Question When Given An Unexpected Answer To The First Set. Please Advise. a Second Round Of Rfi S Will Not Be Accepted.

DEPT OF THE ARMY USA Tender

Telecommunication Services
Corrigendum : Closing Date Modified
United States
Closing Soon17 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12.6, As Supplemented With Additional Information Included In This Notice. this Is A Combined Synopsis/solicitation. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. This Will Be A 100% Set-aside For Small Business Procurement. The Solicitation Number Is W912pm25q0010 And The Solicitation Is Issued As A Request For Quote (rfq). The Naics Code Is 334290. This Solicitation Document Incorporates Provisions And Clauses In Effect Through Federal Acquisition Circular 2024-03. description Of Requirement: The Purpose Of This Contract Is To Install A Cell Phone Booster System Within The Division Hq Building That Will Enable Cell Phone Service For All Office Personnel. The System Will Consist Of (4g And 5g Lte) Antennas For A Total Of Eight (8). We Will Require Quantity Four Additional 4g/5g Capability Antennas To Cover The Office Area. The Cables Will Reach From The Rooftop Into Our Office Space On The 9th And 10 Floor Of The Building. evaluation And Award: The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. Award Shall Be Made To The Lowest Priced Technically Acceptable Offer. See Solicitation Provision 52.212-2. each Offeror Must Submit A Price And Technical Quote Via Email To Shaun M. Mckenna At Shaun.m.mckenna@usace.army.mil, And Rosalind M. Shoemaker At Rosalind.m.shoemaker@usace.army.mil. No Hard Paper Copies Will Be Accepted Or Evaluated. The Price Quote Must Be Received By The Closing Date And Time Set For Receipt Of Quotes. In An Effort To Reduce Paperwork And Reduce Cost, All Quotes Shall Be Submitted Electronically. All Submissions Shall Be In Adobe Pdf Format And Shall Be On 8 ½ X 11 Size Pages In No Less Than A 10 Pitch Or 10 Font. Offerors May Use Compressions Utility Software Such As Winzip Or Pkzip To Reduce File Size And Facilitate Transmission. title The File(s) In The Following Format: w912pm25q0010_ Company Name_pricing w912pm25q0010_company Name_technical quote Due Date And Time: 17 January 2025 request For Quotes No: W912pm25q0010 due Date Of Quotes: 17 January 2025 time By Which Quotes Are Due: 3:00 P.m. (eastern Time) title Of Project: Sad Hq Cell Phone Booster see The Solicitation For The Site Visit Date And Time. A Rsvp Is Required To Attend The Site Visit. quotes Are Due As Specified On The Solicitation Document (as Amended If Applicable). The Time & Date Of Quote Receipt Will Be The Timestamp The Emailed Quotes Are Received By The Government. Do Not Assume That Electronic Communication Is Instantaneous. Offerors Should Time Their Upload Effort With Prudence By Not Waiting Until The Last Few Minutes—this Will Allow For Unexpected Delays In The Transmittal Process. If An Electronic Submission Is Uploaded Minutes Before The Deadline But The Upload Doesn’t Complete Until After The Deadline, The Submission Will Be Considered Late. Offerors Are Encouraged To Keep A Copy Of The Upload Confirmation For Their Record.

University Of The Philippines Tender

Others
Philippines
Closing Date27 Jan 2025
Tender AmountPHP 30 Million (USD 513.6 K)
Details: Description Supply Of Dna Genetic Analyzer For Sanger Sequencing Description: • Dna Genetic Analyzer For Sanger Sequencing With Desktop Detailed Specifications: Dna Genetic Analyzer For Sanger Sequencing Number Of Capillaries 24 Number Of Dyes Supports Up To 8 Sample Format 4-plate Capacity; 96-well Plates, 384-well Plates, Or 8-tube Strips Power Input 100–240 V Internal Hard Drive 512 Gb Solid State Drive (ssd) Excitation Source 505 Nm Solid State Laser On-instrument Tracking Radio Frequency Identification (rfid); Internal Barcode Reader Communication Interface Connect Platform With Cloud-enabled Capability; Usb Port For Wi-fi Dongle; 3 Rj-45 Ethernet Ports Configuration Stand-alone; Optional Desktop Or Laptop Computer Available Warranty Standard 1-year Warranty Included; Extended Warranties Available Orientation And Training Includes One Week Of On-site Training By A Field Application Scientist, As Well As Software Training By Application Specialist Other Inclusions One (1) Unit Of 2 Kva Ups With Built-in Avr For Genetic Analyzer Installation By A Field Service Engineer Starter Consumables Of Machine Genetic Analyzer Install Kit Detailed Specifications: Desktop Processor Intel® Core™ I7-8700 (6 Cores/12mb/12t/up To 4.6ghz/65w); Supports Windows 10/linux Or Higher Chipset Intel® Q370 Chipset Operating System Microsoft® Windows 10 Home (64-bit) Graphics Options 4gb Vram Or Higher Memory 4 Dimm Slots; Non-ecc Dual-channel 2666hz Ddr4 Sdram 16gb (2x8gb) 2666mhz Ddr4 Memory Or Higher Networking Intel® Wireless-ac 9560, Dual-band 2x2 802.11ac Wi-fi With Mu-mimo + Bluetooth 5 I/o Ports Tower/sff 10 External Usb: 1 X Usb Type-c 3.1 Gen 2; 5 X 3.1 Gen 1 Type-a (1front, 4 Rear) And 4 X 2.0 (2 Type-a Front (one With Powershare), 2 Type A Rear (both Smartpower On) 1 Rj-45 2-displayport 1-serial 2-ps/2 1 Optional 3rd Video Port (vga/dp/hdmi 2.0b/usb Type-c Alt-mode) Optional Powered Usb Add-in Card, Optional Powered Serial Add-in Card 1 Universal Audio Jack 1 Line-out Removable Media Options Optional 8x Dvd-rom 9.5mm Odd Optional 8x Dvd+/-rw 9.5mm Odd Optional Sd Media Card Reader Storage Options 2.5 Inch 1tb 5400rpm Sata Solid State Hybrid Drive W/ 8gb Flash Or Higher Warranty Standard 1-year Warranty Included; Extended Warranties Available Monitor 24in Flat Panel Or Higher Other Inclusions One (1) Unit Of 2 Kva Ups With Built-in Avr Installation By A Field Service Engineer Delivery Terms 45-60 Days Upon Receipt Of Purchase Order Warranty: 1 Year

DEFENSE HEALTH AGENCY DHA USA Tender

Healthcare and Medicine
Corrigendum : Closing Date Modified
United States
Closing Soon17 Jan 2025
Tender AmountRefer Documents 
Details: 13 January 2025 - Extend The Response Time To 17 January 2025/12:00pm 31 December 2024 -amendment 1: Attached Question & Answer Document the Defense Health Agency Contracting Activity Southeastern Healthcare Operations Contracting Division (dhaca-seho-cd) Intends To Award A Firm Fixed Price, Full And Open Competition To Provide One (1) 128 Slice Computed Tomography (ct) System. the U.s. Nmrtc Guantanamo Bay, Cuba Has A Requirement For A Single Contract For One (1) 128 Slice Computed Tomography (ct) System. The Contractor Shall Provide Full Contract Support And Full Maintenance Support. Shall Provide Qualified, Certified Technicians, Test Equipment, Tools, And Materials To Perform Troubleshooting, Repair, Preventative Maintenance, Software Upgrades, Firmware Upgrades, Operational Checks, And Adjustments To On-site Equipment In Order To Ensure The Equipment Is Fully Operational And Within Manufacturer Specifications At All Times.place Of Performance: The U.s. Nmrtc Guantanamo Bay, Cuba. the Contract Will Consist Of A Base Period Of Performance (pop) Of 5 Months And One Option Periods Of 4 Months. The Pop Start Date Is Tbd. The Ct System Shall Be Able To Scan The Entire Body Habitus Of The Patients. The Ct System Shall Be Able To Perform Scout Scans In Lateral And/or Anterior-posterior Planes For Accurate Scan Localization. It Should Support Anatomical Range Definition For Prospective Reconstructions. The System Shall Be Capable Of Moving The Patient As The Table Moves Incrementally Between Scans. The System Shall Be Capable Of Acquiring Up To 128 Slices In One Rotation, The Ct System Should Have The Ability To Support Gated Cardiac Calcium Scoring Examinations Using The Wireless Vital Signal Module (vsm). The System Shall Be Able To Preview Reconstructions, Real-time Reconstructions, Reconstructions After Preview And Off-line Reconstructions. The System Shall Be Able To Properly Display The Ctdlvol (unit:mgy/100mas) And Dlp Dose Reports For Each Patient After Completing Their Ct Examination. The Statutory Authority For The Sole Source Procurement Of These Supplies And Services Is Federal Acquisition Regulation (far) Subpart 12.603, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services; Far 12.602, Streamlined Evaluation Of Offers. This Notice Is Not A Request For Competitive Proposals. The Notice Number Is Ht9406-25-q-128slicect. This Announcement Is Issued As A Notice Of Intent (noi). to Be Considered For Award, Firms Must Be Registered In The System For Award Management (sam). Offerors May Obtain Information On Registration In Sam By Calling 866-606-8220, Or Via The Internet At Https://www.sam.gov. responsible Sources May Identify Their Interest And Capability That Shall Be Considered By The Agency. This Notice Is Not A Request For Competitive Proposals. A Determination By The Government Not To Compete The Proposed Requirement Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. Information Received Will Be Considered Solely For The Purpose Of Determining Whether To Conduct A Competitive Procurement. questions Or Clarifications: All Questions Are To Be Submitted Via Email To The Contract Specialist: Rebecca.a.brashears.civ@health.mil And Contracting Officer: Lenore.y.paseda.civ@health.mil, With Email Subject: 128-slice Ct Lease; Gtmo Cuba. The Government May Not Respond To Questions Received Less Than 2 Business Days Prior To The Due Date And Time For Receipt Of Capability Statements.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Closing Soon15 Jan 2025
Tender AmountRefer Documents 
Details: Special Notice special Notice page 3 Of 3 special Notice *= Required Field special Notice page 1 Of 3 the Department Of Veterans Affairs, Visn 9, Tennessee Valley Healthcare System, Nashville Medical Center And Network Contracting Office (nco) 09 Intends To Issue And Award A Sole Source, Single Award Firm-fixed Price Type Contract To Corps Medical Supply Llc, For The Eyesi Surgical Simulator System From Haag-streit Usa, Inc., The Sole Manufacturer Of This Equipment. This Va Medical Center Is Located At 1310 24th Avenue South, Nashville, Tn 37212. it Has Been Determined That Through Initial Market Research, Only 1 (one) Responsible Source Can Provide The Required Equipment As Identified Below, In Accordance With Federal Acquisition Regulation (far) 6.302-1 Only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements . item # description Of Items qty 0001 eyesi Surgical Simulator System 1 Ea 0002 eyesi Surgical Complete Gold Software Plan 1 Ea 0003 simulation Eyesi Cat Spare Instrument Set 1 Ea this Is Not A Request For Competitive Quotes/proposals And No Soliciation Is Available. telephone Requests Will Not Be Honored. No Award Will Be Made Based On Quotes Or Offers Received In Response To This Notice. All Responsible Sources May Identify Their Interest To Meet This Requirement To Scott Dickey By 11:00 Am (cst), Wednesday, January 15, 2025. Additionally, Any Response To This Notice Must Show Clear, Compelling And Convincing Evidence That Competition Will Be Advantageous To The Government By Providing The Following: 1.business Size And Socio-economic Status: (a) Indicate Whether Your Business Is Large Or Small (b) If Small, Indicate If Your Firm Qualifies As A Small, Emerging Business, Or Small Disadvantaged Business (c) If Disadvantaged, Specify Under Which Disadvantaged Group And If Your Firm Is Certified Under Section 8(a) Of The Small Business Act (d) Indicate If Your Firm Is A Certified Hub Zone Firm (e) Indicate If Your Firm Is A Woman-owned Or Operated Business (f) Indicate If Your Firm Is A Vip Verified Service-disabled Veteran Owned Small Business (sdvosb) Or Veteran Owned Small Business (vosb) (g) Include The Duns Number Of Your Firm. (h) State Whether Your Firm Is Registered With The System For Award Management (sam) At Www.sam.gov And/or The Vetbiz Registry At Www.vetbiz.gov. If Not, Please Note: Any Future Solicitation Could Only Be Awarded To A Contractor Who Is Registered In Sam. To Receive Award Based On Vosb Or Sdvosb Status You Must Be Registered In The Vetbiz Registry. 2. Authorization To Perform: Prospective Non-oem Contractors Must Provide An Authorization Letter From Haag-streit Usa, Inc. Identifying They Are Authorized To Provide The Required Original Equipment Manufacturer (oem) Parts/equipment. the Intent Of This Notice Is For Informational Purposes Only. Interested Parties May Submit Information For Consideration By The Government To: Scott.dickey@va.gov No Later Than The Response Due Date/time Identified Above.

DEFENSE LOGISTICS AGENCY USA Tender

Aerospace and Defence
United States
Closing Soon17 Jan 2025
Tender AmountRefer Documents 
Details: This Solicitation Will Contain One Nsn For A Cable Assembly, Radio Frequency, [wsdc: 19f] / End Item: Aircraft, Eagle F-15. A Request For Proposal (rfp) Will Be Solicited For Award Of A Firm Fixed Price Contract. The Original Equipment Manufacturer And Only Approved Source Is Meggitt Safety Systems Inc 25693 P/n 15-30-03700. The Nsn And Quantity Are As Follows: Nsn: 5995-012845363, Quantity 53 Each. The Delivery Schedule Is 128 Days Aro. Fob: Origin; Inspection/acceptance: Destination. Procurement Notice L22 Is In The Solicitation, Item Designated As Source Control/amsc “b”. The Final Contract Award Decision May Be Based Upon A Combination Of Price, Past Performance, And Other Evaluation Factors As Described In The Solicitation. The Solicitation Issue Date Is On Or About December 18, 2024, In Accordance With 10 U. S. C. 2304 (c) (1), Other Than Full And Open Competition Applies. the Proposed Contract Action Is For Supplies Or Services For Which The Government Intends To Solicit And Negotiate With The Approved Source. Interested Persons May Identify Their Interest And Capability To Respond To The Requirement Or Submit Proposals. This Notice Of Intent Is Not A Request For Competitive Proposals. However, All Proposals Received Within Forty-five Days (thirty Days If Award Is Issued Under An Existing Basic Ordering Agreement) After Date Of Publication Of This Synopsis Will Be Considered By The Government. A Determination By The Government Not To Compete With This Proposed Contract Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. Information Received Will Normally Be Considered Solely For The Purpose Of Determining Whether To Conduct A Competitive Procurement. award Will Be Made Only If The Offeror, The Product/service Or The Manufacturer Meets Qualification Requirement At Time Of Award, In Accordance With Far Clause 52.209-1 Or Procurement Note L22. The Solicitation Identifies The Office Where Additional Information Can Be Obtained Concerning Qualification Requirements And Is Cited In Each Individual Solicitation. based Upon Market Research, The Government Is Not Using The Policies Contained In Part 12, Acquisition Of Commercial Items, In Its Solicitation For The Described Supplies Or Services. However, Interested Persons May Identify To The Contracting Officer Their Interest And Capability To Satisfy The Government's Requirement With A Commercial Item Within 15 Days Of This Notice. "item Cited Requires Data Which Is Restricted To Contractors Certified By Dod To Access Unclassified Data Per Dod 5220.22m. Certification Is Obtained By Submitting Dd Form 2345, Military Critical Technical Data Agreement, To The Defense Logistics Information Services. a Copy Of The Solicitation Will Be Available Via The Dla Internet Bid Board Systems (dibbs) Website At Https://www.dibbs.bsm.dla.mil/rfp On The Issue Date Cited In This Solicitation. From The Dibbs Homepage, Select “requests For Proposal (rfp) / Invitation For Bid (ifb)” From The Menu Under The Tab “solicitations.” Then Search For And Choose The Rfp You Wish To Download. Solicitations Are In Portable Document Format (pdf). To Download And View These Documents You Will Need The Latest Version Of Adobe Acrobat Reader. This Software Is Available Free At Http://www.adobe.com. A Paper Copy Of The Solicitation Will Not Be Available To Requestors. the Solicitation Anticipated Close Date Will January 17, 2025. The Buyer For This Requirement Is Lionel Allamby Jr., E-mail: Lionel.allamby@dla.mil.

Surf Bv Tender

Corrigendum : Tender Amount Updated
Netherlands
Closing Date7 Dec 2025
Tender AmountEUR 4 Million (USD 4.1 Million)
Details: De Toekomst Van De Ict En Bijbehorende Dienstverlening Voor Onderwijs- En Onderzoek Ligt Volgens Surf Én De Leden Voor Een Belangrijk Deel In De Cloud. De Leden (instellingen) Willen Daarom Flexibel Gebruik Kunnen Maken Van De Cloud En Deze Combineren Met Eigen Ict-infrastructuren (hybride Infrastructuur). Overgang Naar De Cloud Is In De Praktijk Geen Eenvoudige Stap, En Voor Veel Instellingen Geldt Dat Er Weinig Ervaring Mee Is Opgedaan. Er Kunnen Daardoor Onverwachte Uitdagingen Ontstaan Tijdens De Uitvoering Van Cloud Projecten Alsook In De Beheerfase Erna. De Initieel Beoogde Voordelen Worden Dan Niet Behaald Waardoor Afbreukrisico C.q. Kapitaalvernietiging Kan Ontstaan. Om Instellingen Te Ondersteunen Bij Deze Uitdagingen Is Het Dan Ook Gewenst Om Surfcumulus Professional Services Via Een Surf Aanbesteding Voor Hen Beschikbaar Te Maken. Surf Kiest Ervoor Om Dit Via Een Das Te Laten Verlopen. De Levering Van Surfcumulus Professional Services Is Nadrukkelijk Gekoppeld Aan De surfcumulus Dienst. Concreet Gaat Het Om Uitvoerende, Gangbare Dienstverlening Bedoeld Voor Cloud Implementatie, -migratie En -beheer. Levering Gebeurt Op Basis Van Vaste Prijs En Vaste Opleverdatum. Een Nadere Omschrijving Van De Dienstverleningonderdelen Is Als Volgt: Inrichten Van Een cloud Landing Zone, Geïntegreerd In De Bestaande (hybride) Architectuur Van Een Instelling, Ten Minste Omvattend: Account Setup: Gebaseerd Op De Administratieve Organsiatie, Compliance Richtlijnen, Bestaande Omgevingen En Structuren Van De Instelling. Network Configuratie: Volgens Richtlijnen, Binnen Cloud Omgevingen En Tussen On-premise En Deze Cloud Omgevingen. Security Baseline: Identity En Access Management Op Basis Van Surfconext, Bechikbaarheid Van Gestandaardiseerde, Hardened Machine Images, Security Policies, Network Monitoring En Log Analytics. Automation: Gestandaardiseerde Inrichting Van Security, Governance, And Kostenoptimalisatie. Uitvoeren/ondersteunen Van cloud Migraties, Door Middel Van: Lift-and-shift Migratie Scenario: Het Zonder Ingrijpende Wijzigingen (deels) Verplaatsen Van Een Ict Infrastructuur Uit Een Datacenter Naar De Cloud. Re-design Migratie Scenario: Het Cloud Ready Maken Van (een Deel Van) Een Bestaande Ict Infrastructuur En/of Het Implementeren Van Vervangende, Nieuw Te Bouwen Oplossingen Waardoor Het Potentieel Van De Cloud Optimaal Benut Kan Worden. Leveren Van cloud Managed Services in De (hybride) Cloud Infrastructuur, Waaronder Bijv.: Operations (accountbeheer, Software Update Management, Licentiebeheer, Netwerkbeheer, Backup & Restore, Monitoring, Platformbeheer) Application Management (technisch Applicatiebeheer, Functioneel Applicatiebeheer, Gegevensbeheer, Applicatie Configuratiebeheer) Service Support (incident-, Problem- & Change Management, Multi Vendor Coordinatie, Tweede En Derdelijns Support, Escalatie Afhandeling) Service Delivery (service Level Management, Capacity-, Cost- En Continuity Management) Informatie Beveiliging En Privacy Bescherming (detectie, Preventie, Rapportage, Bijsturing). Zie Verder Het Toegevoegde Document "toelatingsleidraad Das Surfcumulus Professional Services".

DEPT OF THE NAVY USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Closing Date10 Feb 2025
Tender AmountRefer Documents 
Details: Nsn 7h-5998-016936683, Tdp Ver 001, Ref Nr Lt-1000344-01, Qty 1 Ea, Deliver To W25g1u, W1a8 Dla Distribution, New Cumberland, Pa 17070-5002. The Government Does Not Own The Data Or The Rights To The Data Needed To Purchase / Contract Repair Of This Part From Additional Sources. It Has Been Determined To Be Uneconomical To Buy The Data Or Rights To The Data. It Is Uneconomical To Reverse Engineer The Part. Interested Parties May Obtain Copies Of Military And Federal Specifications And Standards, Qualified Products Lists (qpls), Qualified Product Databases (qpds), Military Handbooks, And Other Standardized Documents From The Dod Single Stock Point (dodssp) At Document Automation And Production Service (daps) In Philadelphia, Pa. Note: Patterns, Drawings, Deviation Lists, Purchase Descriptions, Etc. Are Not Stocked At Dodssp. Most Documents Are Available In Adobe Pdf Format From Assist-online At: Http://quicksearch.dla.mil/. Users May Use Assist-quick Search To Search For And Download Available Documents Directly Using Standard Browser Software. Documents That Are Not Available For Downloading From Assist-quick Search Can Be Ordered From The Dodssp Website Using The Assist Shopping Wizard After Obtaining A Dodssp Customer Account By Following The Registration Procedures. Users Who Do Not Have Access To The Internet May Contact The Dodssp Assist Help Desk At 215-697-2667 Or 215-697-2179(dsn: 442-2667), Or Mail Their Requestdla Document Services, Bldg. 4/d, 700 Robbins Avenue, Philadelphia Pa 19111-5094. The Proposed Contract Action Is For Supplies Or Services For Which The Government Intends To Solicit And Negotiate With Only One Source Under The Authority Of Far 6.302-1. All Responsible Sources May Identify Their Interest And Capability To Respond To The Requirement Or Submit Proposals, Quotations Or Capability Statements. This Notice Of Intent Is Not A Request For Competitive Proposals. However, All Proposals Received Within 45 Days (30 Days If Award Is Issued Under An Existing Basic Ordering Agreement (boa) After Date Of Publication Of This Synopsis Will Be Considered By The Government. A Determination By The Government Not To Compete With This Proposed Contract Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. Information Received Will Normally Be Considered Solely For The Purpose Of Determining Whether To Conduct A Competitive Procurement. Award Will Be Made Only If The Offeror, The Product/service, Or The Manufacturer Meets The Qualification Requirement(s) At Time Of Award, In Accordance With Far Clause 52.209-1. The Solicitation Identifies The Office Where Additional Information Can Be Obtained Concerning Qualification Requirements And Is Cited In Each Individual Solicitation. Based Upon Market Research, The Government Is Not Using The Policies Contained In Far Part 12, Acquisition Of Commercial Items, In Its Solicitation For The Described Supplies Or Services. However, Interested Persons May Identify To The Contracting Officer Their Interest And Capability To Satisfy The Government's Requirement With A Commercial Item Within 15 Days Of This Notice. One Or More Of The Items Under This Acquisition Is Subject To: Free Trade Agreements, If Dfars Clause 252.225-7036 Buy American Act--free Trade Agreements--balance Of Payments Program, Is Included In The Solicitation. The World Trade Organization Government Procurement Agreement And Free Trade Agreements, If Dfars Clause 252.225-7021 Trade Agreements, Is Included In The Solicitation.

DEPT OF THE ARMY USA Tender

Security and Emergency Services
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Details: Notice Of Intent To Sole Source For Previously Installed Hid Access And Symmetry Security Doors And Cameras. This Notice Is Being Published In Accordance With Federal Acquisition Regulation (far) Requiring Dissemination Of Information On Proposed Contract Actions. This Is A Notice Of Intent To Sole-source To T. R. Joy & Associates Inc.. The Statutory Authority For This Sole-source Procurement Is Far 6.301-1, "only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements." the U.s. Army Corps Of Engineers, New York District Intends To Sole Source Maintenance Contract For Previously Installed Hid Access And Symmetry Security Doors And Cameras At 26 Federal Plaza Ny, Ny For The Us Army Corps. T. R. Joy & Associates Inc. Was The Original Installer Of The Systems And Maintains The Passwords To The Systems. To Date T. R. Joy & Associates Inc. Has Previously Maintained These Systems Under A Warranty, That Warranty Has Since Expired. the Following Services Would Include The Following: -troubleshoot/repair/replace Faulty Parts, Provide Service Evaluation Checks Upon Completion. -semiannual Preventive Maintenance Visit To Perform Checks On Card Reader/door Locks /contacts/power Supplies / Adjustment And Calibration Of Devices And Check The Video Ameg Surveillance System For Errors, Test All Hard Drives. -annual Preventive Maintenance Visit To Perform Database Cleanup/upgrading Of Pam Versions/and Firmware To Ensure Compatibility With Govt Apl Listings - Ficam Engineer To Ensure Ficam Compliant System Is Maintained And Adhered To. Test Connection With Gsa/dod Cards And Ensure Card Certificates Are Maintained. This Includes All Servers To Include The Ameg Video Surveillance System/drives And Storage. Test All Hard Drives. -provide System(s) Operation Training As Needed Or Annually On The Hd Piv class, Symmetry Video, And All Symmetry/ameg Professional Software. -service Calls As Necessary (labor To Correct Doors Not Closing /read Wright /hardware /database Issues /application). -test All Backup Batteries And Replace As Necessary. -provide All Administrator Passwords And Rights To Usace Security personal. -during The Semiannual/annual Check, Back Up The Hid Piv Class Data Base To A Separate Drive To Be Maintained By Usace Security In Case Of Computer Or Server Failure. this Notice Is Not A Request For Competitive Proposals. All Responsible Sources May Submit A Capability Statement, Which Shall Be Considered By The Agency. Capability Statements Must Be Received By The Response Date And Time Of This Notice. Submissions Will Be Reviewed To Determine If They Can Meet The Requirement. A Determination By The Government To Compete This Proposed Modification Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. it Is Anticipated That A New Contract Will Be Made, Within Approximately Thirty (30) Days After The Date Of This Notice Unless The Government Determines That Any Other Organization Has The Capacity To Meet This Requirement. The Approved Justification And Approval (j&a), For This Stand Alone Contract Will Be Posted Following The Closure Of This Notice. response Date: 27 January 2025 At 2:00 P.m. Est please Email Responses To: Mohenda Surage At Mohenda.r.surage@usace.army.mil Or Mr. Nicholas Emanuel At Nicholas.p.emanuel@usace.army.mil contracting Office Address: room 16-300 26 Federal Plaza new York, New York 10278-0090 United States

U S COAST GUARD USA Tender

Aerospace and Defence
United States
Closing Soon19 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Combined Synopsis/solicitation For Commercial Items, Prepared In Accordance With The Format In Subpart 12.6 Of The Far And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes Only Solicitation; Quotes Are Being Requested And A Separate Written Solicitation Will Not Be Issued. solicitation Number52000pr250001777 Applies And Is Used As A Request For Quote (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-05, Effective, 22 May 2024. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded As A Result Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By This Agency. the U.s. Coast Guard, Surface Forces Logistics Center (sflc) Intends To Award A Firm Fixed Price Purchase Order. No Down Payments Or Advanced Payments Will Be Made To The Awarded Vendor. Vendor Shall Ensure They Can Secure Funding For This Order Until Delivered And Received By The Us Coast Guard. Payment Will Be Made By Government Purchase Order (net 30) And The Vendor Shall Assume Financial Responsibility Until The Order Is Accepted And Received By Us Coast Guard. Payment Of The Work Is Authorized To Be Submitted As Work Is Completed But Must Be Approved By The Contracting Officer First. basis For Award:thissolicitation Is Based On Far 13 – Simplified Acquisition Procedures And Quotes Will Be Reviewed And Awarded On A Lowest Priced Technically Acceptable Basis Per The Solicitation. Past Performance Will Only Be Reviewed For “responsibility” Basis Per Far 9.1.there Are No Adjectival Ratings Nor Will Award Be Based On A Best Value Tradeoff Basis.all Quote’s Will Be Evaluated For Who Meets All The Technical Requirements, Next Who Meets Our Deadlines And Finally What Is The Lowest Cost. all Quotes Shall Be Emailed To Skc Bryan Duffey Via Bryan.a.duffey@uscg.mil And Shall Be Received No Later Than 19 January 2025 03:00pm (eastern). All Emailed Quotes Shall Have 52000pr250001777in The Subject Of The Email. item 1: Motor Life Boat (mlb) 47224 Port Engine Removal, Install, And Engine Alignment. place Of Performance: uscg Station Monterey 100 Lighthouse Ave. monterey, Ca 93940 *due To Logistics Of Moving Boat, Vessel Must Be Drydocked Within 20 Miles Of Unit* invoicing In Ipp it Is Now A Requirement That All Invoicing For Purchase Orders Will Now Be Entered And Processed Through Https://www.ipp.gov. far Clauses this Order Is Subject To But Is Not Limited To The Following Federal Acquisition Regulations: far Clauses this Order Is Subject To But Is Not Limited To The Following Federal Acquisition Regulations: 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment. 52.204-26 Covered Telecommunications Equipment Or Services-representation. 52.212-1 Instructions To Offerors—commercial Products And Commercial Services. 52.212-3 Offeror Representations And Certifications—commercial Products And Commercial Services. 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities. 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders—commercial Products And Commercial Services.
4811-4820 of 5125 active Tenders